1 2 4 5 6
CARPORT 17.00 7.50
I PEK. PERSIAPAN / PENDAHULUAN 75.00 55.00
1 Pembuatan Papan Proyek LS 1.00 80.00 109.25 109.50
2 Administrasi LS 1.00
3 Pek.Pengukuran/Bouwplank LS 1.00
4 Air Kerja LS 1.00
1 2 4 5 6
II PEKERJAAN TANAH DAN PASIR
1 Galian Tanah Pondasi M3 P = 273.75 M¹ V = 273.75 x 0.80 x 0.85
A = 0.80 M¹ V = 186.15 M3
T = 0.85 M¹
TOTAL VOLUME GALIAN = 198.65 M3
= 66.22 M3
JUMLAH HARGA
NO. URAIAN PEKERJAAN PEKERJAAN
( Rp.)
1 2 3
I PEKERJAAN PENDAHULUAN Rp. 10,549,000.00
II PEKERJAAN TANAH DAN PONDASI Rp. 17,113,343.16
III PEKERJAAN BETON Rp. 30,652,742.32
IV PEKERJAAN DINDING,PLESTERAN, PROFIL Rp. 38,423,648.19
V PEKERJAAN LANTAI Rp. 11,723,218.59
VI PEK. KUSEN PINTU, VENTILASI, KACA DAN ALAT PENGGANTUNG Rp. 22,466,009.57
VII PEKERJAAN RANGKA PLAFOND DAN PASANGAN PLAFOND Rp. 12,331,966.77
VIII PEKERJAAN KUDA-KUDA/KAP DAN PENUTUP ATAP Rp. 24,572,442.10
IX PEKERJAAN INSTALASI LISTRIK Rp. 2,576,951.19
X PEKERJAAN FINISHING DAN PENGECETAN Rp. 10,908,892.55
XI PEMBERSIHAN AKHIR Rp. 500,000.00
JUMLAH Rp. 181,818,214.44
A REAL COST Rp. 181,818,214.44
B PPN (10 %) Rp. 18,181,821.44
C JUMLAH (A + B ) Rp. 200,000,035.88
D DIBULATKAN Rp. 200,000,000.00
Unaaha, 2019
Dibuat Oleh :
Konsultan Perencana
CV. ????????????????????
?????????????????
Direktur
RENCANA ANGGARAN BIAYA (RAB)
Pekerjaan : Pembangunan Kios Cinderamata
Lokasi : Kawasan Obyek Wisata Alam Air Panas Sonai
Tahun Anggaran : 2019
I. PEKERJAAN PENDAHULUAN
1 Pengukuran dan Pemasangan Bouwplank Ls 1.00 Rp 2,000,000.00 Rp 2,000,000.00
2 Penyediaan air kerja, air minum, P3K Ls 1.00 Rp 2,500,000.00 Rp 2,500,000.00
3 Pembuatan Barak Kerja dan Gudang Ls 1.00 Rp 3,500,000.00 Rp 3,500,000.00
4 pembuatan papan nama proyek LS 1.00 Rp 250,000.00 Rp 250,000.00
5 Administrasi dokumen dan pelaporan Ls 1.00 Rp 2,299,000.00 Rp 2,299,000.00
Sub Jumlah Rp 10,549,000.0
II. PEKERJAAN TANAH DAN PONDASI
1 Galian Tanah Pondasi M3 15.33 Rp 71,875.00 Rp 1,101,843.75
2 Urugan Kembali Bekas Galian M3 4.60 Rp 51,750.00 Rp 237,998.25
3 Urugan Tanah Bawah Lantai dalam + Pemadatan M3 31.62 Rp 113,850.00 Rp 3,599,723.53
4 Urugan Pasir bawah Pondasi M3 1.28 Rp 146,050.00 Rp 186,578.88
5 Urugan Pasir Bawah Lantai dalam tebal 5 cm M3 2.95 Rp 146,050.00 Rp 431,303.91
6 Pek. Pasangan pondasi batu gunung, 1pc : 5Psr M3 11.50 Rp 891,968.75 Rp 10,255,410.70
7 Pek. Pasangan batu kosong M3 2.56 Rp 508,995.75 Rp 1,300,484.14
Sub Jumlah Rp 17,113,343.16
III. PEKERJAAN BETON
1 Pek Sloof 15x20 cm , 1Pc : 2Psr : 3Krl (200Kg+Bekisting) M3 0.85 Rp 6,862,446.75 Rp 5,861,215.77
2 Pek. Kolom Praktis Beton Bertulang (11 x 11) cm M1 45.60 Rp 165,036.50 Rp 7,525,664.40
3 Pek Balok Latey 10 x 15 pc : 2psr : 3krl M1 32.00 Rp 139,650.25 Rp 4,468,808.00
4 Pek Ringbalk 10 x 15 pc : 2psr : 3krl M1 36.50 Rp 139,650.25 Rp 5,097,234.13
5 Pek Plat Beton Kanopi T=10 Cm 1 Psr : 2 Krl : 3 Krl (150+Bktg) M3 0.96 Rp 6,642,745.00 Rp 6,377,035.20
6 Pek Rabat Beton Dalam bangunan 1Pc : 3Psr : 5Krl, tbl = 5 cm M3 1.74 Rp 761,041.25 Rp 1,322,784.82
Sub Jumlah Rp 30,652,742.32
IV. PEKERJAAN DINDING,PLESTERAN, PROFIL
1 Pek Dinding Tembok 1Pc : 5Psr M2 92.39 Rp 108,439.25 Rp 10,018,702.31
2 Pek Plesteran , 1Pc : 3Psr M2 194.38 Rp 62,691.10 Rp 12,185,896.02
3 Pek. Aluminium Composit Panel + Rangka Hollow 4/4 M2 18.44 Rp 879,796.58 Rp 16,219,049.86
Sub Jumlah Rp 38,423,648.19
V. PEKERJAAN LANTAI
1 Pas lantai keramik ukuran 40cm x 40cm M2 57.94 Rp 202,342.50 Rp 11,723,218.59
Unaaha, 2019
Dibuat Oleh :
Konsultan Perencana
CV. ????????????????????
?????????????????
Direktur
ANALISA HARGA SATUAN S.N.I
Pekerjaan : Pembangunan Kios Cinderamata
Lokasi : Kawasan Obyek Wisata Alam Air Panas Sonai
Tahun Anggaran : 2019
A.2.3.1.9. Pengurugan kembali 1 M³ galian dihitung dari 1/3 kali dari koefisien pekerjaan galian
Jumlah Harga
Harga Satuan
No. Uraian Kode Sat. Koef
(Rp)
(Rp)
A. TENAGA
Pekerja L.01 OH 0.500 80,000.00 40,000.00
Mandor L.04 OH 0.050 100,000.00 5,000.00
JUMLAH TENAGA KERJA 45,000.00
B. BAHAN
A.4.4.1.10. Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu camp. 1SP : 5PP
Jumlah Harga
Harga Satuan
No. Uraian KODE Satuan Koefisien
(Rp)
(Rp)
A. TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang Batu L.02 OH 0.100 90,000.00 9,000.00
Kepala Tukang L.03 OH 0.010 115,000.00 1,150.00
Mandor L.04 OH 0.015 100,000.00 1,500.00
JUMLAH TENAGA KERJA 35,650.00
B. BAHAN
Bata merah Bh 70.000 550.00 38,500.00
Semen Portland Kg 9.680 1,500.00 14,520.00
Pasir Pasang m3 0.045 125,000.00 5,625.00
JUMLAH HARGA BAHAN 58,645.00
C. PERALATAN
A.4.5.1.7. Pemasangan 1 m2 langit-langit Kalci board ukuran (120 x 240x6) mm, tebal 3,5 mm
Jumlah Harga
Harga Satuan
No. Uraian KODE Satuan Koefisien
(Rp)
(Rp)
A. TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Tukang Kayu L.02 OH 0.095 90,000.00 8,550.00
Kepala Tukang L.03 OH 0.005 115,000.00 575.00
Mandor L.04 OH 0.005 100,000.00 500.00
JUMLAH TENAGA KERJA 21,625.00
B. BAHAN
Kalci board Lbr 0.364 65,000.00 23,660.00
paku sekrup Kg 0.110 26,100.00 2,871.00
JUMLAH HARGA BAHAN 26,531.00
C. PERALATAN
A.4.6.1.2. Pembuatan dan pemasangan 1 m³ kusen pintu dan kusen jendela, kayu kelas ll
Jumlah Harga
Harga Satuan
No. Uraian KODE Satuan Koefisien
(Rp)
(Rp)
A. TENAGA
Pekerja L.01 OH 6.000 80,000.00 480,000.00
Tukang kayu L.03 OH 18.000 90,000.00 1,620,000.00
Kepala Tukang L.03 OH 1.800 115,000.00 207,000.00
Mandor L.04 OH 0.300 100,000.00 30,000.00
JUMLAH TENAGA KERJA 2,337,000.00
B. BAHAN
Balok kayu Kls II M³ 1.200 3,160,000.00 3,792,000.00
Paku 10cm Kg 1.250 17,000.00 21,250.00
Lem kayu Kg 1.000 34,000.00 34,000.00
JUMLAH HARGA BAHAN 3,847,250.00
C. PERALATAN
A.4.7.1.10. Pengecatan 1 m² tembok baru ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup )
Jumlah Harga
Harga Satuan
No. Uraian KODE Satuan Koefisien
(Rp)
(Rp)
A. TENAGA
Pekerja L.01 OH 0.020 80,000.00 1,600.00
Tukang cat L.02 OH 0.063 90,000.00 5,670.00
Kepala tukang L.03 OH 0.006 115,000.00 724.50
Mandor L.04 OH 0.003 100,000.00 300.00
JUMLAH TENAGA KERJA 8,294.50
B. BAHAN
amplas lmbr 0.500 4,200.00 2,100.00
Plamir kg 0.1000 4,250.00 425.00
Kuas Roll Bh 0.010 19,400.00 194.00
Cat dasar kg 0.100 4,800.00 480.00
Cat penutup kg 0.260 97,900.00 25,454.00
JUMLAH HARGA BAHAN 28,653.00
C. PERALATAN
Unaaha, 2019
Dibuat Oleh :
Konsultan Perencana
CV. ????????????????????
?????????????????
Direktur
-
STANDAR HARGA BAHAN DAN UPAH KERJA
TAHUN ANGGARAN 2019
a b c d f
I. UPAH TENAGA NON SERTIFIKAT
1 Mandor Hari 100,000.00
2 Kepala tukang Hari 115,000.00
3 Tukang
- Tukang Listrik Hari 90,000.00
- Tukang kayu Hari 90,000.00
- Tukang batu Hari 90,000.00
-Tukang besi Hari 90,000.00
- Tukang Cat Hari 90,000.00
4 Pekerja Hari 80,000.00
5 Sopir Hari 100,000.00
6 Operator Alat Berat Hari 150,000.00
7 Pembantu Operator Hari 100,000.00
8 Penjaga Malam Hari 50,000.00
II. UPAH TENAGA BERSERTIFIKAT
1 Mandor Hari 138,000.00
2 Kepala tukang Hari 155,250.00
3 Tukang
- Tukang Listrik Hari 115,000.00
- Tukang kayu Hari 115,000.00
- Tukang batu Hari 115,000.00
-Tukang besi Hari 115,000.00
- Tukang Cat Hari 115,000.00
4 Pekerja Hari 103,500.00
5 Sopir Hari 100,000.00
6 Operator Alat Berat Hari 150,000.00
7 Pembantu Operator Hari 100,000.00
8 Mekanik Hari 100,000.00
9 Pembantu Mekanik Hari 125,000.00
BIDANG CIPTA KARYA
A. BAHAN DASAR
1 Tanah urug biasa M3 45,000.00
2 Tanah urug pilihan M3 75,000.00
3 Pasir
- Pasir urug M3 85,000.00
- Pasir pasangan M3 125,000.00
- Pasir Beton M3 125,000.00
4 Batu Gunung Hitam (Ulu Meraka) M3 250,000.00
5 Batu Gunung Karang (Sonai) M3 220,000.00
6 Batu merah (Sonai) Bh 550.00
7 Batako Uk. 20 x 40 x10 cm Bh 7,000.00
8 Paving Blok biasa Bh 6,000.00
9 Paving Blok warna Bh 6,500.00
10 Terawang/Loster Beton Bh 7,000.00
11 Kerb Beton Bh 37,500.00
12 Batu Alam M2 147,500.00
13 Batu Kali
- Suplit 7 - 10Cm M3 375,000.00
- Suplit 5 - 7Cm M3 375,000.00
- Suplit 3 - 5 cm M3 375,000.00
- Suplit 2 - 3 cm M3 375,000.00
- Suplit 1 - 2 cm M3 375,000.00
NO URAIAN SAT. WILAYAH DARATAN KET.
a b c d f
- Suplit 0,5 - 1 cm M3 375,000.00
14 Kerikil M3 120,000.00
15 Sirtu M3 105,000.00 Quary
16 Tasirtu M3 105,000.00 Quary
16 Air Ltr 50.00
17 Semen portland 50 kg Kg 1,500.00
18 Semen warna Kg 22,900.00
B. BAHAN LANTAI
1 Tegel Keramik
- Ukuran 20 x 20 cm Bh 3,760.00
- Ukuran 30 x 30 cm ( Polos ) Bh 5,000.00
- Ukuran 30 x 30 cm ( Motiv ) Bh 6,000.00
- Ukuran 40 x 40 cm Bh 11,000.00
- Ukuran 60 x 60 cm Bh 57,500.00
- Anti slip ukuran 20 x 20 cm Bh 37,600.00
- Anti Slip Ukuran 40 x 40 cm Bh 12,000.00
- Anti Slip Ukuran 60 x 60 cm Bh 73,500.00
- Dinding keramik 20 x 25 Bh 4,000.00
- Keramik Lantai plint 10 x 30 Bh 2,750.00
- Keramik Lantai plint 10 x 40 Bh 4,067.00
- Keramik Lantai plint 10 x 60 Bh 9,583.33
2 Tegel Keramik ( Granit Tile )
- Ukuran 60 x 60 cm Bh 120,000.00
- Ukuran 60 x 60 cm ( Anti Slip ) Bh 128,000.00
- Keramik Lantai plint 10 x 60 Bh 20,000.00
3 Tegel kuku / sudut M1 15,600.00
4 Tempat sabun keramik Bh 75,000.00
C. BAHAN KAYU
1 Papan Kayu Jati M3 4,500,000.00
2 Balok Kayu Jati M3 4,500,000.00
3 Papan Kayu Bayam M3 3,160,000.00
4 Balok Kayu Bayam M3 3,160,000.00
5 Papan Kayu Kalapi M3 3,160,000.00
6 Balok Kayu Kalapi M3 3,160,000.00
7 Papan Kayu Silai M3 1,700,000.00
8 Balok Kayu Silai M3 1,700,000.00
9 Papan Kayu Ponto/Balola M3 1,700,000.00
10 Balok Kayu Ponto/Balola M3 1,700,000.00
11 Papan Kayu Maranti M3 1,700,000.00
12 Balok Kayu Maranti M3 1,700,000.00
13 Balok / Papan bekisting M3 1,100,000.00
14 Dolken 5 cm Btg 5,000.00
15 Dolken 10 cm Btg 8,000.00
D. BAHAN LANGIT-LANGIT
1 Tripleks 122 x 244 x 0,3 MM Lbr 50,000.00
2 Tripleks 122 x 244 x 0,6 MM Lbr 80,000.00
3 Tripleks 122 x 244 x 0,9 MM Lbr 135,000.00
4 Teakwood 122 x 244 x 0,3 cm Lbr 86,250.00
5 Multipleks 4 mm Lbr 82,800.00
6 Multipleks 6 mm Lbr 98,325.00
7 Multipleks 9 mm Lbr 155,250.00
8 Eternit 3 mm Lbr 15,525.00
9 Playwood 4 mm Lbr 90,000.00
10 Gipsum Board 240 x 120 x 0,4 mm Lbr 67,275.00
11 Gipsum Board 240 x 120 x 0,6 mm Lbr 85,000.00
12 Kalci Board 240 x 120 x 0,35 mm Lbr 65,000.00
13 Kalci Board 240 x 120 x 0,6 mm Lbr 75,375.00
14 List Profil Kayu Kelas II M' 4,312.50
15 List Profil Gipsum lebar 15 cm M' 22,000.00
E. BAHAN ATAP
NO URAIAN SAT. WILAYAH DARATAN KET.
a b c d f
1 Atap Sirap/Sagu Lbr 7,500.00
2 Atap Spandek Kaki 8,500.00
3 Genteng Metal Roof Lbr 69,000.00
4 Sakura Roof Lbr 35,000.00
5 Asbes Gelombang Kaki 20,850.00
6 Asbes Gel. 092x250 Lbr 145,950.00
7 Seng BWG 34" BJLS 0,20 mm Kaki 7,500.00
8 Seng Plat BWG " BJLS 0,30 mm Lbr 25,500.00
9 Nok/Bumbungan Galvalum M' 18,975.00
10 Nok Atap Sakura Roof Bh 27,500.00
11 Nok Genteng Metal
- Nok C Rad: 9 - 9,5 P=40 cm Bh 27,500.00
- Nok putri P: 109 cm Ef:80 cm Bh 43,100.00
- Nok Ratu P: 91 cm Ef:80 cm Bh 35,578.50
- Nok Raja P: 104 cm Ef:80 cm Bh 48,500.00
- Nok U P: 110 cm Bh 27,500.00
- Nok Samping P: 110 cm Bh 13,650.00
- Tutup Nok Bh 36,500.00
10 Dinabolt Bh 1,500.00
11 Karet Pelapis Genteng M' 6,750.00
F. BAHAN BESI
1 Kawat Berduri 35m/roll Rol 165,000.00
2 Kawat beton Kg 17,500.00
3 Kawat Las Kg 25,000.00
4 Kawat Bronjong Kg 43,600.00
5 Besi Beton Polos Kg 18,500.00
6 Paku Campur 5-10 Kg 17,000.00
7 Paku Sakura Roof Kg 31,300.00
8 Paku Tripleks Kg 27,500.00
9 Paku Seng Dos 27,500.00
10 Paku Beton Kg 35,000.00
11 Baut Fischer Bh 2,000.00
12 Paku sekrup Kg 26,100.00
13 Besi strip Kg 21,000.00
14 Besi Siku Kg 17,000.00
15 Baja IWF Kg 18,500.00
16 Srew Steel 10 x 16 x 20 Bh 250.00
17 Srew Steel 10 x 16 x 22 Bh 350.00
18 Alminium Uk 4 x 10 cm M' 45,000.00
19 Alminium Uk 3 x 8 cm M' 35,000.00
20 Plat Alluminium t = 0,4 mm M' 22,400.00
21 Plat Alluminium t = 0,6 mm M' 27,400.00
22 Plat Alluminium t = 0,8 mm M' 33,600.00
23 Truss baja Ringan Galvanis 75 - 74 - 30 M' 16,900.00
24 Truss baja Ringan Galvalun 75 - 74 - 30 M' 26,300.00
25 Truss baja Ringan Apluss Galvanis 80 - 75 - 32 M' 25,350.00
26 Truss baja Ringan apluss zincalume 80 - 75 - 32 M' 26,300.00
27 Profil C.75. 300 (Baja ringan multitruss) M' 87,750.00
28 Profil C.75. 100 (Baja ringan multitruss) M' 49,140.00
29 Profil C.75. 75(Baja ringan multitruss) M' 45,922.50
30 Reng Essar galvanis M' 16,000.00
31 Reng Apro galvalum M' 16,000.00
32 Reng Spiro galvanis M' 15,600.00
33 Besi Hollow 2 x 4 cm Tebal 0,6 mm M' 14,000.00
34 Besi Hollow 2 x 4 cm Tebal 1,2 mm M' 15,500.00
35 Besi Hollow 4 x 4 cm Tebal 1,2 mm M' 18,000.00
36 Sekrup Bh 1,000.00
37 Sealent M' 10,000.00
38 Dynabolt Bh 14,000.00
39 Bracket Siku M' 12,500.00
40 Aluminium Composit Panel Lbr 900,000.00
NO URAIAN SAT. WILAYAH DARATAN KET.
a b c d f
G. PERPIPAAN AIR BERSIH
G.1 Pipa PVC SNI
1 Diameter 1/2 Inch M' 4,500.00
2 Diameter 3/4 Inch M' 9,500.00
3 Diameter 1 Inch M' 11,250.00
4 Diameter 1 - 1/4 Inch M' 12,250.00
5 Diameter 1 - 1/2 Inch M' 17,000.00
6 Diameter 2 Inch M' 28,900.00
7 Diameter 2 - 1/2 Inch M' 31,000.00
8 Diameter 3 Inch M' 59,000.00
9 Diameter 4 Inch M' 87,250.00
10 Diameter 6 Inch M' 149,725.00
11 Diameter 8 Inch M' 234,050.00
12 Diameter 10 Inch M' 365,212.50
13 Diameter 12 Inch M' 581,300.00
G.2 Pipa GI
1 Pipa Ø 1/2 " GIP M' 21,250.00
2 Pipa Ø 3/4 " GIP M' 27,625.00
3 Pipa Ø 1 " GIP M' 41,700.00
4 Pipa Ø 1,5 " GIP M' 63,750.00
5 Pipa Ø 2 " GIP M' 87,125.00
6 Pipa Ø 2,5 " GIP M' 111,200.00
7 Pipa Ø 3 " GIP M' 143,700.00
8 Pipa Ø 4 " GIP M' 207,500.00
9 Pipa Ø 6 " GIP M' 339,200.00
G.3 Asesories Standar SNI
1 Gate Valves JIS 10K Ø 2 " GI Bh 1,079,000.00
2 Gate Valves JIS 10K Ø 3 " GI Bh 1,677,000.00
3 Gate Valves JIS 10K Ø 4 " GI Bh 2,067,000.00
4 Gate Valves JIS 10K Ø 6 " GI Bh 3,822,000.00
5 Air Vent (Single Port) Ø 1/2 " GI Bh 1,079,000.00
6 Air Vent (Single Port) Ø 3/4 " GI Bh 1,339,000.00
7 Air Vent (Single Port) Ø 1 " GI Bh 1,677,000.00
8 Air Vent (Single Port) Ø 2 " GI Bh 3,081,000.00
9 Air Vent (Single Port) Ø 3 " GI Bh 3,822,000.00
10 Air Vent (Single Port) Ø 4 " GI Bh 6,175,000.00
11 Air Vent (Single Port) Ø 5 " GI Bh 9,932,000.00
12 Air Vent (Single Port) Ø 6 " GI Bh 13,351,000.00
13 Flanges Ø 3" GI Bh 113,190.00
14 Flanges Ø 4" GI Bh 147,290.00
15 Flanges Ø 5" GI Bh 217,620.00
16 Flanges Ø 6" GI Bh 318,500.00
17 Wosh Out Ø 2 " GI Bh 1,079,000.00
18 Wosh Out Ø 3 " GI Bh 1,677,000.00
19 Wosh Out Ø 4 " GI Bh 2,067,000.00
20 Wosh Out Ø 6 " GI Bh 3,822,000.00
G.4 Standar Fitting JIS K-6743
1 Union Socket (AW) 1/2 Inch Bh 17,173.00
2 Union Socket (AW) 3/4 Inch Bh 22,770.00
3 Union Socket (AW) 1 Inch Bh 34,344.75
4 Union Socket (AW) 1 - 1/4 Inch Bh 51,525.75
5 Union Socket (AW) 1 - 1/2 Inch Bh 73,149.00
6 Faucet Elbow With Metal Insert 1/2 Inch Bh 13,377.75
7 Faucet Elbow With Metal Insert 3/4 Inch Bh 20,172.75
8 Faucet Elbow 1/2 Inch Bh 4,034.25
9 Faucet Elbow 3/4 Inch Bh 5,379.75
10 Cap (AW)1/2 Inch Bh 1,344.75
11 Cap (AW) 3/4 Inch Bh 2,689.50
12 Cap (AW) 1 Inch Bh 4,034.25
13 Cap (AW) 6Inch Bh 8,742.00
14 Cap (AW) 8 Inch Bh 14,121.00
NO URAIAN SAT. WILAYAH DARATAN KET.
a b c d f
15 Reducing Socket (AW) 3/4 Inch x 1/2 Inch Bh 3,437.25
16 Reducing Socket (AW) 1 Inch x 1/2 Inch Bh 4,009.50
17 Reducing Socket (AW) 1 Inch x 3/4 Inch Bh 4,009.50
18 Reducing Socket (AW) 1 -1/4 Inch x 1/2 Inch Bh 6,873.75
19 Reducing Socket (AW) 1 -1/4 Inch x 3/4 Inch Bh 7,446.75
20 Reducing Socket (AW) 1 -1/4 Inch x 1 Inch Bh 8,019.00
21 Reducing Socket (AW) 1 -1/2 Inch x 1/2 Inch Bh 12,029.25
22 Reducing Socket (AW) 1 -1/2 Inch x 1 Inch Bh 8,019.00
23 Reducing Socket (AW) 1 -1/2 Inch x 3/4 Inch Bh 12,029.25
24 Reducing Socket (AW) 1 -1/2 Inch x 1 - 1/4 Inch Bh 13,747.50
25 Reducing Socket (AW) 2 Inch x 1 Inch Bh 17,757.00
26 Reducing Socket (AW) 2 Inch x 1 - 1/4 Inch Bh 20,048.25
27 Reducing Socket (AW) 2 Inch x 1 - 1/2 Inch Bh 22,912.50
28 Reducing Socket (AW) 4 Inch x 1 - 1/2 Inch Bh 4,009.50
29 Reducing Socket (AW) 4 Inch x /2 Inch Bh 45,825.00
30 Reducing Socket (AW) 4 Inch x 3 Inch Bh 51,552.75
31 Reducing Socket (AW) 6 Inch x 3 Inch Bh 85,921.50
32 Reducing Socket (AW) 6 Inch x 4 Inch Bh 91,649.25
33 Reducing Socket (AW) 6 Inch x 5 Inch Bh 94,513.50
34 Reducing Socket (AW) 8 Inch x 5 Inch Bh 143,199.75
35 Union Thread (AW) 1/2 Inch Bh 22,912.50
36 Union Thread (AW) 3/4 Inch Bh 28,641.00
37 Union Thread (AW) 1 Inch Bh 40,096.50
38 Union Thread (AW) 1 - 1/4 Inch Bh 51,552.75
39 Union Thread (AW) 1 - 1/2 Inch Bh 74,465.25
40 Faucet socket with Metal Insert (AW) 1/2 Inch Bh 11,456.25
41 Faucet socket with Metal Insert (AW) 3/4 Inch Bh 17,184.00
42 Faucet Socket (AW) 1/2 Inch Bh 2,864.25
43 Faucet Socket (AW) 3/4 Inch Bh 4,009.50
44 Faucet Socket (AW) 1 Inch Bh 5,727.75
45 Faucet Socket (AW) 1 - 1/4 Inch Bh 8,592.75
46 Faucet Socket (AW) 1 - 1/2 Inch Bh 17,184.00
47 Faucet Socket (AW) 1 Inch x 1/2 Inch Bh 572.25
48 Faucet Socket (AW) 1 Inch x 3/4 Inch Bh 687.00
49 Faucet Socket (AW) 2 Inch Bh 22,912.50
50 Plug (AW) 1/2 Inch Bh 3,437.25
51 Plug (AW) 3/4 Inch Bh 5,727.75
52 Elbow (AW) 1/2 Inch Bh 3,437.25
53 Elbow (AW) 3/4 Inch Bh 4,583.25
54 Elbow (AW) 1 Inch Bh 5,727.75
55 Elbow (AW) 1 - 1/4 Inch Bh 11,456.25
56 Elbow (AW) 1 - 1/2 Inch Bh 17,184.00
57 Elbow (AW) 2 Inch Bh 28,641.00
58 Elbow (AW) 2 inch x 1/2 Inch Bh 16,812.00
59 Elbow (AW) 3 Inch Bh 40,096.50
60 Elbow (AW) 4 Inch Bh 74,465.25
61 Elbow (AW) 5 Inch Bh 85,921.50
62 Elbow (AW) 6 Inch Bh 143,202.00
63 Elbow (AW) 8 Inch Bh 315,044.25
64 Faucet Tee (AW) 1/2 Inch Bh 4,981.50
65 Valve Socket (AW) 1/2 Inch Bh 3,735.75
66 Valve Socket (AW) 3/4 Inch Bh 4,981.50
67 Valve Socket (AW) 1 Inch Bh 6,248.25
68 Valve Socket (AW) 1 - 1/4 Inch Bh 9,339.00
69 Valve Socket (AW) 1 - 1/2 Inch Bh 18,678.75
70 Valve Socket (AW) 2 Inch Bh 24,905.25
71 Valve Socket (AW) 1 Inch x 1/2 Inch Bh 3,735.75
72 Valve Socket (AW) 1 Inch x 3/4 Inch Bh 6,248.25
73 Socket (AW) 1/2 Inch Bh 3,735.75
74 Socket (AW) 3/4 Inch Bh 4,981.50
75 Socket (AW) 1 Inch Bh 6,226.50
NO URAIAN SAT. WILAYAH DARATAN KET.
a b c d f
76 Socket (AW) 1 - 1/4 Inch Bh 9,339.00
77 Socket (AW) 1 - 1/2 Inch Bh 12,452.25
78 Socket (AW) 2 Inch Bh 18,678.75
79 Socket (AW) 3 Inch Bh 24,905.25
80 Socket (AW) 4 Inch Bh 56,035.50
81 Socket (AW) 6 Inch Bh 118,297.50
82 45 0 Elbow (D - 45 L) 1 - 1/2 Inch Bh 6,226.50
83 46 0 Elbow (D - 45 L) 1 - 1/4 Inch Bh 9,339.00
84 47 0 Elbow (D - 45 L) 2 Inch Bh 15,565.50
85 48 0 Elbow (D - 45 L) 2 - 1/2 Inch Bh 24,905.25
86 49 0 Elbow (D - 45 L) 3 Inch Bh 31,130.25
87 50 0 Elbow (D - 45 L) 4 Inch Bh 49,809.75
88 51 0 Elbow (D - 45 L) 6 Inch Bh 93,392.25
89 52 0 Elbow (D - 45 L) 8 Inch Bh 161,880.75
90 53 0 Elbow (D - 45 L) 10 Inch Bh 277,065.00
91 Tee (AW) 1/2 Inch Bh 3,735.75
92 Tee (AW) 3/4 Inch Bh 4,981.50
93 Tee (AW) 1 Inch Bh 6,226.50
94 Tee (AW) 1 - 1/4 Inch Bh 9,339.00
H BAHAN PENYAMBUNG DAN POMPA AIR
1 Kran Kuning dia 1/2" Bh 20,000.00
2 Kran Kuning dia 3/4" Bh 32,500.00
3 Penyambung Pipa PVC
- Soker dia 1/2" s/d 3/4" Bh 3,135.00
- Knee dia 1/2" s/d 3/4" Bh 3,135.00
- Elbow dia 1/2" s/d 3/4" Bh 3,950.00
- Tee Stuk dia 1/2" s/d 3/4" Bh 3,700.00
4 Lerm Pipa PVC Ltr 29,600.00
5 Lem Alteco 110 Bh 5,200.00
6 Pompa Air Taman 1 PK Pedroloc Bh 4,450,000.00
H. BAHAN FINISHING / CAT
1 Amplas Kasar Lbr 4,200.00
2 Amplas Halus Lbr 4,200.00
3 Meni Kayu Kg 23,000.00
4 Meni Besi Kg 30,000.00
5 Minyak Cat Ltr 25,000.00
6 Calsium Kg 20,000.00
7 Alkasid Kg 18,000.00
8 Plamur tembok Zak 85,000.00
9 Politur Ltr 41,600.00
10 Spritus Ltr 21,900.00
11 Vernis Ltr 45,000.00
12 Dempul Kayu Kg 15,200.00
13 Cat Tembok
- Boyo 23 kg Kg 4,800.00
- Avitex Kg 9,500.00
- Metrolite Kg 24,400.00
- Propan Kg 24,400.00
- Kimex Kg 24,400.00
- Vinilex Nippon Paint Kg 97,900.00
14 Cat Kayu
- Gloteks Kg 46,000.00
- Avian Kg 50,000.00
15 Plamur Tembok Boyo 23 kg Kg 8,800.00
16 Cat Atap
- AGA Kg 39,580.00
- Lem Seng Bh 10,750.00
17 Residu Kg 8,900.00
18 Compoun Zak 36,000.00
19 Cotton Plaster (untuk gypsum) Bh 10,000.00
20 Teak Oil Kg 16,800.00
NO URAIAN SAT. WILAYAH DARATAN KET.
a b c d f
21 Kuas Biasa 3 cm Bh 4,390.00
22 Kuas Biasa 4 cm Bh 5,370.00
23 Kuas Biasa 5 cm Bh 5,370.00
24 Kuas Roll Bh 19,400.00
25 Lem Kayu Fox Kg 34,000.00
26 Soda api Kg 25,000.00
27 Solar Ltr 8,000.00
28 Minyak Pelumas Ltr 37,000.00
29 Walpapeper M² 58,320.00
30 Karpet M² 765,000.00
I BAHAN PENGGANTUNG
1 Kunci Tanam 2 x Putar Bh 258,750.00
2 Kunci Tanam 1 x Putar Bh 129,300.00
3 Kunci Tanam Antik Bh 258,750.00
4 Kunci Gembok Besar Bh 75,900.00
5 Kunci Sedang Bh 61,668.75
6 Kunci Gembok Kecil Bh 25,800.00
7 Grendel Biasa Bh 4,300.00
8 Grendel Tanam Bh 24,150.00
9 Engsel Kupu-Kupu Pasang Bh 9,315.00
10 Engsel Antik 3 x 4 Bh 15,525.00
11 Door Closer Bh 156,700.00
12 Kait Angin Bh 9,400.00
J BAHAN PERALATAN TUKANG
1 Palu-palu 8 RB Pound Bh 69,000.00
2 Palu-palu 10 RB Pound Bh 94,875.00
3 Palu-palu 12 RB Pound Bh 103,500.00
4 Sekopang RRT Bh 77,625.00
5 Pikuil Asli Bh 86,250.00
6 Sepatu Air (Kerja) Bh 51,750.00
K BAHAN KACA
1 Kaca Bening 2 mm M2 81,900.00
2 Kaca Bening 3 mm M2 86,250.00
3 Kaca Bening 5 mm M2 103,500.00
4 Kaca Rayban 5 mm M2 155,000.00
5 Kaca Bening 8 mm M2 378,000.00
6 Kaca Rayban 8 mm M2 400,000.00
7 Kaca Bening 12 mm M2 600,000.00
8 Kaca Rasa (Cermin) Lembar M2 34,500.00
9 Glass Block Bh 27,500.00
10 Jendela nako (rangka + kaca 5 mm) M2 115,400.00
11 Lem sealent Kg 81,000.00
L BAHAN SANITER
1 Kloset Duduk Toto Bh 1,725,000.00
2 Kloset Duduk KIA Bh 450,000.00
3 Kloset Jongkok Porselin Bh 120,000.00
4 Bak Cuci Logam 1 Lubang Bh 261,200.00
5 Bak Mandi Fiber Glass Bh 593,750.00
6 Pompa Tangan (Air) Bh 3,018,750.00
7 Bak fibreglass (Reservoir 1000 Ltr) Bh 1,015,000.00
8 Bak fibreglass (Reservoir 1200 Ltr) Bh 1,364,000.00
9 Bak fibreglass (Reservoir 5000 Ltr) Bh 7,000,000.00
10 Wastafel dinding Merek Ace Bh 750,000.00
11 Wastafel meja Merek Ace Bh 558,000.00
12 Urinoir Ex.Toto Bh 1,567,500.00
13 Bak Kamar Mandi fiber glass Bh 157,300.00
14 Floor drain Bh 15,000.00
15 Tempat Sabun Merk Ina Bh 32,000.00
16 Kran. Dia 1/2" Bh 20,000.00
17 Kran. Dia 1/2" (wastafel) Bh 325,000.00
18 Kran. Dia 3/4" Bh 26,000.00
NO URAIAN SAT. WILAYAH DARATAN KET.
a b c d f
19 Seal tape Bh 2,900.00
20 Stop Kran Bh 30,000.00
21 Pintu PVC utk Kamar mandi + Kunci pintu Set 375,000.00
22 Pintu Alluminium utk Kamar mandi + Kunci pintu Set 1,350,000.00
M PERALATAN LISTRIK DAN KELENGKAPANNYA
1 Lampu Pijar biasa
- Philips 10 W Elear (gelas bening) Bh 5,500.00
- Philips 15 W Elear (gelas bening) Bh 6,000.00
- Philips 25 W Elear (gelas bening) Bh 6,500.00
- Philips 40 W Elear (gelas bening) Bh 7,000.00
- Philips 60 W Elear (gelas bening) Bh 7,800.00
- Philips 75 W Elear (gelas bening) Bh 9,000.00
- Philips 100 W Elear (gelas bening) Bh 11,100.00
- Philips 150 W Elear (gelas bening) Bh 12,300.00
- Philips 200 W Elear (gelas bening) Bh 14,400.00
- Philips 25 W Super Lux Bh 5,775.00
- Philips 40 W Super Lux Bh 6,435.00
- Philips 60 W Super Lux Bh 7,425.00
- Philips 75 W Super Lux Bh 7,425.00
- Philips 100 W Super Lux Bh 9,900.00
- Candle Frosted 25 W Lampu halaman Gelas Buram Bh 4,950.00
- Candle Frosted 40 W Lampu halaman Gelas Buram Bh 4,950.00
2 Lampu Downlight
- Philips 8 Watt Bh 47,500.00
- Philips 10 Watt Bh 50,000.00
- Philips 15 Watt Bh 55,000.00
- Philips 25 Watt Bh 65,000.00
- Philips 40 Watt Bh 110,000.00
3 Lampu SL
- SL.82/85 8 Watt Bh 27,225.00
- SL.82/85 14 Watt Bh 31,350.00
- SL.82/85 18 Watt Bh 34,650.00
- SL.82/85 23 Watt Bh 37,125.00
4 Lampu Pijar Merek Electra Luxram
- Ball Lamp 10 Watt (bening) Bh 4,400.00
- Ball Lamp 15 Watt (bening) Bh 5,500.00
- Ball Lamp 25 Watt (bening) Bh 5,500.00
- Ball Lamp 60 Watt (bening) Bh 5,500.00
- Ball Lamp 75 Watt (bening) Bh 5,500.00
- Ball Lamp 100 Watt (bening) Bh 7,150.00
5 Fitting
- Fitting Plafond Tampal No. 10 Bh 13,200.00
- Fitting Gantung RRT No. 218 Bh 7,700.00
- Fitting Kap KJ No. 216 CL Bh 13,750.00
- Fitting Plafound miring Porselin No. 220 Bh 6,600.00
NO URAIAN SAT. WILAYAH DARATAN KET.
a b c d f
- Fitting Kombinasi No. 226 Bh 10,560.00
- Fitting Cok No. 336 Bh 6,600.00
- Fitting Rosert Niko No. 410 Bh 6,600.00
6 Fitting Downlight
- Fitting Kecil Bh 25,000.00
- Fitting Sedang Bh 30,000.00
- Fitting Besar Bh 45,000.00
7 Saklar Inbow
- Saklar Engkel Broco Cream Radium Biasa Bh 15,400.00
- Saklar serie Broco Cream Radium Bh 17,600.00
- Saklar Triple Broco Cream Radium Bh 22,000.00
- Saklar Engkel Radium Broco Bh 18,700.00
- Saklar Serie Radium Broco Bh 18,700.00
- Saklar Engkel Radium KJ 101 R Bh 15,400.00
- Saklar Serie Radium KJ 101 R Bh 16,500.00
- Saklar Triple Radium KJ 102 R Bh 18,700.00
8 Saklar Outbow
- Saklar Engkel Bulat KJ 802 C Bh 6,600.00
- Saklar Serie Bulat KJ 803 C Bh 9,900.00
- Saklar Engkel Persegi KJ 311 U Bh 6,600.00
- Saklar Serie Persegi KJ 312 U Bh 9,900.00
- Saklar Engkel Persegi Broco 16.210 Bh 15,400.00
- Saklar Serie Persegi Broco 16.220 Bh 17,600.00
9 Stop Kontak Outbow
- Stop Kontak Arde Putih KJ 106 Bh 9,900.00
- Stop Kontak Arde Hitam Broco No. 6130 B Bh 16,500.00
10 Stop Kontak Inbow
- Stop Kontak AC RRT Set 45,375.00
- Stop Kontak Arde KJ 106 Bh 8,250.00
- Stop Kontak Arde Broco Cream 6.100 Bh 12,375.00
11 Penerangan Dalam Rumah
- Balon Pijar Philips 5 Watt/220 Volt Bh 4,026.00
- Balon Pijar Philips 10 - 40 Watt/220 Volt Bh 4,697.00
- Balon Pijar Philips 60 Watt/220 Volt Bh 5,368.00
- Balon Pijar Philips 100 Watt/220 Volt Bh 6,039.00
- Lampu TL Panjang (Travo) Philips 10W/220V Bh 46,970.00
- Lampu TL Panjang (Travo) Philips 18W/220V Bh 100,650.00
- Lampu TL Panjang (Travo) Philips 36W/220V Bh 117,425.00
- Lampu Philips Electronic SL 5 W/220V Bh 26,840.00
- Lampu Philips Electronic SL 12 W/220V Bh 30,195.00
- Lampu Philips Electronic SL 18 W/220V Bh 35,563.00
- Lampu Philips Electronic SL 36 W/220V Bh 41,602.00
- Lampu Philips Electronic SL 60 W/220V Bh 55,693.00
- Lampu Philips Electronic SL 100 W/220V Bh 84,546.00
12 Kabel Listrik
- Pipa Instalasi M' 7,400.00
- NYA Uk. 1,5 mm Rol (100 m) M' 5,450.00
- NYM Uk. 2 x 1,5 mm Rol (100 m ) Putih M' 4,520.00
- NYM Uk. 3 x 2,5 mm Rol (100 m ) Hitam M' 7,850.00
- NYM Uk. 3 x 4,0 M' 16,000.00
Unaaha, 2019
Dibuat Oleh :
Konsultan Perencana
CV. ????????????????????
?????????????????
NO URAIAN SAT. WILAYAH DARATAN KET.
a b c d f
Direktur
DAFTAR HARGA SATUAN PEKERJAAN
a b c d e
2 A.2.2.1.2. Pembuatan 1 m2 Pagar Sementara Dari Seng Gelombang Tinggi 2 meter Rp 239,803.75
3 A.2.2.1.3. Pembuatan 1 m2 Pagar Sementara Dari Kawat Duri Tinggi 1,8 meter Rp 4,813,118.00
9 A.2.3.1.9. Pengurugan kembali 1 M³ galian dihitung dari 1/3 kali dari koefisien pekerjaan galian Rp 51,750.00
5 A.3.2.1.5. Selokan Dari Pas. Batu Merah camp. 1 : 3 Uk. 25x25, camp. 1 : 3 + acian air semen Rp 169,373.44
7 A.3.2.1.10. Pemasangan 1 M³ Pondasi Siklop 60% Beton Campuran 1SP : 2PB : 3Kr Dan 40% Rp 3,874,666.25
a b c d e
6 A.3.1.1.6. Membongkar 1 m² rangka atap/ reng/ kaso (bongkaran tidak dipakai kembali) Rp 24,279.38
7 A.3.1.1.7. Membuat 1 M³ Beton Mutu f'ͼ = 19,3 Mpa ( K 225 ), Slump (12 ± 2 ) Cm, W/c = 0,58 Rp 193,510.50
8 A.3.1.1.8. Membuat 1 M³ Beton Mutu f'ͼ = 21,7 Mpa ( K 250 ), Slump (12 ± 2 ) Cm, W/c = 0,56 Rp 193,510.50
9 A.3.1.1.9. Membuat 1 M³ Beton Mutu f'ͼ = 24,0 Mpa ( K 275 ), Slump (12 ± 2 ) Cm, W/c = 0,53 Rp 193,510.50
6 A.3.1.1.10. Membongkar 1 m³ kuda-kuda/ gording/ balok (bongkaran tidak dipakai kembali) Rp 701,500.00
24 A.4.1.1.36. Membuat 1 m' Kolom Praktis Beton Bertulang (11 x 11) cm Rp 165,036.50
25 A.4.1.1.37. Membuat 1 m' Balok Latey Beton Bertulang (10 x 15) cm Rp 139,650.25
a b c d e
6 A.4.2.1.4. Pembuatan 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku Rp 1,217,648.75
20 A.4.2.1.18. Membuat & Pemasangan 1 m2 Ralling Tangga Pengaman besi hollow stainless Steel Rp 2,581,555.88
22 A.4.2.1.20. Pemasangan 1 m2 rangka besi hollow 1x40.40.1,2mm, modul 60 x 120 cm, dinding partisiRp 198,518.75
23 A.4.2.1.21. Pemasangan 1 m2 rangka besi hollow 1x40.40.0.6mm, modul 60 x 60 cm, Plafond Rp 350,176.15
1 A.4.4.1.1. Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu camp. 1 sp : 2 PP Rp 257,082.50
2 A.4.4.1.2. Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu camp. 1 sp : 3 PP Rp 358,196.25
3 A.4.4.1.3. Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu camp. 1 sp : 4 PP Rp 229,712.50
4 A.4.4.1.4. Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu camp. 1 sp : 5 PP Rp 223,502.50
5 A.4.4.1.5. Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu camp. 1 sp : 6 PP Rp 219,995.00
6 A.4.4.1.7. Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu camp. 1SP : 2PP Rp 123,423.75
7 A.4.4.1.8. Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu camp. 1SP : 3PP Rp 115,810.75
8 A.4.4.1.9. Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu camp. 1SP : 4PP Rp 111,291.25
9 A.4.4.1.10. Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu camp. 1SP : 5PP Rp 108,439.25
10 A.4.4.1.11. Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu camp. 1SP : 6PP Rp 106,668.25
11 A.4.4.1.12. Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu camp. 1SP : 8PP Rp 103,672.50
13 A.4.4.1.22. Pemasangan 1 m2 dinding terawang (rooster) 12x11x24 camp. 1SP : 3PP Rp 309,608.75
14 A.4.4.1.23. Pemasangan 1 m2 dinding terawang (rooster) 12x11x24 camp. 1SP : 4PP Rp 306,503.75
15 A.4.4.1.24. Pemasangan 1 cm2 dinding bata berongga ekspose 12x11x24 camp. 1SP : 3PP Rp 639,083.75
NO KODE URAIAN ANALISA HARGA SATUAN KET.
a b c d e
17 A.4.4.2.26. Pemasangan 1 m2 finishing siar pasangan batu kali, camp. 1SP : 2PP Rp 57,770.25
6 A.4.4.3.6. Pemasangan 1 m2 lantai Granit Tile ukuran 60cm x 60cm ( Anti Slip ) Rp 607,822.15
11 A.4.4.3.21. Pemasangan 1 m lantai plint Granit Tile ukuran 10cm x 60cm Rp 63,491.50
12 A.4.4.3.22. Pemasangan 1 m2 Lantai Keramik ukuran 40cm x 40cm ( anti slip ) Rp 209,530.00
13 A.4.4.3.23. Pemasangan 1 m2 Lantai Keramik ukuran 60cm x 60cm ( anti slip ) Rp 416,012.50
15 A.4.4.3.28. Pemasangan 1 m lantai plint Granit Tile ukuran 10cm x 60cm Rp 63,491.50
3 A.4.5.1.5. Pemasangan 1 m2 langit-langit tripleks ukuran (120 x 240 x 6) cm, tebal 6 mm Rp 56,896.25
5 A.4.5.1.7. Pemasangan 1 m2 langit-langit Kalci board ukuran (120 x 240x6) mm, tebal 3,5 mm Rp 55,379.40
a b c d e
2 A.4.5.2.31. Pemasangan 1 m' talang 1/2 lingkaran D-15 cm, seng plat BJLS 30 lembar 45 cm Rp 92,799.25
1 A.4.6.1.1. Pembuatan dan pemasangan 1 m³ kusen pintu dan kusen jendela, kayu kelas l Rp 8,891,512.50
2 A.4.6.1.2. Pembuatan dan pemasangan 1 m³ kusen pintu dan kusen jendela, kayu kelas ll Rp 7,111,887.50
3 A.4.6.1.3. Pembuatan dan pemasangan 1 m² pintu pintu klamp standar, kayu kelas ll Rp 303,168.75
4 A.4.6.1.4. Pembuatan dan pemasangan 1 m² pintu klamp sederhana,kayu kelas lll Rp 236,008.75
5 A.4.6.1.5. Pembuatan dan pemasangan 1 m² daun pintu panel, kayu kelas l Rp 674,475.00
6 A.4.6.1.6. Pembuatan dan pemasangan 1 m² Bingkai jendela kaca, kayu kelas lI Rp 457,286.00
7 A.4.6.1.7. Pembuatan dan pemasangan 1 m² pintu dan jendela jalusi kayu kelas ll Rp 700,051.00
13 A.4.6.1.19. Pemasangan 1 m² rangka langit-langit (50 x 100 ) cm, kayu kelas lll Rp 91,459.50
14 A.4.6.1.20. Pemasangan 1 m² rangka langit-langit (60 x 60 ) cm, kayu kelas lll Rp 91,321.50
17 A.4.6.1.26 Pemasangan 1 m² dinding lambrisering dari papan kayu kelas lII Rp 288,897.25
18 A.4.6.1.30 Pemasangan 1 m3 Balok Gelagar / Balok Pengaku / Sandaran Kayu Klas II Rp 5,439,787.50
a b c d e
4 A.4.7.1.4. 1 m² pengecatan bidang kayu baru (1 plamir, 1 lapis cat dasar, 2 lapis cat penutup) Rp 33,255.36
5 A.4.7.1.5. Pengecatan 1 m² bidang kayu baru (1 plamir, 1 lapis cat dasar, 3 lapis cat penutup) Rp 47,687.86
7 A.4.7.1.8. Pelaburan 1 m² bidang kayu dengan cat residu dan ter Rp 13,472.25
9 A.4.7.1.10. Pengecatan 1 m² tembok baru ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup ) Rp 42,489.63
10 A.4.7.1.11. Pengecatan 1 m² tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup ) Rp 28,947.80
13 A.4.7.1.17. Pengecatan 1 m² permukaan baja dengan menie besi dengan perancah Rp 56,645.78
7 A. 5.1.1.8. Pemasangan 1 Buah Bak Mandi Batu Bata Vol 0,30 M³ Rp 1,879,620.95
9 A. 5.1.1.15. Pemasangan 1 Buah Bak Kontrol Pasangan Bata 30cm x 30cm, tinggi 35 cm Rp 447,614.50
10 A. 5.1.1.16. Pemasangan 1 Buah Bak Kontrol Pasangan Bata 45cm x 45cm, tinggi 50 cm Rp 697,319.75
11 A. 5.1.1.17. Pemasangan 1 Buah Bak Kontrol Pasangan Bata 60cm x 60cm, tinggi 65 cm Rp 842,605.00
a b c d e
Unaaha, 2019
Dibuat Oleh:
CV. MALAPUA GROUP
Provinsi : Err:509
1 2 3 4 5 6
I. PEKERJAAN PERSIAPAN
3 - Pembuatan Gudang bahan, Peralatan & Bangsal kerja Ls 1.00 Rp 500,000 Rp 500,000
1 A.3.2.1.3. Pemasangan Pondasi Batu Belah Campuran 1SP : 5PP M³ 17.82 Rp 891,969 Rp 15,894,883
1 A.4.1.1.29. Membuat Sloef Beton Bertulang Uk. 15 x 20 Cm, (150 Kg Besi + Bekisting) M³ 0.18 Rp 6,862,447 Rp 1,235,240
2 A.4.1.1.32. Membuat Kolom Beton Bertulang Uk. 15 x 15 Cm, (150 Kg Besi + Bekisting) M³ 0.45 Rp 6,340,295 Rp 2,853,133
3 A.4.1.1.33. Membuat Balok Beton Bertulang Uk. 15 x 15 Cm, (150 Kg Besi + Bekisting) M¹ 0.14 Rp 6,356,711 Rp 889,940
4 A.4.1.1.38. Membuat Lantai beton bertulang Tebal 12 Cm, ( 150 Kg besi + bekisiting ) M³ 0.34 Rp 6,642,745 Rp 2,258,533
1 2 3 4 5 6
1 A.4.4.1.10. Pemasangan dinding bata merah tebal 1/2 batu camp. 1SP : 5PP M² 23.10 Rp 108,439 Rp 2,504,947
1 A.4.4.2.5. Pekerjaan plesteran Dinding camp. 1PC : 5PP tebal 15 mm. M² 46.20 Rp 58,651 Rp 2,709,683
2 A.4.4.2.3. Pekerjaan plesteran Kolom & Samping Pondasi camp. 1PC : 3PP tbl 15 mm M² 87.46 Rp 62,691 Rp 5,482,964
1 A.4.4.3.22. Pemasangan Lantai Keramik KM/WC, Uk. 40 Cm x 40 Cm (Anti Slip) M² 2.25 Rp 209,530 Rp 471,443
2 A.4.4.3.24. Pemasangan Dinding Keramik Tinggi 150 cm, Uk. 40cm x 40cm, KM/WC M² 10.80 Rp 242,984 Rp 2,624,222
1 A.4.6.1.20. Pemasangan Rangka Plafond Uk. 60 x 60 Cm, kayu kelas III M² 171.80 Rp 91,322 Rp 15,689,034
2 A.4.5.1.5. Pemasangan langit-langit tripleks Uk. 60 x 120 Cm, tebal 3 mm M² 171.80 Rp 56,896 Rp 9,774,776
1 A.4.5.2.30. Pemasangan talang datar/jurai seng BJLS 28 lembar 90 cm M¹ 18.00 Rp 141,991 Rp 2,555,829
2 A.4.5.2.34. Pemasangan Atap Seng Spandek Sokka Jempol M² 172.00 Rp 82,444 Rp 14,180,282
1 A.4.6.1.2. Pembuatan dan pemasangan kusen pintu dan jendela Uk. 4x13,5 Cm M³ 0.64 Rp 7,111,888 Rp 4,551,608
2 A.4.6.1.7. Pembuatan dan pemasangan daun pintu panel, kayu kelas II M² 3.78 Rp 700,051 Rp 2,646,193
3 A.4.6.1.6. Pembuatan dan pemasangan Bingkai jendela kaca, kayu kelas II M² 6.38 Rp 457,286 Rp 2,917,485
4 A.4.6.1.13. Pemasangan konstruksi kuda-kuda konvesional Uk. 8x12 Cm, kayu kls III M³ 2.77 Rp 4,413,930 Rp 12,226,586
5 A.4.6.1.15. Pemasangan Balok Bantalan/Gelagar Lantai Uk. 6/12 cm, Kayu Klas II M³ 1.12 Rp 5,572,498 Rp 6,241,197
8 A.4.6.1.13. Pemasangan konstruksi gordeng Uk. 6x12 Cm, kayu kelas III M³ 1.13 Rp 4,413,930 Rp 4,987,741
9 A.4.6.1.22. Pemasangan Kalsiplank Uk. P.3m x L.0,2m x T.0,06m M¹ 72.80 Rp 45,227 Rp 3,292,551
10 A.4.6.1.20. Pemasangan rangka dinding pemisah (60 x 120)cm,kayu kelas III M² 117.04 Rp 91,322 Rp 10,688,268
11 A.4.6.1.26 Pemasangan dinding lambrisering dari papan kayu kelas III M² 117.04 Rp 288,897 Rp 33,812,534
12 A.4.6.1.6. Pemasangan Papan Lantai & Tangga Uk. 3/30 Cm, Kayu Klas II M² 99.00 Rp 457,286 Rp 45,271,314
1 2 3 4 5 6
1 A.4.7.1.4. Pengecatan bidang kayu baru (1plamir, 1lapis cat dasar, 2lapis cat penutup) M² 234.08 Rp 33,255 Rp 7,784,413
Pelaburan bidang kayu Pintu panil dengan vernis
2 A.4.7.1.9. M² 7.56 Rp 42,861 Rp 324,025
3 A.4.7.1.10. Pengecatan Tembok Baru ( 1lapis plamir, 1lapis cat dasar, 2lapis cat penutup ) M² 46.20 Rp 42,490 Rp 1,963,021
4 A.4.7.1.4. Pengecatan Plafond ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup ) M² 171.80 Rp 33,255 Rp 5,713,270
Dibuat Oleh:
CV. MALAPUA GROUP
JUMLAH HARGA
NO URAIAN PEKERJAAN
( RP )
1 2 3
I PEKERJAAN PERSIAPAN Rp 2,425,500
II HARGA SATUAN PEKERJAAN TANAH Rp 4,070,586
III HARGA SATUAN PEKERJAAN PONDASI Rp 18,338,063
IV HARGA SATUAN PEKERJAAN BETON Rp 7,236,846
V HARGA SATUAN PEKERJAAN PASANGAN DINDING Rp 2,504,947
VI HARGA SATUAN PEKERJAAN PLESTERAN Rp 11,413,689
VII HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING Rp 3,095,664
VIII HARGA SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND) Rp 26,370,397
IX HARGA SATUAN PEKERJAAN PENUTUP ATAP Rp 19,624,746
HARGA SATUAN PEKERJAAN KAYU
X Rp 133,273,173
XI HARGA SATUAN PEKERJAAN KUNCI DAN KACA Rp 15,029,162
HARGA SATUAN PEKERJAAN PENGECATAN
XII. Rp 15,784,730
XIII. HARGA SATUAN PEKERJAAN INSTALASI LISTRIK Rp 6,151,513
A REAL COST Rp 265,319,015
B PPN ( 10 % x A ) Rp 26,531,901
C TOTAL COST ( A + B ) Rp 291,850,916
D DIBULATKAN Rp 291,850,000
Dibuat Oleh:
CV. MALAPUA GROUP
( HPS )
HARGA PERKIRAAN SENDIRI
TAHUN ANGGARAN
2019
85 200,000,000
DUA RATUS JUTA RUPIAH.