S2JB
CABANG LAHAT
II. GARDU
III. JTR
1 4
100
2
2
510 3
750
810
7
7
Direncana : Catatan :
P T. P L N (Persero) WIL. S2JB
CABANG LAHAT Digambar : Rachmad H.
100
2
3
2
1200 4
2
8
100
2
510 8
750 7
7
810
Direncana : Catatan :
P T. P L N (Persero) WIL. S2JB
CABANG LAHAT Digambar : Rachmad H.
100
45
5
1200
2 3
7
100
2
510 7
750 6
6
810
Direncana : Catatan :
P T. P L N (Persero) WIL. S2JB
CABANG LAHAT Digambar : Rachmad H.
120
4
1500
Pandangan
1
Depan
Pandangan
Samping
120
4 1500
Pandangan
1
Depan
Pandangan
Samping
5
2 4
3
100
2
510 3
7
750
810 7
Keterangan :
- Untuk sudut sampai 60o
dipakai Isolator Tumpu.
- Untuk sudut >60o harus
dipakai Isolator Tarik.
Max 60o
KODE PADA GAMBAR DISTRIBUSI
5
2 4
6
100
2
510 3
7
750
810 7
Guy wire
o o
10 - 30
5
4
3
100
2
510 3
7
2
1200
4 7
8
2
3
3 7
750 7
810
Guy wire
o o
10 - 30
100
5
1200 6
3
4
8
2
510 3
7
2
750 7
810
Guy wire
o o
10 - 30
4 1
50 7 550
4
5
Guy wire
80
3 3
510 5
1 2
2
HV Band Strap
M.16 x 125
Guy wire
100
3
510
5
1 3
2
1200 2
4 7 4
6
510 5
1 2 3
Guy wire
100
1200
4 7 4
510 5
1 2 3
1
50 550
100
510
1 2
3 Joint Sleve 70 mm 2 3 Bh
2 Isolator Tumpu 20 KV - 1 Bh TM 4X
1 Isolator Tarik 20 KV 2 3 Set
1 O 3 O
NO NAMA MATE R IAL SAT KONSTRUKSI
JUMLAH
Direncana : Catatan :
P T. P L N (Persero) WIL. S2JB
CABANG LAHAT Digambar : Rachmad H.
1
50 550
100
2
510
1 5
3
4
6
120
6 1500
4
2
Pandangan
Depan
Pandangan
Samping
120
3
6 1500
4
2
Pandangan
1 Depan
Pandangan
Samping
1 50
100
510 6
4
2
3 550
8
50
100
1200 7
1
510
10 4
2 6
3 550
8
100
3 1
9
7
2 4 1200
8
510 6
4
10
2
550 6
120
9
6 1500
4
2
Pandangan
1 Depan
7 8
Pandangan
Samping
120
9 1500
6
4
2 Pandangan
Depan
1
7 8
16 15 14 13
Pandangan 11
Samping
10
12
Direncana : Catatan :
P T. P L N (Persero) WIL. S2JB
CABANG LAHAT Digambar : Rachmad H.
KONSTRUKSI TM. 5 KHUSUS Diketahui :
TIANG GANDA DAN KABEL KONTROL
Disetujui : No. Gambar :
2.000
10
100 650 250 850 100
100
400 600
8
7
4
Guy wire
3
8 8
4
6
5 5
100
400 600
1200
8
2
Guy wire
7
7 9
3
4 4
1000
50
2.000
100
3
400 600
12
5
10
600 6
2
7 Guy wire 7
3
1200
4
4
100
12
600 11 6
7
7
3 10
4 4
2
100
1
4
400 600
3
11
10
3
3 8
7
6
5 5
4
100
400 600
1 2
3
3 8
7
5 5
4
2
100
11
4
3
10
9
12 400 600
11
3
3 8
7
6
5 5 4
100
10
9
1
12 400 600
11
3
3 8
7
6
5 5 4
50
100
600 400
8
2
7 guy wire 5
2 7
4
6
3
guy wire
100
600 400
8
7 5 2
7
4
6
3
guy wire
guy wire
100
8
2
10
9
7
5
7 6
4
100
600 400
guy wire
50
1
3
150
9
5
4 2
8
JARAK POHON
Direncana : Catatan :
P T. P L N (Persero) WIL. S2JB
CABANG LAHAT Digambar : Rachmad H.
Diketahui : No. Gambar :
JARAK SUTM DENGAN TANAM-TUMBUH
Disetujui :
Rk
t
D1
Rb
O
D
D
1
W
L3
L2
L1
CONDUCTOR
P DO D1 L1 L2 L3 W T t Rk Rb
SIZE (Sqmm)
Keterangan :
- Dimension in mm
- Material Allumunium 99,5 %
- Pemakaian pada conduktor AAC dan AAAC
TL-1
Direncana : Catatan :
P T. P L N (Persero) WIL. S2JB
CABANG LAHAT Digambar : Rachmad H.
S
T
G
TL2H
Direncana : Catatan :
P T. P L N (Persero) WIL. S2JB
CABANG LAHAT Digambar : Rachmad H.
16
R
U - BOLT
SC
Direncana : Catatan :
P T. P L N (Persero) WIL. S2JB
CABANG LAHAT Digambar : Rachmad H.
2
1
3000
2000
1850
Direncana : Catatan :
P T. P L N (Persero) WIL. S2JB
CABANG LAHAT Digambar : Rachmad H.
30
0
1 PC : PS
0
65
0
Pasir
10
0
- 750
A
Tanah dipadatkan
A
-A
750
+
350
55
0
75
0
550
P.TB1
Direncana : Catatan :
P T. P L N (Persero) WIL. S2JB
CABANG LAHAT Digambar : Rachmad H.
65
0
10
0
- 750
A
A
-A
100
550
100
100 100
2000
P.TB2
Direncana : Catatan :
P T. P L N (Persero) WIL. S2JB
CABANG LAHAT Digambar : Rachmad H.
R=
Tiang
Q 18 R. 8
6 mm
5
A
TAMPAK ATAS
70
TAMPAK DEPAN
Tiang ( mm ) Plat ( mm ) ( mm )
- Bahan :
76,5 139 199 - Strip plat, tebal 6 mm
102 164 224 - Penekukan tanpa pemanasan
127 189 249 - Untuk Kontruksi SUTM,
153 215 275 tebal plat 70 mm.
157 219 279 - Hot Dip Galvanis 70 gr/m2
179 241 301
190 252 312
KB
Direncana : Catatan :
P T. P L N (Persero) WIL. S2JB
CABANG LAHAT Digambar : Rachmad H.
10
9
11
12
13
14
15
DIRENACANA : CATATAN :
P T. P L N (Persero) WIL. S2JB
CABANG LAHAT DI GAMBAR Rachmad H.
DIPERIKSA : NO. GAMBAR :
KONSTRUKSI KABEL NAIK
DISETUJUI : KKTM1 2/1
:
4 5 3 6
7 2
8 1
10
11
12
13
14
15
DIRENACANA : CATATAN :
P T. P L N (Persero) WIL. S2JB
CABANG LAHAT DI GAMBAR Rachmad H.
DIPERIKSA : NO. GAMBAR :
KONSTRUKSI 2 (DUA) KABEL NAIK
DISETUJUI : KKTM2 2/1
DAFTAR KEBUTUHAN MATERIAL KABEL NAIK
DIRENACANA : CATATAN :
P T. P L N (Persero) WIL. S2JB
CABANG LAHAT DI GAMBAR Rachmad H.
DIPERIKSA : NO. GAMBAR :
DAFTAR KEBUTUHAN MATERIAL
KABEL NAIK DISETUJUI :
KKTM1 2/2
:
DIRENACANA : CATATAN :
P T. P L N (Persero) WIL. S2JB
CABANG LAHAT DI GAMBAR Rachmad H.
DIPERIKSA : NO. GAMBAR :
DAFTAR KEBUTUHAN MATERIAL
2 (DUA) KABEL NAIK DISETUJUI :
KKTM2 2/2
114
73 + 3
25-R
25-R
Min
300
150
108
Tangkai panjang :
A : 185 mm
Tangkai pendek :
A : 50 mm
M 16
ITS
O 73
R 25
18
R 25
O 145
33
6
47
6
O 90
14
0
5
13
ISOLATOR PINPOST
- Jarak rambat = 534 mm
- Minimum beban patah = 10,7 kN
M 16 - Tagangan penahan daya frekuensi
basah = 65 kV
- Tegangan implus petir = 150 kV
IP
16
254
IT
1
3
RIT
30o O 13
3
3/8 -
16
4
105-
191
posisi tertutup
53-191
1
5
10 5
7
68
0
O 13
9 8
posisi terbuka
Keterangan
1. Rangka pemagang R.C.O Tegangan Pengenal : 24 KV
2. Terminal (untuk penghantar) Arus nominal : 100 A
3. Pegangan resin (Resin holder) Kapasitas pemutus : Sym, rms 8 KA
4. Kontak atas (moveable) pengenal : Asym, rms 11,2 KA
5. Kontak statis (tetap) BIL : 125 KV
6. Kait penutup
7. Resin / co
8. Engsel dari brass
9. Terminal bawah (untuk penghantar
10. Isolator (porselin)
CO
SIDE TIE
DIMENSIOM
SUITABLE KONDUKTOR
L D
TOP OF LAY
RIGH HAND
70 sqmm 740 mm Z TIPE
APPROK
150 sqmm 840 mm
80 mm
TT-ST
1000 6
3
L = 12000 mm / 9000 mm
L = 9000 mm / 7000 mm
Tiang beton
o
< 60
2.200
h = 1.550
1/6 L
r.s
5
Rod stay (r.s)
Bahan besi beton 16 mm
Direncana : Catatan :
P T. P L N (Persero) WIL. S2JB
CABANG LAHAT Digambar : Rachmad H.
1.000
L = 12000 mm / 9000 mm
Tiang beton
o
< 45
2.200
h = 1.550
1/6 L
r.s
Rod stay (r.s)
Bahan besi beton 16 mm
Direncana : Catatan :
P T. P L N (Persero) WIL. S2JB
CABANG LAHAT Digambar : Rachmad H.
± 60°
MIN 1000
KSP
GW-BAND
Direncana : Catatan :
P T. P L N (Persero) WIL. S2JB
CABANG LAHAT Digambar : Rachmad H.
5 6
1
5 4
10 11
12
Direncana : Catatan :
P T. P L N (Persero) WIL. S2JB
CABANG LAHAT Digambar : Rachmad H.
1000 1000
O 18
252 252
550 550
550 550
- S T K 37
- HOT DIP GALVANISZED 400 gr/m
- Proses alvanis setelah fabrikasi
CAT 10
Direncana : Catatan :
P T. P L N (Persero) WIL. S2JB
CABANG LAHAT Digambar : Rachmad H.
100
78 or
According to the suplied
cross arm Ø18
25 140
165
44
Ø 18
STK 37 kg/mm2
Hot dip galvanized 450 gr/m2 ( min )
US
Direncana : Catatan :
P T. P L N (Persero) WIL. S2JB
CABANG LAHAT Digambar : Rachmad H.
d2
3 d1 D
R1
R2
DIMENSION ( mm )
KONDUCTOR
SIZE D d1 L G d2 B R1 R2
10 6,5 4,0 58 23 5,5 11 3 ,8
16 9,7 5,7 65 28 8,0 12 5 ,9
25 10,2 7,0 65 28 7,0 14 5 1,9
35 12,7 8,5 65 28 10,0 16 6,5 2,1
50 16,0 10,0 70 30 13,0 22 8 2
70 18,0 11,5 70 30 13,0 22 9 2,5
95 20,0 14,5 70 30 13,0 24 10 4
120 22,0 15,0 80 35 13,0 26 11 4
150 22,7 16,7 80 38 13,0 30 11,5 5,4
185 24,0 19,0 100 40 16,0 33 12 7
300 29,0 24,0 110 45 19,5 41 14,5 9,5
TL-2
Direncana : Catatan :
P T. P L N (Persero) WIL. S2JB
CABANG LAHAT Digambar : Rachmad H.
MM2 L B H K WEIGHT
25 - 10 14 19,0 13 M5 1,70
4 - 16 16 19,5 16 M5 2,10
4 - 25 20 25,0 21 M6 4,10
4 - 25 20 25,0 22 M7 3,95
6 - 35 20 30,0 23 M7 5,20
6 - 50 24 32,5 26 M7 7,40
6 - 50 24 32,5 27 M8 8,15
10 - 70 26 38,5 29 M8 10,80
25 - 95 31 45,0 36 M10 19,30
PC
Direncana : Catatan :
P T. P L N (Persero) WIL. S2JB
CABANG LAHAT Digambar : Rachmad H.
LTC
17 30
13
Washer
17 30
140
Nut
24
Bolt
13
Catatan : M 16 Nut
- Material STK 41
- Hot Dip Galvanis
BN-1
Direncana : Catatan :
P T. P L N (Persero) WIL. S2JB
CABANG LAHAT Digambar : Rachmad H.
Diketahui : No. Gambar :
BOLT, NUT AND WASHER
Disetujui :
30
18
0
10
4,
5
Ring 4 buah
24
13
Mur 4 buah
00
350/400/5
Ring
Mur
10
0
Baut
BN-2
Direncana : Catatan :
P T. P L N (Persero) WIL. S2JB
CABANG LAHAT Digambar : Rachmad H.
min 4,5 mm
Bolt Nut M 16 x 50
Bolt Nut M 16 x 100
min 4,5 mm
Reinforced Plate
Weld
L min = 50 mm
50 50
Ø Sesuai kebutuhan
Catatan :
- STK 37 kg/mm
- Hot Dip Galvanis 450 Gr/m2
- With Stand Load (both side) 1000 kg
- Break Down Load (both side) 1500 kg
ATB1
Direncana : Catatan :
P T. P L N (Persero) WIL. S2JB
CABANG LAHAT Digambar : Rachmad H.
Diketahui : No. Gambar :
ARM TIE BAND
Disetujui :
SINGLE ARM BAND
min. 4,5
Baja STK 37 Kg/mm2
Hot Dip Galvanis 450 gram
Di Las
Q
50
Single End Stud Bolt
20
0
Withsland Load :
Square Washer
- Transverse 2.000 Kg
(52x52x4,5)
- Vertical 1.000 Kg
Breakdown Load :
- Tranverse 4.000 Kg
- Vertical 2.000 Kg
Di Las
55
0
15
0
Q
50
20
0
STK 37 Kg/mm2
Hot Dip Galv.450 gr/m2
ATB2
Di Las
Q = Sesuai Kebutuhan
Ukuran Dalam mm
30 CM
5 CM
B
U. Klem
dilas
U. Klem Rantai
UNP 6 1,50 M
Crane
Permukaan air sungai
Tongkang
B M. air
Kabel
Rantai A
Kabel
Beton pemberat kabel 10 M 10 M 10 M 10 M
Dasar Sungai
Rantai
U. Klem
Kabel air
Dasar Sungai
10 M 10 M 10 M
4 3
6
7
9
3200
10 11
12 13
14
15
16 16
2620
17
18
19
22
6
1210
20 21
6 23
6
97
0
24
2000
25
26
5 3
GP
Direncana : Catatan :
P T. P L N (Persero) WIL. S2JB
CABANG LAHAT Digambar : Rachmad H.
Diketahui : No. Gambar :
KONSTRUKSI GARDU PORTAL
TIANG BETON 12 M, 3 Ph 4 JURUSAN
Disetujui :
NO. MATERIAL SAT VOLUME
SUTM
1 Tap connector 70/150 mm2 Bh 6
2 Konduktor AAAC 70/150 mm2 Mtr 12
3 L. Arrester 24 KV - 5 KA Set 3
CUT OUT ARRESTER 4 Terminal lug 50/70/150 mm2 + u/LV.Panel Bh 39
5 Cut Out 20 KV, 100 A + fuse. Set 3
6 Cross arm type 2500 - UNP 10 Btg 2
7 Double arm band + nut + washer Set 2
TRAFO 8 Tap connector Al-Cu 50/70 - 70/70 mm2 Set 16
9 NYY 150 mm Mtr 36
10 Invoering porselin 3" Bh 1
11 Invoering porselin 2" Bh 4
PIPA GALVANIS 3 " 12 NYY 70 mm Mtr 144
13 Trafo 20 KV (100 s/d 400 KVA) Bh 1
14 Rangka tempat dudukan trafo Set 1
15 Pipa galvanis 3" 7 m + L. Bow Btg 1
16 Pipa galvanis 2" 7 m + L. Bow Btg 4
COPPER CABLE 150 Sqmm 17 Plat tanda bahaya Bh 1
PAPAN PEMBAGI 18 Cross arm type 2500 - UNP 8 Btg 2
SUTR LIHAT DETAIL 19 LV. Panel Set 1
EMPAT JURUSAN
20 Besi type 500 L.50.50.5 Btg 4
21 Arm tie band 3" 2" 2" Set 2
1 3
2 4
SINGLE LINE DIAGRAM
KETERANGAN :
1. GARDU DENGAN TRAFO 50 - 400 KVA
MENGGUNAKAN TANG BETON 11 / 350 daN - 12 / 350 daN
KODE PADA GAMBAR 2. GARDU MENGHADAP KE JALAN
3. NETRAL BODY DAN NETRAL TRAFO TERPISAH
GT-1a
Direncana : Catatan :
P T. P L N (Persero) WIL. S2JB
CABANG LAHAT Digambar : Rachmad H.
6
8
3 4
7
5
9
10
2
11
13
12
14
15
18
16
17
19
20
GC1
DIRENACANA : CATATAN :
P T. P L N (Persero) WIL. S2JB
CABANG LAHAT DI GAMBAR : Rachmad H.
: NO. GAMBAR :
KONSTRUKSI GARDU CANTOL DIPERIKSA
TIANG BETON 11 M DENGAN LV.SWITCH DISETUJUI :
DAFTAR KEBUTUHAN MATERIAL TRAFO CANTOL
GC2
DIRENACANA : CATATAN :
P T. P L N (Persero) WIL. S2JB
CABANG LAHAT DI GAMBAR : Rachmad H.
NO. GAMBAR :
DAFTAR KEBUTUHAN MATERIAL DIPERIKSA :
GARDU CANTOL DISETUJUI :
Gambar I.a
Keterangan :
1. LBS Incoming
1. LBS Outgoing
1. Transformer Protect ( LBS+Fuse )
1. Transformer > 315 KVA
SLD-G1
Direncana : Catatan :
P T. P L N (Persero) WIL. S2JB
CABANG LAHAT Digambar : Rachmad H.
Disetujui :
Gambar I.b
I.C O.G
Ke Rak TR
Keterangan :
1. LBS Incoming
1. LBS Outgoing
2. Transformer Protect ( LBS+Fuse )
2. Transformer
SLD-G2
Direncana : Catatan :
P T. P L N (Persero) WIL. S2JB
CABANG LAHAT Digambar : Rachmad H.
I.C O.G
Ke Rak TR
Keterangan :
1. LBS Incoming
1. LBS Outgoing
1. Transformer Protect ( LBS+Fuse )
1. Transformer < 400 kVA
SLD-G3
Direncana : Catatan :
P T. P L N (Persero) WIL. S2JB
CABANG LAHAT Digambar : Rachmad H.
I.C O.G
Ke Rak TR
Keterangan :
1. LBS Incoming
1. LBS Outgoing
1. Transformer Protect ( LBS+Fuse )
1. Transformer < 1000 kVA
SLD-G4
Direncana : Catatan :
P T. P L N (Persero) WIL. S2JB
CABANG LAHAT Digambar : Rachmad H.
Keterangan :
1 LBS Incoming
1 LBS Outgoing Konsumen
1 CT+FT
1 CB
2 Transformer Protect ( LBS+Fuse & CB )
2 Transformer > @ 1000 kVA
SLD-G5
Direncana : Catatan :
P T. P L N (Persero) WIL. S2JB
CABANG LAHAT Digambar : Rachmad H.
RMU (PORTAL) TM
TR Umum Konsumen
Keterangan :
1 RMU ( Portal )
1 LBS Incoming
1 LBS Outgoing
1 CT+PT
1 CB
1 Transformer u/Umum
2 Transformer Protect ( LBS+Fuse & CB )
2 Transformer > @ 1000 kVA
SLD-G6
Direncana : Catatan :
P T. P L N (Persero) WIL. S2JB
CABANG LAHAT Digambar : Rachmad H.
SLD-G7
Direncana : Catatan :
P T. P L N (Persero) WIL. S2JB
CABANG LAHAT Digambar : Rachmad H.
SLD-G8
Direncana : Catatan :
P T. P L N (Persero) WIL. S2JB
CABANG LAHAT Digambar : Rachmad H.
SLD-G9
Direncana : Catatan :
P T. P L N (Persero) WIL. S2JB
CABANG LAHAT Digambar : Rachmad H.
SLD-G10
Direncana : Catatan :
P T. P L N (Persero) WIL. S2JB GH ditengah
CABANG LAHAT Digambar : Rachmad H. jaringan
PMT PMT PB
UGB
TRAFO
400 KVA
CUBICLE
PMT PMT PB
TRAFO
400 KVA
N R S T
NYY 4x1x150
MM²
PARAREL
MCCB KONSUMEN
RAK TR
N R S T
GB-UGB
SUTM EXISTING
MM²
KABEL TM 3x1x35
CUBICLE GD 02
(GARDU PORTAL
PMT PMT PB EXISTING)
TRAFO
200 KVA
MCCB
RAK TR
PARAREL
N R S T N R S T
GP-UGB
Transformator tegangan
Saklar beban
Pemutus tenaga
Pengaman lebur
EFI
Indikator gangguan ke bumi
(Earth Fault Indicator)
DGT-GD1
X
EFI EFI EFI
Transformator tegangan
Saklar beban
Pemutus tenaga
Pengaman lebur
Pemisah dengan sistem laci
Saklar pembumian (draw out disconector)
EFI
Indikator gangguan ke bumi
(Earth Fault Indicator)
DGT-GD2
Transformator tegangan
Saklar beban
Pemutus tenaga
Pengaman lebur
Pemisah dengan sistem laci
Saklar pembumian (draw out disconector)
EFI
Indikator gangguan ke bumi
(Earth Fault Indicator)
DGT-GD3
Transformator tegangan
Saklar beban
Pemutus tenaga
Pengaman lebur
EFI
Indikator gangguan ke bumi
(Earth Fault Indicator)
DGT-GH1
x
M M 630 A 630 A 630 A
EFI EFI
Transformator tegangan
Saklar beban
Pemutus tenaga
Pengaman lebur
Pemisah dengan sistem laci
Saklar pembumian (draw out disconector)
EFI
Indikator gangguan ke bumi
(Earth Fault Indicator)
DGT-GH2
x
M M M M 630 A 630 A 630 A
IN COMING IN COMING OUT GOING OUT GOING OUT GOING OUT GOING OUT GOING
EXPRES EXPRES (> 1 MW) (> 1 MW) (> 1 MW)
DARI GI/PL DARI GI/PL
Transformator tegangan
Saklar beban
Pemutus tenaga
Pengaman lebur
Pemisah dengan sistem laci
Saklar pembumian (draw out disconector)
EFI
Indikator gangguan ke bumi
(Earth Fault Indicator)
DGT-GH3
x
M M 630 A 630 A M
Transformator tegangan
Saklar beban
Pemutus tenaga
Pengaman lebur
Pemisah dengan sistem laci
Saklar pembumian (draw out disconector)
EFI
Indikator gangguan ke bumi
(Earth Fault Indicator)
DGT-GH4
t
OD
RS 1387 / 67 MEDIUM
TEBAL Berat dengan
SIZE OD BERAT
(t) Drat & Soket
PG
Direncana : Catatan :
P T. P L N (Persero) WIL. S2JB
CABANG LAHAT Digambar : Rachmad H.
Diketahui : No. Gambar :
PIPA GALVANIS
Disetujui :
12 13
2
14 8
9
7
10
11
2" 2"
1
50
50
50
3
5
4
1250
Direncana : Catatan :
P T. P L N (Persero) WIL. S2JB
CABANG LAHAT Digambar : Rachmad H.
5 ENGSEL BUAH 4
9 SAKLAR BUAH 1
10 ZEKERING SET 1
LV-P1M
Direncana : Catatan :
P T. P L N (Persero) WIL. S2JB
CABANG LAHAT Digambar : Rachmad H.
Diketahui : No. Gambar :
DAFTAR MATERIAL
LV. PANEL 4 ( EMPAT ) GROUP KGP 2 2/2
Disetujui :
PLAT TANDA BAHAYA UNTUK GARDU BETON
30
BERBAHAYA
580
TEGANGAN TINGGI
30
30 580 30
20 30 30 20 15 cm
2
20
cm
KETERANGAN :
1. Cat dasar plat warna kuning.
15 cm
Cat simbul petir warna merah.
Cat tulisan warna hitam.
2. Plat untuk klem tebal 3 mm.
Plat untuk tanda bahaya tebal 1 mm.
3. Sesuai dengan tiang yang ada.
PTB
Direncana : Catatan :
P T. P L N (Persero) WIL. S2JB
CABANG LAHAT Digambar : Rachmad H.
20
40
TWISTED CABLE
50
5 Plastik strap 3 Bh
4 Stoping buckle 2 Bh
3 Stainless steel strip Ø 0,75 mtr 2 Bh TR 1
2 Suspension clamp 1 Set
1 Suspension clamp bracket 1 Set
Direncana : Catatan :
P T. P L N (Persero) WIL. S2JB
CABANG LAHAT Digambar : Rachmad H.
1
3
TC
a
15O
90O
5 Plastik strap 3 Bh
4 Stoping buckle 2 Bh
3 Stainless steel strip Ø 0,75 mtr 2 Bh TR 2
2 Strain clamp 2 Set
1 Tension bracket 1 Set
Direncana : Catatan :
P T. P L N (Persero) WIL. S2JB
CABANG LAHAT Digambar : Rachmad H.
Diketahui : No. Gambar :
KONSTRUKSI
TIANG SUDUT DAN BELOKAN Disetujui :
2
1
3
TC
5
DETAIL - A
A
8
Direncana : Catatan :
P T. P L N (Persero) WIL. S2JB
CABANG LAHAT Digambar : Rachmad H.
4 TC
TC
7 Tap connector 50 mm 2 Bh
6 Tap connector 70 mm 6 Bh
5 Plastik strap 6 Bh
4 Stoping buckle 4 Bh TR 4
3 Stainless steel strip Ø 0,75 mtr 4 Bh
2 Suspension clamp 2 Set
1 Suspension clamp bracket 2 Set
Direncana : Catatan :
P T. P L N (Persero) WIL. S2JB
CABANG LAHAT Digambar : Rachmad H.
4
2
1
TC
5 Plastik strap 3 Bh
4 Stoping buckle 2 Bh
3 Stainless steel strip Ø 0,75 mtr 2 Bh TR 5
2 Strain clamp 2 Set
1 Tension bracket 2 Set
Direncana : Catatan :
P T. P L N (Persero) WIL. S2JB
CABANG LAHAT Digambar : Rachmad H.
Diketahui : No. Gambar :
KONSTRUKSI TIANG PENEGANG
Disetujui :
1
3
9 8
4
TC
TC
6
7
Direncana : Catatan :
P T. P L N (Persero) WIL. S2JB
CABANG LAHAT Digambar : Rachmad H.
2
1
TC
7
TC
5
6
Direncana : Catatan :
P T. P L N (Persero) WIL. S2JB
CABANG LAHAT Digambar : Rachmad H.
7 1
2
TC
500 mm
3/7
1900 mm
3000 mm
500 mm
4
100 mm
8
6
KODE PADA GAMBAR DISTRIBUSI
5
KODE PADA GAMBAR JARINGAN
500 mm
3/7
1900 mm
3000 mm
4 500 mm
100 mm
8
6
Full Thread
Split Cotter Pin
M 16 (TR)
M 16 (TM)
16 A
t
D
Data Teknik
A B C D BOLT t Bahan = baja STK 41 Hot Dip Galvanis
Bolt dan Nut = M.16 (ulir kanan dab kiri)
TR 200 140 40 36 M.16 5
Kuat tarik = Min 7000 Kg
TM 230 155 44 46 M.20 6
TB
Direncana : Catatan :
P T. P L N (Persero) WIL. S2JB
CABANG LAHAT Digambar : Rachmad H.
GSW 70 9,5 11
WCL
Direncana : Catatan :
P T. P L N (Persero) WIL. S2JB
CABANG LAHAT Digambar : Rachmad H.
ID OD
ALLUMINIUM SLEEVE
LL
Dimension (mm)
MIN BREAKING
Conduktor Size
ID OD L LL d STRENGTH (KG)
NTJ
Direncana : Catatan :
P T. P L N (Persero) WIL. S2JB
CABANG LAHAT Digambar : Rachmad H.
Keterangan Gambar :
1. Kepala baut ganda. 5. Bagian bawah.
7
2. Ring 6. Baut.
3. Bagian atas. 7. Gigi-gigi konektor.
LTC
Direncana : Catatan :
P T. P L N (Persero) WIL. S2JB
CABANG LAHAT Digambar : Rachmad H.
0,7
20
SSS
26
23
r. 2,5
25
25
LINK
Ukuran : 25 x 25 mm
Material : galvanized steel
LSB
Direncana : Catatan :
P T. P L N (Persero) WIL. S2JB
CABANG LAHAT Digambar : Rachmad H.