1)
5 hari X 4 minggu X 300,000 6,000,000
6,000,000 x setahun 72,000,000
PTKP setahun 54,000,000
PKP setahu72,000,000-54,000,000 18,000,000
pph 21 ter 5% X 18,000,000 900,000
pph 21 terutang sebulan 75,000