Uraian Material3
Uraian Material3
Bongkar Pasangan=2,9m3
Cor beton=59,36m3
Bekestink=735m2
Tulangan/pembesian=6491kg
Pasangan =196m2
pelapon=741m2/2
lantai/keramik=670m2/2
Pengecatan=420m2/2
(KUSDI)
URAIAN MATERIAL
Bergesting
Kasau 5/5= 23 m3
Paku 2in = 330 kg, paku 3in = 20kg, paku 4in= 30kg
Tulangan
Besi D 12 = 92 Btg
Adukan Cor
Split 1,5x2,5 = 48 M3
Pasir cor = 42 m3
Pasangan
Pasir pasang = 24 m3
Semen = 32 sak
( KUSDI