Anda di halaman 1dari 34

PT.

CAHAYA SAMUDRA SHIPYARD


Jl. RE Martadinata Sekupang - Batam
Tel : 0778 327 806, 327 808
Fax : 0778 327 807
Email : info@cahayasamudrashipyard.com

SLIPWAY DOCKING, SHIP REPAIR AND SHIP BUILDING


April 18th, 2022 to April -th, 2022
C
E
PT. CAHAYA SAMUDRA SHIPYARD R
T
.
Jl. RE Martadinata Sekupang - Batam
Tel : 0778 327 806, 327 808 N
O
Fax : 0778 327 807 .
Email : info@cahayasamudrashipyard.com S
G
P
S
SLIPWAY DOCKING, SHIP REPAIR AND SHIP BUILDING G
P
0
0
1
1
0
GENERAL DATA 3

SPECIFICATION

PROJECT CODE : N/A

VESSEL NAME : SB KOMODO 3

TYPE OF VESSEL : Speed Boat

DIMENSION : N/A

CLASSIFICATION :-

OWNER : N/A

YARD OF DOCKING : PT. CAHAYA SAMUDRA SHIPYARD

NO. OF SLIPWAY : N/A

PERIODE OF DOCKING : Aprilr 18th, 2022 to April -th, 2022

GENERAL OF WORK SCOPE : Hull cleaning, Hull sanding, Putty and Painting, Pembuatan
dudukan ac indoor dan dudukan kompressor ac, Pembuatan
eye lugs untuk fender, Pemindahan dudukan lifebuoy, Pembuatan
dudukan liferaft, Pembuatan dudukan baterai box kiri dan kanan
pembuatan dudukan genset, penggantian plat di haluan yang bolong
Pengelasan di plat lambungdepan kiri dan kanan yang bocor,
Pembuatan dan pemasangan bracket fish finder, Potong plat
ukuran 1080 x 800 x 4 untuk tutup MSB, Buat tapak shoure,
Bongkar mesin tengah.

PERSON IN CHARGE

PROJECT MANAGER : MR. DAVID TELAUMBANUA

DATE :
SIGNATURE :

OWNER REPRESENTATIVE :

DATE :

SIGNATURE :
C
E
A SHIPYARD R
T
.

N
O
.

S
G
P
S
AND SHIP BUILDING
G
P
0
0
1
1
0
3

utty and Painting, Pembuatan


n kompressor ac, Pembuatan
ahan dudukan lifebuoy, Pembuatan
dukan baterai box kiri dan kanan
enggantian plat di haluan yang bolong
pan kiri dan kanan yang bocor,
bracket fish finder, Potong plat
tup MSB, Buat tapak shoure,
PT. CAHAYA SAMUDRA SHIPYARD
Jl. RE Martadinata Sekupang - Batam
Tel : 0778 327 806, 327 808
Fax : 0778 327 807
Email : info@cahayasamudrashipyard.com

SLIPWAY DOCKING, SHIP REPAIR AND SHIP BUILDING

Telah diperiksa penyelesaian pekerjaan perbaikan kapal BINTANG 19 sesuai dengan spesifikasi yang disetujui dalam kontrak
Kapal naik dok pada tanggal 1 April 2020 dan turun dok pada tanggal 3 April 2020
Uraian pekerjaan yang telah dilakukan sebagai berikut:

No Main Job Specific Description


1 SLIPwAY CHARGES
A.01 Naik Dock/ Turun Dock + Hari Pertama 18 April 2022 / - April 2022
A.02 Dock Selanjutnya (tidak termasuk hari pertama)
A.03 Asistgensi pemandu untuk masuk kapal ke galangan
A.04 Menyediakan 2 orang penyelam untuk proses menaikkan kapal
A.05 Menambatkan/Melepaskan/Memindahkan kapal N/A
A.06 Penyusunan balok untuk dudukan kapal sebelum naik dok

2 GENERAL SERVICES
B.01 Penambatan kapal N/A

B.02 Penyediaan tempat sampah laporan terlampir


B.03 Penyediaan listrik untuk keperluan kapal 3 phase / 380V / 50Hz -

Penyambungan/ pemutusan kabel listrik N/A


B.04 Melaksanakan Free Gas Tanki untuk kerja panas, dan survey tanki as per Yard's rule
B.05 Pengecekan gas setiap hari selama kerja panas, cleaning tanki as per Yard's rule
B.06 Menyediakan kelengkapan pemadam kebakaran as per Yard's rule
B.07 Supply fresh water
Prepared by, Witnessed

David T.
Project In Charge Captain/ Chief Engineer
Prepared by, Witnessed

David T.
Project In Charge Captain/ Chief Engineer
D Vessel Name : SB KOMODO 3
Project Code : N/A
Subject : JOBS COMPLETION REPORTS
Dimension : N/A
Classification : -
Owner :
disetujui dalam kontrak

Dimension (mm) Qty Remarks

LS
hari
LS
Op
Op
Op

hari
hari
hari
Ops
tanki

hari
bottle
tons
Confirmed/Approved by,

Owner's Representative
Confirmed/Approved by,

Owner's Representative
PT. CAHAYA SAMUDRA SHIPYARD
Jl. RE Martadinata Sekupang - Batam
Tel : 0778 327 806, 327 808
Fax : 0778 327 807
Email : info@cahayasamudrashipyard.com

SLIPWAY DOCKING, SHIP REPAIR AND SHIP BUILDING

COMPLETION WORK DONE REPORT


(BLASTING AND PAINTING)

Vessel Name : SB KOMODO 3 Complete Date


Project Code : N/A Job No
Job Title : HULL CLEANING

Item (s) Inspected : Access Works


Type of inspection : VISUAL Lighting Ventilation Staging
Result of Inspection : ACCEPTED No No No
Jobs description :

HULL CLEANING
C.01 Hard scrap to remove barnackle and marine growth on underwater area

Underwater area (A = 240 M²); 100% of underwater area

C.02 High pressure wash water jet 3000 psi with fresh water for removing salt content on

underwater and top side (include bulwark external)

Underwater area (A = 240 M²); 100% of underwater area


Top side area (A = 65 M²); 100% of top side area
Bulwark area (A = 55 M²); 100% of bulwark area
Fwd Pusher Beam (A = 24 M²); 100% of fwd pusher beam area

C.03 Hose down with fresh water for removing remaining dust on underwater and top side

before apply 2nd coating

Underwater area (A = 240 M²); 100% of underwater area


Top side area (A = 65 M²); 100% of top side area
Bulwark area (A = 55 M²); 100% of bulwark area
Fwd Pusher Beam (A = 24 M²); 100% of fwd pusher beam area

Prepared by, Witnessed by, Confirmed/Approved b


Rizky Julianto S
Yard Respresentative Capt./ Chief Eng. *) Owner's Rep.

N/A
Signature / Date Signature / Date Signature / Date

Vessel Name : SB KOMODO 3 Complete Date


Project Code : N/A Job No
Job Title : HULL SANDING DAN DEMPUL

Item (s) Inspected : Access Works


Type of inspection : VISUAL Lighting Ventilation Staging
Result of Inspection : ACCEPTED No No No
Jobs description :

HULL SANDING DAN DEMPUL

foto
Prepared by, Witnessed by, Confirmed/Approved b

Rizky Julianto S
Yard Respresentative Capt./ Chief Eng. *) Owner's Rep.

Signature / Date Signature / Date Signature / Date


D

LDING

: 12-Oct-2021
: N/A

ks
Cherry Picker
Yes




0 M²




Confirmed/Approved by,
Owner's Rep.

Signature / Date

: 12-Oct-2021
: N/A

ks
Cherry Picker
Yes
Confirmed/Approved by,

Owner's Rep.

Signature / Date
PT. CAHAYA SAMUDRA SHIPYARD
Jl. RE Martadinata Sekupang - Batam
Tel : 0778 327 806, 327 808
Fax : 0778 327 807
Email : info@cahayasamudrashipyard.com

SLIPWAY DOCKING, SHIP REPAIR AND SHIP BUILDING

COMPLETION WORK DONE REPORT


(STEELWORK)

Vessel Name : SB KOMODO 3 Complete Date


Project Code : N/A Job No
Job Title : DUDUKAN AC DAN KOMPRESSOR

Item (s) Inspected : Access Works


Type of inspection : VISUAL Lighting Ventilation Staging
Result of Inspection : ACCEPTED No No No
Jobs description :
Pembuatan dudukan ac indoor dan dudukan kompressor ac
Jobs described :
Dudukan AC dan kompressor
a. Dudukan AC
Aluminium Plate 750 x 360 x 4 (1 pcs)
b. Dudukan kompressor

foto (sebelum)

foto (sesudah)
Prepared by, Witnessed by, Confirmed/Approve

Rizky Julianto Sihombing


Yard Respresentative Capt./ Chief Eng. *) Owner's Rep.

Signature / Date Signature / Date Signature / Dat

Vessel Name : SB KOMODO 3 Complete Date


Project Code : N/A Job No
Job Title : PEMINDAHAN DUDUKAN LIFEBUOY

Item (s) Inspected : Access Works


Type of inspection : VISUAL Lighting Ventilation Staging
Result of Inspection : ACCEPTED No No No
Jobs description :
Pemindahan dudukan lifebuoy port dan stbd yang awalnya di atas wheelhouse, dipindahkan ke wheelhouse forecastle
Jobs described :
Pemindahan dudukan lifebuoy
dudukan lifebuoy
doubler 70 x 70 x 6 (6 pcs)
ukuran lifebuoy yang dipindahkan 780 x 400 (2 pcs)

foto
Prepared by, Witnessed by, Confirmed/Approve

Rizky Julianto Sihombing


Yard Respresentative Capt./ Chief Eng. *) Owner's Rep.

Signature / Date Signature / Date Signature / Dat

Vessel Name : SB KOMODO 3 Complete Date


Project Code : N/A Job No
Job Title : PENGGANTIAN PLATE HALUAN DEPAN YANG BOLONG

Item (s) Inspected : Access Works


Type of inspection : VISUAL Lighting Ventilation Staging
Result of Inspection : ACCEPTED No No No
Jobs description :
Penggantian plate haluan depan yang bolong setelah itu dikasih doubler
Jobs described :
Penggantian plate setelah itu dikasih doubler

Aluminium Plate 100 x 80 x 6 (1 pcs)


Aluminium plate1100 x 620 x 4
lubang paku 100 x 5 phass (3 pcs)
foto (sebelum)

foto (sesudah)

Prepared by, Witnessed by, Confirmed/Approve

Rizky Julianto Sihombing


Yard Respresentative Capt./ Chief Eng. *) Owner's Rep.

Signature / Date Signature / Date Signature / Dat

Vessel Name : SB KOMODO 3 Complete Date


Project Code : N/A Job No
Job Title : PENGELASAN PLATE LAMBUNG DEPAN KIRI, BELAKANG DAN KEEL
YANG BOCOR

Item (s) Inspected : Access Works


Type of inspection : VISUAL Lighting Ventilation Staging
Result of Inspection : ACCEPTED No No No
Jobs description :
Pengelasan pada lambung depan kiri dan belang yang bocor. Di las dari luar dan dalam setelah itu di lakukan tes kebocoran
dengan penetrant test
Jobs described :
Pengelasan pada lambung dan keel yang bocor
a. Lambung depan kiri
30 x 3 phass
b. Lambung belakang
20 x 4 phass x 2 pcs (las luar dan dalam)

foto (sebelum)

foto (sesudah)

Prepared by, Witnessed by, Confirmed/Approve

Rizky Julianto Sihombing


Yard Respresentative Capt./ Chief Eng. *) Owner's Rep.

Signature / Date Signature / Date Signature / Dat

Vessel Name : SB KOMODO 3 Complete Date


Project Code : N/A Job No
Job Title : PEMBUATAN DAN PEMASANGAN BRACKET FISH FINDER

Item (s) Inspected : Access Works


Type of inspection : VISUAL Lighting Ventilation Staging
Result of Inspection : ACCEPTED No No No
Jobs description :
Pembuatan dan pemasangan bracket fish finder
Jobs described :
Buat dan dilaskan bracket fish finder
angle bar aluminium 70 x 50 x 50 x 6 (1 pcs)

foto

Prepared by, Witnessed by, Confirmed/Approve

Rizky Julianto Sihombing


Yard Respresentative Capt./ Chief Eng. *) Owner's Rep.

Signature / Date Signature / Date Signature / Dat

Vessel Name : SB KOMODO 3 Complete Date


Project Code : N/A Job No
Job Title : PEMBUATAN DUDUKAN SHOURCE

Item (s) Inspected : Access Works


Type of inspection : VISUAL Lighting Ventilation Staging
Result of Inspection : ACCEPTED No No No
Jobs description :
Pembuatan dan pemasangan dudukan shource
Jobs described :
Buat dan dilaskan dudukan shource
aluminium plate 150 x 100 x 6 (bending)

foto

Prepared by, Witnessed by, Confirmed/Approve

Rizky Julianto Sihombing


Yard Respresentative Capt./ Chief Eng. *) Owner's Rep.

Signature / Date Signature / Date Signature / Dat

Vessel Name : SB KOMODO 3 Complete Date


Project Code : N/A Job No
Job Title : PEMBUATAN DUDUKAN BATERAI PORT DAN STARBOARD

Item (s) Inspected : Access Works


Type of inspection : VISUAL Lighting Ventilation Staging
Result of Inspection : ACCEPTED No No No
Jobs description :
pembuatan dudukan baterai port dan starboard
Jobs described :
potong dudukan yang lama dan buat dudukan baru untuk baterai di bagian port dan starboard

Buang tapak kotak baterai yang lama 450 x 150 (2 pcs)


dudukan baterai yang baru (Port dan STBD)
angle bar 1620 x 50 x 50 x 6 (4 pcs)
angle bar 310 x 50 x 50 x 6 (4 pcs)
angle bar 200 x 50 x 50 x 6 (2 pcs)
angle bar 50 x 50 x 50 x 6 (12 pcs) (kaki dudukan baterai)
MS 70 x 60 x 4 (12 pcs)(tapak kaki dudukan baterai)

foto (sebelum)

foto (sesudah)

Rizky Julianto Sihombing


Yard Respresentative Capt./ Chief Eng. *) Owner's Rep.

Signature / Date Signature / Date Signature / Dat

Vessel Name : SB KOMODO 3 Complete Date


Project Code : N/A Job No
Job Title : PEMBUATAN DUDUKAN GENSET
Item (s) Inspected : Access Works
Type of inspection : VISUAL Lighting Ventilation Staging
Result of Inspection : ACCEPTED No No No
Jobs description :
Pembuatan dudukan genset

Jobs described :
pembuatan dudukan genset

angle bar 580 x 70 x 45 x 6 (2 pcs)


angle bar 1020 x 70 x 45 x 6 (2 pcs)
angle bar 450 x 70 x 45 x 6 (2 pcs)
angle bar 850 x 70 x 45 x 6 (2 pcs)

foto

Prepared by, Witnessed by, Confirmed/Approve

Rizky Julianto Sihombing


Yard Respresentative Capt./ Chief Eng. *) Owner's Rep.

Signature / Date Signature / Date Signature / Dat


ARD

P BUILDING

Complete Date : 20 April2022


:-

Works
Staging Cherry Picker
No No
Confirmed/Approved by,

Owner's Rep.

Signature / Date

Complete Date : 19 April2022


:-

Works
Staging Cherry Picker
No No
Confirmed/Approved by,

Owner's Rep.

Signature / Date

Complete Date : 20 April2022


:-

Works
Staging Cherry Picker
No No
Confirmed/Approved by,

Owner's Rep.

Signature / Date

Complete Date : 20 April2022


:-
BELAKANG DAN KEEL

Works
Staging Cherry Picker
No No
Confirmed/Approved by,

Owner's Rep.

Signature / Date

Complete Date : 20 April2022


:-
ISH FINDER

Works
Staging Cherry Picker
No No

Confirmed/Approved by,

Owner's Rep.

Signature / Date

Complete Date : 20 April2022


:-

Works
Staging Cherry Picker
No No
Confirmed/Approved by,

Owner's Rep.

Signature / Date

Complete Date : - April2022


:-
STARBOARD

Works
Staging Cherry Picker
No No
Owner's Rep.

Signature / Date

Complete Date : 20 April2022


:-