ENGINEERING ESTIMATE
VOLUME PERKIRAAN
No. URAIAN PEKERJAAN VOLUME SAT SAT JUMLAH HARGA
LAP HARGA SATUAN
1 CAKAR AYAM 70 X 70
semen 40 8,81 ZAK
pasir beton 0,54 m3
besi 10 13,30 BTG
BESI 6 2,45 BTG
SEMEN 40 0,74 M3
3 SLOEF 20/30
besi 10 8,99 btg
besi 6 10,57 btg
semen 40 14,25 zak
pasir beton 0,88 m3
kerikil 1,19 m3
4 KOLOM 15/30 CM
besi 12 27,30 btg
besi 6 114,66 btg
semen 21,62 zak
pasir beton 1,28 m3
kerikil 1,88 m3
6 BALOK 20/30
besi 12 15,84 btg
besi 6 12,41 btg
semen 14,25 zak
pasir beton 0,85 m3
kerikil 1,24 m3
7 PLAT TEBAL 12
besi 10 43,08 btg
semen 27,38 zak
pasir beton 1,62 m3
kerikil 2,38 m3
9 Plesteran
semen 29,00 zak
pasir pasang 4,46 m3
10 Acian
semen 15,10 zak