PEK.

BETON
V=PxLxT
VOLUME
VOLUME
NO P L T KETERANGAN
(M) (M) (M) M 3

1 2 3 4 5(2x3x4) 6
1 54.5 0.15 0.2 1.635 Beton Sloof
2 0.150 0.150 63.000 1.418 Beton Kolom
3 54.500 0.15 0.200 1.635 Beton Ring Balk
Total 3.053
PEK. BEGISTING
VOLUME
LUAS
NO P L T KETERANGAN
(M) (M) (M) M 2

1 2 3 4 5 6
1 54.50 0.15 0.20 21.80 Begisting Sloof
2 0.15 0.15 63.00 37.80 Begisting Kolom
3 54.50 0.15 0.20 21.80 Begisting Ring Balk
Total 59.600
GALIAN
PANJANG = 27.000
TINGGI = 1.100
LEBAR ATAS = 1.300
LEBAR BAWAH = 1.000
PAS BATU KALI
LEBAR ATAS = 0.300
LEBAR BAWAH = 0.800
TINGGI = 0.800
AANSTAMPING
LEBAR = 1.000
TINGI = 0.200
URUGAN PASIR
LEBAR = 1.000
TINGGI = 0.100
PEK.PONDASI TYPE 1
VOLUME JUMLAH
NO P L T M3 KETERANGAN
(M) (M) (M)
1 2 3 4 5(2X3X4) 6
1 27.00 1.15 1.1 34.155 GALIAN PONDASI MENERUS
2 27.00 0.55 0.80 11.88 PAS BATU KALI
3 27.00 1.00 0.20 5.4 AANSTAMPING
4 27.00 1.00 0.1 2.700 URUGAN PASIR

URUGAN PASIR 14.18

GALIAN
PANJANG = 27.500
TINGGI = 1.050
LEBAR ATAS = 1.050
LEBAR BAWAH = 0.900
PAS BATU KALI
LEBAR ATAS = 0.300
LEBAR BAWAH = 0.800
TINGGI = 0.800
AANSTAMPING
LEBAR = 0.900
TINGI = 0.200
URUGAN PASIR
LEBAR = 0.900
TINGGI = 0.100

PEK.PONDASI TYPE 2
VOLUME JUMLAH
NO P L T M3 KETERANGAN
(M) (M) (M)
1 2 3 4 5(2X3X4) 6
1 27.5 0.975 1.05 28.15313 GALIAN PONDASI MENERUS
2 27.5 0.55 0.80 12.1 PAS BATU KALI
3 27.5 0.90 0.20 4.950 AANSTAMPING
4 27.5 0.90 0.1 2.475 URUGAN PASIR

URUGAN PASIR 8.63


PEK. PONDASI
V=PxLxT
VOLUME
VOLUME
NO P L T KETERANGAN
(M) (M) (M) M3
1 2 3 4 5(2x3x4) 6
A. Galian Pondasi Menerus
1 27.000 1.150 1.100 34.155 Galian Pondasi Tipe 1
2 27.500 0.975 1.050 28.153 Galian Pondasi Tipe 2
Total 62.308
B. Pas. Batu Kali
1 27.000 0.550 0.800 11.880 Pas. Batu Kali Pondasi Tipe 1
2 27.500 0.550 0.800 12.100 Pas. Batu Kali Pondasi Tipe 2
Total 23.980
C. Aanstamping/ Batu Kosong
1 27.000 1.000 0.200 5.400 Aanstamping Pondasi Tipe 1
2 27.500 0.900 0.200 4.950 Aanstamping Pondasi Tipe 2
Total 10.350
D. Urugan Pasir
1 27.000 1.000 0.100 2.700 Urugan Kembali Pondasi Tipe 1
2 27.500 0.900 0.1 2.475 Urugan Kembali Pondasi Tipe 2
Total 5.175
Urugan Kembali Pondasi Tipe 1 14.175 (A2-B2-C2-D2)
Urugan Kembali Pondasi Tipe 2 8.628 (A1-B1-C1-D1)
Total Urugan Kembali 22.803
KOLOM
LEBAR = 0.15
PANJANG = 0.15
TINGGI = 3.5
JUMLAH = 18
SLOOF
PANJANG = 54.5
LEBAR = 0.15
TINGGI = 0.20
RING BALK
PANJANG = 54.5
LEBAR = 0.15
TINGGI = 0.2

PEK. BETON
VOLUME JUMLAH
NO P L T (M3)
(M) (M) (M) KETERANGAN
1 2 3 4 5(2X3X4) 6
1 0.15 0.15 63 1.42 BETON KOLOM
2 54.50 0.15 0.20 1.64 BETON SLOOF
3 54.50 0.15 0.20 1.64 BETON RING BALK

TOTAL 4.69
PEK. BETON
VOLUME JUMLAH
NO P L T (M3)
(M) (M) (M) KETERANGAN
1 2 3 4 5(2X3X4) 6
1 54.50 0.15 0.20 1.64 BETON SLOOF
2 0.15 0.15 63.00 1.42 BETON KOLOM
3 54.50 0.15 0.20 1.64 BETON RING BALK
TOTAL 4.69
KOLOM
LEBAR =
PANJANG =
TINGGI =
JUMLAH =
SLOOF
PANJANG =
LEBAR =
TINGGI =
RING BALK
PANJANG =
LEBAR =
TINGGI =

BEGISTING

NO VOLUME KETERANGAN
JUMLAH
P L T (M3)
(M) (M) (M)
1 2 3 4 5 6
1 0.15 0.15 63 1.35 BEGISTING KOLOM
2 54.50 0.15 0.20 0.70 BEGISTING SLOOF
3 54.50 0.15 0.20 0.700 BEGISTING RING BALK

TOTAL 2.75
0.15
0.15
3.5
18

54.5
0.15
0.20

54.5
0.15
0.2
KOLOM
A. TULANGAN POKOK
∅ TULANGAN = 0.012 m
JUMLAH TULANGAN = 4 buah
TINGGI = 3.5 m
BERAT JENIS = 0.89 kg/m3
JUMLAH KOLOM = 18 buah

B. BEGEL
∅ BESI BEGEL = 0.008 m
PANJANG BEGEL = 0.56 m
JARAK BEGEL = 0.2 m
JUMLAH = 18.5 buah
BERAT JENIS = 0.395 kg/m3
SELIMUT BETON = 0.025 m

RING BALK SLOOF


A. TULANGAN POKOK A. TULANGAN POKOK
∅ TULANGAN = 0.01 m ∅ TULANGAN = 0.01 m
JUMLAH TULANGAN = 4 buah JUMLAH TULANGAN = 4 buah
PANJANG = 54.5 m PANJANG = 54.5 m
BERAT JENIS = 0.62 kg/m3 BERAT JENIS = 0.62 kg/m3

B. BEGEL B. BEGEL
∅ BESI BEGEL = 0.008 m ∅ BESI BEGEL = 0.008 m
PANJANG BEGEL = 0.56 m PANJANG BEGEL = 0.56 m
JARAK BEGEL = 0.2 m JARAK BEGEL = 0.2 m
JUMLAH = 273.5 buah JUMLAH = 273.5 buah
BERAT JENIS = 0.395 kg/m3 BERAT JENIS = 0.395 kg/m3
SELIMUT BETON = 0.025 m SELIMUT BETON = 0.025 m

No Uraian P/bt jumlah p total berat jenis bobot total


keterangan
1 2 3 4(2x3) 5 6(4x5)
1 0.012 3.500 63 220.500 0.890 196.245 tulangan kolom
2 0.008 0.560 333 186.480 0.395 73.660 begel kolom
3 0.010 54.500 4 218.000 0.620 135.160 tulangan sloof
4 0.008 0.560 273.5 153.160 0.395 60.498 begel sloof
5 0.010 54.500 4 218.000 0.620 135.160 tulangan ring balk
6 0.008 0.560 273.5 153.160 0.395 60.498 begel ring balk
BERAT TOTAL KESELURUHAN 661.221
PEK. DINDING & PLESTER

NO URAIAN PANJANG LEBAR TINGGI LUASAN SATUAN


1 LUASAN DINDING KOTOR 44.65 3.5 156.275 M2
LUAS KUSEN J1*7 0.60 1.20 5.04 M2
LUAS KUSEN J2*2 0.60 0.80 0.96 M2
LUAS KUSEN P1*5 0.80 2.10 8.4 M2
LUAS KUSEN P2*1 0.70 2.10 1.47 M2
LUAS KOLOM 1*18 0.15 3.5 9.45 M2
RING BALK 54.5 0.2 10.9 M2
LUASAN DINDING BERSIH 120.055 M2

No Uraian Pekerjaan P L Luasan Kusen Luasan Satuan


1 Pengecatan Dinding 296.45 16.36 280.09 m2
seluruh pengecatan 280.09 m2
Perbandingan Semen dan Pasir 1 : 5 Luas Rumah Berat Semen Volume Pasir Luasan
Luasan Plaster Semen 51.25 6.24 319.80
Luasan Plaster Pasir 51.25 0.024 1.23
Luasan Acian 280.09
2 Pengecatan Kusen Pintu dan Jendela P L Jumlah Luasan Satuan
Luas Kusen P1 2.15 0.90 5 9.675 M2
Luas Kusen P2 2.15 0.80 1 1.72 M2
Luas Kusen J1 1.30 0.70 7 6.37 M2
Luas Kusen J2 0.90 0.70 2 1.26 M2
Total 19.025 M2
3 Pengecatan Daun Pintu dan Jendela
Luas Daun P1 2.10 0.80 5 8.4 M2
Luas Daun P2 2.10 0.70 1 1.47 M2
Luas Daun J1 1.20 0.60 7 5.04 M2
Luas Daun J2 0.80 0.60 2 0.96 M2
Total 15.87 M2
PEKERJAAN ATAP

P/ALAS L T
NO URAIAN JUMLAH VOLUME SATUAN
M M M
LUASAN ATAP 54 M3
1 BENTANG 6
BALOK TARIK 3 0.08 0.12 2 0.058 M3
BALOK KUNCI 1 0.08 0.12 1 0.010 M3
BALOK GAPIT 4.55 0.05 0.10 1 0.023 M3
TIANG KUDA-KUDA 2.97 0.08 0.15 1 0.036 M3
BALOK SOKONG 2.17 0.08 0.12 2 0.042 M3
KAKI KUDA-KUDA 4.78 0.08 0.15 2 0.115 M3
GORDING 7.7 0.08 0.12 1 0.074 M3
BALOK NOK 7.7 0.08 0.12 1 0.074 M3
PAPAN REUTER 7.7 0.02 0.2 1 0.031 M3
MURPLAT 7.7 0.8 0.12 1 0.739 M3
VOLUME TOTAL BENTANG 6 1.200 M3
2 USUK 4 0.05 0.07 42 0.594 M2
3 RENG 4 0.02 0.03 315 0.756 M2
4 GENTING 0.3 0.21 0.063 M2
VOLUME TOTAL 1.413 M2
JUMLAH GENTING=LUAS ATAP/LUAS GENTENG = 857 buah
KUSEN PINTU DAN JENDELA
NO URAIAN TINGGI LEBAR TEBAL JUMLAH VOLUME SATUAN
KUSEN J1 1.8 0.8 0.05 0.15 7 10.08 M3
1 KUSEN J2 1.8 1.1 0.05 0.15 2 3.96 M3
KUSEN J3 0.8 0.6 0.05 0.15 2 0.96 M3
KUSEN P1 2.15 0.9 0.05 0.15 1 1.935 M3
2 KUSEN P2 2.15 0.9 0.05 0.15 4 7.74 M3
KUSEN P3 2.15 0.7 0.05 0.15 2 3.01 M3

DAUN PINTU DAN JENDELA


NO URAIAN TINGGI LEBAR TEBAL JUMLAH VOLUME SATUAN
KUSEN J1 1.7 0.7 0.04 1 0.05 M3
1
KUSEN J2 1.65 0.95 0.04 2 0.13 M3
KUSEN P1 2.1 0.8 0.04 1 0.07 M3
2 KUSEN P2 2.1 0.8 0.04 4 0.27 M3
KUSEN P3 2.1 0.6 0.04 2 0.10 M3

KACA JENDELA
NO URAIAN TINGGI LEBAR TEBAL JUMLAH LUASAN SATUAN
KACA J1 1.5 0.1 0.003 1 0.1500 M3
1
KACA J2 1.45 0.55 0.003 2 0.7975 M3

URAIAN JUMLAH SATUAN


JUMLAH DAUN PINTU 7 BUAH
JUMLAH DAUN JENDELA 5 BUAH
ROSTER 1 2 BUAH
ROSTER 2 5 BUAH
ROSTER 3 1 BUAH
ROSTER 4 1 BUAH
ROSTER 5 1 BUAH
KACA #REF! M3
Pek. Kusen
TINGGI LEBAR TEBAL VOLUME
NO JUMLAH KETERANGAN
(M) (M) (M) M3
I II III IV V VI VII VIII
1 2.15 0.90 0.05 0.15 5 0.20 Kusen Pintu 1
2 2.15 0.80 0.05 0.15 1 0.04 Kusen Pintu 2
3 1.3 0.7 0.05 0.15 7 0.21 Kusen Jendela 1
4 0.9 0.7 0.05 0.15 2 0.05 Kusen Jendela 2
Total 0.49

Pek. Daun
TINGGI LEBAR TEBAL LUASAN KETERANGAN
NO JUMLAH
(M) (M) (M) (M2)
I II III IV V VI VII
1 2.10 0.80 0.04 5 8.40 Daun Pintu 1
2 2.10 0.70 0.04 1 1.47 Daun Pintu 2
3 1.20 0.60 0.04 7 5.04 Daun Jendela 1
4 0.80 0.60 1.04 2 0.96 Daun Jendela 2
Total 15.87

Pek. Kaca
NO TINGGI LEBAR TEBAL JUMLAH VOLUME KETERANGAN
(M) (M) (M) M 3

I II III IV VI VII IX
1 1.00 0.40 0.005 7 2.8 Kaca Jendela 1
2 0.60 0.40 0.005 2 0.48 Kaca Jendela 2
Total 3.28
PEKERJAAN LANTAI
KERAMIK LUASAN
NO URAIAN PANJANG LEBAR JUMLAH SATUAN
M2 M2
1 KERAMIK 20x20 cm 0.4 0.4 0.16 2.4975 280 buah
2 KERAMIK 40x40 cm 0.2 0.2 0.04 44.8495 62 buah
LUAS LANTAI 47.347 M2
TOTAL 343 buah
REKAPITULASI
PEMBANGUNAN RUMAH TINGGAL
TYPE 36/60
KENDAL

NO URAIAN PEKERJAAN JUMLAH HARGA


A PEKERJAAN PERSIAPAN
B PEKERJAAN TANAH DAN PONDASI
C PEKERJAAN PASANGAN DAN PLASTERAN
D PEKERJAAN BETON BERTULANG
E PEKERJAAN LANTAI
F PEKERJAAN PINTU, JENDELA DAN KUNCI
G PEKERJAAN ATAP DAN PLAFOND
H PEKERJAAN INSTALASI LISTRIK
I PEKERJAAN PENGECATAN
J PEKERJAAN PLUMBING
JUMLAH
SUB TOTAL
DIBULATKAN
TERBILANG :

........, Januari 2021

Nama
Jabatan
PEMBANGUNAN RUMAH TINGGAL

KENDAL

HARGA SATUAN JUMLAH HARGA


NO. URAIAN PEKERJAAN VOLUME SAT. ANALISA NILAI BOBOT
(RP) (RP)

1 2 3 4 5 6 7=3x6
A PEKERJAAN PERSIAPAN

1 Pembersihan Lapangan 1.00 Ls Dihitung Rp 1,000,000.00 Rp 1,000,000.00 0.406


2 Pengukuran / Pemasangan Bouplank 1.00 Ls Dihitung Rp 3,000,000.00 Rp 3,000,000.00 1.217
Jumlah Rp 4,000,000.00
B PEKERJAAN TANAH DAN PONDASI

1 Galian Tanah Pondasi Menerus 62.31 m3 A.2.3.1.2. Rp 89,347.00 Rp 5,567,044.04 2.258


2 Urugan Kembali Galian Pondasi Menerus 22.80 m3 A.2.3.1.9. Rp 24,337.00 Rp 554,959.65 0.225
3 Urugan Pasir 10cm 5.18 m3 A.2.3.1.11. Rp 253,341.00 Rp 1,311,039.68 0.532
4 Pas. Batu Kosong / Aanstamping 10.35 m3 A.3.2.1.9. Rp 624,413.00 Rp 6,462,674.55 2.621
5 Pas. Pondasi Batu Kali 23.98 m3 A.3.2.1.3. Rp 1,063,879.00 Rp 25,511,818.42 10.345
Jumlah Rp 39,407,536.34
C PEKERJAAN BETON BERTULANG

1 Pekerjaan Sloof 15/20


Beton K-250 1.64 m3 A.4.1.1.8. Rp 1,321,089.00 Rp 2,159,980.52 0.876
Besi Tulangan Pokok ø 10 135.16 kg A.4.1.1.17.a Rp 12,960.00 Rp 1,751,673.60 0.710
Besi Tulangan Sengkang ø 8 - 20 cm 60.50 kg A.4.1.1.17.a Rp 12,960.00 Rp 784,056.67 0.318
Bekisting 0.70 m2 A.4.1.1.21.b Rp 88,165.00 Rp 61,715.50 0.025

2 Pekerjaan Kolom 15/15


Beton K-250 1.42 m3 A.4.1.1.8. Rp 1,321,089.00 Rp 1,872,643.66 0.759
Besi Tulangan Pokok ø 12 196.25 kg A.4.1.1.17.a Rp 12,960.00 Rp 2,543,335.20 1.031
Besi Tulangan Sengkang ø 8 - 20 cm 73.66 kg A.4.1.1.17.a Rp 12,960.00 Rp 954,628.42 0.387
Bekisting 1.35 m2 A.4.1.1.22.a Rp 173,047.00 Rp 233,613.45 0.095

3 Pekerjaan Ring Balok 15/20


Beton K-250 1.64 m3 A.4.1.1.8. Rp 1,321,089.00 Rp 2,159,980.52 0.876
Besi Tulangan Pokok ø 10 135.16 kg A.4.1.1.17.a Rp 12,960.00 Rp 1,751,673.60 0.710
Besi Tulangan Sengkang ø 8 - 20 cm 60.50 kg A.4.1.1.17.a Rp 12,960.00 Rp 784,056.67 0.318
Bekisting 0.70 m2 A.4.1.1.23.a Rp 279,428.00 Rp 195,599.60 0.079
Jumlah Rp 15,252,957.40
D PEKERJAAN PASANGAN DAN PLASTERAN

1 Pasangan batu bata 1 : 5 1 PC : 5 PP 120.06 m2 A.4.4.1.4. Rp 262,805.00 Rp 31,551,054.28 12.794


Jumlah Rp 31,551,054.28
E PEKERJAAN LANTAI

1 Urugan Pasir Bawah Lantai 47.35 m3 A.2.3.1.11. Rp 253,341.00 Rp 11,994,936.33 4.864


2 Rabat Beton 1:3:5 47.35 m3 A.4.1.1.1.a Rp 1,017,421.00 Rp 48,171,832.09 19.534
3 Pas. Keramik Lantai 20/20 2.50 m2 A.4.4.3.36.1 Rp 212,795.00 Rp 531,455.51 0.216
4 Pas. Keramik Lantai 40/40 44.85 m2 A.4.4.3.34.5 Rp 203,797.00 Rp 9,140,193.55 3.706
Jumlah Rp 69,838,417.48
F PEKERJAAN PINTU, JENDELA DAN KUNCI

1 Pas. Pintu P1 80/210


Kusen Pintu 0.20 m3 A.4.6.1.29. Rp 13,308,900.00 Rp 2,595,235.50 1.052
Daun Pintu 5.00 Buah A.4.2.1.45 Rp 2,549,001.00 Rp 12,745,005.00 5.168
AKSESORIS PINTU P1
Handle Pintu 1.00 Buah A.4.6.2.12. Rp 161,221.00 Rp 161,221.00 0.065
Kunci Pintu (Standar) 15.00 Buah A.4.6.2.2. Rp 106,012.00 Rp 1,590,180.00 0.645
Engsel Pintu 15.00 Buah A.4.6.2.5. Rp 69,144.00 Rp 1,037,160.00 0.421

2 Pas. Pintu P2 70/210


Kusen Pintu 0.04 m3 A.4.6.1.29. Rp 13,308,900.00 Rp 509,065.43 0.206
Daun Pintu 1.00 Buah A.4.2.1.44 Rp 2,257,728.00 Rp 2,257,728.00 0.916
AKSESORIS PINTU P2
Handle Pintu 1.00 Buah A.4.6.2.12. Rp 161,221.00 Rp 161,221.00 0.065
Kunci Pintu (Standar) 3.00 Buah A.4.6.2.2. Rp 106,012.00 Rp 318,036.00 0.129
Engsel Pintu 3.00 Buah A.4.6.2.5. Rp 69,144.00 Rp 207,432.00 0.084

3 Pas. Jendela J1 60/120


Kusen Jendela 0.21 m3 A.4.6.1.29. Rp 13,308,900.00 Rp 2,794,869.00 1.133
Daun Jendela 7.00 Buah A.4.2.1.48 Rp 1,299,301.00 Rp 9,095,107.00 3.688
- Kaca 5 mm 2.80 m2 A.4.6.2.17. Rp 150,819.00 Rp 422,293.20 0.171
- Hak Angin / Gagang Jendela 14.00 Buah A.4.6.2.9. Rp 39,726.00 Rp 556,164.00 0.226
- Engsel Jendela 14.00 Buah A.4.6.2.6. Rp 36,192.00 Rp 506,688.00 0.205
4 Jendela J2 60/80
Kusen Jendela 0.05 m3 A.4.6.1.29. Rp 13,308,900.00 Rp 638,827.20 0.259
Daun Jendela 2.00 Buah A.4.2.1.50 Rp 986,138.00 Rp 1,972,276.00 0.800
- Kaca 5 mm 0.48 m2 A.4.6.2.17. Rp 150,819.00 Rp 72,393.12 0.029
- Hak Angin / Gagang Jendela 4.00 Buah A.4.6.2.9. Rp 39,726.00 Rp 158,904.00 0.064
- Engsel Jendela 4.00 Buah A.4.6.2.6. Rp 36,192.00 Rp 144,768.00 0.059
Jumlah Rp 37,944,573.45
G PEKERJAAN ATAP DAN PLAFOND

1 Rangka kuda-kuda kayu (gording, nok, papan reuter, murplat, 1.20 m3 A.4.6.1.34. Rp 11,785,730.00 Rp 14,140,683.85 5.734
kaki kuda-kuda, balok gapit, balok kunci, balok tarik)

2 Penutup Atap (usuk dan reng) 1.35 m3 A.4.6.1.17.a Rp 219,519.00 Rp 296,350.65 0.120
3 penutup atap Genteng 54.00 M2 A.4.5.2.51. Rp 240,504.00 Rp 12,987,216.00 5.266
4 bubungan 7.70 M1 A.4.5.2.52. Rp 118,661.00 Rp 913,689.70 0.371
5 Rangka Plafond Kayu Klas II 47.35 M2 A.4.5.1.10.2 Rp 85,827.00 Rp 4,063,650.97 1.648
6 plafond gipsum 47.35 M2 A.4.5.1.7. Rp 43,981.00 Rp 2,082,368.41 0.844
7 Kayu List Plafond 65.90 M1 A.4.5.1.9. Rp 16,093.00 Rp 1,060,528.70 0.430
Jumlah Rp 35,544,488.280
I PEKERJAAN PENGECATAN

1 Cat Dinding Luar 93.10 m2 A.4.7.1.10.b Rp 59,048.00 Rp 5,497,368.80 2.229


2 Cat Dinding Dalam 203.35 m2 A.4.7.1.10. Rp 32,219.00 Rp 6,551,733.65 2.657
4 Cat Kusen, Daun Pintu / Jendela 16.36 m2 A.4.7.1.5. Rp 61,930.00 Rp 1,013,252.21 0.411
Jumlah Rp 13,062,354.66
Jumlah Total Rp 246,601,381.88 100.000
TIME SCHEDULE

WAKTU PELAKSANNAN
JUMLAH HRG NILAI
NO. URAIAN PEKERJAAN VOL. SAT. Agustus September Oktober
(RP) BOBOT
Minggu 1 Minggu 2 Minggu 3 Minggu 4 Minggu 5 Minggu 6 Minggu 7 Minggu 8 Minggu 9 Minggu 10 Minggu 11 Minggu 12 Minggu 13 Minggu 14
1 2 3 4 5 6 01-07 08-14 15-21 22-28 29-04 05-11 12-18 19-25 26-02 03-09 10-16 17-23 24-30 31
A PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan 1.00 Ls 1,000,000.00 0.406 0.406
2 Pengukuran / Pemasangan Bouplank 1.00 Ls 3,000,000.00 1.217 1.217

B PEKERJAAN TANAH DAN PONDASI


1 Galian Tanah Pondasi Menerus 62.31 m3 5,567,044.04 2.258 2.258
2 Urugan Kembali Galian Pondasi Menerus 22.80 m3 554,959.65 0.225 0.113 0.113
3 Urugan Pasir 10cm 5.18 m3 1,311,039.68 0.532 0.266 0.266
4 Pas. Batu Kosong / Aanstamping 10.35 m3 6,462,674.55 2.621 1.310 1.310
5 Pas. Pondasi Batu Kali 23.98 m3 25,511,818.42 10.345 5.173 5.173

C PEKERJAAN BETON BERTULANG


1 Pekerjaan Sloof 15/20
Beton K-250 1.64 m3 2,159,980.52 0.876 0.876
Besi Tulangan Pokok ø 10 135.16 kg 1,751,673.60 0.710 0.355 0.355
Besi Tulangan Sengkang ø 8 - 20 cm 60.50 kg 784,056.67 0.318 0.159 0.159
Bekisting 0.70 m2 61,715.50 0.025 0.025

2 Pekerjaan Kolom 15/15


Beton K-250 1.42 m3 1,872,643.66 0.759 0.759
Besi Tulangan Pokok ø 12 196.25 kg 2,543,335.20 1.031 1.031
Besi Tulangan Sengkang ø 8 - 20 cm 73.66 kg 954,628.42 0.387 0.387
Bekisting 1.35 m2 233,613.45 0.095 0.095

3 Pekerjaan Ring Balok 15/20


Beton K-250 1.64 m3 2,159,980.52 0.876 0.876
Besi Tulangan Pokok ø 10 135.16 kg 1,751,673.60 0.710 0.710
Besi Tulangan Sengkang ø 8 - 20 cm 60.50 kg 784,056.67 0.318 0.318
Bekisting 0.70 m2 195,599.60 0.079 0.079
D PEKERJAAN PASANGAN DAN PLASTERAN
1 Pasangan batu bata 1 : 5 1 PC : 5 PP 120.06 m2 31,551,054.28 12.794 6.397 6.397

E PEKERJAAN LANTAI
1 Urugan Pasir Bawah Lantai 47.35 m3 11,994,936.33 4.864 4.864
2 Rabat Beton 1:3:5 47.35 m3 48,171,832.09 19.534 9.767 9.767
3 Pas. Keramik Lantai 20/20 2.50 m2 531,455.51 0.216 0.216
4 Pas. Keramik Lantai 40/40 44.85 m2 9,140,193.55 3.706 3.706

F PEKERJAAN PINTU, JENDELA DAN KUNCI


1 Pas. Pintu P1 80/210
Kusen Pintu 0.20 m3 2,595,235.50 1.052 1.052
Daun Pintu 5.00 Buah 12,745,005.00 5.168 5.168
AKSESORIS PINTU P1
Handle Pintu 1.00 Buah 161,221.00 0.065 0.065
Kunci Pintu (Standar) 15.00 Buah 1,590,180.00 0.645 0.645
Engsel Pintu 15.00 Buah 1,037,160.00 0.421 0.421

2 Pas. Pintu P2 70/210


Kusen Pintu 0.04 m3 509,065.43 0.206 0.206
Daun Pintu 1.00 Buah 2,257,728.00 0.916 0.916
AKSESORIS PINTU P2
Handle Pintu 1.00 Buah 161,221.00 0.065 0.065
Kunci Pintu (Standar) 3.00 Buah 318,036.00 0.129 0.129
Engsel Pintu 3.00 Buah 207,432.00 0.084 0.084

3 Pas. Jendela J1 60/120


Kusen Jendela 0.21 m3 2,794,869.00 1.133 1.133
Daun Jendela 7.00 Buah 9,095,107.00 3.688 3.688
- Kaca 5 mm 2.80 m2 422,293.20 0.171 0.171
- Hak Angin / Gagang Jendela 14.00 Buah 556,164.00 0.226 0.226
- Engsel Jendela 14.00 Buah 506,688.00 0.205 0.205

4 Jendela J2 60/80
Kusen Jendela 0.05 m3 638,827.20 0.259 0.259
Daun Jendela 2.00 Buah 1,972,276.00 0.800 0.800
- Kaca 5 mm 0.48 m2 72,393.12 0.029 0.029
- Hak Angin / Gagang Jendela 4.00 Buah 158,904.00 0.064 0.064
- Engsel Jendela 4.00 Buah 144,768.00 0.059 0.059
G PEKERJAAN ATAP DAN PLAFOND
1 Rangka kuda-kuda kayu (gording, papan reuter, murplat, 1.20 m3 14,140,683.85 5.734 5.734
nok, kaki kuda-kuda, balok gapit, balok kunci, balok tarik)
2 Penutup Atap (usuk dan reng) 1.35 m3 296,350.65 0.120 0.120
3 penutup atap Genteng 54.00 M2 12,987,216.00 5.266 5.266
4 bubungan 7.70 M1 913,689.70 0.371 0.371
5 Rangka Plafond Kayu Klas II 47.35 M2 4,063,650.97 1.648 1.648
6 plafond gipsum 47.35 M2 2,082,368.41 0.844 0.844
7 Kayu List Plafond 65.90 M1 1,060,528.70 0.430 0.430

I PEKERJAAN PENGECATAN
1 Cat Dinding Luar 93.10 m2 5,497,368.80 2.229 2.229
2 Cat Dinding Dalam 203.35 m2 6,551,733.65 2.657 2.657
4 Cat Kusen, Daun Pintu / Jendela 16.36 m2 1,013,252.21 0.411 0.411

Sub Total 246,601,381.88 100.000


Rencana 10.741 7.376 12.910 7.251 6.689 5.757 2.922 14.631 13.689 5.297 12.736 - - -
Komulatif Rencana 10.741 18.116 31.027 38.278 44.967 50.725 53.647 68.278 81.967 87.264 100.000 100.000
Realisasi

120.000

100.000

80.000

60.000

40.000

20.000

-
1 2 3 4 5 Row 106
6 7 8 9 10 11
LAPORAN MINGGUAN
Minggu ke : Kesatu
Tanggal : 01 s.d. 07 Agustus 2022

HASIL PEKERJAAN %
JUMLAH HRG NILAI
NO. URAIAN PEKERJAAN VOLUME BOBOT JENIS
(RP) BOBOT MINGGU LALU MINGGU INI JUMLAH
% PEKERJAAN
1 2 3 4 5 6 7 8 9 10
A PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan 1.00 Ls 1,000,000.00 0.406 1.00 Ls 1.00 Ls 0.406 100
2 Pengukuran / Pemasangan Bouplank 1.00 Ls 3,000,000.00 1.217 1.00 Ls 1.00 Ls 1.217 100

B PEKERJAAN TANAH DAN PONDASI


1 Galian Tanah Pondasi Menerus 62.31 m3 5,567,044.04 2.258 62.31 m3 62.31 m3 2.258 100
2 Urugan Kembali Galian Pondasi Menerus 22.80 m3 554,959.65 0.225 11.40 m3 11.40 m3 0.113 50
3 Urugan Pasir 10cm 5.18 m3 1,311,039.68 0.532 2.59 m3 2.59 m3 0.266 50
4 Pas. Batu Kosong / Aanstamping 10.35 m3 6,462,674.55 2.621 5.18 m3 5.18 m3 1.310 50
5 Pas. Pondasi Batu Kali 23.98 m3 25,511,818.42 10.345 11.99 m3 11.99 m3 5.173 50

C PEKERJAAN BETON BERTULANG


1 Pekerjaan Sloof 15/20
Beton K-250 1.64 m3 2,159,980.52 0.876
Besi Tulangan Pokok ø 10 135.16 kg 1,751,673.60 0.710
Besi Tulangan Sengkang ø 8 - 20 cm 60.50 kg 784,056.67 0.318
Bekisting 0.70 m2 61,715.50 0.025

2 Pekerjaan Kolom 15/15


Beton K-250 1.42 m3 1,872,643.66 0.759
Besi Tulangan Pokok ø 12 196.25 kg 2,543,335.20 1.031
Besi Tulangan Sengkang ø 8 - 20 cm 73.66 kg 954,628.42 0.387
Bekisting 1.35 m2 233,613.45 0.095

3 Pekerjaan Ring Balok 15/20


Beton K-250 1.64 m3 2,159,980.52 0.876
Besi Tulangan Pokok ø 10 135.16 kg 1,751,673.60 0.710
Besi Tulangan Sengkang ø 8 - 20 cm 60.50 kg 784,056.67 0.318
Bekisting 0.70 m2 195,599.60 0.079
D PEKERJAAN PASANGAN DAN PLASTERAN
1 Pasangan batu bata 1 : 5 1 PC : 5 PP 120.06 m2 31,551,054.28 12.794

E PEKERJAAN LANTAI
1 Urugan Pasir Bawah Lantai 47.35 m3 11,994,936.33 4.864
2 Rabat Beton 1:3:5 47.35 m3 48,171,832.09 19.534
3 Pas. Keramik Lantai 20/20 2.50 m2 531,455.51 0.216
4 Pas. Keramik Lantai 40/40 44.85 m2 9,140,193.55 3.706

F PEKERJAAN PINTU, JENDELA DAN KUNCI


1 Pas. Pintu P1 80/210
Kusen Pintu 0.20 m3 2,595,235.50 1.052
Daun Pintu 5.00 Buah 12,745,005.00 5.168
AKSESORIS PINTU P1
Handle Pintu 1.00 Buah 161,221.00 0.065
Kunci Pintu (Standar) 15.00 Buah 1,590,180.00 0.645
Engsel Pintu 15.00 Buah 1,037,160.00 0.421

2 Pas. Pintu P2 70/210


Kusen Pintu 0.04 m3 509,065.43 0.206
Daun Pintu 1.00 Buah 2,257,728.00 0.916
AKSESORIS PINTU P2
Handle Pintu 1.00 Buah 161,221.00 0.065
Kunci Pintu (Standar) 3.00 Buah 318,036.00 0.129
Engsel Pintu 3.00 Buah 207,432.00 0.084

3 Pas. Jendela J1 60/120


Kusen Jendela 0.21 m3 2,794,869.00 1.133
Daun Jendela 7.00 Buah 9,095,107.00 3.688
- Kaca 5 mm 2.80 m2 422,293.20 0.171
- Hak Angin / Gagang Jendela 14.00 Buah 556,164.00 0.226
- Engsel Jendela 14.00 Buah 506,688.00 0.205

4 Jendela J2 60/80
Kusen Jendela 0.05 m3 638,827.20 0.259
Daun Jendela 2.00 Buah 1,972,276.00 0.800
- Kaca 5 mm 0.48 m2 72,393.12 0.029
- Hak Angin / Gagang Jendela 4.00 Buah 158,904.00 0.064
- Engsel Jendela 4.00 Buah 144,768.00 0.059
G PEKERJAAN ATAP DAN PLAFOND
1 Rangka kuda-kuda kayu (gording, papan reuter, murplat, 1.20 m3 14,140,683.85 5.734
nok, kaki kuda-kuda, balok gapit, balok kunci, balok tarik)
2 Penutup Atap (usuk dan reng) 1.35 m3 296,350.65 0.120
3 penutup atap Genteng 54.00 M2 12,987,216.00 5.266
4 bubungan 7.70 M1 913,689.70 0.371
5 Rangka Plafond Kayu Klas II 47.35 M2 4,063,650.97 1.648
6 plafond gipsum 47.35 M2 2,082,368.41 0.844
7 Kayu List Plafond 65.90 M1 1,060,528.70 0.430

I PEKERJAAN PENGECATAN
1 Cat Dinding Luar 93.10 m2 5,497,368.80 2.229
2 Cat Dinding Dalam 203.35 m2 6,551,733.65 2.657
3 Cat Kusen, Daun Pintu / Jendela 16.36 m2 1,013,252.21 0.411

Sub Total 246,601,381.88 100

Realisasi 10.741 %
Rencana 10.741 %
Deviasi - %

LAPORAN MINGGUAN
Minggu ke : Kedua
Tanggal : 08 s.d. 14 Agustus 2022

HASIL PEKERJAAN %
JUMLAH HRG NILAI
NO. URAIAN PEKERJAAN VOLUME BOBOT JENIS
(RP) BOBOT MINGGU LALU MINGGU INI JUMLAH
% PEKERJAAN
1 2 3 4 5 6 7 8 9 10
A PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan 1.00 Ls 1,000,000.00 0.406 1.00 Ls 1.00 Ls 0.406 100.000
2 Pengukuran / Pemasangan Bouplank 1.00 Ls 3,000,000.00 1.217 1.00 Ls 1.00 Ls 1.217 100.000

B PEKERJAAN TANAH DAN PONDASI


1 Galian Tanah Pondasi Menerus 62.31 m3 5,567,044.04 2.258 62.31 m3 62.31 m3 2.258 100.000
2 Urugan Kembali Galian Pondasi Menerus 22.80 m3 554,959.65 0.225 11.40 m3 11.40 m3 22.80 m3 0.225 100.000
3 Urugan Pasir 10cm 5.18 m3 1,311,039.68 0.532 2.59 m3 2.59 m3 5.18 m3 0.532 100.000
4 Pas. Batu Kosong / Aanstamping 10.35 m3 6,462,674.55 2.621 5.18 m3 5.18 m3 10.35 m3 2.621 100.000
5 Pas. Pondasi Batu Kali 23.98 m3 25,511,818.42 10.345 11.99 m3 11.99 m3 23.98 m3 10.345 100.000

C PEKERJAAN BETON BERTULANG


1 Pekerjaan Sloof 15/20
Beton K-250 1.64 m3 2,159,980.52 0.876
Besi Tulangan Pokok ø 10 135.16 kg 1,751,673.60 0.710 67.58 kg 67.58 kg 0.355 50.000
Besi Tulangan Sengkang ø 8 - 20 cm 60.50 kg 784,056.67 0.318 30.25 kg 30.25 kg 0.159 50.000
Bekisting 0.70 m2 61,715.50 0.025

2 Pekerjaan Kolom 15/15


Beton K-250 1.42 m3 1,872,643.66 0.759
Besi Tulangan Pokok ø 12 196.25 kg 2,543,335.20 1.031
Besi Tulangan Sengkang ø 8 - 20 cm 73.66 kg 954,628.42 0.387
Bekisting 1.35 m2 233,613.45 0.095

3 Pekerjaan Ring Balok 15/20


Beton K-250 1.64 m3 2,159,980.52 0.876
Besi Tulangan Pokok ø 10 135.16 kg 1,751,673.60 0.710
Besi Tulangan Sengkang ø 8 - 20 cm 60.50 kg 784,056.67 0.318
Bekisting 0.70 m2 195,599.60 0.079

D PEKERJAAN PASANGAN DAN PLASTERAN


1 Pasangan batu bata 1 : 5 1 PC : 5 PP 120.06 m2 31,551,054.28 12.794

E PEKERJAAN LANTAI
1 Urugan Pasir Bawah Lantai 47.35 m3 11,994,936.33 4.864
2 Rabat Beton 1:3:5 47.35 m3 48,171,832.09 19.534
3 Pas. Keramik Lantai 20/20 2.50 m2 531,455.51 0.216
4 Pas. Keramik Lantai 40/40 44.85 m2 9,140,193.55 3.706

F PEKERJAAN PINTU, JENDELA DAN KUNCI


1 Pas. Pintu P1 80/210
Kusen Pintu 0.20 m3 2,595,235.50 1.052
Daun Pintu 5.00 Buah 12,745,005.00 5.168
AKSESORIS PINTU P1
Handle Pintu 1.00 Buah 161,221.00 0.065
Kunci Pintu (Standar) 15.00 Buah 1,590,180.00 0.645
Engsel Pintu 15.00 Buah 1,037,160.00 0.421

2 Pas. Pintu P2 70/210


Kusen Pintu 0.04 m3 509,065.43 0.206
Daun Pintu 1.00 Buah 2,257,728.00 0.916
AKSESORIS PINTU P2
Handle Pintu 1.00 Buah 161,221.00 0.065
Kunci Pintu (Standar) 3.00 Buah 318,036.00 0.129
Engsel Pintu 3.00 Buah 207,432.00 0.084

3 Pas. Jendela J1 60/120


Kusen Jendela 0.21 m3 2,794,869.00 1.133
Daun Jendela 7.00 Buah 9,095,107.00 3.688
- Kaca 5 mm 2.80 m2 422,293.20 0.171
- Hak Angin / Gagang Jendela 14.00 Buah 556,164.00 0.226
- Engsel Jendela 14.00 Buah 506,688.00 0.205

4 Jendela J2 60/80
Kusen Jendela 0.05 m3 638,827.20 0.259
Daun Jendela 2.00 Buah 1,972,276.00 0.800
- Kaca 5 mm 0.48 m2 72,393.12 0.029
- Hak Angin / Gagang Jendela 4.00 Buah 158,904.00 0.064
- Engsel Jendela 4.00 Buah 144,768.00 0.059

G PEKERJAAN ATAP DAN PLAFOND


1 Rangka kuda-kuda kayu (gording, papan reuter, murplat, 1.20 m3 14,140,683.85 5.734
nok, kaki kuda-kuda, balok gapit, balok kunci, balok tarik)
2 Penutup Atap (usuk dan reng) 1.35 m3 296,350.65 0.120
3 penutup atap Genteng 54.00 M2 12,987,216.00 5.266
4 bubungan 7.70 M1 913,689.70 0.371
5 Rangka Plafond Kayu Klas II 47.35 M2 4,063,650.97 1.648
6 plafond gipsum 47.35 M2 2,082,368.41 0.844
7 Kayu List Plafond 65.90 M1 1,060,528.70 0.430

I PEKERJAAN PENGECATAN
1 Cat Dinding Luar 93.10 m2 5,497,368.80 2.229
2 Cat Dinding Dalam 203.35 m2 6,551,733.65 2.657
3 Cat Kusen, Daun Pintu / Jendela 16.36 m2 1,013,252.21 0.411

Sub Total 246,601,381.88 100.00

Realisasi 18.116 %
Rencana 18.116 %
Deviasi - %
BACK UP DATA VOLUME PEKERJAAN

NO PERHITUNGAN VOLUME SATUAN

A. PEKERJAAN PERSIAPAN
1. Pembersihan Lapangan
Lebar = 8.00 m
Panjang = 13 m
Luas = (PxL)
= 104.00 M²

2. Pemasangan Bouwplank
Lebar = 10.00 m
Panjang = 15 m
Keliling = 2 (P + L )
= 50.00 M

B. PEKERJAAN TANAH DAN PONDASI


1 Galian Pondasi Menerus
Lebar atas = 0.30 m
Lebar bawah = 0.70 m
Tinggi = 0.80 m
Panjang = 55.00 m

Volume = ((lebar atas + lebar bawah)/2) x tinggi x panjang


= 22.000 M³

2 Urugan Kembali Pondasi Menerus


Volume = Galian Pondasi Menerus - Urugan Pasir - Batu Kosong - P. Batu Kali
= M³

3 Urugan Pasir
Lebar atas = 0.80 m
Lebar bawah = 0.80 m
Tinggi = 0.10 m
Panjang = 55.00 m

Volume = ((lebar atas + lebar bawah)/2) x tinggi x panjang


= 4.40 M³

4 Aanstamping / Batu Kosong


Lebar atas = 0.80 m
Lebar bawah = 0.80 m
Tinggi = 0.20 m
Panjang = 55.00 m

Volume = ((lebar atas + lebar bawah)/2) x tinggi x panjang


= 8.8 M³

5 Pas. Batu Kali


Lebar atas = 0.30 m
Lebar bawah = 0.70 m
Tinggi = 0.80 m
Panjang = 55.00 m

Volume = ((lebar atas + lebar bawah)/2) x tinggi x panjang


= 22.000 M³

C. Pekerjaan Beton Bertulang


1.a Beton Sloof (15/20)
Tinggi = 0.15 m
Lebar = 0.20 m
Panjang = 55.00 m

Volume = (PxLxT)
= 1.65 M³

1.b Besi Tulangan Pokok


Jumlah Tul. Pokok = 4.00 btg
Ø Tul. Pokok = 10.00 mm
Panjang Sloof = 55.00 m
Berat Jenis = 7.40 kg/m3

Volume = ( Jmlh Tul x P x Berat Jenis Tulangan )


= 1628.00 KG

1.c. Besi Tulangan Sengkang / Begel


Ø Tul. Begel = 0.08 mm
B
Jarak Begel = 0.15 mm
Panjang Begel = 0.35 mm
= ((B - (2xselimut beton)) + (H - (2xselimut beton)) + (2 x 6d))
=
Jumlah Begel = bh
= ( P Tul.Pokok / Jarak Begel) + 1
=
Volume = ( Jmlh Begel x P x Berat Jenis Tulangan )
= KG
1.d Bekisting Sloof
Tinggi = 0.20 m
Panjang = 55 m

Volume = (2xTxP)
= M2

2.a Beton Kolom KP (15/15)


Tinggi = m
Lebar = m
Panjang = m
Jumlah = bh

Volume = ( P x L x T ) x Unit
= M³

2.b Besi Tulangan Pokok


Jumlah Tul. Pokok = btg
Ø Tul. Pokok = mm
Tinggi Kolom = m
Berat Jenis = kg/m3
Jumlah Kolom = bh

Volume = ( Jmlh Tul x T x Berat Jenis Tulangan ) x Jmlh Kolom


= KG

2.c. Besi Tulangan Sengkang / Begel B


Ø Tul. Begel = mm
Jarak Begel = mm
Panjang Begel = mm H
= ((B - (2xselimut beton)) + (H - (2xselimut beton)) + (2 x 6d))
=
Jumlah Begel = bh
= ( P Tul.Pokok / Jarak Begel) + 1
=
Volume = ( Jmlh Begel x P x Berat Jenis Tulangan )
= KG

2.d Bekisting Kolom


Panjang = m
Lebar = m
Tinggi = m
Jumlah = bh

Volume = (( 2 x P ) + ( 2 x L) x T) x Jumlah
= M2

3.a Beton Ring Balk (15/15)


Tinggi = m
Lebar = m
Panjang = m

Volume = (PxLxT)
= M³

3.b Besi Tulangan Pokok


Jumlah Tul. Pokok = btg
Ø Tul. Pokok = mm
Panjang Balok = m
Berat Jenis = kg/m3

Volume = ( Jmlh Tul x P x Berat Jenis Tulangan )


= KG

3.c. Besi Tulangan Sengkang / Begel B

Ø Tul. Begel = mm
H

Jarak Begel = mm
Panjang Begel = mm
= ((B - (2xselimut beton)) + (H - (2xselimut beton)) + (2 x 6d))
=
Jumlah Begel = bh
= ( P Tul.Pokok / Jarak Begel) + 1
=
Volume = ( Jmlh Begel x P x Berat Jenis Tulangan )
= KG
3.d Bekisting Sloof
Tinggi = m
Panjang = m

Volume = (2xTxP)
= M2

D PEKERJAAN DINDING DAN PLASTERAN


1 Pas. Dinding Bata 1 : 2
Tinggi = m
Panjang = m

Luas = (PxT)
= M²

Selasar
Tinggi = m
Panjang = m

Luas = (PxT)
= M²
Pengurang (Pintu, Jendela, Bouven, dll)
Pintu P1
Tinggi = m
Lebar = m
Jumlah = unit

Luas = ( L x T ) x unit
= M²

Volume Dinding Bata 1 : 2 + Selasar - Luas Kusen Pintu


= M²

Plesteran Dinding Bata 1 PC : 2 PP


= ( Luas pas.dinding ) x 2

2 Pas. Dinding Bata 1 : 4


Tinggi = m
Panjang = m

Luas = (PxT )
= M²

Pengurang (Pintu, Jendela, Bouven, dll)


Pintu P1
Tinggi = m
Lebar = m
Jumlah = unit

Luas = ( L x T ) x unit
= M²

Volume Dinding Bata 1 : 4 - Luas Kusen Pintu


= M²

Plesteran Dinding Bata 1 PC : 4 PP


= ( Luas pas.dinding ) x 2

E PEKERJAAN LANTAI DAN PAS. KERAMIK


1 Tanah timbunan dibawah lantai dalam ruangan
Tinggi = m
Lebar = m
Panjang = m
Jumlah = Unit

Luas = ( P x L x T ) x unit
= 0.00 M³

2 Urugan Pasir Bawah dalam Ruangan


Tinggi = m
Lebar = m
Panjang = m
Jumlah = Unit

Luas = ( P x L x T ) x unit
= 0.00 M³

3 Cor Lantai Kerja 1 : 3 : 5 dalam Ruangan


Tinggi = m
Lebar = m
Panjang = m
Jumlah = Unit

Luas = ( P x L x T ) x unit
= M³

4 Pas. Keramik 40/40 dalam Ruangan


Lebar = m
Panjang = m
Jumlah = Unit

Luas = ( P x L) x unit
= M²
F PEKERJAAN PINTU, JENDELA DAN KUNCI

1 Kusen Pintu P1
Panjang = m
Lebar = m
Tinggi = m
Jumlah = unit

Luas = ( P x L x T ) x unit
= M³

2 Daun Pintu P1
Panjang = m
Lebar = m
Jumlah = unit

Luas = ( P x L ) x unit
= M²

3 Engsel Pintu P1
Buah = Bh
Jumlah = unit

Luas = ( Bh ) x unit
= Bh

4 Kunci Pintu P1
Buah = Bh
Jumlah = unit

Luas = ( Bh ) x unit
= Bh

5 Kusen Ventilasi P1
Panjang = m
Lebar = m
Tinggi = m
Jumlah = unit

Luas = ( P x L x T ) x unit
= M³

6 Papan Ventilasi P1
Panjang = m
Lebar = m
Tinggi = m
Jumlah = unit

Luas = ( P x L x T ) x unit
= M³

7 Kusen Jendela J1
Panjang = m
Lebar = m
Tinggi =
Jumlah = unit

Luas = ( P x L x T ) x unit
= M²
8 Daun Jendela J1
Panjang = m
Lebar = m
Jumlah = unit

Luas = ( P x L ) x unit
= M²

9 Kaca Jendela J1
Panjang = m
Lebar = m
Jumlah = unit

Luas = ( P x L ) x unit
= M²

10 Engsel Jendela J1
Buah = Bh
Jumlah = unit

Luas = ( Bh ) x unit
= Bh
11 Kunci Jendela J1
Buah = Bh
Jumlah = unit

Luas = ( Bh ) x unit
= Bh

12 Hak Angin / Gagang Jendela J1


Buah = Bh
Jumlah = unit

Luas = ( Bh ) x unit
= Bh

13 Kusen Ventilasi J1
Panjang = m
Lebar = m
Tinggi =
Jumlah = unit

Luas = ( P x L x T ) x unit
= M³

14 Papan Ventilasi J1
Panjang = m
Lebar = m
Tinggi = m
Jumlah = unit

Luas = ( P x L x T ) x unit
= M³

15 Kusen Jendela J2
Panjang = m
Lebar = m
Tinggi = m
Jumlah = unit

Luas = ( P x L x T ) x unit
= M²

16 Daun Jendela J2
Panjang = m
Lebar = m
Jumlah = unit

Luas = ( P x L ) x unit
= M²

17 Kaca Jendela J2
Panjang = m
Lebar = m
Jumlah = unit

Luas = ( P x L ) x unit
= M²

18 Engsel Jendela J2
Buah = Bh
Jumlah = unit

Luas = ( Bh ) x unit
= Bh

19 Kunci Jendela J2
Buah = Bh
Jumlah = unit

Luas = ( Bh ) x unit
= Bh

20 Hak Angin / Gagang Jendela J2


Buah = Bh
Jumlah = unit

Luas = ( Bh ) x unit
= Bh

21 Kusen Ventilasi J2
Panjang = m
Lebar = m
Tinggi = m
Jumlah = unit
Luas = ( P x L x T ) x unit
= M²
22 Papan Ventilasi J2
Panjang = m
Lebar = m
Tinggi = m
Jumlah = unit

Luas = ( P x L x T ) x unit
= M³

G PEKERJAAN ATAP DAN PLAFOND


1 Rangka Kuda-kuda Kayu
Panjang = m
Lebar = m
Tinggi = m
Jumlah = Unit

Volume = ( P x L x T ) x Jumlah
= M3

2 Penutup Atap Genteng Metal 0,35


Panjang = m
Lebar = m
Jumlah = Unit

Volume = (PxL)
= M2

3 Bubungan Genteng Metal 0,30


Panjang = m
Jumlah = Unit

Volume = (PxU)
= M¹

4 Papan Listplank Uk. 2,5/25 cm


Panjang = m
Jumlah = Unit

Volume = (PxU)
= M¹

Rangka Plafond
Panjang = m
Lebar = m
Jumlah = Unit

Volume = ( P x L ) x unit
= M²

Plafon Triplek 6 mm M²

Kayu List Plafond Lt 1


Panjang = m
Jumlah = Unit
Volume = ( P ) x Unit
= M²

H PEKERJAAN INSTALASI LISTRIK


Lampu Saving Energi 18 Watt Bh

Saklar Tunggal Bh

Saklar dauble Bh

Stop Kontak Bh

I PEKERJAAN PENGECATAN
Cat Dinding Bata Luar Dan Dalam M²

Cat Plafond
Panjang = m
Lebar = m
Jumlah = Unit

Volume = (PxL)
= M²

Cat Kusen Pintu P1


Panjang = m
Lebar = m
Jumlah = unit

Luas = ( P x L) x unit
= M²

Cat Daun Pintu P1


Panjang = m
Lebar = m
Jumlah = unit

Luas = ( P x L) x unit
= M²

Cat Kusen Ventilasi P1


Panjang = m
Lebar = m
Jumlah = unit

Luas = ( P x L) x unit
= M²

Cat Papan Ventilasi P1


Panjang = m
Lebar = m
Jumlah = unit

Luas = ( P x L ) x unit
= M²

Cat Kusen Jendela J1


Panjang = m
Lebar = m
Jumlah = unit

Luas = ( P x L) x unit
= M²

Cat Daun Jendela J1


Panjang = m
Lebar = m
Jumlah = unit

Luas = ( P x L) x unit
= M²

Cat Kusen Ventilasi J1


Panjang = m
Lebar = m
Jumlah = unit
Luas = ( P x L) x unit
= M²

Cat Papan Ventilasi J1


Panjang = m
Lebar = m
Jumlah = unit

Luas = ( P x L) x unit
= M²

Cat Kusen Jendela J2


Panjang = m
Lebar = m
Jumlah = unit

Luas = ( P x L) x unit
= M²

Cat Daun Jendela J2


Panjang = m
Lebar = m
Jumlah = unit

Luas = ( P x L) x unit
= M²

Cat Kusen Ventilasi J2


Panjang = m
Lebar = m
Jumlah = unit

Luas = ( P x L) x unit
= M²

Cat Papan Ventilasi J2


Panjang = m
Lebar = m
Jumlah = unit

Luas = ( P x L) x unit
= M²

Total Volume Cat Kusen, Pintu, Jendela dan Ventilasi M²

J PEKERJAAN PLUMBING
Pipa 3' Bh

Pipa 1/2' Bh

Closet Jongkok Bh

Wastafel Bh
BACK UP DATA VOLUME PEKERJAAN

GAMBAR
DAFTAR HARGA SATUAN PEKERJAAN BIDANG CIPTA KARYA K
(Sudah termasuk overhead dan profit, belum termasuk PPN) E
(Tahun 2019, Semester 2) T
E
HARGA SATUAN R
No KODE ANALISA URAIAN PEKERJAAN SATUAN
(Rp) A
N
A.2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN Pebruari 2020 G
1 A.2.2.1.1. (K3) Pembuatan 1 m2 pagar sementara dari kayu tinggi 2 meter m2 328,471.00 A
N
2 dihit A.2.2.1.2.1 Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2 meter m2 216,014.00 revisi semua
3 dihit A.2.2.1.2.2 Pembuatan 1 m2 pagar sementara dari sasak bambu, tinggi 2,00 meter m2 91,102.00 revisi semua
4 dihit A.2.2.1.2.3 Pembuatan 1 m2 pagar sementara dari MMT, tinggi 2,00 meter m2 68,871.00
5 A.2.2.1.3. Pembuatan 1 m2 pagar sementara dari kawat duri tinggi 1,8 meter m2 248,322.00 Revisi harga
6 A.2.2.1.4. Pengukuran dan pemasangan 1 m’ Bouwplank m' 113,723.00
7 A.2.2.1.5. (K3) Pembuatan 1 m2 kantor sementara lantai plesteran m2 2,454,424.00
8 A.2.2.1.6. (K3) Pembuatan 1 m2 rumah jaga (konstruksi kayu ) m2 2,826,065.00
9 A.2.2.1.7. (K3) Pembuatan 1 m2 gudang semen dan peralatan m2 2,355,688.00
10 A.2.2.1.8. (K3) Pembuatan 1 m2 bedeng pekerja m2 2,299,093.00
11 A.2.2.1.9. (K3) Pembersihan 1 m2 lapangan dan perataan m2 15,125.00
12 A.2.2.1.10. (K3) Pembuatan 1 m2 steger/perancah dari bambu m2 382,025.00
13 A.2.2.1.11. Pembuatan 1 buah kotak adukan ukuran 40cm x 50cm x 25cm buah 207,504.00 Harga papan
14 A.2.2.1.12. Pembuatan 1 m2 jalan sementara m2 183,383.00
15 A.2.2.1.13. Pembongkaran 1 m3 beton bertulang m3 255,027.00
16 dihit A.2.2.1.13.a Pembongkaran 1 m3 pasangan batu m3 219,726.00 analisa baru
17 dihit A.2.2.1.14. Pembongkaran 1 m3 dinding tembok bata m3 100,826.00 REVISI menj
18 A.2.2.1.15. Pemasangan 1 m2 pagar kawat jaring galvanis panjang 240 cm m2 104,914.00 revisi harga p

A.2.3.1 HARGA SATUAN PEKERJAAN TANAH


1 A.2.3.1.1. Menggali 1 m3 tanah biasa sedalam 1 m m3 73,012.00
2 A.2.3.1.2. Menggali 1 m3 tanah biasa sedalam 2 m m3 89,347.00
3 A.2.3.1.3. Menggali 1 m3 tanah biasa sedalam 3 m m3 105,913.00
4 A.2.3.1.4. Menggali 1 m3 tanah keras sedalam 1 m m3 97,196.00
5 A.2.3.1.5. Menggali 1 m3 tanah cadas sedalam 1 m m3 147,180.00
6 A.2.3.1.6. Menggali 1 m3 tanah lumpur sedalam 1 m m3 117,397.00
7 dihit A.2.3.1.6.a Menggali 1 m3 Tanah Berbatu Lunak (dengan excavator) m3 55,466.00
8 dihit A.2.3.1.6.b Menggali 1 m3 Batu (dengan excavator ) m3 57,686.00
9 A.2.3.1.7. Pengerjaan stripping 1 m2 tanah tebing setinggi 1 meter m2 5,252.00
10 A.2.3.1.8. (K3) Pembuangan 1 m3 tanah sejauh 30 meter m3 32,010.00
11 A.2.3.1.9. Pengurugan kembali 1 m3 galian tanah (1/3 Galian; Tanah Biasa Sedalam 1 M) m3 24,337.00
12 A.2.3.1.10.a (K3) Pemadatan tanah 1 m3 tanah ( per 20 cm) manual m3 34,666.00
13 A.2.3.1.10.b Pemadatan tanah 1 m3 tanah ( per 20 cm) dengan stamper m3 82,316.00 analisa meng
14 A.2.3.1.11. Pengurugan 1 m3 dengan pasir urug m3 253,341.00 Revisi harga
15 dihit A.2.3.1.11.a Pengurugan 1 m3 dengan tanah merah untuk taman m3 177,705.00
16 A.2.3.1.12. Pemasangan 1 m3 lapisan pudel campuran 1KP : 3PP : 7TL m3 448,090.00
17 A.2.3.1.13. Pemasangan 1 m2 lapisan ijuk tebal 10 cm untuk bidang resapan m2 45,457.00
18 A.2.3.1.14. Pengurugan 1 m3 sirtu padat (tanpa alat pemadat) m3 295,542.00
19 dihit A.2.3.1.15. 1 m3 urugan batu pecah 5/7 cm m3 469,821.00
20 dihit A.2.3.1.16. 1 m3 urugan batu pecah 3/5 cm m3 473,781.00
Pengurugan 1 m3 dengan tanah padas setempat dengan pemadat stamper (per 20
21 dihit A.2.3.1.17. m3 276,211.00
cm) analisa meng
Pengurugan 1 m3 dengan tanah padas sepanjang jalan dengan pemadat alat berat &
22 dihit A.2.3.1.18. m3 304,035.00 analisa meng
dump truck ( per 20 cm)
Pengurugan 1 m3 dengan tanah padas sepanjang jalan dengan pemadat alat berat
23 dihit A.2.3.1.19. m3 207,032.00 baru
( per 20cm)

A.3.2.1 HARGA SATUAN PEKERJAAN PONDASI


1 A.3.2.1.1. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 3PP m3 1,135,414.00 Revisi harga
2 A.3.2.1.2. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP m3 1,093,196.00 Revisi harga
3 A.3.2.1.3. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 5PP m3 1,063,879.00 Revisi harga
4 A.3.2.1.4. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 6PP m3 1,043,291.00 Revisi harga
5 A.3.2.1.5. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 8PP m3 1,015,017.00 Revisi harga
6 A.3.2.1.6. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 1KP : 2PP m3 839,834.00 Revisi harga
7 A.3.2.1.7. Pemasangan 1 m3 pondasi batu belah campuran 1 SP : 3 KP : 10 PP m3 979,022.00 Revisi harga
8 A.3.2.1.8. Pemasangan 1 m3 pondasi batu belah campuran ¼ SP : 1 KP : 4PP m3 957,796.00 Revisi harga
9 A.3.2.1.9. Pemasangan 1 m3 batu kosong (anstamping) m3 624,413.00 Revisi harga
(K3) Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1SP : 2 PB : 3 Kr dan
10 A.3.2.1.10. m3 2,851,611.00 Revisi harga
40% batu belah
11 A.3.2.1.11. Pemasangan 1 m3 pondasi sumuran, diameter 100 cm m3 1,070,513.00 Revisi harga
12 dihit A.3.3.1.12. Pengadaan & Pasang sheetpile type FPC.220.500 m' 741,193.00 Harga lama i
13 dihit A.3.3.1.12.1 Pengadaan & Pemancangan Cerucuk bambu apus Ø 10 cm, sedalam 2 meter titik 26,790.00

14 dihit A.3.3.1.12.2 Pengadaan & Pemancangan Cerucuk bambu petung Ø 10 cm, sedalam 2 meter titik 37,790.00
K
E
T
E
HARGA SATUAN R
No KODE ANALISA URAIAN PEKERJAAN SATUAN
(Rp) A
N
Pengadaan & Pemancangan Minipile / Triangle Pile 200x200x200 mm (drop
15 dihit A.3.3.1.13.1 m' 295,343.00 GHarga lama i
hammer) A
N
16 dihit A.3.3.1.13.2 Pengadaan & Pemancangan Minipile / Triangle Pile 200x200x200 mm (mekanis) m' 211,918.00
Harga lama in
Pengadaan & Pemancangan Minipile / Triangle Pile 250x250x250 mm (drop
17 dihit A.3.3.1.13.3 m' 339,770.00 Harga lama i
hammer)

18 dihit A.3.3.1.13.4 Pengadaan & Pemancangan Minipile / Triangle Pile 250x250x250 mm (mekanis) m' 284,745.00 Harga lama i

Pengadaan & Pemancangan Minipile / Triangle Pile 280x280x280 mm (drop


19 dihit A.3.3.1.13.5 m' 373,811.00 Harga lama i
hammer)

20 dihit A.3.3.1.13.6 Pengadaan & Pemancangan Minipile / Triangle Pile 280x280x280 mm (mekanis) m' 330,998.00 Harga lama i

Pengadaan & Pemancangan Minipile / Triangle Pile 300x300x300 mm (drop


21 dihit A.3.3.1.13.7 m' 438,494.00 Harga lama i
hammer)

22 dihit A.3.3.1.13.8 Pengadaan & Pemancangan Minipile / Triangle Pile 300x300x300 mm (mekanis) m' 365,486.00 Harga lama i

Pengadaan & Pemancangan Minipile / Triangle Pile 320x320x320 mm (drop


23 dihit A.3.3.1.13.9 m' 418,119.00 Harga lama i
hammer)

24 dihit A.3.3.1.13.10 Pengadaan & Pemancangan Minipile / Triangle Pile 320x320x320 mm (mekanis) m' 381,556.00 Harga lama i

25 dihit A.3.3.1.13.11 Pengadaan & Pemancangan Minipile / kotak 300x300 mm K.500 (drop hammer) m' 576,575.00

26 dihit A.3.3.1.13.12 Pengadaan & Pemancangan Minipile / kotak 300x300 mm K.500 (mekanis) m' 503,567.00

27 dihit A.3.3.1.13.13 Pengadaan & Pemancangan Minipile / kotak 400x400 mm K.500 (drop hammer) m' 617,840.00

28 dihit A.3.3.1.13.14 Pengadaan & Pemancangan Minipile / kotak 400x400 mm K.500 (mekanis) m' 538,777.00

A.4.1.1 HARGA SATUAN PEKERJAAN BETON


Membuat 1 m3 beton mutu fc' = 7,4 MPa (K 100) manual slump (12± 2) cm w/c =
1 A.4.1.1.1 m3 1,170,389.00 Revisi harga
0,87
2 dihit A.4.1.1.1.a Membuat 1 m3 Rabat Beton (manual) setara campuran 1 PC : 3 PS : 5 Kr m3 1,017,421.00
Membuat 1 m3 beton mutu fc’= 9,8 MPa (K 125) manual slump (12± 2) cm w/c =
3 A.4.1.1.2 m3 1,202,619.00 Revisi harga
0,87
Membuat 1 m3 beton mutu fc’= 12,2 MPa (K 150) manual slump (12± 2) cm w/c =
4 A.4.1.1.3 m3 1,227,589.00 Revisi harga
0,87
Membuat 1 m3 lantai kerja beton mutu fc' = 7,4 MPa (K 100), slump (3-6) cm, w/c
5 A.4.1.1.4 m3 1,109,130.00 Revisi harga
= 087 (manual)
1 m3 lantai kerja beton mutu fc' = 7,4 MPa (K 100), slump (3-6) cm, w/c = 087
6 dihit A.4.1.1.4.c m3 972,474.00
(Readymix) tanpa alat Pompa beton
Membuat 1 m3 beton mutu fc’ = 14.5 MPa (K 175), slump (12 ±2) cm, w/c = 0,66
7 A.4.1.1.5. m3 1,257,289.00 Revisi harga
(manual)
8 dihit A.4.1.1.5.c 1 m3 beton mutu fc’= 14.5 MPa (K 175) Readymix tanpa alat Pompa beton m3 1,017,242.00
9 dihit A.4.1.1.5.d 1 m3 beton mutu fc’= 14.5 MPa (K 175) Readymix dengan alat Pompa beton m3 1,107,268.00
Membuat 1 m3 beton mutu fc’= 16,9 MPa (K 200), slump (120 ± 20) mm, w/c =
10 A.4.1.1.6 m3 1,285,559.00 Revisi harga
0,61 (manual)
Membuat 1 m3 beton mutu fc’ = 19,3 MPa (K 225), slump (120 ± 20) mm, w/c =
11 A.4.1.1.7. m3 1,307,119.00 Revisi harga
0,58 (manual)
12 dihit A.4.1.1.7.c 1 m3 beton mutu fc’= 19,3 MPa (K 225) Readymix tanpa alat Pompa beton m3 1,067,844.00
13 dihit A.4.1.1.7.d 1 m3 beton mutu fc’= 19,3 MPa (K 225) Readymix dengan alat Pompa beton m3 1,157,871.00
Membuat 1 m3 beton mutu fc’= 21.7 MPa (K 250), slump (120 ± 20) mm, w/c =
14 A.4.1.1.8. m3 1,321,089.00 Revisi harga
0,56 (manual)
15 dihit A.4.1.1.8.c 1 m3 beton mutu fc’= 21.7 MPa (K 250) Readymix tanpa alat Pompa beton m3 1,098,363.00
16 dihit A.4.1.1.8.d 1 m3 beton mutu fc’= 21.7 MPa (K 250) Readymix dengan alat Pompa beton m3 1,188,389.00
17 dihit A.4.1.1.9.c 1 m3 beton mutu fc’= 24,0 MPa (K 275) Readymix tanpa alat Pompa beton m3 1,107,916.00
18 dihit A.4.1.1.9.d 1 m3 beton mutu fc’= 24,0 MPa (K 275) Readymix dengan alat Pompa beton m3 1,217,785.00
19 dihit A.4.1.1.10.c 1 m3 beton mutu fc’= 26.4 MPa (K 300) Readymix tanpa alat Pompa beton m3 1,138,306.00
20 dihit A.4.1.1.10.c 1 m3 beton mutu fc’= 26.4 MPa (K 300) Readymix dengan alat Pompa beton m3 1,228,332.00
21 dihit A.4.1.1.12.c 1 m3 beton mutu fc’= 31.2 MPa (K 350) Readymix tanpa alat Pompa beton m3 1,192,835.00
22 dihit A.4.1.1.12.d 1 m3 beton mutu fc’= 31.2 MPa (K 350) Readymix dengan alat Pompa beton m3 1,282,861.00
23 A.4.1.1.13 Membuat 1 m3 beton kedap air dengan strorox - 100 m3 1,558,243.00 Revisi harga
24 A.4.1.1.14 Pemasangan 1 m’ PVC Waterstop lebar 150 mm m' 84,496.00
25 A.4.1.1.15 Pemasangan 1 m’ PVC Waterstop lebar 200 mm m' 107,316.00
26 A.4.1.1.16 Membuat 1 m’ PVC Waterstop lebar 230 mm - 320 mm m' 181,192.00
27 A.4.1.1.17.a Pembesian 1 kg dengan besi tulangan polos kg 12,960.00
28 A.4.1.1.17.b Pembesian 1 kg dengan besi tulangan ulir kg 15,501.00
29 A.4.1.1.19 Pemasangan 10 kg jaring kawat baja (wiremesh) 10 kg 289,553.00 Harga wirem
30 A.4.1.1.20 (K3) Pemasangan 1 m2 bekisting untuk pondasi m2 146,553.00 Harga papan
K
E
T
E
HARGA SATUAN R
No KODE ANALISA URAIAN PEKERJAAN SATUAN
(Rp) A
N
31 A.4.1.1.21 (K3) Pemasangan 1 m2 bekisting untuk sloof m2 153,153.00 GHarga papan
32 dihit A.4.1.1.21.b Pemasangan 1 m2 bekisting untuk sloof pasang kembali m2 88,165.00 A
33 A.4.1.1.22 (K3) Pemasangan 1 m2 bekisting untuk kolom m2 364,061.00 NHarga papan
34 dihit A.4.1.1.22.a Pemasangan 1 m2 bekisting untuk kolom pasang kembali m2 173,047.00
35 A.4.1.1.23 (K3) Pemasangan 1 m2 bekisting untuk balok m2 398,711.00 Harga papan
36 dihit A.4.1.1.23.a Pemasangan 1 m2 bekisting untuk balok pasang kembali m2 279,428.00
37 A.4.1.1.24 (K3) Pemasangan 1 m2 bekisting untuk lantai m2 445,104.00 Harga papan
38 dihit A.4.1.1.24.a Pemasangan 1 m2 bekisting untuk lantai pasang kembali m2 168,363.00
39 dihit A.4.1.1.24.b Pemasangan 1 m2 bekisting untuk lantai dengan floordeck (JAP ≤ 0,6 m) m2 260,975.00
40 dihit A.4.1.1.24.c Pemasangan 1 m2 bekisting untuk lantai dengan floordeck (JAP ≤ 0,8 m) m2 261,052.00
41 dihit A.4.1.1.24.d Pemasangan 1 m2 bekisting untuk lantai dengan floordeck (JAP ≤ 1,2 m) m2 246,770.00
40 dihit A.4.1.1.24.e Pemasangan 1 m2 bekisting untuk lantai dengan Scaffolding T.3,8 m m2 336,451.00 Harga papan
41 dihit A.4.1.1.24.f Pemasangan 1 m2 bekisting untuk lantai dengan Scaffolding T.3,4 m m2 327,543.00 Harga papan
42 A.4.1.1.25 (K3) Pemasangan 1 m2 bekisting untuk dinding m2 468,011.00 Harga papan
43 dihit A.4.1.1.25.a Pemasangan 1 m2 bekisting untuk dinding pasang kembali m2 175,478.00
44 A.4.1.1.26 (K3) Pemasangan 1 m2 bekisting untuk tangga m2 363,126.00 Harga papan
45 A.4.1.1.27 Pemasangan 1 m2 jembatan untuk pengecoran beton m2 75,977.00 Harga papan
46 A.4.1.1.35 Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm (termasuk bekisting) m' 151,884.00 Revisi koef p
47 dihit A.4.1.1.35.a Membuat 1 m’ kolom praktis beton bertulang (12 x 12) cm (termasuk bekisting) m' 162,520.00 Revisi koef p
48 dihit A.4.1.1.35.b Pemasangan 1 m' bekisting untuk kolom praktis m' 120,543.00 baru
49 A.4.1.1.36 Membuat 1 m’ ring balok beton bertulang (10 x 15) cm (termasuk bekisting) m' 124,319.00
50 dihit A.4.1.1.36.a Pemasangan 1 m' bekisting untuk ring balok pasang kembali m2 92,081.00
Membuat 1 m’ ring balok beton bertulang (15 x 20) cm (tulangan pokok 4Ø10, begel
51 dihit A.4.1.1.36.b m' 237,729.00 baru
Ø6-150 termasuk bekisting)
Membuat 1 m’ ring balok beton bertulang (15 x 20) cm (tulangan pokok 4Ø12, begel
52 dihit A.4.1.1.36.c m' 250,308.00 baru
Ø6-150 termasuk bekisting)
53 dihit A.4.1.1.37 Pemasangan 1 m Papan Dilatasi Pada Cor Jalan Beton m' 27,624.00 Harga papan
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 13 Cm) & Papan baru
54 dihit A.4.1.1.38.1.1 m3 1,170,946.00
Bekisting 1x pakai, tanpa tulangan dowel & tiebars (L= 4,5 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 13 Cm) & Papan baru
55 dihit A.4.1.1.38.1.2 m3 1,141,463.00
Bekisting 2x pakai, tanpa tulangan dowel & tiebars (L= 4,5 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 15 Cm) & Papan baru
56 dihit A.4.1.1.38.1.3 m3 1,158,888.00
Bekisting 1x pakai, tanpa tulangan dowel & tiebars (L= 4,5 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 15 Cm) & Papan baru
57 dihit A.4.1.1.38.1.4 m3 1,129,227.00
Bekisting 2x pakai, tanpa tulangan dowel & tiebars (L= 4,5 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 13 Cm) & Papan baru
58 dihit A.4.1.1.38.2.1 m3 1,171,224.00
Bekisting 1x pakai, tanpa tulangan dowel & tiebars (L= 4,0 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 13 Cm) & Papan baru
59 dihit A.4.1.1.38.2.2 m3 1,141,249.00
Bekisting 2x pakai, tanpa tulangan dowel & tiebars (L= 4,0 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 15 Cm) & Papan baru
60 dihit A.4.1.1.38.2.3 m3 1,159,073.00
Bekisting 1x pakai, tanpa tulangan dowel & tiebars (L= 4,0 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 15 Cm) & Papan baru
61 dihit A.4.1.1.38.2.4 m3 1,128,921.00
Bekisting 2x pakai, tanpa tulangan dowel & tiebars (L= 4,0 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 13 Cm) & Papan baru
62 dihit A.4.1.1.38.3.1 m3 1,171,968.00
Bekisting 1x pakai, tanpa tulangan dowel & tiebars (L= 3,5 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 13 Cm) & Papan baru
63 dihit A.4.1.1.38.3.2 m3 1,141,360.00
Bekisting 2x pakai, tanpa tulangan dowel & tiebars (L= 3,5 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 15 Cm) & Papan baru
64 dihit A.4.1.1.38.3.3 m3 1,159,705.00
Bekisting 1x pakai, tanpa tulangan dowel & tiebars (L= 3,5 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 15 Cm) & Papan baru
65 dihit A.4.1.1.38.3.4 m3 1,128,920.00
Bekisting 2x pakai, tanpa tulangan dowel & tiebars (L= 3,5 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 13 Cm) & Papan revisi koef. J
66 dihit A.4.1.1.38.4.1 m3 1,173,409.00
Bekisting 1x pakai, tanpa tulangan dowel & tiebars (L= 3,0 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 13 Cm) & Papan revisi koef. J
67 dihit A.4.1.1.38.4.2 m3 1,141,958.00
Bekisting 2x pakai, tanpa tulangan dowel & tiebars (L= 3,0 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 15 Cm) & Papan baru
68 dihit A.4.1.1.38.4.3 m3 1,161,005.00
Bekisting 1x pakai, tanpa tulangan dowel & tiebars (L= 3,0 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 15 Cm) & Papan baru
69 dihit A.4.1.1.38.4.4 m3 1,129,377.00
Bekisting 2x pakai, tanpa tulangan dowel & tiebars (L= 3,0 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 13 Cm) & Papan revisi koef. J
70 dihit A.4.1.1.38.5.1 m3 1,175,968.00
Bekisting 1x pakai, tanpa tulangan dowel & tiebars (L= 2,5 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 13 Cm) & Papan revisi koef. J
71 dihit A.4.1.1.38.5.2 m3 1,143,337.00
Bekisting 2x pakai, tanpa tulangan dowel & tiebars (L= 2,5 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 15 Cm) & Papan baru
72 dihit A.4.1.1.38.5.3 m3 1,163,377.00
Bekisting 1x pakai, tanpa tulangan dowel & tiebars (L= 2,5 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 15 Cm) & Papan baru
73 dihit A.4.1.1.38.5.4 m3 1,130,568.00
Bekisting 2x pakai, tanpa tulangan dowel & tiebars (L= 2,5 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 13 Cm) & Papan revisi koef. J
74 dihit A.4.1.1.38.6.1 m3 1,180,482.00
Bekisting 1x pakai, tanpa tulangan dowel & tiebars (L= 2,0 m)
K
E
T
E
HARGA SATUAN R
No KODE ANALISA URAIAN PEKERJAAN SATUAN
(Rp) A
N
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 13 Cm) & Papan revisi koef. J
75 dihit A.4.1.1.38.6.2 m3 1,146,080.00 G
Bekisting 2x pakai, tanpa tulangan dowel & tiebars (L= 2,0 m) A
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 15 Cm) & Papan Nbaru
76 dihit A.4.1.1.38.6.3 m3 1,167,622.00
Bekisting 1x pakai, tanpa tulangan dowel & tiebars (L= 2,0 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 15 Cm) & Papan baru
77 dihit A.4.1.1.38.6.4 m3 1,133,042.00
Bekisting 2x pakai, tanpa tulangan dowel & tiebars (L= 2,0 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 13 Cm) & Papan revisi koef. J
78 dihit A.4.1.1.38.7.1 m3 1,188,907.00
Bekisting 1x pakai, tanpa tulangan dowel & tiebars (L= 1,5 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 13 Cm) & Papan revisi koef. J
79 dihit A.4.1.1.38.7.2 m3 1,151,553.00
Bekisting 2x pakai, tanpa tulangan dowel & tiebars (L= 1,5 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 15 Cm) & Papan baru
80 dihit A.4.1.1.38.7.3 m3 1,175,614.00
Bekisting 1x pakai, tanpa tulangan dowel & tiebars (L= 1,5 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 15 Cm) & Papan baru
81 dihit A.4.1.1.38.7.4 m3 1,138,083.00
Bekisting 2x pakai, tanpa tulangan dowel & tiebars (L= 1,5 m)
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 20 Cm) & Papan revisi koef. J
80 dihit A.4.1.1.38.8.1 m3 1,141,287.00
Bekisting 1x pakai, tanpa tulangan dowel & tiebars, L = 3 m
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 20 Cm) & Papan revisi koef. J
81 dihit A.4.1.1.38.8.2 m3 1,109,216.00
Bekisting 2x pakai, tanpa tulangan dowel & tiebars, L = 3 m
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 20 Cm) & Papan baru
82 dihit A.4.1.1.38.9.1 m3 1,140,237.00
Bekisting 1x pakai, tanpa tulangan dowel & tiebars, L = 3,5 m
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 20 Cm) & Papan baru
83 dihit A.4.1.1.38.9.2 m3 1,109,009.00
Bekisting 2x pakai, tanpa tulangan dowel & tiebars, L = 3,5 m
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 20 Cm) & Papan baru
84 dihit A.4.1.1.38.10.1 m3 1,139,808.00
Bekisting 1x pakai, tanpa tulangan dowel & tiebars, L = 4 m
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 20 Cm) & Papan baru
85 dihit A.4.1.1.38.10.2 m3 1,109,213.00
Bekisting 2x pakai, tanpa tulangan dowel & tiebars, L = 4 m
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 20 Cm) & Papan baru
86 dihit A.4.1.1.38.11.1 m3 1,139,794.00
Bekisting 1x pakai, tanpa tulangan dowel & tiebars, L = 4,5 m
Perkerasan Jalan Beton dengan Beton K.225 Readymix (t= 20 Cm) & Papan baru
87 dihit A.4.1.1.38.11.2 m3 1,109,691.00
Bekisting 2x pakai, tanpa tulangan dowel & tiebars, L = 4,5 m

A.4.1.2 HARGA SATUAN PEKERJAAN BETON PRACETAK


(K3) Pembuatan 1 m2 lahan produksi tebal 8cm beton f’c 14,5 Mpa (K 175) slump
1 A.4.1.2.1. m2 100,598.00 Revisi harga
(120±20)mm
(K3) Pembuatan 1 m2 lahan produksi tebal 10 cm beton f’c 14,5 Mpa (K 175) slump
2 A.4.1.2.2. m2 125,771.00 Revisi harga
(120±20)mm
(K3) Pembuatan 1 m2 lahan produksi tebal 12 cm beton f’c 14,5 Mpa (K 175) slump
3 A.4.1.2.3. m2 150,839.00 Revisi harga
(120±20)mm
(K3) Pembuatan 1 m2 lahan produksi tebal 15 cm beton f’c 14,5 Mpa (K 175) slump
4 A.4.1.2.4. m2 188,654.00 Revisi harga
(120±20)mm
5 A.4.1.2.5. Pembuatan 1 m2 bekisting untuk plat beton pracetak m2 159,790.00 Revisi harga
6 A.4.1.2.6. Pembuatan 1 m2 bekisting untuk balok beton pracetak m2 62,830.00 Harga kruing
7 A.4.1.2.7. Pembuatan 1 m2 bekisting untuk kolom beton pracetak m2 55,147.00 Harga kruing
8 A.4.1.2.8. Pemasangan dan membuka bekisting 1 buah komponen plat beton pracetak buah 7,711.00
9 A.4.1.2.9. Pemasangan dan membuka bekisting 1 buah komponen balok beton pracetak buah 12,529.00
10 A.4.1.2.10. Pemasangan dan membuka bekisting 1 buah komponen Kolom beton pracetak buah 10,120.00
11 A.4.1.2.11. Penuangan/menebar beton untuk 1 buah komponen plat pracetak buah 58,371.00
12 A.4.1.2.12. Penuangan/menebar beton untuk 1 buah komponen balok pracetak buah 59,994.00
13 A.4.1.2.13. Penuangan/menebar beton untuk 1 buah komponen kolom pracetak buah 53,944.00
14 A.4.1.2.17. Melangsir 1 buah komponen plat pracetak ( ± 20 m) buah 106,501.00
15 A.4.1.2.22. Upah melakukan 1 titik grouting pada join pracetak titik 52,783.00
16 A.4.1.2.23. Pemasangan 1 titik Bekisting join pracetak titik 190,063.00 Harga kayu k
17 A.4.1.2.24. Upah 1 titik Join dengan Sling titik 75,080.00

A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM


1 A.4.2.1.1. Pemasangan 1 kg besi profil kg 31,586.00
2 A.4.2.1.2. Pemasangan 1 kg rangka kuda-kuda baja IWF kg 29,183.00
3 A.4.2.1.3. Pengerjaan 100 kg pekerjaan perakitan kg 102,844.00
4 A.4.2.1.4. Pembuatan 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku m2 1,031,388.00
5 dihit A.4.2.1.4.1 Pembuatan 1 m Rangka Pintu Alluminium Warna Natural/Silver m2 125,345.00
6 dihit A.4.2.1.4.2 Pembuatan 1 m Rangka Pintu Alluminium Warna Powder coating m2 139,865.00
7 dihit A.4.2.1.4.3 Pembuatan 1 m Rangka Pintu U PVC Warna Putih m¹ 258,445.00
8 dihit A.4.2.1.4.4 Pemasangan 1 m Kusen Pintu U PVC Warna Putih m¹ 303,144.00 Harga sealan
9 dihit A.4.2.1.4.5 Pemasangan 1 Unit Pintu PVC + Sticker Kaca Oval Polos Untuk KM/WC unit 367,435.00
10 dihit A.4.2.1.4.6 Pemasangan 1 Unit Pintu Alluminium Panil Kaca Hias Untuk KM/WC unit 1,082,435.00
11 A.4.2.1.5. Pengerjaan 1 cm pengelasan dengan las listrik Cm 2,154.10
12 dihit A.4.2.1.5.1 Pengerjaan 1 cm pengelasan stainless steel Cm 2,924.10
13 A.4.2.1.6. Pembuatan 1 m2 rangka jendela besi scuare tube/Pipa kotak (25 x 5) cm m2 290,445.00
14 dihit A.4.2.1.6.1 Pembuatan 1 m Rangka Jendela Alluminium Warna Natural/Silver m2 105,985.00
K
E
T
E
HARGA SATUAN R
No KODE ANALISA URAIAN PEKERJAAN SATUAN
(Rp) A
N
15 dihit A.4.2.1.6.2 Pembuatan 1 m Rangka Jendela Alluminium Warna Powder coating m2 118,085.00 G
16 dihit A.4.2.1.6.3 Pembuatan 1 m Rangka Jendela U PVC Warna Putih m¹ 173,745.00 A
17 A.4.2.1.7. Pemasangan 1 m2 pintu rolling door besi m2 513,293.00 N
18 A.4.2.1.8. Pemasangan 1 m2 pintu lipat (folding door) bahan plastik/PVC m2 162,261.00
19 dihit A.4.2.1.8.a Pemasangan 1 m2 pintu lipat (folding door) bahan alluminium m2 717,761.00
20 A.4.2.1.9. Pemasangan 1 m2 sunscreen alluminium m2 412,742.00
21 A.4.2.1.10. Pemasangan 1 m2 rolling door alluminium m2 616,275.00
22 A.4.2.1.11. Pemasangan 1 m kusen pintu alluminium 3" warna Natural / Silver m' 110,336.00 Harga sealan
23 dihit A.4.2.1.11.1 Pemasangan 1 m kusen pintu alluminium 3" warna Powder coating m' 143,424.00 Harga sealan
24 dihit A.4.2.1.11.2 Pemasangan 1 m kusen pintu alluminium 4" warna Powder coating m' 194,244.00 Harga sealant
25 dihit A.4.2.1.11.3 Pemasangan 1 m kusen pintu alluminium 4" warna Natural / Silver m' 157,944.00 Harga sealan
26 dihit A.4.2.1.11.4 Pemasangan 1 m Kusen Pintu Alluminium Urat Kayu 3" m' 109,544.00 Harga sealant
27 dihit A.4.2.1.11.5 Pemasangan 1 m Kusen Pintu Alluminium Urat Kayu 4" m' 133,744.00 Harga sealan
28 A.4.2.1.12. Pemasangan 1 m2 pintu alluminium strip lebar 8 cm m2 646,817.00
29 A.4.2.1.13. Pemasangan 1 m2 pintu kaca rangka alluminium m2 803,825.00
30 A.4.2.1.14. Pemasangan 1 m2 venetions blinds dan Vertical blinds (mewah) m2 1,067,154.00
31 dihit A.4.2.1.14.a Pemasangan 1 m2 venetions blinds dan Vertical blinds (sedang) m2 627,154.00
32 dihit A.4.2.1.14.b Pemasangan 1 m2 venetions blinds dan Vertical blinds (standar) m2 275,154.00
33 A.4.2.1.15. Pemasangan 1 m2 teralis besi strip (2 x 3) mm m2 526,860.00
34 A.4.2.1.16. Pemasangan 1 m2 kawat nyamuk m2 516,867.00
35 A.4.2.1.17. Pemasangan 1 m2 jendela nako & tralis m2 412,064.00
36 A.4.2.1.18. Pemasangan 1 m’ talang datar/ jurai seng bjls 28 lebar 90 cm m' 252,788.00
37 A.4.2.1.19 Pemasangan 1 m talang ½ lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm m' 76,219.00 harga seng b
Pemasangan 1 m2 rangka besi hollow 1x40.40.0,4 mm, modul 60 x 120 cm, dinding
38 A.4.2.1.20 m2 228,816.00
partisi
39 A.4.2.1.21 Pemasangan 1 m2 rangka besi hollow 1x40.40.0,4 mm, modul 60 x 60 cm, plafon m2 223,454.00
(K3) Pemasangan 1 m2 atap pelana rangka atap baja canal dingin profil C75 (tebal
40 A.4.2.1.22 m2 238,727.00
1mm)
Pemasangan 1 m2 atap pelana rangka atap baja canal dingin profil C75 (tebal 0,75
41 dihit A.4.2.1.22.a m2 232,422.00
mm)
(K3) Pemasangan 1 m2 atap jurai rangka atap baja canal dingin profil C75 (tebal
42 A.4.2.1.23 m2 267,004.00
1mm)
Pemasangan 1 m2 atap jurai rangka atap baja canal dingin profil C75 (tebal 0,75
43 dihit A.4.2.1.23.a m2 258,673.00
mm)
Pemasangan 1 M2 pasang kuda-kuda baja ringan + reng untuk atap genteng
44 A.4.2.1.24 m2 278,852.00
biasa/metal

45 dihit A.4.2.1.24.a Pemasangan 1 M2 pasang kuda-kuda baja ringan + reng untuk atap asbes / spandek m2 254,700.00

Pemasangan Daun Pintu Rangka Alumunium warna natural / silver, Panil Kaca
45 dihit A.4.2.1.25 buah 1,092,500.00 kenaikan har
Rayban 5 mm Ukuran 70/210 cm
Pemasangan Daun Pintu Rangka Alumunium warna Powder Coating, Panil Kaca
46 dihit A.4.2.1.26 buah 1,169,747.00
Rayban 5 mm Uk.70/210 cm
Pemasangan Daun Pintu Rangka Alumunium warna natural / silver, Panil Kaca
46 dihit A.4.2.1.27 buah 1,148,850.00 kenaikan har
Rayban 5 mm Ukuran 80/210 cm
Pemasangan Daun Pintu Rangka Alumunium warna Powder Coating, Panil Kaca
47 dihit A.4.2.1.28 buah 1,229,000.00
Rayban 5 mm Ukuran 80/210 cm
Pemasangan Daun Pintu Rangka Alumunium warna natural / silver, Panil Kaca
47 dihit A.4.2.1.29 buah 1,205,199.00 kenaikan har
Rayban 5 mm Ukuran 90/210 cm
Pemasangan Daun Pintu Rangka Alumunium warna Powder Coating, Panil Kaca
48 dihit A.4.2.1.30 buah 1,288,254.00
Rayban 5 mm Ukuran 90/210 cm
Pemasangan Daun Jendela Rangka Alumunium warna natural / silver, Panil Kaca
48 dihit A.4.2.1.31 buah 661,572.00 kenaikan har
Rayban 5 mm Ukuran 50/100 cm
Pemasangan Daun Jendela Rangka Alumunium warna Powder Coating, Panil Kaca
49 dihit A.4.2.1.32 buah 696,178.00
Rayban 5 mm Ukuran 50/100 cm
Pemasangan Daun Jendela Rangka Alumunium warna natural / silver, Panil Kaca
49 dihit A.4.2.1.33 buah 758,073.00 kenaikan har
Rayban 5 mm Ukuran 60/120 cm
Pemasangan Daun Jendela Rangka Alumunium warna Powder Coating, Panil Kaca
50 dihit A.4.2.1.34 buah 799,939.00
Rayban 5 mm Ukuran 60/120 cm
Pemasangan Daun Jendela Rangka Alumunium warna natural / silver, Panil Kaca
50 dihit A.4.2.1.35 buah 884,410.00 kenaikan har
Rayban 5 mm Ukuran 70/140 cm
Pemasangan Daun Jendela Rangka Alumunium warna Powder Coating, Panil Kaca
51 dihit A.4.2.1.36 buah 933,536.00
Rayban 5 mm Ukuran 70/140 cm
Pemasangan Daun Jendela Rangka Alumunium warna natural / silver, Panil Kaca
51 dihit A.4.2.1.37 buah 638,094.00 kenaikan har
Rayban 5 mm Ukuran 60/80 cm
Pemasangan Daun Jendela Rangka Alumunium warna Powder Coating, Panil Kaca
52 dihit A.4.2.1.38 buah 670,280.00
Rayban 5 mm Ukuran 60/80 cm
Pemasangan Jendela Boven Rangka Alumunium Panil Kaca Rayban 5 mm Ukuran
52 dihit A.4.2.1.39 buah 491,379.00 kenaikan har
50/40 cm
K
E
T
E
HARGA SATUAN R
No KODE ANALISA URAIAN PEKERJAAN SATUAN
(Rp) A
N
Pemasangan Jendela Boven Rangka Alumunium Panil Kaca Rayban 5 mm Ukuran
53 dihit A.4.2.1.40 buah 518,116.00 Gkenaikan har
60/40 cm A
Pemasangan Jendela Boven Rangka Alumunium Panil Kaca Rayban 5 mm Ukuran N
54 dihit A.4.2.1.41 buah 544,852.00 kenaikan har
70/40 cm
Pemasangan Jendela Boven Rangka Alumunium Panil Kaca Rayban 5 mm Ukuran
55 dihit A.4.2.1.42 buah 571,588.00 kenaikan har
80/40 cm
Pemasangan Jendela Boven Rangka Alumunium Panil Kaca Rayban 5 mm Ukuran
56 dihit A.4.2.1.43 buah 598,324.00 kenaikan har
90/40 cm
Pemasangan Daun Pintu Rangka Kayu Jati Panil Kaca Rayban 5 mm Ukuran 70/210
57 dihit A.4.2.1.44 buah 2,257,728.00
cm
Pemasangan Daun Pintu Rangka Kayu Jati Panil Kaca Rayban 5 mm Ukuran 80/210
58 dihit A.4.2.1.45 buah 2,549,001.00
cm
Pemasangan Daun Pintu Rangka Kayu Jati Panil Kaca Rayban 5 mm Ukuran 90/210
59 dihit A.4.2.1.46 buah 2,840,275.00
cm
Pemasangan Daun Jendela Rangka Kayu Jati Panil Kaca Rayban 5 mm Ukuran
60 dihit A.4.2.1.47 buah 991,401.00
50/100 cm
Pemasangan Daun Jendela Rangka Kayu Jati Panil Kaca Rayban 5 mm Ukuran
61 dihit A.4.2.1.48 buah 1,299,301.00
60/120 cm
Pemasangan Daun Jendela Rangka Kayu Jati Panil Kaca Rayban 5 mm Ukuran
62 dihit A.4.2.1.49 buah 1,658,806.00
70/140 cm
Pemasangan Daun Jendela Rangka Kayu Jati Panil Kaca Rayban 5 mm Ukuran
63 dihit A.4.2.1.50 buah 986,138.00
60/80 cm
Pemasangan Jendela Boven Rangka Kayu Jati Panil Kaca Rayban 5 mm Ukuran
64 dihit A.4.2.1.51 buah 577,636.00
50/40 cm
Pemasangan Jendela Boven Rangka Kayu Jati Panil Kaca Rayban 5 mm Ukuran
65 dihit A.4.2.1.52 buah 630,126.00
60/40 cm
Pemasangan Jendela Boven Rangka Kayu Jati Panil Kaca Rayban 5 mm Ukuran
66 dihit A.4.2.1.53 buah 682,615.00
70/40 cm
Pemasangan Jendela Boven Rangka Kayu Jati Panil Kaca Rayban 5 mm Ukuran
67 dihit A.4.2.1.54 buah 735,104.00
80/40 cm
Pemasangan Jendela Boven Rangka Kayu Jati Panil Kaca Rayban 5 mm Ukuran
68 dihit A.4.2.1.55 buah 787,593.00
90/40 cm
A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING
Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP :
1 A.4.4.1.1. m2 284,746.00 Revisi harga
2 PP
Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP :
2 A.4.4.1.2. m2 273,918.00 Revisi harga
3 PP
Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 4
3 A.4.4.1.3. m2 265,541.00 Revisi harga
PP
Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 5
4 A.4.4.1.4. m2 262,805.00 Revisi harga
PP
Pemasangan 1 m2 dinding Bata Merah (5x11x22) cm tebal 1 batu campuran 1 SP : 6
5 A.4.4.1.5. m2 265,258.00 Revisi harga
PP
Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP :
6 A.4.4.1.6 m2 249,751.00 Revisi harga
3KP : 10PP
Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :
7 A.4.4.1.7 m2 137,594.00 Revisi harga
2PP
Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :
8 A.4.4.1.8 m2 131,819.00 Revisi harga
3PP
Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran
9 A.4.4.1.9 m2 128,877.00 Revisi harga
1SP :4PP
Pemasangan 1 m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1 SP :
10 A.4.4.1.10 m2 127,048.00 Revisi harga
5 PP
Pemasangan 1 m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1 SP :
11 A.4.4.1.11 m2 126,652.00 Revisi harga
6 PP
Pemasangan 1 m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP :
12 A.4.4.1.12 m2 124,437.00 Revisi harga
8 PP
Pemasangan 1 m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP :
13 A.4.4.1.13 m2 125,917.00 Revisi harga
3KP :10PP
Pemasangan 1 m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SM :
14 A.4.4.1.14 m2 107,985.00 Revisi harga
1KP :1PP
Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SM :
15 A.4.4.1.15 m2 110,694.00 Revisi harga
1KP :2PP
Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal ½ batu dengan semen
16 dihit A.4.4.1.15.1 m2 209,302.00 Revisi harga
instan
17 A.4.4.1.16 Pemasangan 1 m2 dinding conblock HB20 campuran 1SP : 3PP m2 619,025.00 Revisi harga
18 A.4.4.1.17 Pemasangan 1 m2 dinding conblock HB20 campuran 1SP:4PP m2 627,396.00 Revisi harga
K
E
T
E
HARGA SATUAN R
No KODE ANALISA URAIAN PEKERJAAN SATUAN
(Rp) A
N
19 A.4.4.1.18 Pemasangan 1 m2 dinding conblock HB15 campuran 1SP :3PP m2 430,848.00 GRevisi harga
20 A.4.4.1.19 Pemasangan 1 m2 dinding conblock HB15 campuran 1SP :4PP m2 436,746.00 ARevisi harga
21 A.4.4.1.20 Pemasangan 1 m2 dinding conblock HB10 campuran 1SP :3PP m2 267,958.00 NRevisi harga
22 A.4.4.1.21 Pemasangan 1 m2 dinding conblock HB10 campuran 1SP :4PP m2 272,918.00 Revisi harga
23 A.4.4.1.22 Pemasangan 1 m2 dinding terawang (rooster) 12x11x24 campuran 1SP : 3PP m2 351,664.00 Revisi harga
24 A.4.4.1.23 Pemasangan 1 m2 dinding terawang (rooster) 12x11x24 campuran 1SP : 4PP m2 351,189.00 Revisi harga
25 dihit A.4.4.1.23.1 Pemasangan 1 m2 dinding terawang (rooster) 20 x 20 cm campuran 1SP : 4PP m2 215,820.00 revisi koef PC
26 dihit A.4.4.1.23.2 Pemasangan 1 m2 dinding terawang (rooster) 40 x 20 cm campuran 1SP : 4PP m2 182,380.00 revisi koef PC
27 dihit A.4.4.1.23.3 Pemasangan 1 m2 dinding terawang (rooster) genteng kecil m2 243,567.00 revisi koef PC
28 dihit A.4.4.1.23.4 Pemasangan 1 m2 dinding terawang (rooster) genteng sedang m2 342,815.00 revisi koef PC
29 dihit A.4.4.1.23.5 Pemasangan 1 m2 dinding terawang (rooster) genteng besar m2 362,175.00 revisi koef PC
30 dihit A.4.4.1.23.6 Pemasangan 1 m2 dinding terawang (rooster) keramik 20 x 20 cm m2 1,241,570.00 revisi koef PC
31 dihit A.4.4.1.23.7 Pemasangan 1 m2 dinding terawang (rooster) keramik 30 x 30 cm m2 887,012.00 revisi koef PC
32 dihit A.4.4.1.23.8 Pemasangan 1 m2 dinding terawang (rooster) GRC m2 980,815.00 Revisi harga s
33 A.4.4.1.24 Pemasangan 1 m2 dinding bata berongga ekspose 12x11x24 campuran 1SP:3PP m2 212,342.00 harga bata b
34 A.4.4.1.25 Pemasangan 1 m2 dinding bata ringan tebal 7,5 cm dengan mortar siap pakai. m2 321,744.00
35 A.4.4.1.26 Pemasangan 1 m2 dinding bata ringan tebal 10 cm dengan mortar siap pakai m2 324,303.00
36 dihit A.4.4.1.27 Pemasangan 1m2 Glass Block 20x20 cm m2 648,862.00 Revisi harga
37 dihit A.4.4.1.28 Pasang Partisi Dobel Gipsum Board 9 mm Rangka Hollow Meni 4 x 4 cm m2 286,073.00
38 dihit A.4.4.1.29 Pasang Partisi Dobel Plywood 6 mm Rangka Hollow Meni 4 x 4 cm m2 312,961.00

39 dihit A.4.4.1.30 Pemasangan 1 m2 Penutup Dinding / Pintu dg HPL Lapis Plywood 9 mm warna polos m2 455,240.00 Harga plywo

40 dihit A.4.4.1.31 Pemasangan 1 m2 Penutup Dinding / Pintu dg HPL Lapis Plywood 9 mm warna kayu m2 466,324.00
Harga plywoo
41 dihit A.4.4.1.32 Pasang Partisi Dobel GRC Board 6 mm Rangka Hollow Meni 4 x 4 cm m2 315,902.00
42 dihit A.4.4.1.33 Pasang Partisi Dobel Gipsum Board 9 mm Rangka Metal Stud / Alumunium m2 208,303.00
43 dihit A.4.4.1.34 Pasang Partisi Dobel Plywood 6 mm Rangka Metal Stud / Alumunium m2 235,191.00
44 dihit A.4.4.1.35 Pasang Partisi Dobel GRC Board 6 mm Rangka Metal Stud / Alumunium m2 238,132.00

A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN


1 A.4.4.2.1. Pemasangan 1 m2 plesteran 1SP : 1PP tebal 15 mm. m2 76,298.00 Revisi harga
2 A.4.4.2.2. Pemasangan 1 m2 plesteran 1SP : 2PP tebal 15 mm. m2 70,296.00 Revisi harga
3 A.4.4.2.3. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15mm. m2 67,957.00 Revisi harga
4 A.4.4.2.4. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 15 mm m2 66,148.00 Revisi harga
5 A.4.4.2.5. Pemasangan 1 m2 plesteran 1SP : 5PP tebal 15 mm m2 65,412.00 Revisi harga
6 A.4.4.2.6. Pemasangan 1 m2 plesteran 1SP : 6PP tebal 15 mm. m2 64,701.00 Revisi harga
7 A.4.4.2.7. Pemasangan 1 m2 plesteran 1SP : 7PP tebal 15 mm m2 64,402.00 Revisi harga
8 A.4.4.2.8. Pemasangan 1 m2 plesteran 1SP : 8PP tebal 15 mm m2 64,103.00 Revisi harga
9 A.4.4.2.9. Pemasangan 1 m2 plesteran 1SP : 1/2KP : 3PP tebal 15 mm m2 64,397.00 Revisi harga
10 A.4.4.2.10. Pemasangan 1 m2 plesteran 1SP : 2KP : 8PP tebal 15 mm m2 63,739.00 Revisi harga
11 A.4.4.2.13. Pemasangan 1 m2 plesteran 1SP : 1PP tebal 20 mm m2 94,089.00 Revisi harga
12 A.4.4.2.14. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 20 mm m2 76,840.00 Revisi harga
13 A.4.4.2.15. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 20 mm. m2 88,429.00 Revisi harga
14 A.4.4.2.16. Pemasangan 1 m2 plesteran 1SP : 5PP tebal 20 mm m2 87,577.00 Revisi harga
15 A.4.4.2.17. Pemasangan 1 m2 plesteran 1SP : 6PP tebal 20 mm m2 86,500.00 Revisi harga
16 A.4.4.2.19. Pemasangan 1 m2 berapen 1SP : 5PP tebal 15 mm m2 41,559.00 Revisi harga
17 A.4.4.2.20. Pemasangan 1 m’ plesteran skoning 1SP : 3PP lebar 10 cm m2 62,090.00 Revisi harga
18 A.4.4.2.21. Pemasangan 1 m2 plesteran granit 1SP : 2 granit tebal 1cm m2 465,811.00 Revisi harga
19 A.4.4.2.22. Pemasangan 1 m2 plesteran traso 1SP : 2 traso tebal 1cm m2 441,061.00 Revisi harga
20 A.4.4.2.23. Pemasangan 1 m2 plesteran ciprat 1SP : 2PP m2 50,383.00 Revisi harga
21 A.4.4.2.24 Pemasangan 1 m2 finishing siar pasangan bata merah m2 28,523.00 Revisi harga
22 A.4.4.2.25. Pemasangan 1 m2 finishing siar pasangan conblock ekspose m2 13,585.00 Revisi harga
23 A.4.4.2.26. Pemasangan 1 m2 finishing siar pasangan batu kali, campuran 1SP : 2PP. m2 61,645.00 Revisi harga
24 A.4.4.2.27. Pemasangan 1 m2 acian. m2 36,602.00 Revisi harga
25 A.4.4.2.28. Pemasangan 1 m2 plesteran dengan mortar siap pakai (MSP) m2 116,132.00 Revisi harga
26 A.4.4.2.29. Pemasangan 1 m2 Acian dengan mortar siap pakai (MSP) m2 40,425.00 Revisi harga

A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING


1 dihit A.4.4.3.8.a Pemasangan 1 m2 lantai ubin granit ukuran 60cm x 60cm m2 361,592.00 Revisi harga
2 A.4.4.3.9. Pemasangan 1 m2 lantai ubin granit ukuran 40cm x 40cm m2 331,425.00 Revisi harga
3 A.4.4.3.10. Pemasangan 1 m2 lantai ubin granit ukuran 30cm x 30cm m2 463,611.00 Revisi harga
4 dihit A.4.4.3.10.a Pemasangan 1 m2 lantai ubin granit unpolish / anti skid m2 376,948.00
5 A.4.4.3.11. Pemasangan 1 m2 lantai ubin teralux ukuran 40cm x 40cm m2 609,288.00 Revisi harga
6 A.4.4.3.12. Pemasangan 1 m2 lantai ubin teralux ukuran 30cm x 30cm m2 496,254.00 Revisi harga
7 A.4.4.3.13. Pemasangan 1 m2 lantai ubin teralux marmer ukuran 60cm x 60cm m2 946,748.00 Revisi harga
8 A.4.4.3.14. Pemasangan 1 m2 lantai ubin teralux marmer ukuran 40cm x 40cm m2 752,961.00 Revisi harga
9 A.4.4.3.15. Pemasangan 1 m2 lantai ubin teralux marmer ukuran 30cm x 30cm m2 776,979.00 Revisi harga
10 A.4.4.3.17. Pemasangan 1 m’ plint ubin Pc abu-abu ukuran 10cm x 30cm m' 44,562.00 Revisi harga
11 A.4.4.3.18. Pemasangan 1 m’ plint ubin Pc abu-abu ukuran 10cm x 40cm m' 40,307.00 Revisi harga
K
E
T
E
HARGA SATUAN R
No KODE ANALISA URAIAN PEKERJAAN SATUAN
(Rp) A
N
12 A.4.4.3.24. Pemasangan 1 m’ plint ubin granit ukuran 10cm x 40cm m' 32,486.00 GRevisi harga
13 A.4.4.3.25. Pemasangan 1 m’ plint ubin granit ukuran 10cm x 30cm m' 30,925.00 ARevisi harga
14 A.4.4.3.26. Pemasangan 1 m’ plint ubin teralux kerang ukuran 10cm x 40cm m' 105,328.00 NRevisi harga
15 A.4.4.3.27. Pemasangan 1 m’ plint ubin teralux kerang ukuran 10cm x 30cm m' 105,867.00 Revisi harga
16 A.4.4.3.28. Pemasangan 1 m’ plint ubin teralux marmer ukuran 10cm x 60cm m' 102,864.00 Revisi harga
17 A.4.4.3.29. Pemasangan 1 m’ plint ubin teralux marmer ukuran 10cm x 40cm m' 105,944.00 Revisi harga
18 A.4.4.3.30. Pemasangan 1 m’ plint ubin teralux marmer ukuran 10cm x 30cm m' 104,702.00 Revisi harga
19 dihit A.4.4.3.30.1 Pemasangan 1 m’ plint kaca rayben tinggi 10cm m' 24,065.00 Revisi harga
20 dihit A.4.4.3.30.2 Pemasangan 1 m Plint Hospital 8 x 30 cm m' 145,324.00 harga Plint h
21 dihit A.4.4.3.30.3 Pemasangan 1 m Plint Hospital 10 x 40 cm m' 160,449.00 Revisi harga
22 A.4.4.3.31. Pemasangan 1 m2 lantai teraso cor di tempat, tebal 3cm m2 73,821.00 Revisi harga
23 A.4.4.3.32. Pemasangan 1 m2 lantai keramik artistik 10cm x 20cm (Setara Roman) m2 273,803.00 Revisi harga s
Pemasangan 1 m2 lantai keramik artistik 10cm x 10cm atau 5cm x 20cm (Setara
24 A.4.4.3.33. Roman) m2 718,478.00
Revisi harga s
Pemasangan 1 m2 lantai keramik ukuran 60cm x 60cm (putih) (Setara Milan,
25 dihit A.4.4.3.34.1 Roman, KIA) m2 248,275.00 harga keram

Pemasangan 1 m2 lantai keramik ukuran 60cm x 60cm (motif) (Setara Milan,


26 dihit A.4.4.3.34.2 Roman, KIA) m2 258,670.00

Pemasangan 1 m2 lantai keramik ukuran 50cm x 50cm (putih) (Setara Milan,


27 dihit A.4.4.3.34.3 Roman, KIA) m2 225,747.00

Pemasangan 1 m2 lantai keramik ukuran 50cm x 50cm (motif) (Setara Milan,


28 dihit A.4.4.3.34.4 Roman, KIA) m2 239,030.00 Revisi harga

Pemasangan 1 m2 lantai keramik ukuran 40cm x 40cm (putih) (Setara Milan,


29 dihit A.4.4.3.34.5 Roman, KIA) m2 203,797.00 Revisi harga

Pemasangan 1 m2 lantai keramik ukuran 40cm x 40cm (motif) (Setara Milan,


30 dihit A.4.4.3.34.6 Roman, KIA) m2 225,164.00 Revisi harga

Pemasangan 1 m2 lantai keramik ukuran 30cm x 30cm (putih) (Setara Milan,


31 A.4.4.3.35. Roman, KIA) m2 198,594.00 Revisi harga

Pemasangan 1 m2 lantai keramik ukuran 30cm x 30cm (motif) (Setara Milan,


32 dihit A.4.4.3.35.1 Roman, KIA) m2 199,749.00 Revisi harga

Pemasangan 1 m2 lantai keramik ukuran 25cm x 25cm (putih) (Setara Milan,


33 dihit A.4.4.3.35.2 Roman, KIA) m2 222,326.00 Revisi harga

Pemasangan 1 m2 lantai keramik ukuran 25cm x 25cm (motif) (Setara Milan,


34 dihit A.4.4.3.35.3 Roman, KIA) m2 220,247.00 Revisi harga

Pemasangan 1 m2 lantai keramik ukuran 20cm x 20cm (putih) (Setara Milan,


35 A.4.4.3.36. Roman, KIA) m2 213,026.00
harga kerami
Pemasangan 1 m2 lantai keramik ukuran 20cm x 20cm (motif) (Setara Milan,
36 dihit A.4.4.3.36.1 Roman, KIA) m2 212,795.00 Revisi harga

37 A.4.4.3.37. Pemasangan 1 m2 Lantai keramik ukuran 10cm x 40 cm untuk variasi/border m2 906,669.00 harga lama t
38 A.4.4.3.38. Pemasangan 1 m2 lantai keramik mozaik ukuran 30cm x 30cm m2 313,359.00 Revisi harga
39 A.4.4.3.39. Pemasangan 1 m’ plint keramik ukuran 10cm x 20cm m' 78,416.00 Revisi harga
40 A.4.4.3.40. Pemasangan 1 m’ plint keramik ukuran 10cm x 10cm m' 107,979.00 Revisi harga
41 A.4.4.3.41. Pemasangan 1 m’ plint keramik ukuran 5cm x 20cm m' 43,008.00 harga kerami
42 A.4.4.3.42. Pemasangan 1 m’ plint internal cove artistik 5cm x 5cm x 20cm m' 397,075.00 Revisi harga
43 A.4.4.3.43. Pemasangan 1 m2 lantai marmer ukuran 100cm x 100cm m2 1,309,189.00 Revisi harga
44 A.4.4.3.44. Pemasangan 1 m2 lantai karpet m2 68,711.00 Harga lem ai
45 A.4.4.3.45. Pemasangan 1 m2 underlayer (pelapis bawah karpet) m2 100,518.00 Harga lem ai
46 A.4.4.3.46. Pemasangan 1 m2 lantai parquet kayu m2 368,142.00
47 A.4.4.3.47. Pemasangan 1 m2 lantai kayu gymfloor m2 495,192.00
48 A.4.4.3.48. Pemasangan 1 m2 dinding porslen 11cm x 11cm m2 240,268.00 Revisi harga
49 A.4.4.3.49. Pemasangan 1 m2 dinding porslen 10cm x 20cm m2 355,191.00 harga keram
50 A.4.4.3.50. Pemasangan 1 m2 dinding porslen 20cm x 20cm (putih) m2 256,136.00 Revisi harga
51 A.4.4.3.51. Pemasangan 1 m2 dinding keramik artistik 10cm x 20cm (Setara Roman) m2 296,891.00 harga lama t
52 A.4.4.3.52. Pemasangan 1 m2 dinding keramik artistik 5cm x 20cm (Setara Roman) m2 736,616.00 harga lama t
53 A.4.4.3.53. Pemasangan 1 m2 dinding keramik 10cm x 20cm (Setara Milan, Roman, KIA) m2 355,191.00 harga keram
54 A.4.4.3.54. Pemasangan 1 m2 dinding keramik artistik 20cm x 20cm (Setara Roman) m2 295,186.00 revisi jenis ke
55 dihit A.4.4.3.54.1a Pemasangan 1 m2 dinding keramik 20cm x 25cm (putih) (Setara Milan, Roman, KIA) m2 261,911.00 Revisi harga
56 dihit A.4.4.3.54.1b Pemasangan 1 m2 dinding keramik 20cm x 25cm (motif) (Setara Milan, Roman, KIA) m2 258,446.00 Revisi harga
57 dihit A.4.4.3.54.2.a Pemasangan 1 m2 Dinding Keramik 20 x 40 cm (Setara Milan, Roman, KIA) m2 292,601.00 Revisi harga
58 dihit A.4.4.3.54.2.b Pemasangan 1 m2 Dinding Keramik 25 x 40 cm (putih) (Setara Milan, Roman, KIA) m2 257,126.00
59 dihit A.4.4.3.54.2.c Pemasangan 1 m2 Dinding Keramik 25 x 40 cm (motif) (Setara Milan, Roman, KIA) m2 284,076.00
60 dihit A.4.4.3.54.3 Pemasangan 1 m2 Dinding Keramik 25 x 50 cm (Setara Milan, Roman, KIA) m2 323,786.00 Revisi harga
61 dihit A.4.4.3.54.4 Pemasangan 1 m2 Dinding Keramik 20 x 60 cm (Setara Milan, Roman, KIA) m2 424,931.00 Revisi harga
62 dihit A.4.4.3.54.5 Pemasangan 1 m2 Dinding Keramik 30 x 60 cm (Setara Milan, Roman, KIA) m2 345,511.00 Revisi harga
63 dihit A.4.4.3.54.6 Pemasangan 1 m2 Dinding Keramik 25 x 33 cm (Setara Milan, Roman, KIA) m2 319,331.00 Revisi harga
64 dihit A.4.4.3.54.7 Pemasangan 1 m2 Dinding Keramik 32,5 x 65,5 cm (Setara Milan, Roman, KIA) m2 339,076.00 Revisi harga
65 dihit A.4.4.3.54.8 Pemasangan 1 m Step Tile 30x30 cm m¹ 99,047.00 Revisi harga
66 dihit A.4.4.3.54.9 Pemasangan 1 m Step Tile 30x60 cm m¹ 86,534.00 Revisi harga
67 dihit A.4.4.3.54.10 Pemasangan 1 m Step Tile 30x120 cm m¹ 151,599.00 Revisi harga
K
E
T
E
HARGA SATUAN R
No KODE ANALISA URAIAN PEKERJAAN SATUAN
(Rp) A
N
68 dihit A.4.4.3.54.11 Pemasangan 1 m Step Nosing Keramik 10x40 cm m' 119,974.00 GRevisi harga
69 dihit A.4.4.3.54.12 Pemasangan 1 m Step Nosing Granit 10x60 cm m' 96,599.00 ARevisi harga
70 dihit A.4.4.3.54.13 Pemasangan 1 m Step Nosing Allumunium m' 331,724.00 NRevisi harga
71 dihit A.4.4.3.54.14 Pemasangan 1 m Step Nosing Karet m' 121,635.00 Revisi harga
72 dihit A.4.4.3.54.15 Pemasangan 1 m Step Nosing Allumunium Karet m' 345,485.00 Revisi harga
73 dihit A.4.4.3.54.16 Pemasangan 1 m2 Kuku Macan 10 cm m2 55,799.00 Revisi harga
74 dihit A.4.4.3.54.17.a Pemasangan 1 m Keramik Border Dinding 5/25 cm m2 98,299.00 Revisi harga
75 dihit A.4.4.3.54.17.b Pemasangan 1 m Keramik Border Dinding 5-8/20 cm m2 75,474.00 Revisi harga
76 dihit A.4.4.3.54.18 Pemasangan 1 m Keramik Border Dinding 10/40 cm m2 75,474.00
77 dihit A.4.4.3.54.19 Pemasangan 1 m Keramik Border Dinding 10/50 cm m2 60,459.00 Revisi harga
78 dihit A.4.4.3.54.20 Pemasangan 1 m Keramik Border Dinding 10/60 cm m¹ 58,149.00 Revisi harga
79 dihit A.4.4.3.54.21 Pemasangan 1 m Keramik Homogenous 40 x 40 cm (setara Granito) m¹ 414,880.00 Revisi harga
80 dihit A.4.4.3.54.22 Pemasangan 1 m2 Keramik Homogenous 60 x 30 cm (setara Granito) m2 327,897.00 Revisi harga s
81 dihit A.4.4.3.54.23 Pemasangan 1 m2 Keramik Homogenous 60 x 60 cm (setara Granito) m2 642,416.00 Revisi harga
82 dihit A.4.4.3.54.24 Pemasangan 1 m2 Keramik Homogenous 80 x 80 cm (setara Granito) m2 813,014.00 Revisi harga
83 A.4.4.3.55. Pemasangan 1 m2 dinding marmer 100cm x 100cm m2 1,412,901.00 Revisi harga
84 A.4.4.3.56. Pemasangan 1 m2 dinding bata pelapis 3cm x 7cm x 24cm m2 392,009.00 harga batu te
85 A.4.4.3.57. Pemasangan 1 m2 dinding batu paras m2 245,047.00 Revisi harga
86 A.4.4.3.58. Pemasangan 1 m2 dinding batu tempel hitam m2 293,447.00 Revisi harga
87 dihit A.4.4.3.58.1 Pemasangan 1 m2 Batu Alam Andesit Polos Bakar m2 284,372.00 Revisi harga
88 dihit A.4.4.3.58.2 Pemasangan 1 m2 Batu Alam Andesit Bintik Bakar m2 287,397.00 Revisi harga
89 dihit A.4.4.3.58.3 Pemasangan 1 m2 Batu Alam Andesit Alur Bakar m2 296,472.00 Revisi harga
90 dihit A.4.4.3.58.4 Pemasangan 1 m2 Batu Alam Andesit Motif m2 287,397.00 Revisi harga
91 dihit A.4.4.3.58.5 Pemasangan 1 m2 Batu Candi Hitam m2 293,447.00 Revisi harga
92 dihit A.4.4.3.58.6 Pemasangan 1 m2 Batu Candi Warna m2 260,777.00 Revisi harga
93 dihit A.4.4.3.58.7 Pemasangan 1 m2 Batu Wall Clading m2 334,224.00 harga batu w
94 dihit A.4.4.3.58.8 Pemasangan 1 m2 Batu Sikat (batu mozaik) m2 285,301.00 Revisi harga
95 A.4.4.3.59. Pemasangan 1 m2 lantai vynil ukuran 30cm x 30cm m2 221,019.00
96 A.4.4.3.60. Pemasangan 1 m2 wallpaper lebar 50 cm m2 90,926.00 Harga lama b
97 A.4.4.3.61. Pemasangan 1 m2 floor harderner m2 45,683.00
98 A.4.4.3.62. Pemasangan 1 m’ plint vynil 15cm x 30cm m' 41,941.00
99 A.4.4.3.63. Pemasangan 1 m’ plint kayu tebal 2 cm lebar 10 cm m' 69,993.00
Pemasangan 1 m2 paving block natural tebal 6 cm (K.250)(alas dengan pasir
100 A.4.4.3.64. m2 201,256.00
muntilan)

101 dihit A.4.4.3.64.a Pemasangan 1 m2 paving block natural tebal 6 cm (K.250)(alas dengan pasir urug) m2 191,335.00
Revisi harga p
Pemasangan 1 m2 paving block natural tebal 8 cm (K.300)(alas dengan pasir
102 dihit A.4.4.3.65.a m2 237,307.00
muntilan)

103 dihit A.4.4.3.65.b Pemasangan 1 m2 paving block natural tebal 8 cm (K.300)(alas dengan pasir urug) m2 227,387.00 Revisi harga

Pemasangan 1 m2 paving block berwarna tebal 6 cm (K.250)(alas dengan pasir


104 A.4.4.3.66. m2 267,860.00
muntilan)
Pemasangan 1 m2 paving block berwarna tebal 6 cm (K.250)(alas dengan pasir
105 dihit A.4.4.3.66.a m2 257,939.00 Revisi harga
urug)
Pemasangan 1 m2 paving block berwarna tebal 8 cm (K.300)(alas dengan pasir
106 dihit A.4.4.3.67.a m2 303,301.00
muntilan)
Pemasangan 1 m2 paving block berwarna tebal 8 cm (K.300)(alas dengan pasir
107 dihit A.4.4.3.67.b m2 293,380.00 Revisi harga
urug)
108 dihit A.4.4.3.68.a Pemasangan 1 m2 Penutup Dinding Dalam Ruangan dg ACP Rangka Allumunium m2 574,345.00 Revisi harga
109 dihit A.4.4.3.68.b Pemasangan 1 m2 Penutup Dinding Luar Ruangan dg ACP Rangka Allumunium m2 583,657.00 Revisi harga
110 dihit A.4.4.3.69.a Pemasangan 1m2 Ubin/Tegel Untuk Jalur Difabel 30 x 30 cm (Motif) m2 646,230.00 Revisi harga
111 dihit A.4.4.3.69.b Pemasangan 1m2 Ubin/Tegel Untuk Jalur Difabel 20 x 20 cm (Motif) m2 772,102.00 Revisi harga
112 dihit A.4.4.3.70. Perbaikan 1 m2 paving block (tanpa alat pemadat) m2 61,006.00
113 dihit A.4.4.3.71. Pemasangan 1 m Kansteen Tipe S / tali air m¹ 140,694.00 Revisi harga
114 dihit A.4.4.3.72. Pemasangan 1 m Kansteen Taman m¹ 158,844.00 Revisi harga
115 dihit A.4.4.3.73. Pemasangan 1 m Kansteen Trotoar 1 m¹ 128,594.00 Revisi harga
116 dihit A.4.4.3.74. Pemasangan 1 m Kansteen Trotoar 2 m¹ 130,409.00 Revisi harga
117 dihit A.4.4.3.75. Pemasangan 1 m Kansteen 60x25x22x18 cm m¹ 155,315.00 Revisi harga
118 dihit A.4.4.3.76. Pemasangan 1 m Kansteen 60x15x22 cm m¹ 124,258.00
K
E
T
E
HARGA SATUAN R
No KODE ANALISA URAIAN PEKERJAAN SATUAN
(Rp) A
N
A.4.5.1 HARGA SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND) G
1 A.4.5.1.1. Pemasangan 1 m2 langit-langit asbes semen, tebal 4 mm, 5 mm, dan 6 mm m2 30,255.00 A
2 A.4.5.1.2. Pemasangan 1 m2 langit-langit akustik ukuran (30 x 30) cm m2 312,570.00 N
3 A.4.5.1.3. Pemasangan 1 m2 langit-langit akustik ukuran (30 x 60) cm m2 223,360.00
4 A.4.5.1.4. Pemasangan 1 m2 langit-langit akustik ukuran (60 x 120) cm m2 114,895.00
5 dihit A.4.5.1.4.1 Pemasangan 1 m2 Langit-Langit Akustik Ukuran (60 x 60) cm m2 113,340.00
6 dihit A.4.5.1.4.2 Pemasangan 1 m2 Langit - Langit Calsiboard, Uk. (120 x 240) cm Tebal 3,5 mm m2 34,365.00
7 dihit A.4.5.1.4.3 Pemasangan 1 m2 Langit - Langit GRC board, Uk. (120 x 240) cm Tebal 4 mm m2 39,970.00
8 dihit A.4.5.1.4.4 Pemasangan 1 m2 Langit - Langit Plat Lembaran Aluminium (spandril) m2 309,837.00
9 dihit A.4.5.1.4.5 Pemasangan 1 m2 Langit - Langit PVC setara Shunda m2 124,982.00
10 dihit A.4.5.1.4.6 Pemasangan 1 m2 Langit - Langit Plat Metal Berpori -Pori m2 144,837.00
Pemasangan 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm &
11 A.4.5.1.5. m2 50,426.00 Harga triplek
6 mm
12 A.4.5.1.6. Pemasangan 1 m2 langit-langit lambrisering kayu, tebal 9 mm m2 394,735.00
Pemasangan 1 m2 langit-langit gypsum board ukuran (120 x 240 x 9) mm, tebal 9
13 A.4.5.1.7. m2 43,981.00
mm
Pemasangan 1 m2 langit-langit akustik ukuran (60 x 120) cm berikut rangka
14 A.4.5.1.8. m2 268,279.00
alluminium
15 A.4.5.1.9. Pemasangan 1 m’ list langit-langit kayu profil m2 16,093.00
16 A.4.5.1.10. Pemasangan 1 m2 Plafond PVC m2 163,226.00
Pemasangan 1 m2 Rangka Plafon Holo Galvanis Uk. 40 x 40 / 20 x 40 Tebal ± 0,4
17 dihit A.4.5.1.10.2 m2 85,827.00
mm, modul 60 x 60 cm
18 dihit A.4.5.1.10.4 Pemasangan 1 m2 Rangka Plafon Dengan Bahan Metal Furing m2 74,690.00
19 dihit A.4.5.1.10.5 Pemasangan 1 m2 Rangka Plafon Dengan Bahan Metal Stud m2 107,460.00
20 dihit A.4.5.1.10.6 Pemasangan 1 m2 Rangka Plafon Dengan Bahan profil " T " Alumunium m2 200,134.00
21 dihit A.4.5.1.11. Pemasangan 1 m2 List PVC m2 36,492.00
22 dihit A.4.5.1.11.1 Pemasangan 1 m List Langit - Langit Profil Gipsum Lebar ± 8 cm m2 17,432.00
23 dihit A.4.5.1.11.2 Pemasangan 1 m List Langit - Langit Profil Gipsum Lebar ± 10 cm m2 18,587.00
24 dihit A.4.5.1.11.3 Pemasangan 1 m List Langit - Langit Profil Gipsum Lebar ± 15 cm m2 20,897.00
25 dihit A.4.5.1.12. Pemasangan 1 m2 rangka langit-langit besi hollow 40.40.1,1 mm (A.4.2.1.21) m2 218,504.00

A.4.5.2. HARGA SATUAN PEKERJAAN PENUTUP ATAP


1 A.4.5.2.1. Pemasangan 1 m2 atap genteng palentong kecil m2 90,849.00
2 A.4.5.2.2. Pemasangan 1 m2 atap genteng kodok glazuur m2 217,404.00
3 A.4.5.2.3. Pemasangan 1 m2 atap genteng palentong besar/super m2 76,384.00
4 A.4.5.2.4. Pemasangan 1 m’ bubung genteng palentong m2 137,361.00 Revisi harga
5 A.4.5.2.5. Pemasangan 1 m’ bubung genteng kodok glazuur m2 170,361.00 Revisi harga
6 A.4.5.2.6. Pemasangan 1 m’ bubung genteng palentong besar m2 127,461.00 Revisi harga
7 A.4.5.2.7. Pemasangan 1 m2 roof light fibreglass 90x180 m2 70,790.00
8 A.4.5.2.8. Pemasangan 1 m2 atap asbes gelombang 0,92mx2,5m x 5mm m2 83,259.00
9 A.4.5.2.9. Pemasangan 1 m2 atap asbes gelombang 0,92mx2,25m x 5mm m2 87,659.00
10 A.4.5.2.10. Pemasangan 1 m2 atap asbes gelombang 0,92mx2,00m x 5mm m2 81,878.00
11 A.4.5.2.11. Pemasangan 1 m2 atap asbes gelombang 0,92mx1.80m x 5mm m2 86,003.00
12 A.4.5.2.12. Pemasangan 1 m2 atap asbes gelombang 1.05mx3.00m x 4mm m2 63,508.00
13 A.4.5.2.13. Pemasangan 1 m2 atap asbes gelombang 1.05mx2.70m x 4mm m2 64,956.00
14 A.4.5.2.14. Pemasangan 1 m2 atap asbes gelombang 1.05mx2.40m x 4mm m2 59,658.00
15 A.4.5.2.15. Pemasangan 1 m2 atap asbes gelombang 1.05mx2.10m x 4mm m2 59,719.00
16 A.4.5.2.16. Pemasangan 1 m2 atap asbes gelombang 1.05mx1.50m x 4mm m2 67,578.00
17 A.4.5.2.17. Pemasangan 1 m2 atap asbes gelombang 1.08mx3.00m x 6mm m2 75,025.00
18 A.4.5.2.18. Pemasangan 1 m2 atap asbes gelombang 1.08mx2.70m x 6mm m2 73,848.00
19 A.4.5.2.19. Pemasangan 1 m2 atap asbes gelombang 1.08mx2.40m x 6mm m2 77,896.00
20 A.4.5.2.20. Pemasangan 1 m2 atap asbes gelombang 1.08mx2.10m x 6mm m2 71,593.00
21 A.4.5.2.21. Pemasangan 1 m2 atap asbes gelombang 1.08mx1.80m x 6mm m2 75,938.00
22 A.4.5.2.22. Pemasangan 1 m’ bubung stel gelombang 0,92m m2 170,071.00
23 A.4.5.2.23. Pemasangan 1 m’ bubung stel gelombang 1,05m m' 136,774.00
24 A.4.5.2.24. Pemasangan 1 m’ bubung stel gelombang 1,08m m' 131,241.00
25 A.4.5.2.25. Pemasangan 1 m’ nok paten 0,92m m' 100,111.00
26 A.4.5.2.26. Pemasangan 1 m’ nok paten 1,05m m' 86,911.00
27 A.4.5.2.27. Pemasangan 1 m’ nok paten 1,08m m' 86,911.00
28 A.4.5.2.28. Pemasangan 1 m’ nok stel rata 0,92m m' 98,582.00
29 A.4.5.2.29. Pemasangan 1 m’ nok stel rata 1,05m m' 81,961.00
30 A.4.5.2.30. Pemasangan 1 m2 genteng beton m2 118,349.00
31 A.4.5.2.31. Pemasangan 1 m2 genteng aspal (Onduvilla,106Cm x 40Cm x 3mm) m2 327,328.00
32 dihit A.4.5.2.31.a Pemasangan 1 m2 genteng aspal (Onduline, 200Cm x 95Cm x 3mm) m2 214,375.00
33 A.4.5.2.32. Pemasangan 1 m2 genteng metal ukuran 80 x 100 atap pelana m2 91,525.00
34 A.4.5.2.33. Pemasangan 1 m2 genteng metal ukuran 80 x 100 atap Jurai m2 120,015.00
35 A.4.5.2.34. Pemasangan 1 m2 atap sirap kayu m2 145,805.00
36 A.4.5.2.35. Pemasangan 1 m’ nok genteng beton m' 173,694.00 Revisi harga
37 A.4.5.2.36. Pemasangan 1 m’ nok genteng aspal m' 248,055.00
K
E
T
E
HARGA SATUAN R
No KODE ANALISA URAIAN PEKERJAAN SATUAN
(Rp) A
N
38 A.4.5.2.37. Pemasangan 1 m’ nok genteng metal m' 95,331.00 G
39 A.4.5.2.38. Pemasangan 1 m’ nok sirap m' 63,888.00 A
40 A.4.5.2.39. Pemasangan 1 m2 atap seng gelombang m2 67,980.00 N
41 A.4.5.2.40. Pemasangan 1 m’nok atap seng m' 47,212.00
42 A.4.5.2.41. Pemasangan 1 m2 atap alumunium m' 157,102.00
43 dihit A.4.5.2.41.a Pemasangan 1 m2 Atap Galvalum (tanpa rangka atap) m2 66,055.00
43 A.4.5.2.42. Pemasangan 1 m’ nok alumunium m' 235,213.00
44 A.4.5.2.43. Pemasangan 1 m2 alumunium foil/sisalation m2 33,676.00
45 dihit A.4.5.2.44. Pemasangan 1 m2 genteng Press Jatiwangi Kecil Natural m2 82,654.00
46 dihit A.4.5.2.45. Pemasangan 1 m2 Atap Genteng Press Jatiwangi Besar Natural m2 82,324.00 Harga genten
47 dihit A.4.5.2.46. Pemasangan 1 m2 Atap Genteng Press Jatiwangi Besar Glazur m2 102,124.00
48 dihit A.4.5.2.47. Pemasangan 1 m’ Bubung Genteng Jatiwangi Kecil Natural m' 123,611.00
49 dihit A.4.5.2.48. Pemasangan 1 m’ Bubung Genteng Jatiwangi Besar Natural m' 118,661.00 Revisi harga
50 dihit A.4.5.2.49. Pemasangan 1 m’ Bubung Genteng Jatiwangi Besar Glazur m' 138,461.00 Revisi harga
51 dihit A.4.5.2.50. Pemasangan 1 m2 Atap Fibre glass (jabes) m2 68,747.00 Harga Fiberg
52 dihit A.4.5.2.51. Pemasangan 1 m2 Atap Genteng Keramik m2 240,504.00
53 dihit A.4.5.2.52. Pemasangan 1 m’ Bubung Genteng Keramik m2 169,261.00 Revisi harga
54 dihit A.4.5.2.54. Pemasangan 1 m2 Atap U PVC Gelombang Setara Go Grenn m2 74,501.00
55 dihit A.4.5.2.55. Pemasangan 1 m2 Atap Transparan Gelombang m2 72,825.00
56 dihit A.4.5.2.55.a Pemasangan 1 m2 atap Carport / penutup atap Polycarbonate , t = 10 mm m2 627,327.00
Pemasangan 1 m2 atap Carport / penutup atap Galvalum gelombang, t= 0.3 mm, L=
57 dihit A.4.5.2.55.b m2 508,401.00
80 cm
58 dihit A.4.5.2.56. Pemasangan 1 m2 Atap Genteng Asbes ( Asbes Motif Genteng ) m2 91,228.00

A.4.6.1 HARGA SATUAN PEKERJAAN KAYU

1 A.4.6.1.1. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I (jati) m3 32,548,175.00

Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II
2 A.4.6.1.2. m3 17,532,900.00 Harga kayu b
(Bengkirai)

3 A.4.6.1.3. Pembuatan dan pemasangan 1 m2 pintu klamp standar, kayu kelas II (Bengkirai) m2 733,194.00

4 A.4.6.1.4. Pembuatan dan pemasangan 1 m2 pintu klamp sederhana, kayu kelas III (kruing) m2 524,194.00 Harga kayu k

5 A.4.6.1.5. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas II (Bengkirai) m2 1,062,325.00
6 dihit A.4.6.1.5.a Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I (Jati) m2 1,713,525.00 analisa baru

7 A.4.6.1.6. Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas II (Bengkirai) m2 736,450.00

8 A.4.6.1.7. Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu kelas II (Bengkirai) m2 1,397,605.00

Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup (Lebar
9 A.4.6.1.8. m2 768,603.00
s/d 90 cm)

10 A.4.6.1.9. Pembuatan 1 m2 pintu plywood rangkap, rangka expose kayu kelas II (Bengkirai) m2 826,512.00

11 A.4.6.1.10. Pemasangan 1 m2 jalusi kusen, kayu kelas II (Bengkirai) m2 1,206,590.00


12 A.4.6.1.11. Pemasangan 1 m2 teakwood rangkap, rangka expose kayu kelas I (jati) m2 1,274,080.00
Pemasangan 1 m2 teakwood rangkap lapis formika, rangka expose kayu kelas III
13 A.4.6.1.12. m2 798,127.00
(kruing)
Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas II bentang 6
14 A.4.6.1.13. m3 15,657,730.00 Harga kayu k
meter
15 A.4.6.1.14. Pemasangan 1 m3 konstruksi kuda-kuda expose, kayu kelas I (jati) m3 35,364,972.00
16 A.4.6.1.15. Pemasangan 1 m3 konstruksi gording, kayu kelas II (Bengkirai) m3 16,943,492.00 Harga kayu b
17 dihit A.4.6.1.16.a Pemasangan 1 m2 rangka atap genteng keramik, kayu kelas II (Bengkirai) m2 234,177.00 Harga kayu b
18 dihit A.4.6.1.17.a Pemasangan 1 m2 rangka atap genteng beton, kayu kelas II (Bengkirai) m2 219,519.00 Harga kayu b
19 A.4.6.1.18. Pemasangan 1 m2 rangka atap sirap, kayu kelas II (Bengkirai) m2 198,281.00 Harga kayu b
20 A.4.6.1.19. Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas III (kruing) m2 198,379.00
21 A.4.6.1.20. Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas III (kruing) m2 204,259.00
22 A.4.6.1.21. Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kelas II (Bengkirai) m' 189,183.00
23 dihit A.4.6.1.21.a Pemasangan 1 m’ lisplank ukuran (2 x 20) cm, kayu kelas II (Bengkirai) m' 105,363.00
24 A.4.6.1.22. Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas II (Bengkirai) m' 191,977.00
25 dihit A.4.6.1.22.a Pemasangan 1 m’ lisplank ukuran (2 x 30) cm, kayu kelas II (Bengkirai) m' 137,901.00
26 dihit A.4.6.1.22.b Pemasangan 1 m Lisplank Profil Beton Pracetak L 20 cm m¹ 100,624.00 revisi harga b
27 dihit A.4.6.1.22.c Pemasangan 1 m Lisplank Profil Beton Pracetak L 30 cm m¹ 128,977.00 revisi harga b
28 dihit A.4.6.1.22.d Pemasangan 1 m Lisplank Urat Kayu 20 cm m¹ 43,508.00
29 dihit A.4.6.1.22.e Pemasangan 1 m Lisplank Urat Kayu 30 cm m¹ 45,800.00
30 A.4.6.1.23. Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu kelas III (kruing) m2 317,559.00
Pemasangan 1 m2 dinding pemisah teakwood rangkap, rangka kayu kelas III
31 A.4.6.1.24. m2 434,170.00
(kruing)

32 A.4.6.1.25. Pemasangan 1 m2 dinding pemisah plywood rangkap, rangka kayu kelas III (kruing) m2 406,373.00
K
E
T
E
HARGA SATUAN R
No KODE ANALISA URAIAN PEKERJAAN SATUAN
(Rp) A
N
33 A.4.6.1.26. Pemasangan 1 m2 dinding lambrisering dari Kayu Papan kayu kelas II (Bengkirai) m2 401,885.00 G
34 A.4.6.1.27. Pemasangan 1 m2 dinding lambrisering dari plywood ukuran (120 x 240) cm m2 38,945.00 AHarga plywo
35 A.4.6.1.28. Pemasangan 1 m2 dinding bilik bambu, rangka kayu kelas III (kruing) m2 150,103.00 N
36 dihit A.4.6.1.29. Pembuatan dan pemasangan 1 m3 Kusen pintu dan jendela kayu Kruing m3 13,308,900.00
37 dihit A.4.6.1.30. Pembuatan dan Pemasangan 1 m2 Daun Pintu Panel, Kayu Kruing m2 845,900.00
38 dihit A.4.6.1.31. Pembuatan dan Pemasangan 1 m2 Pintu dan Jendela Kaca Kayu Kruing m2 611,050.00
Pembuatan dan Pemasangan 1 m2 Pintu Plywood Rangkap Rangka Kayu Kruing (L
39 dihit A.4.6.1.32. m2 686,378.00 Harga plywo
s/d 90 cm)
Pembuatan dan Pemasangan 1 m2 Pintu Plywood Rangkap Rangka Expose Kayu
40 dihit A.4.6.1.33. m2 741,152.00 Harga plywo
Kruing
Pembuatan dan Pemasangan 1 m3 Konstruksi Kuda-Kuda Konvensional Kayu Kruing
41 dihit A.4.6.1.34. m3 11,785,730.00
Bentang 6 m
42 dihit A.4.6.1.35. Pemasangan 1 m3 Konstruksi Gording, Kayu Kruing m3 10,941,810.00
43 dihit A.4.6.1.36. Pemasangan 1 m2 Rangka Atap Genteng Keramik, Kayu Kruing m2 155,589.00 Harga kruing
44 dihit A.4.6.1.37. Pemasangan 1 m2 Rangka Atap Genteng Beton, Kayu Kruing m2 145,986.00 Harga kruing
Pembuatan dan Pemasangan 1 m3 Konstruksi Kuda - Kuda Konfensional Kayu Lokal
45 dihit A.4.6.1.38. m3 5,675,230.00
6m
46 dihit A.4.6.1.39. Pemasangan 1 m2 Rangka Atap Genteng Kecil, Kayu Lokal m2 67,100.00 Link lama pa
47 dihit A.4.6.1.40. Pemasangan 1 m3 Rangka Dinding Pemisah (60x120) cm Kayu Lokal m3 162,019.00 Link lama pa
48 dihit A.4.6.1.41.a Pembuatan dan Pemasangan 1 m2 Pintu dan Jendela Kaca Kayu Lokal m2 432,850.00 Harga papan
49 dihit A.4.6.1.41.b Pembuatan dan Pemasangan 1 m2 Pintu dan Jendela Kayu jati panel Kaca m2 1,127,170.00
50 dihit A.4.6.1.42. Pembuatan dan Pemasangan 1 m2 Kusen Pintu dan Jendela Kayu Lokal m2 6,642,900.00 Link lama pa

A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA


1 A.4.6.2.1. Pemasangan 1 buah kunci tanam antik buah 250,156.00
2 A.4.6.2.2. Pemasangan 1 buah kunci tanam biasa buah 106,012.00 harga kunci n
3 A.4.6.2.3. Pemasangan 1 buah kunci kamar mandi buah 182,314.00
4 A.4.6.2.4. Pemasangan 1 buah kunci silinder buah 154,814.00
5 A.4.6.2.5. Pemasangan 1 buah engsel pintu buah 69,144.00
6 A.4.6.2.6. Pemasangan 1 buah engsel jendela kupu-kupu buah 36,192.00 harga engsel
7 A.4.6.2.7. Pemasangan 1 buah engsel angin buah 82,007.00
8 dihit A.4.6.2.7.a Pemasangan 1 buah floor hinge set 937,924.00 analisa baru
9 dihit A.4.6.2.7.b Pemasangan 1 buah Patch fitting set ( top , bottom, lock fitting & overpanel ) set 3,214,044.00 analisa baru
10 A.4.6.2.8. Pemasangan 1 buah spring knip buah 58,756.00
11 A.4.6.2.9. Pemasangan 1 buah kait angin buah 39,726.00
12 A.4.6.2.10. Pemasangan 1 buah door closer buah 269,021.00
13 A.4.6.2.11. Pemasangan 1 buah kunci slot buah 39,935.00 harga bahan
14 A.4.6.2.12. Pemasangan 1 buah Door holder buah 161,221.00
15 A.4.6.2.13. Pemasangan 1 buah door stop buah 67,512.00
16 A.4.6.2.14. Pemasangan 1 buah Rel pintu sorong buah 360,156.00 harga bahan
17 A.4.6.2.15. Pemasangan 1 buah kunci lemari buah 53,087.00
18 A.4.6.2.16. Pemasangan 1 m2 kaca tebal 3 mm m2 114,519.00
19 A.4.6.2.17. Pemasangan 1 m2 kaca tebal 5 mm m2 150,819.00
20 A.4.6.2.18. Pemasangan 1 m2 kaca tebal 8 mm m2 272,623.00 harga kaca n
21 A.4.6.2.19. Pemasangan 1 m2 kaca buram tebal 12 mm m2 401,952.00 harga kaca n
22 A.4.6.2.20. Pemasangan 1 m2 kaca cermin tebal 5 mm m2 261,101.00 harga kaca na
23 A.4.6.2.21. Pemasangan 1 m2 kaca cermin tebal 8 mm m2 333,619.00
24 A.4.6.2.23. Pemasangan 1 m2 kaca patri tebal 5 mm m2 283,849.00 harga kaca n
25 dihit A.4.6.2.24.a Pemasangan 1 m2 kaca ray band tebal 5 mm m2 162,919.00
26 dihit A.4.6.2.24.b Pemasangan 1 m2 kaca ray band tebal 8 mm m2 265,769.00
27 dihit A.4.6.2.25. Pemasangan 1 m2 Kaca Bening Warna tebal 5 mm m2 162,919.00 harga kaca n
28 dihit A.4.6.2.26. Pemasangan 1 m2 Kaca Buram/Es/Kabur tebal 5 mm m2 168,771.00
29 dihit A.4.6.2.27. Pemasangan 1 m2 Kaca Hias Lukis tebal 5 mm m2 1,233,769.00
30 dihit A.4.6.2.28. Pemasangan 1 m2 Kaca Bening Polos tebal 5 mm Lapis Sandblast m2 402,003.00
31 dihit A.4.6.2.29. Pemasangan 1 m2 Kaca Oneway tebal 5 mm m2 474,494.00 harga kaca n
32 dihit A.4.6.2.30.a Pemasangan 1 m2 Kaca Tempered tebal 5 mm m2 280,289.00
33 dihit A.4.6.2.30.b Pemasangan 1 m2 Kaca Tempered tebal 8 mm m2 493,448.00
34 dihit A.4.6.2.30.c Pemasangan 1 m2 Kaca Tempered tebal 12 mm m2 613,702.00 baru
35 dihit A.4.6.2.31. Pemasangan 1 Buah Selot Tanam Pintu Tinggi 6" buah 143,885.00
36 dihit A.4.6.2.32. Pemasangan 1 Buah Grendel Panjang 4" buah 44,885.00 Harga grend
37 dihit A.4.6.2.33. Pemasangan 1 Buah Grendel Rantai (Door Guard) buah 59,185.00
38 dihit A.4.6.2.34. Pemasangan 1 Pasang Tarikan Pintu Panjang ± 30 cm pasang 114,185.00 harga handle
39 dihit A.4.6.2.35. Pemasangan 1 Pasang Tarikan Pintu Panjang ± 40 cm pasang 193,385.00
40 dihit A.4.6.2.36. Pemasangan 1 Pasang Tarikan Pintu Panjang ± 50 cm pasang 336,385.00
41 dihit A.4.6.2.37. Pemasangan 1 Pasang Casement Jendela Allumunium Ukuran 8" pasang 131,125.00
42 dihit A.4.6.2.38. Pemasangan 1 Pasang Casement Jendela Allumunium Ukuran 12" pasang 142,785.00
43 dihit A.4.6.2.39. Pemasangan 1 Buah Rambuncis Jendela Allumunium buah 28,822.00 harga bahan
44 dihit A.4.6.2.40. Pemasangan 1 m2 Sticker Kaca m2 248,256.00
K
E
T
E
HARGA SATUAN R
No KODE ANALISA URAIAN PEKERJAAN SATUAN
(Rp) A
N
A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN G
1 A.4.7.1.1. Pengikisan/pengerokan 1 m2 permukaan cat lama m2 14,558.00 A
2 A.4.7.1.2. Pencucian 1 m2 bidang permukaan tembok yang pernah dicat m2 15,031.00 NHarga sabun
3 A.4.7.1.3. Pengerokan 1 m2 karat pada permukaan baja cara manual m2 15,609.00 Harga sabun
Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat
4 A.4.7.1.4. m2 46,637.00
penutup)
Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat
5 A.4.7.1.5. m2 61,930.00
Penutup)
6 A.4.7.1.6. Pelaburan 1 m2 bidang kayu dengan teak oil m2 29,044.00
7 A.4.7.1.7. Pelaburan 1 m2 bidang kayu dengan politur m2 58,219.00
8 A.4.7.1.8. Pelaburan 1 m2 bidang kayu dengan cat residu dan ter m2 20,168.00
9 A.4.7.1.9. Pelaburan 1 m2 bidang kayu dengan vernis m2 44,456.00
Pengecatan 1 m2 tembok baru ( 1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat
10 A.4.7.1.10. penutup) Interior setara Mowilex (Decorcryl, Dulux Pentalite, Nippon) m2 32,219.00

Pengecatan 1 m2 tembok baru ( 1 lapis cat dasar, 2 lapis cat penutup) Interior
11 dihit A.4.7.1.10.a setara Mowilex (Decorcryl, Dulux Pentalite, Nippon) m2 25,696.00

Pengecatan 1 m2 tembok baru ( 1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat
12 dihit A.4.7.1.10.b penutup) Exterior setara Mowilex (Decorcryl, Dulux Pentalite, Nippon) m2 59,048.00

Pengecatan 1 m2 tembok baru ( 1 lapis cat dasar, 2 lapis cat penutup) Exterior
13 dihit A.4.7.1.10.c setara Mowilex (Decorcryl, Dulux Pentalite, Nippon) m2 52,448.00

Pengecatan 1 m2 tembok baru ( 1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat
14 dihit A.4.7.1.10.d penutup) Interior setara Catylac (Vinilex, Property, Danacryl, Avitex) m2 26,488.00

Pengecatan 1 m2 tembok baru ( 1 lapis cat dasar, 2 lapis cat penutup) Interior
15 dihit A.4.7.1.10.e setara Catylac (Vinilex, Property, Danacryl, Avitex) m2 19,888.00

Pengecatan 1 m2 tembok baru ( 1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat
16 dihit A.4.7.1.10.f penutup) Exterior setara Catylac (Vinilex, Property, Danacryl, Avitex) m2 33,748.00

Pengecatan 1 m2 tembok baru ( 1 lapis cat dasar, 2 lapis cat penutup) Exterior
17 dihit A.4.7.1.10.g setara Catylac (Vinilex, Property, Danacryl, Avitex) m2 27,148.00

Pengecatan 1 m2 tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup) Interior
18 A.4.7.1.11. m2 21,213.00
setara Mowilex (Decorcryl, Dulux Pentalite, Nippon)
Pengecatan 1 m2 tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup) Exterior
19 dihit A.4.7.1.11.a m2 40,470.00
setara Mowilex (Decorcryl, Dulux Pentalite, Nippon)
Pengecatan 1 m2 tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup) Interior
20 dihit A.4.7.1.11.b m2 16,644.00
setara Catylac (Vinilex, Property, Danacryl, Avitex)
Pengecatan 1 m2 tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup) Exterior
21 dihit A.4.7.1.11.c m2 22,089.00
setara Catylac (Vinilex, Property, Danacryl, Avitex)
22 A.4.7.1.12. Pelaburan 1 m2 tembok dengan kalkarium m2 8,695.00
23 A.4.7.1.13. Pelaburan 1 m2 tembok dengan kapur sirih m2 19,104.00
24 A.4.7.1.14. Pelaburan 1 m2 tembok lama dengan kapur sirih (pemeliharaan) m2 11,206.00
25 A.4.7.1.15. Pemasangan 1 m2 wallpaper minimalis (motif sederhana) m2 92,358.00
26 dihit A.4.7.1.15.a Pemasangan 1 m2 wallpaper Artistik ( motif warna warni ) m2 92,358.00
27 A.4.7.1.16. Pengecatan 1 m2 permukaan besi / baja dengan menie besi m2 29,700.00
28 A.4.7.1.17. Pengecatan 1 m2 permukaan besi / baja dengan menie besi dengan perancah m2 55,632.00
29 A.4.7.1.18. Pengecatan 1 m2 permukaan besi / baja galvanis secara manual 4 lapis m2 73,869.00
Pengecatan 1 m2 permukaan besi / baja galvanis secara manual sistem 1 lapis cat
30 A.4.7.1.19. m2 36,886.00
mutakhir
31 A.4.7.1.20. Pengecatan 1 m2 permukaan besi / baja galvanis secara manual sistem 3 lapis m2 160,366.00
Pengecatan 1 m2 permukaan besi / baja galvanis secara semprot sistem 3 lapis cat
32 A.4.7.1.21. m2 143,858.00
mutakhir
33 A.4.7.1.22. Plituran 10 m2 dengan plitur melamic 10 m2 2,139,115.00
34 dihit A.4.7.1.23. Pengecatan 1 m2 kerb dengan cat genteng m2 41,309.00
35 dihit A.4.7.1.24. Pengecatan 1 m2 Kerb dengan cat besi m2 41,749.00
36 dihit A.4.7.1.25. Pelapisan 1 m2 batu alam dengan cat coating (Natural / Hitam / Gloss) m2 41,115.00
37 dihit A.4.7.1.26. Pengecatan 1 m2 Tembok Dengan Cat Waterproofing ( 3 Lapis ) m2 34,870.00
38 dihit A.4.7.1.27.a Pengecatan 1 m2 Plat Atap/Talang Dengan Lapisan Membran Waterproofing m2 81,136.00
39 dihit A.4.7.1.27.b Pengecatan 1 m2 Plat Atap/Talang Dengan Cat Waterproofing ( 3 lapis ) m2 34,793.00
40 dihit A.4.7.1.28. 1 m2 pengecatan tembok dengan cat mengkilap m2 34,870.00 harga cat da
41 dihit A.4.7.1.29. 1 m2 pengecatan permukaan besi dan baja dengan cat besi 3 lapis cat penutup m2 53,663.00
K
E
T
E
HARGA SATUAN R
No KODE ANALISA URAIAN PEKERJAAN SATUAN
(Rp) A
N
A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG G
1 A.5.1.1.1. (K3) Pemasangan 1 buah closet duduk/monoblock (biasa) buah 1,556,830.00 A
2 dihit A.5.1.1 1.a Pemasangan 1 buah closet duduk/monoblock (setara INA) dengan jet washer buah 3,480,730.00 N
3 dihit A.5.1.1 1.b Pemasangan 1 buah closet duduk/monoblock (setara TOTO) dengan jet washer buah 3,364,130.00
4 A.5.1.1 2. Pemasangan 1 buah closet jongkok porselen (biasa) buah 429,682.00 Revisi harga
5 dihit A.5.1.1 2.a Pemasangan 1 buah closet jongkok porselen (Setara INA) buah 459,932.00 Revisi harga
6 A.5.1.1 3. Pemasangan 1 buah closet jongkok teraso buah 463,617.00 Revisi harga
7 A.5.1.1 4. (K3) Pemasangan 1 buah urinoir buah 2,091,727.00 Revisi harga
8 A.5.1.1 5. (K3) Pemasangan 1 buah wastafel buah 1,083,742.00
9 A.5.1.1 6. (K3) Pemasangan 1 buah bathcuip porselen buah 3,926,109.00
10 dihit A.5.1.1 7.a Pemasangan 1 buah Reservoir fibreglass vol 1 m3 (Roof tank) buah 3,096,390.00
11 A.5.1.1 9. Pemasangan 1 buah bak mandi teraso vol 0,30 m3 buah 1,519,430.00
12 dihit A.5.1.1 10.a Pemasangan 1 buah bak mandi fibreglass vol 120 liter (oval) buah 548,326.00
13 dihit A.5.1.1 10.b Pemasangan 1 buah bak mandi fibreglass vol 120 liter (kotak) buah 398,392.00
14 A.5.1.1 11. Pemasangan 1 buah bak beton volume 1 m3 buah 5,638,842.00
15 A.5.1.1 12. Pemasangan 1 buah bak cuci piring stainlessteel buah 560,587.00
16 A.5.1.1 13. Pemasangan 1 buah bak cuci piring teraso buah 1,040,022.00 Revisi harga
17 A.5.1.1 14. Pemasangan 1 buah floor drain buah 114,262.00
18 A.5.1.1 15. Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm buah 478,252.00 Revisi harga
19 A.5.1.1 16. Pemasangan 1 buah bak kontrol pasangan bata 45cm x45cm tinggi 50 cm buah 713,108.00 Revisi harga
20 A.5.1.1 17. Pemasangan 1 buah bak kontrol pasangan bata 60cm x60cm tinggi 65 cm buah 868,117.00 Revisi harga
21 A.5.1.1 18. Pemasangan 1 m’ pipa galvanis medium A diameter ½” buah 64,587.00
22 A.5.1.1 19. Pemasangan 1 buah kran diameter ½” atau 3/4” (Stainles steel) buah 121,522.00
23 dihit A.5.1.1 19.a Pemasangan 1 buah kran diameter ½” atau 3/4” (Plastik) buah 61,022.00
24 dihit A.5.1.1 19.b Pemasangan 1 buah shower setara ONDA buah 226,022.00
24 A.5.1.1 20. Pemasangan 1 m’ pipa galvanis medium B diameter 3/4” m' 67,171.00 Revisi harga
25 A.5.1.1 21. Pemasangan 1 m’ pipa galvanis medium B diameter 1” m' 77,863.00 Revisi harga
26 A.5.1.1 22. Pemasangan 1 m’ pipa galvanis medium B diameter 1 ½” m' 117,991.00 Revisi harga
27 dihit A.5.1.1 22.a Pemasangan 1 m’ pipa galvanis medium A diameter 1 ½” m' 166,610.00
28 A.5.1.1 23. Pemasangan 1 m’ pipa galvanis medium B diameter 3” m' 233,167.00 Revisi harga
29 A.5.1.1 24. Pemasangan 1 m’ pipa galvanis medium B diameter 4” m' 288,409.00 Revisi harga
30 dihit A.5.1.1 24.a Pemasangan 1 m’ pipa galvanis medium A diameter 4” m' 493,636.00
31 A.5.1.1 25. Pemasangan 1 m’ pipa PVC tipe AW diameter 1/2” m' 23,331.00 Revisi harga
32 A.5.1.1 26. Pemasangan 1 m’ pipa PVC tipe AW diameter 3/4” m' 25,113.00 Revisi harga
33 A.5.1.1 27. Pemasangan 1 m’ pipa PVC tipe AW diameter 1” m' 28,677.00 Revisi harga p
34 A.5.1.1 28. Pemasangan 1 m’ pipa PVC tipe AW diameter 11/2” m' 50,143.00 Revisi harga
35 A.5.1.1 29. Pemasangan 1 m’ pipa PVC tipe AW diameter 2” m' 64,399.00 Revisi harga
36 A.5.1.1 30. Pemasangan 1 m’ pipa PVC tipe AW diameter 21/2” m' 86,740.00 Revisi harga
37 A.5.1.1 31. Pemasangan 1 m’ pipa PVC tipe AW diameter 3” m' 113,470.00 Revisi harga
38 A.5.1.1 32. Pemasangan 1 m’ pipa PVC tipe AW diameter 4” m' 152,674.00 Revisi harga
39 A.5.1.1 33. Pemasangan 1 m’ pipa air limbah jenis pipa tanah diameter 20 cm m' 429,907.00 Revisi harga
40 A.5.1.1 34. Pemasangan 1 m’ pipa air limbah jenis pipa tanah diameter 16 cm m' 252,079.00 Revisi harga
41 A.5.1.1 35. Pemasangan 1 m’ pipa beton diameter 15 - 20 cm m' 125,465.00 Revisi harga
42 A.5.1.1.36. Pemasangan 1 m’ pipa beton diameter 30 - 100 cm m' 528,311.00 Revisi harga
43 dihit A.5.1.1.37. Pemasangan 1 m Talang Air Hujan PVC Persegi m' 50,952.00
44 dihit A.5.1.1.38. Pemasangan 1 m Talang Air Hujan PVC 1/2 Lingkaran 6" m¹ 50,952.00 Barang dipas
45 dihit A.5.1.1.39. Pemasangan 1 m Talang Air Hujan Galvanis 1/2 Lingkaran 6" m¹ 171,237.00 analisa lama
46 dihit A.5.1.1.40. Pemasangan 1 Unit Septictank Dinding Bata Trassram 2x1,5x1,5 m unit 13,274,195.00 Revisi harga
47 dihit A.5.1.1.41. Pemasangan 1 Unit Septictank Dinding Bata Trassram 1,5x1,2x1,7 m unit 9,090,284.00 Revisi harga
48 dihit A.5.1.1.42. Pembuatan 1 Unit Septictank Bio Filter Kapasitas 6 orang unit 5,950,009.00 revisi harga b
49 dihit A.5.1.1.43. Pembuatan 1 Unit Septictank Bio Filter Kapasitas 8 orang unit 6,816,505.00 revisi harga b
50 dihit A.5.1.1.44. Pembuatan 1 Unit Septictank Bio Filter Kapasitas 12 orang unit 9,588,046.00 revisi harga b

A.8.4.1 HARGA SATUAN PEKERJAAN PEMASANGAN PIPA DILUAR GEDUNG


1 A.8.4.1.1 (K3) Pemasangan 1 m pipa PVC AW Ø 63 mm m' 44,819.00 Revisi harga
2 dihit A.8.4.1.1.a Pemasangan 1 m pipa PVC Ø 63 mm (SNI.S-12,5 / 10 BAR) SCJ m' 50,292.00
3 dihit A.8.4.1.1.b Pemasangan 1 m pipa PVC Ø 63 mm (SNI.S-12,5 / 10 BAR) RRJ m' 55,207.00
4 dihit A.8.4.1.1.c Pemasangan 1 m pipa PVC AW Ø 75 mm m' 55,258.00 Revisi harga
5 dihit A.8.4.1.1.d Pemasangan 1 m pipa PVC Ø 75 mm (SNI.S-12,5 / 10 BAR) SCJ m' 72,369.00
6 A.8.4.1.2 (K3) Pemasangan 1 m pipa PVC AW Ø 90 mm m' 72,985.00 Revisi harga
7 dihit A.8.4.1.2.a Pemasangan 1 m pipa PVC Ø 90 mm (SNI.S-12,5 / 10 BAR) SCJ m' 92,400.00
8 dihit A.8.4.1.2.b Pemasangan 1 m pipa PVC Ø 90 mm (SNI.S-12,5 / 10 BAR) RRJ m' 99,161.00
9 A.8.4.1.3 (K3) Pemasangan 1 m pipa PVC AW Ø 110 mm m' 100,694.00 Revisi harga
10 dihit A.8.4.1.3.a Pemasangan 1 m pipa PVC Ø 110 mm (SNI.S-12,5 / 10 BAR) SCJ m' 127,836.00
11 dihit A.8.4.1.3.b Pemasangan 1 m pipa PVC Ø 110 mm (SNI.S-12,5 / 10 BAR) RRJ m' 141,124.00
12 A.8.4.1.4 (K3) Pemasangan 1 m pipa PVC AW Ø 160 mm m' 196,069.00 Revisi harga
13 dihit A.8.4.1.4.a Pemasangan 1 m pipa PVC Ø 160 mm (SNI.S-12,5 / 10 BAR) SCJ m' 250,354.00
14 dihit A.8.4.1.4.b Pemasangan 1 m pipa PVC Ø 160 mm (SNI.S-12,5 / 10 BAR) RRJ m' 277,055.00
15 A.8.4.1.5 (K3) Pemasangan 1 m pipa PVC AW Ø 200 mm m' 313,813.00 Revisi harga
16 dihit A.8.4.1.5.a Pemasangan 1 m pipa PVC Ø 200 mm (SNI.S-12,5 / 10 BAR) SCJ m' 410,936.00
K
E
T
E
HARGA SATUAN R
No KODE ANALISA URAIAN PEKERJAAN SATUAN
(Rp) A
N
17 dihit A.8.4.1.5.b Pemasangan 1 m pipa PVC Ø 200 mm (SNI.S-12,5 / 10 BAR) RRJ m' 431,957.00 G
18 A.8.4.1.6 (K3) Pemasangan 1 m pipa PVC AW Ø 250 mm m' 498,905.00 ARevisi harga
19 dihit A.8.4.1.6.a Pemasangan 1 m pipa PVC Ø 250 mm (SNI.S-12,5 / 10 BAR) SCJ m' 635,892.00 N
20 dihit A.8.4.1.6.b Pemasangan 1 m pipa PVC Ø 250 mm (SNI.S-12,5 / 10 BAR) RRJ m' 663,206.00
21 A.8.4.1.7 (K3) Pemasangan 1 m pipa PVC AW Ø 315 mm m' 772,805.00
22 dihit A.8.4.1.7.a Pemasangan 1 m pipa PVC Ø 315 mm (SNI.S-12,5 / 10 BAR) SCJ m' 989,656.00
23 dihit A.8.4.1.7.b Pemasangan 1 m pipa PVC Ø 315 mm (SNI.S-12,5 / 10 BAR) RRJ m' 952,568.00
22 A.8.4.1.8 (K3) Pemasangan 1 m pipa PVC AW Ø 400 mm m' 1,404,205.00 Harga PVC 1
24 dihit A.8.4.1.8.a Pemasangan 1 m pipa PVC Ø 400 mm (SNI.S-12,5 / 10 BAR) SCJ m' 1,490,981.00
25 dihit A.8.4.1.8.b Pemasangan 1 m pipa PVC Ø 400 mm (SNI.S-12,5 / 10 BAR) RRJ m' 1,566,027.00
26 A.8.4.1.17 (K3) Pemasangan 1 m pipa HDPE Ø 63 mm m' 78,490.00
27 A.8.4.1.18 (K3) Pemasangan 1 m pipa HDPE Ø 110 mm m' 213,185.00
28 A.8.4.1.19 (K3) Pemasangan 1 m pipa HDPE Ø 125 mm m' 269,769.00
29 A.8.4.1.20 (K3) Pemasangan 1 m pipa HDPE Ø 160 mm m' 419,622.00
30 A.8.4.1.21 (K3) Pemasangan 1 m pipa HDPE Ø 200 mm m' 688,314.00
31 A.8.4.1.22 (K3) Pemasangan 1 m pipa HDPE Ø 250 mm m' 1,052,469.00
32 A.8.4.1.23 (K3) Pemasangan 1 m pipa HDPE Ø 315 mm m' 1,682,433.00
33 A.8.4.1.24 (K3) Pemasangan 1 m pipa HDPE Ø 400 mm m' 2,745,165.00
34 A.8.4.1.25 (K3) Pemasangan 1 m pipa HDPE Ø 450 mm m' 3,465,121.00
35 A.8.4.1.26 (K3) Pemasangan 1 m pipa HDPE Ø 500 mm m' 4,236,386.00
36 A.8.4.1.27 (K3) Pemasangan 1 m pipa HDPE Ø 630 mm m' 6,644,247.00
37 A.8.4.1.28 (K3) Pemasangan 1 m pipa HDPE Ø 800 mm m' 14,735,582.00
38 A.8.4.1.33 (K3) Pemasangan 1 m pipa GIP Ø 63 mm m' 173,178.00 sudah digant
39 A.8.4.1.34 (K3) Pemasangan 1 m pipa GIP Ø 90 mm m' 257,106.00 sudah digant
40 A.8.4.1.35 (K3) Pemasangan 1 m pipa GIP Ø 110 mm m' 356,346.00 sudah digant
41 A.8.4.1.36 (K3) Pemasangan 1 m pipa GIP Ø 160 mm m' 507,576.00 sudah digant
42 A.8.4.1.37 (K3) Pemasangan 1 m pipa GIP Ø 200 mm m' 895,642.00 sudah digant
38 A.8.4.1.64 (K3) Pemasangan 1 m pipa baja Ø 63 mm m' 210,177.00 Revisi harga
39 A.8.4.1.65 (K3) Pemasangan 1 m pipa baja Ø 100 mm m' 444,339.00 Revisi harga
40 A.8.4.1.66 (K3) Pemasangan 1 m pipa baja Ø 125 mm m' 672,842.00 Revisi harga
41 A.8.4.1.67 (K3) Pemasangan 1 m pipa baja Ø 150 mm m' 737,720.00
42 A.8.4.1.68 (K3) Pemasangan 1 m pipa baja Ø 200 mm m' 1,168,684.00 Revisi harga
43 A.8.4.1.75 (K3) Pemasangan 1 m pipa baja Ø 800 mm m' 2,178,222.00
44 A.8.4.1.76 (K3) Pemasangan 1 m pipa baja Ø 900 mm m' 2,569,230.00
45 dihit A.8.4.1.77.a Pemasangan 1 m pipa baja Ø 1/2" , t = 1.5 mm (stainless steel) m' 45,458.00
46 dihit A.8.4.1.77.b Pemasangan 1 m pipa baja Ø 3/4" , t = 1.5 mm (stainless steel) m' 59,123.00
47 dihit A.8.4.1.77.c Pemasangan 1 m pipa baja Ø 1" , t = 1.5 mm (stainless steel) m' 72,455.00
48 dihit A.8.4.1.77.d Pemasangan 1 m pipa baja Ø 1.1/2" , t = 1.5 mm (stainless steel) m' 111,366.00
49 dihit A.8.4.1.77.e Pemasangan 1 m pipa baja Ø 2" , t = 1.5 mm (stainless steel) m' 138,141.00
50 dihit A.8.4.1.77.f Pemasangan 1 m pipa baja Ø 2.1/2" , t = 1.5 mm (stainless steel) m' 216,646.00
51 dihit A.8.4.1.77.g Pemasangan 1 m pipa baja Ø 3" , t = 1.5 mm (stainless steel) m' 256,671.00
52 dihit A.8.4.1.77.h Pemasangan 1 m pipa baja Ø 3.1/2" , t = 1.5 mm (stainless steel) m' 293,867.00
53 dihit A.8.4.1.77.i Pemasangan 1 m pipa baja Ø 4" , t = 1.5 mm (stainless steel) m' 329,414.00
54 dihit A.8.4.1.78.a Pekerjaan incian pipa GI Ø 0,5" panjang 0,5 m ( Las ) 0,5 m 24,575.00
55 dihit A.8.4.1.78.b Pekerjaan incian pipa GI Ø 1" panjang 0,5 m ( Las ) 0,5 m 55,055.00
56 dihit A.8.4.1.78.c Pekerjaan incian pipa GI Ø 2" panjang 0,5 m ( Las ) 0,5 m 108,515.00
57 dihit A.8.4.1.78.d Pekerjaan incian pipa GI Ø 3" panjang 0,5 m ( Las ) 0,5 m 172,057.60
58 dihit A.8.4.1.78.e Pekerjaan incian pipa GI Ø 4" panjang 0,5 m ( Las ) 0,5 m 243,851.30
59 dihit A.8.4.1.78.f Pekerjaan incian pipa GI Ø 0,5" panjang 0,5 m ( Drat ) 0,5 m 25,162.50
60 dihit A.8.4.1.78.g Pekerjaan incian pipa GI Ø 1" panjang 0,5 m ( Drat ) 0,5 m 39,985.00
61 dihit A.8.4.1.78.h Pekerjaan incian pipa GI Ø 2" panjang 0,5 m ( Drat ) 0,5 m 67,485.00
62 dihit A.8.4.1.78.i Pekerjaan incian pipa GI Ø 3" panjang 0,5 m ( Drat ) 0,5 m 110,567.60
63 dihit A.8.4.1.78.j Pekerjaan incian pipa GI Ø 4" panjang 0,5 m ( Drat ) 0,5 m 156,401.30
64 dihit A.8.4.1.78.k Pekerjaan incian pipa wall pipe GI Ø 2" panjang 0,5 m ( Las & Drat ) 0,5 m 447,315.00
65 dihit A.8.4.1.78.l Pekerjaan incian pipa wall pipe GI Ø 3" panjang 0,5 m ( Las & Drat ) 0,5 m 752,087.60
66 dihit A.8.4.1.78.m Pekerjaan incian pipa wall pipe GI Ø 4" panjang 0,5 m ( Las & Drat ) 0,5 m 938,061.30
K
E
T
E
HARGA SATUAN R
No KODE ANALISA URAIAN PEKERJAAN SATUAN
(Rp) A
N
A.8.4.2 HARGA SATUAN PEKERJAAN PEMOTONGAN PIPA G
1 A.8.4.2.1 (K3) Pemotongan 1 buah pipa PVC Ø 63 mm buah 750.00 A
2 A.8.4.2.2 (K3) Pemotongan 1 buah pipa PVC Ø 90 mm buah 2,172.00 N
3 A.8.4.2.3 (K3) Pemotongan 1 buah pipa PVC Ø 110 mm buah 3,454.00
4 A.8.4.2.4 (K3) Pemotongan 1 buah pipa PVC Ø 160 mm buah 4,829.00
5 A.8.4.2.5 (K3) Pemotongan 1 buah pipa PVC Ø 200 mm buah 12,771.00
6 A.8.4.2.6 (K3) Pemotongan 1 buah pipa PVC Ø 250 mm buah 20,322.00
7 A.8.4.2.7 (K3) Pemotongan 1 buah pipa PVC Ø 315 mm buah 24,475.00
8 A.8.4.2.8 (K3) Pemotongan 1 buah pipa PVC Ø 400 mm buah 52,580.00
9 A.8.4.2.17 (K3) Pemotongan 1 buah pipa HDPE Ø 63 mm buah 5,692.00
10 A.8.4.2.18 (K3) Pemotongan 1 buah pipa HDPE Ø 100 mm buah 10,847.00
11 A.8.4.2.19 (K3) Pemotongan 1 buah pipa HDPE Ø 125 mm buah 14,496.00
12 A.8.4.2.20 (K3) Pemotongan 1 buah pipa HDPE Ø 150 mm buah 19,558.00
13 A.8.4.2.21 (K3) Pemotongan 1 buah pipa HDPE Ø 200 mm buah 32,647.00
14 A.8.4.2.22 (K3) Pemotongan 1 buah pipa HDPE Ø 250 mm buah 44,250.00
15 A.8.4.2.23 (K3) Pemotongan 1 buah pipa HDPE Ø 300 mm buah 56,252.00
16 A.8.4.2.24 (K3) Pemotongan 1 buah pipa HDPE Ø 400 mm buah 91,158.00
17 A.8.4.2.25 (K3) Pemotongan 1 buah pipa HDPE Ø 450 mm buah 110,479.00
18 A.8.4.2.26 (K3) Pemotongan 1 buah pipa HDPE Ø 500 mm buah 130,279.00
19 A.8.4.2.27 (K3) Pemotongan 1 buah pipa HDPE Ø 600 mm buah 156,571.00
20 A.8.4.2.28 (K3) Pemotongan 1 buah pipa HDPE Ø 800 mm buah 252,694.00
21 A.8.4.2.64 (K3) Pemotongan 1 buah pipa baja Ø 63 mm buah 18,744.00
22 A.8.4.2.65 (K3) Pemotongan 1 buah pipa baja Ø 100 mm buah 27,029.00
23 A.8.4.2.66 (K3) Pemotongan 1 buah pipa baja Ø 125 mm buah 33,958.00
24 A.8.4.2.67 (K3) Pemotongan 1 buah pipa baja Ø 150 mm buah 41,578.00
25 A.8.4.2.68 (K3) Pemotongan 1 buah pipa baja Ø 200 mm buah 84,549.00
26 A.8.4.2.75 (K3) Pemotongan 1 buah pipa baja Ø 800 mm buah 398,449.00
27 A.8.4.2.76 (K3) Pemotongan 1 buah pipa baja Ø 900 mm buah 449,109.00

A.8.4.3 HARGA SATUAN PEKERJAAN PEMASANGAN AKSESORIS PIPA


1 dihit A.8.4.3.1.a Pemasangan 1 buah Valve HDPE Ø 63 mm buah 694,375.00
2 dihit A.8.4.3.1.b Pemasangan 1 buah Valve HDPE Ø 75 mm buah 1,234,255.00
3 dihit A.8.4.3.1.c Pemasangan 1 buah Valve HDPE Ø 90 mm buah 1,611,885.00
4 dihit A.8.4.3.1.d Pemasangan 1 buah Valve HDPE Ø 110 mm buah 2,849,165.00
5 dihit A.8.4.3.15.a Pemasangan 1 buah Tee HDPE Ø 63 mm buah 197,340.00
6 dihit A.8.4.3.15.b Pemasangan 1 buah Tee HDPE Ø 90 mm buah 363,110.00
7 dihit A.8.4.3.15.c Pemasangan 1 buah Tee HDPE Ø 110 mm buah 506,880.00

A.8.4.4 HARGA SATUAN PEKERJAAN PENYAMBUNGAN PIPA BARU KE PIPA LAMA


1 A.8.4.4.1 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 80 mm buah 1,462,537.00
2 A.8.4.4.2 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 100 mm buah 1,877,475.00
3 A.8.4.4.3 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 150 mm buah 2,914,819.00
4 A.8.4.4.4 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 200 mm buah 3,952,163.00

A.8.4.5 HARGA SATUAN PEKERJAAN PENGETESAN PIPA


1 A.8.4.5.1 (K3) Pengetesan 1 m pipa Ø 50 mm m' 1,440.00
2 A.8.4.5.2 (K3) Pengetesan 1 m pipa Ø 75 mm m' 1,449.00
3 A.8.4.5.3 (K3) Pengetesan 1 m pipa Ø 100 mm m' 1,466.00
4 A.8.4.5.4 (K3) Pengetesan 1 m pipa Ø 150 mm m' 1,508.00
5 A.8.4.5.5 (K3) Pengetesan 1 m pipa Ø 200 mm m' 1,563.00
6 A.8.4.5.6 (K3) Pengetesan 1 m pipa Ø 250 mm m' 1,639.00
7 A.8.4.5.7 (K3) Pengetesan 1 m pipa Ø 300 mm m' 1,732.00
8 A.8.4.5.8 (K3) Pengetesan 1 m pipa Ø 400 mm m' 1,965.00
9 A.8.4.5.9 (K3) Pengetesan 1 m pipa Ø 500 mm m' 2,101.00
10 A.8.4.5.10 (K3) Pengetesan 1 m pipa Ø 600 mm m' 2,630.00
K
E
T
E
HARGA SATUAN R
No KODE ANALISA URAIAN PEKERJAAN SATUAN
(Rp) A
N
A.8.4.6 HARGA SATUAN PEKERJAAN ELEKTRIKAL G
1 A.8.4.6.1 (K3) Pemasangan 1 buah titik lampu (lengkap terpasang dengan fitting keramik) buah 273,845.00 A
2 dihit A.8.4.6.1.a Pemasangan 1 buah instalasi titik lampu (tanpa saklar & fitting) buah 224,125.00 N
3 dihit A.8.4.6.1.b Pemasangan 2 buah instalasi titik lampu ( dalam 1 saklar ) unit 300,355.00
4 dihit A.8.4.6.1.c Pemasangan 3 buah instalasi titik lampu ( dalam 1 saklar ) unit 355,355.00
5 dihit A.8.4.6.1.d Pemasangan 4 buah instalasi titik lampu ( dalam 1 saklar ) unit 411,345.00
6 A.8.4.6.2 (K3) Pemasangan 1 buah MCB (6 A) buah 306,680.00
7 dihit A.8.4.6.3 1 unit - pemasangan box panel unit 7,153,135.00
Pemasangan 1 Unit Panel MCB Ukuran Box 30x40x15 cm untuk 6 Grup MCB
8 dihit A.8.4.6.3.a unit 696,850.00 Revisi harga
(1.Phasa)
Pemasangan 1 Unit Panel MCB Ukuran Box 40x50x20 cm untuk 12 Grup MCB
9 dihit A.8.4.6.3.b unit 1,203,950.00
(1.Phasa)
Pemasangan 1 Unit Panel MCB Ukuran Box 30x40x15 cm untuk 6 Grup MCB (3
10 dihit A.8.4.6.3.c unit 1,911,250.00 Revisi harga
Phasa)
Pemasangan 1 Unit Panel MCB Ukuran Box 40x50x20 cm untuk 12 Grup MCB (3
11 dihit A.8.4.6.3.d unit 3,632,750.00
Phasa)
12 dihit A.8.4.6.4 Pasang Saklar Tunggal sekualitas Broco, clipsal buah 29,012.00
13 dihit A.8.4.6.5 Pasang Saklar Ganda sekualitas Broco, clipsal buah 32,312.00
14 dihit A.8.4.6.6 Pasang Saklar Triple sekualitas Broco, clipsal buah 64,762.00
15 dihit A.8.4.6.7 Pasang Stop Kontak sekualitas Broco, clipsal buah 30,112.00
16 dihit A.8.4.6.7.a Pemasangan 1 buah instalasi stop kontak (tanpa stop kontak) buah 175,010.00
17 dihit A.8.4.6.8 Pasang Stop Kontak AC, Sekualtas Broco, clipsal buah 84,562.00
18 dihit A.8.4.6.9 1 m' memasang kabel NYM 3 x 1.5 mm m¹ 15,895.00
19 dihit A.8.4.6.10 1 m' memasang kabel NYM 2 x 2.5 mm m¹ 16,995.00
20 dihit A.8.4.6.11 1 m' memasang kabel NYY 3 x 2.5 mm m¹ 20,845.00
21 dihit A.8.4.6.12 1 m' memasang kabel NYY 3 x 4 mm m¹ 29,095.00
22 dihit A.8.4.6.13 1 m' memasang kabel NYY 3 x 6 mm m¹ 42,295.00 harga kabel n
23 dihit A.8.4.6.14 1 m' memasang kabel NYA 1 x 1.5 mm m¹ 7,535.00
24 dihit A.8.4.6.15 1 m' memasang kabel NYA 1 x 2.5 mm m¹ 8,525.00
25 Ls Penangkal Petir Konvensional 2 AIP- BC 25 mm (termasuk biaya pemasangan) unit 2,362,500.00 dihilangkan k
26 Ls Penangkal Petir Konvensional 3 AIP- BC 25 mm (termasuk biaya pemasangan) unit 2,625,000.00 dihilangkan k
27 Ls Penangkal Petir Konvensional 4 AIP- BC 25 mm (termasuk biaya pemasangan) unit 3,150,000.00 dihilangkan k

28 Ls Penangkal Petir Elektrostatis Kurn R 35 M - BC 50 mm (termasuk biaya pemasangan) unit 7,350,000.00 dihilangkan k

29 Ls Penangkal Petir Elektrostatis Kurn R 85 M - BC 50 mm (termasuk biaya pemasangan) unit 8,925,000.00 dihilangkan k

Penangkal Petir Elektrostatis Kurn R 150 M - BC 50 mm (termasuk biaya


30 Ls unit 9,187,500.00
pemasangan)

AD.1 HARGA SATUAN PEKERJAAN SANITASI DILUAR GEDUNG


1 dihit AD.1.1 Got Normal U - Ø 15 cm ( lengkap terpasang ) m¹ 78,655.00 revisi harga s
2 dihit AD.1.1.a Got Normal U - Ø 15 cm ( tanpa bata penjepit ) m¹ 47,383.00 revisi harga s
3 dihit AD.1.2 Got Normal U - Ø 20 cm ( lengkap terpasang ) m¹ 99,889.00 revisi harga s
4 dihit AD.1.2.a Got Normal U - Ø 20 cm ( tanpa bata penjepit ) m¹ 58,472.00 revisi harga s
5 dihit AD.1.3 Got Normal U - Ø 30 cm ( lengkap terpasang ) m¹ 134,715.00 revisi harga s
6 dihit AD.1.3.a Got Normal U - Ø 30 cm ( tanpa bata penjepit ) m¹ 65,610.00 revisi harga s
7 dihit AD.1.4 Got Normal U - Ø 40 cm ( lengkap terpasang ) m¹ 223,034.00 revisi harga s
8 dihit AD.1.4.a Got Normal U - Ø 40 cm ( tanpa bata penjepit ) m¹ 151,161.00 revisi harga s
9 dihit AD.1.5 Got Normal U - Ø 60 cm ( lengkap terpasang ) m¹ 333,991.00 revisi harga s
10 dihit AD.1.5.a Got Normal U - Ø 60 cm ( tanpa bata penjepit ) m¹ 255,581.00 revisi harga s
11 dihit AD.1.6 Buis beton Ø 20 cm ( lengkap terpasang ) m¹ 123,712.00 revisi harga s
12 dihit AD.1.7 Buis beton Ø 30 cm ( lengkap terpasang ) m¹ 177,004.00 revisi harga s
13 dihit AD.1.8 Buis beton Ø 40 cm ( lengkap terpasang ) m¹ 263,750.00 revisi harga s
14 dihit AD.1.9 Buis beton Ø 60 cm ( lengkap terpasang ) m¹ 360,550.00 revisi harga s
15 dihit AD.1.10 Buis beton Ø 80 cm ( lengkap terpasang ) m¹ 1,231,750.00 revisi harga s
16 dihit AD.1.11 Buis beton Ø 100 cm ( lengkap terpasang ) m¹ 1,473,750.00 revisi harga s
17 dihit AD.1.12 U-Ditch 20 x 20 cm, K - 350, Fabrikasi ( terpasang ) m¹ 176,331.00
18 dihit AD.1.13 U-Ditch 30 x 30 cm, K - 350, Fabrikasi ( terpasang ) m¹ 370,429.00
19 dihit AD.1.14 U-Ditch 40 x 40 cm, K - 350, Fabrikasi ( terpasang ) m¹ 510,048.00
20 dihit AD.1.15 U-Ditch 50 x 50 cm, K - 350, Fabrikasi ( terpasang ) m¹ 689,623.00
21 dihit AD.1.16 U-Ditch 60 x 60 cm, K - 350, Fabrikasi ( terpasang ) m¹ 883,263.00
22 dihit AD.1.17 U-Ditch 60 x 80 cm, K - 350, Fabrikasi ( terpasang ) m¹ 1,001,238.00
23 dihit AD.1.18 U-Ditch 80 x 80 cm, K - 350, Fabrikasi ( terpasang ) m¹ 1,281,542.00
24 dihit AD.1.19 U-Ditch 80 x 100 cm, K - 350, Fabrikasi ( terpasang ) m¹ 1,425,229.00
25 dihit AD.1.20 U-Ditch 100 x 100 cm, K - 350, Fabrikasi ( terpasang ) m¹ 1,942,890.00
26 dihit AD.1.20a U-Ditch 100 x 120 cm, K - 350, Fabrikasi ( terpasang ) m¹ 2,148,590.00
27 dihit AD.1.21 U-Ditch 120 x 120 cm, K - 350, Fabrikasi ( terpasang ) m¹ 2,715,159.00
28 dihit AD.1.21a U-Ditch 140 x 140 cm, K - 350, Fabrikasi ( terpasang ) m¹ 3,256,225.00
29 dihit AD.1.22 Tutup U-Ditch 20 cm, K - 350, Fabrikasi, untuk beban ringan ( terpasang ) m¹ 149,250.00
K
E
T
E
HARGA SATUAN R
No KODE ANALISA URAIAN PEKERJAAN SATUAN
(Rp) A
N
30 dihit AD.1.23 Tutup U-Ditch 30 cm, K - 350, Fabrikasi, untuk beban berat ( terpasang ) m¹ 446,946.00 G
31 dihit AD.1.24 Tutup U-Ditch 40 cm, K - 350, Fabrikasi, untuk beban ringan ( terpasang ) m¹ 275,933.00 A
32 dihit AD.1.24.a Tutup U-Ditch 40 cm, K - 350, Fabrikasi, untuk beban berat ( terpasang ) m¹ 530,649.00 N
33 dihit AD.1.25 Tutup U-Ditch 50 cm, K - 350, Fabrikasi, untuk beban ringan ( terpasang ) m¹ 303,983.00
34 dihit AD.1.26 Tutup U-Ditch 60 cm, K - 350, Fabrikasi, untuk beban ringan ( terpasang ) m¹ 344,500.00
35 dihit AD.1.27 Tutup U-Ditch 60 cm, K - 350, Fabrikasi, untuk beban berat ( terpasang ) m¹ 730,248.00
36 dihit AD.1.28 Tutup U-Ditch 80 cm, K - 350, Fabrikasi, untuk beban ringan ( terpasang ) m¹ 488,416.00
37 dihit AD.1.29 Tutup U-Ditch 80 cm, K - 350, Fabrikasi, untuk beban berat ( terpasang ) m¹ 1,058,620.00
38 dihit AD.1.30 Tutup U-Ditch 100 cm, K - 350, Fabrikasi, untuk beban ringan ( terpasang ) m¹ 627,933.00
39 dihit AD.1.31 Tutup U-Ditch 100 cm, K - 350, Fabrikasi, untuk beban berat ( terpasang ) m¹ 1,799,066.00
40 dihit AD.1.36 Box Culvert 80 x 80 cm, K - 350, Fabrikasi, untuk beban ringan ( terpasang ) m¹ 2,353,060.00
41 dihit AD.1.37 Box Culvert 80 x 80 cm, K - 350, Fabrikasi, untuk beban berat ( terpasang ) m¹ 3,293,543.00
42 dihit AD.1.38 Box Culvert 100 x 100 cm, K - 350, Fabrikasi, untuk beban ringan ( terpasang ) m¹ 3,601,022.00
43 dihit AD.1.39 Box Culvert 100 x 100 cm, K - 350, Fabrikasi, untuk beban berat ( terpasang ) m¹ 5,135,236.00
44 dihit AD.1.40 Box Culvert 120 x 120 cm, K - 350, Fabrikasi, untuk beban ringan ( terpasang ) m¹ 4,839,132.00
45 dihit AD.1.41 Box Culvert 120 x 120 cm, K - 350, Fabrikasi, untuk beban berat ( terpasang ) m¹ 6,666,452.00

AD.2 HARGA SATUAN PEKERJAAN LANGSIRAN


1 dihit AD.2.1 Mengangkut 1 m3 material / hasil galian / Beton Segar dengan jarak angkut 10m m¹ 28,392.00
2 dihit AD.2.2 Mengangkut 1 m3 material / hasil galian / Beton Segar dengan jarak angkut 30m m¹ 35,341.00
3 dihit AD.2.3 Mengangkut 1 m3 material / hasil galian / Beton Segar dengan jarak angkut 50m m¹ 41,894.00

4 dihit AD.2.4 Mengangkut 1 m3 material / hasil galian / Beton Segar dengan jarak angkut 100 m m¹ 59,565.00

5 dihit AD.2.5 Mengangkut 1 m3 material / hasil galian / Beton Segar dengan jarak angkut 200 m m¹ 94,311.00

6 dihit AD.2.6 Mengangkut 1 m3 material / hasil galian / Beton Segar dengan jarak angkut 300 m m¹ 129,057.00

AD.3 HARGA SATUAN PEKERJAAN PAGAR BETON DAN BESI


Pasang Pagar Panel Beton 240 x 40 x 5 cm & Kolom 225 x 18 x 17 cm, tinggi 160
1 dihit AD.3.1 m¹ 692,719.00 revisi harga s
cm
Pasang Pagar Panel Beton 240 x 40 x 5 cm & Kolom 280 x 18 x 17 cm, tinggi 200
2 dihit AD.3.2 m¹ 766,844.00 revisi harga s
cm
Pasang Pagar Panel Beton 240 x 40 x 5 cm & Kolom 320 x 18 x 17 cm, tinggi 240
3 dihit AD.3.3 m¹ 871,995.00 revisi harga s
cm
Pasang Pagar Panel Beton 240 x 40 x 5 cm & Kolom 370 x 18 x 17 cm, tinggi
4 dihit AD.3.4 m¹ 974,258.00 revisi harga s
280cm
Pasang Pagar Panel Beton 240 x 45 x 5 cm & Kolom 225 x 18 x 17 cm, tinggi 180
5 dihit AD.3.5 m¹ 701,825.00 revisi harga s
cm
Pasang Pagar Panel Beton 240 x 45 x 5 cm & Kolom 280 x 18 x 17 cm, tinggi 225
6 dihit AD.3.6 m¹ 812,677.00 revisi harga s
cm
Pasang Pagar Panel Beton 240 x 45 x 5 cm & Kolom 320 x 18 x 17 cm, tinggi 270
7 dihit AD.3.7 m¹ 926,995.00 revisi harga s
cm
Pasang Pagar Panel Beton 240 x 45 x 5 cm & Kolom 370 x 18 x 17 cm, tinggi 315
8 dihit AD.3.8 m¹ 1,038,425.00 revisi harga s
cm
Pasang Pagar Panel Beton 240 x 50 x 5 cm & Kolom 225 x 18 x 17 cm, tinggi 150
9 dihit AD.3.9 m¹ 695,010.00 revisi harga s
cm
Pasang Pagar Panel Beton 240 x 50 x 5 cm & Kolom 280 x 18 x 17 cm, tinggi 200
10 dihit AD.3.10 m¹ 792,052.00 revisi harga s
cm
Pasang Pagar Panel Beton 240 x 50 x 5 cm & Kolom 320 x 18 x 17 cm, tinggi 250
11 dihit AD.3.11 m¹ 920,120.00 revisi harga s
cm
Pasang Pagar Panel Beton 240 x 50 x 5 cm & Kolom 350 x 18 x 17 cm, tinggi 300
12 dihit AD.3.12 m¹ 1,027,397.00 revisi harga s
cm
13 dihit AD.3.13 Pasang Pagar BRC tinggi 90 cm + tiang Ø 2,0" m¹ 537,315.00 Harga pagar
14 dihit AD.3.14 Pasang Pagar BRC tinggi 120 cm + tiang Ø 2,0" m¹ 596,898.00 Harga pagar B
15 dihit AD.3.15 Pasang Pagar BRC tinggi 175 cm + tiang Ø 2,0" m¹ 473,088.00 Harga pagar
16 dihit AD.3.16 Pasang Pagar BRC tinggi 190 cm + tiang Ø 2,0" m¹ 518,921.00 Harga pagar B
17 dihit AD.3.17 Pemasangan 1 m2 Kawat Berduri diatas Pagar Panel Beton tinggi 50 cm - 4 lajur m¹ 67,764.00
18 dihit AD.3.18 Pemasangan 1 m2 Kawat Berduri diatas Pagar Panel Beton tinggi 60 cm - 5 lajur m¹ 77,574.00
19 dihit AD.3.19 Pemasangan 1 m2 Kawat Berduri diatas Pagar Panel Beton tinggi 60 cm - 7 lajur m¹ 92,094.00
20 LS Pekerjaan Pagar Railling Besi Hollow Meni tinggi s/d 120 cm m¹ 495,000.00
21 LS Pekerjaan Pintu Pagar Pipa Stainless tinggi s/d 200 cm m¹ 1,650,000.00
22 LS Pekerjaan Pintu Pagar Besi Hollow Meni tinggi s/d 200 cm m¹ 770,000.00
23 dihit AD.3.23 Pekerjaan railling tangga pipa stainless steel (SS.304) m¹ 501,500.00
24 dihit AD.3.24 Pekerjaan railling tangga pipa besi hollow m¹ 144,112.00
K
E
T
E
HARGA SATUAN R
No KODE ANALISA URAIAN PEKERJAAN SATUAN
(Rp) A
N
AD.4 HARGA SATUAN PEKERJAAN SUMUR DALAM / AIR TANAH & AIR BERSIH G
1 dihit A.T.01.1 Mobillisasi & demobilisasi drilling rig dan peralatan bor unit 2,332,000.00 A
2 dihit A.T.01.2 Pembuatan bak untuk sirkulasi air kerja unit 402,353.00 Nrevisi harga s
3 dihit A.T.02 Pengeboran dia. 8 3/4" m' 548,424.00
4 dihit A.T.02.1 Pengeboran dia. 6" m' 396,433.00
5 dihit A.T.02.2 Pengeboran Lubang Pandu 4" dari 0 m - 40 m m¹ 330,638.00
6 dihit A.T.02.3 Pengeboran Lubang Pandu 4" dari 40 m - 80 m m¹ 353,848.00
7 dihit A.T.02.4 Pengeboran Lubang Pandu 4" dari 80 m - 120 m m¹ 388,663.00
8 dihit A.T.03 1 m' Reaming Ø8 3/4" - Ø12" m' 507,119.00
9 dihit A.T.03.1 1 m' Reaming Ø6" - Ø8" m' 360,612.00
10 dihit A.T.03.2 Reaming dari 0 m - 40 m dari Ø4'' ke Ø8'' m¹ 290,598.00
11 dihit A.T.03.3 Reaming dari 40 m - 80 m dari Ø4'' ke Ø8'' m¹ 313,808.00
12 dihit A.T.03.4 Reaming dari 80 m - 120 m dari Ø4'' ke Ø8'' m¹ 337,018.00
13 dihit A.T.03.5 Reaming dari 0 m - 40 m dari Ø4'' ke Ø6'' m¹ 190,659.00
14 dihit A.T.03.6 Reaming dari 40 m - 80 m dari Ø4'' ke Ø6'' m¹ 227,764.00
15 dihit A.T.03.7 Reaming dari 80 m - 120 m dari Ø4'' ke Ø6'' m¹ 264,869.00
16 dihit A.T.05 Bongkar Pasang Temporary Cassing (ID) 12" m' 342,921.00
17 dihit A.T.07 Pengadaan dan Pemasangan Cassing Pipa Black Steel 6" m' 868,842.00
18 dihit A.T.07.1 Pengadaan dan Pemasangan Cassing Pipa Galvanis GI. SNI (Medium A) dia. 4" m' 441,508.00
19 dihit A.T.08 Pengadaan dan Pemasangan LC Screen 6" m' 1,489,000.00
20 dihit A.T.08.1 Pengadaan dan Pemasangan ST. Screen dia. 4" m' 1,445,396.00
21 dihit A.T.08.2 Pengadaan dan Pemasangan LC. Screen dia. 4" m' 1,157,801.00
22 dihit A.T.08.3 Pengadaan dan Pemasangan PVC. Screen dia. 4" m' 317,413.00
23 dihit A.T.12 Pengadaan dan Pemasangan Gravel Pack m3 468,665.00
24 dihit A.T.13 Pencucian Sumur (Well Development) jam 91,015.00 Koefisien me
25 dihit A.T.14 Uji Pemompaan (Pumping Test) jam 35,502.00 Koefisien me
26 dihit A.T.15 Pasang dan bongkar peralatan uji Unit 2,132,900.00
27 dihit A.T.16 Pemeriksaan Kualitas Air Spl 1,743,500.00
28 dihit A.T.18 Electric Logging ttk 1,333,750.00
29 dihit A.T.18.1 Bor Hole Logging m¹ 37,510.00
30 dihit A.T.18.2 Grouting 1 : 2 m3 1,450,580.00 revisi harga s

AD.5 HARGA SATUAN PEKERJAAN PERTAMANAN


1 dihit AD.5.1 Penanaman 1 m2 rumput gajah mini m2 56,883.00 revisi harga s
2 dihit AD.5.2 Penanaman 1 m2 rumput golf m2 68,983.00
3 dihit AD.5.3 Penanaman 1 m2 rumput jepang m2 44,783.00
4 dihit AD.5.4 Penyiapan media tanah dalam Polybag untuk tanaman Semak buah 4,746.00
5 dihit AD.5.5 Penanaman 1 Pohon Peneduh cemara kipas **) buah 119,785.00
6 dihit AD.5.6 Penanaman 1 Pohon Peneduh glodogan pecut **) Besar buah 771,540.00
7 dihit AD.5.7 Penanaman 1 Pohon Peneduh ketapang kencana **) Besar buah 605,985.00
8 dihit AD.5.8 Penanaman 1 Pohon Peneduh palem botol **) Besar buah 276,540.00
9 dihit AD.5.9 Penanaman 1 Pohon Peneduh palem ekor tupai **) Besar buah 404,140.00
10 dihit AD.5.10 Penanaman 1 Pohon Peneduh pucuk merah **) buah 72,302.00
11 dihit AD.5.11 Penanaman 1 Pohon Peneduh tabebuya kuning **) Besar buah 993,190.00
12 dihit AD.5.12 Penanaman 1 Pohon Peneduh trembesi **) Besar buah 771,540.00
**) Besar / Kecilnya pohon peneduh disesuaikan ketersediaan barang
AD.6 HARGA SATUAN PEKERJAAN LAIN - LAIN
1 dihit AD.6.1 Sewa Scaffolding (m3 ruang) (m3 ruang) 11,421.00 revisi harga s
2 dihit AD.6.2 Pemasangan platik cor m2 925.00
3 dihit AD.6.3 Pemasangan Letter / logo Pemerintah dari bahan Marmer uk. ( 40 x 50 ) cm2 buah 1,000,000.00
4 dihit AD.6.4 1 m3 bronjong penahan kawat Ø 3 mm m3 927,987.00
5 dihit AD.6.5 Penyediaan dan Pemasangan rangka panggung besi IWF Kg 19,250.00
6 dihit AD.6.6 Pasang penutup panggung multiplek 18 mm m2 176,336.00
ANALISA HARGA SATUAN PEKERJAAN BIDANG CIPTA KARYA
SESUAI PERMEN PU NO. 28/PRT/M/2016

A.2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN


A.2.2.1.1. (K3) Pembuatan 1 m2 pagar sementara dari kayu tinggi 2 meter
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.400 85,000.00 34,000.00
Tukang Kayu L.02 OH 0.200 110,000.00 22,000.00
Kepala Tukang L.03 OH 0.020 100,000.00 2,000.00
Mandor L.04 OH 0.020 105,000.00 2,100.00
JUMLAH TENAGA KERJA 60,100.00
B BAHAN
Bambu Ø 10 cm panjang 400 cm M.23.b Batang 1.250 14,000.00 17,500.00
Portland cement M.245.a Kg 5.000 1,300.00 6,500.00
Pasir Beton (muntilan) M.9.a m3 0.005 352,000.00 1,760.00
Koral beton M.11.b m3 0.009 350,000.00 3,150.00
Kayu Sengon (balok) M.28.b m3 0.072 2,750,000.00 198,000.00
Paku 5 cm M.56.d Kg 0.060 18,000.00 1,080.00
Residu M.391 Liter 0.400 26,300.00 10,520.00
JUMLAH HARGA BAHAN 238,510.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 298,610.00
E Overhead & Profit 10% 0.100 29,861.00
F Harga Satuan Pekerjaan (D+E) 328,471.00

A.2.2.1.3. Pembuatan 1 m2 pagar sementara dari kawat duri tinggi 1,8 meter
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.200 85,000.00 17,000.00
Tukang Kayu L.02 OH 0.300 110,000.00 33,000.00
Kepala Tukang L.03 OH 0.020 100,000.00 2,000.00
Mandor L.04 OH 0.020 105,000.00 2,100.00
JUMLAH TENAGA KERJA 54,100.00
B BAHAN
Bambu Ø 10 cm panjang 400 cm M.23.b Batang 1.000 14,000.00 14,000.00
Portland cement M.245.a Kg 2.000 1,300.00 2,600.00
Kawat duri M.55.b M’ 25.000 6,000.00 150,000.00
Pasir Beton (muntilan) M.9.a m3 0.005 352,000.00 1,760.00
Koral bulat M.11.a m3 0.009 245,300.00 2,207.70
Paku 5 cm M.56.d Kg 0.060 18,000.00 1,080.00
JUMLAH HARGA BAHAN 171,647.70
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 225,747.70
E Overhead & Profit 10% 0.100 22,574.77
F Harga Satuan Pekerjaan (D+E) 248,322.00

A.2.2.1.4. Pengukuran dan pemasangan 1 m’ Bouwplank


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.100 85,000.00 8,500.00
Tukang Kayu L.02 OH 0.100 110,000.00 11,000.00
Kepala Tukang L.03 OH 0.010 100,000.00 1,000.00
Mandor L.04 OH 0.005 105,000.00 525.00
JUMLAH TENAGA KERJA 21,025.00
B BAHAN
Kayu Sengon (balok) M.28.b m3 0.012 2,750,000.00 33,000.00
Paku 5 cm M.56.d Kg 0.020 18,000.00 360.00
Kayu Meranti (papan) M.29.b m3 0.007 7,000,000.00 49,000.00
JUMLAH HARGA BAHAN 82,360.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 103,385.00
E Overhead & Profit 10% 0.100 10,338.50
F Harga Satuan Pekerjaan (D+E) 113,723.00
A.2.2.1.5. (K3) Pembuatan 1 m2 kantor sementara lantai plesteran
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 2.000 85,000.00 170,000.00
Tukang Kayu L.02 OH 2.000 110,000.00 220,000.00
Tukang batu L.02 OH 1.000 100,000.00 100,000.00
Kepala Tukang L.03 OH 0.300 100,000.00 30,000.00
Mandor L.04 OH 0.050 105,000.00 5,250.00
JUMLAH TENAGA KERJA 525,250.00
B BAHAN
Bambu Ø 10 cm panjang 400 cm M.23.b Batang 1.250 14,000.00 17,500.00
Kayu kruing (balok) M.18.a m3 0.180 7,800,000.00 1,404,000.00
Paku 3,5 cm M.56.c Kg 0.080 18,000.00 1,440.00
Besi strip M.46.g Kg 1.100 15,500.00 17,050.00
Portland cement M.245.a Kg 35.000 1,300.00 45,500.00
Pasir Beton (muntilan) M.9.a m3 0.150 352,000.00 52,800.00
Pasir Beton (muntilan) M.9.a m3 0.100 352,000.00 35,200.00
Koral beton M.11.b m3 0.150 350,000.00 52,500.00
Bata merah 5 x 11 x 22 cm M.218.a buah 30.000 700.00 21,000.00
Seng plat bjls 30 M.137.g Lembar 0.250 53,500.00 13,375.00
Jendela nako M.351.a buah 0.200 17,500.00 3,500.00
Kaca polos 8 mm M.352.c m2 0.080 202,500.00 16,200.00
Kunci tanam antik M.312.a buah 0.150 150,000.00 22,500.00
Plywood 4 mm (120x240) M.32.a Lembar 0.060 58,000.00 3,480.00
JUMLAH HARGA BAHAN 1,706,045.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 2,231,295.00
E Overhead & Profit 10% 0.100 223,129.50
F Harga Satuan Pekerjaan (D+E) 2,454,424.00

A.2.2.1.6. (K3) Pembuatan 1 m2 rumah jaga (konstruksi kayu )


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.000 85,000.00 85,000.00
Tukang Kayu L.02 OH 1.500 110,000.00 165,000.00
Kepala Tukang L.03 OH 0.150 100,000.00 15,000.00
Mandor L.04 OH 0.050 105,000.00 5,250.00
JUMLAH TENAGA KERJA 270,250.00
B BAHAN
Bambu Ø 10 cm panjang 400 cm M.23.b Batang 3.000 14,000.00 42,000.00
Kayu kruing (balok) M.18.a m3 0.276 7,800,000.00 2,152,800.00
Paku 3,5 cm M.56.c Kg 0.700 18,000.00 12,600.00
Seng gelombang bjls 28 M.137.c Lembar 1.500 61,000.00 91,500.00
JUMLAH HARGA BAHAN 2,298,900.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 2,569,150.00
E Overhead & Profit 10% 0.100 256,915.00
F Harga Satuan Pekerjaan (D+E) 2,826,065.00
A.2.2.1.7. (K3) Pembuatan 1 m2 gudang semen dan peralatan
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.000 85,000.00 85,000.00
Tukang Kayu L.02 OH 2.000 110,000.00 220,000.00
Kepala Tukang L.03 OH 0.200 100,000.00 20,000.00
Mandor L.04 OH 0.050 105,000.00 5,250.00
JUMLAH TENAGA KERJA 330,250.00
B BAHAN
Bambu Ø 10 cm panjang 400 cm M.23.b Batang 1.700 14,000.00 23,800.00
Kayu kruing (balok) M.18.a m3 0.210 7,800,000.00 1,638,000.00
Paku 3,5 cm M.56.c Kg 0.300 18,000.00 5,400.00
Portland cement M.245.a Kg 10.500 1,300.00 13,650.00
Pasir Beton (muntilan) M.9.a m3 0.030 352,000.00 10,560.00
Koral beton M.11.b m3 0.050 350,000.00 17,500.00
Seng gelombang bljs 30 M.137.b Lembar 1.500 62,000.00 93,000.00
Seng plat bjls 28 M.137.f Lembar 0.250 37,500.00 9,375.00
JUMLAH HARGA BAHAN 1,811,285.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 2,141,535.00
E Overhead & Profit 10% 0.100 214,153.50
F Harga Satuan Pekerjaan (D+E) 2,355,688.00

A.2.2.1.8. (K3) Pembuatan 1 m2 bedeng pekerja


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.000 85,000.00 85,000.00
Tukang Kayu L.02 OH 2.000 110,000.00 220,000.00
Kepala Tukang L.03 OH 0.200 100,000.00 20,000.00
Mandor L.04 OH 0.050 105,000.00 5,250.00
JUMLAH TENAGA KERJA 330,250.00
B BAHAN
Bambu Ø 10 cm panjang 400 cm M.23.b Batang 1.250 14,000.00 17,500.00
Kayu kruing (balok) M.18.a m3 0.186 7,800,000.00 1,450,800.00
Paku 3,5 cm M.56.c Kg 0.300 18,000.00 5,400.00
Portland cement M.245.a Kg 18.000 1,300.00 23,400.00
Pasir Beton (muntilan) M.9.a m3 0.030 352,000.00 10,560.00
Koral beton M.11.b m3 0.050 350,000.00 17,500.00
Seng gelombang 3"-5" M.137.a Lembar 1.500 54,300.00 81,450.00
Teakwood 4 mm (120x240) M.31.b Lembar 1.350 113,500.00 153,225.00
JUMLAH HARGA BAHAN 1,759,835.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 2,090,085.00
E Overhead & Profit 10% 0.100 209,008.50
F Harga Satuan Pekerjaan (D+E) 2,299,093.00

A.2.2.1.9. (K3) Pembersihan 1 m2 lapangan dan perataan


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.100 85,000.00 8,500.00
Mandor L.04 OH 0.050 105,000.00 5,250.00
JUMLAH TENAGA KERJA 13,750.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 13,750.00
E Overhead & Profit 10% 0.100 1,375.00
F Harga Satuan Pekerjaan (D+E) 15,125.00
A.2.2.1.10. (K3) Pembuatan 1 m2 steger/perancah dari bambu
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.000 85,000.00 85,000.00
Tukang Kayu L.02 OH 2.000 110,000.00 220,000.00
Kepala Tukang L.03 OH 0.200 100,000.00 20,000.00
Mandor L.04 OH 0.050 105,000.00 5,250.00
JUMLAH TENAGA KERJA 330,250.00
B BAHAN
Bambu Ø 6 - 8 cm, panjang 400 cm M.23.a Batang 1.250 12,000.00 15,000.00
Tali ijuk M.556 kg 0.186 11,000.00 2,046.00
JUMLAH HARGA BAHAN 17,046.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 347,296.00
E Overhead & Profit 10% 0.100 34,729.60
F Harga Satuan Pekerjaan (D+E) 382,025.00

A.2.2.1.11. Pembuatan 1 buah kotak adukan ukuran 40cm x50cm x25cm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Tukang Kayu L.02 OH 0.300 110,000.00 33,000.00
Kepala Tukang L.03 OH 0.030 100,000.00 3,000.00
JUMLAH TENAGA KERJA 36,000.00
B BAHAN
Kayu Sengon (papan) M.28.a m3 0.036 1,200,000.00 43,200.00
Kayu kruing (kaso 5x7) M.27.a m3 0.014 7,714,300.00 108,000.20
Paku 3,5 cm M.56.c kg 0.080 18,000.00 1,440.00
JUMLAH HARGA BAHAN 152,640.20
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 188,640.20
E Overhead & Profit 10% 0.100 18,864.02
F Harga Satuan Pekerjaan (D+E) 207,504.00

A.2.2.1.12. Pembuatan 1 m2 jalan sementara


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.000 85,000.00 85,000.00
Mandor L.04 OH 0.005 105,000.00 525.00
JUMLAH TENAGA KERJA 85,525.00
B BAHAN
Batu belah (quarry - lokasi pekerjaan) M.2.b m3 0.150 317,500.00 47,625.00
Batu pecah M.10.e m3 0.090 333,800.00 30,042.00
Pasir Beton (muntilan) M.9.a m3 0.010 352,000.00 3,520.00
JUMLAH HARGA BAHAN 81,187.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 166,712.00
E Overhead & Profit 10% 0.100 16,671.20
F Harga Satuan Pekerjaan (D+E) 183,383.00

A.2.2.1.13. Pembongkaran 1 m3 beton bertulang


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.905 85,000.00 161,912.86
Mandor L.04 OH 0.666 105,000.00 69,930.00
JUMLAH TENAGA KERJA 231,842.86
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 231,842.86
E Overhead & Profit 10% 0.100 23,184.29
F Harga Satuan Pekerjaan (D+E) 255,027.00
A.2.2.1.14. Pembongkaran 1 m3 dinding tembok bata
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 6.667 85,000.00 566,695.00
Mandor L.04 OH 0.333 105,000.00 34,965.00
JUMLAH TENAGA KERJA 601,660.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 601,660.00
E Overhead & Profit 10% 0.100 60,166.00
F Harga Satuan Pekerjaan (D+E) 661,826.00

A.2.2.1.15. Pemasangan 1 m2 pagar kawat jaring galvanis panjang 240 cm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.042 85,000.00 3,570.00
Tukang Kayu L.02 OH 0.004 110,000.00 440.00
Kepala Tukang L.03 OH 0.002 100,000.00 200.00
Mandor L.04 OH 0.042 105,000.00 4,410.00
JUMLAH TENAGA KERJA 8,620.00
B BAHAN
Jaring Kawat galvanis Ø 3mm, 1.2x2.4cm M.48.b Lembar 0.143 605,000.00 86,757.00
JUMLAH HARGA BAHAN 86,757.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 95,377.00
E Overhead & Profit 10% 0.100 9,537.70
F Harga Satuan Pekerjaan (D+E) 104,914.00

A.2.3.1 HARGA SATUAN PEKERJAAN TANAH


A.2.3.1.1. Menggali 1 m3 tanah biasa sedalam 1 m
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.750 85,000.00 63,750.00
Mandor L.04 OH 0.025 105,000.00 2,625.00
JUMLAH TENAGA KERJA 66,375.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 66,375.00
E Overhead & Profit 10% 0.100 6,637.50
F Harga Satuan Pekerjaan (D+E) 73,012.00

A.2.3.1.2. Menggali 1 m3 tanah biasa sedalam 2 m


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.900 85,000.00 76,500.00
Mandor L.04 OH 0.045 105,000.00 4,725.00
JUMLAH TENAGA KERJA 81,225.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 81,225.00
E Overhead & Profit 10% 0.100 8,122.50
F Harga Satuan Pekerjaan (D+E) 89,347.00
A.2.3.1.3. Menggali 1 m3 tanah biasa sedalam 3 m
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.050 85,000.00 89,250.00
Mandor L.04 OH 0.067 105,000.00 7,035.00
JUMLAH TENAGA KERJA 96,285.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 96,285.00
E Overhead & Profit 10% 0.100 9,628.50
F Harga Satuan Pekerjaan (D+E) 105,913.00

A.2.3.1.4. Menggali 1 m3 tanah keras sedalam 1 m


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.000 85,000.00 85,000.00
Mandor L.04 OH 0.032 105,000.00 3,360.00
JUMLAH TENAGA KERJA 88,360.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 88,360.00
E Overhead & Profit 10% 0.100 8,836.00
F Harga Satuan Pekerjaan (D+E) 97,196.00

A.2.3.1.5. Menggali 1 m3 tanah cadas sedalam 1 m


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.500 85,000.00 127,500.00
Mandor L.04 OH 0.060 105,000.00 6,300.00
JUMLAH TENAGA KERJA 133,800.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 133,800.00
E Overhead & Profit 10% 0.100 13,380.00
F Harga Satuan Pekerjaan (D+E) 147,180.00

A.2.3.1.6. Menggali 1 m3 tanah lumpur sedalam 1 m


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.200 85,000.00 102,000.00
Mandor L.04 OH 0.045 105,000.00 4,725.00
JUMLAH TENAGA KERJA 106,725.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 106,725.00
E Overhead & Profit 10% 0.100 10,672.50
F Harga Satuan Pekerjaan (D+E) 117,397.00
A.2.3.1.7. Pengerjaan stripping 1 m2 tanah tebing setinggi 1 meter
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.050 85,000.00 4,250.00
Mandor L.04 OH 0.005 105,000.00 525.00
JUMLAH TENAGA KERJA 4,775.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 4,775.00
E Overhead & Profit 10% 0.100 477.50
F Harga Satuan Pekerjaan (D+E) 5,252.00

A.2.3.1.8. (K3) Pembuangan 1 m3 tanah sejauh 30 meter


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.330 85,000.00 28,050.00
Mandor L.04 OH 0.010 105,000.00 1,050.00
JUMLAH TENAGA KERJA 29,100.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 29,100.00
E Overhead & Profit 10% 0.100 2,910.00
F Harga Satuan Pekerjaan (D+E) 32,010.00

A.2.3.1.9. Pengurugan kembali 1 m3 galian tanah Tanah Biasa Sedalam 1 M


Pengurugan kembali 1 m3 galian dihitung dari 1/3 kali dari koefisien pekerjaan galian

No Uraian Kode Satuan Koefisien Harga Satuan (Rp


Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.250 85,000.00 21,250.00
Mandor L.04 OH 0.008 105,000.00 875.00
JUMLAH TENAGA KERJA 22,125.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 22,125.00
E Overhead & Profit 10% 0.100 2,212.50
F Harga Satuan Pekerjaan (D+E) 24,337.00

A.2.3.1.10.a (K3) Pemadatan tanah 1 m3 tanah ( per 20 cm) manual


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.330 85,000.00 28,050.00
Mandor L.04 OH 0.033 105,000.00 3,465.00
JUMLAH TENAGA KERJA 31,515.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 31,515.00
E Overhead & Profit 10% 0.100 3,151.50
F Harga Satuan Pekerjaan (D+E) 34,666.00
A.2.3.1.10.b Pemadatan tanah 1 m3 tanah ( per 20 cm) dengan stamper
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.500 85,000.00 42,500.00
Mandor L.04 OH 0.050 105,000.00 5,250.00
JUMLAH TENAGA KERJA 47,750.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
Stamper alat 45 hari 0.050 541,662.80 27,083.14
JUMLAH HARGA ALAT 27,083.14
D Jumlah (A+B+C) 74,833.14
E Overhead & Profit 10% 0.100 7,483.31
F Harga Satuan Pekerjaan (D+E) 82,316.00

A.2.3.1.11. Pengurugan 1 m3 dengan pasir urug


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.300 85,000.00 25,500.00
Mandor L.04 OH 0.010 105,000.00 1,050.00
JUMLAH TENAGA KERJA 26,550.00
B BAHAN
Pasir urug (quarry - lokasi pekerjaan) M.4.b m3 1.200 169,800.00 203,760.00
JUMLAH HARGA BAHAN 203,760.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 230,310.00
E Overhead & Profit 10% 0.100 23,031.00
F Harga Satuan Pekerjaan (D+E) 253,341.00

A.2.3.1.12. Pemasangan 1 m3 lapisan pudel campuran 1KP:3PP:7TL


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.800 85,000.00 68,000.00
Tukang Kayu L.02 OH 0.400 110,000.00 44,000.00
Kepala Tukang L.03 OH 0.040 100,000.00 4,000.00
Mandor L.04 OH 0.080 105,000.00 8,400.00
JUMLAH TENAGA KERJA 124,400.00
B BAHAN
Kapur M.563 m3 0.135 263,000.00 35,505.00
Pasir Beton (muntilan) M.9.a m3 0.400 352,000.00 140,800.00
Tanah liat (quarry - lokasi pekerjaan) M.8.b m3 0.948 112,500.00 106,650.00
JUMLAH HARGA BAHAN 282,955.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 407,355.00
E Overhead & Profit 10% 0.100 40,735.50
F Harga Satuan Pekerjaan (D+E) 448,090.00

A.2.3.1.13. Pemasangan 1 m2 lapisan ijuk tebal 10 cm untuk bidang resapan


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.150 85,000.00 12,750.00
Mandor L.04 OH 0.015 105,000.00 1,575.00
JUMLAH TENAGA KERJA 14,325.00
B BAHAN
Ijuk M.552.a Kg 6.000 4,500.00 27,000.00
JUMLAH HARGA BAHAN 27,000.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 41,325.00
E Overhead & Profit 10% 0.100 4,132.50
F Harga Satuan Pekerjaan (D+E) 45,457.00
A.2.3.1.14. Pengurugan 1 m3 sirtu padat
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.250 85,000.00 21,250.00
Mandor L.04 OH 0.025 105,000.00 2,625.00
JUMLAH TENAGA KERJA 23,875.00
B BAHAN
Sirtu (quarry - lokasi pekerjaan) M.5.b m3 1.200 204,000.00 244,800.00
JUMLAH HARGA BAHAN 244,800.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 268,675.00
E Overhead & Profit 10% 0.100 26,867.50
F Harga Satuan Pekerjaan (D+E) 295,542.00

A.3.2.1 HARGA SATUAN PEKERJAAN PONDASI


A.3.2.1.1. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 3PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.500 85,000.00 127,500.00
Tukang Batu L.02 OH 0.750 100,000.00 75,000.00
Kepala Tukang L.03 OH 0.075 100,000.00 7,500.00
Mandor L.04 OH 0.075 105,000.00 7,875.00
JUMLAH TENAGA KERJA 217,875.00
B BAHAN
Batu belah (quarry - lokasi pekerjaan) M.2.b m3 1.200 317,500.00 381,000.00
Portland cement M.245.a Kg 202.000 1,300.00 262,600.00
Pasir Beton (muntilan) M.9.a m3 0.485 352,000.00 170,720.00
JUMLAH HARGA BAHAN 814,320.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,032,195.00
E Overhead & Profit 10% 0.100 103,219.50
F Harga Satuan Pekerjaan (D+E) 1,135,414.00

A.3.2.1.2. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.500 85,000.00 127,500.00
Tukang Batu L.02 OH 0.750 100,000.00 75,000.00
Kepala Tukang L.03 OH 0.075 100,000.00 7,500.00
Mandor L.04 OH 0.075 105,000.00 7,875.00
JUMLAH TENAGA KERJA 217,875.00
B BAHAN
Batu belah (quarry - lokasi pekerjaan) M.2.b m3 1.200 317,500.00 381,000.00
Portland cement M.245.a Kg 163.000 1,300.00 211,900.00
Pasir Beton (muntilan) M.9.a m3 0.520 352,000.00 183,040.00
JUMLAH HARGA BAHAN 775,940.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 993,815.00
E Overhead & Profit 10% 0.100 99,381.50
F Harga Satuan Pekerjaan (D+E) 1,093,196.00
A.3.2.1.3. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 5PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.500 85,000.00 127,500.00
Tukang Batu L.02 OH 0.750 100,000.00 75,000.00
Kepala Tukang L.03 OH 0.075 100,000.00 7,500.00
Mandor L.04 OH 0.075 105,000.00 7,875.00
JUMLAH TENAGA KERJA 217,875.00
B BAHAN
Batu belah (quarry - lokasi pekerjaan) M.2.b m3 1.200 317,500.00 381,000.00
Portland cement M.245.a Kg 136.000 1,300.00 176,800.00
Pasir Beton (muntilan) M.9.a m3 0.544 352,000.00 191,488.00
JUMLAH HARGA BAHAN 749,288.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 967,163.00
E Overhead & Profit 10% 0.100 96,716.30
F Harga Satuan Pekerjaan (D+E) 1,063,879.00

A.3.2.1.4. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 6PP


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.500 85,000.00 127,500.00
Tukang Batu L.02 OH 0.750 100,000.00 75,000.00
Kepala Tukang L.03 OH 0.075 100,000.00 7,500.00
Mandor L.04 OH 0.075 105,000.00 7,875.00
JUMLAH TENAGA KERJA 217,875.00
B BAHAN
Batu belah (quarry - lokasi pekerjaan) M.2.b m3 1.200 317,500.00 381,000.00
Portland cement M.245.a Kg 117.000 1,300.00 152,100.00
Pasir Beton (muntilan) M.9.a m3 0.561 352,000.00 197,472.00
JUMLAH HARGA BAHAN 730,572.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 948,447.00
E Overhead & Profit 10% 0.100 94,844.70
F Harga Satuan Pekerjaan (D+E) 1,043,291.00

A.3.2.1.5. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 8PP


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.500 85,000.00 127,500.00
Tukang Batu L.02 OH 0.750 100,000.00 75,000.00
Kepala Tukang L.03 OH 0.075 100,000.00 7,500.00
Mandor L.04 OH 0.075 105,000.00 7,875.00
JUMLAH TENAGA KERJA 217,875.00
B BAHAN
Batu belah (quarry - lokasi pekerjaan) M.2.b m3 1.200 317,500.00 381,000.00
Portland cement M.245.a Kg 91.000 1,300.00 118,300.00
Pasir Beton (muntilan) M.9.a m3 0.584 352,000.00 205,568.00
JUMLAH HARGA BAHAN 704,868.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 922,743.00
E Overhead & Profit 10% 0.100 92,274.30
F Harga Satuan Pekerjaan (D+E) 1,015,017.00
A.3.2.1.6. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 1KP : 2PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.500 85,000.00 127,500.00
Tukang Batu L.02 OH 0.750 100,000.00 75,000.00
Kepala Tukang L.03 OH 0.075 100,000.00 7,500.00
Mandor L.04 OH 0.075 105,000.00 7,875.00
JUMLAH TENAGA KERJA 217,875.00
B BAHAN
Batu belah (quarry - lokasi pekerjaan) M.2.b m3 1.200 317,500.00 381,000.00
Kapur M.563 m3 0.170 263,000.00 44,710.00
Portland cement M.245.a Kg 0.170 1,300.00 221.00
Pasir Beton (muntilan) M.9.a m3 0.340 352,000.00 119,680.00
JUMLAH HARGA BAHAN 545,611.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 763,486.00
E Overhead & Profit 10% 0.100 76,348.60
F Harga Satuan Pekerjaan (D+E) 839,834.00

A.3.2.1.7. Pemasangan 1 m3 pondasi batu belah campuran 1 SP : 3 KP : 10 PP


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.500 85,000.00 127,500.00
Tukang Batu L.02 OH 0.750 100,000.00 75,000.00
Kepala Tukang L.03 OH 0.075 100,000.00 7,500.00
Mandor L.04 OH 0.075 105,000.00 7,875.00
JUMLAH TENAGA KERJA 217,875.00
B BAHAN
Batu belah (quarry - lokasi pekerjaan) M.2.b m3 1.200 317,500.00 381,000.00
Portland cement M.245.a Kg 61.000 1,300.00 79,300.00
Kapur M.563 m3 0.147 263,000.00 38,661.00
Pasir Beton (muntilan) M.9.a m3 0.492 352,000.00 173,184.00
JUMLAH HARGA BAHAN 672,145.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 890,020.00
E Overhead & Profit 10% 0.100 89,002.00
F Harga Satuan Pekerjaan (D+E) 979,022.00

A.3.2.1.8. Pemasangan 1 m3 pondasi batu belah campuran ¼ SP : 1 KP : 4PP


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.500 85,000.00 127,500.00
Tukang Batu L.02 OH 0.750 100,000.00 75,000.00
Kepala Tukang L.03 OH 0.075 100,000.00 7,500.00
Mandor L.04 OH 0.075 105,000.00 7,875.00
JUMLAH TENAGA KERJA 217,875.00
B BAHAN
Batu belah (quarry - lokasi pekerjaan) M.2.b m3 1.200 317,500.00 381,000.00
Portland cement M.245.a Kg 41.000 1,300.00 53,300.00
Kapur M.563 m3 0.131 263,000.00 34,453.00
Pasir Beton (muntilan) M.9.a m3 0.523 352,000.00 184,096.00
JUMLAH HARGA BAHAN 652,849.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 870,724.00
E Overhead & Profit 10% 0.100 87,072.40
F Harga Satuan Pekerjaan (D+E) 957,796.00
A.3.2.1.9. Pemasangan 1 m3 batu kosong (anstamping)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.780 85,000.00 66,300.00
Tukang Batu L.02 OH 0.390 100,000.00 39,000.00
Kepala Tukang L.03 OH 0.039 100,000.00 3,900.00
Mandor L.04 OH 0.039 105,000.00 4,095.00
JUMLAH TENAGA KERJA 113,295.00
B BAHAN
Batu belah (quarry - lokasi pekerjaan) M.2.b m3 1.200 317,500.00 381,000.00
Pasir urug (quarry - lokasi pekerjaan) M.4.b m3 0.432 169,800.00 73,353.60
JUMLAH HARGA BAHAN 454,353.60
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 567,648.60
E Overhead & Profit 10% 0.100 56,764.86
F Harga Satuan Pekerjaan (D+E) 624,413.00

A.3.2.1.10. (K3) Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1SP : 2 PB : 3 Kr dan 40% batu belah
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 3.400 85,000.00 289,000.00
Tukang Batu L.02 OH 0.850 100,000.00 85,000.00
Kepala Tukang L.03 OH 0.085 100,000.00 8,500.00
Mandor L.04 OH 0.170 105,000.00 17,850.00
JUMLAH TENAGA KERJA 400,350.00
B BAHAN
Batu belah (quarry - lokasi pekerjaan) M.2.b m3 0.480 317,500.00 152,400.00
Portland cement M.245.a Kg 194.000 1,300.00 252,200.00
Pasir Beton (muntilan) M.9.a m3 0.312 352,000.00 109,824.00
Koral beton M.11.b m3 0.468 350,000.00 163,800.00
Besi beton (ulir) M.46.b Kg 126.000 11,800.00 1,486,800.00
Kawat beton M.54 Kg 1.800 15,000.00 27,000.00
JUMLAH HARGA BAHAN 2,192,024.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 2,592,374.00
E Overhead & Profit 10% 0.100 259,237.40
F Harga Satuan Pekerjaan (D+E) 2,851,611.00

A.3.2.1.11. Pemasangan 1 m3 pondasi sumuran, diameter 100 cm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 2.400 85,000.00 204,000.00
Tukang Batu L.02 OH 0.800 100,000.00 80,000.00
Kepala Tukang L.03 OH 0.080 100,000.00 8,000.00
Mandor L.04 OH 0.119 105,000.00 12,495.00
JUMLAH TENAGA KERJA 304,495.00
B BAHAN
Batu belah (quarry - lokasi pekerjaan) M.2.b m3 0.450 317,500.00 142,875.00
Portland cement M.245.a Kg 194.000 1,300.00 252,200.00
Pasir Beton (muntilan) M.9.a m3 0.312 352,000.00 109,824.00
Koral beton M.11.b m3 0.468 350,000.00 163,800.00
JUMLAH HARGA BAHAN 668,699.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 973,194.00
E Overhead & Profit 10% 0.100 97,319.40
F Harga Satuan Pekerjaan (D+E) 1,070,513.00
A.4.1.1 HARGA SATUAN PEKERJAAN BETON
A.4.1.1.1 Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100) manual
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.650 85,000.00 140,250.00
Tukang Batu L.02 OH 0.275 100,000.00 27,500.00
Kepala Tukang L.03 OH 0.028 100,000.00 2,800.00
Mandor L.04 OH 0.083 105,000.00 8,715.00
JUMLAH TENAGA KERJA 179,265.00
B BAHAN
Portland cement M.245.a kg 247.000 1,300.00 321,100.00
Pasir Beton M.9.b kg 869.000 300.00 260,700.00
Koral beton (kg) M.12 kg 999.000 300.00 299,700.00
Air, M.550.b Liter 215.000 15.00 3,225.00
JUMLAH HARGA BAHAN 884,725.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,063,990.00
E Overhead & Profit 10% 0.100 106,399.00
F Harga Satuan Pekerjaan (D+E) 1,170,389.00

A.4.1.1.2 Membuat 1 m3 beton mutu f’= 9,8 MPa (K 125) manual


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.650 85,000.00 140,250.00
Tukang Batu L.02 OH 0.275 100,000.00 27,500.00
Kepala Tukang L.03 OH 0.028 100,000.00 2,800.00
Mandor L.04 OH 0.083 105,000.00 8,715.00
JUMLAH TENAGA KERJA 179,265.00
B BAHAN
Portland cement M.245.a kg 276.000 1,300.00 358,800.00
Pasir Beton M.9.b kg 828.000 300.00 248,400.00
Koral beton (kg) M.12 kg 1,012.00 300.00 303,600.00
Air, M.550.b Liter 215.000 15.00 3,225.00
JUMLAH HARGA BAHAN 914,025.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,093,290.00
E Overhead & Profit 10% 0.100 109,329.00
F Harga Satuan Pekerjaan (D+E) 1,202,619.00

A.4.1.1.3 Membuat 1 m3 beton mutu f’= 12,2 MPa (K 150) manual


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.650 85,000.00 140,250.00
Tukang Batu L.02 OH 0.275 100,000.00 27,500.00
Kepala Tukang L.03 OH 0.028 100,000.00 2,800.00
Mandor L.04 OH 0.083 105,000.00 8,715.00
JUMLAH TENAGA KERJA 179,265.00
B BAHAN
Portland cement M.245.a kg 299.000 1,300.00 388,700.00
Pasir Beton M.9.b kg 799.000 300.00 239,700.00
Koral beton (kg) M.12 kg 1,017.00 300.00 305,100.00
Air, M.550.b Liter 215.000 15.00 3,225.00
JUMLAH HARGA BAHAN 936,725.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,115,990.00
E Overhead & Profit 10% 0.100 111,599.00
F Harga Satuan Pekerjaan (D+E) 1,227,589.00
CATATAN
Bobot isi pasir = 1.400 kg/m3, Bobot isi kerikil = 1.350 kg/m3, Buckling factor pasir = 20 %
A.4.1.1.4 Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0,87 (manual)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.200 85,000.00 102,000.00
Tukang Batu L.02 OH 0.200 100,000.00 20,000.00
Kepala Tukang L.03 OH 0.020 100,000.00 2,000.00
Mandor L.04 OH 0.060 105,000.00 6,300.00
JUMLAH TENAGA KERJA 130,300.00
B BAHAN
Portland cement M.245.a kg 230.000 1,300.00 299,000.00
Pasir Beton M.9.b kg 893.000 300.00 267,900.00
Koral beton (kg) M.12 kg 1,027.00 300.00 308,100.00
Air, M.550.b Liter 200.000 15.00 3,000.00
JUMLAH HARGA BAHAN 878,000.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,008,300.00
E Overhead & Profit 10% 0.100 100,830.00
F Harga Satuan Pekerjaan (D+E) 1,109,130.00

A.4.1.1.5. Membuat 1 m3 beton mutu f’ = 14,5 MPa (K 175), slump (12 ±2) cm, w/c = 0,66 (manual)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.650 85,000.00 140,250.00
Tukang Batu L.02 OH 0.275 100,000.00 27,500.00
Kepala Tukang L.03 OH 0.028 100,000.00 2,800.00
Mandor L.04 OH 0.083 105,000.00 8,715.00
JUMLAH TENAGA KERJA 179,265.00
B BAHAN
Portland cement M.245.a kg 326.000 1,300.00 423,800.00
Pasir Beton M.9.b kg 760.000 300.00 228,000.00
Koral beton (kg) M.12 kg 1,029.00 300.00 308,700.00
Air, M.550.b Liter 215.000 15.00 3,225.00
JUMLAH HARGA BAHAN 963,725.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,142,990.00
E Overhead & Profit 10% 0.100 114,299.00
F Harga Satuan Pekerjaan (D+E) 1,257,289.00

A.4.1.1.6 Membuat 1 m3 beton mutu f’= 16,9 MPa (K 200), slump (120 ± 20) mm, w/c = 0,61 (manual)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.650 85,000.00 140,250.00
Tukang Batu L.02 OH 0.275 100,000.00 27,500.00
Kepala Tukang L.03 OH 0.028 100,000.00 2,800.00
Mandor L.04 OH 0.083 105,000.00 8,715.00
JUMLAH TENAGA KERJA 179,265.00
B BAHAN
Portland cement M.245.a kg 352.000 1,300.00 457,600.00
Pasir Beton M.9.b kg 731.000 300.00 219,300.00
Koral beton (kg) M.12 kg 1,031.00 300.00 309,300.00
Air, M.550.b Liter 215.000 15.00 3,225.00
JUMLAH HARGA BAHAN 989,425.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,168,690.00
E Overhead & Profit 10% 0.100 116,869.00
F Harga Satuan Pekerjaan (D+E) 1,285,559.00
A.4.1.1.7. Membuat 1 m3 beton mutu f’ = 19,3 MPa (K 225), slump (120 ± 20) mm, w/c = 0,58 (manual)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.650 85,000.00 140,250.00
Tukang Batu L.02 OH 0.275 100,000.00 27,500.00
Kepala Tukang L.03 OH 0.028 100,000.00 2,800.00
Mandor L.04 OH 0.083 105,000.00 8,715.00
JUMLAH TENAGA KERJA 179,265.00
B BAHAN
Portland cement M.245.a kg 371.000 1,300.00 482,300.00
Pasir Beton M.9.b kg 698.000 300.00 209,400.00
Koral beton (kg) M.12 kg 1,047.00 300.00 314,100.00
Air, M.550.b Liter 215.000 15.00 3,225.00
JUMLAH HARGA BAHAN 1,009,025.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,188,290.00
E Overhead & Profit 10% 0.100 118,829.00
F Harga Satuan Pekerjaan (D+E) 1,307,119.00

A.4.1.1.8. Membuat 1 m3 beton mutu f’= 21,7 MPa (K 250), slump (120 ± 20) mm, w/c = 0,56 (manual)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.650 85,000.00 140,250.00
Tukang Batu L.02 OH 0.275 100,000.00 27,500.00
Kepala Tukang L.03 OH 0.028 100,000.00 2,800.00
Mandor L.04 OH 0.083 105,000.00 8,715.00
JUMLAH TENAGA KERJA 179,265.00
B BAHAN
Portland cement M.245.a kg 384.000 1,300.00 499,200.00
Pasir Beton M.9.b kg 692.000 300.00 207,600.00
Koral beton (kg) M.12 kg 1,039.00 300.00 311,700.00
Air, M.550.b Liter 215.000 15.00 3,225.00
JUMLAH HARGA BAHAN 1,021,725.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,200,990.00
E Overhead & Profit 10% 0.100 120,099.00
F Harga Satuan Pekerjaan (D+E) 1,321,089.00
A.4.1.1.13 Membuat 1 m3 beton kedap air dengan strorox - 100
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 2.100 85,000.00 178,500.00
Tukang Batu L.02 OH 0.350 100,000.00 35,000.00
Kepala Tukang L.03 OH 0.035 100,000.00 3,500.00
Mandor L.04 OH 0.105 105,000.00 11,025.00
JUMLAH TENAGA KERJA 228,025.00
B BAHAN
Portland cement M.245.a kg 400.000 1,300.00 520,000.00
Pasir Beton (muntilan) M.9.a m3 0.480 352,000.00 168,960.00
Koral beton M.11.b m3 0.800 350,000.00 280,000.00
Strorox - 100 M.401 kg 1.200 183,000.00 219,600.00
JUMLAH HARGA BAHAN 1,188,560.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,416,585.00
E Overhead & Profit 10% 0.100 141,658.50
F Harga Satuan Pekerjaan (D+E) 1,558,243.00

A.4.1.1.14 Pemasangan 1 m’ PVC Waterstop lebar 150 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.060 85,000.00 5,100.00
Tukang Pipa L.02 OH 0.030 95,000.00 2,850.00
Kepala Tukang L.03 OH 0.003 100,000.00 300.00
Mandor L.04 OH 0.003 105,000.00 315.00
JUMLAH TENAGA KERJA 8,565.00
B BAHAN
Waterstop lebar 150 mm M.381.a m 1.050 65,000.00 68,250.00
JUMLAH HARGA BAHAN 68,250.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 76,815.00
E Overhead & Profit 10% 0.100 7,681.50
F Harga Satuan Pekerjaan (D+E) 84,496.00

A.4.1.1.15 Pemasangan 1 m’ PVC Waterstop lebar 200 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.070 85,000.00 5,950.00
Tukang Pipa L.02 OH 0.035 95,000.00 3,325.00
Kepala Tukang L.03 OH 0.004 100,000.00 400.00
Mandor L.04 OH 0.007 105,000.00 735.00
JUMLAH TENAGA KERJA 10,410.00
B BAHAN
Waterstop lebar 200 mm M.381.b m 1.050 83,000.00 87,150.00
JUMLAH HARGA BAHAN 87,150.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 97,560.00
E Overhead & Profit 10% 0.100 9,756.00
F Harga Satuan Pekerjaan (D+E) 107,316.00
A.4.1.1.16 Membuat 1 m’ PVC Waterstop lebar 230 mm - 320 mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.080 85,000.00 6,800.00
Tukang Pipa L.02 OH 0.040 95,000.00 3,800.00
Kepala Tukang L.03 OH 0.004 100,000.00 400.00
Mandor L.04 OH 0.004 105,000.00 420.00
JUMLAH TENAGA KERJA 11,420.00
B BAHAN
Waterstop lebar 230 mm - 320 mm M.381.c m 1.050 146,000.00 153,300.00
JUMLAH HARGA BAHAN 153,300.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 164,720.00
E Overhead & Profit 10% 0.100 16,472.00
F Harga Satuan Pekerjaan (D+E) 181,192.00

A.4.1.1.17.a Pembesian dengan besi tulangan polos


Jumlah
No Uraian Kode Satuan Koefisien Harga Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.070 85,000.00 5,950.00
2 Tukang Besi L.02 OH 0.070 110,000.00 7,700.00
3 Kepala Tukang L.03 OH 0.007 100,000.00 700.00
4 Mandor L.04 OH 0.004 105,000.00 420.00
JUMLAH HARGA TENAGA KERJA 14,770.00
B BAHAN
1 Baja tulangan polos M.46.a kg 10.500 9,600.00 100,800.00
2 Kawat beton M.54 kg 0.150 15,000.00 2,250.00
JUMLAH HARGA BAHAN 103,050.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) Harga per 10 kg 117,820.00


E Harga per 1 kg 11,782.00
F Overhead & Profit 10% 0.100 1,178.20
G Harga Satuan Pekerjaan (E+F) 12,960.00

A.4.1.1.17.b Pembesian dengan besi tulangan ulir


Jumlah
No Uraian Kode Satuan Koefisien Harga Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.070 85,000.00 5,950.00
2 Tukang Besi L.02 OH 0.070 110,000.00 7,700.00
3 Kepala Tukang L.03 OH 0.007 100,000.00 700.00
4 Mandor L.04 OH 0.004 105,000.00 420.00
JUMLAH HARGA TENAGA KERJA 14,770.00
B BAHAN
1 Besi beton (ulir) M.46.b kg 10.500 11,800.00 123,900.00
2 Kawat beton M.54 kg 0.150 15,000.00 2,250.00
JUMLAH HARGA BAHAN 126,150.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) Harga per 10 kg 140,920.00


E Harga per 1 kg 14,092.00
F Overhead & Profit 10% 0.100 1,409.20
G Harga Satuan Pekerjaan (E+F) 15,501.00
A.4.1.1.19 Pemasangan 10 kg jaring kawat baja (wiremesh)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.025 85,000.00 2,125.00
Tukang Besi L.02 OH 0.025 110,000.00 2,750.00
Kepala Tukang L.03 OH 0.025 100,000.00 2,500.00
Mandor L.04 OH 0.001 105,000.00 105.00
JUMLAH TENAGA KERJA 7,480.00
B BAHAN
Jaring kawat baja dilas M.48.a kg 10.200 25,000.00 255,000.00
Kawat beton M.54 kg 0.050 15,000.00 750.00
JUMLAH HARGA BAHAN 255,750.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 263,230.00
E Overhead & Profit 10% 0.100 26,323.00
F Harga Satuan Pekerjaan (D+E) 289,553.00

A.4.1.1.20 (K3) Pemasangan 1 m2 bekisting untuk pondasi


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.520 85,000.00 44,200.00
Tukang Kayu L.02 OH 0.260 110,000.00 28,600.00
Kepala Tukang L.03 OH 0.026 100,000.00 2,600.00
Mandor L.04 OH 0.026 105,000.00 2,730.00
JUMLAH TENAGA KERJA 78,130.00
B BAHAN
Kayu Sengon (papan) M.28.a m3 0.040 1,200,000.00 48,000.00
Paku 7 cm M.56.e kg 0.300 18,000.00 5,400.00
Minyak bekisting M.397 Liter 0.100 17,000.00 1,700.00
JUMLAH HARGA BAHAN 55,100.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 133,230.00
E Overhead & Profit 10% 0.100 13,323.00
F Harga Satuan Pekerjaan (D+E) 146,553.00

A.4.1.1.21 (K3) Pemasangan 1 m2 bekisting untuk sloof


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.520 85,000.00 44,200.00
Tukang Kayu L.02 OH 0.260 110,000.00 28,600.00
Kepala Tukang L.03 OH 0.026 100,000.00 2,600.00
Mandor L.04 OH 0.026 105,000.00 2,730.00
JUMLAH TENAGA KERJA 78,130.00
B BAHAN
Kayu Sengon (papan) M.28.a m3 0.045 1,200,000.00 54,000.00
Paku 7 cm M.56.e kg 0.300 18,000.00 5,400.00
Minyak bekisting M.397 Liter 0.100 17,000.00 1,700.00
JUMLAH HARGA BAHAN 61,100.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 139,230.00
E Overhead & Profit 10% 0.100 13,923.00
F Harga Satuan Pekerjaan (D+E) 153,153.00
A.4.1.1.22 (K3) Pemasangan 1 m2 bekisting untuk kolom
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.660 85,000.00 56,100.00
Tukang Kayu L.02 OH 0.330 110,000.00 36,300.00
Kepala Tukang L.03 OH 0.033 100,000.00 3,300.00
Mandor L.04 OH 0.033 105,000.00 3,465.00
JUMLAH TENAGA KERJA 99,165.00
B BAHAN
Paku 7 cm M.56.e kg 0.400 18,000.00 7,200.00
Minyak bekisting M.397 Liter 0.200 17,000.00 3,400.00
Balok kayu kelas II M.16.a m3 0.015 10,500,000.00 157,500.00
Plywood 9 mm (120x240) M.32.c Lembar 0.350 102,000.00 35,700.00
Bambu Ø 10 cm panjang 400 cm M.23.b Batang 2.000 14,000.00 28,000.00
JUMLAH HARGA BAHAN 231,800.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 330,965.00
E Overhead & Profit 10% 0.100 33,096.50
F Harga Satuan Pekerjaan (D+E) 364,061.00

A.4.1.1.23 (K3) Pemasangan 1 m2 bekisting untuk balok


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.660 85,000.00 56,100.00
Tukang Kayu L.02 OH 0.330 110,000.00 36,300.00
Kepala Tukang L.03 OH 0.033 100,000.00 3,300.00
Mandor L.04 OH 0.033 105,000.00 3,465.00
JUMLAH TENAGA KERJA 99,165.00
B BAHAN
Paku 7 cm M.56.e kg 0.400 18,000.00 7,200.00
Minyak bekisting M.397 Liter 0.200 17,000.00 3,400.00
Balok kayu kelas II M.16.a m3 0.018 10,500,000.00 189,000.00
Plywood 9 mm (120x240) M.32.c Lembar 0.350 102,000.00 35,700.00
Bambu Ø 10 cm panjang 400 cm M.23.b Batang 2.000 14,000.00 28,000.00
JUMLAH HARGA BAHAN 263,300.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 362,465.00
E Overhead & Profit 10% 0.100 36,246.50
F Harga Satuan Pekerjaan (D+E) 398,711.00

A.4.1.1.24 (K3) Pemasangan 1 m2 bekisting untuk lantai


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.660 85,000.00 56,100.00
Tukang Kayu L.02 OH 0.330 110,000.00 36,300.00
Kepala Tukang L.03 OH 0.033 100,000.00 3,300.00
Mandor L.04 OH 0.033 105,000.00 3,465.00
JUMLAH TENAGA KERJA 99,165.00
B BAHAN
Paku 7 cm M.56.e kg 0.400 18,000.00 7,200.00
Minyak bekisting M.397 Liter 0.200 17,000.00 3,400.00
Balok kayu kelas II M.16.a m3 0.015 10,500,000.00 157,500.00
Plywood 12 mm (120x240) M.32.d Lembar 0.350 152,500.00 53,375.00
Bambu Ø 10 cm panjang 400 cm M.23.b Batang 6.000 14,000.00 84,000.00
JUMLAH HARGA BAHAN 305,475.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 404,640.00
E Overhead & Profit 10% 0.100 40,464.00
F Harga Satuan Pekerjaan (D+E) 445,104.00
A.4.1.1.25 (K3) Pemasangan 1 m2 bekisting untuk dinding
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.660 85,000.00 56,100.00
Tukang Kayu L.02 OH 0.330 110,000.00 36,300.00
Kepala Tukang L.03 OH 0.033 100,000.00 3,300.00
Mandor L.04 OH 0.033 105,000.00 3,465.00
JUMLAH TENAGA KERJA 99,165.00
B BAHAN
Paku 7 cm M.56.e kg 0.400 18,000.00 7,200.00
Minyak bekisting M.397 Liter 0.200 17,000.00 3,400.00
Balok kayu kelas II M.16.a m3 0.020 10,500,000.00 210,000.00
Plywood 9 mm (120x240) M.32.c Lembar 0.350 102,000.00 35,700.00
Bambu Ø 10 cm panjang 400 cm M.23.b Batang 3.000 14,000.00 42,000.00
Formtie/penjaga jarak bekesting/spacer M.253 Buah 4.000 7,000.00 28,000.00
JUMLAH HARGA BAHAN 326,300.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 425,465.00
E Overhead & Profit 10% 0.100 42,546.50
F Harga Satuan Pekerjaan (D+E) 468,011.00

A.4.1.1.26 (K3) Pemasangan 1 m2 bekisting untuk tangga


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.660 85,000.00 56,100.00
Tukang Kayu L.02 OH 0.330 110,000.00 36,300.00
Kepala Tukang L.03 OH 0.033 100,000.00 3,300.00
Mandor L.04 OH 0.033 105,000.00 3,465.00
JUMLAH TENAGA KERJA 99,165.00
B BAHAN
Paku 7 cm M.56.e kg 0.400 18,000.00 7,200.00
Minyak bekisting M.397 Liter 0.150 17,000.00 2,550.00
Balok kayu kelas II M.16.a m3 0.015 10,500,000.00 157,500.00
Plywood 9 mm (120x240) M.32.c Lembar 0.350 102,000.00 35,700.00
Bambu Ø 10 cm panjang 400 cm M.23.b Batang 2.000 14,000.00 28,000.00
JUMLAH HARGA BAHAN 230,950.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 330,115.00
E Overhead & Profit 10% 0.100 33,011.50
F Harga Satuan Pekerjaan (D+E) 363,126.00

A.4.1.1.27 Pemasangan 1 m2 jembatan untuk pengecoran beton


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.150 85,000.00 12,750.00
Tukang Kayu L.02 OH 0.050 110,000.00 5,500.00
Kepala Tukang L.03 OH 0.005 100,000.00 500.00
Mandor L.04 OH 0.008 105,000.00 840.00
JUMLAH TENAGA KERJA 19,590.00
B BAHAN
Kayu Sengon (papan) M.28.a m3 0.026 1,200,000.00 31,680.00
Paku 10 cm M.56.f kg 0.600 18,000.00 10,800.00
Bambu Ø 10 cm panjang 400 cm M.23.b Batang 0.500 14,000.00 7,000.00
JUMLAH HARGA BAHAN 49,480.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 69,070.00
E Overhead & Profit 10% 0.100 6,907.00
F Harga Satuan Pekerjaan (D+E) 75,977.00
A.4.1.1.35 Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.180 85,000.00 15,300.00
Tukang batu L.02 OH 0.020 100,000.00 2,000.00
Tukang kayu L.02 OH 0.020 110,000.00 2,200.00
Tukang besi L.02 OH 0.020 110,000.00 2,200.00
Kepala Tukang L.03 OH 0.006 100,000.00 600.00
Mandor L.04 OH 0.009 105,000.00 945.00
JUMLAH TENAGA KERJA 23,245.00
B BAHAN
Kayu kelas III M.18.a m3 0.009 7,800,000.00 68,640.00
Paku 10 Cm M.56.f kg 0.010 18,000.00 180.00
Besi beton polos M.46.a kg 3.000 9,600.00 28,800.00
Kawat beton M.54 kg 0.450 15,000.00 6,750.00
Portland cement M.245.a kg 4.000 1,300.00 5,200.00
Pasir Beton (muntilan) M.9.a m3 0.006 352,000.00 2,112.00
Koral beton M.11.b m3 0.009 350,000.00 3,150.00
JUMLAH HARGA BAHAN 114,832.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 138,077.00
E Overhead & Profit 10% 0.100 13,807.70
F Harga Satuan Pekerjaan (D+E) 151,884.00

A.4.1.1.36 Membuat 1 m’ ring balok beton bertulang (10 x 15) cm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.297 85,000.00 25,245.00
Tukang batu L.02 OH 0.033 100,000.00 3,300.00
Tukang kayu L.02 OH 0.033 110,000.00 3,630.00
Tukang besi L.02 OH 0.033 110,000.00 3,630.00
Kepala Tukang L.03 OH 0.010 100,000.00 1,000.00
Mandor L.04 OH 0.015 105,000.00 1,575.00
JUMLAH TENAGA KERJA 38,380.00
B BAHAN
Kayu kelas III M.18.a m3 0.003 7,800,000.00 23,400.00
Paku 10 Cm M.56.f kg 0.020 18,000.00 360.00
Besi beton polos M.46.a kg 3.600 9,600.00 34,560.00
Kawat beton M.54 kg 0.050 15,000.00 750.00
Portland cement M.245.a kg 5.500 1,300.00 7,150.00
Pasir Beton (muntilan) M.9.a m3 0.009 352,000.00 3,168.00
Koral beton M.11.b m3 0.015 350,000.00 5,250.00
JUMLAH HARGA BAHAN 74,638.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 113,018.00
E Overhead & Profit 10% 0.100 11,301.80
F Harga Satuan Pekerjaan (D+E) 124,319.00

A.4.1.2 HARGA SATUAN PEKERJAAN BETON PRACETAK


A.4.1.2.1. (K3) Pembuatan 1 m2 lahan produksi tebal 8cm beton f’c 14,5 Mpa (K 175) slump (120 ± 20) mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.132 85,000.00 11,220.00
Tukang batu L.02 OH 0.022 100,000.00 2,200.00
Kepala Tukang L.03 OH 0.002 100,000.00 200.00
Mandor L.04 OH 0.007 105,000.00 735.00
JUMLAH TENAGA KERJA 14,355.00
B BAHAN
Portland cement M.245.a Kg 26.080 1,300.00 33,904.00
Pasir beton M.9.b Kg 60.800 300.00 18,240.00
Koral beton (kg) M.12 Kg 82.320 300.00 24,696.00
Air, M.550.b Liter 17.200 15.00 258.00
JUMLAH HARGA BAHAN 77,098.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 91,453.00
E Overhead & Profit 10% 0.100 9,145.30
F Harga Satuan Pekerjaan (D+E) 100,598.00

A.4.1.2.2. (K3) Pembuatan 1 m2 lahan produksi tebal 10 cm beton f’c 14,5 Mpa (K 175) slump (120 ± 20) mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.165 85,000.00 14,025.00
Tukang batu L.02 OH 0.028 100,000.00 2,800.00
Kepala Tukang L.03 OH 0.003 100,000.00 300.00
Mandor L.04 OH 0.008 105,000.00 840.00
JUMLAH TENAGA KERJA 17,965.00
B BAHAN
Portland cement M.245.a Kg 32.600 1,300.00 42,380.00
Pasir beton M.9.b Kg 76.000 300.00 22,800.00
Koral beton (kg) M.12 Kg 102.900 300.00 30,870.00
Air, M.550.b Liter 21.500 15.00 322.50
JUMLAH HARGA BAHAN 96,372.50
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 114,337.50
E Overhead & Profit 10% 0.100 11,433.75
F Harga Satuan Pekerjaan (D+E) 125,771.00

A.4.1.2.3. (K3) Pembuatan 1 m2 lahan produksi tebal 12 cm beton f’c 14,5 Mpa (K 175) slump (120 ± 20) mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.198 85,000.00 16,830.00
Tukang batu L.02 OH 0.033 100,000.00 3,300.00
Kepala Tukang L.03 OH 0.003 100,000.00 300.00
Mandor L.04 OH 0.010 105,000.00 1,050.00
JUMLAH TENAGA KERJA 21,480.00
B BAHAN
Portland cement M.245.a Kg 39.120 1,300.00 50,856.00
Pasir beton M.9.b Kg 91.200 300.00 27,360.00
Koral beton (kg) M.12 Kg 123.480 300.00 37,044.00
Air, M.550.b Liter 25.800 15.00 387.00
JUMLAH HARGA BAHAN 115,647.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 137,127.00
E Overhead & Profit 10% 0.100 13,712.70
F Harga Satuan Pekerjaan (D+E) 150,839.00

A.4.1.2.4. (K3) Pembuatan 1 m2 lahan produksi tebal 15 cm beton f’c 14,5 Mpa (K 175) slump (120 ± 20) mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.248 85,000.00 21,080.00
Tukang batu L.02 OH 0.041 100,000.00 4,100.00
Kepala Tukang L.03 OH 0.004 100,000.00 400.00
Mandor L.04 OH 0.013 105,000.00 1,365.00
JUMLAH TENAGA KERJA 26,945.00
B BAHAN
Portland cement M.245.a Kg 48.900 1,300.00 63,570.00
Pasir beton M.9.b Kg 114.000 300.00 34,200.00
Koral beton (kg) M.12 Kg 154.350 300.00 46,305.00
Air, M.550.b Liter 32.250 15.00 483.75
JUMLAH HARGA BAHAN 144,558.75
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 171,503.75
E Overhead & Profit 10% 0.100 17,150.38
F Harga Satuan Pekerjaan (D+E) 188,654.00
A.4.1.2.5. Pembuatan 1 m2 bekisting untuk plat beton pracetak ( 5 kali pakai)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.007 85,000.00 595.00
Tukang batu L.02 OH 0.076 100,000.00 7,600.00
Kepala Tukang L.03 OH 0.008 100,000.00 800.00
Mandor L.04 OH 0.001 105,000.00 105.00
JUMLAH TENAGA KERJA 9,100.00
B BAHAN
Lantai kerja tebal 10cm m3 0.008 1,008,300.00 8,066.40
Besi hollow 50.50.3 (Kg) M.47.b Kg 9.394 5,900.00 55,424.60
Kayu kruing (kaso 5x7) M.27.a m3 0.005 7,714,300.00 38,571.50
Phenol film 12mm (1 muka) M.33.a Lembar 0.080 146,000.00 11,680.00
Minyak bekisting M.397 Liter 0.200 17,000.00 3,400.00
Dynabolt dia 12mm (10-15cm) M.75.f buah 3.882 4,900.00 19,021.80
JUMLAH HARGA BAHAN 136,164.30
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 145,264.30
E Overhead & Profit 10% 0.100 14,526.43
F Harga Satuan Pekerjaan (D+E) 159,790.00

A.4.1.2.6. Pembuatan 1 m2 bekisting untuk balok beton pracetak ( 10-12 kali pakai)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.004 85,000.00 340.00
Tukang batu L.02 OH 0.038 100,000.00 3,800.00
Kepala Tukang L.03 OH 0.004 100,000.00 400.00
Mandor L.04 OH 0.001 105,000.00 105.00
JUMLAH TENAGA KERJA 4,645.00
B BAHAN
Kayu kruing (kaso 5x7) M.27.a m3 0.005 7,714,300.00 38,571.50
Phenol film 12mm (1 muka) M.33.a Lembar 0.043 146,000.00 6,278.00
Minyak bekisting M.397 Liter 0.200 17,000.00 3,400.00
Paku 7 cm M.56.e Kg 0.046 18,000.00 828.00
Dynabolt dia 12mm (10-15cm) M.75.f buah 0.693 4,900.00 3,395.70
JUMLAH HARGA BAHAN 52,473.20
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 57,118.20
E Overhead & Profit 10% 0.100 5,711.82
F Harga Satuan Pekerjaan (D+E) 62,830.00

A.4.1.2.7. Pembuatan 1 m2 bekisting untuk kolom beton pracetak (10-12 kali pakai)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.004 85,000.00 340.00
Tukang batu L.02 OH 0.038 100,000.00 3,800.00
Kepala Tukang L.03 OH 0.004 100,000.00 400.00
Mandor L.04 OH 0.001 105,000.00 105.00
JUMLAH TENAGA KERJA 4,645.00
B BAHAN
Kayu kruing (balok) 5/7 M.27.a m3 0.004 7,714,300.00 30,857.20
Phenol film 12mm (1 muka) M.33.a Lembar 0.048 146,000.00 7,008.00
Minyak bekisting M.397 Liter 0.200 17,000.00 3,400.00
Paku 7 cm M.56.e Kg 0.046 18,000.00 828.00
Dynabolt dia 12mm (10-15cm) M.75.f buah 0.693 4,900.00 3,395.70
JUMLAH HARGA BAHAN 45,488.90
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 50,133.90
E Overhead & Profit 10% 0.100 5,013.39
F Harga Satuan Pekerjaan (D+E) 55,147.00
A.4.1.2.8. Pemasangan dan membuka bekisting 1 buah komponen plat beton pracetak
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.053 85,000.00 4,505.00
Tukang kayu L.02 OH 0.018 110,000.00 1,980.00
Mandor L.04 OH 0.005 105,000.00 525.00
JUMLAH TENAGA KERJA 7,010.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 7,010.00
E Overhead & Profit 10% 0.100 701.00
F Harga Satuan Pekerjaan (D+E) 7,711.00

A.4.1.2.9. Pemasangan dan membuka bekisting 1 buah komponen balok beton pracetak
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.089 85,000.00 7,565.00
Tukang kayu L.02 OH 0.030 110,000.00 3,300.00
Mandor L.04 OH 0.005 105,000.00 525.00
JUMLAH TENAGA KERJA 11,390.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 11,390.00
E Overhead & Profit 10% 0.100 1,139.00
F Harga Satuan Pekerjaan (D+E) 12,529.00

A.4.1.2.10. Pemasangan dan membuka bekisting 1 buah komponen Kolom beton pracetak
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.071 85,000.00 6,035.00
Tukang kayu L.02 OH 0.024 110,000.00 2,640.00
Mandor L.04 OH 0.005 105,000.00 525.00
JUMLAH TENAGA KERJA 9,200.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 9,200.00
E Overhead & Profit 10% 0.100 920.00
F Harga Satuan Pekerjaan (D+E) 10,120.00

A.4.1.2.11. Penuangan/menebar beton untuk 1 buah komponen plat pracetak


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.064 85,000.00 5,440.00
Tukang batu L.02 OH 0.244 100,000.00 24,400.00
Tukang vibrator L.02 OH 0.128 95,000.00 12,160.00
Kepala Tukang L.03 OH 0.034 100,000.00 3,400.00
Mandor L.04 OH 0.073 105,000.00 7,665.00
JUMLAH TENAGA KERJA 53,065.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 53,065.00
E Overhead & Profit 10% 0.100 5,306.50
F Harga Satuan Pekerjaan (D+E) 58,371.00
A.4.1.2.12. Penuangan/menebar beton untuk 1 buah komponen balok pracetak
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.069 85,000.00 5,865.00
Tukang batu L.02 OH 0.242 100,000.00 24,200.00
Tukang vibrator L.02 OH 0.138 95,000.00 13,110.00
Kepala Tukang L.03 OH 0.037 100,000.00 3,700.00
Mandor L.04 OH 0.073 105,000.00 7,665.00
JUMLAH TENAGA KERJA 54,540.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 54,540.00
E Overhead & Profit 10% 0.100 5,454.00
F Harga Satuan Pekerjaan (D+E) 59,994.00

A.4.1.2.13. Penuangan/menebar beton untuk 1 buah komponen kolom pracetak


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.061 85,000.00 5,185.00
Tukang batu L.02 OH 0.213 100,000.00 21,300.00
Tukang vibrator L.02 OH 0.122 95,000.00 11,590.00
Kepala Tukang L.03 OH 0.033 100,000.00 3,300.00
Mandor L.04 OH 0.073 105,000.00 7,665.00
JUMLAH TENAGA KERJA 49,040.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 49,040.00
E Overhead & Profit 10% 0.100 4,904.00
F Harga Satuan Pekerjaan (D+E) 53,944.00

A.4.1.2.17. Melangsir 1 buah komponen plat pracetak ( ± 20 m)


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Operator crane L.06 OH 0.019 175,000.00 3,325.00
Pembantu operator crane L.08 OH 0.019 90,000.00 1,710.00
Pekerja L.01 OH 0.019 85,000.00 1,615.00
Tukang batu L.02 OH 0.038 100,000.00 3,800.00
JUMLAH TENAGA KERJA 10,450.00
B BAHAN
Solar (industri) M.393.a Liter 1.897 14,500.00 27,506.50
JUMLAH HARGA BAHAN 27,506.50
C PERALATAN
Sewa Crane alat 61 OH 0.019 3,098,053.00 58,863.01
JUMLAH HARGA ALAT 58,863.01
D Jumlah (A+B+C) 96,819.51
E Overhead & Profit 10% 0.100 9,681.95
F Harga Satuan Pekerjaan (D+E) 106,501.00

A.4.1.2.22. Upah melakukan 1 titik pekerjaan grout pada join pracetak


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Tukang batu L.02 OH 0.367 100,000.00 36,700.00
Kepala Tukang L.03 OH 0.074 100,000.00 7,400.00
Mandor L.04 OH 0.037 105,000.00 3,885.00
JUMLAH TENAGA KERJA 47,985.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 47,985.00
E Overhead & Profit 10% 0.100 4,798.50
F Harga Satuan Pekerjaan (D+E) 52,783.00
A.4.1.2.23. Pemasangan 1 titik Bekisting join pracetak
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.147 85,000.00 12,495.00
Tukang kayu L.02 OH 0.147 110,000.00 16,170.00
Kepala Tukang L.03 OH 0.015 100,000.00 1,500.00
Mandor L.04 OH 0.005 105,000.00 525.00
JUMLAH TENAGA KERJA 30,690.00
B BAHAN
Kayu kamper (kaso 5x7) M.26.a m3 0.012 10,678,600.00 128,143.20
Kayu bekisting M.20 m3 0.004 2,300,000.00 9,200.00
Paku 7 cm M.56.e Kg 0.264 18,000.00 4,752.00
JUMLAH HARGA BAHAN 142,095.20
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 172,785.20
E Overhead & Profit 10% 0.100 17,278.52
F Harga Satuan Pekerjaan (D+E) 190,063.00

A.4.1.2.24. Upah 1 titik Join dengan Sling


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.220 85,000.00 18,700.00
Tukang kayu L.02 OH 0.220 110,000.00 24,200.00
Tukang besi L.02 OH 0.220 110,000.00 24,200.00
Mandor L.04 OH 0.011 105,000.00 1,155.00
JUMLAH TENAGA KERJA 68,255.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 68,255.00
E Overhead & Profit 10% 0.100 6,825.50
F Harga Satuan Pekerjaan (D+E) 75,080.00

A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM


A.4.2.1.1. Pemasangan 1 kg besi profil
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.060 85,000.00 5,100.00
Tukang Las Konstruksi L.02 OH 0.060 110,000.00 6,600.00
Kepala Tukang L.03 OH 0.006 100,000.00 600.00
Mandor L.04 OH 0.003 105,000.00 315.00
JUMLAH TENAGA KERJA 12,615.00
B BAHAN
Besi Profil M.46.e Kg 1.150 14,000.00 16,100.00
JUMLAH HARGA BAHAN 16,100.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 28,715.00
E Overhead & Profit 10% 0.100 2,871.50
F Harga Satuan Pekerjaan (D+E) 31,586.00
A.4.2.1.2. Pemasangan 1 kg rangka kuda-kuda baja IWF
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.060 85,000.00 5,100.00
Tukang Las Konstruksi L.02 OH 0.060 110,000.00 6,600.00
Kepala Tukang L.03 OH 0.006 100,000.00 600.00
Mandor L.04 OH 0.003 105,000.00 315.00
JUMLAH TENAGA KERJA 12,615.00
B BAHAN
Besi IWF M.46.i Kg 1.150 12,100.00 13,915.00
JUMLAH HARGA BAHAN 13,915.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 26,530.00
E Overhead & Profit 10% 0.100 2,653.00
F Harga Satuan Pekerjaan (D+E) 29,183.00

A.4.2.1.3. Pengerjaan 100 kg pekerjaan perakitan


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.100 85,000.00 8,500.00
Tukang Besi Konstruksi L.02 OH 0.100 102,500.00 10,250.00
Kepala Tukang L.03 OH 0.001 100,000.00 100.00
Mandor L.04 OH 0.005 105,000.00 525.00
JUMLAH TENAGA KERJA 19,375.00
B BAHAN
Solar (industri) M.393.a Liter 1.000 14,500.00 14,500.00
Minyak pelumas M.398 Liter 0.100 25,000.00 2,500.00
JUMLAH HARGA BAHAN 17,000.00
C PERALATAN
Sewa alat las (pek.ringan) alat 62 Jam 0.800 71,400.00 57,120.00
JUMLAH HARGA ALAT 57,120.00
D Jumlah (A+B+C) 93,495.00
E Overhead & Profit 10% 0.100 9,349.50
F Harga Satuan Pekerjaan (D+E) 102,844.00

A.4.2.1.4. Pembuatan 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.050 85,000.00 89,250.00
Tukang Las Konstruksi L.02 OH 1.050 110,000.00 115,500.00
Kepala Tukang L.03 OH 0.105 100,000.00 10,500.00
Mandor L.04 OH 0.052 105,000.00 5,460.00
JUMLAH TENAGA KERJA 220,710.00
B BAHAN
Besi siku L 30.30.3 M.46.f Kg 15.000 12,300.00 184,500.00
Besi plat baja M.46.h Kg 32.800 15,000.00 492,000.00
Kawat las listrik M.57 Kg 0.050 25,000.00 1,250.00
Pengerjaan 1 cm pengelasan dengan las listrik L.04 cm 20.000 1,958.30 39,166.00
JUMLAH HARGA BAHAN 716,916.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 937,626.00
E Overhead & Profit 10% 0.100 93,762.60
F Harga Satuan Pekerjaan (D+E) 1,031,388.00
A.4.2.1.5. Pengerjaan 1 cm pengelasan dengan las listrik
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.040 85,000.00 3,400.00
Tukang Las Konstruksi L.02 OH 0.020 110,000.00 2,200.00
Kepala Tukang L.03 OH 0.002 100,000.00 200.00
Mandor L.04 OH 0.002 105,000.00 210.00
JUMLAH TENAGA KERJA 6,010.00
B BAHAN
Kawat las listrik M.57 Kg 0.040 25,000.00 1,000.00
Solar (industri) M.393.a Liter 0.030 14,500.00 435.00
Minyak pelumas M.398 Liter - 25,000.00 -
JUMLAH HARGA BAHAN 1,435.00
C PERALATAN
Sewa alat las alat 62 Jam 0.170 71,400.00 12,138.00
JUMLAH HARGA ALAT 12,138.00
D Jumlah (A+B+C) 19,583.00
E Overhead & Profit 10% 0.100 1,958.30
F Harga Satuan Pekerjaan untuk 10 cm 38,831.00
G Harga Satuan Pekerjaan (F/10) 2,154.10

A.4.2.1.6. Pembuatan 1 m2 rangka jendela besi scuare tube (25 x 5) cm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.650 85,000.00 55,250.00
Tukang Las Biasa L.02 OH 0.650 97,500.00 63,375.00
Kepala Tukang L.03 OH 0.065 100,000.00 6,500.00
Mandor L.04 OH 0.032 105,000.00 3,360.00
JUMLAH TENAGA KERJA 128,485.00
B BAHAN
Besi square tube (Hollow) M.47.f m 4.760 15,500.00 73,780.00
Alumunium lis kaca (1 x 1) cm M.61 m 4.522 5,000.00 22,610.00
Pengerjaan 1 cm pengelasan dengan las listrik A.4.2.1.5. cm 20.000 1,958.30 39,166.00
JUMLAH HARGA BAHAN 135,556.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 264,041.00
E Overhead & Profit 10% 0.100 26,404.10
F Harga Satuan Pekerjaan (D+E) 290,445.00

A.4.2.1.7. Pemasangan 1 m2 pintu rolling door besi


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.200 85,000.00 102,000.00
Tukang Las Biasa L.02 OH 1.200 97,500.00 117,000.00
Kepala Tukang L.03 OH 0.120 100,000.00 12,000.00
Mandor L.04 OH 0.006 105,000.00 630.00
JUMLAH TENAGA KERJA 231,630.00
B BAHAN
Rolling door besi M.430 m2 1.000 235,000.00 235,000.00
JUMLAH HARGA BAHAN 235,000.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 466,630.00
E Overhead & Profit 10% 0.100 46,663.00
F Harga Satuan Pekerjaan (D+E) 513,293.00
A.4.2.1.8. Pemasangan 1 m2 pintu lipat (folding door) bahan plastik/PVC
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.440 85,000.00 37,400.00
Tukang Besi L.02 OH 0.440 110,000.00 48,400.00
Kepala Tukang L.03 OH 0.044 100,000.00 4,400.00
Mandor L.04 OH 0.022 105,000.00 2,310.00
JUMLAH TENAGA KERJA 92,510.00
B BAHAN
Pintu lipat (folding door) bahan plastik/PVC M.585 m2 1.000 55,000.00 55,000.00
JUMLAH HARGA BAHAN 55,000.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 147,510.00
E Overhead & Profit 10% 0.100 14,751.00
F Harga Satuan Pekerjaan (D+E) 162,261.00

A.4.2.1.9. Pemasangan 1 m2 sunscreen alluminium


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.080 85,000.00 6,800.00
Tukang Khusus Alumunium L.02 OH 0.800 100,000.00 80,000.00
Kepala Tukang L.03 OH 0.080 100,000.00 8,000.00
Mandor L.04 OH 0.004 105,000.00 420.00
JUMLAH TENAGA KERJA 95,220.00
B BAHAN
Sunscreen aluminium M.434 m2 1.000 280,000.00 280,000.00
JUMLAH HARGA BAHAN 280,000.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 375,220.00
E Overhead & Profit 10% 0.100 37,522.00
F Harga Satuan Pekerjaan (D+E) 412,742.00

A.4.2.1.10. Pemasangan 1 m2 rolling door alluminium


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.000 85,000.00 85,000.00
Tukang Khusus Alumunium L.02 OH 1.000 100,000.00 100,000.00
Kepala Tukang L.03 OH 0.100 100,000.00 10,000.00
Mandor L.04 OH 0.050 105,000.00 5,250.00
JUMLAH TENAGA KERJA 200,250.00
B BAHAN
Rolling door aluminium M.435 m2 1.000 360,000.00 360,000.00
JUMLAH HARGA BAHAN 360,000.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 560,250.00
E Overhead & Profit 10% 0.100 56,025.00
F Harga Satuan Pekerjaan (D+E) 616,275.00

A.4.2.1.11. Pemasangan 1 m kusen pintu alluminium 3" warna Natural / Silver


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.043 85,000.00 3,655.00
Tukang Khusus Alumunium L.02 OH 0.043 100,000.00 4,300.00
Kepala Tukang L.03 OH 0.004 100,000.00 430.00
Mandor L.04 OH 0.002 105,000.00 220.50
JUMLAH TENAGA KERJA 8,605.50
B BAHAN
Profil aluminium warna Natural M.426.a m 1.100 80,000.00 88,000.00
Skrup fixer M.56.o buah 2.000 500.00 1,000.00
Sealant kaca (besar) M.562.c Tube 0.060 45,000.00 2,700.00
JUMLAH HARGA BAHAN 91,700.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 100,305.50
E Overhead & Profit 10% 0.100 10,030.55
F Harga Satuan Pekerjaan (D+E) 110,336.00

A.4.2.1.12. Pemasangan 1 m2 pintu alluminium strip lebar 8 cm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.085 85,000.00 7,225.00
Tukang Khusus Alumunium L.02 OH 0.085 100,000.00 8,500.00
Kepala Tukang L.03 OH 0.009 100,000.00 850.00
Mandor L.04 OH 0.004 105,000.00 441.00
JUMLAH TENAGA KERJA 17,016.00
B BAHAN
Profil aluminium warna Natural M.426.a m 4.400 80,000.00 352,000.00
Aluminium strip M.428 m 14.600 15,000.00 219,000.00
JUMLAH HARGA BAHAN 571,000.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 588,016.00
E Overhead & Profit 10% 0.100 58,801.60
F Harga Satuan Pekerjaan (D+E) 646,817.00

A.4.2.1.13. Pemasangan 1 m2 pintu kaca rangka alluminium


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.085 85,000.00 7,225.00
Tukang Khusus Alumunium L.02 OH 0.085 100,000.00 8,500.00
Kepala Tukang L.03 OH 0.009 100,000.00 900.00
Mandor L.04 OH 0.005 105,000.00 525.00
JUMLAH TENAGA KERJA 17,150.00
B BAHAN
Pintu aluminium M.425 m 4.400 145,000.00 638,000.00
Profil kaca M.350 m 4.500 14,100.00 63,450.00
Sealant kaca (besar) M.562.c Tube 0.270 45,000.00 12,150.00
JUMLAH HARGA BAHAN 713,600.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 730,750.00
E Overhead & Profit 10% 0.100 73,075.00
F Harga Satuan Pekerjaan (D+E) 803,825.00

A.4.2.1.14. Pemasangan 1 m2 venetions blinds dan Vertical blinds


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.350 85,000.00 29,750.00
Tukang Khusus Alumunium L.02 OH 0.350 100,000.00 35,000.00
Kepala Tukang L.03 OH 0.035 100,000.00 3,500.00
Mandor L.04 OH 0.018 105,000.00 1,890.00
JUMLAH TENAGA KERJA 70,140.00
B BAHAN
Venetions blinds dan vertical blinds (tirai) M.571 m2 1.000 900,000.00 900,000.00
JUMLAH HARGA BAHAN 900,000.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 970,140.00
E Overhead & Profit 10% 0.100 97,014.00
F Harga Satuan Pekerjaan (D+E) 1,067,154.00
A.4.2.1.15. Pemasangan 1 m2 terali besi strip (2 x 3) mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.670 85,000.00 141,950.00
Tukang Las biasa L.02 OH 1.670 97,500.00 162,825.00
Kepala Tukang L.03 OH 0.167 100,000.00 16,700.00
Mandor L.04 OH 0.083 105,000.00 8,715.00
JUMLAH TENAGA KERJA 330,190.00
B BAHAN
Besi strip M.46.g kg 6.177 15,500.00 95,743.50
Pengerjaan 1 cm pengelasan dengan las listrik A.4.2.1.5. cm 27.080 1,958.30 53,030.76
JUMLAH HARGA BAHAN 148,774.26
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 478,964.26
E Overhead & Profit 10% 0.100 47,896.43
F Harga Satuan Pekerjaan (D+E) 526,860.00

A.4.2.1.16. Pemasangan 1 m2 kawat nyamuk


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.100 85,000.00 8,500.00
Tukang Batu L.02 OH 0.100 100,000.00 10,000.00
Kepala Tukang L.03 OH 0.010 100,000.00 1,000.00
Mandor L.04 OH 0.005 105,000.00 525.00
JUMLAH TENAGA KERJA 20,025.00
B BAHAN
Kawat nyamuk bahan magnet fiber M.59.c m2 1.100 365,000.00 401,500.00
Pengerjaan 1 cm pengelasan dengan las listrik A.4.2.1.5. cm 11.110 1,958.30 21,756.71
Besi strip M.46.g kg 1.716 15,500.00 26,598.00
JUMLAH HARGA BAHAN 449,854.71
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 469,879.71
E Overhead & Profit 10% 0.100 46,987.97
F Harga Satuan Pekerjaan (D+E) 516,867.00

A.4.2.1.17. Pemasangan 1 m2 jendela nako & tralis


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.200 85,000.00 17,000.00
Tukang Batu L.02 OH 0.200 100,000.00 20,000.00
Kepala Tukang L.03 OH 0.020 100,000.00 2,000.00
Mandor L.04 OH 0.001 105,000.00 105.00
JUMLAH TENAGA KERJA 39,105.00
B BAHAN
Jendela nako (rangka + kaca 5 mm) M.351.b m2 1.100 245,000.00 269,500.00
Paku sekrup M.56.j buah 10.000 400.00 4,000.00
Besi strip M.46.g m 7.000 8,857.00 61,999.00
JUMLAH HARGA BAHAN 335,499.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 374,604.00
E Overhead & Profit 10% 0.100 37,460.40
F Harga Satuan Pekerjaan (D+E) 412,064.00
A.4.2.1.18. Pemasangan 1 m’ talang datar/ jurai seng bjls 28 lebar 90 cm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.200 85,000.00 17,000.00
Tukang batu L.02 OH 0.200 100,000.00 20,000.00
Kepala Tukang L.03 OH 0.020 100,000.00 2,000.00
Mandor L.04 OH 0.001 105,000.00 105.00
JUMLAH TENAGA KERJA 39,105.00
B BAHAN
Seng plat, Lebar 90 cm M.137.f m 1.050 37,500.00 39,375.00
Paku 2,5 cm M.56.b kg 0.015 18,500.00 277.50
Kayu kruing (papan) M.18.b m3 0.019 7,950,000.00 151,050.00
JUMLAH HARGA BAHAN 190,702.50
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 229,807.50
E Overhead & Profit 10% 0.100 22,980.75
F Harga Satuan Pekerjaan (D+E) 252,788.00

A.4.2.1.19 Pemasangan 1 m talang ½ lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.150 85,000.00 12,750.00
Tukang batu L.02 OH 0.300 100,000.00 30,000.00
Kepala Tukang L.03 OH 0.030 100,000.00 3,000.00
Mandor L.04 OH 0.008 105,000.00 840.00
JUMLAH TENAGA KERJA 46,590.00
B BAHAN
Seng plat, Lebar 45 cm M.137.f m 1.050 14,062.50 14,765.63
Paku 2,5 cm M.56.b kg 0.010 18,500.00 185.00
Besi strip M.46.g kg 0.500 15,500.00 7,750.00
JUMLAH HARGA BAHAN 22,700.63
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 69,290.63
E Overhead & Profit 10% 0.100 6,929.06
F Harga Satuan Pekerjaan (D+E) 76,219.00

A.4.2.1.20. Pemasangan 1 m2 rangka besi hollow 1 x 40 x 40 x 0.4 mm, modul 60 x 120 cm, dinding partisi
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.250 85,000.00 21,250.00
Tukang Besi L.02 OH 0.250 110,000.00 27,500.00
Kepala Tukang L.03 OH 0.025 100,000.00 2,500.00
Mandor L.04 OH 0.013 105,000.00 1,365.00
JUMLAH TENAGA KERJA 52,615.00
B BAHAN
Rangka metal hollow 40.40.0,4 mm M.47.c m' 5.000 25,900.00 129,500.00
Assesoris (perkuatan, las dll) 100% rangka 25,900.00 25,900.00
JUMLAH HARGA BAHAN 155,400.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 208,015.00
E Overhead & Profit 10% 0.100 20,801.50
F Harga Satuan Pekerjaan (D+E) 228,816.00
A.4.2.1.21. Pemasangan 1 m2 rangka besi hollow 1 x 40 x 40 x 0,4 mm, modul 60 x 60 cm, plafon
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.350 85,000.00 29,750.00
Tukang Besi L.02 OH 0.350 110,000.00 38,500.00
Kepala Tukang L.03 OH 0.035 100,000.00 3,500.00
Mandor L.04 OH 0.018 105,000.00 1,890.00
JUMLAH TENAGA KERJA 73,640.00
B BAHAN
Rangka metal hollow 40.40.0,4 mm M.47.c m' 4.000 25,900.00 103,600.00
Assesoris (perkuatan, las dll) 100% rangka 25,900.00 25,900.00
JUMLAH HARGA BAHAN 129,500.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 203,140.00
E Overhead & Profit 10% 0.100 20,314.00
F Harga Satuan Pekerjaan (D+E) 223,454.00

A.4.2.1.22. (K3) Pemasangan 1 m2 atap pelana rangka atap baja canal dingin profil C75
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.734 85,000.00 62,390.00
Tukang Besi L.02 OH 0.734 110,000.00 80,740.00
Kepala Tukang L.03 OH 0.073 100,000.00 7,300.00
Mandor L.04 OH 0.037 105,000.00 3,885.00
JUMLAH TENAGA KERJA 154,315.00
B BAHAN
C channel galvanis lebar 75 mm, t= 1,0 mm (kg) M.436.e kg 3.065 18,600.00 57,009.00
JUMLAH HARGA BAHAN 57,009.00
C PERALATAN
Alat Rangka Atap Baja Canal Dingin % 10.000 57,009.00 5,700.90
JUMLAH HARGA ALAT 5,700.90
D Jumlah (A+B+C) 217,024.90
E Overhead & Profit 10% 0.100 21,702.49
F Harga Satuan Pekerjaan (D+E) 238,727.00

A.4.2.1.23. (K3) Pemasangan 1 m2 atap jurai rangka atap baja canal dingin profil C75
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.760 85,000.00 64,634.00
Tukang Besi L.02 OH 0.760 110,000.00 83,644.00
Kepala Tukang L.03 OH 0.076 100,000.00 7,600.00
Mandor L.04 OH 0.038 105,000.00 3,990.00
JUMLAH TENAGA KERJA 159,868.00
B BAHAN
C channel galvanis lebar 75 mm, t= 1,0 mm (kg) M.436.e kg 4.050 18,600.00 75,330.00
JUMLAH HARGA BAHAN 75,330.00
C PERALATAN
Alat Rangka Atap Baja Canal Dingin % 10.000 75,330.00 7,533.00
JUMLAH HARGA ALAT 7,533.00
D Jumlah (A+B+C) 242,731.00
E Overhead & Profit 10% 0.100 24,273.10
F Harga Satuan Pekerjaan (D+E) 267,004.00
A.4.2.1.24. Pemasangan 1m2 pasang kuda-kuda baja ringan + reng untuk atap genteng biasa/metal
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.200 85,000.00 17,000.00
Tukang Besi L.02 OH 0.450 110,000.00 49,500.00
Kepala Tukang L.03 OH 0.010 100,000.00 1,000.00
Mandor L.04 OH 0.050 105,000.00 5,250.00
JUMLAH TENAGA KERJA 72,750.00
B BAHAN
C channel galvanis lebar 75 mm, t= 1,0 mm M.436.d m' 3.720 21,000.00 78,120.00
Sekrup kait / roofing M.56.p buah 28.000 800.00 22,400.00
Dynabolt dia 12mm (10-15cm) M.75.f buah 2.000 4,900.00 9,800.00
Reng Canal Dingin M.436.a m' 5.400 10,000.00 54,000.00
JUMLAH HARGA BAHAN 164,320.00
C PERALATAN
Alat Rangka Atap Baja Canal Dingin % 10.000 164,320.00 16,432.00
JUMLAH HARGA ALAT 16,432.00
D Jumlah (A+B+C) 253,502.00
E Overhead & Profit 10% 0.100 25,350.20
F Harga Satuan Pekerjaan (D+E) 278,852.00

A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING


A.4.4.1.1. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 2 PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.600 85,000.00 51,000.00
Tukang Batu L.02 OH 0.200 100,000.00 20,000.00
Kepala Tukang L.03 OH 0.020 100,000.00 2,000.00
Mandor L.04 OH 0.030 105,000.00 3,150.00
JUMLAH TENAGA KERJA 76,150.00
B BAHAN
Bata merah 5 x 11 x 22 cm M.218.a buah 140.000 700.00 98,000.00
Portland cement M.245.a Kg 43.500 1,300.00 56,550.00
Pasir Beton (muntilan) M.9.a m3 0.080 352,000.00 28,160.00
JUMLAH HARGA BAHAN 182,710.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 258,860.00
E Overhead & Profit 10% 0.100 25,886.00
F Harga Satuan Pekerjaan (D+E) 284,746.00

A.4.4.1.2. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 3 PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.600 85,000.00 51,000.00
Tukang Batu L.02 OH 0.200 100,000.00 20,000.00
Kepala Tukang L.03 OH 0.020 100,000.00 2,000.00
Mandor L.04 OH 0.030 105,000.00 3,150.00
JUMLAH TENAGA KERJA 76,150.00
B BAHAN
Bata merah 5 x 11 x 22 cm M.218.a buah 140.000 700.00 98,000.00
Portland cement M.245.a Kg 32.950 1,300.00 42,835.00
Pasir Beton (muntilan) M.9.a m3 0.091 352,000.00 32,032.00
JUMLAH HARGA BAHAN 172,867.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 249,017.00
E Overhead & Profit 10% 0.100 24,901.70
F Harga Satuan Pekerjaan (D+E) 273,918.00
A.4.4.1.3. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 4 PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.600 85,000.00 51,000.00
Tukang Batu L.02 OH 0.200 100,000.00 20,000.00
Kepala Tukang L.03 OH 0.020 100,000.00 2,000.00
Mandor L.04 OH 0.030 105,000.00 3,150.00
JUMLAH TENAGA KERJA 76,150.00
B BAHAN
Bata merah 5 x 11 x 22 cm M.218.a buah 140.000 700.00 98,000.00
Portland cement M.245.a Kg 26.550 1,300.00 34,515.00
Pasir Beton (muntilan) M.9.a m3 0.093 352,000.00 32,736.00
JUMLAH HARGA BAHAN 165,251.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 241,401.00
E Overhead & Profit 10% 0.100 24,140.10
F Harga Satuan Pekerjaan (D+E) 265,541.00

A.4.4.1.4. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 5 PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.600 85,000.00 51,000.00
Tukang Batu L.02 OH 0.200 100,000.00 20,000.00
Kepala Tukang L.03 OH 0.020 100,000.00 2,000.00
Mandor L.04 OH 0.030 105,000.00 3,150.00
JUMLAH TENAGA KERJA 76,150.00
B BAHAN
Bata merah 5 x 11 x 22 cm M.218.a buah 140.000 700.00 98,000.00
Portland cement M.245.a Kg 22.200 1,300.00 28,860.00
Pasir Beton (muntilan) M.9.a m3 0.102 352,000.00 35,904.00
JUMLAH HARGA BAHAN 162,764.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 238,914.00
E Overhead & Profit 10% 0.100 23,891.40
F Harga Satuan Pekerjaan (D+E) 262,805.00

A.4.4.1.5. Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal 1 batu campuran 1 SP : 6 PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.600 85,000.00 51,000.00
Tukang Batu L.02 OH 0.200 100,000.00 20,000.00
Kepala Tukang L.03 OH 0.020 100,000.00 2,000.00
Mandor L.04 OH 0.030 105,000.00 3,150.00
JUMLAH TENAGA KERJA 76,150.00
B BAHAN
Bata merah 5 x 11 x 22 cm M.218.a buah 140.000 700.00 98,000.00
Portland cement M.245.a Kg 18.500 1,300.00 24,050.00
Pasir Beton (muntilan) M.9.a m3 0.122 352,000.00 42,944.00
JUMLAH HARGA BAHAN 164,994.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 241,144.00
E Overhead & Profit 10% 0.100 24,114.40
F Harga Satuan Pekerjaan (D+E) 265,258.00
A.4.4.1.6 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3KP : 10PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.600 85,000.00 51,000.00
Tukang Batu L.02 OH 0.200 100,000.00 20,000.00
Kepala Tukang L.03 OH 0.020 100,000.00 2,000.00
Mandor L.04 OH 0.030 105,000.00 3,150.00
JUMLAH TENAGA KERJA 76,150.00
B BAHAN
Bata merah 5 x 11 x 22 cm M.218.a buah 140.000 700.00 98,000.00
Portland cement M.245.a Kg 10.080 1,300.00 13,104.00
Kapur M.563 m3 0.028 263,000.00 7,232.50
Pasir Beton (muntilan) M.9.a m3 0.093 352,000.00 32,560.00
JUMLAH HARGA BAHAN 150,896.50
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 227,046.50
E Overhead & Profit 10% 0.100 22,704.65
F Harga Satuan Pekerjaan (D+E) 249,751.00

A.4.4.1.7 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 2PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.300 85,000.00 25,500.00
Tukang Batu L.02 OH 0.100 100,000.00 10,000.00
Kepala Tukang L.03 OH 0.010 100,000.00 1,000.00
Mandor L.04 OH 0.015 105,000.00 1,575.00
JUMLAH TENAGA KERJA 38,075.00
B BAHAN
Bata merah 5 x 11 x 22 cm M.218.a buah 70.000 700.00 49,000.00
Portland cement M.245.a Kg 18.950 1,300.00 24,635.00
Pasir Beton (muntilan) M.9.a m3 0.038 352,000.00 13,376.00
JUMLAH HARGA BAHAN 87,011.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 125,086.00
E Overhead & Profit 10% 0.100 12,508.60
F Harga Satuan Pekerjaan (D+E) 137,594.00

A.4.4.1.8 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 3PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.300 85,000.00 25,500.00
Tukang Batu L.02 OH 0.100 100,000.00 10,000.00
Kepala Tukang L.03 OH 0.010 100,000.00 1,000.00
Mandor L.04 OH 0.015 105,000.00 1,575.00
JUMLAH TENAGA KERJA 38,075.00
B BAHAN
Bata merah 5 x 11 x 22 cm M.218.a buah 70.000 700.00 49,000.00
Portland cement M.245.a Kg 14.370 1,300.00 18,681.00
Pasir Beton (muntilan) M.9.a m3 0.040 352,000.00 14,080.00
JUMLAH HARGA BAHAN 81,761.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 119,836.00
E Overhead & Profit 10% 0.100 11,983.60
F Harga Satuan Pekerjaan (D+E) 131,819.00
A.4.4.1.9 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :4PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.300 85,000.00 25,500.00
Tukang Batu L.02 OH 0.100 100,000.00 10,000.00
Kepala Tukang L.03 OH 0.010 100,000.00 1,000.00
Mandor L.04 OH 0.015 105,000.00 1,575.00
JUMLAH TENAGA KERJA 38,075.00
B BAHAN
Bata merah 5 x 11 x 22 cm M.218.a buah 70.000 700.00 49,000.00
Portland cement M.245.a Kg 11.500 1,300.00 14,950.00
Pasir Beton (muntilan) M.9.a m3 0.043 352,000.00 15,136.00
JUMLAH HARGA BAHAN 79,086.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 117,161.00
E Overhead & Profit 10% 0.100 11,716.10
F Harga Satuan Pekerjaan (D+E) 128,877.00

A.4.4.1.10 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1 SP : 5 PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.300 85,000.00 25,500.00
Tukang Batu L.02 OH 0.100 100,000.00 10,000.00
Kepala Tukang L.03 OH 0.010 100,000.00 1,000.00
Mandor L.04 OH 0.015 105,000.00 1,575.00
JUMLAH TENAGA KERJA 38,075.00
B BAHAN
Bata merah 5 x 11 x 22 cm M.218.a buah 70.000 700.00 49,000.00
Portland cement M.245.a Kg 9.680 1,300.00 12,584.00
Pasir Beton (muntilan) M.9.a m3 0.045 352,000.00 15,840.00
JUMLAH HARGA BAHAN 77,424.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 115,499.00
E Overhead & Profit 10% 0.100 11,549.90
F Harga Satuan Pekerjaan (D+E) 127,048.00

A.4.4.1.11 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1 SP : 6 PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.300 85,000.00 25,500.00
Tukang Batu L.02 OH 0.100 100,000.00 10,000.00
Kepala Tukang L.03 OH 0.010 100,000.00 1,000.00
Mandor L.04 OH 0.015 105,000.00 1,575.00
JUMLAH TENAGA KERJA 38,075.00
B BAHAN
Bata merah 5 x 11 x 22 cm M.218.a buah 70.000 700.00 49,000.00
Portland cement M.245.a Kg 8.320 1,300.00 10,816.00
Pasir Beton (muntilan) M.9.a m3 0.049 352,000.00 17,248.00
JUMLAH HARGA BAHAN 77,064.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 115,139.00
E Overhead & Profit 10% 0.100 11,513.90
F Harga Satuan Pekerjaan (D+E) 126,652.00
A.4.4.1.12 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 8 PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.300 85,000.00 25,500.00
Tukang Batu L.02 OH 0.100 100,000.00 10,000.00
Kepala Tukang L.03 OH 0.010 100,000.00 1,000.00
Mandor L.04 OH 0.015 105,000.00 1,575.00
JUMLAH TENAGA KERJA 38,075.00
B BAHAN
Bata merah 5 x 11 x 22 cm M.218.a buah 70.000 700.00 49,000.00
Portland cement M.245.a Kg 6.500 1,300.00 8,450.00
Pasir Beton (muntilan) M.9.a m3 0.050 352,000.00 17,600.00
JUMLAH HARGA BAHAN 75,050.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 113,125.00
E Overhead & Profit 10% 0.100 11,312.50
F Harga Satuan Pekerjaan (D+E) 124,437.00

A.4.4.1.13 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 3KP :10PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.300 85,000.00 25,500.00
Tukang Batu L.02 OH 0.100 100,000.00 10,000.00
Kepala Tukang L.03 OH 0.010 100,000.00 1,000.00
Mandor L.04 OH 0.015 105,000.00 1,575.00
JUMLAH TENAGA KERJA 38,075.00
B BAHAN
Bata merah 5 x 11 x 22 cm M.218.a buah 70.000 700.00 49,000.00
Portland cement M.245.a Kg 4.500 1,300.00 5,850.00
Kapur M.563 m3 0.015 263,000.00 3,945.00
Pasir Beton (muntilan) M.9.a m3 0.050 352,000.00 17,600.00
JUMLAH HARGA BAHAN 76,395.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 114,470.00
E Overhead & Profit 10% 0.100 11,447.00
F Harga Satuan Pekerjaan (D+E) 125,917.00

A.4.4.1.14 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SM : 1KP :1PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.300 85,000.00 25,500.00
Tukang Batu L.02 OH 0.100 100,000.00 10,000.00
Kepala Tukang L.03 OH 0.010 100,000.00 1,000.00
Mandor L.04 OH 0.015 105,000.00 1,575.00
JUMLAH TENAGA KERJA 38,075.00
B BAHAN
Bata merah 5 x 11 x 22 cm M.218.a buah 70.000 700.00 49,000.00
Portland cement M.245.a Kg 0.018 1,300.00 23.40
Kapur M.563 m3 0.018 263,000.00 4,734.00
Pasir Beton (muntilan) M.9.a m3 0.018 352,000.00 6,336.00
JUMLAH HARGA BAHAN 60,093.40
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 98,168.40
E Overhead & Profit 10% 0.100 9,816.84
F Harga Satuan Pekerjaan (D+E) 107,985.00
A.4.4.1.15 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SM : 1KP :2PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.300 85,000.00 25,500.00
Tukang Batu L.02 OH 0.100 100,000.00 10,000.00
Kepala Tukang L.03 OH 0.010 100,000.00 1,000.00
Mandor L.04 OH 0.015 105,000.00 1,575.00
JUMLAH TENAGA KERJA 38,075.00
B BAHAN
Bata merah 5 x 11 x 22 cm M.218.a buah 70.000 700.00 49,000.00
Portland cement M.245.a Kg 0.014 1,300.00 18.20
Kapur M.563 m3 0.014 263,000.00 3,682.00
Pasir Beton (muntilan) M.9.a m3 0.028 352,000.00 9,856.00
JUMLAH HARGA BAHAN 62,556.20
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 100,631.20
E Overhead & Profit 10% 0.100 10,063.12
F Harga Satuan Pekerjaan (D+E) 110,694.00

A.4.4.1.16 Pemasangan 1m2 dinding conblock HB20 campuran 1SP : 3PP


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.350 85,000.00 29,750.00
Tukang Batu L.02 OH 0.150 100,000.00 15,000.00
Kepala Tukang L.03 OH 0.015 100,000.00 1,500.00
Mandor L.04 OH 0.018 105,000.00 1,890.00
JUMLAH TENAGA KERJA 48,140.00
B BAHAN
HB.20 - Batako (ukuran 40x20x20) M.225.a buah 12.500 17,300.00 216,250.00
Portland cement M.245.a Kg 30.320 1,300.00 39,416.00
Pasir Beton (muntilan) M.9.a m3 0.728 352,000.00 256,256.00
Besi angker dia 8 M.46.a Kg 0.280 9,600.00 2,688.00
JUMLAH HARGA BAHAN 514,610.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 562,750.00
E Overhead & Profit 10% 0.100 56,275.00
F Harga Satuan Pekerjaan (D+E) 619,025.00

A.4.4.1.17 Pemasangan 1m2 dinding conblock HB20 campuran 1SP:4PP


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.350 85,000.00 29,750.00
Tukang Batu L.02 OH 0.150 100,000.00 15,000.00
Kepala Tukang L.03 OH 0.015 100,000.00 1,500.00
Mandor L.04 OH 0.018 105,000.00 1,890.00
JUMLAH TENAGA KERJA 48,140.00
B BAHAN
HB.20 - Batako (ukuran 40x20x20) M.225.a buah 12.500 17,300.00 216,250.00
Portland cement M.245.a Kg 24.260 1,300.00 31,538.00
Pasir Beton (muntilan) M.9.a m3 0.772 352,000.00 271,744.00
Besi angker dia 8 M.46.a Kg 0.280 9,600.00 2,688.00
JUMLAH HARGA BAHAN 522,220.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 570,360.00
E Overhead & Profit 10% 0.100 57,036.00
F Harga Satuan Pekerjaan (D+E) 627,396.00
A.4.4.1.8 Pemasangan 1m2 dinding conblock HB15 campuran 1SP :3PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.320 85,000.00 27,200.00
Tukang Batu L.02 OH 0.120 100,000.00 12,000.00
Kepala Tukang L.03 OH 0.012 100,000.00 1,200.00
Mandor L.04 OH 0.016 105,000.00 1,680.00
JUMLAH TENAGA KERJA 42,080.00
B BAHAN
HB.15 - Batako (ukuran 40x20x15) M.224.a buah 12.500 9,900.00 123,750.00
Portland cement M.245.a Kg 22.740 1,300.00 29,562.00
Pasir Beton (muntilan) M.9.a m3 0.550 352,000.00 193,600.00
Besi angker dia 8 M.46.a Kg 0.280 9,600.00 2,688.00
JUMLAH HARGA BAHAN 349,600.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 391,680.00
E Overhead & Profit 10% 0.100 39,168.00
F Harga Satuan Pekerjaan (D+E) 430,848.00

A.4.4.1.19 Pemasangan 1 m2 dinding conblock HB15 campuran 1SP :4PP


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.320 85,000.00 27,200.00
Tukang Batu L.02 OH 0.120 100,000.00 12,000.00
Kepala Tukang L.03 OH 0.012 100,000.00 1,200.00
Mandor L.04 OH 0.016 105,000.00 1,680.00
JUMLAH TENAGA KERJA 42,080.00
B BAHAN
HB.15 - Batako (ukuran 40x20x15) M.224.a buah 12.500 9,900.00 123,750.00
Portland cement M.245.a Kg 18.200 1,300.00 23,660.00
Pasir Beton (muntilan) M.9.a m3 0.582 352,000.00 204,864.00
Besi angker dia 8 M.46.a Kg 0.280 9,600.00 2,688.00
JUMLAH HARGA BAHAN 354,962.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 397,042.00
E Overhead & Profit 10% 0.100 39,704.20
F Harga Satuan Pekerjaan (D+E) 436,746.00

A.4.4.1.20 Pemasangan 1 m2 dinding conblock HB10 campuran 1SP :3PP


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.300 85,000.00 25,500.00
Tukang Batu L.02 OH 0.100 100,000.00 10,000.00
Kepala Tukang L.03 OH 0.010 100,000.00 1,000.00
Mandor L.04 OH 0.015 105,000.00 1,575.00
JUMLAH TENAGA KERJA 38,075.00
B BAHAN
HB.10 - Batako (ukuran 40x20x10) M.222.a buah 12.500 4,400.00 55,000.00
Portland cement M.245.a Kg 15.160 1,300.00 19,708.00
Pasir Beton (muntilan) M.9.a m3 0.364 352,000.00 128,128.00
Besi angker dia 8 M.46.a Kg 0.280 9,600.00 2,688.00
JUMLAH HARGA BAHAN 205,524.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 243,599.00
E Overhead & Profit 10% 0.100 24,359.90
F Harga Satuan Pekerjaan (D+E) 267,958.00
A.4.4.1.21 Pemasangan 1 m2 dinding conblock HB10 campuran 1SP :4PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.300 85,000.00 25,500.00
Tukang Batu L.02 OH 0.100 100,000.00 10,000.00
Kepala Tukang L.03 OH 0.010 100,000.00 1,000.00
Mandor L.04 OH 0.015 105,000.00 1,575.00
JUMLAH TENAGA KERJA 38,075.00
B BAHAN
HB.10 - Batako (ukuran 40x20x10) M.222.a buah 12.500 4,400.00 55,000.00
Portland cement M.245.a Kg 12.130 1,300.00 15,769.00
Pasir Beton (muntilan) M.9.a m3 0.388 352,000.00 136,576.00
Besi angker dia 8 M.46.a Kg 0.280 9,600.00 2,688.00
JUMLAH HARGA BAHAN 210,033.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 248,108.00
E Overhead & Profit 10% 0.100 24,810.80
F Harga Satuan Pekerjaan (D+E) 272,918.00

A.4.4.1.22 Pemasangan 1 m2 dinding terawang (rooster) 12x11x24 campuran 1SP :3PP


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.300 85,000.00 25,500.00
Tukang Batu L.02 OH 0.100 100,000.00 10,000.00
Kepala Tukang L.03 OH 0.010 100,000.00 1,000.00
Mandor L.04 OH 0.015 105,000.00 1,575.00
JUMLAH TENAGA KERJA 38,075.00
B BAHAN
Roster/terawang M.220 buah 30.000 8,500.00 255,000.00
Portland cement M.245.a Kg 11.000 1,300.00 14,300.00
Pasir Beton (muntilan) M.9.a m3 0.035 352,000.00 12,320.00
JUMLAH HARGA BAHAN 281,620.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 319,695.00
E Overhead & Profit 10% 0.100 31,969.50
F Harga Satuan Pekerjaan (D+E) 351,664.00

A.4.4.1.23 Pemasangan 1 m2 dinding terawang (rooster) 12x11x24 campuran 1SP :4PP


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.300 85,000.00 25,500.00
Tukang Batu L.02 OH 0.100 100,000.00 10,000.00
Kepala Tukang L.03 OH 0.010 100,000.00 1,000.00
Mandor L.04 OH 0.015 105,000.00 1,575.00
JUMLAH TENAGA KERJA 38,075.00
B BAHAN
Roster/terawang M.220 buah 30.000 8,500.00 255,000.00
Portland cement M.245.a Kg 7.500 1,300.00 9,750.00
Pasir Beton (muntilan) M.9.a m3 0.047 352,000.00 16,438.40
JUMLAH HARGA BAHAN 281,188.40
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 319,263.40
E Overhead & Profit 10% 0.100 31,926.34
F Harga Satuan Pekerjaan (D+E) 351,189.00
A.4.4.1.24 Pemasangan 1 m2 dinding bata berongga ekspose 12x11x24 campuran 1 SP : 3 PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.300 85,000.00 25,500.00
Tukang Batu L.02 OH 0.150 100,000.00 15,000.00
Kepala Tukang L.03 OH 0.015 100,000.00 1,500.00
Mandor L.04 OH 0.015 105,000.00 1,575.00
JUMLAH TENAGA KERJA 43,575.00
B BAHAN
Bata berongga / Roster 12x11 M.221.a buah 30.000 4,000.00 120,000.00
Portland cement M.245.a Kg 14.000 1,300.00 18,200.00
Pasir Beton (muntilan) M.9.a m3 0.032 352,000.00 11,264.00
JUMLAH HARGA BAHAN 149,464.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 193,039.00
E Overhead & Profit 10% 0.100 19,303.90
F Harga Satuan Pekerjaan (D+E) 212,342.00

A.4.4.1.25 Pemasangan 1 m2 dinding bata ringan tebal 7,5 cm dengan mortar siap pakai.
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.670 85,000.00 56,950.00
Tukang Batu L.02 OH 1.300 100,000.00 130,000.00
Kepala Tukang L.03 OH 0.130 100,000.00 13,000.00
Mandor L.04 OH 0.003 105,000.00 315.00
JUMLAH TENAGA KERJA 200,265.00
B BAHAN
Hebel Block (ukuran 60x20x7,5 cm) M.235.a buah 8.400 9,800.00 82,320.00
Pengisi bata ringan (Semen MU 380) M.240.c Kg 0.473 3,225.00 1,525.43
JUMLAH HARGA BAHAN 83,845.43
C PERALATAN
Peralatan Pasang Dinding Bata Ringan % 10.000 83,845.43 8,384.54
JUMLAH HARGA ALAT 8,384.54
D Jumlah (A+B+C) 292,494.97
E Overhead & Profit 10% 0.100 29,249.50
F Harga Satuan Pekerjaan (D+E) 321,744.00

A.4.4.1.26 Pemasangan 1 m2 dinding bata ringan tebal 10 cm dengan mortar siap pakai
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.671 85,000.00 57,035.00
Tukang Batu L.02 OH 1.300 100,000.00 130,000.00
Kepala Tukang L.03 OH 0.130 100,000.00 13,000.00
Mandor L.04 OH 0.003 105,000.00 315.00
JUMLAH TENAGA KERJA 200,350.00
B BAHAN
Hebel Block (ukuran 60x20x10 cm) M.235.b buah 8.400 10,200.00 85,680.00
Pengisi bata ringan (Semen MU 380) M.240.c Kg 0.063 3,225.00 203.18
JUMLAH HARGA BAHAN 85,883.18
C PERALATAN
Peralatan Pasang Dinding Bata Ringan Ls 0.100 85,883.18 8,588.32
JUMLAH HARGA ALAT 8,588.32
D Jumlah (A+B+C) 294,821.49
E Overhead & Profit 10% 0.100 29,482.15
F Harga Satuan Pekerjaan (D+E) 324,303.00
A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN
A.4.4.2.1. Pemasangan 1 m2 plesteran 1SP : 1PP tebal 15 mm.
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.300 85,000.00 25,500.00
Tukang Batu L.02 OH 0.150 100,000.00 15,000.00
Kepala Tukang L.03 OH 0.015 100,000.00 1,500.00
Mandor L.04 OH 0.015 105,000.00 1,575.00
JUMLAH TENAGA KERJA 43,575.00
B BAHAN
Portland cement M.245.a Kg 15.504 1,300.00 20,155.20
Pasir Beton (muntilan) M.9.a m3 0.016 352,000.00 5,632.00
JUMLAH HARGA BAHAN 25,787.20
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 69,362.20
E Overhead & Profit 10% 0.100 6,936.22
F Harga Satuan Pekerjaan (D+E) 76,298.00

A.4.4.2.2. Pemasangan 1 m2 plesteran 1SP : 2PP tebal 15 mm.


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.300 85,000.00 25,500.00
Tukang Batu L.02 OH 0.150 100,000.00 15,000.00
Kepala Tukang L.03 OH 0.015 100,000.00 1,500.00
Mandor L.04 OH 0.015 105,000.00 1,575.00
JUMLAH TENAGA KERJA 43,575.00
B BAHAN
Portland cement M.245.a Kg 10.224 1,300.00 13,291.20
Pasir Beton (muntilan) M.9.a m3 0.020 352,000.00 7,040.00
JUMLAH HARGA BAHAN 20,331.20
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 63,906.20
E Overhead & Profit 10% 0.100 6,390.62
F Harga Satuan Pekerjaan (D+E) 70,296.00

A.4.4.2.3. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15mm.


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.300 85,000.00 25,500.00
Tukang Batu L.02 OH 0.150 100,000.00 15,000.00
Kepala Tukang L.03 OH 0.015 100,000.00 1,500.00
Mandor L.04 OH 0.015 105,000.00 1,575.00
JUMLAH TENAGA KERJA 43,575.00
B BAHAN
Portland cement M.245.a Kg 7.776 1,300.00 10,108.80
Pasir Beton (muntilan) M.9.a m3 0.023 352,000.00 8,096.00
JUMLAH HARGA BAHAN 18,204.80
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 61,779.80
E Overhead & Profit 10% 0.100 6,177.98
F Harga Satuan Pekerjaan (D+E) 67,957.00
A.4.4.2.4. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 15 mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.300 85,000.00 25,500.00
Tukang Batu L.02 OH 0.150 100,000.00 15,000.00
Kepala Tukang L.03 OH 0.015 100,000.00 1,500.00
Mandor L.04 OH 0.015 105,000.00 1,575.00
JUMLAH TENAGA KERJA 43,575.00
B BAHAN
Portland cement M.245.a Kg 6.240 1,300.00 8,112.00
Pasir Beton (muntilan) M.9.a m3 0.024 352,000.00 8,448.00
JUMLAH HARGA BAHAN 16,560.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 60,135.00
E Overhead & Profit 10% 0.100 6,013.50
F Harga Satuan Pekerjaan (D+E) 66,148.00

A.4.4.2.5. Pemasangan 1 m2 plesteran 1SP : 5PP tebal 15 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.300 85,000.00 25,500.00
Tukang Batu L.02 OH 0.150 100,000.00 15,000.00
Kepala Tukang L.03 OH 0.015 100,000.00 1,500.00
Mandor L.04 OH 0.015 105,000.00 1,575.00
JUMLAH TENAGA KERJA 43,575.00
B BAHAN
Portland cement M.245.a Kg 5.184 1,300.00 6,739.20
Pasir Beton (muntilan) M.9.a m3 0.026 352,000.00 9,152.00
JUMLAH HARGA BAHAN 15,891.20
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 59,466.20
E Overhead & Profit 10% 0.100 5,946.62
F Harga Satuan Pekerjaan (D+E) 65,412.00

A.4.4.2.6. Pemasangan 1 m2 plesteran 1SP : 6PP tebal 15 mm.


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.300 85,000.00 25,500.00
Tukang Batu L.02 OH 0.150 100,000.00 15,000.00
Kepala Tukang L.03 OH 0.015 100,000.00 1,500.00
Mandor L.04 OH 0.015 105,000.00 1,575.00
JUMLAH TENAGA KERJA 43,575.00
B BAHAN
Portland cement M.245.a Kg 4.416 1,300.00 5,740.80
Pasir Beton (muntilan) M.9.a m3 0.027 352,000.00 9,504.00
JUMLAH HARGA BAHAN 15,244.80
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 58,819.80
E Overhead & Profit 10% 0.100 5,881.98
F Harga Satuan Pekerjaan (D+E) 64,701.00
A.4.4.2.7. Pemasangan 1 m2 plesteran 1SP : 7PP tebal 15 mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.300 85,000.00 25,500.00
Tukang Batu L.02 OH 0.150 100,000.00 15,000.00
Kepala Tukang L.03 OH 0.015 100,000.00 1,500.00
Mandor L.04 OH 0.015 105,000.00 1,575.00
JUMLAH TENAGA KERJA 43,575.00
B BAHAN
Portland cement M.245.a Kg 3.936 1,300.00 5,116.80
Pasir Beton (muntilan) M.9.a m3 0.028 352,000.00 9,856.00
JUMLAH HARGA BAHAN 14,972.80
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 58,547.80
E Overhead & Profit 10% 0.100 5,854.78
F Harga Satuan Pekerjaan (D+E) 64,402.00

A.4.4.2.8. Pemasangan 1 m2 plesteran 1SP : 8PP tebal 15 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.300 85,000.00 25,500.00
Tukang Batu L.02 OH 0.150 100,000.00 15,000.00
Kepala Tukang L.03 OH 0.015 100,000.00 1,500.00
Mandor L.04 OH 0.015 105,000.00 1,575.00
JUMLAH TENAGA KERJA 43,575.00
B BAHAN
Portland cement M.245.a Kg 3.456 1,300.00 4,492.80
Pasir Beton (muntilan) M.9.a m3 0.029 352,000.00 10,208.00
JUMLAH HARGA BAHAN 14,700.80
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 58,275.80
E Overhead & Profit 10% 0.100 5,827.58
F Harga Satuan Pekerjaan (D+E) 64,103.00

A.4.4.2.9. Pemasangan 1 m2 plesteran 1SP : 1/2KP : 3PP tebal 15 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.360 85,000.00 30,600.00
Tukang Batu L.02 OH 0.120 100,000.00 12,000.00
Kepala Tukang L.03 OH 0.012 100,000.00 1,200.00
Mandor L.04 OH 0.018 105,000.00 1,890.00
JUMLAH TENAGA KERJA 45,690.00
B BAHAN
Portland cement M.245.a Kg 5.760 1,300.00 7,488.00
Kapur M.563 m3 0.003 263,000.00 789.00
Pasir Beton (muntilan) M.9.a m3 0.013 352,000.00 4,576.00
JUMLAH HARGA BAHAN 12,853.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 58,543.00
E Overhead & Profit 10% 0.100 5,854.30
F Harga Satuan Pekerjaan (D+E) 64,397.00
A.4.4.2.10. Pemasangan 1 m2 plesteran 1SP : 2KP : 8PP tebal 15 mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.360 85,000.00 30,600.00
Tukang Batu L.02 OH 0.120 100,000.00 12,000.00
Kepala Tukang L.03 OH 0.012 100,000.00 1,200.00
Mandor L.04 OH 0.018 105,000.00 1,890.00
JUMLAH TENAGA KERJA 45,690.00
B BAHAN
Portland cement M.245.a Kg 3.000 1,300.00 3,900.00
Kapur M.563 m3 0.005 263,000.00 1,315.00
Pasir Beton (muntilan) M.9.a m3 0.020 352,000.00 7,040.00
JUMLAH HARGA BAHAN 12,255.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 57,945.00
E Overhead & Profit 10% 0.100 5,794.50
F Harga Satuan Pekerjaan (D+E) 63,739.00

A.4.4.2.13. Pemasangan 1 m2 plesteran 1SP : 1PP tebal 20 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.400 85,000.00 34,000.00
Tukang Batu L.02 OH 0.200 100,000.00 20,000.00
Kepala Tukang L.03 OH 0.020 100,000.00 2,000.00
Mandor L.04 OH 0.022 105,000.00 2,310.00
JUMLAH TENAGA KERJA 58,310.00
B BAHAN
Portland cement M.245.a Kg 13.632 1,300.00 17,721.60
Pasir Beton (muntilan) M.9.a m3 0.027 352,000.00 9,504.00
JUMLAH HARGA BAHAN 27,225.60
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 85,535.60
E Overhead & Profit 10% 0.100 8,553.56
F Harga Satuan Pekerjaan (D+E) 94,089.00

A.4.4.2.14. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 20 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.260 85,000.00 22,100.00
Tukang Batu L.02 OH 0.200 100,000.00 20,000.00
Kepala Tukang L.03 OH 0.020 100,000.00 2,000.00
Mandor L.04 OH 0.013 105,000.00 1,365.00
JUMLAH TENAGA KERJA 45,465.00
B BAHAN
Portland cement M.245.a Kg 10.368 1,300.00 13,478.40
Pasir Beton (muntilan) M.9.a m3 0.031 352,000.00 10,912.00
JUMLAH HARGA BAHAN 24,390.40
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 69,855.40
E Overhead & Profit 10% 0.100 6,985.54
F Harga Satuan Pekerjaan (D+E) 76,840.00
A.4.4.2.15. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 20 mm.
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.400 85,000.00 34,000.00
Tukang Batu L.02 OH 0.200 100,000.00 20,000.00
Kepala Tukang L.03 OH 0.020 100,000.00 2,000.00
Mandor L.04 OH 0.022 105,000.00 2,310.00
JUMLAH TENAGA KERJA 58,310.00
B BAHAN
Portland cement M.245.a Kg 8.320 1,300.00 10,816.00
Pasir Beton (muntilan) M.9.a m3 0.032 352,000.00 11,264.00
JUMLAH HARGA BAHAN 22,080.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 80,390.00
E Overhead & Profit 10% 0.100 8,039.00
F Harga Satuan Pekerjaan (D+E) 88,429.00

A.4.4.2.16. Pemasangan 1 m2 plesteran 1SP : 5PP tebal 20 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.400 85,000.00 34,000.00
Tukang Batu L.02 OH 0.200 100,000.00 20,000.00
Kepala Tukang L.03 OH 0.020 100,000.00 2,000.00
Mandor L.04 OH 0.022 105,000.00 2,310.00
JUMLAH TENAGA KERJA 58,310.00
B BAHAN
Portland cement M.245.a Kg 6.912 1,300.00 8,985.60
Pasir Beton (muntilan) M.9.a m3 0.035 352,000.00 12,320.00
JUMLAH HARGA BAHAN 21,305.60
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 79,615.60
E Overhead & Profit 10% 0.100 7,961.56
F Harga Satuan Pekerjaan (D+E) 87,577.00

A.4.4.2.17. Pemasangan 1 m2 plesteran 1SP : 6PP tebal 20 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.400 85,000.00 34,000.00
Tukang Batu L.02 OH 0.200 100,000.00 20,000.00
Kepala Tukang L.03 OH 0.020 100,000.00 2,000.00
Mandor L.04 OH 0.022 105,000.00 2,310.00
JUMLAH TENAGA KERJA 58,310.00
B BAHAN
Portland cement M.245.a Kg 5.888 1,300.00 7,654.40
Pasir Beton (muntilan) M.9.a m3 0.036 352,000.00 12,672.00
JUMLAH HARGA BAHAN 20,326.40
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 78,636.40
E Overhead & Profit 10% 0.100 7,863.64
F Harga Satuan Pekerjaan (D+E) 86,500.00
A.4.4.2.19. Pemasangan 1 m2 berapen 1SP : 5PP tebal 15 mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.150 85,000.00 12,750.00
Tukang Batu L.02 OH 0.075 100,000.00 7,500.00
Kepala Tukang L.03 OH 0.008 100,000.00 800.00
Mandor L.04 OH 0.008 105,000.00 840.00
JUMLAH TENAGA KERJA 21,890.00
B BAHAN
Portland cement M.245.a Kg 5.184 1,300.00 6,739.20
Pasir Beton (muntilan) M.9.a m3 0.026 352,000.00 9,152.00
JUMLAH HARGA BAHAN 15,891.20
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 37,781.20
E Overhead & Profit 10% 0.100 3,778.12
F Harga Satuan Pekerjaan (D+E) 41,559.00

A.4.4.2.20. Pemasangan 1 m’ plesteran skoning 1SP : 3PP lebar 10 cm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.080 85,000.00 6,800.00
Tukang Batu L.02 OH 0.400 100,000.00 40,000.00
Kepala Tukang L.03 OH 0.040 100,000.00 4,000.00
Mandor L.04 OH 0.004 105,000.00 420.00
JUMLAH TENAGA KERJA 51,220.00
B BAHAN
Portland cement M.245.a Kg 0.500 1,300.00 650.00
Pasir Beton (muntilan) M.9.a m3 0.013 352,000.00 4,576.00
JUMLAH HARGA BAHAN 5,226.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 56,446.00
E Overhead & Profit 10% 0.100 5,644.60
F Harga Satuan Pekerjaan (D+E) 62,090.00

A.4.4.2.21. Pemasangan 1 m2 plesteran granit 1SP : 2 granit tebal 1cm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.450 85,000.00 38,250.00
Tukang Batu L.02 OH 0.225 100,000.00 22,500.00
Kepala Tukang L.03 OH 0.023 100,000.00 2,300.00
Mandor L.04 OH 0.023 105,000.00 2,415.00
JUMLAH TENAGA KERJA 65,465.00
B BAHAN
Portland cement M.245.a Kg 10.000 1,300.00 13,000.00
Batu granit kg 15.000 23,000.00 345,000.00
JUMLAH HARGA BAHAN 358,000.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 423,465.00
E Overhead & Profit 10% 0.100 42,346.50
F Harga Satuan Pekerjaan (D+E) 465,811.00
A.4.4.2.22. Pemasangan 1 m2 plesteran traso 1SP : 2 traso tebal 1cm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.450 85,000.00 38,250.00
Tukang Batu L.02 OH 0.225 100,000.00 22,500.00
Kepala Tukang L.03 OH 0.023 100,000.00 2,300.00
Mandor L.04 OH 0.023 105,000.00 2,415.00
JUMLAH TENAGA KERJA 65,465.00
B BAHAN
Portland cement M.245.a Kg 10.000 1,300.00 13,000.00
Batu traso Kg 15.000 21,500.00 322,500.00
JUMLAH HARGA BAHAN 335,500.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 400,965.00
E Overhead & Profit 10% 0.100 40,096.50
F Harga Satuan Pekerjaan (D+E) 441,061.00

A.4.4.2.23. Pemasangan 1 m2 plesteran ciprat 1SP : 2PP


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.300 85,000.00 25,500.00
Tukang Batu L.02 OH 0.100 100,000.00 10,000.00
Kepala Tukang L.03 OH 0.010 100,000.00 1,000.00
Mandor L.04 OH 0.015 105,000.00 1,575.00
JUMLAH TENAGA KERJA 38,075.00
B BAHAN
Portland cement M.245.a Kg 4.320 1,300.00 5,616.00
Pasir Beton (muntilan) M.9.a m3 0.006 352,000.00 2,112.00
JUMLAH HARGA BAHAN 7,728.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 45,803.00
E Overhead & Profit 10% 0.100 4,580.30
F Harga Satuan Pekerjaan (D+E) 50,383.00

A.4.4.2.24 Pemasangan 1 m2 finishing siar pasangan bata merah


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.150 85,000.00 12,750.00
Tukang Batu L.02 OH 0.075 100,000.00 7,500.00
Kepala Tukang L.03 OH 0.008 100,000.00 800.00
Mandor L.04 OH 0.008 105,000.00 840.00
JUMLAH TENAGA KERJA 21,890.00
B BAHAN
Portland cement M.245.a Kg 3.108 1,300.00 4,040.40
JUMLAH HARGA BAHAN 4,040.40
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 25,930.40
E Overhead & Profit 10% 0.100 2,593.04
F Harga Satuan Pekerjaan (D+E) 28,523.00

A.4.4.2.25. Pemasangan 1 m2 finishing siar pasangan conblock ekspose


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.070 85,000.00 5,950.00
Tukang Batu L.02 OH 0.035 100,000.00 3,500.00
Kepala Tukang L.03 OH 0.004 100,000.00 400.00
Mandor L.04 OH 0.004 105,000.00 420.00
JUMLAH TENAGA KERJA 10,270.00
B BAHAN
Portland cement M.245.a Kg 1.600 1,300.00 2,080.00
JUMLAH HARGA BAHAN 2,080.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 12,350.00
E Overhead & Profit 10% 0.100 1,235.00
F Harga Satuan Pekerjaan (D+E) 13,585.00

A.4.4.2.26. Pemasangan 1 m2 finishing siar pasangan batu kali, campuran 1SP : 2PP.
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.300 85,000.00 25,500.00
Tukang Batu L.02 OH 0.150 100,000.00 15,000.00
Kepala Tukang L.03 OH 0.015 100,000.00 1,500.00
Mandor L.04 OH 0.015 105,000.00 1,575.00
JUMLAH TENAGA KERJA 43,575.00
B BAHAN
Portland cement M.245.a Kg 6.340 1,300.00 8,242.00
Pasir Beton (muntilan) M.9.a m3 0.012 352,000.00 4,224.00
JUMLAH HARGA BAHAN 12,466.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 56,041.00
E Overhead & Profit 10% 0.100 5,604.10
F Harga Satuan Pekerjaan (D+E) 61,645.00

A.4.4.2.27. Pemasangan 1 m2 acian.


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.200 85,000.00 17,000.00
Tukang Batu L.02 OH 0.100 100,000.00 10,000.00
Kepala Tukang L.03 OH 0.010 100,000.00 1,000.00
Mandor L.04 OH 0.010 105,000.00 1,050.00
JUMLAH TENAGA KERJA 29,050.00
B BAHAN
Portland cement M.245.a Kg 3.250 1,300.00 4,225.00
JUMLAH HARGA BAHAN 4,225.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 33,275.00
E Overhead & Profit 10% 0.100 3,327.50
F Harga Satuan Pekerjaan (D+E) 36,602.00

A.4.4.2.28. Pemasangan 1 m2 plesteran dengan mortar siap pakai (MSP)


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.300 85,000.00 25,500.00
Tukang Batu L.02 OH 0.150 100,000.00 15,000.00
Kepala Tukang L.03 OH 0.015 100,000.00 1,500.00
Mandor L.04 OH 0.015 105,000.00 1,575.00
JUMLAH TENAGA KERJA 43,575.00
B BAHAN
Perekat plesteran (Semen MU 100) M.240.a Kg 20.000 3,100.00 62,000.00
JUMLAH HARGA BAHAN 62,000.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 105,575.00
E Overhead & Profit 10% 0.100 10,557.50
F Harga Satuan Pekerjaan (D+E) 116,132.00

A.4.4.2.29. Pemasangan 1 m2 Acian dengan mortar siap pakai (MSP)


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.200 85,000.00 17,000.00
Tukang Batu L.02 OH 0.100 100,000.00 10,000.00
Kepala Tukang L.03 OH 0.010 100,000.00 1,000.00
Mandor L.04 OH 0.010 105,000.00 1,050.00
JUMLAH TENAGA KERJA 29,050.00
B BAHAN
Perekat acian (Semen MU 200) M.240.b Kg 2.000 3,850.00 7,700.00
JUMLAH HARGA BAHAN 7,700.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 36,750.00
E Overhead & Profit 10% 0.100 3,675.00
F Harga Satuan Pekerjaan (D+E) 40,425.00

A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING


A.4.4.3.9. Pemasangan 1m2 lantai ubin granit ukuran 40cm x40cm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.250 85,000.00 21,250.00
Tukang Batu L.02 OH 0.125 100,000.00 12,500.00
Kepala Tukang L.03 OH 0.013 100,000.00 1,300.00
Mandor L.04 OH 0.013 105,000.00 1,365.00
JUMLAH TENAGA KERJA 36,415.00
B BAHAN
Granit tile 40 x 40 cm ( double loading ) M.191.b buah 6.630 32,700.00 216,801.00
Portland cement M.245.a kg 9.800 1,300.00 12,740.00
Semen Warna M.244 Kg 1.300 15,000.00 19,500.00
Pasir Beton (muntilan) M.9.a m3 0.045 352,000.00 15,840.00
JUMLAH HARGA BAHAN 264,881.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 301,296.00
E Overhead & Profit 10% 0.100 30,129.60
F Harga Satuan Pekerjaan (D+E) 331,425.00

A.4.4.3.10. Pemasangan 1m2 lantai ubin granit ukuran 30cm x30cm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.260 85,000.00 22,100.00
Tukang Batu L.02 OH 0.130 100,000.00 13,000.00
Kepala Tukang L.03 OH 0.013 100,000.00 1,300.00
Mandor L.04 OH 0.013 105,000.00 1,365.00
JUMLAH TENAGA KERJA 37,765.00
B BAHAN
Granit tile 30 x 30 cm ( double loading ) M.191.c buah 11.870 28,000.00 332,360.00
Portland cement M.245.a kg 10.000 1,300.00 13,000.00
Semen Warna M.244 Kg 1.500 15,000.00 22,500.00
Pasir Beton (muntilan) M.9.a m3 0.045 352,000.00 15,840.00
JUMLAH HARGA BAHAN 383,700.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 421,465.00
E Overhead & Profit 10% 0.100 42,146.50
F Harga Satuan Pekerjaan (D+E) 463,611.00

A.4.4.3.11. Pemasangan 1m2 lantai ubin teralux ukuran 40cm x40cm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.250 85,000.00 21,250.00
Tukang Batu L.02 OH 0.125 100,000.00 12,500.00
Kepala Tukang L.03 OH 0.013 100,000.00 1,300.00
Mandor L.04 OH 0.013 105,000.00 1,365.00
JUMLAH TENAGA KERJA 36,415.00
B BAHAN
Ubin Teralux 40 cm x 40 cm M.195.b buah 6.630 70,800.00 469,404.00
Portland cement M.245.a kg 9.800 1,300.00 12,740.00
Semen Warna M.244 Kg 1.300 15,000.00 19,500.00
Pasir Beton (muntilan) M.9.a m3 0.045 352,000.00 15,840.00
JUMLAH HARGA BAHAN 517,484.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 553,899.00
E Overhead & Profit 10% 0.100 55,389.90
F Harga Satuan Pekerjaan (D+E) 609,288.00
A.4.4.3.12. Pemasangan 1m2 lantai ubin teralux ukuran 30cm x30cm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.260 85,000.00 22,100.00
Tukang Batu L.02 OH 0.130 100,000.00 13,000.00
Kepala Tukang L.03 OH 0.013 100,000.00 1,300.00
Mandor L.04 OH 0.013 105,000.00 1,365.00
JUMLAH TENAGA KERJA 37,765.00
B BAHAN
Ubin Teralux 30 cm x 30 cm M.195.a buah 11.870 30,500.00 362,035.00
Portland cement M.245.a kg 10.000 1,300.00 13,000.00
Semen Warna M.244 Kg 1.500 15,000.00 22,500.00
Pasir Beton (muntilan) M.9.a m3 0.045 352,000.00 15,840.00
JUMLAH HARGA BAHAN 413,375.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 451,140.00
E Overhead & Profit 10% 0.100 45,114.00
F Harga Satuan Pekerjaan (D+E) 496,254.00

A.4.4.3.13. Pemasangan 1m2 lantai ubin teralux marmer ukuran 60cm x60cm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.240 85,000.00 20,400.00
Tukang Batu L.02 OH 0.120 100,000.00 12,000.00
Kepala Tukang L.03 OH 0.012 100,000.00 1,200.00
Mandor L.04 OH 0.012 105,000.00 1,260.00
JUMLAH TENAGA KERJA 34,860.00
B BAHAN
Ubin Teralux Marmer 60 cm x 60 cm M.196.c buah 3.100 250,000.00 775,000.00
Portland cement M.245.a kg 9.600 1,300.00 12,480.00
Semen Warna M.244 Kg 1.500 15,000.00 22,500.00
Pasir Beton (muntilan) M.9.a m3 0.045 352,000.00 15,840.00
JUMLAH HARGA BAHAN 825,820.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 860,680.00
E Overhead & Profit 10% 0.100 86,068.00
F Harga Satuan Pekerjaan (D+E) 946,748.00

A.4.4.3.14. Pemasangan 1m2 lantai ubin teralux marmer ukuran 40cm x40cm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.250 85,000.00 21,250.00
Tukang Batu L.02 OH 0.125 100,000.00 12,500.00
Kepala Tukang L.03 OH 0.013 100,000.00 1,300.00
Mandor L.04 OH 0.013 105,000.00 1,365.00
JUMLAH TENAGA KERJA 36,415.00
B BAHAN
Ubin Teralux Marmer 40 cm x 40 cm M.196.b buah 6.630 90,500.00 600,015.00
Portland cement M.245.a kg 9.800 1,300.00 12,740.00
Semen Warna M.244 Kg 1.300 15,000.00 19,500.00
Pasir Beton (muntilan) M.9.a m3 0.045 352,000.00 15,840.00
JUMLAH HARGA BAHAN 648,095.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 684,510.00
E Overhead & Profit 10% 0.100 68,451.00
F Harga Satuan Pekerjaan (D+E) 752,961.00
A.4.4.3.15. Pemasangan 1m2 lantai ubin teralux marmer ukuran 30cm x30cm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.260 85,000.00 22,100.00
Tukang Batu L.02 OH 0.130 100,000.00 13,000.00
Kepala Tukang L.03 OH 0.013 100,000.00 1,300.00
Mandor L.04 OH 0.013 105,000.00 1,365.00
JUMLAH TENAGA KERJA 37,765.00
B BAHAN
Ubin Teralux Marmer 30 cm x 30 cm M.196.a buah 11.870 52,000.00 617,240.00
Portland cement M.245.a kg 10.000 1,300.00 13,000.00
Semen Warna M.244 Kg 1.500 15,000.00 22,500.00
Pasir Beton (muntilan) M.9.a m3 0.045 352,000.00 15,840.00
JUMLAH HARGA BAHAN 668,580.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 706,345.00
E Overhead & Profit 10% 0.100 70,634.50
F Harga Satuan Pekerjaan (D+E) 776,979.00

A.4.4.3.17. Pemasangan 1 m’ plint ubin Pc abu-abu ukuran 10cm x 30cm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.090 85,000.00 7,650.00
Tukang Batu L.02 OH 0.090 100,000.00 9,000.00
Kepala Tukang L.03 OH 0.009 100,000.00 900.00
Mandor L.04 OH 0.005 105,000.00 525.00
JUMLAH TENAGA KERJA 18,075.00
B BAHAN
Plint ubin PC abu - abu 10 cm x 30 cm M.198.a buah 3.530 5,600.00 19,768.00
Portland cement M.245.a kg 1.240 1,300.00 1,612.00
Pasir Beton (muntilan) M.9.a m3 0.003 352,000.00 1,056.00
JUMLAH HARGA BAHAN 22,436.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 40,511.00
E Overhead & Profit 10% 0.100 4,051.10
F Harga Satuan Pekerjaan (D+E) 44,562.00

A.4.4.3.18. Pemasangan 1 m’ plint ubin Pc abu-abu ukuran 10cm x 40cm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.090 85,000.00 7,650.00
Tukang Batu L.02 OH 0.090 100,000.00 9,000.00
Kepala Tukang L.03 OH 0.009 100,000.00 900.00
Mandor L.04 OH 0.005 105,000.00 525.00
JUMLAH TENAGA KERJA 18,075.00
B BAHAN
Plint ubin PC abu - abu 10 cm x 40 cm M.198.b buah 2.650 6,000.00 15,900.00
Portland cement M.245.a kg 1.240 1,300.00 1,612.00
Pasir Beton (muntilan) M.9.a m3 0.003 352,000.00 1,056.00
JUMLAH HARGA BAHAN 18,568.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 36,643.00
E Overhead & Profit 10% 0.100 3,664.30
F Harga Satuan Pekerjaan (D+E) 40,307.00
A.4.4.3.24. Pemasangan 1 m’ plint ubin granit ukuran 10cm x 40cm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.090 85,000.00 7,650.00
Tukang Batu L.02 OH 0.090 100,000.00 9,000.00
Kepala Tukang L.03 OH 0.009 100,000.00 900.00
Mandor L.04 OH 0.005 105,000.00 525.00
JUMLAH TENAGA KERJA 18,075.00
B BAHAN
Plint granit 10cm x 40cm M.201.a buah 2.650 2,800.00 7,420.00
Portland cement M.245.a kg 1.140 1,300.00 1,482.00
Semen Warna M.244 Kg 0.100 15,000.00 1,500.00
Pasir Beton (muntilan) M.9.a m3 0.003 352,000.00 1,056.00
JUMLAH HARGA BAHAN 11,458.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 29,533.00
E Overhead & Profit 10% 0.100 2,953.30
F Harga Satuan Pekerjaan (D+E) 32,486.00

A.4.4.3.25. Pemasangan 1 m’ plint ubin granit ukuran 10cm x 30cm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.090 85,000.00 7,650.00
Tukang Batu L.02 OH 0.090 100,000.00 9,000.00
Kepala Tukang L.03 OH 0.009 100,000.00 900.00
Mandor L.04 OH 0.005 105,000.00 525.00
JUMLAH TENAGA KERJA 18,075.00
B BAHAN
Plint granit 10cm x 30cm M.201.b buah 3.530 1,700.00 6,001.00
Portland cement M.245.a kg 1.140 1,300.00 1,482.00
Semen Warna M.244 Kg 0.100 15,000.00 1,500.00
Pasir Beton (muntilan) M.9.a m3 0.003 352,000.00 1,056.00
JUMLAH HARGA BAHAN 10,039.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 28,114.00
E Overhead & Profit 10% 0.100 2,811.40
F Harga Satuan Pekerjaan (D+E) 30,925.00

A.4.4.3.26. Pemasangan 1 m’ plint ubin teralux kerang ukuran 10cm x 40cm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.090 85,000.00 7,650.00
Tukang Batu L.02 OH 0.090 100,000.00 9,000.00
Kepala Tukang L.03 OH 0.009 100,000.00 900.00
Mandor L.04 OH 0.005 105,000.00 525.00
JUMLAH TENAGA KERJA 18,075.00
B BAHAN
Plint ubin Teralux Kerang 10 cm x 40 cm M.202.b buah 2.630 28,000.00 73,640.00
Portland cement M.245.a kg 1.140 1,300.00 1,482.00
Semen Warna M.244 Kg 0.100 15,000.00 1,500.00
Pasir Beton (muntilan) M.9.a m3 0.003 352,000.00 1,056.00
JUMLAH HARGA BAHAN 77,678.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 95,753.00
E Overhead & Profit 10% 0.100 9,575.30
F Harga Satuan Pekerjaan (D+E) 105,328.00
A.4.4.3.27. Pemasangan 1 m’ plint ubin teralux kerang ukuran 10cm x 30cm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.090 85,000.00 7,650.00
Tukang Batu L.02 OH 0.090 100,000.00 9,000.00
Kepala Tukang L.03 OH 0.009 100,000.00 900.00
Mandor L.04 OH 0.005 105,000.00 525.00
JUMLAH TENAGA KERJA 18,075.00
B BAHAN
Plint ubin Teralux Kerang 10 cm x 30 cm M.202.a buah 3.530 21,000.00 74,130.00
Portland cement M.245.a kg 1.140 1,300.00 1,482.00
Semen Warna M.244 Kg 0.100 15,000.00 1,500.00
Pasir Beton (muntilan) M.9.a m3 0.003 352,000.00 1,056.00
JUMLAH HARGA BAHAN 78,168.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 96,243.00
E Overhead & Profit 10% 0.100 9,624.30
F Harga Satuan Pekerjaan (D+E) 105,867.00

A.4.4.3.28. Pemasangan 1 m’ plint ubin teralux marmer ukuran 10cm x 60cm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.090 85,000.00 7,650.00
Tukang Batu L.02 OH 0.090 100,000.00 9,000.00
Kepala Tukang L.03 OH 0.009 100,000.00 900.00
Mandor L.04 OH 0.005 105,000.00 525.00
JUMLAH TENAGA KERJA 18,075.00
B BAHAN
Plint ubin Teralux Marmer 10 cm x 60 cm M.203.c buah 1.700 42,000.00 71,400.00
Portland cement M.245.a kg 1.140 1,300.00 1,482.00
Semen Warna M.244 Kg 0.100 15,000.00 1,500.00
Pasir Beton (muntilan) M.9.a m3 0.003 352,000.00 1,056.00
JUMLAH HARGA BAHAN 75,438.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 93,513.00
E Overhead & Profit 10% 0.100 9,351.30
F Harga Satuan Pekerjaan (D+E) 102,864.00

A.4.4.3.29. Pemasangan 1 m’ plint ubin teralux marmer ukuran 10cm x 40cm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.090 85,000.00 7,650.00
Tukang Batu L.02 OH 0.090 100,000.00 9,000.00
Kepala Tukang L.03 OH 0.009 100,000.00 900.00
Mandor L.04 OH 0.005 105,000.00 525.00
JUMLAH TENAGA KERJA 18,075.00
B BAHAN
Plint ubin Teralux Marmer 10 cm x 40 cm M.203.b buah 2.650 28,000.00 74,200.00
Portland cement M.245.a kg 1.140 1,300.00 1,482.00
Semen Warna M.244 Kg 0.100 15,000.00 1,500.00
Pasir Beton (muntilan) M.9.a m3 0.003 352,000.00 1,056.00
JUMLAH HARGA BAHAN 78,238.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 96,313.00
E Overhead & Profit 10% 0.100 9,631.30
F Harga Satuan Pekerjaan (D+E) 105,944.00
A.4.4.3.30. Pemasangan 1 m’ plint ubin teralux marmer ukuran 10cm x 30cm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.090 85,000.00 7,650.00
Tukang Batu L.02 OH 0.090 100,000.00 9,000.00
Kepala Tukang L.03 OH 0.009 100,000.00 900.00
Mandor L.04 OH 0.005 105,000.00 525.00
JUMLAH TENAGA KERJA 18,075.00
B BAHAN
Plint ubin Teralux marmer 10 cm x 30 cm M.203.a buah 3.530 20,700.00 73,071.00
Portland cement M.245.a kg 1.140 1,300.00 1,482.00
Semen Warna M.244 Kg 0.100 15,000.00 1,500.00
Pasir Beton (muntilan) M.9.a m3 0.003 352,000.00 1,056.00
JUMLAH HARGA BAHAN 77,109.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 95,184.00
E Overhead & Profit 10% 0.100 9,518.40
F Harga Satuan Pekerjaan (D+E) 104,702.00

A.4.4.3.31. Pemasangan 1m2 lantai teraso cor di tempat, tebal 3cm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.360 85,000.00 30,600.00
Tukang Batu L.02 OH 0.180 100,000.00 18,000.00
Kepala Tukang L.03 OH 0.018 100,000.00 1,800.00
Mandor L.04 OH 0.018 105,000.00 1,890.00
JUMLAH TENAGA KERJA 52,290.00
B BAHAN
Teraso cor di tempat, tebal 3cm m3 0.036 370,000.00 13,320.00
Semen warna M.244 Kg 0.100 15,000.00 1,500.00
JUMLAH HARGA BAHAN 14,820.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 67,110.00
E Overhead & Profit 10% 0.100 6,711.00
F Harga Satuan Pekerjaan (D+E) 73,821.00

A.4.4.3.32. Pemasangan 1m2 lantai keramik artistik 10cm x 20cm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.700 85,000.00 59,500.00
Tukang Batu L.02 OH 0.350 100,000.00 35,000.00
Kepala Tukang L.03 OH 0.035 100,000.00 3,500.00
Mandor L.04 OH 0.035 105,000.00 3,675.00
JUMLAH TENAGA KERJA 101,675.00
B BAHAN
Keramik Artistik 10 cm x 20 cm M.186.a buah 53.000 1,500.00 79,500.00
Portland cement M.245.a Kg 8.190 1,300.00 10,647.00
Pasir Beton (muntilan) M.9.a m3 0.045 352,000.00 15,840.00
Semen warna M.244 Kg 2.750 15,000.00 41,250.00
JUMLAH HARGA BAHAN 147,237.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 248,912.00
E Overhead & Profit 10% 0.100 24,891.20
F Harga Satuan Pekerjaan (D+E) 273,803.00
A.4.4.3.33. Pemasangan 1m2 lantai keramik artistik 10cm x 10cm atau 5cm x 20cm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.700 85,000.00 59,500.00
Tukang Batu L.02 OH 0.350 100,000.00 35,000.00
Kepala Tukang L.03 OH 0.035 100,000.00 3,500.00
Mandor L.04 OH 0.035 105,000.00 3,675.00
JUMLAH TENAGA KERJA 101,675.00
B BAHAN
keramik artistik 10cm x 10cm atau 5cm x 20cm M.186.c buah 106.000 4,500.00 477,000.00
Portland cement M.245.a Kg 8.190 1,300.00 10,647.00
Pasir Beton (muntilan) M.9.a m3 0.045 352,000.00 15,840.00
Semen Warna M.244 Kg 3.200 15,000.00 48,000.00
JUMLAH HARGA BAHAN 551,487.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 653,162.00
E Overhead & Profit 10% 0.100 65,316.20
F Harga Satuan Pekerjaan (D+E) 718,478.00

A.4.4.3.35. Pemasangan 1m2 lantai keramik ukuran 30cm x 30cm (putih)


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.700 85,000.00 59,500.00
Tukang Batu L.02 OH 0.350 100,000.00 35,000.00
Kepala Tukang L.03 OH 0.035 100,000.00 3,500.00
Mandor L.04 OH 0.035 105,000.00 3,675.00
JUMLAH TENAGA KERJA 101,675.00
B BAHAN
Keramik 30 x 30 cm (putih) M.175.a doos 1.050 40,500.00 42,525.00
Portland cement M.245.a Kg 10.000 1,300.00 13,000.00
Pasir Beton (muntilan) M.9.a m3 0.045 352,000.00 15,840.00
Semen Warna M.244 Kg 0.500 15,000.00 7,500.00
JUMLAH HARGA BAHAN 78,865.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 180,540.00
E Overhead & Profit 10% 0.100 18,054.00
F Harga Satuan Pekerjaan (D+E) 198,594.00

A.4.4.3.36. Pemasangan 1m2 lantai keramik ukuran 20cm x 20cm (putih)


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.700 85,000.00 59,500.00
Tukang Batu L.02 OH 0.350 100,000.00 35,000.00
Kepala Tukang L.03 OH 0.035 100,000.00 3,500.00
Mandor L.04 OH 0.035 105,000.00 3,675.00
JUMLAH TENAGA KERJA 101,675.00
B BAHAN
Keramik 20 x 20 cm (putih) M.172.a doos 1.050 52,500.00 55,125.00
Portland cement M.245.a Kg 10.400 1,300.00 13,520.00
Pasir Beton (muntilan) M.9.a m3 0.045 352,000.00 15,840.00
Semen Warna M.244 Kg 0.500 15,000.00 7,500.00
JUMLAH HARGA BAHAN 91,985.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 193,660.00
E Overhead & Profit 10% 0.100 19,366.00
F Harga Satuan Pekerjaan (D+E) 213,026.00
A.4.4.3.37. Pemasangan 1 m2 Lantai keramik ukuran 10cm x 40 cm untuk variasi/border
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.050 85,000.00 89,250.00
Tukang Batu L.02 OH 0.525 100,000.00 52,500.00
Kepala Tukang L.03 OH 0.053 100,000.00 5,300.00
Mandor L.04 OH 0.053 105,000.00 5,565.00
JUMLAH TENAGA KERJA 152,615.00
B BAHAN
Keramik Border 10 x 40 cm M.188.a buah 33.000 17,500.00 577,500.00
Portland cement M.245.a Kg 9.800 1,300.00 12,740.00
Pasir Beton (muntilan) M.9.a m3 0.045 352,000.00 15,840.00
Semen Warna M.244 Kg 4.370 15,000.00 65,550.00
JUMLAH HARGA BAHAN 671,630.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 824,245.00
E Overhead & Profit 10% 0.100 82,424.50
F Harga Satuan Pekerjaan (D+E) 906,669.00

A.4.4.3.38. Pemasangan 1m2 lantai keramik mozaik ukuran 30cm x 30cm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.700 85,000.00 59,500.00
Tukang Batu L.02 OH 0.350 100,000.00 35,000.00
Kepala Tukang L.03 OH 0.035 100,000.00 3,500.00
Mandor L.04 OH 0.035 105,000.00 3,675.00
JUMLAH TENAGA KERJA 101,675.00
B BAHAN
Ubin keramik mozaik 30 cm x 30 cm M.190 buah 11.870 10,200.00 121,074.00
Portland cement M.245.a Kg 14.150 1,300.00 18,395.00
Pasir Beton (muntilan) M.9.a m3 0.039 352,000.00 13,728.00
Semen Warna M.244 Kg 2.000 15,000.00 30,000.00
JUMLAH HARGA BAHAN 183,197.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 284,872.00
E Overhead & Profit 10% 0.100 28,487.20
F Harga Satuan Pekerjaan (D+E) 313,359.00

A.4.4.3.39. Pemasangan 1 m’ plint keramik ukuran 10cm x 20cm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.090 85,000.00 7,650.00
Tukang Batu L.02 OH 0.090 100,000.00 9,000.00
Kepala Tukang L.03 OH 0.035 100,000.00 3,500.00
Mandor L.04 OH 0.005 105,000.00 525.00
JUMLAH TENAGA KERJA 20,675.00
B BAHAN
Plint keramik 10 x 20 cm M.204.a buah 5.300 9,000.00 47,700.00
Portland cement M.245.a Kg 1.140 1,300.00 1,482.00
Pasir Beton (muntilan) M.9.a m3 0.003 352,000.00 1,056.00
Semen Warna M.244 Kg 0.025 15,000.00 375.00
JUMLAH HARGA BAHAN 50,613.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 71,288.00
E Overhead & Profit 10% 0.100 7,128.80
F Harga Satuan Pekerjaan (D+E) 78,416.00
A.4.4.3.40. Pemasangan 1 m’ plint keramik ukuran 10cm x 10cm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.090 85,000.00 7,650.00
Tukang Batu L.02 OH 0.090 100,000.00 9,000.00
Kepala Tukang L.03 OH 0.035 100,000.00 3,500.00
Mandor L.04 OH 0.005 105,000.00 525.00
JUMLAH TENAGA KERJA 20,675.00
B BAHAN
Plint keramik 10 x 10 cm M.204.b buah 10.600 7,000.00 74,200.00
Portland cement M.245.a Kg 1.140 1,300.00 1,482.00
Pasir Beton (muntilan) M.9.a m3 0.003 352,000.00 1,056.00
Semen Warna M.244 Kg 0.050 15,000.00 750.00
JUMLAH HARGA BAHAN 77,488.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 98,163.00
E Overhead & Profit 10% 0.100 9,816.30
F Harga Satuan Pekerjaan (D+E) 107,979.00

A.4.4.3.41. Pemasangan 1 m’ plint keramik ukuran 5cm x 20cm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.090 85,000.00 7,650.00
Tukang Batu L.02 OH 0.090 100,000.00 9,000.00
Kepala Tukang L.03 OH 0.035 100,000.00 3,500.00
Mandor L.04 OH 0.005 105,000.00 525.00
JUMLAH TENAGA KERJA 20,675.00
B BAHAN
Plint keramik 5 x 20 cm M.204.c buah 5.300 3,200.00 16,960.00
Portland cement M.245.a Kg 0.570 1,300.00 741.00
Pasir Beton (muntilan) M.9.a m3 0.002 352,000.00 528.00
Semen Warna M.244 Kg 0.013 15,000.00 195.00
JUMLAH HARGA BAHAN 18,424.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 39,099.00
E Overhead & Profit 10% 0.100 3,909.90
F Harga Satuan Pekerjaan (D+E) 43,008.00

A.4.4.3.42. Pemasangan 1 m’ plint internal cove artistik 5cm x 5cm x 20cm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.750 85,000.00 63,750.00
Tukang Batu L.02 OH 0.750 100,000.00 75,000.00
Kepala Tukang L.03 OH 0.075 100,000.00 7,500.00
Mandor L.04 OH 0.038 105,000.00 3,990.00
JUMLAH TENAGA KERJA 150,240.00
B BAHAN
Internal Cove M.209 buah 5.300 39,000.00 206,700.00
Portland cement M.245.a Kg 1.140 1,300.00 1,482.00
Pasir Beton (muntilan) M.9.a m3 0.003 352,000.00 1,056.00
Semen Warna M.244 Kg 0.100 15,000.00 1,500.00
JUMLAH HARGA BAHAN 210,738.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 360,978.00
E Overhead & Profit 10% 0.100 36,097.80
F Harga Satuan Pekerjaan (D+E) 397,075.00
A.4.4.3.43. Pemasangan 1 m2 lantai marmer ukuran 100cm x 100cm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.700 85,000.00 59,500.00
Tukang Batu L.02 OH 0.350 100,000.00 35,000.00
Kepala Tukang L.03 OH 0.035 100,000.00 3,500.00
Mandor L.04 OH 0.035 105,000.00 3,675.00
JUMLAH TENAGA KERJA 101,675.00
B BAHAN
Marmer 100 x 100 cm M.211 buah 1.060 1,000,000.00 1,060,000.00
Portland cement M.245.a Kg 8.190 1,300.00 10,647.00
Pasir Beton (muntilan) M.9.a m3 0.045 352,000.00 15,840.00
Semen Warna M.244 Kg 0.134 15,000.00 2,010.00
JUMLAH HARGA BAHAN 1,088,497.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,190,172.00
E Overhead & Profit 10% 0.100 119,017.20
F Harga Satuan Pekerjaan (D+E) 1,309,189.00

A.4.4.3.44. Pemasangan 1 m2 lantai karpet


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.170 85,000.00 14,450.00
Tukang Kayu L.02 OH 0.170 110,000.00 18,700.00
Kepala Tukang L.03 OH 0.017 100,000.00 1,700.00
Mandor L.04 OH 0.009 105,000.00 945.00
JUMLAH TENAGA KERJA 35,795.00
B BAHAN
Carpet M.215 m2 1.050 14,400.00 15,120.00
Lem aibon M.574 Kg 0.350 33,000.00 11,550.00
JUMLAH HARGA BAHAN 26,670.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 62,465.00
E Overhead & Profit 10% 0.100 6,246.50
F Harga Satuan Pekerjaan (D+E) 68,711.00

A.4.4.3.45. Pemasangan 1 m2 underlayer (pelapis bawah karpet)


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.120 85,000.00 10,200.00
Tukang Kayu L.02 OH 0.120 110,000.00 13,200.00
Kepala Tukang L.03 OH 0.012 100,000.00 1,200.00
Mandor L.04 OH 0.006 105,000.00 630.00
JUMLAH TENAGA KERJA 25,230.00
B BAHAN
underlayer M.578 m2 1.050 52,000.00 54,600.00
Lem aibon M.574 Kg 0.350 33,000.00 11,550.00
JUMLAH HARGA BAHAN 66,150.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 91,380.00
E Overhead & Profit 10% 0.100 9,138.00
F Harga Satuan Pekerjaan (D+E) 100,518.00
A.4.4.3.46. Pemasangan 1 m2 lantai parquet kayu
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.700 85,000.00 59,500.00
Tukang Kayu L.02 OH 0.350 110,000.00 38,500.00
Kepala Tukang L.03 OH 0.035 100,000.00 3,500.00
Mandor L.04 OH 0.035 105,000.00 3,675.00
JUMLAH TENAGA KERJA 105,175.00
B BAHAN
Parquet jati M.214 m2 1.050 210,000.00 220,500.00
Lem kayu M.572 Kg 0.600 15,000.00 9,000.00
JUMLAH HARGA BAHAN 229,500.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 334,675.00
E Overhead & Profit 10% 0.100 33,467.50
F Harga Satuan Pekerjaan (D+E) 368,142.00

A.4.4.3.47. Pemasangan 1 m2 lantai kayu gymfloor


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.700 85,000.00 59,500.00
Tukang Kayu L.02 OH 0.350 110,000.00 38,500.00
Kepala Tukang L.03 OH 0.035 100,000.00 3,500.00
Mandor L.04 OH 0.035 105,000.00 3,675.00
JUMLAH TENAGA KERJA 105,175.00
B BAHAN
Parquet kayu gymfloor m2 1.050 320,000.00 336,000.00
Lem kayu M.572 Kg 0.600 15,000.00 9,000.00
JUMLAH HARGA BAHAN 345,000.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 450,175.00
E Overhead & Profit 10% 0.100 45,017.50
F Harga Satuan Pekerjaan (D+E) 495,192.00

A.4.4.3.48. Pemasangan 1 m2 dinding porselen 11cm x 11cm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.000 85,000.00 85,000.00
Tukang Batu L.02 OH 0.500 100,000.00 50,000.00
Kepala Tukang L.03 OH 0.050 100,000.00 5,000.00
Mandor L.04 OH 0.050 105,000.00 5,250.00
JUMLAH TENAGA KERJA 145,250.00
B BAHAN
Porselin Dinding 11 x 11 cm M.170 doos 1.050 45,000.00 47,250.00
Portland cement M.245.a Kg 9.300 1,300.00 12,090.00
Pasir Beton (muntilan) M.9.a m3 0.018 352,000.00 6,336.00
Semen Warna M.244 Kg 0.500 15,000.00 7,500.00
JUMLAH HARGA BAHAN 73,176.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 218,426.00
E Overhead & Profit 10% 0.100 21,842.60
F Harga Satuan Pekerjaan (D+E) 240,268.00
A.4.4.3.49. Pemasangan 1 m2 dinding porselen 10cm x 20cm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.900 85,000.00 76,500.00
Tukang Batu L.02 OH 0.450 100,000.00 45,000.00
Kepala Tukang L.03 OH 0.045 100,000.00 4,500.00
Mandor L.04 OH 0.045 105,000.00 4,725.00
JUMLAH TENAGA KERJA 130,725.00
B BAHAN
Keramik 10 x 20 cm (putih) M.171 buah 53.000 2,500.00 132,500.00
Portland cement M.245.a Kg 9.300 1,300.00 12,090.00
Pasir Beton (muntilan) M.9.a m3 0.018 352,000.00 6,336.00
Semen Warna M.244 Kg 2.750 15,000.00 41,250.00
JUMLAH HARGA BAHAN 192,176.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 322,901.00
E Overhead & Profit 10% 0.100 32,290.10
F Harga Satuan Pekerjaan (D+E) 355,191.00

A.4.4.3.50. Pemasangan 1 m2 dinding porselen 20cm x 20cm (putih)


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.900 85,000.00 76,500.00
Tukang Batu L.02 OH 0.450 100,000.00 45,000.00
Kepala Tukang L.03 OH 0.045 100,000.00 4,500.00
Mandor L.04 OH 0.045 105,000.00 4,725.00
JUMLAH TENAGA KERJA 130,725.00
B BAHAN
Keramik 20 x 20 cm (putih) M.172.a buah 26.000 2,100.00 54,600.00
Portland cement M.245.a Kg 9.300 1,300.00 12,090.00
Pasir Beton (muntilan) M.9.a m3 0.018 352,000.00 6,336.00
Semen Warna M.244 Kg 1.940 15,000.00 29,100.00
JUMLAH HARGA BAHAN 102,126.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 232,851.00
E Overhead & Profit 10% 0.100 23,285.10
F Harga Satuan Pekerjaan (D+E) 256,136.00

A.4.4.3.51. Pemasangan 1 m2 dinding keramik artistik 10cm x 20cm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.900 85,000.00 76,500.00
Tukang Batu L.02 OH 0.450 100,000.00 45,000.00
Kepala Tukang L.03 OH 0.045 100,000.00 4,500.00
Mandor L.04 OH 0.045 105,000.00 4,725.00
JUMLAH TENAGA KERJA 130,725.00
B BAHAN
Keramik Artistik 10 cm x 20 cm M.186.a buah 53.000 1,500.00 79,500.00
Portland cement M.245.a Kg 9.300 1,300.00 12,090.00
Pasir Beton (muntilan) M.9.a m3 0.018 352,000.00 6,336.00
Semen Warna M.244 Kg 2.750 15,000.00 41,250.00
JUMLAH HARGA BAHAN 139,176.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 269,901.00
E Overhead & Profit 10% 0.100 26,990.10
F Harga Satuan Pekerjaan (D+E) 296,891.00
A.4.4.3.52. Pemasangan 1 m2 dinding keramik artistik 5cm x 20cm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.900 85,000.00 76,500.00
Tukang Batu L.02 OH 0.450 100,000.00 45,000.00
Kepala Tukang L.03 OH 0.045 100,000.00 4,500.00
Mandor L.04 OH 0.045 105,000.00 4,725.00
JUMLAH TENAGA KERJA 130,725.00
B BAHAN
Keramik Artistik 5 cm x 20 cm M.186.c buah 106.000 4,500.00 477,000.00
Portland cement M.245.a Kg 9.300 1,300.00 12,090.00
Pasir Beton (muntilan) M.9.a m3 0.018 352,000.00 6,336.00
Semen Warna M.244 Kg 2.900 15,000.00 43,500.00
JUMLAH HARGA BAHAN 538,926.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 669,651.00
E Overhead & Profit 10% 0.100 66,965.10
F Harga Satuan Pekerjaan (D+E) 736,616.00

A.4.4.3.53. Pemasangan 1 m2 dinding keramik 10cm x 20cm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.900 85,000.00 76,500.00
Tukang Batu L.02 OH 0.450 100,000.00 45,000.00
Kepala Tukang L.03 OH 0.045 100,000.00 4,500.00
Mandor L.04 OH 0.045 105,000.00 4,725.00
JUMLAH TENAGA KERJA 130,725.00
B BAHAN
Keramik 10 x 20 cm (putih) M.171 buah 53.000 2,500.00 132,500.00
Portland cement M.245.a Kg 9.300 1,300.00 12,090.00
Pasir Beton (muntilan) M.9.a m3 0.018 352,000.00 6,336.00
Semen Warna M.244 Kg 2.750 15,000.00 41,250.00
JUMLAH HARGA BAHAN 192,176.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 322,901.00
E Overhead & Profit 10% 0.100 32,290.10
F Harga Satuan Pekerjaan (D+E) 355,191.00

A.4.4.3.54. Pemasangan 1 m2 dinding keramik Artistik 20cm x 20cm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.900 85,000.00 76,500.00
Tukang Batu L.02 OH 0.450 100,000.00 45,000.00
Kepala Tukang L.03 OH 0.045 100,000.00 4,500.00
Mandor L.04 OH 0.045 105,000.00 4,725.00
JUMLAH TENAGA KERJA 130,725.00
B BAHAN
Keramik Artistik 20 cm x 20 cm M.186.b buah 26.500 3,400.00 90,100.00
Portland cement M.245.a Kg 9.300 1,300.00 12,090.00
Pasir Beton (muntilan) M.9.a m3 0.018 352,000.00 6,336.00
Semen Warna M.244 Kg 1.940 15,000.00 29,100.00
JUMLAH HARGA BAHAN 137,626.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 268,351.00
E Overhead & Profit 10% 0.100 26,835.10
F Harga Satuan Pekerjaan (D+E) 295,186.00
A.4.4.3.55. Pemasangan 1 m2 dinding marmer 100cm x 100cm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.300 85,000.00 110,500.00
Tukang Batu L.02 OH 0.650 100,000.00 65,000.00
Kepala Tukang L.03 OH 0.065 100,000.00 6,500.00
Mandor L.04 OH 0.065 105,000.00 6,825.00
JUMLAH TENAGA KERJA 188,825.00
B BAHAN
marmer M.211 buah 1.060 1,000,000.00 1,060,000.00
Portland cement M.245.a Kg 12.440 1,300.00 16,172.00
Pasir Beton (muntilan) M.9.a m3 0.025 352,000.00 8,800.00
Semen Warna M.244 Kg 0.650 15,000.00 9,750.00
Paku 12 cm M.56.g buah 3.030 300.00 909.00
JUMLAH HARGA BAHAN 1,095,631.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,284,456.00
E Overhead & Profit 10% 0.100 128,445.60
F Harga Satuan Pekerjaan (D+E) 1,412,901.00

A.4.4.3.56. Pemasangan 1 m2 dinding bata pelapis 3cm x 7cm x 24cm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.000 85,000.00 85,000.00
Tukang Batu L.02 OH 0.500 100,000.00 50,000.00
Kepala Tukang L.03 OH 0.050 100,000.00 5,000.00
Mandor L.04 OH 0.050 105,000.00 5,250.00
JUMLAH TENAGA KERJA 145,250.00
B BAHAN
Bata tempel M.219 buah 63.000 2,300.00 144,900.00
Portland cement M.245.a Kg 12.440 1,300.00 16,172.00
Pasir Beton (muntilan) M.9.a m3 0.025 352,000.00 8,800.00
Semen Warna M.244 Kg 2.750 15,000.00 41,250.00
JUMLAH HARGA BAHAN 211,122.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 356,372.00
E Overhead & Profit 10% 0.100 35,637.20
F Harga Satuan Pekerjaan (D+E) 392,009.00

A.4.4.3.57. Pemasangan 1 m2 dinding batu paras


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.700 85,000.00 59,500.00
Tukang Batu L.02 OH 0.350 100,000.00 35,000.00
Kepala Tukang L.03 OH 0.035 100,000.00 3,500.00
Mandor L.04 OH 0.035 105,000.00 3,675.00
JUMLAH TENAGA KERJA 101,675.00
B BAHAN
Batu paras M.226 buah 1.100 85,000.00 93,500.00
Portland cement M.245.a Kg 11.750 1,300.00 15,275.00
Pasir Beton (muntilan) M.9.a m3 0.035 352,000.00 12,320.00
JUMLAH HARGA BAHAN 121,095.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 222,770.00
E Overhead & Profit 10% 0.100 22,277.00
F Harga Satuan Pekerjaan (D+E) 245,047.00
A.4.4.3.58. Pemasangan 1 m2 dinding batu tempel hitam
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.700 85,000.00 59,500.00
Tukang Batu L.02 OH 0.350 100,000.00 35,000.00
Kepala Tukang L.03 OH 0.035 100,000.00 3,500.00
Mandor L.04 OH 0.035 105,000.00 3,675.00
JUMLAH TENAGA KERJA 101,675.00
B BAHAN
batu tempel hitam M.227 buah 1.100 125,000.00 137,500.00
Portland cement M.245.a Kg 11.750 1,300.00 15,275.00
Pasir Beton (muntilan) M.9.a m3 0.035 352,000.00 12,320.00
JUMLAH HARGA BAHAN 165,095.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 266,770.00
E Overhead & Profit 10% 0.100 26,677.00
F Harga Satuan Pekerjaan (D+E) 293,447.00

A.4.4.3.59. Pemasangan 1 m2 lantai vynil ukuran 30cm x 30cm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.150 85,000.00 12,750.00
Tukang Batu L.02 OH 0.150 100,000.00 15,000.00
Kepala Tukang L.03 OH 0.015 100,000.00 1,500.00
Mandor L.04 OH 0.008 105,000.00 840.00
JUMLAH TENAGA KERJA 30,090.00
B BAHAN
Lantai Vynil M.212 buah 11.870 13,950.00 165,586.50
Lem Kayu M.572 Kg 0.350 15,000.00 5,250.00
JUMLAH HARGA BAHAN 170,836.50
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 200,926.50
E Overhead & Profit 10% 0.100 20,092.65
F Harga Satuan Pekerjaan (D+E) 221,019.00

A.4.4.3.60. Pemasangan 1 m2 wallpaper lebar 50 cm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.350 85,000.00 29,750.00
Tukang Batu L.02 OH 0.175 100,000.00 17,500.00
Kepala Tukang L.03 OH 0.017 100,000.00 1,700.00
Mandor L.04 OH 0.002 105,000.00 210.00
JUMLAH TENAGA KERJA 49,160.00
B BAHAN
Wallpaper M.581 m 2.200 11,250.00 24,750.00
Perekat untuk wallpaper M.576 Kg 0.250 35,000.00 8,750.00
JUMLAH HARGA BAHAN 33,500.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 82,660.00
E Overhead & Profit 10% 0.100 8,266.00
F Harga Satuan Pekerjaan (D+E) 90,926.00
A.4.4.3.61. Pemasangan 1m2 floor harderner
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.120 85,000.00 10,200.00
Tukang Batu L.02 OH 0.120 100,000.00 12,000.00
Kepala Tukang L.03 OH 0.012 100,000.00 1,200.00
Mandor L.04 OH 0.006 105,000.00 630.00
JUMLAH TENAGA KERJA 24,030.00
B BAHAN
floor harderner M.249 Kg 5.000 3,500.00 17,500.00
JUMLAH HARGA BAHAN 17,500.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 41,530.00
E Overhead & Profit 10% 0.100 4,153.00
F Harga Satuan Pekerjaan (D+E) 45,683.00

A.4.4.3.62. Pemasangan 1 m’ plint vynil 15cm x 30cm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.080 85,000.00 6,800.00
Tukang Batu L.02 OH 0.080 100,000.00 8,000.00
Kepala Tukang L.03 OH 0.008 100,000.00 800.00
Mandor L.04 OH 0.004 105,000.00 420.00
JUMLAH TENAGA KERJA 16,020.00
B BAHAN
plint vynil M.213 buah 1.760 11,880.00 20,908.80
Lem Kayu M.572 Kg 0.080 15,000.00 1,200.00
JUMLAH HARGA BAHAN 22,108.80
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 38,128.80
E Overhead & Profit 10% 0.100 3,812.88
F Harga Satuan Pekerjaan (D+E) 41,941.00

A.4.4.3.63. Pemasangan 1 m’ plint kayu tebal 2 cm lebar 10 cm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.120 85,000.00 10,200.00
Tukang Batu L.02 OH 0.120 100,000.00 12,000.00
Kepala Tukang L.03 OH 0.012 100,000.00 1,200.00
Mandor L.04 OH 0.006 105,000.00 630.00
JUMLAH TENAGA KERJA 24,030.00
B BAHAN
Kayu bengkirai (papan) M.17.b m3 0.003 12,700,000.00 38,100.00
Paku sekrup M.56.j Kg 0.050 30,000.00 1,500.00
JUMLAH HARGA BAHAN 39,600.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 63,630.00
E Overhead & Profit 10% 0.100 6,363.00
F Harga Satuan Pekerjaan (D+E) 69,993.00
A.4.4.3.64. Pemasangan 1 m2 paving block natural tebal 6 cm (K.250)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.250 85,000.00 21,250.00
Tukang Batu L.02 OH 0.500 100,000.00 50,000.00
Kepala Tukang L.03 OH 0.050 100,000.00 5,000.00
Mandor L.04 OH 0.001 105,000.00 136.50
JUMLAH TENAGA KERJA 76,386.50
B BAHAN
Paving block 6 cm abu-abu K-250 M.90.a M2 1.010 78,500.00 79,285.00
Pasir Beton (muntilan) M.9.a m3 0.050 352,000.00 17,600.00
JUMLAH HARGA BAHAN 96,885.00
C PERALATAN
Peralatan Kerja Paving Blok % 10.000 96,885.00 9,688.50
JUMLAH HARGA ALAT 9,688.50
D Jumlah (A+B+C) 182,960.00
E Overhead & Profit 10% 0.100 18,296.00
F Harga Satuan Pekerjaan (D+E) 201,256.00

A.4.4.3.66. Pemasangan 1 m2 paving block berwarna tebal 6 cm (K.250)


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.250 85,000.00 21,250.00
Tukang Batu L.02 OH 0.500 100,000.00 50,000.00
Kepala Tukang L.03 OH 0.050 100,000.00 5,000.00
Mandor L.04 OH 0.001 105,000.00 136.50
JUMLAH TENAGA KERJA 76,386.50
B BAHAN
Paving block 6 cm warna K-250 M.90.b M2 1.010 133,000.00 134,330.00
Pasir Beton (muntilan) M.9.a m3 0.050 352,000.00 17,600.00
JUMLAH HARGA BAHAN 151,930.00
C PERALATAN
Peralatan Kerja Paving Blok % 10.000 151,930.00 15,193.00
JUMLAH HARGA ALAT 15,193.00
D Jumlah (A+B+C) 243,509.50
E Overhead & Profit 10% 0.100 24,350.95
F Harga Satuan Pekerjaan (D+E) 267,860.00

A.4.5.1 HARGA SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)


A.4.5.1.1. Pemasangan 1 m2 langit-langit asbes semen, tebal 4 mm, 5 mm, dan 6 mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.030 85,000.00 2,550.00
Tukang kayu L.02 OH 0.070 110,000.00 7,700.00
Kepala Tukang L.03 OH 0.007 100,000.00 700.00
Mandor L.04 OH 0.004 105,000.00 420.00
JUMLAH TENAGA KERJA 11,370.00
B BAHAN
Asbes 1,00 x 1,00 m M.138.a m2 1.100 14,500.00 15,950.00
Paku tripleks M.56.a kg 0.010 18,500.00 185.00
JUMLAH HARGA BAHAN 16,135.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 27,505.00
E Overhead & Profit 10% 0.100 2,750.50
F Harga Satuan Pekerjaan (D+E) 30,255.00
A.4.5.1.2. Pemasangan 1 m2 langit-langit akustik ukuran (30 x 30) cm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.120 85,000.00 10,200.00
Tukang kayu L.02 OH 0.120 110,000.00 13,200.00
Kepala Tukang L.03 OH 0.012 100,000.00 1,200.00
Mandor L.04 OH 0.006 105,000.00 630.00
JUMLAH TENAGA KERJA 25,230.00
B BAHAN
Akustik ukuran 30 x 30 cm M.150.a Lembar 12.000 21,500.00 258,000.00
Paku tripleks M.56.a kg 0.050 18,500.00 925.00
JUMLAH HARGA BAHAN 258,925.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 284,155.00
E Overhead & Profit 10% 0.100 28,415.50
F Harga Satuan Pekerjaan (D+E) 312,570.00

A.4.5.1.3. Pemasangan 1 m2 langit-langit akustik ukuran (30 x 60) cm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.120 85,000.00 10,200.00
Tukang kayu L.02 OH 0.120 110,000.00 13,200.00
Kepala Tukang L.03 OH 0.012 100,000.00 1,200.00
Mandor L.04 OH 0.006 105,000.00 630.00
JUMLAH TENAGA KERJA 25,230.00
B BAHAN
Akustik ukuran 30 x 60 cm M.150.b Lembar 5.800 30,500.00 176,900.00
Paku tripleks M.56.a kg 0.050 18,500.00 925.00
JUMLAH HARGA BAHAN 177,825.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 203,055.00
E Overhead & Profit 10% 0.100 20,305.50
F Harga Satuan Pekerjaan (D+E) 223,360.00

A.4.5.1.4. Pemasangan 1 m2 langit-langit akustik ukuran (60 x 120) cm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.100 85,000.00 8,500.00
Tukang kayu L.02 OH 0.100 110,000.00 11,000.00
Kepala Tukang L.03 OH 0.010 100,000.00 1,000.00
Mandor L.04 OH 0.005 105,000.00 525.00
JUMLAH TENAGA KERJA 21,025.00
B BAHAN
Akustik 60 x 120 cm tebal 15 mm M.150.c Lembar 1.500 55,000.00 82,500.00
Paku tripleks M.56.a kg 0.050 18,500.00 925.00
JUMLAH HARGA BAHAN 83,425.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 104,450.00
E Overhead & Profit 10% 0.100 10,445.00
F Harga Satuan Pekerjaan (D+E) 114,895.00
A.4.5.1.5. Pemasangan 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm & 6
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.100 85,000.00 8,500.00
Tukang kayu L.02 OH 0.100 110,000.00 11,000.00
Kepala Tukang L.03 OH 0.010 100,000.00 1,000.00
Mandor L.04 OH 0.005 105,000.00 525.00
JUMLAH TENAGA KERJA 21,025.00
B BAHAN
Tripleks t= 4 mm, 120x240 cm M.34 Lembar 0.375 64,700.00 24,262.50
Paku tripleks M.56.a kg 0.030 18,500.00 555.00
JUMLAH HARGA BAHAN 24,817.50
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 45,842.50
E Overhead & Profit 10% 0.100 4,584.25
F Harga Satuan Pekerjaan (D+E) 50,426.00

A.4.5.1.6. Pemasangan 1 m2 langit-langit lambrisering kayu, tebal 9 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.800 85,000.00 68,000.00
Tukang kayu L.02 OH 0.800 110,000.00 88,000.00
Kepala Tukang L.03 OH 0.080 100,000.00 8,000.00
Mandor L.04 OH 0.040 105,000.00 4,200.00
JUMLAH TENAGA KERJA 168,200.00
B BAHAN
Kayu lambrisering M.17.b m3 0.015 12,700,000.00 190,500.00
Paku tripleks M.56.a kg 0.010 15,000.00 150.00
JUMLAH HARGA BAHAN 190,650.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 358,850.00
E Overhead & Profit 10% 0.100 35,885.00
F Harga Satuan Pekerjaan (D+E) 394,735.00

A.4.5.1.7. Pemasangan 1 m2 langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.100 85,000.00 8,500.00
Tukang kayu L.02 OH 0.050 110,000.00 5,500.00
Kepala Tukang L.03 OH 0.005 100,000.00 500.00
Mandor L.04 OH 0.005 105,000.00 525.00
JUMLAH TENAGA KERJA 15,025.00
B BAHAN
Gypsum Board (120 cm x 240 cm x 9 mm) M.151.a Lembar 0.364 59,500.00 21,658.00
Paku sekrup M.56.j kg 0.110 30,000.00 3,300.00
JUMLAH HARGA BAHAN 24,958.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 39,983.00
E Overhead & Profit 10% 0.100 3,998.30
F Harga Satuan Pekerjaan (D+E) 43,981.00
A.4.5.1.8. Pemasangan 1 m2 langit-langit akustik ukuran (60 x 120) cm berikut rangka alluminium
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.500 85,000.00 42,500.00
Tukang kayu L.02 OH 0.500 110,000.00 55,000.00
Kepala Tukang L.03 OH 0.050 100,000.00 5,000.00
Mandor L.04 OH 0.025 105,000.00 2,625.00
JUMLAH TENAGA KERJA 105,125.00
B BAHAN
Profil Alumunium "T" M.162.a m 3.600 13,500.00 48,600.00
Kawat galvanis Ø 4 mm M.52.b kg 0.150 16,100.00 2,415.00
Ramset M.75.g Buah 1.050 5,000.00 5,250.00
Akustik 60 x 120 cm tebal 15 mm M.150.c Lembar 1.500 55,000.00 82,500.00
JUMLAH HARGA BAHAN 138,765.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 243,890.00
E Overhead & Profit 10% 0.100 24,389.00
F Harga Satuan Pekerjaan (D+E) 268,279.00

A.4.5.1.9. Pemasangan 1 m’ list langit-langit kayu profil


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.050 85,000.00 4,250.00
Tukang Kayu L.02 OH 0.050 110,000.00 5,500.00
Kepala Tukang L.03 OH 0.005 100,000.00 500.00
Mandor L.04 OH 0.003 105,000.00 315.00
JUMLAH TENAGA KERJA 10,565.00
B BAHAN
List kayu profil 32 x 32 mm M.30.a m 1.050 3,700.00 3,885.00
Paku 3,5 cm M.56.c kg 0.010 18,000.00 180.00
JUMLAH HARGA BAHAN 4,065.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 14,630.00
E Overhead & Profit 10% 0.100 1,463.00
F Harga Satuan Pekerjaan (D+E) 16,093.00
A.4.5.1.10 Pemasangan 1 m2 Rangka langit-langit besi hollow 40.40
Lihat pada kelompok Pekerjaan Besi dan Alumunium ( A.9.21)

A.4.5.1.10. Pemasangan 1 m2 Plafond PVC


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.150 85,000.00 12,750.00
Tukang Kayu L.02 OH 0.250 110,000.00 27,500.00
Kepala Tukang L.03 OH 0.025 100,000.00 2,500.00
Mandor L.04 OH 0.075 105,000.00 7,875.00
JUMLAH TENAGA KERJA 50,625.00
B BAHAN
Plafond PVC (setara Shunda Plafon, Flat Gloss HalM.160.a m2 1.050 86,250.00 90,562.50
Paku sekrup M.56.j buah 18.000 400.00 7,200.00
JUMLAH HARGA BAHAN 97,762.50
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 148,387.50
E Overhead & Profit 10% 0.100 14,838.75
F Harga Satuan Pekerjaan (D+E) 163,226.00
A.4.5.2. HARGA SATUAN PEKERJAAN PENUTUP ATAP
A.4.5.2.1. Pemasangan 1 m2 atap genteng palentong kecil
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.150 85,000.00 12,750.00
Tukang Kayu L.02 OH 0.075 110,000.00 8,250.00
Kepala Tukang L.03 OH 0.008 100,000.00 750.00
Mandor L.04 OH 0.008 105,000.00 840.00
JUMLAH TENAGA KERJA 22,590.00
B BAHAN
Genteng palentong M.129.a buah 25.000 2,400.00 60,000.00
JUMLAH HARGA BAHAN 60,000.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 82,590.00
E Overhead & Profit 10% 0.100 8,259.00
F Harga Satuan Pekerjaan (D+E) 90,849.00

A.4.5.2.2. Pemasangan 1 m2 atap genteng kodok glazuur


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.150 85,000.00 12,750.00
Tukang Kayu L.02 OH 0.075 110,000.00 8,250.00
Kepala Tukang L.03 OH 0.008 100,000.00 800.00
Mandor L.04 OH 0.008 105,000.00 840.00
JUMLAH TENAGA KERJA 22,640.00
B BAHAN
Genteng kodok glazuur M.127.b buah 25.000 7,000.00 175,000.00
JUMLAH HARGA BAHAN 175,000.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 197,640.00
E Overhead & Profit 10% 0.100 19,764.00
F Harga Satuan Pekerjaan (D+E) 217,404.00

A.4.5.2.3. Pemasangan 1 m2 atap genteng palentong besar/super


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.150 85,000.00 12,750.00
Tukang Kayu L.02 OH 0.075 110,000.00 8,250.00
Kepala Tukang L.03 OH 0.008 100,000.00 800.00
Mandor L.04 OH 0.008 105,000.00 840.00
JUMLAH TENAGA KERJA 22,640.00
B BAHAN
Genteng palentong super M.129.b buah 18.000 2,600.00 46,800.00
JUMLAH HARGA BAHAN 46,800.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 69,440.00
E Overhead & Profit 10% 0.100 6,944.00
F Harga Satuan Pekerjaan (D+E) 76,384.00
A.4.5.2.4. Pemasangan 1 m’ bubung genteng palentong
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.400 85,000.00 34,000.00
Tukang Kayu L.02 OH 0.200 110,000.00 22,000.00
Kepala Tukang L.03 OH 0.020 100,000.00 2,000.00
Mandor L.04 OH 0.002 105,000.00 210.00
JUMLAH TENAGA KERJA 58,210.00
B BAHAN
Bubung genteng palentong M.134.e buah 5.000 9,000.00 45,000.00
Portland cement M.245.a Kg 8.000 1,300.00 10,400.00
Pasir Beton (muntilan) M.9.a m3 0.032 352,000.00 11,264.00
JUMLAH HARGA BAHAN 66,664.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 124,874.00
E Overhead & Profit 10% 0.100 12,487.40
F Harga Satuan Pekerjaan (D+E) 137,361.00

A.4.5.2.5. Pemasangan 1 m’ bubung genteng kodok glazuur


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.400 85,000.00 34,000.00
Tukang Kayu L.02 OH 0.200 110,000.00 22,000.00
Kepala Tukang L.03 OH 0.020 100,000.00 2,000.00
Mandor L.04 OH 0.002 105,000.00 210.00
JUMLAH TENAGA KERJA 58,210.00
B BAHAN
Bubung genteng kodok glazuur M.134.d buah 5.000 15,000.00 75,000.00
Portland cement M.245.a Kg 8.000 1,300.00 10,400.00
Pasir Beton (muntilan) M.9.a m3 0.032 352,000.00 11,264.00
JUMLAH HARGA BAHAN 96,664.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 154,874.00
E Overhead & Profit 10% 0.100 15,487.40
F Harga Satuan Pekerjaan (D+E) 170,361.00

A.4.5.2.6. Pemasangan 1 m’ bubung genteng palentong besar


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.400 85,000.00 34,000.00
Tukang Kayu L.02 OH 0.200 110,000.00 22,000.00
Kepala Tukang L.03 OH 0.020 100,000.00 2,000.00
Mandor L.04 OH 0.002 105,000.00 210.00
JUMLAH TENAGA KERJA 58,210.00
B BAHAN
Bubung genteng palentong M.134.e buah 4.000 9,000.00 36,000.00
Portland cement M.245.a Kg 8.000 1,300.00 10,400.00
Pasir Beton (muntilan) M.9.a m3 0.032 352,000.00 11,264.00
JUMLAH HARGA BAHAN 57,664.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 115,874.00
E Overhead & Profit 10% 0.100 11,587.40
F Harga Satuan Pekerjaan (D+E) 127,461.00
A.4.5.2.7. Pemasangan 1 m2 roof light fibreglass 90x180
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.140 85,000.00 11,900.00
Tukang Kayu L.02 OH 0.067 110,000.00 7,370.00
Kepala Tukang L.03 OH 0.007 100,000.00 700.00
Mandor L.04 OH 0.007 105,000.00 735.00
JUMLAH TENAGA KERJA 20,705.00
B BAHAN
Atap Transparan Gelombang 180 x 80 cm M.142.a Lembar 0.600 70,000.00 42,000.00
Paku payung M.56.k Kg 0.050 33,000.00 1,650.00
JUMLAH HARGA BAHAN 43,650.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 64,355.00
E Overhead & Profit 10% 0.100 6,435.50
F Harga Satuan Pekerjaan (D+E) 70,790.00

A.4.5.2.8. Pemasangan 1 m2 atap asbes gelombang 0,92mx2,5m x 5mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.140 85,000.00 11,900.00
Tukang Kayu L.02 OH 0.075 110,000.00 8,250.00
Kepala Tukang L.03 OH 0.008 100,000.00 800.00
Mandor L.04 OH 0.008 105,000.00 840.00
JUMLAH TENAGA KERJA 21,790.00
B BAHAN
Asbes gelombang besar 5mm (250x102cm) M.138.b Lembar 0.500 103,000.00 51,500.00
Paku pancing 6x23 M.56.m Kg 0.120 20,000.00 2,400.00
JUMLAH HARGA BAHAN 53,900.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 75,690.00
E Overhead & Profit 10% 0.100 7,569.00
F Harga Satuan Pekerjaan (D+E) 83,259.00

A.4.5.2.9. Pemasangan 1 m2 atap asbes gelombang 0,92mx2,25m x 5mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.140 85,000.00 11,900.00
Tukang Kayu L.02 OH 0.075 110,000.00 8,250.00
Kepala Tukang L.03 OH 0.008 100,000.00 800.00
Mandor L.04 OH 0.008 105,000.00 840.00
JUMLAH TENAGA KERJA 21,790.00
B BAHAN
Asbes gelombang besar 5mm (225x102cm) M.138.c Lembar 0.600 92,500.00 55,500.00
Paku pancing 6x23 M.56.m Kg 0.120 20,000.00 2,400.00
JUMLAH HARGA BAHAN 57,900.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 79,690.00
E Overhead & Profit 10% 0.100 7,969.00
F Harga Satuan Pekerjaan (D+E) 87,659.00
A.4.5.2.10. Pemasangan 1 m2 atap asbes gelombang 0,92mx2,00m x 5mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.140 85,000.00 11,900.00
Tukang Kayu L.02 OH 0.070 110,000.00 7,700.00
Kepala Tukang L.03 OH 0.007 100,000.00 700.00
Mandor L.04 OH 0.007 105,000.00 735.00
JUMLAH TENAGA KERJA 21,035.00
B BAHAN
Asbes gelombang besar 5mm (200x102cm) M.138.d Lembar 0.600 85,000.00 51,000.00
Paku pancing 6x23 M.56.m Kg 0.120 20,000.00 2,400.00
JUMLAH HARGA BAHAN 53,400.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 74,435.00
E Overhead & Profit 10% 0.100 7,443.50
F Harga Satuan Pekerjaan (D+E) 81,878.00

A.4.5.2.11. Pemasangan 1 m2 atap asbes gelombang 0,92mx1.80m x 5mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.140 85,000.00 11,900.00
Tukang Kayu L.02 OH 0.070 110,000.00 7,700.00
Kepala Tukang L.03 OH 0.007 100,000.00 700.00
Mandor L.04 OH 0.007 105,000.00 735.00
JUMLAH TENAGA KERJA 21,035.00
B BAHAN
Asbes gelombang besar 5mm (180x102cm) M.138.e Lembar 0.750 73,000.00 54,750.00
Paku pancing 6x23 M.56.m Kg 0.120 20,000.00 2,400.00
JUMLAH HARGA BAHAN 57,150.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 78,185.00
E Overhead & Profit 10% 0.100 7,818.50
F Harga Satuan Pekerjaan (D+E) 86,003.00

A.4.5.2.12. Pemasangan 1 m2 atap asbes gelombang 1.05mx3.00m x 4mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.140 85,000.00 11,900.00
Tukang Kayu L.02 OH 0.070 110,000.00 7,700.00
Kepala Tukang L.03 OH 0.007 100,000.00 700.00
Mandor L.04 OH 0.007 105,000.00 735.00
JUMLAH TENAGA KERJA 21,035.00
B BAHAN
Asbes gelombang kecil 4mm (300x105) M.138.f Lembar 0.350 98,000.00 34,300.00
Paku pancing 6x23 M.56.m Kg 0.120 20,000.00 2,400.00
JUMLAH HARGA BAHAN 36,700.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 57,735.00
E Overhead & Profit 10% 0.100 5,773.50
F Harga Satuan Pekerjaan (D+E) 63,508.00
A.4.5.2.13. Pemasangan 1 m2 atap asbes gelombang 1.05mx2.70m x 4mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.140 85,000.00 11,900.00
Tukang Kayu L.02 OH 0.070 110,000.00 7,700.00
Kepala Tukang L.03 OH 0.007 100,000.00 700.00
Mandor L.04 OH 0.007 105,000.00 735.00
JUMLAH TENAGA KERJA 21,035.00
B BAHAN
Asbes gelombang kecil 4mm (270x105) M.138.g Lembar 0.420 84,800.00 35,616.00
Paku pancing 6x23 M.56.m Kg 0.120 20,000.00 2,400.00
JUMLAH HARGA BAHAN 38,016.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 59,051.00
E Overhead & Profit 10% 0.100 5,905.10
F Harga Satuan Pekerjaan (D+E) 64,956.00

A.4.5.2.14. Pemasangan 1 m2 atap asbes gelombang 1.05mx2.40m x 4mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.140 85,000.00 11,900.00
Tukang Kayu L.02 OH 0.070 110,000.00 7,700.00
Kepala Tukang L.03 OH 0.007 100,000.00 700.00
Mandor L.04 OH 0.007 105,000.00 735.00
JUMLAH TENAGA KERJA 21,035.00
B BAHAN
Asbes gelombang kecil 4mm (240x105) M.138.h Lembar 0.440 70,000.00 30,800.00
Paku pancing 6x23 M.56.m Kg 0.120 20,000.00 2,400.00
JUMLAH HARGA BAHAN 33,200.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 54,235.00
E Overhead & Profit 10% 0.100 5,423.50
F Harga Satuan Pekerjaan (D+E) 59,658.00

A.4.5.2.15. Pemasangan 1 m2 atap asbes gelombang 1.05mx2.10m x 4mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.140 85,000.00 11,900.00
Tukang Kayu L.02 OH 0.070 110,000.00 7,700.00
Kepala Tukang L.03 OH 0.007 100,000.00 700.00
Mandor L.04 OH 0.007 105,000.00 735.00
JUMLAH TENAGA KERJA 21,035.00
B BAHAN
Asbes gelombang kecil 4mm (210x105) M.138.i Lembar 0.510 60,500.00 30,855.00
Paku pancing 6x23 M.56.m Kg 0.120 20,000.00 2,400.00
JUMLAH HARGA BAHAN 33,255.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 54,290.00
E Overhead & Profit 10% 0.100 5,429.00
F Harga Satuan Pekerjaan (D+E) 59,719.00
A.4.5.2.16. Pemasangan 1 m2 atap asbes gelombang 1.05mx1.50m x 4mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.140 85,000.00 11,900.00
Tukang Kayu L.02 OH 0.070 110,000.00 7,700.00
Kepala Tukang L.03 OH 0.007 100,000.00 700.00
Mandor L.04 OH 0.007 105,000.00 735.00
JUMLAH TENAGA KERJA 21,035.00
B BAHAN
Asbes gelombang kecil 4mm (150x105) M.138.k Lembar 0.800 47,500.00 38,000.00
Paku pancing 6x23 M.56.m Kg 0.120 20,000.00 2,400.00
JUMLAH HARGA BAHAN 40,400.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 61,435.00
E Overhead & Profit 10% 0.100 6,143.50
F Harga Satuan Pekerjaan (D+E) 67,578.00

A.4.5.2.17. Pemasangan 1 m2 atap asbes gelombang 1.08mx3.00m x 6mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.140 85,000.00 11,900.00
Tukang Kayu L.02 OH 0.070 110,000.00 7,700.00
Kepala Tukang L.03 OH 0.007 100,000.00 700.00
Mandor L.04 OH 0.007 105,000.00 735.00
JUMLAH TENAGA KERJA 21,035.00
B BAHAN
Asbes gelombang besar 6mm (300x102) M.138.l Lembar 0.370 121,000.00 44,770.00
Paku pancing 6x23 M.56.m Kg 0.120 20,000.00 2,400.00
JUMLAH HARGA BAHAN 47,170.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 68,205.00
E Overhead & Profit 10% 0.100 6,820.50
F Harga Satuan Pekerjaan (D+E) 75,025.00

A.4.5.2.18. Pemasangan 1 m2 atap asbes gelombang 1.08mx2.70m x 6mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.140 85,000.00 11,900.00
Tukang Kayu L.02 OH 0.070 110,000.00 7,700.00
Kepala Tukang L.03 OH 0.007 100,000.00 700.00
Mandor L.04 OH 0.007 105,000.00 735.00
JUMLAH TENAGA KERJA 21,035.00
B BAHAN
Asbes gelombang besar 6mm (270x102) M.138.m Lembar 0.380 115,000.00 43,700.00
Paku pancing 6x23 M.56.m Kg 0.120 20,000.00 2,400.00
JUMLAH HARGA BAHAN 46,100.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 67,135.00
E Overhead & Profit 10% 0.100 6,713.50
F Harga Satuan Pekerjaan (D+E) 73,848.00
A.4.5.2.19. Pemasangan 1 m2 atap asbes gelombang 1.08mx2.40m x 6mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.140 85,000.00 11,900.00
Tukang Kayu L.02 OH 0.070 110,000.00 7,700.00
Kepala Tukang L.03 OH 0.007 100,000.00 700.00
Mandor L.04 OH 0.007 105,000.00 735.00
JUMLAH TENAGA KERJA 21,035.00
B BAHAN
Asbes gelombang besar 6mm (240x102) M.138.n Lembar 0.460 103,000.00 47,380.00
Paku pancing 6x23 M.56.m Kg 0.120 20,000.00 2,400.00
JUMLAH HARGA BAHAN 49,780.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 70,815.00
E Overhead & Profit 10% 0.100 7,081.50
F Harga Satuan Pekerjaan (D+E) 77,896.00

A.4.5.2.20. Pemasangan 1 m2 atap asbes gelombang 1.08mx2.10m x 6mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.140 85,000.00 11,900.00
Tukang Kayu L.02 OH 0.070 110,000.00 7,700.00
Kepala Tukang L.03 OH 0.007 100,000.00 700.00
Mandor L.04 OH 0.007 105,000.00 735.00
JUMLAH TENAGA KERJA 21,035.00
B BAHAN
Asbes gelombang besar 6mm (210x102) M.138.o Lembar 0.490 85,000.00 41,650.00
Paku pancing 6x23 M.56.m Kg 0.120 20,000.00 2,400.00
JUMLAH HARGA BAHAN 44,050.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 65,085.00
E Overhead & Profit 10% 0.100 6,508.50
F Harga Satuan Pekerjaan (D+E) 71,593.00

A.4.5.2.21. Pemasangan 1 m2 atap asbes gelombang 1.08mx1.80m x 6mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.140 85,000.00 11,900.00
Tukang Kayu L.02 OH 0.070 110,000.00 7,700.00
Kepala Tukang L.03 OH 0.007 100,000.00 700.00
Mandor L.04 OH 0.007 105,000.00 735.00
JUMLAH TENAGA KERJA 21,035.00
B BAHAN
Asbes gelombang besar 6mm (180x102) M.138.p Lembar 0.570 80,000.00 45,600.00
Paku pancing 6x23 M.56.m Kg 0.120 20,000.00 2,400.00
JUMLAH HARGA BAHAN 48,000.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 69,035.00
E Overhead & Profit 10% 0.100 6,903.50
F Harga Satuan Pekerjaan (D+E) 75,938.00
A.4.5.2.22. Pemasangan 1 m’ bubung stel gelombang 0,92m
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.084 85,000.00 7,140.00
Tukang Kayu L.02 OH 0.125 110,000.00 13,750.00
Kepala Tukang L.03 OH 0.013 100,000.00 1,300.00
Mandor L.04 OH 0.004 105,000.00 420.00
JUMLAH TENAGA KERJA 22,610.00
B BAHAN
Nok stel gelombang M.135.b Lembar 2.400 54,000.00 129,600.00
Paku sekrup M.56.j buah 6.000 400.00 2,400.00
JUMLAH HARGA BAHAN 132,000.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 154,610.00
E Overhead & Profit 10% 0.100 15,461.00
F Harga Satuan Pekerjaan (D+E) 170,071.00

A.4.5.2.23. Pemasangan 1 m’ bubung stel gelombang 1,05m


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.084 85,000.00 7,140.00
Tukang Kayu L.02 OH 0.125 110,000.00 13,750.00
Kepala Tukang L.03 OH 0.013 100,000.00 1,300.00
Mandor L.04 OH 0.004 105,000.00 420.00
JUMLAH TENAGA KERJA 22,610.00
B BAHAN
Nok stel gelombang M.135.b Lembar 2.100 47,300.00 99,330.00
Paku sekrup M.56.j buah 6.000 400.00 2,400.00
JUMLAH HARGA BAHAN 101,730.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 124,340.00
E Overhead & Profit 10% 0.100 12,434.00
F Harga Satuan Pekerjaan (D+E) 136,774.00

A.4.5.2.24. Pemasangan 1 m’ bubung stel gelombang 1,08m


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.084 85,000.00 7,140.00
Tukang Kayu L.02 OH 0.125 110,000.00 13,750.00
Kepala Tukang L.03 OH 0.013 100,000.00 1,300.00
Mandor L.04 OH 0.004 105,000.00 420.00
JUMLAH TENAGA KERJA 22,610.00
B BAHAN
Nok stel gelombang M.135.b Lembar 2.050 46,000.00 94,300.00
Paku sekrup M.56.j buah 6.000 400.00 2,400.00
JUMLAH HARGA BAHAN 96,700.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 119,310.00
E Overhead & Profit 10% 0.100 11,931.00
F Harga Satuan Pekerjaan (D+E) 131,241.00
A.4.5.2.25. Pemasangan 1 m’ nok paten 0,92m
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.084 85,000.00 7,140.00
Tukang Kayu L.02 OH 0.125 110,000.00 13,750.00
Kepala Tukang L.03 OH 0.013 100,000.00 1,300.00
Mandor L.04 OH 0.004 105,000.00 420.00
JUMLAH TENAGA KERJA 22,610.00
B BAHAN
Nok paten 92 cm M.135.f Lembar 1.200 55,000.00 66,000.00
Paku sekrup M.56.j buah 6.000 400.00 2,400.00
JUMLAH HARGA BAHAN 68,400.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 91,010.00
E Overhead & Profit 10% 0.100 9,101.00
F Harga Satuan Pekerjaan (D+E) 100,111.00

A.4.5.2.26. Pemasangan 1 m’ nok paten 1,05m


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.084 85,000.00 7,140.00
Tukang Kayu L.02 OH 0.125 110,000.00 13,750.00
Kepala Tukang L.03 OH 0.013 100,000.00 1,300.00
Mandor L.04 OH 0.004 105,000.00 420.00
JUMLAH TENAGA KERJA 22,610.00
B BAHAN
Nok paten 105 cm M.135.g Lembar 1.200 45,000.00 54,000.00
Paku sekrup M.56.j buah 6.000 400.00 2,400.00
JUMLAH HARGA BAHAN 56,400.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 79,010.00
E Overhead & Profit 10% 0.100 7,901.00
F Harga Satuan Pekerjaan (D+E) 86,911.00

A.4.5.2.27. Pemasangan 1 m’ nok paten 1,08m


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.084 85,000.00 7,140.00
Tukang Kayu L.02 OH 0.125 110,000.00 13,750.00
Kepala Tukang L.03 OH 0.013 100,000.00 1,300.00
Mandor L.04 OH 0.004 105,000.00 420.00
JUMLAH TENAGA KERJA 22,610.00
B BAHAN
Nok paten 108 cm M.135.g Lembar 1.200 45,000.00 54,000.00
Paku sekrup M.56.j buah 6.000 400.00 2,400.00
JUMLAH HARGA BAHAN 56,400.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 79,010.00
E Overhead & Profit 10% 0.100 7,901.00
F Harga Satuan Pekerjaan (D+E) 86,911.00
A.4.5.2.28. Pemasangan 1 m’ nok stel rata 0,92m
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.100 85,000.00 8,500.00
Tukang Kayu L.02 OH 0.150 110,000.00 16,500.00
Kepala Tukang L.03 OH 0.013 100,000.00 1,300.00
Mandor L.04 OH 0.004 105,000.00 420.00
JUMLAH TENAGA KERJA 26,720.00
B BAHAN
nok stel rata 92 cm M.135.f Lembar 1.100 55,000.00 60,500.00
Paku sekrup M.56.j buah 6.000 400.00 2,400.00
JUMLAH HARGA BAHAN 62,900.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 89,620.00
E Overhead & Profit 10% 0.100 8,962.00
F Harga Satuan Pekerjaan (D+E) 98,582.00

A.4.5.2.29. Pemasangan 1 m’ nok steel rata 1,05m


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.084 85,000.00 7,140.00
Tukang Kayu L.02 OH 0.125 110,000.00 13,750.00
Kepala Tukang L.03 OH 0.013 100,000.00 1,300.00
Mandor L.04 OH 0.004 105,000.00 420.00
JUMLAH TENAGA KERJA 22,610.00
B BAHAN
nok stel rata 105 cm M.135.g Lembar 1.100 45,000.00 49,500.00
Paku sekrup M.56.j buah 6.000 400.00 2,400.00
JUMLAH HARGA BAHAN 51,900.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 74,510.00
E Overhead & Profit 10% 0.100 7,451.00
F Harga Satuan Pekerjaan (D+E) 81,961.00

A.4.5.2.30. Pemasangan 1 m2 genteng beton


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.200 85,000.00 17,000.00
Tukang Kayu L.02 OH 0.100 110,000.00 11,000.00
Kepala Tukang L.03 OH 0.010 100,000.00 1,000.00
Mandor L.04 OH 0.010 105,000.00 1,050.00
JUMLAH TENAGA KERJA 30,050.00
B BAHAN
Genteng beton M.125 buah 11.000 7,000.00 77,000.00
Paku 10 cm M.56.f Kg 0.030 18,000.00 540.00
JUMLAH HARGA BAHAN 77,540.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 107,590.00
E Overhead & Profit 10% 0.100 10,759.00
F Harga Satuan Pekerjaan (D+E) 118,349.00
A.4.5.2.31. Pemasangan 1 m2 genteng aspal (Onduvilla, 106Cm x 40Cm x 3mm)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.200 85,000.00 17,000.00
Tukang Kayu L.02 OH 0.300 110,000.00 33,000.00
Kepala Tukang L.03 OH 0.003 100,000.00 300.00
Mandor L.04 OH 0.010 105,000.00 1,050.00
JUMLAH TENAGA KERJA 51,350.00
B BAHAN
Genteng aspal (Onduvilla) M.132.a buah 3.667 67,000.00 245,666.67
Plywood 6 mm (120x240) M.32.b Lembar - 91,500.00 -
Paku 2,5 cm M.56.b Kg 0.030 18,500.00 555.00
Plastic aerator M.570 buah - 15,900.00 -
JUMLAH HARGA BAHAN 246,221.67
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 297,571.67
E Overhead & Profit 10% 0.100 29,757.17
F Harga Satuan Pekerjaan (D+E) 327,328.00

A.4.5.2.32. Pemasangan 1 m2 genteng metal ukuran 80 x 100 atap pelana


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.200 85,000.00 17,000.00
Tukang Kayu L.02 OH 0.100 110,000.00 11,000.00
Kepala Tukang L.03 OH 0.010 100,000.00 1,000.00
Mandor L.04 OH 0.001 105,000.00 105.00
JUMLAH TENAGA KERJA 29,105.00
B BAHAN
Genteng metal M.128.a buah 1.300 37,000.00 48,100.00
Paku sekrup M.56.j Kg 0.200 30,000.00 6,000.00
JUMLAH HARGA BAHAN 54,100.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 83,205.00
E Overhead & Profit 10% 0.100 8,320.50
F Harga Satuan Pekerjaan (D+E) 91,525.00

A.4.5.2.33. Pemasangan 1 m2 genteng metal ukuran 80 x 100 atap Jurai


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.200 85,000.00 17,000.00
Tukang Kayu L.02 OH 0.100 110,000.00 11,000.00
Kepala Tukang L.03 OH 0.010 100,000.00 1,000.00
Mandor L.04 OH 0.001 105,000.00 105.00
JUMLAH TENAGA KERJA 29,105.00
B BAHAN
Genteng metal M.128.a buah 2.000 37,000.00 74,000.00
Paku sekrup M.56.j Kg 0.200 30,000.00 6,000.00
JUMLAH HARGA BAHAN 80,000.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 109,105.00
E Overhead & Profit 10% 0.100 10,910.50
F Harga Satuan Pekerjaan (D+E) 120,015.00
A.4.5.2.34. Pemasangan 1 m2 atap sirap kayu
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.166 85,000.00 14,110.00
Tukang Kayu L.02 OH 0.250 110,000.00 27,500.00
Kepala Tukang L.03 OH 0.025 100,000.00 2,500.00
Mandor L.04 OH 0.008 105,000.00 840.00
JUMLAH TENAGA KERJA 44,950.00
B BAHAN
Sirap kayu M.141 buah 30.000 2,800.00 84,000.00
Paku 3,5 cm M.56.c Kg 0.200 18,000.00 3,600.00
JUMLAH HARGA BAHAN 87,600.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 132,550.00
E Overhead & Profit 10% 0.100 13,255.00
F Harga Satuan Pekerjaan (D+E) 145,805.00

A.4.5.2.35. Pemasangan 1 m’ nok genteng beton


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.400 85,000.00 34,000.00
Tukang Kayu L.02 OH 0.200 110,000.00 22,000.00
Kepala Tukang L.03 OH 0.020 100,000.00 2,000.00
Mandor L.04 OH 0.020 105,000.00 2,100.00
JUMLAH TENAGA KERJA 60,100.00
B BAHAN
Nok genteng beton M.135.a buah 3.500 16,000.00 56,000.00
Paku sekrup M.56.j Kg 0.050 30,000.00 1,500.00
Portland cement M.245.a Kg 10.800 1,300.00 14,040.00
Pasir Beton (muntilan) M.9.a m3 0.032 352,000.00 11,264.00
Semen warna M.244 Kg 1.000 15,000.00 15,000.00
JUMLAH HARGA BAHAN 97,804.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 157,904.00
E Overhead & Profit 10% 0.100 15,790.40
F Harga Satuan Pekerjaan (D+E) 173,694.00

A.4.5.2.36. Pemasangan 1 m’ nok genteng aspal


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.125 85,000.00 10,625.00
Tukang Kayu L.02 OH 0.250 110,000.00 27,500.00
Kepala Tukang L.03 OH 0.025 100,000.00 2,500.00
Mandor L.04 OH 0.006 105,000.00 630.00
JUMLAH TENAGA KERJA 41,255.00
B BAHAN
Nok genteng aspal M.135.d buah 2.000 73,000.00 146,000.00
Paku sekrup M.56.j Kg 0.050 30,000.00 1,500.00
Kayu kamper (balok) M.16.a m3 0.004 10,500,000.00 36,750.00
JUMLAH HARGA BAHAN 184,250.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 225,505.00
E Overhead & Profit 10% 0.100 22,550.50
F Harga Satuan Pekerjaan (D+E) 248,055.00
A.4.5.2.37. Pemasangan 1 m’ nok genteng metal
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.250 85,000.00 21,250.00
Tukang Kayu L.02 OH 0.150 110,000.00 16,500.00
Kepala Tukang L.03 OH 0.015 100,000.00 1,500.00
Mandor L.04 OH 0.013 105,000.00 1,365.00
JUMLAH TENAGA KERJA 40,615.00
B BAHAN
Nok genteng metal M.135.c buah 1.100 40,500.00 44,550.00
Paku sekrup M.56.j Kg 0.050 30,000.00 1,500.00
JUMLAH HARGA BAHAN 46,050.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 86,665.00
E Overhead & Profit 10% 0.100 8,666.50
F Harga Satuan Pekerjaan (D+E) 95,331.00

A.4.5.2.38. Pemasangan 1 m’ nok sirap


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.125 85,000.00 10,625.00
Tukang Kayu L.02 OH 0.250 110,000.00 27,500.00
Kepala Tukang L.03 OH 0.025 100,000.00 2,500.00
Mandor L.04 OH 0.006 105,000.00 630.00
JUMLAH TENAGA KERJA 41,255.00
B BAHAN
Seng plat bjls 28 M.137.f Lembar 0.400 37,500.00 15,000.00
Paku biasa ½" - 1" M.56.b Kg 0.050 18,500.00 925.00
Paku biasa 2"- 5" M.56.g Kg 0.050 18,000.00 900.00
JUMLAH HARGA BAHAN 16,825.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 58,080.00
E Overhead & Profit 10% 0.100 5,808.00
F Harga Satuan Pekerjaan (D+E) 63,888.00

A.4.5.2.39. Pemasangan 1 m2 atap seng gelombang


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.120 85,000.00 10,200.00
Tukang Kayu L.02 OH 0.060 110,000.00 6,600.00
Kepala Tukang L.03 OH 0.006 100,000.00 600.00
Mandor L.04 OH 0.006 105,000.00 630.00
JUMLAH TENAGA KERJA 18,030.00
B BAHAN
Seng gelombang bljs 30 M.137.b Lembar 0.700 62,000.00 43,400.00
Paku biasa ½" - 1" M.56.b Kg 0.020 18,500.00 370.00
JUMLAH HARGA BAHAN 43,770.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 61,800.00
E Overhead & Profit 10% 0.100 6,180.00
F Harga Satuan Pekerjaan (D+E) 67,980.00
A.4.5.2.40. Pemasangan 1 m’nok atap seng
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.150 85,000.00 12,750.00
Tukang Kayu L.02 OH 0.070 110,000.00 7,700.00
Kepala Tukang L.03 OH 0.007 100,000.00 700.00
Mandor L.04 OH 0.006 105,000.00 630.00
JUMLAH TENAGA KERJA 21,780.00
B BAHAN
Seng plat 3" x 6" bjls 28 M.137.e Lembar 0.300 68,000.00 20,400.00
Paku biasa ½" - 1" M.56.b Kg 0.040 18,500.00 740.00
JUMLAH HARGA BAHAN 21,140.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 42,920.00
E Overhead & Profit 10% 0.100 4,292.00
F Harga Satuan Pekerjaan (D+E) 47,212.00

A.4.5.2.41. Pemasangan 1 m2 atap alumunium


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.150 85,000.00 12,750.00
Tukang Kayu L.02 OH 0.750 110,000.00 82,500.00
Kepala Tukang L.03 OH 0.080 100,000.00 8,000.00
Mandor L.04 OH 0.006 105,000.00 630.00
JUMLAH TENAGA KERJA 103,880.00
B BAHAN
Alumunium gelombang tebal 0,55 M.143 Lembar 0.350 110,000.00 38,500.00
Paku hak panj 15cm M.56.n Kg 0.020 22,000.00 440.00
JUMLAH HARGA BAHAN 38,940.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 142,820.00
E Overhead & Profit 10% 0.100 14,282.00
F Harga Satuan Pekerjaan (D+E) 157,102.00

A.4.5.2.42. Pemasangan 1 m’ nok alumunium


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.100 85,000.00 8,500.00
Tukang Kayu L.02 OH 1.000 110,000.00 110,000.00
Kepala Tukang L.03 OH 0.100 100,000.00 10,000.00
Mandor L.04 OH 0.050 105,000.00 5,250.00
JUMLAH TENAGA KERJA 133,750.00
B BAHAN
Nok standar 40x18 M.135.e buah 1.200 66,000.00 79,200.00
Paku hak panj 15cm M.56.n Kg 0.040 22,000.00 880.00
JUMLAH HARGA BAHAN 80,080.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 213,830.00
E Overhead & Profit 10% 0.100 21,383.00
F Harga Satuan Pekerjaan (D+E) 235,213.00
A.4.5.2.43. Pemasangan 1 m2 alumunium foil/sisalation
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.150 85,000.00 12,750.00
Tukang Kayu L.02 OH 0.050 110,000.00 5,500.00
Kepala Tukang L.03 OH 0.005 100,000.00 500.00
Mandor L.04 OH 0.008 105,000.00 840.00
JUMLAH TENAGA KERJA 19,590.00
B BAHAN
Aluminium foil M.560 M2 1.050 10,500.00 11,025.00
JUMLAH HARGA BAHAN 11,025.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 30,615.00
E Overhead & Profit 10% 0.100 3,061.50
F Harga Satuan Pekerjaan (D+E) 33,676.00

A.4.6.1 HARGA SATUAN PEKERJAAN KAYU


A.4.6.1.1. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I (Jati)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 7.000 85,000.00 595,000.00
Tukang kayu L.02 OH 21.000 110,000.00 2,310,000.00
Kepala Tukang L.03 OH 2.100 100,000.00 210,000.00
Mandor L.04 OH 0.350 105,000.00 36,750.00
JUMLAH TENAGA KERJA 3,151,750.00
B BAHAN
Kayu jati (balok) M.15.a m3 1.100 24,000,000.00 26,400,000.00
Paku 10 cm M.56.f Kg 1.250 18,000.00 22,500.00
Lem Kayu M.572 Kg 1.000 15,000.00 15,000.00
JUMLAH HARGA BAHAN 26,437,500.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 29,589,250.00
E Overhead & Profit 10% 0.100 2,958,925.00
F Harga Satuan Pekerjaan (D+E) 32,548,175.00

A.4.6.1.2. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II (Bengkirai)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 6.000 85,000.00 510,000.00
Tukang kayu L.02 OH 18.000 110,000.00 1,980,000.00
Kepala Tukang L.03 OH 1.800 100,000.00 180,000.00
Mandor L.04 OH 0.300 105,000.00 31,500.00
JUMLAH TENAGA KERJA 2,701,500.00
B BAHAN
Kayu bengkirai (balok) M.17.a m3 1.200 11,000,000.00 13,200,000.00
Paku 10 cm M.56.f Kg 1.250 18,000.00 22,500.00
Lem Kayu M.572 Kg 1.000 15,000.00 15,000.00
JUMLAH HARGA BAHAN 13,237,500.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 15,939,000.00
E Overhead & Profit 10% 0.100 1,593,900.00
F Harga Satuan Pekerjaan (D+E) 17,532,900.00
A.4.6.1.3. Pembuatan dan pemasangan 1 m2 pintu klamp standar, kayu kelas II (Bengkirai)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.350 85,000.00 29,750.00
Tukang kayu L.02 OH 1.050 110,000.00 115,500.00
Kepala Tukang L.03 OH 0.105 100,000.00 10,500.00
Mandor L.04 OH 0.018 105,000.00 1,890.00
JUMLAH TENAGA KERJA 157,640.00
B BAHAN
Kayu bengkirai (papan) M.17.b m3 0.040 12,700,000.00 508,000.00
Paku 7 cm M.56.e Kg 0.050 18,000.00 900.00
JUMLAH HARGA BAHAN 508,900.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 666,540.00
E Overhead & Profit 10% 0.100 66,654.00
F Harga Satuan Pekerjaan (D+E) 733,194.00

A.4.6.1.4. Pembuatan dan pemasangan 1 m2 pintu klamp sederhana, kayu kelas III (Kruing)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.350 85,000.00 29,750.00
Tukang kayu L.02 OH 1.050 110,000.00 115,500.00
Kepala Tukang L.03 OH 0.105 100,000.00 10,500.00
Mandor L.04 OH 0.018 105,000.00 1,890.00
JUMLAH TENAGA KERJA 157,640.00
B BAHAN
Kayu kruing (papan) M.18.b m3 0.040 7,950,000.00 318,000.00
Paku 7 cm M.56.e Kg 0.050 18,000.00 900.00
JUMLAH HARGA BAHAN 318,900.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 476,540.00
E Overhead & Profit 10% 0.100 47,654.00
F Harga Satuan Pekerjaan (D+E) 524,194.00

A.4.6.1.5. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas II (Bengkirai)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.000 85,000.00 85,000.00
Tukang kayu L.02 OH 3.000 110,000.00 330,000.00
Kepala Tukang L.03 OH 0.300 100,000.00 30,000.00
Mandor L.04 OH 0.050 105,000.00 5,250.00
JUMLAH TENAGA KERJA 450,250.00
B BAHAN
Kayu bengkirai (papan) M.17.b m3 0.040 12,700,000.00 508,000.00
Lem Kayu M.572 Kg 0.500 15,000.00 7,500.00
JUMLAH HARGA BAHAN 515,500.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 965,750.00
E Overhead & Profit 10% 0.100 96,575.00
F Harga Satuan Pekerjaan (D+E) 1,062,325.00
A.4.6.1.6. Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas II (Bengkirai)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.800 85,000.00 68,000.00
Tukang kayu L.02 OH 2.400 110,000.00 264,000.00
Kepala Tukang L.03 OH 0.240 100,000.00 24,000.00
Mandor L.04 OH 0.040 105,000.00 4,200.00
JUMLAH TENAGA KERJA 360,200.00
B BAHAN
Kayu bengkirai (papan) M.17.b m3 0.024 12,700,000.00 304,800.00
Lem Kayu M.572 Kg 0.300 15,000.00 4,500.00
JUMLAH HARGA BAHAN 309,300.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 669,500.00
E Overhead & Profit 10% 0.100 66,950.00
F Harga Satuan Pekerjaan (D+E) 736,450.00

A.4.6.1.7. Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu kelas II (Bengkirai)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.000 85,000.00 85,000.00
Tukang kayu L.02 OH 3.000 110,000.00 330,000.00
Kepala Tukang L.03 OH 0.300 100,000.00 30,000.00
Mandor L.04 OH 0.050 105,000.00 5,250.00
JUMLAH TENAGA KERJA 450,250.00
B BAHAN
Kayu bengkirai (papan) M.17.b m3 0.064 12,700,000.00 812,800.00
Lem Kayu M.572 Kg 0.500 15,000.00 7,500.00
JUMLAH HARGA BAHAN 820,300.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,270,550.00
E Overhead & Profit 10% 0.100 127,055.00
F Harga Satuan Pekerjaan (D+E) 1,397,605.00

A.4.6.1.8. Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup (Bengkirai)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.700 85,000.00 59,500.00
Tukang kayu L.02 OH 2.100 110,000.00 231,000.00
Kepala Tukang L.03 OH 0.210 100,000.00 21,000.00
Mandor L.04 OH 0.035 105,000.00 3,675.00
JUMLAH TENAGA KERJA 315,175.00
B BAHAN
Kayu bengkirai (papan) M.17.b m3 0.025 12,700,000.00 317,500.00
Paku 2,5 cm M.56.b kg 0.030 18,500.00 555.00
Lem Kayu M.572 kg 0.500 15,000.00 7,500.00
Plywood 4 mm (120x240) M.32.a Lembar 1.000 58,000.00 58,000.00
JUMLAH HARGA BAHAN 383,555.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 698,730.00
E Overhead & Profit 10% 0.100 69,873.00
F Harga Satuan Pekerjaan (D+E) 768,603.00
A.4.6.1.9. Pembuatan 1 m2 pintu plywood rangkap, rangka expose kayu kelas II (Bengkirai)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.800 85,000.00 68,000.00
Tukang kayu L.02 OH 2.400 110,000.00 264,000.00
Kepala Tukang L.03 OH 0.240 100,000.00 24,000.00
Mandor L.04 OH 0.040 105,000.00 4,200.00
JUMLAH TENAGA KERJA 360,200.00
B BAHAN
Kayu bengkirai (papan) M.17.b m3 0.026 12,700,000.00 325,120.00
Paku 2,5 cm M.56.b kg 0.030 18,500.00 555.00
Lem Kayu M.572 kg 0.500 15,000.00 7,500.00
Plywood 4 mm (120x240) M.32.a Lembar 1.000 58,000.00 58,000.00
JUMLAH HARGA BAHAN 391,175.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 751,375.00
E Overhead & Profit 10% 0.100 75,137.50
F Harga Satuan Pekerjaan (D+E) 826,512.00

A.4.6.1.10. Pemasangan 1 m2 jalusi kusen, kayu kelas II (Bengkirai)


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.670 85,000.00 56,950.00
Tukang kayu L.02 OH 2.000 110,000.00 220,000.00
Kepala Tukang L.03 OH 0.200 100,000.00 20,000.00
Mandor L.04 OH 0.335 105,000.00 35,175.00
JUMLAH TENAGA KERJA 332,125.00
B BAHAN
Kayu bengkirai (papan) M.17.b m3 0.060 12,700,000.00 762,000.00
Paku 2,5 cm M.56.b kg 0.150 18,500.00 2,775.00
JUMLAH HARGA BAHAN 764,775.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,096,900.00
E Overhead & Profit 10% 0.100 109,690.00
F Harga Satuan Pekerjaan (D+E) 1,206,590.00

A.4.6.1.11. Pemasangan 1 m2 teakwood rangkap, rangka expose kayu kelas I (Jati)


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.800 85,000.00 68,000.00
Tukang kayu L.02 OH 2.400 110,000.00 264,000.00
Kepala Tukang L.03 OH 0.240 100,000.00 24,000.00
Mandor L.04 OH 0.040 105,000.00 4,200.00
JUMLAH TENAGA KERJA 360,200.00
B BAHAN
Kayu jati (papan) M.15.b m3 0.025 27,500,000.00 687,500.00
Paku 2,5 cm M.56.b kg 0.030 18,500.00 555.00
Lem Kayu M.572 kg 0.300 15,000.00 4,500.00
Teakwood 4 mm (90x220) M.31.a Lembar 1.000 105,500.00 105,500.00
JUMLAH HARGA BAHAN 798,055.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,158,255.00
E Overhead & Profit 10% 0.100 115,825.50
F Harga Satuan Pekerjaan (D+E) 1,274,080.00
A.4.6.1.12. Pemasangan 1 m2 teakwood rangkap lapis formika, rangka expose kayu kelas III (Kruing)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.850 85,000.00 72,250.00
Tukang kayu L.02 OH 2.550 110,000.00 280,500.00
Kepala Tukang L.03 OH 0.255 100,000.00 25,500.00
Mandor L.04 OH 0.043 105,000.00 4,515.00
JUMLAH TENAGA KERJA 382,765.00
B BAHAN
Kayu kruing (papan) M.18.b m3 0.025 7,950,000.00 198,750.00
Paku 2,5 cm M.56.b kg 0.030 18,500.00 555.00
Lem Kayu M.572 kg 0.800 15,000.00 12,000.00
Teakwood 4 mm (90x220) M.31.a Lembar 1.000 105,500.00 105,500.00
Formika M.557 Lembar 0.500 52,000.00 26,000.00
JUMLAH HARGA BAHAN 342,805.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 725,570.00
E Overhead & Profit 10% 0.100 72,557.00
F Harga Satuan Pekerjaan (D+E) 798,127.00

A.4.6.1.13. Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas II bentang 6 meter


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 4.000 85,000.00 340,000.00
Tukang kayu L.02 OH 12.000 110,000.00 1,320,000.00
Kepala Tukang L.03 OH 1.200 100,000.00 120,000.00
Mandor L.04 OH 0.200 105,000.00 21,000.00
JUMLAH TENAGA KERJA 1,801,000.00
B BAHAN
Kayu bengkirai (balok) M.17.a m3 1.100 11,000,000.00 12,100,000.00
Besi strip M.46.g kg 15.000 15,500.00 232,500.00
Paku 12 cm M.56.g kg 5.600 18,000.00 100,800.00
JUMLAH HARGA BAHAN 12,433,300.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 14,234,300.00
E Overhead & Profit 10% 0.100 1,423,430.00
F Harga Satuan Pekerjaan (D+E) 15,657,730.00

A.4.6.1.14. Pemasangan 1 m3 konstruksi kuda-kuda expose, kayu kelas I (Jati)


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 6.700 85,000.00 569,500.00
Tukang kayu L.02 OH 20.100 110,000.00 2,211,000.00
Kepala Tukang L.03 OH 2.010 100,000.00 201,000.00
Mandor L.04 OH 0.335 105,000.00 35,175.00
JUMLAH TENAGA KERJA 3,016,675.00
B BAHAN
Kayu jati (balok) M.15.a m3 1.200 24,000,000.00 28,800,000.00
Besi strip M.46.g kg 15.000 15,500.00 232,500.00
Paku 12 cm M.56.g kg 5.600 18,000.00 100,800.00
JUMLAH HARGA BAHAN 29,133,300.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 32,149,975.00
E Overhead & Profit 10% 0.100 3,214,997.50
F Harga Satuan Pekerjaan (D+E) 35,364,972.00
A.4.6.1.15. Pemasangan 1 m3 konstruksi gording, kayu kelas II (Bengkirai)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 6.700 85,000.00 569,500.00
Tukang kayu L.02 OH 20.100 110,000.00 2,211,000.00
Kepala Tukang L.03 OH 2.010 100,000.00 201,000.00
Mandor L.04 OH 0.335 105,000.00 35,175.00
JUMLAH TENAGA KERJA 3,016,675.00
B BAHAN
Kayu bengkirai (balok) M.17.a m3 1.100 11,000,000.00 12,100,000.00
Besi strip M.46.g kg 15.000 15,500.00 232,500.00
Paku 12 cm M.56.g kg 3.000 18,000.00 54,000.00
JUMLAH HARGA BAHAN 12,386,500.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 15,403,175.00
E Overhead & Profit 10% 0.100 1,540,317.50
F Harga Satuan Pekerjaan (D+E) 16,943,492.00

A.4.6.1.18. Pemasangan 1 m2 rangka atap sirap, kayu kelas II (Bengkirai)


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.120 85,000.00 10,200.00
Tukang kayu L.02 OH 0.120 110,000.00 13,200.00
Kepala Tukang L.03 OH 0.012 100,000.00 1,200.00
Mandor L.04 OH 0.006 105,000.00 630.00
JUMLAH TENAGA KERJA 25,230.00
B BAHAN
Kayu bengkirai (balok) M.17.a m3 0.014 11,000,000.00 154,000.00
Paku 7 cm M.56.e kg 0.057 18,000.00 1,026.00
JUMLAH HARGA BAHAN 155,026.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 180,256.00
E Overhead & Profit 10% 0.100 18,025.60
F Harga Satuan Pekerjaan (D+E) 198,281.00

A.4.6.1.19. Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas III (Kruing)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.150 85,000.00 12,750.00
Tukang kayu L.02 OH 0.300 110,000.00 33,000.00
Kepala Tukang L.03 OH 0.030 100,000.00 3,000.00
Mandor L.04 OH 0.075 105,000.00 7,875.00
JUMLAH TENAGA KERJA 56,625.00
B BAHAN
Kayu kruing (balok) M.18.a m3 0.015 7,800,000.00 120,120.00
Paku 7 cm M.56.e kg 0.200 18,000.00 3,600.00
JUMLAH HARGA BAHAN 123,720.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 180,345.00
E Overhead & Profit 10% 0.100 18,034.50
F Harga Satuan Pekerjaan (D+E) 198,379.00
A.4.6.1.20. Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas III (Kruing)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.200 85,000.00 17,000.00
Tukang kayu L.02 OH 0.300 110,000.00 33,000.00
Kepala Tukang L.03 OH 0.030 100,000.00 3,000.00
Mandor L.04 OH 0.010 105,000.00 1,050.00
JUMLAH TENAGA KERJA 54,050.00
B BAHAN
Kayu kruing (balok) M.18.a m3 0.016 7,800,000.00 127,140.00
Paku 7 cm M.56.e kg 0.250 18,000.00 4,500.00
JUMLAH HARGA BAHAN 131,640.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 185,690.00
E Overhead & Profit 10% 0.100 18,569.00
F Harga Satuan Pekerjaan (D+E) 204,259.00

A.4.6.1.21. Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kelas II (Bengkirai)


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.100 85,000.00 8,500.00
Tukang kayu L.02 OH 0.200 110,000.00 22,000.00
Kepala Tukang L.03 OH 0.020 100,000.00 2,000.00
Mandor L.04 OH 0.005 105,000.00 525.00
JUMLAH TENAGA KERJA 33,025.00
B BAHAN
Kayu bengkirai (papan) M.17.b m3 0.011 12,700,000.00 137,160.00
Paku 7 cm M.56.e kg 0.100 18,000.00 1,800.00
JUMLAH HARGA BAHAN 138,960.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 171,985.00
E Overhead & Profit 10% 0.100 17,198.50
F Harga Satuan Pekerjaan (D+E) 189,183.00

A.4.6.1.22. Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas II (Bengkirai)


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.100 85,000.00 8,500.00
Tukang kayu L.02 OH 0.200 110,000.00 22,000.00
Kepala Tukang L.03 OH 0.020 100,000.00 2,000.00
Mandor L.04 OH 0.005 105,000.00 525.00
JUMLAH TENAGA KERJA 33,025.00
B BAHAN
Kayu bengkirai (papan) M.17.b m3 0.011 12,700,000.00 139,700.00
Paku 7 cm M.56.e kg 0.100 18,000.00 1,800.00
JUMLAH HARGA BAHAN 141,500.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 174,525.00
E Overhead & Profit 10% 0.100 17,452.50
F Harga Satuan Pekerjaan (D+E) 191,977.00
A.4.6.1.23. Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu kelas III (Kruing)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.150 85,000.00 12,750.00
Tukang kayu L.02 OH 0.450 110,000.00 49,500.00
Kepala Tukang L.03 OH 0.045 100,000.00 4,500.00
Mandor L.04 OH 0.008 105,000.00 840.00
JUMLAH TENAGA KERJA 67,590.00
B BAHAN
Kayu kruing (balok) M.18.a m3 0.028 7,800,000.00 218,400.00
Paku 7 cm M.56.e kg 0.150 18,000.00 2,700.00
JUMLAH HARGA BAHAN 221,100.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 288,690.00
E Overhead & Profit 10% 0.100 28,869.00
F Harga Satuan Pekerjaan (D+E) 317,559.00

A.4.6.1.24. Pemasangan 1 m2 dinding pemisah teakwood rangkap, rangka kayu kelas III (Kruing)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.150 85,000.00 12,750.00
Tukang kayu L.02 OH 0.450 110,000.00 49,500.00
Kepala Tukang L.03 OH 0.045 100,000.00 4,500.00
Mandor L.04 OH 0.008 105,000.00 840.00
JUMLAH TENAGA KERJA 67,590.00
B BAHAN
Kayu kruing (balok) M.18.a m3 0.028 7,800,000.00 218,400.00
Paku 7 cm M.56.e kg 0.150 18,000.00 2,700.00
Teakwood 4 mm (120x240) M.31.b Lembar 0.860 113,500.00 97,610.00
Lem Kayu M.572 kg 0.560 15,000.00 8,400.00
JUMLAH HARGA BAHAN 327,110.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 394,700.00
E Overhead & Profit 10% 0.100 39,470.00
F Harga Satuan Pekerjaan (D+E) 434,170.00

A.4.6.1.25. Pemasangan 1 m2 dinding pemisah plywood rangkap, rangka kayu kelas III (kruing)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.200 85,000.00 17,000.00
Tukang kayu L.02 OH 0.600 110,000.00 66,000.00
Kepala Tukang L.03 OH 0.060 100,000.00 6,000.00
Mandor L.04 OH 0.010 105,000.00 1,050.00
JUMLAH TENAGA KERJA 90,050.00
B BAHAN
Kayu kruing (balok) M.18.a m3 0.028 7,800,000.00 218,400.00
Paku 7 cm M.56.e kg 0.150 18,000.00 2,700.00
Plywood 4 mm (120x240) M.32.a Lembar 0.860 58,000.00 49,880.00
Lem Kayu M.572 kg 0.560 15,000.00 8,400.00
JUMLAH HARGA BAHAN 279,380.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 369,430.00
E Overhead & Profit 10% 0.100 36,943.00
F Harga Satuan Pekerjaan (D+E) 406,373.00
A.4.6.1.26. Pemasangan 1 m2 dinding lambrisering dari Kayu Papan kayu kelas II (Bengkirai)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.600 85,000.00 51,000.00
Tukang kayu L.02 OH 1.800 110,000.00 198,000.00
Kepala Tukang L.03 OH 0.180 100,000.00 18,000.00
Mandor L.04 OH 0.030 105,000.00 3,150.00
JUMLAH TENAGA KERJA 270,150.00
B BAHAN
Kayu bengkirai (papan) M.17.b m3 0.007 12,700,000.00 88,900.00
Paku 7 cm M.56.e kg 0.100 18,000.00 1,800.00
Paku sekrup M.56.j kg 0.150 30,000.00 4,500.00
JUMLAH HARGA BAHAN 95,200.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 365,350.00
E Overhead & Profit 10% 0.100 36,535.00
F Harga Satuan Pekerjaan (D+E) 401,885.00

A.4.6.1.27. Pemasangan 1 m2 dinding lambrisering dari plywood ukuran (120 x 240) cm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.025 85,000.00 2,125.00
Tukang kayu L.02 OH 0.075 110,000.00 8,250.00
Kepala Tukang L.03 OH 0.008 100,000.00 800.00
Mandor L.04 OH 0.001 105,000.00 105.00
JUMLAH TENAGA KERJA 11,280.00
B BAHAN
Plywood 4 mm (120x240) M.32.a Lembar 0.400 58,000.00 23,200.00
Paku 2,5 cm M.56.b kg 0.050 18,500.00 925.00
JUMLAH HARGA BAHAN 24,125.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 35,405.00
E Overhead & Profit 10% 0.100 3,540.50
F Harga Satuan Pekerjaan (D+E) 38,945.00

A.4.6.1.28. Pemasangan 1 m2 dinding bilik bambu, rangka kayu kelas III (Kruing)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.100 85,000.00 8,500.00
Tukang kayu L.02 OH 0.050 110,000.00 5,500.00
Kepala Tukang L.03 OH 0.005 100,000.00 500.00
Mandor L.04 OH 0.005 105,000.00 525.00
JUMLAH TENAGA KERJA 15,025.00
B BAHAN
Sesek bambu (2x1,5m) M.555.a m2 1.500 8,000.00 12,000.00
Kayu kruing (balok) M.18.a m3 0.014 7,800,000.00 109,200.00
Paku 2,5 cm M.56.b kg 0.012 18,500.00 222.00
List kayu 2/4 M.30.a m' 0.003 3,700.00 11.10
JUMLAH HARGA BAHAN 121,433.10
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 136,458.10
E Overhead & Profit 10% 0.100 13,645.81
F Harga Satuan Pekerjaan (D+E) 150,103.00
A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA
A.4.6.2.1. Pemasangan 1 buah kunci tanam antik
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.060 85,000.00 5,100.00
Tukang kayu L.02 OH 0.600 110,000.00 66,000.00
Kepala Tukang L.03 OH 0.060 100,000.00 6,000.00
Mandor L.04 OH 0.003 105,000.00 315.00
JUMLAH TENAGA KERJA 77,415.00
B BAHAN
Kunci tanam antik M.312.a buah 1.000 150,000.00 150,000.00
JUMLAH HARGA BAHAN 150,000.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 227,415.00
E Overhead & Profit 10% 0.100 22,741.50
F Harga Satuan Pekerjaan (D+E) 250,156.00

A.4.6.2.2. Pemasangan 1 buah kunci tanam biasa


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.010 85,000.00 850.00
Tukang kayu L.02 OH 0.500 110,000.00 55,000.00
Kepala Tukang L.03 OH 0.050 100,000.00 5,000.00
Mandor L.04 OH 0.005 105,000.00 525.00
JUMLAH TENAGA KERJA 61,375.00
B BAHAN
Kunci tanam biasa M.312.b buah 1.000 35,000.00 35,000.00
JUMLAH HARGA BAHAN 35,000.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 96,375.00
E Overhead & Profit 10% 0.100 9,637.50
F Harga Satuan Pekerjaan (D+E) 106,012.00

A.4.6.2.3. Pemasangan 1 buah kunci kamar mandi


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.005 85,000.00 425.00
Tukang kayu L.02 OH 0.500 110,000.00 55,000.00
Kepala Tukang L.03 OH 0.050 100,000.00 5,000.00
Mandor L.04 OH 0.003 105,000.00 315.00
JUMLAH TENAGA KERJA 60,740.00
B BAHAN
Kunci tanam kamar mandi M.312.c buah 1.000 105,000.00 105,000.00
JUMLAH HARGA BAHAN 105,000.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 165,740.00
E Overhead & Profit 10% 0.100 16,574.00
F Harga Satuan Pekerjaan (D+E) 182,314.00

A.4.6.2.4. Pemasangan 1 buah kunci silinder


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.005 85,000.00 425.00
Tukang kayu L.02 OH 0.500 110,000.00 55,000.00
Kepala Tukang L.03 OH 0.050 100,000.00 5,000.00
Mandor L.04 OH 0.003 105,000.00 315.00
JUMLAH TENAGA KERJA 60,740.00
B BAHAN
Kunci silinder M.311 buah 1.000 80,000.00 80,000.00
JUMLAH HARGA BAHAN 80,000.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 140,740.00
E Overhead & Profit 10% 0.100 14,074.00
F Harga Satuan Pekerjaan (D+E) 154,814.00

A.4.6.2.5. Pemasangan 1 buah engsel pintu


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.015 85,000.00 1,275.00
Tukang kayu L.02 OH 0.150 110,000.00 16,500.00
Kepala Tukang L.03 OH 0.015 100,000.00 1,500.00
Mandor L.04 OH 0.001 105,000.00 84.00
JUMLAH TENAGA KERJA 19,359.00
B BAHAN
Engsel pintu (kw 1) M.305.b buah 1.000 43,500.00 43,500.00
JUMLAH HARGA BAHAN 43,500.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 62,859.00
E Overhead & Profit 10% 0.100 6,285.90
F Harga Satuan Pekerjaan (D+E) 69,144.00

A.4.6.2.6. Pemasangan 1 buah engsel jendela kupu-kupu


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.010 85,000.00 850.00
Tukang kayu L.02 OH 0.100 110,000.00 11,000.00
Kepala Tukang L.03 OH 0.010 100,000.00 1,000.00
Mandor L.04 OH 0.001 105,000.00 52.50
JUMLAH TENAGA KERJA 12,902.50
B BAHAN
Engsel kupu-kupu M.306 buah 1.000 20,000.00 20,000.00
JUMLAH HARGA BAHAN 20,000.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 32,902.50
E Overhead & Profit 10% 0.100 3,290.25
F Harga Satuan Pekerjaan (D+E) 36,192.00

A.4.6.2.7. Pemasangan 1 buah engsel angin


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.100 85,000.00 8,500.00
Tukang kayu L.02 OH 0.200 110,000.00 22,000.00
Kepala Tukang L.03 OH 0.020 100,000.00 2,000.00
Mandor L.04 OH 0.001 105,000.00 52.50
JUMLAH TENAGA KERJA 32,552.50
B BAHAN
Engsel angin M.303 buah 1.000 42,000.00 42,000.00
JUMLAH HARGA BAHAN 42,000.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 74,552.50
E Overhead & Profit 10% 0.100 7,455.25
F Harga Satuan Pekerjaan (D+E) 82,007.00

A.4.6.2.8. Pemasangan 1 buah spring knip


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.015 85,000.00 1,275.00
Tukang kayu L.02 OH 0.150 110,000.00 16,500.00
Kepala Tukang L.03 OH 0.015 100,000.00 1,500.00
Mandor L.04 OH 0.008 105,000.00 840.00
JUMLAH TENAGA KERJA 20,115.00
B BAHAN
Spring knip M.313 buah 1.000 33,300.00 33,300.00
JUMLAH HARGA BAHAN 33,300.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 53,415.00
E Overhead & Profit 10% 0.100 5,341.50
F Harga Satuan Pekerjaan (D+E) 58,756.00
A.4.6.2.9. Pemasangan 1 buah kait angin
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.015 85,000.00 1,275.00
Tukang kayu L.02 OH 0.150 110,000.00 16,500.00
Kepala Tukang L.03 OH 0.015 100,000.00 1,500.00
Mandor L.04 OH 0.008 105,000.00 840.00
JUMLAH TENAGA KERJA 20,115.00
B BAHAN
Kait angin M.308 buah 1.000 16,000.00 16,000.00
JUMLAH HARGA BAHAN 16,000.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 36,115.00
E Overhead & Profit 10% 0.100 3,611.50
F Harga Satuan Pekerjaan (D+E) 39,726.00

A.4.6.2.10. Pemasangan 1 buah door closer


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.050 85,000.00 4,250.00
Tukang kayu L.02 OH 0.500 110,000.00 55,000.00
Kepala Tukang L.03 OH 0.050 100,000.00 5,000.00
Mandor L.04 OH 0.003 105,000.00 315.00
JUMLAH TENAGA KERJA 64,565.00
B BAHAN
Door closer M.300 set 1.000 180,000.00 180,000.00
JUMLAH HARGA BAHAN 180,000.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 244,565.00
E Overhead & Profit 10% 0.100 24,456.50
F Harga Satuan Pekerjaan (D+E) 269,021.00

A.4.6.2.11. Pemasangan 1 buah kunci slot


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.020 85,000.00 1,700.00
Tukang kayu L.02 OH 0.200 110,000.00 22,000.00
Kepala Tukang L.03 OH 0.020 100,000.00 2,000.00
Mandor L.04 OH 0.001 105,000.00 105.00
JUMLAH TENAGA KERJA 25,805.00
B BAHAN
Kunci selot M.310 buah 1.000 10,500.00 10,500.00
JUMLAH HARGA BAHAN 10,500.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 36,305.00
E Overhead & Profit 10% 0.100 3,630.50
F Harga Satuan Pekerjaan (D+E) 39,935.00

A.4.6.2.12. Pemasangan 1 buah Door holder


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.050 85,000.00 4,250.00
Tukang kayu L.02 OH 0.500 110,000.00 55,000.00
Kepala Tukang L.03 OH 0.050 100,000.00 5,000.00
Mandor L.04 OH 0.003 105,000.00 315.00
JUMLAH TENAGA KERJA 64,565.00
B BAHAN
Door holder M.301 buah 1.000 82,000.00 82,000.00
JUMLAH HARGA BAHAN 82,000.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 146,565.00
E Overhead & Profit 10% 0.100 14,656.50
F Harga Satuan Pekerjaan (D+E) 161,221.00
A.4.6.2.13. Pemasangan 1 buah door stop
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.010 85,000.00 850.00
Tukang kayu L.02 OH 0.100 110,000.00 11,000.00
Kepala Tukang L.03 OH 0.010 100,000.00 1,000.00
Mandor L.04 OH 0.005 105,000.00 525.00
JUMLAH TENAGA KERJA 13,375.00
B BAHAN
Door stop M.302 buah 1.000 48,000.00 48,000.00
JUMLAH HARGA BAHAN 48,000.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 61,375.00
E Overhead & Profit 10% 0.100 6,137.50
F Harga Satuan Pekerjaan (D+E) 67,512.00

A.4.6.2.14. Pemasangan 1 buah Rel pintu sorong


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.060 85,000.00 5,100.00
Tukang kayu L.02 OH 0.600 110,000.00 66,000.00
Kepala Tukang L.03 OH 0.060 100,000.00 6,000.00
Mandor L.04 OH 0.003 105,000.00 315.00
JUMLAH TENAGA KERJA 77,415.00
B BAHAN
Rel pintu sorong M.316 Set 1.000 250,000.00 250,000.00
JUMLAH HARGA BAHAN 250,000.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 327,415.00
E Overhead & Profit 10% 0.100 32,741.50
F Harga Satuan Pekerjaan (D+E) 360,156.00

A.4.6.2.15. Pemasangan 1 buah kunci lemari


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.025 85,000.00 2,125.00
Tukang kayu L.02 OH 0.250 110,000.00 27,500.00
Kepala Tukang L.03 OH 0.025 100,000.00 2,500.00
Mandor L.04 OH 0.001 105,000.00 136.50
JUMLAH TENAGA KERJA 32,261.50
B BAHAN
Kunci lemari M.309 Set 1.000 16,000.00 16,000.00
JUMLAH HARGA BAHAN 16,000.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 48,261.50
E Overhead & Profit 10% 0.100 4,826.15
F Harga Satuan Pekerjaan (D+E) 53,087.00

A.4.6.2.16. Pemasangan 1 m2 kaca tebal 3 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.015 85,000.00 1,275.00
Tukang kayu L.02 OH 0.150 110,000.00 16,500.00
Kepala Tukang L.03 OH 0.015 100,000.00 1,500.00
Mandor L.04 OH 0.001 105,000.00 84.00
JUMLAH TENAGA KERJA 19,359.00
B BAHAN
Kaca polos 3 mm M.352.a m2 1.100 75,000.00 82,500.00
Sealant kaca (besar) M.562.c Kg 0.050 45,000.00 2,250.00
JUMLAH HARGA BAHAN 84,750.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 104,109.00
E Overhead & Profit 10% 0.100 10,410.90
F Harga Satuan Pekerjaan (D+E) 114,519.00

A.4.6.2.17. Pemasangan 1 m2 kaca tebal 5 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.015 85,000.00 1,275.00
Tukang kayu L.02 OH 0.150 110,000.00 16,500.00
Kepala Tukang L.03 OH 0.015 100,000.00 1,500.00
Mandor L.04 OH 0.001 105,000.00 84.00
JUMLAH TENAGA KERJA 19,359.00
B BAHAN
Kaca polos 5 mm M.352.b m2 1.100 105,000.00 115,500.00
Sealant kaca (besar) M.562.c Kg 0.050 45,000.00 2,250.00
JUMLAH HARGA BAHAN 117,750.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 137,109.00
E Overhead & Profit 10% 0.100 13,710.90
F Harga Satuan Pekerjaan (D+E) 150,819.00

A.4.6.2.18. Pemasangan 1 m2 kaca tebal 8 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.017 85,000.00 1,445.00
Tukang kayu L.02 OH 0.170 110,000.00 18,700.00
Kepala Tukang L.03 OH 0.017 100,000.00 1,700.00
Mandor L.04 OH 0.001 105,000.00 94.50
JUMLAH TENAGA KERJA 21,939.50
B BAHAN
Kaca polos 8 mm M.352.c m2 1.100 202,500.00 222,750.00
Sealant kaca (besar) M.562.c Kg 0.070 45,000.00 3,150.00
JUMLAH HARGA BAHAN 225,900.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 247,839.50
E Overhead & Profit 10% 0.100 24,783.95
F Harga Satuan Pekerjaan (D+E) 272,623.00

A.4.6.2.19. Pemasangan 1 m2 kaca buram tebal 12 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.025 85,000.00 2,125.00
Tukang kayu L.02 OH 0.250 110,000.00 27,500.00
Kepala Tukang L.03 OH 0.025 100,000.00 2,500.00
Mandor L.04 OH 0.001 105,000.00 136.50
JUMLAH TENAGA KERJA 32,261.50
B BAHAN
Kaca buram 12 mm M.354.b m2 1.100 300,000.00 330,000.00
Sealant kaca (besar) M.562.c Kg 0.070 45,000.00 3,150.00
JUMLAH HARGA BAHAN 333,150.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 365,411.50
E Overhead & Profit 10% 0.100 36,541.15
F Harga Satuan Pekerjaan (D+E) 401,952.00
A.4.6.2.20. Pemasangan 1 m2 kaca cermin tebal 5 mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.015 85,000.00 1,275.00
Tukang kayu L.02 OH 0.150 110,000.00 16,500.00
Kepala Tukang L.03 OH 0.015 100,000.00 1,500.00
Mandor L.04 OH 0.008 105,000.00 840.00
JUMLAH TENAGA KERJA 20,115.00
B BAHAN
Kaca cermin 5 mm M.355.a m2 1.100 197,500.00 217,250.00
JUMLAH HARGA BAHAN 217,250.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 237,365.00
E Overhead & Profit 10% 0.100 23,736.50
F Harga Satuan Pekerjaan (D+E) 261,101.00

A.4.6.2.21. Pemasangan 1 m2 kaca cermin tebal 8 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.017 85,000.00 1,445.00
Tukang kayu L.02 OH 0.170 110,000.00 18,700.00
Kepala Tukang L.03 OH 0.017 100,000.00 1,700.00
Mandor L.04 OH 0.009 105,000.00 945.00
JUMLAH TENAGA KERJA 22,790.00
B BAHAN
Kaca cermin 8 mm M.355.c m2 1.100 255,000.00 280,500.00
JUMLAH HARGA BAHAN 280,500.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 303,290.00
E Overhead & Profit 10% 0.100 30,329.00
F Harga Satuan Pekerjaan (D+E) 333,619.00

A.4.6.2.23. Pemasangan 1 m2 kaca patri tebal 5 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.075 85,000.00 6,375.00
Tukang kayu L.02 OH 0.150 110,000.00 16,500.00
Kepala Tukang L.03 OH 0.015 100,000.00 1,500.00
Mandor L.04 OH 0.004 105,000.00 420.00
JUMLAH TENAGA KERJA 24,795.00
B BAHAN
Kaca patri 5 mm M.356 m2 1.100 210,000.00 231,000.00
Sealant kaca (besar) M.562.c Kg 0.050 45,000.00 2,250.00
JUMLAH HARGA BAHAN 233,250.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 258,045.00
E Overhead & Profit 10% 0.100 25,804.50
F Harga Satuan Pekerjaan (D+E) 283,849.00

A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN


A.4.7.1.1. 1 m2 Pengikisan/pengerokan permukaan cat lama
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.150 85,000.00 12,750.00
Mandor L.04 OH 0.003 105,000.00 315.00
JUMLAH TENAGA KERJA 13,065.00
B BAHAN
Soda api M.561 Kg 0.050 3,400.00 170.00
JUMLAH HARGA BAHAN 170.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 13,235.00
E Overhead & Profit 10% 0.100 1,323.50
F Harga Satuan Pekerjaan (D+E) 14,558.00
A.4.7.1.2. 1 m2 Pencucian bidang permukaan tembok yang pernah dicat
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.150 85,000.00 12,750.00
Mandor L.04 OH 0.003 105,000.00 315.00
JUMLAH TENAGA KERJA 13,065.00
B BAHAN
Sabun M.558 Kg 0.050 12,000.00 600.00
JUMLAH HARGA BAHAN 600.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 13,665.00
E Overhead & Profit 10% 0.100 1,366.50
F Harga Satuan Pekerjaan (D+E) 15,031.00

A.4.7.1.3. 1 m2 Pengerokan karat pada permukaan baja cara manual


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.150 85,000.00 12,750.00
Mandor L.04 OH 0.008 105,000.00 840.00
JUMLAH TENAGA KERJA 13,590.00
B BAHAN
Sabun M.558 Kg 0.050 12,000.00 600.00
JUMLAH HARGA BAHAN 600.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 14,190.00
E Overhead & Profit 10% 0.100 1,419.00
F Harga Satuan Pekerjaan (D+E) 15,609.00

A.4.7.1.4. 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.070 85,000.00 5,950.00
Tukang cat L.02 OH 0.009 95,000.00 855.00
Kepala Tukang L.03 OH 0.006 100,000.00 600.00
Mandor L.04 OH 0.003 105,000.00 315.00
JUMLAH TENAGA KERJA 7,720.00
B BAHAN
Meni kayu M.268.a Kg 0.200 40,000.00 8,000.00
Plamir kayu M.273.a Kg 0.150 41,800.00 6,270.00
Cat dasar (cat kayu) M.260.a Kg 0.170 31,000.00 5,270.00
Cat penutup (cat kayu) M.260.b Kg 0.260 55,000.00 14,300.00
Kuas 1" M.272.d buah 0.010 3,800.00 38.00
Pengencer cat kayu/besi M.276.a Kg 0.030 10,000.00 300.00
Ampelas M.271 Lembar 0.200 2,500.00 500.00
JUMLAH HARGA BAHAN 34,678.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 42,398.00
E Overhead & Profit 10% 0.100 4,239.80
F Harga Satuan Pekerjaan (D+E) 46,637.00
A.4.7.1.5. Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat Penutup)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.070 85,000.00 5,950.00
Tukang cat L.02 OH 0.105 95,000.00 9,975.00
Kepala Tukang L.03 OH 0.004 100,000.00 400.00
Mandor L.04 OH 0.003 105,000.00 315.00
JUMLAH TENAGA KERJA 16,640.00
B BAHAN
Meni kayu M.268.a Kg 0.200 40,000.00 8,000.00
Plamir kayu M.273.a Kg 0.150 41,800.00 6,270.00
Cat dasar (cat kayu) M.260.a Kg 0.170 31,000.00 5,270.00
Cat penutup (cat kayu) M.260.b Kg 0.350 55,000.00 19,250.00
Kuas 2" M.272.c buah 0.010 7,000.00 70.00
Pengencer cat kayu/besi M.276.a Kg 0.030 10,000.00 300.00
Ampelas M.271 Lembar 0.200 2,500.00 500.00
JUMLAH HARGA BAHAN 39,660.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 56,300.00
E Overhead & Profit 10% 0.100 5,630.00
F Harga Satuan Pekerjaan (D+E) 61,930.00

A.4.7.1.6. Pelaburan 1 m2 bidang kayu dengan teak oil


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.040 85,000.00 3,400.00
Tukang cat L.02 OH 0.063 95,000.00 5,985.00
Kepala Tukang L.03 OH 0.063 100,000.00 6,300.00
Mandor L.04 OH 0.003 105,000.00 315.00
JUMLAH TENAGA KERJA 16,000.00
B BAHAN
Teak oil M.392 Liter 0.360 28,900.00 10,404.00
JUMLAH HARGA BAHAN 10,404.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 26,404.00
E Overhead & Profit 10% 0.100 2,640.40
F Harga Satuan Pekerjaan (D+E) 29,044.00

A.4.7.1.7. Pelaburan 1 m2 bidang kayu dengan politur


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.040 85,000.00 3,400.00
Tukang cat L.02 OH 0.060 95,000.00 5,700.00
Kepala Tukang L.03 OH 0.016 100,000.00 1,600.00
Mandor L.04 OH 0.003 105,000.00 315.00
JUMLAH TENAGA KERJA 11,015.00
B BAHAN
Politur M.274.a Liter 0.150 70,000.00 10,500.00
Politur jadi M.274.b Liter 0.372 71,000.00 26,412.00
Ampelas M.271 Lembar 2.000 2,500.00 5,000.00
JUMLAH HARGA BAHAN 41,912.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 52,927.00
E Overhead & Profit 10% 0.100 5,292.70
F Harga Satuan Pekerjaan (D+E) 58,219.00
A.4.7.1.8. Pelaburan 1 m2 bidang kayu dengan cat residu dan ter
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.100 85,000.00 8,500.00
Mandor L.04 OH 0.006 105,000.00 630.00
JUMLAH TENAGA KERJA 9,130.00
B BAHAN
Residu M.391 Liter 0.350 26,300.00 9,205.00
JUMLAH HARGA BAHAN 9,205.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 18,335.00
E Overhead & Profit 10% 0.100 1,833.50
F Harga Satuan Pekerjaan (D+E) 20,168.00

A.4.7.1.9. Pelaburan 1 m2 bidang kayu dengan vernis


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.160 85,000.00 13,600.00
Tukang cat L.02 OH 0.160 95,000.00 15,200.00
Kepala Tukang L.03 OH 0.016 100,000.00 1,600.00
Mandor L.04 OH 0.003 105,000.00 315.00
JUMLAH TENAGA KERJA 30,715.00
B BAHAN
Vernis M.275 Liter 0.150 50,000.00 7,500.00
Dempul M.269.a Kg 0.050 39,000.00 1,950.00
Ampelas M.271 Lembar 0.100 2,500.00 250.00
JUMLAH HARGA BAHAN 9,700.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 40,415.00
E Overhead & Profit 10% 0.100 4,041.50
F Harga Satuan Pekerjaan (D+E) 44,456.00

A.4.7.1.10. Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) Interior setara mowilex
(Decorcryl, Dulux Pentalite, Nippon)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.020 85,000.00 1,700.00
Tukang cat L.02 OH 0.063 95,000.00 5,985.00
Kepala Tukang L.03 OH 0.006 100,000.00 630.00
Mandor L.04 OH 0.003 105,000.00 315.00
JUMLAH TENAGA KERJA 8,630.00
B BAHAN
Plamir tembok M.273.b Kg 0.100 60,000.00 6,000.00
Cat dasar (cat tembok interior) setara mowilex M.263.a Kg 0.100 40,000.00 4,000.00
Cat penutup (cat tembok interior) setara mowilex M.263.b Kg 0.260 41,000.00 10,660.00
JUMLAH HARGA BAHAN 20,660.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 29,290.00
E Overhead & Profit 10% 0.100 2,929.00
F Harga Satuan Pekerjaan (D+E) 32,219.00
A.4.7.1.11. Pengecatan 1 m2 tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup) Interior setara mowilex
(Decorcryl, Dulux Pentalite, Nippon)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.028 85,000.00 2,380.00
Tukang cat L.02 OH 0.042 95,000.00 3,990.00
Kepala Tukang L.03 OH 0.004 100,000.00 420.00
Mandor L.04 OH 0.003 105,000.00 315.00
JUMLAH TENAGA KERJA 7,105.00
B BAHAN
Cat dasar (cat tembok interior) setara mowilex M.263.a Kg 0.120 40,000.00 4,800.00
Cat penutup (cat tembok interior) setara mowilex M.263.b Kg 0.180 41,000.00 7,380.00
JUMLAH HARGA BAHAN 12,180.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 19,285.00
E Overhead & Profit 10% 0.100 1,928.50
F Harga Satuan Pekerjaan (D+E) 21,213.00

A.4.7.1.12. Pelaburan 1 m2 tembok dengan kalkarium


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.028 85,000.00 2,380.00
Tukang cat L.02 OH 0.042 95,000.00 3,990.00
Kepala Tukang L.03 OH 0.004 100,000.00 420.00
Mandor L.04 OH 0.003 105,000.00 315.00
JUMLAH TENAGA KERJA 7,105.00
B BAHAN
Kalkarium M.280 Kg 0.100 8,000.00 800.00
JUMLAH HARGA BAHAN 800.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 7,905.00
E Overhead & Profit 10% 0.100 790.50
F Harga Satuan Pekerjaan (D+E) 8,695.00

A.4.7.1.13. Pelaburan 1 m2 tembok dengan kapur sirih


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.150 85,000.00 12,750.00
Tukang cat L.02 OH 0.001 95,000.00 95.00
Kepala Tukang L.03 OH 0.000 100,000.00 10.00
Mandor L.04 OH 0.003 105,000.00 262.50
JUMLAH TENAGA KERJA 13,117.50
B BAHAN
Kapur sirih M.281 Kg 0.150 10,000.00 1,500.00
Ampelas M.271 Lembar 0.100 2,500.00 250.00
Alang-alang Ikat 0.250 10,000.00 2,500.00
JUMLAH HARGA BAHAN 4,250.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 17,367.50
E Overhead & Profit 10% 0.100 1,736.75
F Harga Satuan Pekerjaan (D+E) 19,104.00
A.4.7.1.14. Pelaburan 1 m2 tembok lama dengan kapur sirih (pemeliharaan)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.040 85,000.00 3,400.00
Tukang cat L.02 OH 0.005 95,000.00 475.00
Kepala Tukang L.03 OH 0.001 100,000.00 50.00
Mandor L.04 OH 0.003 105,000.00 262.50
JUMLAH TENAGA KERJA 4,187.50
B BAHAN
Kapur sirih M.281 Kg 0.300 10,000.00 3,000.00
Ampelas M.271 Lembar 0.200 2,500.00 500.00
Alang-alang Ikat 0.250 10,000.00 2,500.00
JUMLAH HARGA BAHAN 6,000.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 10,187.50
E Overhead & Profit 10% 0.100 1,018.75
F Harga Satuan Pekerjaan (D+E) 11,206.00

A.4.7.1.15. Pemasangan 1 m2 wallpaper minimalis (motif sederhana)


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.020 85,000.00 1,700.00
Tukang cat L.02 OH 0.200 95,000.00 19,000.00
Kepala Tukang L.03 OH 0.020 100,000.00 2,000.00
Mandor L.04 OH 0.003 105,000.00 262.50
JUMLAH TENAGA KERJA 22,962.50
B BAHAN
Wallpaper M.581 m2 1.200 45,000.00 54,000.00
Perekat untuk wallpaper M.576 Kg 0.200 35,000.00 7,000.00
JUMLAH HARGA BAHAN 61,000.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 83,962.50
E Overhead & Profit 10% 0.100 8,396.25
F Harga Satuan Pekerjaan (D+E) 92,358.00

A.4.7.1.16. Pengecatan 1 m2 permukaan besi / baja dengan menie besi


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.020 85,000.00 1,700.00
Tukang cat L.02 OH 0.200 95,000.00 19,000.00
Kepala Tukang L.03 OH 0.020 100,000.00 2,000.00
Mandor L.04 OH 0.003 105,000.00 262.50
JUMLAH TENAGA KERJA 22,962.50
B BAHAN
Meni besi M.268.b Kg 0.100 40,000.00 4,000.00
Kuas 1" M.272.d buah 0.010 3,800.00 38.00
JUMLAH HARGA BAHAN 4,038.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 27,000.50
E Overhead & Profit 10% 0.100 2,700.05
F Harga Satuan Pekerjaan (D+E) 29,700.00
A.4.7.1.17. Pengecatan 1 m2 permukaan besi / baja dengan menie besi dengan perancah
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.250 85,000.00 21,250.00
Tukang cat L.02 OH 0.225 95,000.00 21,375.00
Kepala Tukang L.03 OH 0.023 100,000.00 2,250.00
Mandor L.04 OH 0.008 105,000.00 787.50
JUMLAH TENAGA KERJA 45,662.50
B BAHAN
Meni besi M.268.b Kg 0.100 40,000.00 4,000.00
Thinner M.276.c Liter 0.010 18,000.00 180.00
Kuas 1" M.272.d buah 0.010 3,800.00 38.00
Perancah kayu A.2.2.1.10. m3 0.002 347,296.00 694.59
JUMLAH HARGA BAHAN 4,912.59
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 50,575.09
E Overhead & Profit 10% 0.100 5,057.51
F Harga Satuan Pekerjaan (D+E) 55,632.00

A.4.7.1.18. Pengecatan 1 m2 permukaan besi / baja galvanis secara manual 4 lapis


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.250 85,000.00 21,250.00
Tukang cat L.02 OH 0.250 95,000.00 23,750.00
Kepala Tukang L.03 OH 0.025 100,000.00 2,500.00
Mandor L.04 OH 0.001 105,000.00 136.50
JUMLAH TENAGA KERJA 47,636.50
B BAHAN
Cat dasar (cat besi) M.261.a Kg 0.100 57,000.00 5,700.00
Cat antara (cat besi) M.261.b Kg 0.100 80,000.00 8,000.00
Cat penutup (Cat besi) M.261.c Kg 0.080 70,000.00 5,600.00
Kuas 1" M.272.d buah 0.010 3,800.00 38.00
Thinner M.276.c Liter 0.010 18,000.00 180.00
JUMLAH HARGA BAHAN 19,518.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 67,154.50
E Overhead & Profit 10% 0.100 6,715.45
F Harga Satuan Pekerjaan (D+E) 73,869.00

A.4.7.1.19. Pengecatan 1 m2 permukaan besi / baja galvanis secara manual sistem 1 lapis cat mutakhir
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.060 85,000.00 5,100.00
Tukang cat L.02 OH 0.060 95,000.00 5,700.00
Kepala Tukang L.03 OH 0.012 100,000.00 1,200.00
Mandor L.04 OH 0.003 105,000.00 315.00
JUMLAH TENAGA KERJA 12,315.00
B BAHAN
Cat penutup (Cat besi) M.261.c Kg 0.300 70,000.00 21,000.00
Kuas 1" M.272.d buah 0.010 3,800.00 38.00
Thinner M.276.c Liter 0.010 18,000.00 180.00
JUMLAH HARGA BAHAN 21,218.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 33,533.00
E Overhead & Profit 10% 0.100 3,353.30
F Harga Satuan Pekerjaan (D+E) 36,886.00
A.4.7.1.20. Pengecatan 1 m2 permukaan besi / baja galvanis secara manual sistem 3 lapis
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.400 85,000.00 34,000.00
Tukang cat L.02 OH 0.800 95,000.00 76,000.00
Kepala Tukang L.03 OH 0.080 100,000.00 8,000.00
Mandor L.04 OH 0.020 105,000.00 2,100.00
JUMLAH TENAGA KERJA 120,100.00
B BAHAN
Cat dasar (cat besi) M.261.a Kg 0.110 57,000.00 6,270.00
Cat antara (cat besi) M.261.b Kg 0.170 80,000.00 13,600.00
Cat penutup (Cat besi) M.261.c Kg 0.080 70,000.00 5,600.00
Kuas 1" M.272.d buah 0.010 3,800.00 38.00
Thinner M.276.c Liter 0.010 18,000.00 180.00
JUMLAH HARGA BAHAN 25,688.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 145,788.00
E Overhead & Profit 10% 0.100 14,578.80
F Harga Satuan Pekerjaan (D+E) 160,366.00

A.4.7.1.21. Pengecatan 1 m2 permukaan besi / baja galvanis secara semprot sistem 3 lapis cat mutakhir
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.400 85,000.00 34,000.00
Tukang cat L.02 OH 0.700 95,000.00 66,500.00
Kepala Tukang L.03 OH 0.070 100,000.00 7,000.00
Mandor L.04 OH 0.020 105,000.00 2,100.00
JUMLAH TENAGA KERJA 109,600.00
B BAHAN
Cat penutup (Cat besi) M.261.c Kg 0.300 70,000.00 21,000.00
Thinner M.276.c Liter 0.010 18,000.00 180.00
JUMLAH HARGA BAHAN 21,180.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 130,780.00
E Overhead & Profit 10% 0.100 13,078.00
F Harga Satuan Pekerjaan (D+E) 143,858.00

A.4.7.1.22. Plituran 10 m2 dengan plitur melamic


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 2.000 85,000.00 170,000.00
Tukang cat L.02 OH 12.000 95,000.00 1,140,000.00
Kepala Tukang L.03 OH 1.200 100,000.00 120,000.00
Mandor L.04 OH 0.100 105,000.00 10,500.00
JUMLAH TENAGA KERJA 1,440,500.00
B BAHAN
Wood filler M.278 kg 1.500 40,000.00 60,000.00
Woodstain -
kg 1.500 56,700.00 85,050.00
Shanding M.277 kg 1.500 79,000.00 118,500.00
Melamic M.279 kg 2.400 79,000.00 189,600.00
Thinner M.276.c Liter 2.000 18,000.00 36,000.00
Ampelas M.271 Lembar 6.000 2,500.00 15,000.00
JUMLAH HARGA BAHAN 504,150.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,944,650.00
E Overhead & Profit 10% 0.100 194,465.00
F Harga Satuan Pekerjaan (D+E) 2,139,115.00
A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG
A.5.1.1.1. (K3) Pemasangan 1 buah closet duduk/monoblock (Biasa)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 3.300 85,000.00 280,500.00
Tukang batu L.02 OH 1.100 100,000.00 110,000.00
Kepala Tukang L.03 OH 0.010 100,000.00 1,000.00
Mandor L.04 OH 0.160 105,000.00 16,800.00
JUMLAH TENAGA KERJA 408,300.00
B BAHAN
Kloset duduk/monoblok (biasa / KW) M.376.a Unit 1.000 950,000.00 950,000.00
Perlengkapan % 6.000 950,000.00 57,000.00
JUMLAH HARGA BAHAN 1,007,000.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,415,300.00
E Overhead & Profit 10% 0.100 141,530.00
F Harga Satuan Pekerjaan (D+E) 1,556,830.00

A.5.1.1 2.a Pemasangan 1 buah closet jongkok porselen (Biasa)


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.000 85,000.00 85,000.00
Tukang batu L.02 OH 1.500 100,000.00 150,000.00
Kepala Tukang L.03 OH 0.150 100,000.00 15,000.00
Mandor L.04 OH 0.160 105,000.00 16,800.00
JUMLAH TENAGA KERJA 266,800.00
B BAHAN
Kloset jongkok porselen (biasa) M.377.a Unit 1.000 112,500.00 112,500.00
Portland cement M.245.a Kg 6.000 1,300.00 7,800.00
Pasir Beton (muntilan) M.9.a m3 0.010 352,000.00 3,520.00
JUMLAH HARGA BAHAN 123,820.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 390,620.00
E Overhead & Profit 10% 0.100 39,062.00
F Harga Satuan Pekerjaan (D+E) 429,682.00

A.5.1.1 3. Pemasangan 1 buah closet jongkok teraso


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.000 85,000.00 85,000.00
Tukang batu L.02 OH 1.500 100,000.00 150,000.00
Kepala Tukang L.03 OH 0.150 100,000.00 15,000.00
Mandor L.04 OH 0.050 105,000.00 5,250.00
JUMLAH TENAGA KERJA 255,250.00
B BAHAN
Closet jongkok teraso Unit 1.000 150,000.00 150,000.00
Portland cement M.245.a Kg 6.000 1,300.00 7,800.00
Pasir Beton (muntilan) M.9.a m3 0.010 352,000.00 3,520.00
Bata merah 5 x 11 x 22 cm M.218.a buah 7.000 700.00 4,900.00
JUMLAH HARGA BAHAN 166,220.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 421,470.00
E Overhead & Profit 10% 0.100 42,147.00
F Harga Satuan Pekerjaan (D+E) 463,617.00
A.5.1.1 4. (K3) Pemasangan 1 buah urinoir
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.000 85,000.00 85,000.00
Tukang batu L.02 OH 1.000 100,000.00 100,000.00
Kepala Tukang L.03 OH 0.100 100,000.00 10,000.00
Mandor L.04 OH 0.050 105,000.00 5,250.00
JUMLAH TENAGA KERJA 200,250.00
B BAHAN
Urinoir (Besar) M.379.b Unit 1.000 1,300,000.00 1,300,000.00
Portland cement M.245.a Kg 6.000 1,300.00 7,800.00
Pasir Beton (muntilan) M.9.a m3 0.010 352,000.00 3,520.00
Perlengkapan % 30.000 1,300,000.00 390,000.00
JUMLAH HARGA BAHAN 1,701,320.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,901,570.00
E Overhead & Profit 10% 0.100 190,157.00
F Harga Satuan Pekerjaan (D+E) 2,091,727.00

A.5.1.1 5. (K3) Pemasangan 1 buah wastafel


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.200 85,000.00 102,000.00
Tukang batu L.02 OH 1.450 100,000.00 145,000.00
Kepala Tukang L.03 OH 0.150 100,000.00 15,000.00
Mandor L.04 OH 0.060 105,000.00 6,300.00
JUMLAH TENAGA KERJA 268,300.00
B BAHAN
Wastafel (persegi) M.380.a Unit 1.200 525,000.00 630,000.00
Portland cement M.245.a Kg 6.000 1,300.00 7,800.00
Pasir Beton (muntilan) M.9.a m3 0.010 352,000.00 3,520.00
Perlengkapan % 12.000 630,000.00 75,600.00
JUMLAH HARGA BAHAN 716,920.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 985,220.00
E Overhead & Profit 10% 0.100 98,522.00
F Harga Satuan Pekerjaan (D+E) 1,083,742.00

A.5.1.1 6. (K3) Pemasangan 1 buah bathcuip porselen


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.075 85,000.00 6,375.00
Tukang batu L.02 OH 0.750 100,000.00 75,000.00
Kepala Tukang L.03 OH 0.075 100,000.00 7,500.00
Mandor L.04 OH 0.003 105,000.00 315.00
JUMLAH TENAGA KERJA 89,190.00
B BAHAN
bathcup Unit 1.000 2,900,000.00 2,900,000.00
Perlengkapan % 20.000 2,900,000.00 580,000.00
JUMLAH HARGA BAHAN 3,480,000.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 3,569,190.00
E Overhead & Profit 10% 0.100 356,919.00
F Harga Satuan Pekerjaan (D+E) 3,926,109.00
A.5.1.1 9. Pemasangan 1 buah bak mandi teraso vol 0,30 m3
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 3.000 85,000.00 255,000.00
Tukang batu L.02 OH 4.500 100,000.00 450,000.00
Kepala Tukang L.03 OH 0.050 100,000.00 5,000.00
Mandor L.04 OH 0.900 105,000.00 94,500.00
JUMLAH TENAGA KERJA 804,500.00
B BAHAN
bak mandi teraso vol 0,30 m3 Unit 1.000 515,000.00 515,000.00
Perlengkapan % 12.000 515,000.00 61,800.00
JUMLAH HARGA BAHAN 576,800.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,381,300.00
E Overhead & Profit 10% 0.100 138,130.00
F Harga Satuan Pekerjaan (D+E) 1,519,430.00

A.5.1.1 11. Pemasangan 1 buah bak beton volume 1 m3


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 3.500 85,000.00 297,500.00
Tukang batu L.02 OH 4.500 100,000.00 450,000.00
Kepala Tukang L.03 OH 0.050 100,000.00 5,000.00
Mandor L.04 OH 0.018 105,000.00 1,890.00
JUMLAH TENAGA KERJA 754,390.00
B BAHAN
Beton 1:2:3 m3 0.900 1,115,990.00 1,004,391.00
Baja tulangan polos U-24 M.46.a Kg 180.000 9,600.00 1,728,000.00
Kayu Sengon (papan) M.28.a M2 8.000 24,000.00 192,000.00
Keramik 20 x 20 cm (putih) M.172.a buah 500.000 2,100.00 1,050,000.00
Perlengkapan % 10.000 3,974,391.00 397,439.10
JUMLAH HARGA BAHAN 4,371,830.10
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 5,126,220.10
E Overhead & Profit 10% 0.100 512,622.01
F Harga Satuan Pekerjaan (D+E) 5,638,842.00

A.5.1.1 12. Pemasangan 1 buah bak cuci piring stainlessteel


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.030 85,000.00 2,550.00
Tukang batu L.02 OH 0.300 100,000.00 30,000.00
Kepala Tukang L.03 OH 0.030 100,000.00 3,000.00
Mandor L.04 OH 0.015 105,000.00 1,575.00
JUMLAH TENAGA KERJA 37,125.00
B BAHAN
Bak cuci stainless steel (kecil) M.370 Unit 1.000 412,500.00 412,500.00
Water drain + asesories M.382 buah 1.000 60,000.00 60,000.00
JUMLAH HARGA BAHAN 472,500.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 509,625.00
E Overhead & Profit 10% 0.100 50,962.50
F Harga Satuan Pekerjaan (D+E) 560,587.00
A.5.1.1 13. Pemasangan 1 buah bak cuci piring teraso
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.050 85,000.00 4,250.00
Tukang batu L.02 OH 0.500 100,000.00 50,000.00
Kepala Tukang L.03 OH 0.050 100,000.00 5,000.00
Mandor L.04 OH 0.025 105,000.00 2,625.00
JUMLAH TENAGA KERJA 61,875.00
B BAHAN
Bak cuci piring teraso Unit 1.000 780,000.00 780,000.00
Water drain + asesories M.382 buah 1.000 60,000.00 60,000.00
Portland cement M.245.a Kg 20.000 1,300.00 26,000.00
Pasir Beton (muntilan) M.9.a m3 0.050 352,000.00 17,600.00
JUMLAH HARGA BAHAN 883,600.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 945,475.00
E Overhead & Profit 10% 0.100 94,547.50
F Harga Satuan Pekerjaan (D+E) 1,040,022.00

A.5.1.1 14. Pemasangan 1 buah floor drain stainles steel


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.010 85,000.00 850.00
Tukang batu L.02 OH 0.100 100,000.00 10,000.00
Kepala Tukang L.03 OH 0.010 100,000.00 1,000.00
Mandor L.04 OH 0.005 105,000.00 525.00
JUMLAH TENAGA KERJA 12,375.00
B BAHAN
Floor drain stainles steel M.375.a Unit 1.000 91,500.00 91,500.00
JUMLAH HARGA BAHAN 91,500.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 103,875.00
E Overhead & Profit 10% 0.100 10,387.50
F Harga Satuan Pekerjaan (D+E) 114,262.00

A.5.1.1 15. Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 2.160 85,000.00 183,600.00
Tukang batu L.02 OH 0.720 100,000.00 72,000.00
Kepala Tukang L.03 OH 0.072 100,000.00 7,200.00
Mandor L.04 OH 0.011 105,000.00 1,155.00
JUMLAH TENAGA KERJA 263,955.00
B BAHAN
Bata merah 5 x 11 x 22 cm M.218.a buah 40.000 700.00 28,000.00
Portland cement M.245.a Kg 44.000 1,300.00 57,200.00
Pasir Beton (muntilan) M.9.a m3 0.070 352,000.00 24,640.00
Pasir Beton (muntilan) M.9.a m3 0.060 352,000.00 21,120.00
Koral beton M.11.b m3 0.070 350,000.00 24,500.00
Baja tulangan polos U-24 M.46.a Kg 1.600 9,600.00 15,360.00
JUMLAH HARGA BAHAN 170,820.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 434,775.00
E Overhead & Profit 10% 0.100 43,477.50
F Harga Satuan Pekerjaan (D+E) 478,252.00
A.5.1.1 16. Pemasangan 1 buah bak kontrol pasangan bata 45cm x45cm tinggi 50 cm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 3.200 85,000.00 272,000.00
Tukang batu L.02 OH 1.150 100,000.00 115,000.00
Kepala Tukang L.03 OH 0.011 100,000.00 1,100.00
Mandor L.04 OH 0.016 105,000.00 1,680.00
JUMLAH TENAGA KERJA 389,780.00
B BAHAN
Bata merah 5 x 11 x 22 cm M.218.a buah 70.000 700.00 49,000.00
Portland cement M.245.a Kg 77.000 1,300.00 100,100.00
Pasir Beton (muntilan) M.9.a m3 0.130 352,000.00 45,760.00
Pasir Beton (muntilan) M.9.a m3 0.090 352,000.00 31,680.00
Koral beton M.11.b m3 0.020 350,000.00 7,000.00
Baja tulangan polos U-24 M.46.a Kg 2.600 9,600.00 24,960.00
JUMLAH HARGA BAHAN 258,500.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 648,280.00
E Overhead & Profit 10% 0.100 64,828.00
F Harga Satuan Pekerjaan (D+E) 713,108.00

A.5.1.1 17. Pemasangan 1 buah bak kontrol pasangan bata 60cm x60cm tinggi 65 cm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 3.200 85,000.00 272,000.00
Tukang batu L.02 OH 1.150 100,000.00 115,000.00
Kepala Tukang L.03 OH 0.011 100,000.00 1,100.00
Mandor L.04 OH 0.016 105,000.00 1,680.00
JUMLAH TENAGA KERJA 389,780.00
B BAHAN
Bata merah 5 x 11 x 22 cm M.218.a buah 123.000 700.00 86,100.00
Portland cement M.245.a Kg 114.000 1,300.00 148,200.00
Pasir Beton (muntilan) M.9.a m3 0.184 352,000.00 64,768.00
Pasir Beton (muntilan) M.9.a m3 0.120 352,000.00 42,240.00
Koral beton M.11.b m3 0.033 350,000.00 11,550.00
Baja tulangan polos U-24 M.46.a Kg 4.850 9,600.00 46,560.00
JUMLAH HARGA BAHAN 399,418.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 789,198.00
E Overhead & Profit 10% 0.100 78,919.80
F Harga Satuan Pekerjaan (D+E) 868,117.00

A.5.1.1 18. Pemasangan 1 m’ pipa galvanis diameter ½”


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.054 85,000.00 4,590.00
Tukang batu L.02 OH 0.090 100,000.00 9,000.00
Kepala Tukang L.03 OH 0.009 100,000.00 900.00
Mandor L.04 OH 0.027 105,000.00 2,835.00
JUMLAH TENAGA KERJA 17,325.00
B BAHAN
Pipa galvanis medium A Ø 1/2" panjang 6 m M.44.a M 1.200 25,550.00 30,660.00
Perlengkapan % 35.000 30,660.00 10,731.00
JUMLAH HARGA BAHAN 41,391.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 58,716.00
E Overhead & Profit 10% 0.100 5,871.60
F Harga Satuan Pekerjaan (D+E) 64,587.00
A.5.1.1 19. Pemasangan 1 buah kran diameter ½” atau 3/4” (Stainles steel)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.010 85,000.00 850.00
Tukang batu L.02 OH 0.400 100,000.00 40,000.00
Kepala Tukang L.03 OH 0.040 100,000.00 4,000.00
Mandor L.04 OH 0.005 105,000.00 525.00
JUMLAH TENAGA KERJA 45,375.00
B BAHAN
Kran air (setara ONDA) M.378.b Buah 1.000 65,000.00 65,000.00
Seal tape M.559 Buah 0.025 4,000.00 100.00
JUMLAH HARGA BAHAN 65,100.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 110,475.00
E Overhead & Profit 10% 0.100 11,047.50
F Harga Satuan Pekerjaan (D+E) 121,522.00

A.5.1.1 20. Pemasangan 1 m’ pipa galvanis medium B diameter 3/4”


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.054 85,000.00 4,590.00
Tukang batu L.02 OH 0.090 100,000.00 9,000.00
Kepala Tukang L.03 OH 0.009 100,000.00 900.00
Mandor L.04 OH 0.027 105,000.00 2,835.00
JUMLAH TENAGA KERJA 17,325.00
B BAHAN
Pipa galvanis medium B Ø 3/4" panjang 6 m M.43.b M 1.200 27,000.00 32,400.00
Perlengkapan % 35.000 32,400.00 11,340.00
JUMLAH HARGA BAHAN 43,740.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 61,065.00
E Overhead & Profit 10% 0.100 6,106.50
F Harga Satuan Pekerjaan (D+E) 67,171.00

A.5.1.1 21. Pemasangan 1 m’ pipa galvanis medium B diameter 1”


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.054 85,000.00 4,590.00
Tukang batu L.02 OH 0.090 100,000.00 9,000.00
Kepala Tukang L.03 OH 0.009 100,000.00 900.00
Mandor L.04 OH 0.027 105,000.00 2,835.00
JUMLAH TENAGA KERJA 17,325.00
B BAHAN
Pipa galvanis medium B Ø 1" panjang 6 m M.43.c M 1.200 33,000.00 39,600.00
Perlengkapan % 35.000 39,600.00 13,860.00
JUMLAH HARGA BAHAN 53,460.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 70,785.00
E Overhead & Profit 10% 0.100 7,078.50
F Harga Satuan Pekerjaan (D+E) 77,863.00
A.5.1.1 22. Pemasangan 1 m’ pipa galvanis medium B diameter 1 ½”
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.108 85,000.00 9,180.00
Tukang batu L.02 OH 0.180 100,000.00 18,000.00
Kepala Tukang L.03 OH 0.018 100,000.00 1,800.00
Mandor L.04 OH 0.005 105,000.00 525.00
JUMLAH TENAGA KERJA 29,505.00
B BAHAN
Pipa galvanis medium B Ø 1 1/2" panjang 6 m M.43.d M 1.200 48,000.00 57,600.00
Perlengkapan % 35.000 57,600.00 20,160.00
JUMLAH HARGA BAHAN 77,760.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 107,265.00
E Overhead & Profit 10% 0.100 10,726.50
F Harga Satuan Pekerjaan (D+E) 117,991.00

A.5.1.1 23. Pemasangan 1 m’ pipa galvanis medium B diameter 3”


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.135 85,000.00 11,475.00
Tukang batu L.02 OH 0.225 100,000.00 22,500.00
Kepala Tukang L.03 OH 0.023 100,000.00 2,300.00
Mandor L.04 OH 0.007 105,000.00 735.00
JUMLAH TENAGA KERJA 37,010.00
B BAHAN
Pipa galvanis medium B Ø 3" panjang 6 m M.43.f M 1.200 108,000.00 129,600.00
Perlengkapan % 35.000 129,600.00 45,360.00
JUMLAH HARGA BAHAN 174,960.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 211,970.00
E Overhead & Profit 10% 0.100 21,197.00
F Harga Satuan Pekerjaan (D+E) 233,167.00

A.5.1.1 24. Pemasangan 1 m’ pipa galvanis medium B diameter 4”


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.135 85,000.00 11,475.00
Tukang batu L.02 OH 0.225 100,000.00 22,500.00
Kepala Tukang L.03 OH 0.023 100,000.00 2,300.00
Mandor L.04 OH 0.007 105,000.00 735.00
JUMLAH TENAGA KERJA 37,010.00
B BAHAN
Pipa galvanis medium B Ø 4" panjang 6 m M.43.g M 1.200 139,000.00 166,800.00
Perlengkapan % 35.000 166,800.00 58,380.00
JUMLAH HARGA BAHAN 225,180.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 262,190.00
E Overhead & Profit 10% 0.100 26,219.00
F Harga Satuan Pekerjaan (D+E) 288,409.00
A.5.1.1 25. Pemasangan 1 m’ pipa PVC tipe AW diameter 1/2”
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.036 85,000.00 3,060.00
Tukang batu L.02 OH 0.060 100,000.00 6,000.00
Kepala Tukang L.03 OH 0.006 100,000.00 600.00
Mandor L.04 OH 0.002 105,000.00 210.00
JUMLAH TENAGA KERJA 9,870.00
B BAHAN
Pipa PVC tipe AW Ø 1/2" panjang 4 m M.40.a M 1.200 7,000.00 8,400.00
Perlengkapan % 35.000 8,400.00 2,940.00
JUMLAH HARGA BAHAN 11,340.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 21,210.00
E Overhead & Profit 10% 0.100 2,121.00
F Harga Satuan Pekerjaan (D+E) 23,331.00

A.5.1.1 26. Pemasangan 1 m’ pipa PVC tipe AW diameter 3/4”


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.036 85,000.00 3,060.00
Tukang batu L.02 OH 0.060 100,000.00 6,000.00
Kepala Tukang L.03 OH 0.006 100,000.00 600.00
Mandor L.04 OH 0.002 105,000.00 210.00
JUMLAH TENAGA KERJA 9,870.00
B BAHAN
Pipa PVC tipe AW Ø 3/4" panjang 4 m M.40.b M 1.200 8,000.00 9,600.00
Perlengkapan % 35.000 9,600.00 3,360.00
JUMLAH HARGA BAHAN 12,960.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 22,830.00
E Overhead & Profit 10% 0.100 2,283.00
F Harga Satuan Pekerjaan (D+E) 25,113.00

A.5.1.1 27. Pemasangan 1 m’ pipa PVC tipe AW diameter 1”


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.036 85,000.00 3,060.00
Tukang batu L.02 OH 0.060 100,000.00 6,000.00
Kepala Tukang L.03 OH 0.006 100,000.00 600.00
Mandor L.04 OH 0.002 105,000.00 210.00
JUMLAH TENAGA KERJA 9,870.00
B BAHAN
Pipa PVC tipe AW Ø 1" panjang 4 m M.40.c M 1.200 10,000.00 12,000.00
Perlengkapan % 35.000 12,000.00 4,200.00
JUMLAH HARGA BAHAN 16,200.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 26,070.00
E Overhead & Profit 10% 0.100 2,607.00
F Harga Satuan Pekerjaan (D+E) 28,677.00
A.5.1.1 28. Pemasangan 1 m’ pipa PVC tipe AW diameter 11/2”
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.054 85,000.00 4,590.00
Tukang batu L.02 OH 0.090 100,000.00 9,000.00
Kepala Tukang L.03 OH 0.009 100,000.00 900.00
Mandor L.04 OH 0.003 105,000.00 315.00
JUMLAH TENAGA KERJA 14,805.00
B BAHAN
Pipa PVC tipe AW Ø 1 1/2" panjang 4 m M.40.d M 1.200 19,000.00 22,800.00
Perlengkapan % 35.000 22,800.00 7,980.00
JUMLAH HARGA BAHAN 30,780.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 45,585.00
E Overhead & Profit 10% 0.100 4,558.50
F Harga Satuan Pekerjaan (D+E) 50,143.00

A.5.1.1 29. Pemasangan 1 m’ pipa PVC tipe AW diameter 2”


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.054 85,000.00 4,590.00
Tukang batu L.02 OH 0.090 100,000.00 9,000.00
Kepala Tukang L.03 OH 0.009 100,000.00 900.00
Mandor L.04 OH 0.003 105,000.00 315.00
JUMLAH TENAGA KERJA 14,805.00
B BAHAN
Pipa PVC tipe AW Ø 2" panjang 4 m M.40.e M 1.200 27,000.00 32,400.00
Perlengkapan % 35.000 32,400.00 11,340.00
JUMLAH HARGA BAHAN 43,740.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 58,545.00
E Overhead & Profit 10% 0.100 5,854.50
F Harga Satuan Pekerjaan (D+E) 64,399.00

A.5.1.1 30. Pemasangan 1 m’ pipa PVC tipe AW diameter 21/2”


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.081 85,000.00 6,885.00
Tukang batu L.02 OH 0.135 100,000.00 13,500.00
Kepala Tukang L.03 OH 0.014 100,000.00 1,350.00
Mandor L.04 OH 0.004 105,000.00 420.00
JUMLAH TENAGA KERJA 22,155.00
B BAHAN
Pipa PVC tipe AW Ø 2 1/2" panjang 4 m M.40.f M 1.200 35,000.00 42,000.00
Perlengkapan % 35.000 42,000.00 14,700.00
JUMLAH HARGA BAHAN 56,700.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 78,855.00
E Overhead & Profit 10% 0.100 7,885.50
F Harga Satuan Pekerjaan (D+E) 86,740.00
A.5.1.1 31. Pemasangan 1 m’ pipa PVC tipe AW diameter 3”
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.081 85,000.00 6,885.00
Tukang batu L.02 OH 0.135 100,000.00 13,500.00
Kepala Tukang L.03 OH 0.014 100,000.00 1,350.00
Mandor L.04 OH 0.004 105,000.00 420.00
JUMLAH TENAGA KERJA 22,155.00
B BAHAN
Pipa PVC tipe AW Ø 3" panjang 4 m M.40.g M 1.200 50,000.00 60,000.00
Perlengkapan % 35.000 60,000.00 21,000.00
JUMLAH HARGA BAHAN 81,000.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 103,155.00
E Overhead & Profit 10% 0.100 10,315.50
F Harga Satuan Pekerjaan (D+E) 113,470.00

A.5.1.1 32. Pemasangan 1 m’ pipa PVC tipe AW diameter 4”


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.081 85,000.00 6,885.00
Tukang batu L.02 OH 0.135 100,000.00 13,500.00
Kepala Tukang L.03 OH 0.014 100,000.00 1,350.00
Mandor L.04 OH 0.004 105,000.00 420.00
JUMLAH TENAGA KERJA 22,155.00
B BAHAN
Pipa PVC tipe AW Ø 4" panjang 4 m M.40.h M 1.200 72,000.00 86,400.00
Perlengkapan % 35.000 86,400.00 30,240.00
JUMLAH HARGA BAHAN 116,640.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 138,795.00
E Overhead & Profit 10% 0.100 13,879.50
F Harga Satuan Pekerjaan (D+E) 152,674.00

A.5.1.1 33. Pemasangan 1 m’ pipa air limbah jenis pipa tanah diameter 20 cm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.080 85,000.00 6,800.00
Tukang batu L.02 OH 0.040 100,000.00 4,000.00
Kepala Tukang L.03 OH 0.004 100,000.00 400.00
Mandor L.04 OH 0.004 105,000.00 420.00
JUMLAH TENAGA KERJA 11,620.00
B BAHAN
Pipa tanah Ø 200 mm SDR-41 (air limbah) M.608.b buah 1.600 204,000.00 326,400.00
Portland cement M.245.a Kg 35.000 1,300.00 45,500.00
Pasir Beton (muntilan) M.9.a m3 0.014 352,000.00 4,928.00
Pasir urug (quarry - lokasi pekerjaan) M.4.b m3 0.014 169,800.00 2,377.20
JUMLAH HARGA BAHAN 379,205.20
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 390,825.20
E Overhead & Profit 10% 0.100 39,082.52
F Harga Satuan Pekerjaan (D+E) 429,907.00
A.5.1.1 34. Pemasangan 1 m’ pipa air limbah jenis pipa tanah diameter 16 cm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.060 85,000.00 5,100.00
Tukang batu L.02 OH 0.030 100,000.00 3,000.00
Kepala Tukang L.03 OH 0.003 100,000.00 300.00
Mandor L.04 OH 0.003 105,000.00 315.00
JUMLAH TENAGA KERJA 8,715.00
B BAHAN
Pipa tanah Ø 160 mm SDR-41 (air limbah) M.608.a m' 1.600 133,200.00 213,120.00
Portland cement M.245.a Kg 0.680 1,300.00 884.00
Pasir Beton (muntilan) M.9.a m3 0.013 352,000.00 4,576.00
Pasir urug (quarry - lokasi pekerjaan) M.4.b m3 0.011 169,800.00 1,867.80
JUMLAH HARGA BAHAN 220,447.80
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 229,162.80
E Overhead & Profit 10% 0.100 22,916.28
F Harga Satuan Pekerjaan (D+E) 252,079.00

A.5.1.1 35. Pemasangan 1 m’ pipa beton diameter 15 - 20 cm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.140 85,000.00 11,900.00
Tukang batu L.02 OH 0.070 100,000.00 7,000.00
Kepala Tukang L.03 OH 0.007 100,000.00 700.00
Mandor L.04 OH 0.007 105,000.00 735.00
JUMLAH TENAGA KERJA 20,335.00
B BAHAN
Buis beton Ø 20 cm M.95.a buah 1.100 45,000.00 49,500.00
Bata merah 5 x 11 x 22 cm (m3) M.218.b m3 0.027 568,200.00 15,341.40
Portland cement M.245.a Kg 3.920 1,300.00 5,096.00
Pasir Beton (muntilan) M.9.a m3 0.056 352,000.00 19,712.00
Pasir urug (quarry - lokasi pekerjaan) M.4.b m3 0.024 169,800.00 4,075.20
JUMLAH HARGA BAHAN 93,724.60
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 114,059.60
E Overhead & Profit 10% 0.100 11,405.96
F Harga Satuan Pekerjaan (D+E) 125,465.00

A.5.1.1.36. Pemasangan 1 m’ pipa beton diameter 30 - 100 cm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.380 85,000.00 32,300.00
Tukang batu L.02 OH 0.190 100,000.00 19,000.00
Kepala Tukang L.03 OH 0.019 100,000.00 1,900.00
Mandor L.04 OH 0.019 105,000.00 1,995.00
JUMLAH TENAGA KERJA 55,195.00
B BAHAN
Buis beton Ø 30 cm M.95.b buah 1.100 60,000.00 66,000.00
Bata merah 5 x 11 x 22 cm (m3) M.218.b m3 0.550 568,200.00 312,510.00
Portland cement M.245.a Kg 10.300 1,300.00 13,390.00
Pasir Beton (muntilan) M.9.a m3 0.061 352,000.00 21,472.00
Pasir urug (quarry - lokasi pekerjaan) M.4.b m3 0.069 169,800.00 11,716.20
JUMLAH HARGA BAHAN 425,088.20
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 480,283.20
E Overhead & Profit 10% 0.100 48,028.32
F Harga Satuan Pekerjaan (D+E) 528,311.00
A.8.4.1 HARGA SATUAN PEKERJAAN PEMASANGAN PIPA DILUAR GEDUNG
A.8.4.1.1 (K3) Pemasangan 1 m pipa PVC AW Ø 63 mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.081 85,000.00 6,885.00
Tukang pipa L.02 OH 0.041 95,000.00 3,895.00
Mandor L.04 OH 0.008 105,000.00 840.00
JUMLAH TENAGA KERJA 11,620.00
B BAHAN
Pipa PVC tipe AW Ø 2" panjang 4 m M.40.e m 1.000 26,825.00 26,825.00
Lem Ls 0.100 5,000.00 500.00
JUMLAH HARGA BAHAN 27,325.00
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.006 300,000.00 1,800.00
JUMLAH HARGA ALAT 1,800.00
D Jumlah (A+B+C) 40,745.00
E Overhead & Profit 10% 0.100 4,074.50
F Harga Satuan Pekerjaan (D+E) 44,819.00
Catatan:
Koefisien peralatan yang digunakan pada A.8.4.1 ini adalah seperti yang tercantum pada tabel.
Apabila ada tambahan peralatan yang digunakan, harus disesuaikan dengan spesifikasi dan
gambar kerja.

A.8.4.1.2 (K3) Pemasangan 1 m pipa PVC AW Ø 90 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.094 85,000.00 7,990.00
Tukang pipa L.02 OH 0.047 95,000.00 4,465.00
Mandor L.04 OH 0.009 105,000.00 945.00
JUMLAH TENAGA KERJA 13,400.00
B BAHAN
Pipa PVC tipe AW Ø 3" panjang 4 m M.40.g m 1.000 49,050.00 49,050.00
Lem Ls 0.300 5,000.00 1,500.00
JUMLAH HARGA BAHAN 50,550.00
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.008 300,000.00 2,400.00
JUMLAH HARGA ALAT 2,400.00
D Jumlah (A+B+C) 66,350.00
E Overhead & Profit 10% 0.100 6,635.00
F Harga Satuan Pekerjaan (D+E) 72,985.00

A.8.4.1.3 (K3) Pemasangan 1 m pipa PVC AW Ø 110 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.105 85,000.00 8,925.00
Tukang pipa L.02 OH 0.053 95,000.00 5,035.00
Mandor L.04 OH 0.011 105,000.00 1,155.00
JUMLAH TENAGA KERJA 15,115.00
B BAHAN
Pipa PVC tipe AW Ø 4" panjang 4 m M.40.h m 1.000 71,625.00 71,625.00
Lem Ls 0.300 6,000.00 1,800.00
JUMLAH HARGA BAHAN 73,425.00
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.010 300,000.00 3,000.00
JUMLAH HARGA ALAT 3,000.00
D Jumlah (A+B+C) 91,540.00
E Overhead & Profit 10% 0.100 9,154.00
F Harga Satuan Pekerjaan (D+E) 100,694.00
A.8.4.1.4 (K3) Pemasangan 1 m pipa PVC AW Ø 160 mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.118 85,000.00 10,030.00
Tukang pipa L.02 OH 0.059 95,000.00 5,605.00
Mandor L.04 OH 0.012 105,000.00 1,260.00
JUMLAH TENAGA KERJA 16,895.00
B BAHAN
Pipa PVC tipe AW Ø 6" panjang 4 m M.40.j m 1.000 154,750.00 154,750.00
Lem Ls 0.500 6,000.00 3,000.00
JUMLAH HARGA BAHAN 157,750.00
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.012 300,000.00 3,600.00
JUMLAH HARGA ALAT 3,600.00
D Jumlah (A+B+C) 178,245.00
E Overhead & Profit 10% 0.100 17,824.50
F Harga Satuan Pekerjaan (D+E) 196,069.00

A.8.4.1.5 (K3) Pemasngan 1 m pipa PVC AW Ø 200 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.189 85,000.00 16,065.00
Tukang pipa L.02 OH 0.095 95,000.00 9,025.00
Mandor L.04 OH 0.019 105,000.00 1,995.00
JUMLAH TENAGA KERJA 27,085.00
B BAHAN
Pipa PVC tipe AW Ø 8" panjang 4 m M.40.k m 1.000 248,000.00 248,000.00
Lem Ls 0.500 6,000.00 3,000.00
JUMLAH HARGA BAHAN 251,000.00
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.024 300,000.00 7,200.00
JUMLAH HARGA ALAT 7,200.00
D Jumlah (A+B+C) 285,285.00
E Overhead & Profit 10% 0.100 28,528.50
F Harga Satuan Pekerjaan (D+E) 313,813.00

A.8.4.1.6 (K3) Pemasangan 1 m pipa PVC AW Ø 250 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.256 85,000.00 21,760.00
Tukang pipa L.02 OH 0.128 95,000.00 12,160.00
Mandor L.04 OH 0.026 105,000.00 2,730.00
JUMLAH TENAGA KERJA 36,650.00
B BAHAN
Pipa PVC tipe AW Ø 10" panjang 4 m M.40.l m 1.000 402,500.00 402,500.00
Lem Ls 0.700 6,000.00 4,200.00
JUMLAH HARGA BAHAN 406,700.00
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.034 300,000.00 10,200.00
JUMLAH HARGA ALAT 10,200.00
D Jumlah (A+B+C) 453,550.00
E Overhead & Profit 10% 0.100 45,355.00
F Harga Satuan Pekerjaan (D+E) 498,905.00
A.8.4.1.7 (K3) Pemasangan 1 m pipa PVC AW Ø 315 mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.294 85,000.00 24,990.00
Tukang pipa L.02 OH 0.147 95,000.00 13,965.00
Mandor L.04 OH 0.029 105,000.00 3,045.00
JUMLAH TENAGA KERJA 42,000.00
B BAHAN
Pipa PVC tipe AW Ø 12" panjang 4 m M.40.m m 1.000 643,750.00 643,750.00
Lem Ls 0.800 6,000.00 4,800.00
JUMLAH HARGA BAHAN 648,550.00
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.040 300,000.00 12,000.00
JUMLAH HARGA ALAT 12,000.00
D Jumlah (A+B+C) 702,550.00
E Overhead & Profit 10% 0.100 70,255.00
F Harga Satuan Pekerjaan (D+E) 772,805.00

A.8.4.1.8 (K3) Pemasangan 1 m pipa PVC Ø 400 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.544 85,000.00 46,240.00
Tukang pipa L.02 OH 0.272 95,000.00 25,840.00
Mandor L.04 OH 0.054 105,000.00 5,670.00
JUMLAH TENAGA KERJA 77,750.00
B BAHAN
Pipa PVC tipe AW Ø 16" panjang 4 m M.40.n m 1.000 1,170,000.00 1,170,000.00
Lem Ls 0.800 6,000.00 4,800.00
JUMLAH HARGA BAHAN 1,174,800.00
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.080 300,000.00 24,000.00
JUMLAH HARGA ALAT 24,000.00
D Jumlah (A+B+C) 1,276,550.00
E Overhead & Profit 10% 0.100 127,655.00
F Harga Satuan Pekerjaan (D+E) 1,404,205.00

A.8.4.1.17 (K3) Pemasangan 1 m pipa HDPE Ø 63 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.035 85,000.00 2,975.00
Tukang pipa L.02 OH 0.017 95,000.00 1,615.00
Mandor L.04 OH 0.003 105,000.00 315.00
JUMLAH TENAGA KERJA 4,905.00
B BAHAN
Pipa HDPE Ø 63 mm (SDR 17) M.603.a m 1.000 45,000.00 45,000.00
Perlengkapan % 35.000 45,000.00 15,750.00
JUMLAH HARGA BAHAN 60,750.00
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.019 300,000.00 5,700.00
JUMLAH HARGA ALAT 5,700.00
D Jumlah (A+B+C) 71,355.00
E Overhead & Profit 10% 0.100 7,135.50
F Harga Satuan Pekerjaan (D+E) 78,490.00
A.8.4.1.18 (K3) Pemasangan 1 m pipa HDPE Ø 110 mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.040 85,000.00 3,400.00
Tukang pipa L.02 OH 0.020 95,000.00 1,900.00
Mandor L.04 OH 0.004 105,000.00 420.00
JUMLAH TENAGA KERJA 5,720.00
B BAHAN
Pipa HDPE Ø 110 mm (SDR 17) M.603.b m 1.000 135,100.00 135,100.00
Perlengkapan % 35.000 135,100.00 47,285.00
JUMLAH HARGA BAHAN 182,385.00
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.019 300,000.00 5,700.00
JUMLAH HARGA ALAT 5,700.00
D Jumlah (A+B+C) 193,805.00
E Overhead & Profit 10% 0.100 19,380.50
F Harga Satuan Pekerjaan (D+E) 213,185.00

A.8.4.1.19 (K3) Pemasangan 1 m pipa HDPE Ø 125 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.045 85,000.00 3,825.00
Tukang pipa L.02 OH 0.023 95,000.00 2,185.00
Mandor L.04 OH 0.005 105,000.00 525.00
JUMLAH TENAGA KERJA 6,535.00
B BAHAN
Pipa HDPE Ø 125 mm (SDR 17) M.603.c m 1.000 172,600.00 172,600.00
Perlengkapan % 35.000 172,600.00 60,410.00
JUMLAH HARGA BAHAN 233,010.00
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.019 300,000.00 5,700.00
JUMLAH HARGA ALAT 5,700.00
D Jumlah (A+B+C) 245,245.00
E Overhead & Profit 10% 0.100 24,524.50
F Harga Satuan Pekerjaan (D+E) 269,769.00

A.8.4.1.20 (K3) Pemasangan 1 m pipa HDPE Ø 160 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.062 85,000.00 5,270.00
Tukang pipa L.02 OH 0.031 95,000.00 2,945.00
Mandor L.04 OH 0.006 105,000.00 630.00
JUMLAH TENAGA KERJA 8,845.00
B BAHAN
Pipa HDPE Ø 160 mm (SDR 17) M.603.d m 1.000 271,800.00 271,800.00
Perlengkapan % 35.000 271,800.00 95,130.00
JUMLAH HARGA BAHAN 366,930.00
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.019 300,000.00 5,700.00
JUMLAH HARGA ALAT 5,700.00
D Jumlah (A+B+C) 381,475.00
E Overhead & Profit 10% 0.100 38,147.50
F Harga Satuan Pekerjaan (D+E) 419,622.00
A.8.4.1.21 (K3) Pemasangan 1 m pipa HDPE Ø 200 mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.102 85,000.00 8,670.00
Tukang pipa L.02 OH 0.051 95,000.00 4,845.00
Mandor L.04 OH 0.010 105,000.00 1,050.00
JUMLAH TENAGA KERJA 14,565.00
B BAHAN
Pipa HDPE Ø 200 mm (SDR 17) M.603.e m 1.000 448,500.00 448,500.00
Perlengkapan % 35.000 448,500.00 156,975.00
JUMLAH HARGA BAHAN 605,475.00
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.019 300,000.00 5,700.00
JUMLAH HARGA ALAT 5,700.00
D Jumlah (A+B+C) 625,740.00
E Overhead & Profit 10% 0.100 62,574.00
F Harga Satuan Pekerjaan (D+E) 688,314.00

A.8.4.1.22 (K3) Pemasangan 1 m pipa HDPE Ø 250 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.133 85,000.00 11,305.00
Tukang pipa L.02 OH 0.067 95,000.00 6,365.00
Mandor L.04 OH 0.013 105,000.00 1,365.00
JUMLAH TENAGA KERJA 19,035.00
B BAHAN
Pipa HDPE Ø 250 mm (SDR 17) M.603.f m 1.000 685,300.00 685,300.00
Perlengkapan % 35.000 685,300.00 239,855.00
JUMLAH HARGA BAHAN 925,155.00
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.042 300,000.00 12,600.00
JUMLAH HARGA ALAT 12,600.00
D Jumlah (A+B+C) 956,790.00
E Overhead & Profit 10% 0.100 95,679.00
F Harga Satuan Pekerjaan (D+E) 1,052,469.00

A.8.4.1.23 (K3) Pemasangan 1 m pipa HDPE Ø 315 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.170 85,000.00 14,450.00
Tukang pipa L.02 OH 0.085 95,000.00 8,075.00
Mandor L.04 OH 0.017 105,000.00 1,785.00
JUMLAH TENAGA KERJA 24,310.00
B BAHAN
Pipa HDPE Ø 315 mm (SDR 17) M.603.g m 1.000 1,100,500.00 1,100,500.00
Perlengkapan % 35.000 1,100,500.00 385,175.00
JUMLAH HARGA BAHAN 1,485,675.00
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.065 300,000.00 19,500.00
JUMLAH HARGA ALAT 19,500.00
D Jumlah (A+B+C) 1,529,485.00
E Overhead & Profit 10% 0.100 152,948.50
F Harga Satuan Pekerjaan (D+E) 1,682,433.00
A.8.4.1.24 (K3) Pemasangan 1 m pipa HDPE Ø 400 mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.290 85,000.00 24,650.00
Tukang pipa L.02 OH 0.145 95,000.00 13,775.00
Mandor L.04 OH 0.029 105,000.00 3,045.00
JUMLAH TENAGA KERJA 41,470.00
B BAHAN
Pipa HDPE Ø 400 mm (SDR 17) M.603.h m 1.000 1,784,100.00 1,784,100.00
Perlengkapan % 35.000 1,784,100.00 624,435.00
JUMLAH HARGA BAHAN 2,408,535.00
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.152 300,000.00 45,600.00
JUMLAH HARGA ALAT 45,600.00
D Jumlah (A+B+C) 2,495,605.00
E Overhead & Profit 10% 0.100 249,560.50
F Harga Satuan Pekerjaan (D+E) 2,745,165.00

A.8.4.1.25 (K3) Pemasangan 1 m pipa HDPE Ø 450 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.359 85,000.00 30,515.00
Tukang pipa L.02 OH 0.180 95,000.00 17,100.00
Mandor L.04 OH 0.036 105,000.00 3,780.00
JUMLAH TENAGA KERJA 51,395.00
B BAHAN
Pipa HDPE Ø 450 mm (SDR 17) M.603.i m 1.000 2,250,900.00 2,250,900.00
Perlengkapan % 35.000 2,250,900.00 787,815.00
JUMLAH HARGA BAHAN 3,038,715.00
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.200 300,000.00 60,000.00
JUMLAH HARGA ALAT 60,000.00
D Jumlah (A+B+C) 3,150,110.00
E Overhead & Profit 10% 0.100 315,011.00
F Harga Satuan Pekerjaan (D+E) 3,465,121.00

A.8.4.1.26 (K3) Pemasangan 1 m pipa HDPE Ø 500 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.433 85,000.00 36,805.00
Tukang pipa L.02 OH 0.216 95,000.00 20,520.00
Mandor L.04 OH 0.043 105,000.00 4,515.00
JUMLAH TENAGA KERJA 61,840.00
B BAHAN
Pipa HDPE Ø 500 mm (SDR 17) M.603.j m 1.000 2,751,200.00 2,751,200.00
Perlengkapan % 35.000 2,751,200.00 962,920.00
JUMLAH HARGA BAHAN 3,714,120.00
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.251 300,000.00 75,300.00
JUMLAH HARGA ALAT 75,300.00
D Jumlah (A+B+C) 3,851,260.00
E Overhead & Profit 10% 0.100 385,126.00
F Harga Satuan Pekerjaan (D+E) 4,236,386.00
A.8.4.1.27 (K3) Pemasangan 1 m pipa HDPE Ø 630 mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.512 85,000.00 43,520.00
Tukang pipa L.02 OH 0.256 95,000.00 24,320.00
Mandor L.04 OH 0.051 105,000.00 5,355.00
JUMLAH TENAGA KERJA 73,195.00
B BAHAN
Pipa HDPE Ø 630 mm (SDR 17) M.603.k m 1.000 4,351,800.00 4,351,800.00
Perlengkapan % 35.000 4,351,800.00 1,523,130.00
JUMLAH HARGA BAHAN 5,874,930.00
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.307 300,000.00 92,100.00
JUMLAH HARGA ALAT 92,100.00
D Jumlah (A+B+C) 6,040,225.00
E Overhead & Profit 10% 0.100 604,022.50
F Harga Satuan Pekerjaan (D+E) 6,644,247.00

A.8.4.1.28 (K3) Pemasangan 1 m pipa HDPE Ø 800 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.893 85,000.00 75,905.00
Tukang pipa L.02 OH 0.446 95,000.00 42,370.00
Mandor L.04 OH 0.089 105,000.00 9,345.00
JUMLAH TENAGA KERJA 127,620.00
B BAHAN
Pipa HDPE Ø 800 mm (SDR 17) M.603.l m 1.000 9,701,084.34 9,701,084.34
Perlengkapan % 35.000 9,701,084.34 3,395,379.52
JUMLAH HARGA BAHAN 13,096,463.86
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.573 300,000.00 171,900.00
JUMLAH HARGA ALAT 171,900.00
D Jumlah (A+B+C) 13,395,983.86
E Overhead & Profit 10% 0.100 1,339,598.39
F Harga Satuan Pekerjaan (D+E) 14,735,582.00

A.8.4.1.33 (K3) Pemasangan 1 m pipa GIP Ø 63 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.345 85,000.00 29,325.00
Tukang pipa L.02 OH 0.172 95,000.00 16,340.00
Mandor L.04 OH 0.034 105,000.00 3,570.00
JUMLAH TENAGA KERJA 49,235.00
B BAHAN
Pipa galvanis medium A Ø 2" panjang 6 m M.44.e m 1.000 102,500.00 102,500.00
JUMLAH HARGA BAHAN 102,500.00
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.019 300,000.00 5,700.00
JUMLAH HARGA ALAT 5,700.00
D Jumlah (A+B+C) 157,435.00
E Overhead & Profit 10% 0.100 15,743.50
F Harga Satuan Pekerjaan (D+E) 173,178.00

A.8.4.1.34 (K3) Pemasangan 1 m pipa GIP Ø 90 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.400 85,000.00 34,000.00
Tukang pipa L.02 OH 0.200 95,000.00 19,000.00
Mandor L.04 OH 0.040 105,000.00 4,200.00
JUMLAH TENAGA KERJA 57,200.00
B BAHAN
Pipa galvanis medium A Ø 3" panjang 6 m M.44.f m 1.000 170,833.33 170,833.33
JUMLAH HARGA BAHAN 170,833.33
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.019 300,000.00 5,700.00
JUMLAH HARGA ALAT 5,700.00
D Jumlah (A+B+C) 233,733.33
E Overhead & Profit 10% 0.100 23,373.33
F Harga Satuan Pekerjaan (D+E) 257,106.00

A.8.4.1.35 (K3) Pemasangan 1 m pipa GIP Ø 110 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.448 85,000.00 38,080.00
Tukang pipa L.02 OH 0.224 95,000.00 21,280.00
Mandor L.04 OH 0.045 105,000.00 4,725.00
JUMLAH TENAGA KERJA 64,085.00
B BAHAN
Pipa galvanis medium A Ø 4" panjang 6 m M.44.g m 1.000 254,166.67 254,166.67
JUMLAH HARGA BAHAN 254,166.67
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.019 300,000.00 5,700.00
JUMLAH HARGA ALAT 5,700.00
D Jumlah (A+B+C) 323,951.67
E Overhead & Profit 10% 0.100 32,395.17
F Harga Satuan Pekerjaan (D+E) 356,346.00

A.8.4.1.36 (K3) Pemasangan 1 m pipa GIP Ø 160 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.506 85,000.00 43,010.00
Tukang pipa L.02 OH 0.253 95,000.00 24,035.00
Mandor L.04 OH 0.051 105,000.00 5,355.00
JUMLAH TENAGA KERJA 72,400.00
B BAHAN
Pipa galvanis medium A Ø 6" panjang 6 m M.44.i m 1.000 383,333.33 383,333.33
JUMLAH HARGA BAHAN 383,333.33
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.019 300,000.00 5,700.00
JUMLAH HARGA ALAT 5,700.00
D Jumlah (A+B+C) 461,433.33
E Overhead & Profit 10% 0.100 46,143.33
F Harga Satuan Pekerjaan (D+E) 507,576.00

A.8.4.1.37 (K3) Pemasangan 1 m pipa GIP Ø 200 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.796 85,000.00 67,660.00
Tukang pipa L.02 OH 0.398 95,000.00 37,810.00
Mandor L.04 OH 0.080 105,000.00 8,400.00
JUMLAH TENAGA KERJA 113,870.00
B BAHAN
Pipa galvanis medium A Ø 8" panjang 6 m M.44.j m 1.000 694,650.00 694,650.00
JUMLAH HARGA BAHAN 694,650.00
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.019 300,000.00 5,700.00
JUMLAH HARGA ALAT 5,700.00
D Jumlah (A+B+C) 814,220.00
E Overhead & Profit 10% 0.100 81,422.00
F Harga Satuan Pekerjaan (D+E) 895,642.00
A.8.4.1.64 (K3) Pemasangan 1 m pipa baja Ø 63 mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.499 85,000.00 42,415.00
Tukang pipa L.02 OH 0.100 95,000.00 9,500.00
Mandor L.04 OH 0.050 105,000.00 5,250.00
JUMLAH TENAGA KERJA 57,165.00
B BAHAN
Pipa Baja Ø 63 mm M.600.a m 1.000 98,300.00 98,300.00
Perlengkapan % 35.000 98,300.00 34,405.00
JUMLAH HARGA BAHAN 132,705.00
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.004 300,000.00 1,200.00
JUMLAH HARGA ALAT 1,200.00
D Jumlah (A+B+C) 191,070.00
E Overhead & Profit 10% 0.100 19,107.00
F Harga Satuan Pekerjaan (D+E) 210,177.00

A.8.4.1.65 (K3) Pemasangan 1 m pipa baja Ø 100 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.579 85,000.00 49,215.00
Tukang pipa L.02 OH 0.116 95,000.00 11,020.00
Mandor L.04 OH 0.058 105,000.00 6,090.00
JUMLAH TENAGA KERJA 66,325.00
B BAHAN
Pipa Baja Ø 100 mm M.600.b m 1.000 249,200.00 249,200.00
Perlengkapan % 35.000 249,200.00 87,220.00
JUMLAH HARGA BAHAN 336,420.00
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.004 300,000.00 1,200.00
JUMLAH HARGA ALAT 1,200.00
D Jumlah (A+B+C) 403,945.00
E Overhead & Profit 10% 0.100 40,394.50
F Harga Satuan Pekerjaan (D+E) 444,339.00

A.8.4.1.66 (K3) Pemasangan 1 m pipa baja Ø 125 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.648 85,000.00 55,080.00
Tukang pipa L.02 OH 0.130 95,000.00 12,350.00
Mandor L.04 OH 0.065 105,000.00 6,825.00
JUMLAH TENAGA KERJA 74,255.00
B BAHAN
Pipa Baja Ø 125 mm M.600.c m 1.000 397,200.00 397,200.00
Perlengkapan % 35.000 397,200.00 139,020.00
JUMLAH HARGA BAHAN 536,220.00
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.004 300,000.00 1,200.00
JUMLAH HARGA ALAT 1,200.00
D Jumlah (A+B+C) 611,675.00
E Overhead & Profit 10% 0.100 61,167.50
F Harga Satuan Pekerjaan (D+E) 672,842.00
A.8.4.1.67 (K3) Pemasangan 1 m pipa baja Ø 150 mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.708 85,000.00 60,180.00
Tukang pipa L.02 OH 0.142 95,000.00 13,490.00
Mandor L.04 OH 0.071 105,000.00 7,455.00
JUMLAH TENAGA KERJA 81,125.00
B BAHAN
Pipa Baja Ø 150 mm M.600.d m 1.000 435,800.00 435,800.00
Perlengkapan % 35.000 435,800.00 152,530.00
JUMLAH HARGA BAHAN 588,330.00
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.004 300,000.00 1,200.00
JUMLAH HARGA ALAT 1,200.00
D Jumlah (A+B+C) 670,655.00
E Overhead & Profit 10% 0.100 67,065.50
F Harga Satuan Pekerjaan (D+E) 737,720.00

A.8.4.1.68 (K3) Pemasangan 1 m pipa baja Ø 200 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.113 85,000.00 94,605.00
Tukang pipa L.02 OH 0.223 95,000.00 21,185.00
Mandor L.04 OH 0.111 105,000.00 11,655.00
JUMLAH TENAGA KERJA 127,445.00
B BAHAN
Pipa Baja Ø 200 mm M.600.e m 1.000 691,700.00 691,700.00
Perlengkapan % 35.000 691,700.00 242,095.00
JUMLAH HARGA BAHAN 933,795.00
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.004 300,000.00 1,200.00
JUMLAH HARGA ALAT 1,200.00
D Jumlah (A+B+C) 1,062,440.00
E Overhead & Profit 10% 0.100 106,244.00
F Harga Satuan Pekerjaan (D+E) 1,168,684.00

A.8.4.1.75 (K3) Pemasangan 1 m pipa baja Ø 800 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 3.897 85,000.00 331,245.00
Tukang pipa L.02 OH 0.779 95,000.00 74,005.00
Mandor L.04 OH 0.390 105,000.00 40,950.00
JUMLAH TENAGA KERJA 446,200.00
B BAHAN
Pipa Baja Ø 800 mm M.600.f m 1.000 975,000.00 975,000.00
Perlengkapan % 35.000 975,000.00 341,250.00
JUMLAH HARGA BAHAN 1,316,250.00
C PERALATAN
Excavator 80-140 HP alat 27 hari 0.046 4,094,605.38 188,351.85
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.098 300,000.00 29,400.00
JUMLAH HARGA ALAT 217,751.85
D Jumlah (A+B+C) 1,980,201.85
E Overhead & Profit 10% 0.100 198,020.18
F Harga Satuan Pekerjaan (D+E) 2,178,222.00
A.8.4.1.76 (K3) Pemasangan 1 m pipa baja Ø 900 mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 4.403 85,000.00 374,255.00
Tukang pipa L.02 OH 0.081 95,000.00 7,695.00
Mandor L.04 OH 0.440 105,000.00 46,200.00
JUMLAH TENAGA KERJA 428,150.00
B BAHAN
Pipa Baja Ø 900 mm M.600.g m 1.000 1,229,700.00 1,229,700.00
Perlengkapan % 35.000 1,229,700.00 430,395.00
JUMLAH HARGA BAHAN 1,660,095.00
C PERALATAN
Excavator 80-140 HP alat 27 hari 0.052 4,094,605.38 212,919.48
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.115 300,000.00 34,500.00
JUMLAH HARGA ALAT 247,419.48
D Jumlah (A+B+C) 2,335,664.48
E Overhead & Profit 10% 0.100 233,566.45
F Harga Satuan Pekerjaan (D+E) 2,569,230.00

A.8.4.2 HARGA SATUAN PEKERJAAN PEMOTONGAN PIPA


A.8.4.2.1 (K3) Pemotongan 1 buah pipa PVC Ø 63 mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.005 85,000.00 425.00
Tukang pipa L.02 OH 0.002 95,000.00 190.00
Mandor L.04 OH 0.001 105,000.00 52.50
JUMLAH TENAGA KERJA 667.50
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
Gergaji Besi alat 91 hari 0.003 5,000.00 15.00
JUMLAH HARGA ALAT 15.00
D Jumlah (A+B+C) 682.50
E Overhead & Profit 10% 0.100 68.25
F Harga Satuan Pekerjaan (D+E) 750.00

A.8.4.2.2 (K3) Pemotongan 1 buah pipa PVC Ø 90 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.014 85,000.00 1,190.00
Tukang pipa L.02 OH 0.007 95,000.00 665.00
Mandor L.04 OH 0.001 105,000.00 105.00
JUMLAH TENAGA KERJA 1,960.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
Gergaji Besi alat 91 hari 0.003 5,000.00 15.00
JUMLAH HARGA ALAT 15.00
D Jumlah (A+B+C) 1,975.00
E Overhead & Profit 10% 0.100 197.50
F Harga Satuan Pekerjaan (D+E) 2,172.00

A.8.4.2.3 (K3) Pemotongan 1 buah pipa PVC Ø 110 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.022 85,000.00 1,870.00
Tukang pipa L.02 OH 0.011 95,000.00 1,045.00
Mandor L.04 OH 0.002 105,000.00 210.00
JUMLAH TENAGA KERJA 3,125.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
Gergaji Besi alat 91 hari 0.003 5,000.00 15.00
JUMLAH HARGA ALAT 15.00
D Jumlah (A+B+C) 3,140.00
E Overhead & Profit 10% 0.100 314.00
F Harga Satuan Pekerjaan (D+E) 3,454.00
A.8.4.2.4 (K3) Pemotongan 1 buah pipa PVC Ø 160 mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.031 85,000.00 2,635.00
Tukang pipa L.02 OH 0.015 95,000.00 1,425.00
Mandor L.04 OH 0.003 105,000.00 315.00
JUMLAH TENAGA KERJA 4,375.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
Gergaji Besi alat 91 hari 0.003 5,000.00 15.00
JUMLAH HARGA ALAT 15.00
D Jumlah (A+B+C) 4,390.00
E Overhead & Profit 10% 0.100 439.00
F Harga Satuan Pekerjaan (D+E) 4,829.00

A.8.4.2.5 (K3) Pemotongan 1 buah pipa PVC Ø 200 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.081 85,000.00 6,885.00
Tukang pipa L.02 OH 0.040 95,000.00 3,800.00
Mandor L.04 OH 0.008 105,000.00 840.00
JUMLAH TENAGA KERJA 11,525.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
Gergaji Besi alat 91 hari 0.017 5,000.00 85.00
JUMLAH HARGA ALAT 85.00
D Jumlah (A+B+C) 11,610.00
E Overhead & Profit 10% 0.100 1,161.00
F Harga Satuan Pekerjaan (D+E) 12,771.00

A.8.4.2.6 (K3) Pemotongan 1 buah pipa PVC Ø 250 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.128 85,000.00 10,880.00
Tukang pipa L.02 OH 0.064 95,000.00 6,080.00
Mandor L.04 OH 0.013 105,000.00 1,365.00
JUMLAH TENAGA KERJA 18,325.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
Gergaji Besi alat 91 hari 0.030 5,000.00 150.00
JUMLAH HARGA ALAT 150.00
D Jumlah (A+B+C) 18,475.00
E Overhead & Profit 10% 0.100 1,847.50
F Harga Satuan Pekerjaan (D+E) 20,322.00

A.8.4.2.7 (K3) Pemotongan 1 buah pipa PVC Ø 315 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.155 85,000.00 13,175.00
Tukang pipa L.02 OH 0.077 95,000.00 7,315.00
Mandor L.04 OH 0.015 105,000.00 1,575.00
JUMLAH TENAGA KERJA 22,065.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
Gergaji Besi alat 91 hari 0.037 5,000.00 185.00
JUMLAH HARGA ALAT 185.00
D Jumlah (A+B+C) 22,250.00
E Overhead & Profit 10% 0.100 2,225.00
F Harga Satuan Pekerjaan (D+E) 24,475.00
A.8.4.2.8 (K3) Pemotongan 1 buah pipa PVC Ø 400 mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.331 85,000.00 28,135.00
Tukang pipa L.02 OH 0.166 95,000.00 15,770.00
Mandor L.04 OH 0.033 105,000.00 3,465.00
JUMLAH TENAGA KERJA 47,370.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
Gergaji Besi alat 91 hari 0.086 5,000.00 430.00
JUMLAH HARGA ALAT 430.00
D Jumlah (A+B+C) 47,800.00
E Overhead & Profit 10% 0.100 4,780.00
F Harga Satuan Pekerjaan (D+E) 52,580.00

A.8.4.2.17 (K3) Pemotongan 1 buah pipa HDPE Ø 63 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.002 85,000.00 170.00
Tukang pipa L.02 OH 0.001 95,000.00 95.00
Mandor L.04 OH 0.000 105,000.00 21.00
Operator pompa L.06 OH 0.034 100,000.00 3,400.00
JUMLAH TENAGA KERJA 3,686.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
Pipe Cutter alat 102 hari 0.004 372,302.00 1,489.21
JUMLAH HARGA ALAT 1,489.21
D Jumlah (A+B+C) 5,175.21
E Overhead & Profit 10% 0.100 517.52
F Harga Satuan Pekerjaan (D+E) 5,692.00

A.8.4.2.18 (K3) Pemotongan 1 buah pipa HDPE Ø 110 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.006 85,000.00 510.00
Tukang pipa L.02 OH 0.003 95,000.00 285.00
Mandor L.04 OH 0.001 105,000.00 105.00
Operator pompa L.06 OH 0.071 100,000.00 7,100.00
JUMLAH TENAGA KERJA 8,000.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
Pipe Cutter alat 102 hari 0.005 372,302.00 1,861.51
JUMLAH HARGA ALAT 1,861.51
D Jumlah (A+B+C) 9,861.51
E Overhead & Profit 10% 0.100 986.15
F Harga Satuan Pekerjaan (D+E) 10,847.00

A.8.4.2.19 (K3) Pemotongan 1 buah pipa HDPE Ø 125 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.009 85,000.00 765.00
Tukang pipa L.02 OH 0.005 95,000.00 475.00
Mandor L.04 OH 0.001 105,000.00 105.00
Operator pompa L.06 OH 0.096 100,000.00 9,600.00
JUMLAH TENAGA KERJA 10,945.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
Pipe Cutter alat 102 hari 0.006 372,302.00 2,233.81
JUMLAH HARGA ALAT 2,233.81
D Jumlah (A+B+C) 13,178.81
E Overhead & Profit 10% 0.100 1,317.88
F Harga Satuan Pekerjaan (D+E) 14,496.00
A.8.4.2.20 (K3) Pemotongan 1 buah pipa HDPE Ø 160 mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.016 85,000.00 1,360.00
Tukang pipa L.02 OH 0.008 95,000.00 760.00
Mandor L.04 OH 0.002 105,000.00 210.00
Operator pompa L.06 OH 0.121 100,000.00 12,100.00
JUMLAH TENAGA KERJA 14,430.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
Pipe Cutter alat 102 hari 0.009 372,302.00 3,350.72
JUMLAH HARGA ALAT 3,350.72
D Jumlah (A+B+C) 17,780.72
E Overhead & Profit 10% 0.100 1,778.07
F Harga Satuan Pekerjaan (D+E) 19,558.00

A.8.4.2.21 (K3) Pemotongan 1 buah pipa HDPE Ø 200 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.044 85,000.00 3,740.00
Tukang pipa L.02 OH 0.022 95,000.00 2,090.00
Mandor L.04 OH 0.004 105,000.00 420.00
Operator pompa L.06 OH 0.171 100,000.00 17,100.00
JUMLAH TENAGA KERJA 23,350.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
Pipe Cutter alat 102 hari 0.017 372,302.00 6,329.13
JUMLAH HARGA ALAT 6,329.13
D Jumlah (A+B+C) 29,679.13
E Overhead & Profit 10% 0.100 2,967.91
F Harga Satuan Pekerjaan (D+E) 32,647.00

A.8.4.2.22 (K3) Pemotongan 1 buah pipaHDPE Ø 250 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.067 85,000.00 5,695.00
Tukang pipa L.02 OH 0.033 95,000.00 3,135.00
Mandor L.04 OH 0.007 105,000.00 735.00
Operator pompa L.06 OH 0.221 100,000.00 22,100.00
JUMLAH TENAGA KERJA 31,665.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
Pipe Cutter alat 102 hari 0.023 372,302.00 8,562.95
JUMLAH HARGA ALAT 8,562.95
D Jumlah (A+B+C) 40,227.95
E Overhead & Profit 10% 0.100 4,022.79
F Harga Satuan Pekerjaan (D+E) 44,250.00

A.8.4.2.23 (K3) Pemotongan 1 buah pipa HDPE Ø 315 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.090 85,000.00 7,650.00
Tukang pipa L.02 OH 0.045 95,000.00 4,275.00
Mandor L.04 OH 0.009 105,000.00 945.00
Operator pompa L.06 OH 0.271 100,000.00 27,100.00
JUMLAH TENAGA KERJA 39,970.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
Pipe Cutter alat 102 hari 0.030 372,302.00 11,169.06
JUMLAH HARGA ALAT 11,169.06
D Jumlah (A+B+C) 51,139.06
E Overhead & Profit 10% 0.100 5,113.91
F Harga Satuan Pekerjaan (D+E) 56,252.00
A.8.4.2.24 (K3) Pemotongan 1 buah pipa HDPE Ø 400 mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.177 85,000.00 15,045.00
Tukang pipa L.02 OH 0.088 95,000.00 8,360.00
Mandor L.04 OH 0.018 105,000.00 1,890.00
Operator pompa L.06 OH 0.371 100,000.00 37,100.00
JUMLAH TENAGA KERJA 62,395.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
Pipe Cutter alat 102 hari 0.055 372,302.00 20,476.61
JUMLAH HARGA ALAT 20,476.61
D Jumlah (A+B+C) 82,871.61
E Overhead & Profit 10% 0.100 8,287.16
F Harga Satuan Pekerjaan (D+E) 91,158.00

A.8.4.2.25 (K3) Pemotongan 1 buah pipa HDPE Ø 450 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.225 85,000.00 19,125.00
Tukang pipa L.02 OH 0.113 95,000.00 10,735.00
Mandor L.04 OH 0.023 105,000.00 2,415.00
Operator pompa L.06 OH 0.421 100,000.00 42,100.00
JUMLAH TENAGA KERJA 74,375.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
Pipe Cutter alat 102 hari 0.070 372,302.00 26,061.14
JUMLAH HARGA ALAT 26,061.14
D Jumlah (A+B+C) 100,436.14
E Overhead & Profit 10% 0.100 10,043.61
F Harga Satuan Pekerjaan (D+E) 110,479.00

A.8.4.2.26 (K3) Pemotongan 1 buah pipa HDPE Ø 500 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.277 85,000.00 23,545.00
Tukang pipa L.02 OH 0.139 95,000.00 13,205.00
Mandor L.04 OH 0.028 105,000.00 2,940.00
Operator pompa L.06 OH 0.471 100,000.00 47,100.00
JUMLAH TENAGA KERJA 86,790.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
Pipe Cutter alat 102 hari 0.085 372,302.00 31,645.67
JUMLAH HARGA ALAT 31,645.67
D Jumlah (A+B+C) 118,435.67
E Overhead & Profit 10% 0.100 11,843.57
F Harga Satuan Pekerjaan (D+E) 130,279.00

A.8.4.2.27 (K3) Pemotongan 1 buah pipa HDPE Ø 630 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.333 85,000.00 28,305.00
Tukang pipa L.02 OH 0.167 95,000.00 15,865.00
Mandor L.04 OH 0.033 105,000.00 3,465.00
Operator pompa L.06 OH 0.571 100,000.00 57,100.00
JUMLAH TENAGA KERJA 104,735.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
Pipe Cutter alat 102 hari 0.101 372,302.00 37,602.50
JUMLAH HARGA ALAT 37,602.50
D Jumlah (A+B+C) 142,337.50
E Overhead & Profit 10% 0.100 14,233.75
F Harga Satuan Pekerjaan (D+E) 156,571.00
A.8.4.2.28 (K3) Pemotongan 1 buah pipa HDPE Ø 800 mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.601 85,000.00 51,085.00
Tukang pipa L.02 OH 0.301 95,000.00 28,595.00
Mandor L.04 OH 0.060 105,000.00 6,300.00
Operator pompa L.06 OH 0.771 100,000.00 77,100.00
JUMLAH TENAGA KERJA 163,080.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
Pipe Cutter alat 102 hari 0.179 372,302.00 66,642.06
JUMLAH HARGA ALAT 66,642.06
D Jumlah (A+B+C) 229,722.06
E Overhead & Profit 10% 0.100 22,972.21
F Harga Satuan Pekerjaan (D+E) 252,694.00

A.8.4.2.64 (K3) Pemotongan 1 buah pipa baja Ø 63 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.028 85,000.00 2,380.00
Tukang pipa L.02 OH 0.006 95,000.00 570.00
Mandor L.04 OH 0.003 105,000.00 315.00
JUMLAH TENAGA KERJA 3,265.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
Pipe Cutter alat 102 hari 0.037 372,302.00 13,775.17
JUMLAH HARGA ALAT 13,775.17
D Jumlah (A+B+C) 17,040.17
E Overhead & Profit 10% 0.100 1,704.02
F Harga Satuan Pekerjaan (D+E) 18,744.00

A.8.4.2.65 (K3) Pemotongan 1 buah pipa baja Ø 100 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.085 85,000.00 7,225.00
Tukang pipa L.02 OH 0.017 95,000.00 1,615.00
Mandor L.04 OH 0.008 105,000.00 840.00
JUMLAH TENAGA KERJA 9,680.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
Pipe Cutter alat 102 hari 0.040 372,302.00 14,892.08
JUMLAH HARGA ALAT 14,892.08
D Jumlah (A+B+C) 24,572.08
E Overhead & Profit 10% 0.100 2,457.21
F Harga Satuan Pekerjaan (D+E) 27,029.00

A.8.4.2.66 (K3) Pemotongan 1 buah pipa baja Ø 125 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.133 85,000.00 11,305.00
Tukang pipa L.02 OH 0.027 95,000.00 2,565.00
Mandor L.04 OH 0.013 105,000.00 1,365.00
JUMLAH TENAGA KERJA 15,235.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
Pipe Cutter alat 102 hari 0.042 372,302.00 15,636.68
JUMLAH HARGA ALAT 15,636.68
D Jumlah (A+B+C) 30,871.68
E Overhead & Profit 10% 0.100 3,087.17
F Harga Satuan Pekerjaan (D+E) 33,958.00
A.8.4.2.67 (K3) Pemotongan 1 buah pipa baja Ø 150 mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.184 85,000.00 15,640.00
Tukang pipa L.02 OH 0.037 95,000.00 3,515.00
Mandor L.04 OH 0.018 105,000.00 1,890.00
JUMLAH TENAGA KERJA 21,045.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
Pipe Cutter alat 102 hari 0.045 372,302.00 16,753.59
JUMLAH HARGA ALAT 16,753.59
D Jumlah (A+B+C) 37,798.59
E Overhead & Profit 10% 0.100 3,779.86
F Harga Satuan Pekerjaan (D+E) 41,578.00

A.8.4.2.68 (K3) Pemotongan 1 buah pipa baja Ø 200 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.476 85,000.00 40,460.00
Tukang pipa L.02 OH 0.095 95,000.00 9,025.00
Mandor L.04 OH 0.048 105,000.00 5,040.00
JUMLAH TENAGA KERJA 54,525.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
Pipe Cutter alat 102 hari 0.060 372,302.00 22,338.12
JUMLAH HARGA ALAT 22,338.12
D Jumlah (A+B+C) 76,863.12
E Overhead & Profit 10% 0.100 7,686.31
F Harga Satuan Pekerjaan (D+E) 84,549.00

A.8.4.2.75 (K3) Pemotongan 1 buah pipa baja Ø 800 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 2.624 85,000.00 223,040.00
Tukang pipa L.02 OH 0.525 95,000.00 49,875.00
Mandor L.04 OH 0.262 105,000.00 27,510.00
JUMLAH TENAGA KERJA 300,425.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
Pipe Cutter alat 102 hari 0.166 372,302.00 61,802.13
JUMLAH HARGA ALAT 61,802.13
D Jumlah (A+B+C) 362,227.13
E Overhead & Profit 10% 0.100 36,222.71
F Harga Satuan Pekerjaan (D+E) 398,449.00

A.8.4.2.76 (K3) Pemotongan 1 buah pipa baja Ø 900 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 2.971 85,000.00 252,535.00
Tukang pipa L.02 OH 0.594 95,000.00 56,430.00
Mandor L.04 OH 0.297 105,000.00 31,185.00
JUMLAH TENAGA KERJA 340,150.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
Pipe Cutter alat 102 hari 0.183 372,302.00 68,131.27
JUMLAH HARGA ALAT 68,131.27
D Jumlah (A+B+C) 408,281.27
E Overhead & Profit 10% 0.100 40,828.13
F Harga Satuan Pekerjaan (D+E) 449,109.00
A.8.4.4 HARGA SATUAN PEKERJAAN PENYAMBUNGAN PIPA BARU KE PIPA LAMA
A.8.4.4.1 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 80 mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.466 85,000.00 124,610.00
Tukang pipa L.02 OH 0.733 95,000.00 69,635.00
Mandor L.04 OH 0.147 105,000.00 15,435.00
JUMLAH TENAGA KERJA 209,680.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
Pipe Cutter alat 102 hari 0.606 372,302.00 225,615.01
Generator set 135 KVA alat 29 hari 0.075 3,301,127.51 247,584.56
Pompa submersible alat 89 hari 0.968 400,000.00 387,200.00
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.865 300,000.00 259,500.00
JUMLAH HARGA ALAT 1,119,899.57
D Jumlah (A+B+C) 1,329,579.57
E Overhead & Profit 10% 0.100 132,957.96
F Harga Satuan Pekerjaan (D+E) 1,462,537.00

A.8.4.4.2 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 100 mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.646 85,000.00 139,910.00
Tukang pipa L.02 OH 0.823 95,000.00 78,185.00
Mandor L.04 OH 0.165 105,000.00 17,325.00
JUMLAH TENAGA KERJA 235,420.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
Pipe Cutter alat 102 hari 0.650 372,302.00 241,996.30
Generator set 135 KVA alat 29 hari 0.159 3,301,127.51 524,879.27
Pompa submersible alat 89 hari 1.078 400,000.00 431,200.00
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 0.911 300,000.00 273,300.00
JUMLAH HARGA ALAT 1,471,375.57
D Jumlah (A+B+C) 1,706,795.57
E Overhead & Profit 10% 0.100 170,679.56
F Harga Satuan Pekerjaan (D+E) 1,877,475.00

A.8.4.4.3 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 150 mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 2.096 85,000.00 178,160.00
Tukang pipa L.02 OH 1.048 95,000.00 99,560.00
Mandor L.04 OH 0.210 105,000.00 22,050.00
JUMLAH TENAGA KERJA 299,770.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
Pipe Cutter alat 102 hari 0.760 372,302.00 282,949.52
Generator set 135 KVA alat 29 hari 0.369 3,301,127.51 1,218,116.05
Pompa submersible alat 89 hari 1.353 400,000.00 541,200.00
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 1.026 300,000.00 307,800.00
JUMLAH HARGA ALAT 2,350,065.57
D Jumlah (A+B+C) 2,649,835.57
E Overhead & Profit 10% 0.100 264,983.56
F Harga Satuan Pekerjaan (D+E) 2,914,819.00
A.8.4.4.4 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 200 mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 2.546 85,000.00 216,410.00
Tukang pipa L.02 OH 1.273 95,000.00 120,935.00
Mandor L.04 OH 0.255 105,000.00 26,775.00
JUMLAH TENAGA KERJA 364,120.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
Pipe Cutter alat 102 hari 0.870 372,302.00 323,902.74
Generator set 135 KVA alat 29 hari 0.579 3,301,127.51 1,911,352.83
Pompa submersible alat 89 hari 1.628 400,000.00 651,200.00
Sewa Tripot/Tackel & handle crane 2 T alat 100 hari 1.141 300,000.00 342,300.00
JUMLAH HARGA ALAT 3,228,755.57
D Jumlah (A+B+C) 3,592,875.57
E Overhead & Profit 10% 0.100 359,287.56
F Harga Satuan Pekerjaan (D+E) 3,952,163.00

A.8.4.5 HARGA SATUAN PEKERJAAN PENGETESAN PIPA


A.8.4.5.1 (K3) Pengetesan 1 m pipa Ø 50 mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.008 85,000.00 680.00
Mandor L.04 OH 0.001 105,000.00 84.00
JUMLAH TENAGA KERJA 764.00
B BAHAN
Air M.550.a m3 0.002 3,850.00 7.70
Pertalite M.395.b liter 0.060 7,700.00 462.00
Oli mesin M.399.a liter 0.002 38,000.00 76.00
JUMLAH HARGA BAHAN 545.70
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,309.70
E Overhead & Profit 10% 0.100 130.97
F Harga Satuan Pekerjaan (D+E) 1,440.00

A.8.4.5.2 (K3) Pengetesan 1 m pipa Ø 75 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.008 85,000.00 680.00
Mandor L.04 OH 0.001 105,000.00 84.00
JUMLAH TENAGA KERJA 764.00
B BAHAN
Air M.550.a m3 0.004 3,850.00 15.40
Pertalite M.395.b liter 0.060 7,700.00 462.00
Oli mesin M.399.a liter 0.002 38,000.00 76.00
JUMLAH HARGA BAHAN 553.40
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,317.40
E Overhead & Profit 10% 0.100 131.74
F Harga Satuan Pekerjaan (D+E) 1,449.00
A.8.4.5.3 (K3) Pengetesan 1 m pipa Ø 100 mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.008 85,000.00 680.00
Mandor L.04 OH 0.001 105,000.00 84.00
JUMLAH TENAGA KERJA 764.00
B BAHAN
Air M.550.a m3 0.008 3,850.00 30.80
Pertalite M.395.b liter 0.060 7,700.00 462.00
Oli mesin M.399.a liter 0.002 38,000.00 76.00
JUMLAH HARGA BAHAN 568.80
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,332.80
E Overhead & Profit 10% 0.100 133.28
F Harga Satuan Pekerjaan (D+E) 1,466.00

A.8.4.5.4 (K3) Pengetesan 1 m pipa Ø 150 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.008 85,000.00 680.00
Mandor L.04 OH 0.001 105,000.00 84.00
JUMLAH TENAGA KERJA 764.00
B BAHAN
Air M.550.a m3 0.018 3,850.00 69.30
Pertalite M.395.b liter 0.060 7,700.00 462.00
Oli mesin M.399.a liter 0.002 38,000.00 76.00
JUMLAH HARGA BAHAN 607.30
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,371.30
E Overhead & Profit 10% 0.100 137.13
F Harga Satuan Pekerjaan (D+E) 1,508.00

A.8.4.5.5 (K3) Pengetesan 1 m pipa Ø 200 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.008 85,000.00 680.00
Mandor L.04 OH 0.001 105,000.00 84.00
JUMLAH TENAGA KERJA 764.00
B BAHAN
Air M.550.a m3 0.031 3,850.00 119.35
Pertalite M.395.b liter 0.060 7,700.00 462.00
Oli mesin M.399.a liter 0.002 38,000.00 76.00
JUMLAH HARGA BAHAN 657.35
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,421.35
E Overhead & Profit 10% 0.100 142.14
F Harga Satuan Pekerjaan (D+E) 1,563.00

A.8.4.5.6 (K3) Pengetesan 1 m pipa Ø 250 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.008 85,000.00 680.00
Mandor L.04 OH 0.001 105,000.00 84.00
JUMLAH TENAGA KERJA 764.00
B BAHAN
Air M.550.a m3 0.049 3,850.00 188.65
Pertalite M.395.b liter 0.060 7,700.00 462.00
Oli mesin M.399.a liter 0.002 38,000.00 76.00
JUMLAH HARGA BAHAN 726.65
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,490.65
E Overhead & Profit 10% 0.100 149.07
F Harga Satuan Pekerjaan (D+E) 1,639.00
A.8.4.5.7 (K3) Pengetesan 1 m pipa Ø 300 mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.008 85,000.00 680.00
Mandor L.04 OH 0.001 105,000.00 84.00
JUMLAH TENAGA KERJA 764.00
B BAHAN
Air M.550.a m3 0.071 3,850.00 273.35
Pertalite M.395.b liter 0.060 7,700.00 462.00
Oli mesin M.399.a liter 0.002 38,000.00 76.00
JUMLAH HARGA BAHAN 811.35
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,575.35
E Overhead & Profit 10% 0.100 157.54
F Harga Satuan Pekerjaan (D+E) 1,732.00

A.8.4.5.8 (K3) Pengetesan 1 m pipa Ø 400 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.008 85,000.00 680.00
Mandor L.04 OH 0.001 105,000.00 84.00
JUMLAH TENAGA KERJA 764.00
B BAHAN
Air M.550.a m3 0.126 3,850.00 485.10
Pertalite M.395.b liter 0.060 7,700.00 462.00
Oli mesin M.399.a liter 0.002 38,000.00 76.00
JUMLAH HARGA BAHAN 1,023.10
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,787.10
E Overhead & Profit 10% 0.100 178.71
F Harga Satuan Pekerjaan (D+E) 1,965.00

A.8.4.5.9 (K3) Pengetesan 1 m pipa Ø 500 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.008 85,000.00 680.00
Mandor L.04 OH 0.001 105,000.00 84.00
JUMLAH TENAGA KERJA 764.00
B BAHAN
Air M.550.a m3 0.158 3,850.00 608.30
Pertalite M.395.b liter 0.060 7,700.00 462.00
Oli mesin M.399.a liter 0.002 38,000.00 76.00
JUMLAH HARGA BAHAN 1,146.30
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,910.30
E Overhead & Profit 10% 0.100 191.03
F Harga Satuan Pekerjaan (D+E) 2,101.00

A.8.4.5.10 (K3) Pengetesan 1 m pipa Ø 600 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.008 85,000.00 680.00
Mandor L.04 OH 0.001 105,000.00 84.00
JUMLAH TENAGA KERJA 764.00
B BAHAN
Air M.550.a m3 0.283 3,850.00 1,089.55
Pertalite M.395.b liter 0.060 7,700.00 462.00
Oli mesin M.399.a liter 0.002 38,000.00 76.00
JUMLAH HARGA BAHAN 1,627.55
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 2,391.55
E Overhead & Profit 10% 0.100 239.16
F Harga Satuan Pekerjaan (D+E) 2,630.00
A.8.4.6 HARGA SATUAN PEKERJAAN ELEKTRIKAL
A.8.4.6.1 (K3) Pemasangan 1 buah titik lampu (Fitting Keramik)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Tukang listrik L.02 % 100.000 110,000.00 110,000.00
JUMLAH TENAGA KERJA 110,000.00
B BAHAN
Pipa listrik 5/8” M.475 btg 2.000 7,800.00 15,600.00
Kabel NYM 2 x 1.5 mm2 M.504.a m 10.000 8,800.00 88,000.00
T Dus (biasa) M.476.b buah 1.000 1,100.00 1,100.00
L Bow M.478 buah 2.000 500.00 1,000.00
Las Dop M.479 buah 3.000 450.00 1,350.00
Klem Pipa Listrik M.480 buah 12.000 1,200.00 14,400.00
Mongkok (Listrik) M.481 buah 1.000 1,200.00 1,200.00
Saklar Tunggal biasa M.482.a buah 1.000 6,800.00 6,800.00
Fitting DK E 27 / Keramik M.509.b buah 1.000 9,500.00 9,500.00
JUMLAH HARGA BAHAN 138,950.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 248,950.00
E Overhead & Profit 10% 0.100 24,895.00
F Harga Satuan Pekerjaan (D+E) 273,845.00

A.8.4.6.2 (K3) Pemasangan 1 buah MCB (6 A)


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Tukang listrik L.02 % 100.000 110,000.00 110,000.00
JUMLAH TENAGA KERJA 110,000.00
B BAHAN
Pipa listrik 5/8” M.475 btg 3.000 7,800.00 23,400.00
Kabel NYA 2.5 mm M.507.b m 15.000 4,300.00 64,500.00
T Dus (biasa) M.476.b buah 1.000 1,100.00 1,100.00
L Bow M.478 buah 2.000 500.00 1,000.00
Klem Pipa Listrik M.480 buah 24.000 1,200.00 28,800.00
MCB 6 A, 1 Phase M.500.a buah 1.000 50,000.00 50,000.00
JUMLAH HARGA BAHAN 168,800.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 278,800.00
E Overhead & Profit 10% 0.100 27,880.00
F Harga Satuan Pekerjaan (D+E) 306,680.00