Anda di halaman 1dari 1

BUBUNGAN EL+11.

26

3.657
4.457

RING BALK 2 EL+7.60


1.100

RING BALK 1 EL+6.80


PLAFOND EL+6.50
0.500

HEAD EL+6.00
11.257

3.300
2.500

MUKA LANTAI 1 EL+3.50


0.400

PLAFOND EL+3.10
1.350
3.500

BORDES EL+1.75
1.750

MUKA L.DASAR EL±0.00


0.400

MUKA TANAH EL-0.40

3.000 4.000 3.000 2.000

7.000 5.000

12.000

G E D C A

08 TAMPAK BELKANG
Ars 08 Skala 1:120

LOKASI PROYEK DETAIL ENGINEERING DESIGN (DED) PERENCANA


C:\Users\UNTUK GURU\Documents\logo ali.png

RUBBAYYI SHAFFIYYAH
NAMA PROYEK RUMAH 2 LT TYPE BOUGENVILE
TANGGAL REVISI TGL CATATAN
1.SEMUA SATUAN DIMENSI MENGGUNAKAN SATUAN MILILMETER (MM)
JUDUL GAMBAR MENGETAHUI 2.SEMUA SATUAN ELVASI MENGGUNAKAN SATUAN METER (M)
3.TITIK DUGA ±0.00 DI AMBIL DARI AS JALAN +0.35
TENAGA AHLI 4.KEMIRINGNA ATAP 35°
TAMPAK BELAKANG DRAFTER
5.TEBAL DINDING 15 CM TERMASUK PLESTERAN DAN ACIAN
NOTASI : FFL = FLOOR FINISHING LEVEL
GL = GROUND LEVEL = ARAH POTONGAN
SKALA GAMBAR KODE GAMBAR NO.GMB JML.GMB DEVELOPER FD = FLOOR DRAIN
Up = NAIK = ARAH TAMPAK
1 : 100 SMKN 1 NGANJUK Dn = TURUN

Anda mungkin juga menyukai