INFORMASI UMUM
PROYEK ELEVATED TOLL A.P. PETARANI
www.wikabeton.co.id
Informasi Umum
Nama Proyek : Pembangunan Jalan Tol Ujung Pandang Seksi 3 (Jalan Tol Layang A.P. Pettarani)
Kategori Proyek : Sipil
Jenis Proyek : Jalan dan Jembatan
Lokasi Pekerjaan : Makassar, Sulawesi Selatan
Konstruksi Spesifik : Box Girder
Pengguna Jasa : PT. BOSOWA MARGA NUSANTARA
Penyedia Jasa : PT. WIJAYA KARYA BETON Tbk
Konsultan Perencana : PT. CIPTA GRAHA ABADI
CES : PT. CIPTA GRAHA ABADI
Reviewer : NIPPON KOEI
Konsultan Pengawas : NIPPON KOEI-INDOKOEI-CIPTA STRADA
Konsultan PMI : PT. VIRAMA KARYA
www.wikabeton.co.id │ 3
Informasi Umum
Status Kontrak : 2 April 2018
SPMK : 30 April 2018
Nilai Investasi : Rp 2,243 Trilliun
Penyelesaian proyek
Tol Layang : 30 September 2020
Pengembalian Jalan Arteri : 30 Desember 2020
Jenis Kontrak : Gabungan Lump Sum, Unit Price dan Provisional Sum
Waktu Pemeliharaan : 365 hari
www.wikabeton.co.id │ 4
Data Teknis Proyek
www.wikabeton.co.id │ 5
METODE KONSTRUKSI
www.wikabeton.co.id
TAHAPAN PEKERJAAN
www.wikabeton.co.id │ 7
KONDISI AWAL JALAN PETTARANI
www.wikabeton.co.id │ 8
PEKERJAAN PERSIAPAN
www.wikabeton.co.id │ 10
Dokumentasi Pekerjaan Bored Pile
www.wikabeton.co.id │ 11
Metode – Pile Cap
www.wikabeton.co.id │ 12
Dokumentasi Pekerjaan Pile Cap MARET 2019
JANUARI 2019
JANUARI 2019
www.wikabeton.co.id │ 13
Metode – Kolom
www.wikabeton.co.id │ 14
Dokumentasi Pekerjaan Kolom
APRIL 2019
APRIL 2019
www.wikabeton.co.id │ 15
Metode – Pier Head
Sistem Cetakan Gantung – Plate Girder
www.wikabeton.co.id │ 16
Latar Belakang Metode Pier Head
lalu lintas aktif dan jumlah pier head yang banyak (74
www.wikabeton.co.id │ 17
Pier Head Formwork Geometry
Berat Bekisting
@40 Ton
www.wikabeton.co.id │ 18
Embedded Steel Pipe
www.wikabeton.co.id │ 19
Durasi Pekerjaan Pier Head
www.wikabeton.co.id │ 20
Dokumentasi Pekerjaan Pier Head
APRIL 2019
JANUARI 2019
APRIL 2019
www.wikabeton.co.id │ 21
Dokumentasi Pekerjaan Pier Head
JANUARI 2019
APRIL 2019
www.wikabeton.co.id │ 22
METODE INSTALASI BOX GIRDER
MENGGUNAKAN LAUNCHING
GANTRY
www.wikabeton.co.id
Box Girder Precast
Bentang tipikal : 50 m
Jumlah box girder per bentang
• Standar : 15 buah
• Deviator : 2 buah
• EJ/ LS : 2 buah
www.wikabeton.co.id │ 24
Box Girder Precast
TIPE EJ/ LS
www.wikabeton.co.id │ 25
Durasi Pekerjaan Erection Box Girder
www.wikabeton.co.id │ 26
Skema Penggunaan LG
• 2 LG beroperasi secara
bersamaan di bentang timur dan
barat
LG set 1
• Produktivitas erection box girder LG set 2
adalah 4 hari/ 2 bentang
Bentang timur
Bentang barat
www.wikabeton.co.id │ 27
GENERAL ARRANGEMENT
2
8 6 1 6 7
11 9 9 10
3
5 4 12
1. Launching
PROSES LAUNCHING
www.wikabeton.co.id │ 29
Dokumentasi Launching
www.wikabeton.co.id │ 30
Dokumentasi Launching
20/11/19
www.wikabeton.co.id │ 31
Tahapan Erection Box Girder
www.wikabeton.co.id │ 33
Dokumentasi Pekerjaan Lifting
www.wikabeton.co.id │ 34
Tahapan Erection Box Girder
www.wikabeton.co.id
SETTING KOORDINAT DAN ELEVASI
│ 35
STRESSING TEMPORARY PT
Tahapan Erection Box Girder
5. Stressing
www.wikabeton.co.id
INSTALL STRAND SETTING JACK STRESSING │ 36
Tahapan Erection Box Girder
6. Lowering
LOWERING
www.wikabeton.co.id │ 37
Metode – LRB
Mulai A
(Start)
No
Persiapan (Preparation)
1. Perancah Grouting
2. Platform
3. Winch
4. Pulley
Yes
5. Chain Block
6. Main Jack 260 ton
7. Shimming Jack Plate Aktivasi LRB (LRB Activation)
8. Safety Plate
MARET 2020
Sementara (Temporary Bearing (Finish)
Installation)
DOKUMENTASI LRB
Penarikan TPT, Penahanan
Beban Oleh Bearing Sementara
( Preload TPT, Transfering
Temporary Bearing)
A B
PARAPET FORMWORK
www.wikabeton.co.id │ 39
Dokumentasi Parapet
www.wikabeton.co.id │ 40
Metode – Aspal
17/07/20
17/07/20
www.wikabeton.co.id │ 41
Metode – Expansion Joint
Mulai
Persiapan
Pengaspalan
Pelaksanaan Perkerasan Jalan
Cutting Perkerasan
Cutting AspalJalan CROSS SECTION EXPANSION JOINT RUBBER MAT
Selesai
CROSS SECTION EXPANSION JOINT STRIP SEAL
www.wikabeton.co.id │ 42
Dokumentasi Expansion Joint
15/08/20
UJI BEBAN STATIS
15/08/20
UJI BEBAN DINAMIS
www.wikabeton.co.id │ 44
Pettarani Toll Road Project
www.wikabeton.co.id
I. INTRODUCTION
Anti – Seismic Structure in General
www.wikabeton.co.id
I. INTRODUCTION
Seismic Isolation System (Isolation Bearing)
• The concept: ‘decoupling’ superstructure
from substructure to induced ground
motions caused by earthquake motions, by
‘inserting’ seismic isolator/isolation rubber
bearing between the superstructure and
substructure.
• Seismic isolator which has low horizontal
stiffness, so it can extend the natural
vibration period of the structure, at the same
time reducing the acceleration responses of
the upper structure, to ensure the safety of
the bridge.
www.wikabeton.co.id
I. INTRODUCTION
Energy Dissipation (Isolation Bearing)
www.wikabeton.co.id
I. INTRODUCTION
Pot bearing vs Lead Rubber Bearing
Fixed Bearing (only vertical) All type LRB can support both vertical load and lateral movement capacity
Guide Bearing (vertical and one way lateral movement)
Multi Bearing (vertical and two way lateral movement
Elasticity of the rubber accomodate rotation of the beam end, and stainless
The component of lead core provide the energy dissipation of LRB, the
steel plate is welded to the top plate. The free sliding of the stainless steel
rubber properties provide the re-centering capability.
plate and PTFE meet the displacement of the bridge superstructure.
www.wikabeton.co.id
I. INTRODUCTION
Pot bearing vs Lead Rubber Bearing
www.wikabeton.co.id
I. INTRODUCTION
1 1
3
3 2
2 • Rectangular Lead Bearing:
1. In general, rectangular LRB is used for linear bridges
4
4
5 5 • Circular Lead Bearing:
1. In general, circular LRB is used for curved bridges
2.The anisotropy of circular type is better than rectangular type.
3.Easier for vulcanization process, the cost is lower.
1. Sleeve/ Anchorage Dowel 2. Anchorage Steel Plate 3. Bolt 4. Anchor Bolt and Washer 5. Lead Rubber Bearing
www.wikabeton.co.id
I. INTRODUCTION
Movement of Structure under the Earthquake
Left: No installation of lead isolation rubber bearing Right: Installation of Isolation rubber bearing
www.wikabeton.co.id
I. INTRODUCTION
LRB Structure
• Reinforcing plate – improve the vertical stiffness, axial
load capacity, confinement of lead core, made from
rolled structural steel conforming to EN10025
www.wikabeton.co.id
I. INTRODUCTION
LRB Behavior
• Damping : characteristic that opposes motion and tends to return the system to rest when it is
disturbed. (BASE ISOLATION OF STRUCTURES – Design Guidelines, Kelly)
• Energy Dissipation : lead core which confined by steel plates, has low yield stress 10 Mpa, this
allows it to perform elastoplastic.
Before lead yield stress – (in condition: wind load, traffic load, minor earthquake) LRB is laterally
(resulted from high elastic stiffness of the lead) and vertically stiff (resulted from high rigidity of
steel rubber layer).
After lead yield stress – (icondition: earthquake) lateral stiffness is reduced, equal to shear
stiffness of rubber.
www.wikabeton.co.id
II. LRB KEY DESIGN PARAMETER
www.wikabeton.co.id
II. LRB KEY DESIGN PARAMETER
Technical Data – Pettarani Main Road Type
www.wikabeton.co.id
III. CERTIFICATION, TEST AND INSPECTION
www.wikabeton.co.id
III. CERTIFICATION, TEST AND INSPECTION
a. Certificate of Constancy of Performance for Lead Rubber Bearing
• The CE Certification guarantee that the LRB product are designed and
manufactured satisfy the European Standard EN 15129:2009 the products are all
marked with CE Marking to indicates that the product can satisfy all the
requirements.
www.wikabeton.co.id
III. CERTIFICATION, TEST AND INSPECTION
b. Prototype Test in Europe
www.wikabeton.co.id
III. CERTIFICATION, TEST AND INSPECTION
b. Prototype Test in Europe
www.wikabeton.co.id
III. CERTIFICATION, TEST AND INSPECTION
b. Prototype Test in Europe
www.wikabeton.co.id
III. CERTIFICATION, TEST AND INSPECTION
b. Prototype Test in Europe: Pettarani Project – LRB 620x196 (Type Ramp Box Girder)
www.wikabeton.co.id
III. CERTIFICATION, TEST AND INSPECTION
c. Factory Production Test witnessed by third party inspector
www.wikabeton.co.id
III. CERTIFICATION, TEST AND INSPECTION
c. Inspection
Proposed
No Inspection Content
Period
1) Check around the bearing: Whether there are debris, such as excess mortar, dust and water.
1 One year
2) Check the pad stone: Whether there is cracking.
2 One year Check the bolts for loosen, deformation and corrosion.
1) Appearance of bearings: whether the rubber layer has aging phenomenon such as cracking or hardening.
2) Bearing shear deformation situation.
3 One year
3) Whether the bearing has slippage, void, uneven pressure and whether the compression deformation is evenly
bulged.
Inspect the steel components of bearing, including the upper and lower outer steel plates and the
4 Two years
exposed steel members, and check for cracks or corrosion.
Inspection Table
www.wikabeton.co.id
III. CERTIFICATION, TEST AND INSPECTION
c. Inspection
www.wikabeton.co.id
Inspection Data Record FORM
IV. INSTALLATION
www.wikabeton.co.id
IV. INSTALLATION
www.wikabeton.co.id
IV. INSTALLATION
Temporary Bearing Installation
www.wikabeton.co.id
IV. INSTALLATION
Preload Temporary Prestressing & Load Transfer from Temporary Bearing to Jack
www.wikabeton.co.id
IV. INSTALLATION
Box Geometry Adjustment (Elevation Setting)
www.wikabeton.co.id
IV. INSTALLATION
LRB Installation
www.wikabeton.co.id
IV. INSTALLATION
LRB Installation
www.wikabeton.co.id
IV. INSTALLATION
LRB Installation
www.wikabeton.co.id
V. LRB Project – Pettarani Toll Road
LRB Main Road Type (550x550x202)
Qd 231 kN
Movement SLS 25 mm
www.wikabeton.co.id
V. LRB Project – Pettarani Toll Road
LRB Ramp Box Girder Type (620x196)
Qd 212 kN
Movement SLS 15 mm
www.wikabeton.co.id
V. LRB Project – Pettarani Toll Road
LRB Ramp U-Girder Type (600x196)
Qd 170 kN
Movement SLS 10 mm
www.wikabeton.co.id
WIKA BETON
STRUCTURAL HEALTH MONITORING SYSTEM
www.wikabeton.co.id
Structural Health
ISI
Monitoring
System
(SHMS)
www.wikabeton.co.id
LATAR BELAKANG
1. Peningkatan Jumlah infrastruktur yang ada di
Indonesia seperti Jalan dan Jembatan,
Terowongan, Bendungan, dan Lintasan Kereta Api
membutuhkan suatu sistem yang dapat memantau
kondisi struktur.
www.wikabeton.co.id
MANFAAT
Structural Health Monitoring System
Data tetap tersimpan saat jaringan internet offline dan akan terkirim ke server saat jaringan online
kembali
Hasil pembacaan sensor dapat diakses secara online menggunakan aplikasi WTONSHMS
Energi listrik menggunakan Listrik PLN dan Panel Surya sebagai cadangan
SENSOR
SENSOR
SENSOR
www.wikabeton.co.id
SENSOR REMOTE CONTROLLER &
LOCAL DATA LOGGER
SENSOR
Structural Health Monitoring System
Sensor temperatur
dan kelembaban
Sensor defleksi udara
Laser untuk menggunakan
sensor dioda yang
defleksi disorot sinar
laser
www.wikabeton.co.id
SOFTWARE
Structural Health Monitoring System
www.wikabeton.co.id
SOFTWARE
Structural Health Monitoring System
www.wikabeton.co.id
SOFTWARE
Structural Health Monitoring System
www.wikabeton.co.id
Aplikasi WTONSHMS pada Jembatan Jalan Layang Tol A.P Pettarani
www.wikabeton.co.id
LOKASI SENSOR
www.wikabeton.co.id
LOKASI SENSOR
www.wikabeton.co.id
LOKASI SENSOR
www.wikabeton.co.id
DOKUMENTASI PEMASANGAN SENSOR
Deflection Multi
Unit Processing
Meter
www.wikabeton.co.id
DOKUMENTASI PEMASANGAN SENSOR
www.wikabeton.co.id