REVISION :0
Revisi
NO DESCRIPTION AMOUNT
No Uraian Jumlah Harga
(Rp)
AMOUNT 101,146,168.13
OVERHEAD & PROFIT (10%) 10,114,616.81
TOTAL 111,260,784.94
ROUNDED 111,261,000.00
1 fr 92
BILL OF QUANTITY
PROYEK : PENINGKATAN POS JAGA 1&2 SALINO
LOKASI : KOTABARU - KALIMANTAN SELATAN
TAHUN : 2020 Rev. 0
By pak Rizal
bh
4 Saklar tunggal inbow ; Panasonic WESJ5531 + WEJ780 19W 4.00 bh 27,500.00 110,000.00
5 Fitting lampu Panasonic 2.00 bh 15,000.00 30,000.00
6 Lampu Philips LED Bulb 10.5 Watt 2.00 bh 58,650.00 117,300.00
7 Stop kontak AC inbow ; Panasonic WBJ1214W-3K 2.00 bh 118,750.00 237,500.00
8 AC Sharp outdoor + indoor kap. 1 PK 2.00 unit 4,500,000.00 9,000,000.00
9 Panel PHB (box MCB isi 8 Schneider) 2.00 set 150,000.00 300,000.00
10 Panel PHB (box MCB isi 1 Schneider) 2.00 set 30,000.00 60,000.00
11 Instalasi Titik lampu + Stop Kontak 24.00 ttk 250,000.00 6,000,000.00
Jumlah ( A + B + C + D + E + F ) 101,146,168.13
Overhead dan Profit (10%) 10,114,616.81
Total Harga 111,260,784.94
Dibulatkan Rp : 111,261,000.00
D JUMLAH ( A + B + C ) 250,935.00
D JUMLAH ( A + B + C ) 204,272.50
D JUMLAH ( A + B + C ) 284,750.00
A.2.3.1.11c 1 M2 PEK.LAPISAN IJUK 10 CM UNTUK PERESAPAN
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Ijuk kg 6.0000 27,000.00 162,000.00
JUMLAH HARGA BAHAN 162,000.00
B TENAGA
1 Pekerja L.01 OH 0.1500 70,000.00 10,500.00
2 Mandor L.04 OH 0.0150 119,000.00 1,785.00
JUMLAH HARGA TENAGA 12,285.00
C PERALATAN
D JUMLAH ( A + B + C ) 174,285.00
D JUMLAH ( A + B + C ) 14,095.00
D JUMLAH ( A + B + C ) 784,125.20
A.3.2.1.9 1 M3 PEK.PEMASANGAN BATU KOSONG ( AANSTAMPING )
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Batu kali belah m³ 1.2000 216,200.00 259,440.00
2 Pasir urug m³ 0.4320 171,800.00 74,217.60
JUMLAH HARGA BAHAN 333,657.60
B TENAGA
1 Pekerja L.01 OH 0.7800 70,000.00 54,600.00
2 Tukang batu L.02 OH 0.3900 100,000.00 39,000.00
3 Kepala tukang batu L.03 OH 0.0390 119,000.00 4,641.00
4 Mandor L.04 OH 0.0390 119,000.00 4,641.00
JUMLAH HARGA TENAGA 102,882.00
C PERALATAN
D JUMLAH ( A + B + C ) 436,539.60
1 Btg Pemasangan Cerucuk Kayu Bulat dia 10-15 cm (panjang 3-4 meter)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Kayu bulat cerucuk Btg 1.0000 15,000.00 15,000.00
D JUMLAH ( A + B + C ) 66,849.00
D JUMLAH ( A + B + C ) 870,111.71
A.4.1.1.2 1 M3 LANTAI KERJA BETON MUTU f ' c = 9,8 MPa ( K 125 ), slump ( 12-2 ) cm, w/c = 0,78
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Semen/Pc kg 276.0000 1,716.00 473,616.00
2 Pasir cor kg 826.0000 122.71 101,362.00
3 Krikil alam 2-3cm kg 1,012.0000 162.07 164,018.96
4 Air kerja Liter 215.0000 100.00 21,500.00
JUMLAH HARGA BAHAN 760,496.96
B TENAGA
1 Pekerja L.01 OH 1.6500 70,000.00 115,500.00
2 Tukang batu L.02 OH 0.2750 100,000.00 27,500.00
3 Kepala tukang batu L.03 OH 0.0280 119,000.00 3,332.00
4 Mandor L.04 OH 0.0830 119,000.00 9,877.00
JUMLAH HARGA TENAGA 156,209.00
C PERALATAN
D JUMLAH ( A + B + C ) 997,162.08
A.4.1.1.6 1 M3 BETON MUTU f ' c = 16,9 MPa ( K 200 ), slump ( 12 ± 2 ) cm, w/c = 0,61
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Semen/Pc kg 352.0000 1,716.00 604,032.00
2 Pasir cor kg 731.0000 122.71 89,704.14
3 Krikil alam 2-3cm kg 1,031.0000 162.07 167,098.37
4 Air kerja Liter 215.0000 100.00 21,500.00
JUMLAH HARGA BAHAN 882,334.51
B TENAGA
1 Pekerja L.01 OH 1.6500 70,000.00 115,500.00
2 Tukang batu L.02 OH 0.2750 100,000.00 27,500.00
3 Kepala tukang batu L.03 OH 0.0280 119,000.00 3,332.00
4 Mandor L.04 OH 0.0830 119,000.00 9,877.00
JUMLAH HARGA TENAGA 156,209.00
C PERALATAN
D JUMLAH ( A + B + C ) 1,038,543.51
A.4.1.1.7 1 M3 BETON MUTU f 'c = 19,3 Mpa ( K 225 ), slump ( 12 ± 2 ) cm, w/c = 0,58
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Semen/Pc kg 371.0000 1,716.00 636,636.00
2 Pasir cor kg 698.0000 122.71 85,654.57
3 Krikil alam 2-3cm kg 1,047.0000 162.07 169,691.56
4 Air kerja Liter 215.0000 100.00 21,500.00
JUMLAH HARGA BAHAN 913,482.13
B TENAGA
1 Pekerja L.01 OH 1.6500 70,000.00 115,500.00
2 Tukang batu L.02 OH 0.2750 100,000.00 27,500.00
3 Kepala tukang batu L.03 OH 0.0280 119,000.00 3,332.00
4 Mandor L.04 OH 0.0830 119,000.00 9,877.00
JUMLAH HARGA TENAGA 156,209.00
C PERALATAN
JUMLAH HARGA PERALATAN 150,000.00
D JUMLAH ( A + B + C ) 1,219,691.13
A.4.1.1.8 1 M3 BETON MUTU f 'c = 21,7 Mpa ( K 250 ), slump ( 12 ± 2 ) cm, w/c = 0,56
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Semen/Pc kg 384.0000 1,716.00 658,944.00
2 Pasir cor kg 692.0000 122.71 84,918.29
3 Krikil alam 2-3cm kg 1,039.0000 162.07 168,394.96
4 Air kerja Liter 215.0000 100.00 21,500.00
JUMLAH HARGA BAHAN 933,757.25
B TENAGA
1 Pekerja L.01 OH 1.6500 70,000.00 115,500.00
2 Tukang batu L.02 OH 0.2750 100,000.00 27,500.00
3 Kepala tukang batu L.03 OH 0.0280 119,000.00 3,332.00
4 Mandor L.04 OH 0.0830 119,000.00 9,877.00
JUMLAH HARGA TENAGA 156,209.00
C PERALATAN
JUMLAH HARGA PERALATAN 175,000.00
D JUMLAH ( A + B + C ) 1,264,966.25
D JUMLAH ( A + B + C ) 18,672.00
D JUMLAH ( A + B + C ) 163,688.00
D JUMLAH ( A + B + C ) 340,854.00
A.4.1.1.23 1 M2 PEK. BEKISTING UNTUK BALOK
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Papan kayu kelas III m³ 0.0400 2,200,000.00 88,000.00
2 Paku usuk/reng kg 0.4000 22,000.00 8,800.00
3 Minyak begesting liter 0.2000 5,000.00 1,000.00
4 Balok kayu kelas II m³ 0.0180 2,750,000.00 49,500.00
5 Triplek 120x240x9mm lembar 0.3500 185,000.00 64,750.00
6 Dolken perancah ø 10cm - 4 m batang 2.0000 25,000.00 50,000.00
JUMLAH HARGA BAHAN 262,050.00
B TENAGA
1 Pekerja L.01 OH 0.6600 70,000.00 46,200.00
2 Tukang kayu L.02 OH 0.3300 100,000.00 33,000.00
3 Kepala tukang kayu L.03 OH 0.0330 119,000.00 3,927.00
4 Mandor L.04 OH 0.0330 119,000.00 3,927.00
JUMLAH HARGA TENAGA 87,054.00
C PERALATAN
D JUMLAH ( A + B + C ) 349,104.00
D JUMLAH ( A + B + C ) 290,854.00
D JUMLAH ( A + B + C ) 318,604.00
A.4.1.1.28.b 1 M³ PONDASI FOOTPLAT BETON BERTULANG (150X150) CM
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
TENAGA/BAHAN
1 Beton mutu 16,9 Mpa - K.225 (A.4.1.1.7) m³ 1.0000 1,219,691.13 1,219,691.13
2 Cetakan beton pondasi (A.4.1.1.20) m² 2.4242 163,688.00 396,819.39
3 Besi beton polos ( A.4.1.1.17) kg 48.2240 18,672.00 900,438.53
4 Besi beton ulir ( A.4.1.1.17a) kg 55.5672 22,022.00 1,223,700.88
HARGA SATUAN PEKERJAAN 3,740,649.93
A.4.1.1.35 1 M1 PEK. BETON KOLOM PRAKTIS BERTULANG 10X10CM (Besi 4Ø10 ; Bg. Ø6-15) - Type A
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Papan kayu kelas III m³ 0.0020 2,200,000.00 4,400.00
2 Paku usuk/reng kg 0.0100 22,000.00 220.00
3 Minyak begesting liter - - -
4 Besi beton polos Kg 3.0000 12,500.00 37,500.00
5 Kawat beton Kg 0.0450 14,500.00 652.50
6 Semen/Pc Kg 4.0000 1,716.00 6,864.00
7 Pasir cor beton - 1 m³/1400 kg Kg 0.0060 171,800.00 1,030.80
8 Krikil alam 2-3cm - 1 m³ /1350 kg Kg 0.0090 218,800.00 1,969.20
JUMLAH HARGA BAHAN 52,636.50
B TENAGA
1 Pekerja L.01 OH 0.1800 70,000.00 12,600.00
2 Tukang batu L.02 OH 0.0200 100,000.00 2,000.00
3 Tukang kayu L.02 OH 0.0200 100,000.00 2,000.00
4 Tukang besi L.02 OH 0.0200 100,000.00 2,000.00
5 Kepala tukang kayu L.03 OH 0.0060 119,000.00 714.00
6 Mandor L.04 OH 0.0090 119,000.00 1,071.00
JUMLAH HARGA TENAGA 20,385.00
C PERALATAN
D JUMLAH ( A + B + C ) 73,021.50
A.4.1.1.35a 1 M1 PEK. BETON KOLOM PRAKTIS BERTULANG 10X10CM (Besi 4Ø12 ; Bg. Ø6-15) - Type B
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Papan kayu kelas III m³ 0.0020 2,200,000.00 4,400.00
2 Paku usuk/reng kg 0.0100 22,000.00 220.00
3 Minyak begesting liter - - -
4 Besi beton polos Kg 4.1400 12,500.00 51,750.00
5 Kawat beton Kg 0.0450 14,500.00 652.50
6 Semen/Pc Kg 4.0000 1,716.00 6,864.00
7 Pasir cor beton - 1 m³/1400 kg Kg 0.0060 171,800.00 1,030.80
8 Krikil alam 2-3cm - 1 m³ /1350 kg Kg 0.0090 218,800.00 1,969.20
JUMLAH HARGA BAHAN 66,886.50
B TENAGA
1 Pekerja L.01 OH 0.1800 70,000.00 12,600.00
2 Tukang batu L.02 OH 0.0200 100,000.00 2,000.00
3 Tukang kayu L.02 OH 0.0200 100,000.00 2,000.00
4 Tukang besi L.02 OH 0.0200 100,000.00 2,000.00
5 Kepala tukang kayu L.03 OH 0.0060 119,000.00 714.00
6 Mandor L.04 OH 0.0090 119,000.00 1,071.00
JUMLAH HARGA TENAGA 20,385.00
C PERALATAN
D JUMLAH ( A + B + C ) 87,271.50
A.4.1.1.36 1 M1 PEK. BETON BALOK BERTULANG 10X15CM (Besi 4Ø10 ; Bg. Ø6-15)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Papan kayu kelas III m³ 0.0020 2,200,000.00 4,400.00
2 Paku usuk/reng kg 0.0100 22,000.00 220.00
3 Minyak begesting liter - - -
4 Besi beton polos Kg 3.2100 12,500.00 40,125.00
5 Kawat beton Kg 0.0500 14,500.00 725.00
6 Semen/Pc Kg 5.5000 1,716.00 9,438.00
7 Pasir cor beton - 1 m³/1400 kg Kg 0.0090 171,800.00 1,546.20
8 Krikil alam 2-3cm - 1 m³ /1350 kg Kg 0.0150 218,800.00 3,282.00
JUMLAH HARGA BAHAN 59,736.20
B TENAGA
1 Pekerja L.01 OH 0.2970 70,000.00 20,790.00
2 Tukang batu L.02 OH 0.0330 100,000.00 3,300.00
3 Tukang kayu L.02 OH 0.0330 100,000.00 3,300.00
4 Tukang besi L.02 OH 0.0330 100,000.00 3,300.00
5 Kepala tukang kayu L.03 OH 0.0100 119,000.00 1,190.00
6 Mandor L.04 OH 0.0150 119,000.00 1,785.00
JUMLAH HARGA TENAGA 33,665.00
C PERALATAN
D JUMLAH ( A + B + C ) 93,401.20
D JUMLAH ( A + B + C ) 32,546.00
D JUMLAH ( A + B + C ) 27,723.94
D JUMLAH ( A + B + C ) 27,723.94
A.4.2.1.2b 1 Kg PEK. BESI BAJA PLAT
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Baja plat kg 1.1500 19,000.00 21,850.00
JUMLAH HARGA BAHAN 21,850.00
B TENAGA
1 Pekerja L.01 OH 0.0600 70,000.00 4,200.00
2 Tukang las L.02 OH 0.0600 100,000.00 6,000.00
3 Kepala tukang las L.03 OH 0.0060 119,000.00 714.00
4 Mandor L.04 OH 0.0030 119,000.00 357.00
JUMLAH HARGA TENAGA 11,271.00
C PERALATAN
D JUMLAH ( A + B + C ) 33,121.00
D JUMLAH ( A + B + C ) 202,243.22
D JUMLAH ( A + B + C ) 1,429,048.78
D JUMLAH ( A + B + C ) 78,214.00
E Untuk 1 kg 782.14
D JUMLAH ( A + B + C ) 2,495.10
D JUMLAH ( A + B + C ) 6,578,214.00
E Untuk 1 kg 65,782.14
D JUMLAH ( A + B + C ) 176,843.25
A.4.2.1.11a 1 M PEK.KUSEN PINTU /JENDELA ALLUMINIUM 3''
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Aluminium 3'' silver M' 1.1000 95,850.00 105,435.00
2 Perlengkapan material (Harga kusen) Hb 15% 105,435.00 15,815.25
JUMLAH HARGA BAHAN 121,250.25
B TENAGA
1 Pekerja L.01 OH 0.2000 70,000.00 14,000.00
2 Tukang batu L.02 OH 0.2000 100,000.00 20,000.00
3 Kepala tukang batu L.03 OH 0.0200 119,000.00 2,380.00
4 Mandor L.04 OH 0.0020 119,000.00 238.00
JUMLAH HARGA TENAGA 36,618.00
C PERALATAN
D JUMLAH ( A + B + C ) 157,868.25
A.4.2.1.12 1 DAUN PEK. DAUN PINTU KACA 5MM,RANGKA ALLUMINIUM UK. 80 X 210CM
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Frame pintu aluminium 3x8 silver M' 5.4800 100,000.00 548,000.00
2 List pintu aluminium M' 2.9000 45,000.00 130,500.00
3 Silent M' 4.5000 50,000.00 225,000.00
4 Paku ripet bh 16.0000 350.00 5,600.00
5 Baut full drat Ø 10x80cm M' 2.0000 75,000.00 150,000.00
6 Kaca bening 5mm M2 1.3000 85,850.00 111,605.00
7 Engsel pintu klas tinggi bh 3.0000 25,000.00 75,000.00
8 Kunci pintu aluminium bh 1.0000 200,000.00 200,000.00
JUMLAH HARGA BAHAN 1,445,705.00
B TENAGA
1 Pekerja L.01 OH 2.5000 70,000.00 175,000.00
2 Tukang batu L.02 OH 2.5000 100,000.00 250,000.00
3 Kepala tukang batu L.03 OH 0.2500 119,000.00 29,750.00
4 Mandor L.04 OH 0.0150 119,000.00 1,785.00
JUMLAH HARGA TENAGA 456,535.00
C PERALATAN
D JUMLAH ( A + B + C ) 1,902,240.00
D JUMLAH ( A + B + C ) 2,093,985.00
D JUMLAH ( A + B + C ) 1,979,240.00
A.4.2.1.13b 1 M2 PEK. DAUN PINTU PLAT ROLLING DOOR
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Pintu plat rolling door warna M² 1.0500 605,000.00 635,250.00
D JUMLAH ( A + B + C ) 871,863.80
D JUMLAH ( A + B + C ) 197,925.00
D JUMLAH ( A + B + C ) 154,610.03
D JUMLAH ( A + B + C ) 205,505.92
D JUMLAH ( A + B + C ) 201,096.40
A.4.4.1.10 1 M2 PEK. DINDING UKURAN ( 5 X 11 X 22 ) CM TEBAL 1/2 BATA, CAMPURAN 1C : 5PS
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Bata merah klas I buah 70.0000 2,000.00 140,000.00
2 Semen/Pc kg 9.6800 1,716.00 16,610.88
3 Pasir pasang m³ 0.0450 171,800.00 7,731.00
JUMLAH HARGA BAHAN 164,341.88
B TENAGA
1 Pekerja L.01 OH 0.3000 70,000.00 21,000.00
2 Tukang batu L.02 OH 0.1000 100,000.00 10,000.00
3 Kepala tukang batu L.03 OH 0.0100 119,000.00 1,190.00
4 Mandor L.04 OH 0.0150 119,000.00 1,785.00
JUMLAH HARGA TENAGA 33,975.00
C PERALATAN
D JUMLAH ( A + B + C ) 198,316.88
D JUMLAH ( A + B + C ) 56,865.02
D JUMLAH ( A + B + C ) 54,401.04
A.4.4.2.5 1 M2 PLESTERAN 1PC : 5PS TEBAL 15 mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Semen/Pc kg 5.1840 1,716.00 8,895.74
2 Pasir pasang m³ 0.0260 171,800.00 4,466.80
JUMLAH HARGA BAHAN 13,362.54
B TENAGA
1 Pekerja L.01 OH 0.3000 70,000.00 21,000.00
2 Tukang batu L.02 OH 0.1500 100,000.00 15,000.00
3 Kepala tukang batu L.03 OH 0.0150 119,000.00 1,785.00
4 Mandor L.04 OH 0.0150 119,000.00 1,785.00
JUMLAH HARGA TENAGA 39,570.00
C PERALATAN
D JUMLAH ( A + B + C ) 52,932.54
D JUMLAH ( A + B + C ) 51,392.04
A.4.4.2.27 1 M2 ACIAN PC
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Semen PC kg 2.0000 -
JUMLAH HARGA BAHAN -
B TENAGA
1 Pekerja L.01 OH 0.0250 70,000.00 1,750.00
2 Tukang batu L.02 OH 0.0500 100,000.00 5,000.00
3 Kepala tukang batu L.03 OH 0.0050 119,000.00 595.00
4 Mandor L.04 OH 0.0050 119,000.00 595.00
JUMLAH HARGA TENAGA 7,940.00
C PERALATAN
JUMLAH HARGA PERALATAN -
D JUMLAH ( A + B + C ) 7,940.00
D JUMLAH ( A + B + C ) 213,221.00
D JUMLAH ( A + B + C ) 366,816.00
D JUMLAH ( A + B + C ) 178,927.80
A.4.4.3.37 1 M2 LANTAI KERAMIK ( 50 X 50 ) CM - MUTU TINGGI
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Keramik 50x50cm kw 1 (mutu tinggi) bh 4.2400 30,000.00 127,200.00
2 Semen instan MU-420 kg 5.0000 5,400.00 27,000.00
3 Pasir pasang m³ - 171,800.00 -
4 Semen warna kg 0.5000 22,500.00 11,250.00
JUMLAH HARGA BAHAN 165,450.00
B TENAGA
1 Pekerja L.01 OH 0.3500 70,000.00 24,500.00
2 Tukang batu L.02 OH 0.4500 100,000.00 45,000.00
3 Kepala tukang batu L.03 OH 0.0350 119,000.00 4,165.00
4 Mandor L.04 OH 0.0350 119,000.00 4,165.00
JUMLAH HARGA TENAGA 77,830.00
C PERALATAN
JUMLAH HARGA PERALATAN -
D JUMLAH ( A + B + C ) 243,280.00
36,492.00
279,772.00
D JUMLAH ( A + B + C ) 205,307.40
A.4.4.3.39 1 M2 DINDING KERAMIK ( 20 X 25 ) CM - MUTU MENENGAH
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Keramik 20x25cm kw 1 (mutu menengah) bh 22.0000 3,000.00 66,000.00
2 Semen/Pc kg 9.3000 1,716.00 15,958.80
3 Pasir pasang m³ 0.0180 171,800.00 3,092.40
4 Semen warna kg 1.9400 20,000.00 38,800.00
JUMLAH HARGA BAHAN 123,851.20
B TENAGA
1 Pekerja L.01 OH 0.7000 70,000.00 49,000.00
2 Tukang batu L.02 OH 0.4500 100,000.00 45,000.00
3 Kepala tukang batu L.03 OH 0.0450 119,000.00 5,355.00
4 Mandor L.04 OH 0.0300 119,000.00 3,570.00
JUMLAH HARGA TENAGA 102,925.00
C PERALATAN
D JUMLAH ( A + B + C ) 226,776.20
D JUMLAH ( A + B + C ) 69,037.66
D JUMLAH ( A + B + C ) 22,287.66
D JUMLAH ( A + B + C ) 194,376.20
D JUMLAH ( A + B + C ) 304,811.00
A.4.4.3.58 1 M2 DINDING BATU TEMPEL HITAM/CANDI
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Batu tempel hitam/candi M2 1.1000 185,000.00 203,500.00
2 Semen/Pc kg 11.7500 1,716.00 20,163.00
3 Pasir pasang m³ 0.0350 171,800.00 6,013.00
JUMLAH HARGA BAHAN 229,676.00
B TENAGA
1 Pekerja L.01 OH 0.4500 70,000.00 31,500.00
2 Tukang batu L.02 OH 0.5500 100,000.00 55,000.00
3 Kepala tukang batu L.03 OH 0.0550 119,000.00 6,545.00
4 Mandor L.04 OH 0.0550 119,000.00 6,545.00
JUMLAH HARGA TENAGA 99,590.00
C PERALATAN
JUMLAH HARGA PERALATAN -
D JUMLAH ( A + B + C ) 329,266.00
D JUMLAH ( A + B + C ) 125,517.50
D JUMLAH ( A + B + C ) 234,854.50
D JUMLAH ( A + B + C ) 170,186.00
1 M3 KONSTRUKSI KAYU
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Balok kayu kelas II m³ 0.4896 2,750,000.00 1,346,400.00
2 Paku usuk/reng kg 2.0000 22,000.00 44,000.00
JUMLAH HARGA BAHAN 1,390,400.00
B TENAGA
1 Pekerja L.01 OH 5.0000 70,000.00 350,000.00
2 Tukang kayu L.02 OH 18.0000 100,000.00 1,800,000.00
3 Kepala tukang kayu L.03 OH 1.8000 119,000.00 214,200.00
4 Mandor L.04 OH 0.4000 119,000.00 47,600.00
JUMLAH HARGA TENAGA 2,411,800.00
C PERALATAN
D JUMLAH ( A + B + C ) 3,802,200.00
D JUMLAH ( A + B + C ) 152,614.00
D JUMLAH ( A + B + C ) 29,160.00
D JUMLAH ( A + B + C ) 39,660.00
A.4.5.2 ANALISA PEKERJAAN PENUTUP ATAP
A.4.5.2.39.a 1 M2 PEKERJAAN ATAP COLOURBOND 0.45 MM
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Atap Zinkcalume 0,35mm m2 1.0500 77,000.00 80,850.00
2 Paku baut drailing bh 6.0000 1,000.00 6,000.00
JUMLAH HARGA BAHAN 86,850.00
B TENAGA
1 Tukang batu L.01 OH 0.1750 100,000.00 17,500.00
2 Kepala tukang batu L.02 OH 0.0175 119,000.00 2,082.50
3 Pekerja L.03 OH 0.2000 70,000.00 14,000.00
4 Mandor L.04 OH 0.0010 119,000.00 119.00
JUMLAH HARGA TENAGA 33,701.50
C PERALATAN
1 Mesin bor (sewa) Jam 0.2000 12,500.00 2,500.00
2 Listrik kwh - - -
JUMLAH HARGA PERALATAN 2,500.00
D JUMLAH ( A + B + C ) 123,051.50
D JUMLAH ( A + B + C ) 130,182.00
D JUMLAH ( A + B + C ) 5,532,400.00
D JUMLAH ( A + B + C ) 531,650.00
A.4.6.1.5a 1 M² MEMBUAT DAN MEMASANG DAUN PINTU PANEL KAYU KLAS II, DALAM DILAPISI TRIPLEK ALUMINIUM - PINTU TOILET
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Papan kayu kelas II m³ 0.0400 2,750,000.00 110,000.00
2 Lem kayu kg 0.2500 20,000.00 5,000.00
3 Triplek aluminium lbr 0.2000 125,000.00 25,000.00
JUMLAH HARGA BAHAN 140,000.00
B TENAGA
1 Pekerja L.01 OH 0.6500 70,000.00 45,500.00
2 Tukang kayu L.02 OH 1.0000 100,000.00 100,000.00
3 Kepala tukang kayu L.03 OH 0.1000 119,000.00 11,900.00
4 Mandor L.04 OH 0.0500 119,000.00 5,950.00
JUMLAH HARGA TENAGA 163,350.00
C PERALATAN
JUMLAH HARGA PERALATAN 27,500.00
D JUMLAH ( A + B + C ) 330,850.00
A.4.6.1.6 1 M² MEMBUAT DAN MEMASANG DAUN PINTU DAN JENDELA KACA KAYU KLAS I
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Papan kayu kelas II m³ 0.0240 2,750,000.00 66,000.00
2 Lem kayu kg 0.3000 20,000.00 6,000.00
3 Kaca bening 5mm kg 0.8500 85,850.00 72,972.50
JUMLAH HARGA BAHAN 144,972.50
B TENAGA
1 Pekerja L.01 OH 0.8000 70,000.00 56,000.00
2 Tukang kayu L.02 OH 2.4000 100,000.00 240,000.00
3 Kepala tukang kayu L.03 OH 0.2400 119,000.00 28,560.00
4 Mandor L.04 OH 0.2400 119,000.00 28,560.00
JUMLAH HARGA TENAGA 353,120.00
C PERALATAN
JUMLAH HARGA PERALATAN 72,500.00
D JUMLAH ( A + B + C ) 570,592.50
D JUMLAH ( A + B + C ) 3,445,083.60
D JUMLAH ( A + B + C ) 289,556.50
D JUMLAH ( A + B + C ) 60,270.00
A.4.6.1.21a 1 M1 PASANGAN LISPLANK KALSIPLANK 8MM-20CM
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Kalsiplank 8mm - 20cm m1 1.1000 50,000.00 55,000.00
2 Paku usuk/reng kg 0.1000 22,000.00 2,200.00
JUMLAH HARGA BAHAN 57,200.00
B TENAGA
1 Pekerja L.01 OH 0.1000 70,000.00 7,000.00
2 Tukang kayu L.02 OH 0.1000 100,000.00 10,000.00
3 Kepala tukang kayu L.03 OH 0.0100 119,000.00 1,190.00
4 Mandor L.04 OH 0.0050 119,000.00 595.00
JUMLAH HARGA TENAGA 18,785.00
C PERALATAN
D JUMLAH ( A + B + C ) 75,985.00
D JUMLAH ( A + B + C ) 92,485.00
D JUMLAH ( A + B + C ) 282,485.00
D JUMLAH ( A + B + C ) 34,449.50
D JUMLAH ( A + B + C ) 34,924.25
D JUMLAH ( A + B + C ) 34,970.00
A.4.6.2.9a MEMASANG 1 BUAH GRENDEL PINTU
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Grendel pintu klas tinggi bh 1.0000 35,000.00 35,000.00
JUMLAH HARGA BAHAN 35,000.00
B TENAGA
1 Pekerja L.01 OH 0.0200 70,000.00 1,400.00
2 Tukang kayu L.02 OH 0.2000 100,000.00 20,000.00
3 Kepala tukang kayu L.03 OH 0.0200 119,000.00 2,380.00
4 Mandor L.04 OH 0.0100 119,000.00 1,190.00
JUMLAH HARGA TENAGA 24,970.00
C PERALATAN
JUMLAH HARGA PERALATAN -
D JUMLAH ( A + B + C ) 59,970.00
8,995.50
68,965.50
D JUMLAH ( A + B + C ) 68,899.00
D JUMLAH ( A + B + C ) 273,899.00
D JUMLAH ( A + B + C ) 112,359.25
A.4.6.2.17 MEMASANG 1 M2 KACA POLOS TEBAL 10MM
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Kaca bening 10mm m2 1.1000 300,850.00 330,935.00
JUMLAH HARGA BAHAN 330,935.00
B TENAGA
1 Pekerja L.01 OH 0.0150 70,000.00 1,050.00
2 Tukang kayu L.02 OH 0.1500 100,000.00 15,000.00
3 Kepala tukang kayu L.03 OH 0.0150 119,000.00 1,785.00
4 Mandor L.04 OH 0.0008 119,000.00 89.25
JUMLAH HARGA TENAGA 17,924.25
C PERALATAN
D JUMLAH ( A + B + C ) 348,859.25
A.4.7.1.4a 1 M2 PENGECATAN KAYU BARU (1 lapis cat dasar, 2 lapis cat penutup)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Meny kayu kg 0.2000 27,500.00 5,500.00
2 Minyak cat klas menengah kg 0.0300 25,000.00 750.00
3 Amplas lbr 0.2000 3,500.00 700.00
4 Kuas cat bh 0.0100 25,000.00 250.00
Cat dasar Cat kayu klas menengah kg 0.1700 62,000.00 10,540.00
Cat penutup Cat kayu klas menengah kg 0.2600 62,000.00 16,120.00
JUMLAH HARGA BAHAN 33,860.00
B TENAGA
1 Pekerja L.01 OH 0.2000 70,000.00 14,000.00
2 Tukang cat L.02 OH 0.2500 100,000.00 25,000.00
3 Kepala tukang cat L.03 OH 0.0250 119,000.00 2,975.00
4 Mandor L.04 OH 0.0100 119,000.00 1,190.00
JUMLAH HARGA TENAGA 43,165.00
C PERALATAN
D JUMLAH ( A + B + C ) 77,025.00
A.4.7.1.7 1 M2 POLITURAN DAUN PINTU (2 lapis cat penutup)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Wood filer kg 0.1000 60,000.00 6,000.00
2 Politur kg 0.3720 57,000.00 21,204.00
3 Amplas lbr 2.0000 3,500.00 7,000.00
JUMLAH HARGA BAHAN 34,204.00
B TENAGA
1 Pekerja L.01 OH 0.2000 70,000.00 14,000.00
2 Tukang cat L.02 OH 0.2500 100,000.00 25,000.00
3 Kepala tukang cat L.03 OH 0.0250 119,000.00 2,975.00
4 Mandor L.04 OH 0.0100 119,000.00 1,190.00
JUMLAH HARGA TENAGA 43,165.00
C PERALATAN
D JUMLAH ( A + B + C ) 77,369.00
A.4.7.1.10 1 M2 PENGECATAN TEMBOK BARU - INTERIOR (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Plamir tembok kg 0.1000 27,500.00 2,750.00
2 Amplas kg 0.5000 3,500.00 1,750.00
3 Roll cat kg 0.0100 35,000.00 350.00
Cat dasar Cat tembok klas menengah kg 0.1000 36,000.00 3,600.00
Cat penutup Cat tembok klas menengah kg 0.2600 75,000.00 19,500.00
JUMLAH HARGA BAHAN 27,950.00
B TENAGA
1 Pekerja L.01 OH 0.0600 70,000.00 4,200.00
2 Tukang cat L.02 OH 0.0630 100,000.00 6,300.00
3 Kepala tukang cat L.03 OH 0.0063 119,000.00 749.70
4 Mandor L.04 OH 0.0025 119,000.00 297.50
JUMLAH HARGA TENAGA 11,547.20
C PERALATAN
JUMLAH HARGA PERALATAN -
D JUMLAH ( A + B + C ) 39,497.20
A.4.7.1.10a 1 M2 PENGECATAN TEMBOK BARU - EXSTERIOR (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Alkali (anti jamur) kg 0.1000 50,000.00 5,000.00
2 Amplas kg 0.5000 3,500.00 1,750.00
3 Roll cat kg 0.0100 35,000.00 350.00
Cat dasar Cat tembok klas tinggi kg 0.1000 125,000.00 12,500.00
Cat penutup Cat tembok klas tinggi kg 0.2600 125,000.00 32,500.00
JUMLAH HARGA BAHAN 52,100.00
B TENAGA
1 Pekerja L.01 OH 0.0600 70,000.00 4,200.00
2 Tukang cat L.02 OH 0.0630 100,000.00 6,300.00
3 Kepala tukang cat L.03 OH 0.0063 119,000.00 749.70
4 Mandor L.04 OH 0.0025 119,000.00 297.50
JUMLAH HARGA TENAGA 11,547.20
C PERALATAN
JUMLAH HARGA PERALATAN -
D JUMLAH ( A + B + C ) 63,647.20
A.4.7.1.17 1 M2 PENGECATAN BESI
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Cat besi klas menengah Kg 0.2600 120,000.00 31,200.00
2 Kuas cat bh 0.0100 25,000.00 250.00
JUMLAH HARGA BAHAN 31,450.00
B TENAGA
1 Pekerja L.01 OH 0.0200 70,000.00 1,400.00
2 Tukang cat L.02 OH 0.2000 100,000.00 20,000.00
3 Kepala tukang cat L.03 OH 0.0200 119,000.00 2,380.00
4 Mandor L.04 OH 0.0100 119,000.00 1,190.00
JUMLAH HARGA TENAGA 24,970.00
C PERALATAN
D JUMLAH ( A + B + C ) 56,420.00
D JUMLAH ( A + B + C ) 32,370.00
D JUMLAH ( A + B + C ) 678,554.00
D JUMLAH ( A + B + C ) 5,025,159.00
D JUMLAH ( A + B + C ) 601,764.00
A.5.1.1.19 MEMASANG 1 M PIPA GIP MEDIUM B - Ø 1/2"
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Pipa GI ø 1/2" - Medium B M' 1.2000 30,800.00 36,960.00
2 Perlengkapan (Support) 35% harga pipa Ls 0.3500 36,960.00 12,936.00
JUMLAH HARGA BAHAN 49,896.00
B TENAGA
1 Pekerja L.01 OH 0.0540 70,000.00 3,780.00
2 Tukang batu L.02 OH 0.0900 100,000.00 9,000.00
3 Kepala tukang batu L.03 OH 0.0090 119,000.00 1,071.00
4 Mandor L.04 OH 0.0270 119,000.00 3,213.00
JUMLAH HARGA TENAGA 17,064.00
C PERALATAN
D JUMLAH ( A + B + C ) 66,960.00
D JUMLAH ( A + B + C ) 72,306.00
D JUMLAH ( A + B + C ) 83,889.00
D JUMLAH ( A + B + C ) 19,828.35
A.5.1.1.26 MEMASANG 1 M PIPA PVC TIPE AW DIAMETER 3/4"
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Pipa PVC ø 3/4" - Aw M' 1.2000 8,717.50 10,461.00
2 Perlengkapan (Support) 35% harga pipa Ls 0.3500 10,461.00 3,661.35
JUMLAH HARGA BAHAN 14,122.35
B TENAGA
1 Pekerja L.01 OH 0.0360 70,000.00 2,520.00
2 Tukang batu L.02 OH 0.0600 100,000.00 6,000.00
3 Kepala tukang batu L.03 OH 0.0060 119,000.00 714.00
4 Mandor L.04 OH 0.0018 119,000.00 214.20
JUMLAH HARGA TENAGA 9,448.20
C PERALATAN
D JUMLAH ( A + B + C ) 23,570.55
D JUMLAH ( A + B + C ) 28,738.35
D JUMLAH ( A + B + C ) 56,583.90
D JUMLAH ( A + B + C ) 60,009.30
A.5.1.1.31 MEMASANG 1 M PIPA PVC TIPE AW DIAMETER 3"
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Pipa PVC ø 3" - Aw M' 1.2000 53,790.00 64,548.00
2 Perlengkapan (Support) 35% harga pipa Ls 0.3500 64,548.00 22,591.80
JUMLAH HARGA BAHAN 87,139.80
B TENAGA
1 Pekerja L.01 OH 0.0810 70,000.00 5,670.00
2 Tukang batu L.02 OH 0.1350 100,000.00 13,500.00
3 Kepala tukang batu L.03 OH 0.0135 119,000.00 1,606.50
4 Mandor L.04 OH 0.0041 119,000.00 487.90
JUMLAH HARGA TENAGA 21,264.40
C PERALATAN
D JUMLAH ( A + B + C ) 108,404.20
D JUMLAH ( A + B + C ) 266,564.40
D JUMLAH ( A + B + C ) 171,843.40
D JUMLAH ( A + B + C ) 385,848.50
A.5.1.1.35 MEMASANG 1 BUAH KRAN 1/2"
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Kran air GI ø 1/2" bh 1.0000 25,000.00 25,000.00
2 Seal tape bh 0.0250 8,000.00 200.00
JUMLAH HARGA BAHAN 25,200.00
B TENAGA
1 Pekerja L.01 OH 0.0100 70,000.00 700.00
2 Tukang batu L.02 OH 0.1000 100,000.00 10,000.00
3 Kepala tukang batu L.03 OH 0.0100 119,000.00 1,190.00
4 Mandor L.04 OH 0.0050 119,000.00 595.00
JUMLAH HARGA TENAGA 12,485.00
C PERALATAN
D JUMLAH ( A + B + C ) 37,685.00
D JUMLAH ( A + B + C ) 212,685.00
D JUMLAH ( A + B + C ) 187,685.00
A.5.1.1.35d MEMASANG 1 BUAH HANDCLOSET Ø 1/2"
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Kran handcloset ø 1/2" bh 1.0000 225,000.00 225,000.00
2 Seal tape bh 0.0250 8,000.00 200.00
JUMLAH HARGA BAHAN 225,200.00
B TENAGA
1 Pekerja L.01 OH 0.0100 70,000.00 700.00
2 Tukang batu L.02 OH 0.1000 100,000.00 10,000.00
3 Kepala tukang batu L.03 OH 0.0100 119,000.00 1,190.00
4 Mandor L.04 OH 0.0050 119,000.00 595.00
JUMLAH HARGA TENAGA 12,485.00
C PERALATAN
D JUMLAH ( A + B + C ) 237,685.00
B JUMLAH ( A ) 5,509,679.18
C HARGA SATUAN PEKERJAAN ( B ) 5,509,679.18
B JUMLAH ( A ) 2,644,519.26
C HARGA SATUAN PEKERJAAN ( B ) 2,644,519.26
ANALISA PEKERJAAN INSTALASI LISTRIK
Analisa Ls.1 1 TITIK PEKERJAAN MEMASANG INSTALASI TITIK LAMPU
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Kabel NYA 2x2,5mm2 m' 8.0000 12,500.00 100,000.00
2 Pipa conduit (Ex. Ega) m' 8.0000 3,500.00 28,000.00
3 Switch double / single 13 A ea 1.0000 37,500.00 37,500.00
4 Down light feeting ea 1.0000 67,250.00 67,250.00
5 LED Lamp ea 1.0000 77,500.00 77,500.00
6 Socket pipa bh 1.0000 500.00 500.00
7 Tee Doos bh 2.0000 2,500.00 5,000.00
8 Klem pipa bh 3.0000 250.00 750.00
9 Fhiser bh 6.0000 100.00 600.00
10 Las doop bh 2.0000 200.00 400.00
11 Isolasi ban bh 0.2500 5,000.00 1,250.00
JUMLAH HARGA BAHAN 318,750.00
B TENAGA
1 Tukang listrik L.01 OH 1.5000 100,000.00 150,000.00
JUMLAH HARGA TENAGA 150,000.00
C PERALATAN
JUMLAH HARGA PERALATAN -
D JUMLAH ( A + B + C ) 468,750.00
Analisa Ls.1A 1 TITIK PEKERJAAN MEMASANG INSTALASI TITIK LAMPU TLD 2x36W
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Kabel NYA 2x2,5mm2 m' 8.0000 12,500.00 100,000.00
2 Pipa conduit (Ex. Ega) m' 8.0000 3,500.00 28,000.00
3 Switch double / single 13 A ea 0.5000 37,500.00 18,750.00
4 KAP TLD 2x36W PHILIP ea 1.0000 290,000.00 290,000.00
5 TLD 36W PHILIP ea 2.0000 22,500.00 45,000.00
6 Socket pipa bh 1.0000 500.00 500.00
7 Tee Doos bh 2.0000 2,500.00 5,000.00
8 Klem pipa bh 3.0000 250.00 750.00
9 Fhiser bh 6.0000 100.00 600.00
10 Las doop bh 2.0000 200.00 400.00
11 Isolasi ban bh 0.2500 5,000.00 1,250.00
JUMLAH HARGA BAHAN 490,250.00
B TENAGA
1 Tukang listrik L.01 OH 1.5000 100,000.00 150,000.00
JUMLAH HARGA TENAGA 150,000.00
C PERALATAN
JUMLAH HARGA PERALATAN -
D JUMLAH ( A + B + C ) 640,250.00
Analisa Ls.1B 1 TITIK PEKERJAAN MEMASANG INSTALASI TITIK LAMPU TLD 1x36W
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Kabel NYA 2x2,5mm2 m' 8.0000 12,500.00 100,000.00
2 Pipa conduit (Ex. Ega) m' 8.0000 3,500.00 28,000.00
3 Switch double / single 13 A ea 1.0000 37,500.00 37,500.00
4 KAP TLD 1x36W PHILIP ea 1.0000 250,000.00 250,000.00
5 TLD 36W PHILIP ea 1.0000 22,500.00 22,500.00
6 Socket pipa bh 1.0000 500.00 500.00
7 Tee Doos bh 2.0000 2,500.00 5,000.00
8 Klem pipa bh 3.0000 250.00 750.00
9 Fhiser bh 6.0000 100.00 600.00
10 Las doop bh 2.0000 200.00 400.00
11 Isolasi ban bh 0.2500 5,000.00 1,250.00
JUMLAH HARGA BAHAN 446,500.00
B TENAGA
1 Tukang listrik L.01 OH 1.5000 100,000.00 150,000.00
JUMLAH HARGA TENAGA 150,000.00
C PERALATAN
JUMLAH HARGA PERALATAN -
D JUMLAH ( A + B + C ) 596,500.00
B TENAGA
1 Pekerja OH 0.30 70,000.00 21,000.00
2 Tukang batu OH 0.20 100,000.00 20,000.00
3 Kepala tukang batu OH 0.02 119,000.00 2,380.00
4 Mandor OH 0.03 119,000.00 3,570.00
JUMLAH HARGA TENAGA 46,950.00
JUMLAH ( A + B ) 186,154.00
B TENAGA
1 Pekerja OH 1.50 70,000.00 105,000.00
2 Tukang batu OH 1.75 100,000.00 175,000.00
3 Kepala tukang batu OH 0.15 119,000.00 17,850.00
4 Mandor OH 0.18 119,000.00 20,825.00
JUMLAH HARGA TENAGA 318,675.00
JUMLAH ( A + B ) 620,480.00
B TENAGA
1 Pekerja OH 3.00 70,000.00 210,000.00
2 Tukang batu OH 2.25 100,000.00 225,000.00
3 Kepala tukang batu OH 0.30 119,000.00 35,700.00
4 Mandor OH 0.23 119,000.00 26,775.00
JUMLAH HARGA TENAGA 497,475.00
JUMLAH ( A + B ) 2,499,120.00
VOL.AKHIR = A - B
= 226.80 - 16.28 = 210.52 M2
VOL.AKHIR = A - B
= 227.50 - 20.90 = 206.60 M2
VOL.AKHIR = A - B
= 106.50 - 11.88 = 94.62 M2
XI Pekerjaan Atap
1 Atap Zinkcalume/spandeck VOLUME = P x L x JMH 198.00 M2
Entrance Pelana = 11.00 x 9.00 x 2.00 = 198.00 M2
198.00 M2
I Pekerjaan Tanah
1 Galian Tanah pondasi menerus VOLUME = P x L x T x JMH 614.40 M3
Memanjang selasar dep. = 92.50 x 1.00 x 0.80 x 1.00 = 74.00 M3
selasar belakng = 100.50 x 1.00 x 0.80 x 3.00 = 241.20 M3
= 39.00 x 1.00 x 0.80 x 2.00 = 62.40 M3
= 1.75 x 1.00 x 0.80 x 12.00 = 16.80 M3
Melintang selasar samp. = 12.00 x 1.00 x 0.80 x 2.00 = 19.20 M3
= 8.00 x 1.00 x 0.80 x 30.00 = 192.00 M3
Ditangga = 3.00 x 1.00 x 0.80 x 1.00 = 2.40 M3
= 4.00 x 1.00 x 0.80 x 2.00 = 6.40 M3
614.40 M3
II Pekerjaan Pasangan
1 Batu kosong VOLUME = P x L x T x JMH 153.60 M3
Memanjang selasar dep. = 92.50 x 1.00 x 0.20 x 1.00 = 18.50 M3
selsr belakng = 100.50 x 1.00 x 0.20 x 3.00 = 60.30 M3
= 39.00 x 1.00 x 0.20 x 2.00 = 15.60 M3
= 1.75 x 1.00 x 0.20 x 12.00 = 4.20 M3
Melintang selasar samp. = 12.00 x 1.00 x 0.20 x 2.00 = 4.80 M3
= 8.00 x 1.00 x 0.20 x 30.00 = 48.00 M3
Ditangga = 3.00 x 1.00 x 0.20 x 1.00 = 0.60 M3
= 4.00 x 1.00 x 0.20 x 2.00 = 1.60 M3
153.60 M3
Pembesian Bb Ø16-15 mm = 1.042 x 1.50 x 11.00 x 2.00 x 18.00 = 618.88 Kg 55.57 Kg/M3
10 Stek besi kolom yg masuk kepondasi VOLUME = P x Berat x masing 2 x JMH 217.80 KG
K. 25/35 = 0.75 x 1.58 x 8.00 x 8.00 = 75.76 KG
K. 35/35 = 0.75 x 1.58 x 12.00 x 10.00 = 142.04 KG
217.80 KG
III Pekerjaan Beton diatas lantai
1 Kolom K3 - 20/20 VOLUME = T x DIMENSI x JMH 18.14 M3
diatas lantai = 3.25 x 0.20 x 0.20 x 62.00 = 8.06 M3
= 4.50 x 0.20 x 0.20 x 56.00 = 10.08 M3
18.14 M3
VOL.AKHIR = A - B
= 2399.67 - 383.96 = 2,015.71 M2
VOL.AKHIR = A - B
= 2187.25 - 9.04 = 2,178.21 M2
VOL.AKHIR = A - B
= 1005.92 - 371.66 = 634.26 M2
XI Pekerjaan Sanitair
VOLUME = JMH x JMh
1 Closet duduk = 1.00 x 4.00 = 4.00 BH
2 Washtafle = 1.00 x 3.00 = 3.00 BH
3 Floor drain = 1.00 x 4.00 = 4.00 BH
4 Jet washer = 1.00 x 4.00 = 4.00 BH
4 Septictank = 1.00 x 2.00 = 2.00 unit
5 Perespan = 1.00 x 2.00 = 2.00 unit
RABAT KELILING BANGUNAN
I Pekerjaan Tanah
1 Galian Tanah VOLUME = P x L x T x JMH 7.29 M3
Memanjang = 41.00 x 0.30 x 0.30 x 1.00 = 3.69 M3
= 16.00 x 0.30 x 0.30 x 1.00 = 1.44 M3
Melintang = 12.00 x 0.30 x 0.30 x 2.00 = 2.16 M3
7.29 M3
DIMENSION
No. DESCRIPTION QTY. PERIMETER
Length/L Widht/W Height/H
(1) (2) (3) (4) (5) (6) (7)
54.0000
18.0000
36.0000
33.0000
15.0000
96.0000
19.8000
-10.4000
-6.5600
-13.1200
-6.5600
235.1600 M2
16.00 Teras
m'
32.00 m' CPP room & harbour master
26.40 m' Area wastafel
24.80 m' Toilet
10.30 m' R Vsat
35.00 m' R Utama
12.20 m' Pantry
18.00 m' Dining room
14.00 m' Admin room
188.70 m'
64.60 m'
20.30 m'
84.90 m'
30.03 m2
4.62 m2
2.84 m2
2.21 m2
5.25 m2
1.89 m2
3.50 m2
20.30 m2