BEAM B1 25 50 Lt 1
B2 25 50 Balok anak tower
B3 25 45 Lt atap
B4 35 70 Tower
BT 20 40 Balok Anak Tangga
BK 25 50-40 Balok kantilever
TAMPAK ATAS
TAMPAK ATAP
ELEVASI +15.1
ELEVASI 16.4
POTONGAN 9-9
POTONGAN 8-8
POT 8’-8’
POT 7-7
POT 6-6
POT 5-5
POT 4-4
POT 3-3
POT 2-2
POT 2’=2’
POT 1-1
POT 1-1
POT A-A
POT B-B
POT B’-B’
POT C-C
POT D-D
POT E-E
POT F-F
POT G-G
POT H-H
POT I-I
POT J-J
POT J’-J’
POT K-K
POT L-L