METODE KONSTRUKSI, PENGGUNAAN LEAD RUBBER

BEARING & SHMS


PROYEK ELEVATED TOLL A.P. PETARANI

- 12 NOVEMBER 2020 -

www.wikabeton.co.id
INFORMASI UMUM
PROYEK ELEVATED TOLL A.P. PETARANI

www.wikabeton.co.id
Informasi Umum
Nama Proyek : Pembangunan Jalan Tol Ujung Pandang Seksi 3 (Jalan Tol Layang A.P. Pettarani)
Kategori Proyek : Sipil
Jenis Proyek : Jalan dan Jembatan
Lokasi Pekerjaan : Makassar, Sulawesi Selatan
Konstruksi Spesifik : Box Girder
Pengguna Jasa : PT. BOSOWA MARGA NUSANTARA
Penyedia Jasa : PT. WIJAYA KARYA BETON Tbk
Konsultan Perencana : PT. CIPTA GRAHA ABADI
CES : PT. CIPTA GRAHA ABADI
Reviewer : NIPPON KOEI
Konsultan Pengawas : NIPPON KOEI-INDOKOEI-CIPTA STRADA
Konsultan PMI : PT. VIRAMA KARYA

www.wikabeton.co.id │ 3
Informasi Umum
Status Kontrak : 2 April 2018
SPMK : 30 April 2018
Nilai Investasi : Rp 2,243 Trilliun
Penyelesaian proyek
Tol Layang : 30 September 2020
Pengembalian Jalan Arteri : 30 Desember 2020
Jenis Kontrak : Gabungan Lump Sum, Unit Price dan Provisional Sum
Waktu Pemeliharaan : 365 hari

www.wikabeton.co.id │ 4
Data Teknis Proyek

• Panjang Jalan Layang (Main Road) : ± 4.030 m • Main Road


• Panjang Jalan Toll Total : ± 4.375 m • Jumlah Abutment MR : 1 Buah
• Lebar Main Road : 2 x 10.3 m • Jumlah Pier Main Road : 74 Buah
• Jumlah Pier Head EJ : 10 Buah
• Jumlah Ramp : • Jumlah Pier Head LS : 64 Buah
➢ Ramp On Boulevard & Ramp Off Boulevard
➢ Ramp On Alauddin & Ramp Off Alauddin • Ramp
• Jumlah Pier Ramp : 55 Buah
• Panjang Ramp Total : ± 2.069,2 m • Jumlah Pier Head Box Ramp : 16 Buah
• Jumlah Precast PC-U Girder : 78 Balok • Jumlah Pier Head EJ Ramp : 4 Buah
• Jumlah Box Girder Main Road : 2752 Segmen • Jumlah Pier Head untuk U Girder : 35 Buah
• Jumlah Box Girder Ramp : 292 Segmen • Jumlah Abutment Ramp : 4 Buah
• Jumlah Precast Slab Main Road : 250 Buah
• Jumlah Precast Slab Ramp : 148 Buah
• Jumlah Bored Pile Φ 1,2 m : 524 titik
• Jumlah Bored Pile Φ 1,0 m : 220 titik
• Jumlah Bored Pile Φ 0,8 m : 215 titik

www.wikabeton.co.id │ 5
METODE KONSTRUKSI

www.wikabeton.co.id
TAHAPAN PEKERJAAN

DESAIN DAN PEKERJAAN SUB-STRUKTUR SUPER- BANGUNAN


PERENCANAAN PERSIAPAN STRUKTUR PELENGKAP

• DED • Mobilisasi • Bored Pile • Erection Box • Marka jalan


• Analisa/ alat & • Pile cap Girder • Drainase
Perhitungan personil • Kolom/ Pier • Erection U- • Tiang lampu
Struktur • Survey awal • Pier Head girder • Perambuan
• Shop • Pemindahan • Pemasangan
Drawing utilitas LRB
• Schedule eksisting • Parapet
• Pagar • Aspal
pengaman • Expansion
proyek Joint

www.wikabeton.co.id │ 7
KONDISI AWAL JALAN PETTARANI

CROSS SECTION TIPIKAL JALAN EKSISTING

DOKUMENTASI JALAN EKSISTING PETTARANI

www.wikabeton.co.id │ 8
PEKERJAAN PERSIAPAN

PEMINDAHAN PIPA PDAM


PEMOTONGAN POHON

www.wikabeton.co.id PEMBONGKARAN MEDIAN DAN SEPARATOR JALAN │ 9


Metode – Bored Pile

www.wikabeton.co.id │ 10
Dokumentasi Pekerjaan Bored Pile

SEPTEMBER 2018 SEPTEMBER 2018

SEPTEMBER 2018 SEPTEMBER 2018

www.wikabeton.co.id │ 11
Metode – Pile Cap

www.wikabeton.co.id │ 12
Dokumentasi Pekerjaan Pile Cap MARET 2019

JANUARI 2019

JANUARI 2019

www.wikabeton.co.id │ 13
Metode – Kolom

www.wikabeton.co.id │ 14
Dokumentasi Pekerjaan Kolom

APRIL 2019

APRIL 2019

www.wikabeton.co.id │ 15
Metode – Pier Head
Sistem Cetakan Gantung – Plate Girder

www.wikabeton.co.id │ 16
Latar Belakang Metode Pier Head

Pekerjaan Pier Head Proyek Pettarani berada di atas jalur

lalu lintas aktif dan jumlah pier head yang banyak (74

buah), merupakan sebuah tantangan tersendiri untuk

menemukan metode yang memungkinkan rangkaian proses

pekerjaan pier head dijalankan dengan tetap memperhatikan

aspek K3 terutama potensi bahaya terhadap kendaraan di

bawahnya, kemudahan pengerjaan, dengan durasi

pengerjaan yang cepat.

www.wikabeton.co.id │ 17
Pier Head Formwork Geometry
Berat Bekisting
@40 Ton

www.wikabeton.co.id │ 18
Embedded Steel Pipe

www.wikabeton.co.id │ 19
Durasi Pekerjaan Pier Head

No. Item of Work Days 1 2 3 4 5 6 7 8 9 10 11 12 13 14


1 Pekerjaan re assembly Cetakan 1
2 Pemasangan Cetakan 1
3 Pembesian Pier Head & Instal Ducting 4
4 Pengecoran 1
5 Curing 3
6 Stressing 1
7 Pekerjaan Grouting Tendon 1
8 Bongkar Cetakan 1
9 Pemindahan Cetakan 1
Total 14

www.wikabeton.co.id │ 20
Dokumentasi Pekerjaan Pier Head

APRIL 2019

JANUARI 2019

APRIL 2019

www.wikabeton.co.id │ 21
Dokumentasi Pekerjaan Pier Head

JANUARI 2019

APRIL 2019

www.wikabeton.co.id │ 22
METODE INSTALASI BOX GIRDER
MENGGUNAKAN LAUNCHING
GANTRY

www.wikabeton.co.id
Box Girder Precast

Bentang tipikal : 50 m
Jumlah box girder per bentang
• Standar : 15 buah
• Deviator : 2 buah
• EJ/ LS : 2 buah

TIPIKAL POTONGAN MEMANJANG BENTANG 50 M

www.wikabeton.co.id │ 24
Box Girder Precast

TIPE STANDAR TIPE DEVIATOR

TIPE EJ/ LS

www.wikabeton.co.id │ 25
Durasi Pekerjaan Erection Box Girder

www.wikabeton.co.id │ 26
Skema Penggunaan LG

• 2 LG beroperasi secara
bersamaan di bentang timur dan
barat
LG set 1
• Produktivitas erection box girder LG set 2
adalah 4 hari/ 2 bentang

Bentang timur
Bentang barat

www.wikabeton.co.id │ 27
GENERAL ARRANGEMENT
2
8 6 1 6 7

11 9 9 10
3
5 4 12

Launching Gantry Components:


1. Main Girder/Beam 4. Spreader Beam 7. Front Nose 10. Front Leg
2. Master winch 5. Hanger Bars 8. Rear Nose 11. Rear Leg
3. Lifting Device 6. End Suspension 9. Main Support 12. False Segment
www.wikabeton.co.id │ 28
Tahapan Erection Box Girder

1. Launching

Proses pergerakan LG dari bentang


awal ke bentang berikutnya. LG akan
menumpu pada box girder terpasang
dan false segment.

PROSES LAUNCHING

www.wikabeton.co.id │ 29
Dokumentasi Launching

INSTALL FALSE SEGMENT PEMINDAHAN REAR PEMINDAHAN FRONT


MAIN SUPPORT MAIN SUPPORT

www.wikabeton.co.id │ 30
Dokumentasi Launching

20/11/19

www.wikabeton.co.id │ 31
Tahapan Erection Box Girder

2. Pengiriman Box Girder dan


Pemasangan asesoris

Box Girder sebelum dilakukan lifting


perlu dilakukan pemasangan asesoris ILUSTRASI PEMASANGAN ASESORIS BOX GIRDER
yang berfungsi untuk kegiatan lifting
dan setting/ perapatan.

PEMASANGAN SPREADER BEAM BOX GIRDER SIAP DILIFTING


www.wikabeton.co.id │ 32
Tahapan Erection Box Girder

3. Lifting Box Girder

Proses pengangkatan seluruh


segmen box girder pada bentang
yang dikerjakan.

PROSES LIFTING BOX GIRDER

www.wikabeton.co.id │ 33
Dokumentasi Pekerjaan Lifting

PEMASANGAN CONNCETOR PIN LIFTING HANGING

www.wikabeton.co.id │ 34
Tahapan Erection Box Girder

4. Setting Box Girder

Proses perapatan segmen-segmen


yang sudah terlifting menggunakan
epoxy. Pada tahapan ini harus
dilakukan kontrol yang baik pada APLIKASI EPOXY

koordinat dan elevasi segmen.

www.wikabeton.co.id
SETTING KOORDINAT DAN ELEVASI
│ 35
STRESSING TEMPORARY PT
Tahapan Erection Box Girder

5. Stressing

Pemberian tegangan pada bentang


box girder.

ILUSTRASI PEKERJAAN STRESSING

www.wikabeton.co.id
INSTALL STRAND SETTING JACK STRESSING │ 36
Tahapan Erection Box Girder
6. Lowering

Proses penurunan bentang box girder


yang telah distressing dan
selanjutnya akan didudukkan di atas
temporary bearing di atas Pier Head.

LOWERING

www.wikabeton.co.id │ 37
Metode – LRB
Mulai A
(Start)
No
Persiapan (Preparation)
1. Perancah Grouting
2. Platform
3. Winch
4. Pulley
Yes
5. Chain Block
6. Main Jack 260 ton
7. Shimming Jack Plate Aktivasi LRB (LRB Activation)
8. Safety Plate

Pemasangan Bearing Selesai

MARET 2020
Sementara (Temporary Bearing (Finish)
Installation)

DOKUMENTASI LRB
Penarikan TPT, Penahanan
Beban Oleh Bearing Sementara
( Preload TPT, Transfering
Temporary Bearing)

Setting Elevasi Geometri Box


Girder (Box Geometry /
Elevation Set)

Pemasangan LRB (LRB


Installation)

CROSS SECTION LRB


www.wikabeton.co.id
A │ 38
Metode – Parapet
A
Start / Mulai B
Formwork System
Installation / Pemasangan Dismantle Formwork /
Preparation / Persiapan Modul Bekisting Pembongkaran Bekisting
No / Tidak

Formwork System Inspection / Finish /


Fabication / Fabrikasi Inspeksi Selesai
Sistem Formwok
No / Tidak

Inspection / Pouring Concrete /


Inspeksi Pengecoran Beton

Rebar Installation / Inspection /


Pemasangan Pembesian Inspeksi
No / Tidak

Inspection / Curing Concrete /


Inspeksi Perawatan Beton

A B

PARAPET FORMWORK

www.wikabeton.co.id │ 39
Dokumentasi Parapet

PARAPET FORMWORK 22/09/20


SELESAI PENGECORAN

www.wikabeton.co.id │ 40
Metode – Aspal
17/07/20

17/07/20

www.wikabeton.co.id │ 41
Metode – Expansion Joint
Mulai

Persiapan

Persiapan dan Pembersihan Permukaan Block


Out

Pemasangan Block Out Pada Area EJ

Pengaspalan
Pelaksanaan Perkerasan Jalan

Cutting Perkerasan
Cutting AspalJalan CROSS SECTION EXPANSION JOINT RUBBER MAT

Pemasangan Ekpansion Joint

Menutup Zona Antara Join dan Aspal

Menutup Lubang Angkur Pada Ekpansion


Join

Selesai
CROSS SECTION EXPANSION JOINT STRIP SEAL
www.wikabeton.co.id │ 42
Dokumentasi Expansion Joint

EXPANSION JOINT STRIP SEAL

EXPANSION JOINT RUBBER MAT


www.wikabeton.co.id │ 43
Uji Beban Statis dan Dinamis
Uji beban proyek Jalan Tol Layang A.P. Pettarani telah dilakukan pada tanggal 15-17 Agustus 2020 yang
disaksikan oleh KKJTJ dan perwakilan dari Kementerian PUPR. Pengujian yang dilakukan yaitu uji beban
statis dan dinamis pada bentang P7-P9.

15/08/20
UJI BEBAN STATIS
15/08/20
UJI BEBAN DINAMIS
www.wikabeton.co.id │ 44
Pettarani Toll Road Project

www.wikabeton.co.id
I. INTRODUCTION
Anti – Seismic Structure in General

• Conventional structural seismic design


method is to increase the strength of the
structure itself (columns and the
substructure), rely on the seismic
deformation ability.

www.wikabeton.co.id
I. INTRODUCTION
Seismic Isolation System (Isolation Bearing)
• The concept: ‘decoupling’ superstructure
from substructure to induced ground
motions caused by earthquake motions, by
‘inserting’ seismic isolator/isolation rubber
bearing between the superstructure and
substructure.
• Seismic isolator which has low horizontal
stiffness, so it can extend the natural
vibration period of the structure, at the same
time reducing the acceleration responses of
the upper structure, to ensure the safety of
the bridge.
www.wikabeton.co.id
I. INTRODUCTION
Energy Dissipation (Isolation Bearing)

•Although seismic isolator can lengthen the


natural vibration of the structure, and
reduced seismic forces, it still affects on
larger displacement on superstructure.
• To limit this displacement, seismic isolator
also needs to provide energy dissipation.

www.wikabeton.co.id
I. INTRODUCTION
Pot bearing vs Lead Rubber Bearing

POT BEARING LEAD RUBBER BEARING

Fixed Bearing (only vertical) All type LRB can support both vertical load and lateral movement capacity
Guide Bearing (vertical and one way lateral movement)
Multi Bearing (vertical and two way lateral movement

Elasticity of the rubber accomodate rotation of the beam end, and stainless
The component of lead core provide the energy dissipation of LRB, the
steel plate is welded to the top plate. The free sliding of the stainless steel
rubber properties provide the re-centering capability.
plate and PTFE meet the displacement of the bridge superstructure.

www.wikabeton.co.id
I. INTRODUCTION
Pot bearing vs Lead Rubber Bearing

POT BEARING LEAD RUBBER BEARING


ADVANTAGE:
ADVANTAGE:
1. The bearing can withstand great vertical forces, horizontal forces,
1. The bearing can withstand great vertical forces, multi directional
displacement and rotation.
horizontal forces, displacement and rotation.
2. The material is mainly steel, easy to process.
2.The lead core has good damping effect, and good energy dissipation
3. Low cost.
capacity.
3.Easy installation, easy replacement, very low maintenance.
DISADVANTAGE: 4.Better fatigue and temperature stability, stable performance.
Rigid aseismic, depending on its own structural stiffness and strength to 5.Can reduce the bridge engineering cost, efficiently.
resist seismic force, there is no function of energy dissipation.

www.wikabeton.co.id
I. INTRODUCTION
1 1
3
3 2
2 • Rectangular Lead Bearing:
1. In general, rectangular LRB is used for linear bridges
4
4
5 5 • Circular Lead Bearing:
1. In general, circular LRB is used for curved bridges
2.The anisotropy of circular type is better than rectangular type.
3.Easier for vulcanization process, the cost is lower.

1. Sleeve/ Anchorage Dowel 2. Anchorage Steel Plate 3. Bolt 4. Anchor Bolt and Washer 5. Lead Rubber Bearing

www.wikabeton.co.id
I. INTRODUCTION
Movement of Structure under the Earthquake

Left: No installation of lead isolation rubber bearing Right: Installation of Isolation rubber bearing
www.wikabeton.co.id
I. INTRODUCTION
LRB Structure
• Reinforcing plate – improve the vertical stiffness, axial
load capacity, confinement of lead core, made from
rolled structural steel conforming to EN10025

• Rubber layer/ elastomer – high elastic deformation


and re-centering, made from natural rubber

• Lead core – increase damping, energy dissipation, with


a minimum lead purity of 99%

www.wikabeton.co.id
I. INTRODUCTION
LRB Behavior
• Damping : characteristic that opposes motion and tends to return the system to rest when it is
disturbed. (BASE ISOLATION OF STRUCTURES – Design Guidelines, Kelly)

• Energy Dissipation : lead core which confined by steel plates, has low yield stress 10 Mpa, this
allows it to perform elastoplastic.

Before lead yield stress – (in condition: wind load, traffic load, minor earthquake) LRB is laterally
(resulted from high elastic stiffness of the lead) and vertically stiff (resulted from high rigidity of
steel rubber layer).

After lead yield stress – (icondition: earthquake) lateral stiffness is reduced, equal to shear
stiffness of rubber.

www.wikabeton.co.id
II. LRB KEY DESIGN PARAMETER

www.wikabeton.co.id
II. LRB KEY DESIGN PARAMETER
Technical Data – Pettarani Main Road Type

Axial Load Capacity at Service, Nsls 4700 kN

Axial Load Capacity at Ultimate, Nuls 8300 kN

Characteristic Strength, Qd 231 kN

Stiffness before yield, K1 15.97 kN/mm

Stiffness after yield, K2 2.56 kN/mm

Effective Stiffness, Keff 4.5 kN/mm

Damping ratio, ζ 23%


Lateral movement capacity at
25 mm
Service
Lateral movement capacity at
101 mm
Ultimate

www.wikabeton.co.id
III. CERTIFICATION, TEST AND INSPECTION

www.wikabeton.co.id
III. CERTIFICATION, TEST AND INSPECTION
a. Certificate of Constancy of Performance for Lead Rubber Bearing

• The CE Certification guarantee that the LRB product are designed and
manufactured satisfy the European Standard EN 15129:2009 the products are all
marked with CE Marking to indicates that the product can satisfy all the
requirements.

www.wikabeton.co.id
III. CERTIFICATION, TEST AND INSPECTION
b. Prototype Test in Europe

www.wikabeton.co.id
III. CERTIFICATION, TEST AND INSPECTION
b. Prototype Test in Europe

www.wikabeton.co.id
III. CERTIFICATION, TEST AND INSPECTION
b. Prototype Test in Europe

www.wikabeton.co.id
III. CERTIFICATION, TEST AND INSPECTION
b. Prototype Test in Europe: Pettarani Project – LRB 620x196 (Type Ramp Box Girder)

www.wikabeton.co.id Horizontal characteristics under cyclic deformation testing


III. CERTIFICATION, TEST AND INSPECTION
b. Prototype Test in Europe: Pettarani Project – LRB 550x550x202 (Type Main Road)

www.wikabeton.co.id Variation of horizontal characteristics with frequency


III. CERTIFICATION, TEST AND INSPECTION
b. Prototype Test in Europe: Pettarani Project – LRB 550x550x202 (Type Main Road)

www.wikabeton.co.id Variation of horizontal characteristics with repeated cycling


III. CERTIFICATION, TEST AND INSPECTION
c. Factory Production Test witnessed by third party inspector

www.wikabeton.co.id
III. CERTIFICATION, TEST AND INSPECTION
c. Factory Production Test witnessed by third party inspector

www.wikabeton.co.id
III. CERTIFICATION, TEST AND INSPECTION
c. Inspection
Proposed
No Inspection Content
Period
1) Check around the bearing: Whether there are debris, such as excess mortar, dust and water.
1 One year
2) Check the pad stone: Whether there is cracking.

2 One year Check the bolts for loosen, deformation and corrosion.

1) Appearance of bearings: whether the rubber layer has aging phenomenon such as cracking or hardening.
2) Bearing shear deformation situation.
3 One year
3) Whether the bearing has slippage, void, uneven pressure and whether the compression deformation is evenly
bulged.

Inspect the steel components of bearing, including the upper and lower outer steel plates and the
4 Two years
exposed steel members, and check for cracks or corrosion.

Inspection Table

www.wikabeton.co.id
III. CERTIFICATION, TEST AND INSPECTION
c. Inspection

www.wikabeton.co.id
Inspection Data Record FORM
IV. INSTALLATION

www.wikabeton.co.id
IV. INSTALLATION

Working Platform Installation

www.wikabeton.co.id
IV. INSTALLATION
Temporary Bearing Installation

www.wikabeton.co.id
IV. INSTALLATION
Preload Temporary Prestressing & Load Transfer from Temporary Bearing to Jack

www.wikabeton.co.id
IV. INSTALLATION
Box Geometry Adjustment (Elevation Setting)

www.wikabeton.co.id
IV. INSTALLATION
LRB Installation

Winch Pulley Chain Block

www.wikabeton.co.id
IV. INSTALLATION
LRB Installation

LRB Setting LRB Pedestal Formwork


LRB Formwork

www.wikabeton.co.id
IV. INSTALLATION
LRB Installation

LRB Pedestal Grouting

www.wikabeton.co.id LRB Formwork Release


& LRB Activation
V. LRB Project – Pettarani Toll Road

www.wikabeton.co.id
V. LRB Project – Pettarani Toll Road
LRB Main Road Type (550x550x202)

Vertical Load SLS 4700 kN

Vertical Load ULS 8300 kN

Qd 231 kN

First Stiffness, K1 15.97 kN/mm


Second Stiffness,
2.56 kN/mm
K2
Effective Stiffness,
4.5 kN/mm
Keff

Damping Ratio 23%

Movement SLS 25 mm

Movement ULS 101 mm

www.wikabeton.co.id
V. LRB Project – Pettarani Toll Road
LRB Ramp Box Girder Type (620x196)

Vertical Load SLS 2500 kN

Vertical Load ULS 5000 kN

Qd 212 kN

First Stiffness, K1 10.681 kN/mm


Second Stiffness,
1.709 kN/mm
K2
Effective Stiffness,
3.87 kN/mm
Keff

Damping Ratio 23%

Movement SLS 15 mm

Movement ULS 100 mm

www.wikabeton.co.id
V. LRB Project – Pettarani Toll Road
LRB Ramp U-Girder Type (600x196)

Vertical Load SLS 2322 kN

Vertical Load ULS 4500 kN

Qd 170 kN

First Stiffness, K1 9.565 kN/mm

Second Stiffness, 1.53 kN/mm


K2
Effective Stiffness, 3.28 kN/mm
Keff
Damping Ratio 26%

Movement SLS 10 mm

Movement ULS 100 mm

www.wikabeton.co.id
WIKA BETON
STRUCTURAL HEALTH MONITORING SYSTEM

www.wikabeton.co.id
Structural Health
ISI

Monitoring
System
(SHMS)
www.wikabeton.co.id
LATAR BELAKANG
1. Peningkatan Jumlah infrastruktur yang ada di
Indonesia seperti Jalan dan Jembatan,
Terowongan, Bendungan, dan Lintasan Kereta Api
membutuhkan suatu sistem yang dapat memantau
kondisi struktur.

2. Perkembangan teknologi digital mempermudah


pengamatan perilaku struktur secara realtime
sehingga dapat mendeteksi dini terhadap
perubahan perilaku struktur yang dapat mengurangi
kinerja struktur.

3. Perawatan infrastruktur yang dilakukan pada saat


yang tepat dapat mengembalikan kinerja struktur
www.wikabeton.co.id
untuk mencapai masa layan dan mengoptimalkan
DEFINISI SHMS

Structural Health Monitoring System (SHMS)


adalah sistem monitoring secara periodik
menggunakan sensor sensitif yang datanya
terbaca secara realtime dan terintegrasi.

Tujuannya adalah untuk mendeteksi perubahan


karakteristik / kerusakan pada material/posisi
geometris dari suatu struktur yang dapat
mempengaruhi kinerja struktur.

www.wikabeton.co.id
MANFAAT
Structural Health Monitoring System

Memonitor perilaku struktur seperti jembatan,


terowongan, jalan raya/rel dan gedung secara
realtime dan terintegrasi

Mendeteksi degradasi kekuatan yang terjadi pada


suatu struktur
Identifikasi awal untuk menentukan penyebab
apabila terjadi kerusakan pada suatu struktur

Sebagai sistem early warning (peringatan dini) untuk


menentukan waktu perawatan struktur yang tepat

Mendapatkan data perilaku sebagai data history


selama masa layan yang dapat digunakan sebagai
www.wikabeton.co.id
kajian improvement desain struktur
KEUNTUNGAN
Structural Health Monitoring System
Satu sistem, untuk semua jenis/merk sensor

Pengambilan data secara realtime dan terintegrasi


Pre-processing untuk filter data, sehingga penggunaan memori relatif
kecil
Rekaman/data disimpan di server yang berada di Indonesia

Data mudah diakses dan didownload

Data tetap tersimpan saat jaringan internet offline dan akan terkirim ke server saat jaringan online
kembali

Hasil pembacaan sensor dapat diakses secara online menggunakan aplikasi WTONSHMS

Energi listrik menggunakan Listrik PLN dan Panel Surya sebagai cadangan

Tingkat Kandungan Dalam Negeri (TKDN) Tinggi


www.wikabeton.co.id
DIAGRAM PROSES
Structural Health Monitoring System
DATA
CONNECTION
INTERNET
SERVER
SENSOR
SENSOR
SENSOR
CONSISTS OF :
SENSOR
REMOTE CONTROLLER &
LOCAL DATA LOGGER Sensor systems

INTERNET Data acquisition and delivery


DATA systems
CONNECTION
INTERNET
Data processing system
SENSOR
SENSOR
SENSOR
SENSOR REMOTE CONTROLLER & Data management system
LOCAL DATA LOGGER

Data evaluation system


DATA
CONNECTION
INTERNET
USER

SENSOR
SENSOR
SENSOR
www.wikabeton.co.id
SENSOR REMOTE CONTROLLER &
LOCAL DATA LOGGER
SENSOR
Structural Health Monitoring System

Processing unit berfungsi untuk mengumpulkan dan mengolah data hasil


pembacaan sensor yang selanjutnya dikirimkan ke server dan diakses oleh aplikasi
WTON SHMS. Sistem Processing unit tetap memproses data walaupun jaringan
internet
www.wikabeton.co.id
dalam kondisi offline.
SENSOR
Structural Health Monitoring System

Panel solar cell


Strain gauge, tilt meter,
accelorometer sensor
Tilt meter
dibagian
ujung

Sensor temperatur
dan kelembaban
Sensor defleksi udara
Laser untuk menggunakan
sensor dioda yang
defleksi disorot sinar
laser

www.wikabeton.co.id
SOFTWARE
Structural Health Monitoring System

www.wikabeton.co.id
SOFTWARE
Structural Health Monitoring System

www.wikabeton.co.id
SOFTWARE
Structural Health Monitoring System

www.wikabeton.co.id
Aplikasi WTONSHMS pada Jembatan Jalan Layang Tol A.P Pettarani

Sensor Sensor Laser Sensor Tiltmeter


Accelerometer Displacement Meter
(LDM)

WTONSHMS dipasang saat uji loading test Jalan Layang Tol


A.P Pettarani.
www.wikabeton.co.id
LOKASI SENSOR

www.wikabeton.co.id
LOKASI SENSOR

www.wikabeton.co.id
LOKASI SENSOR

www.wikabeton.co.id
LOKASI SENSOR

www.wikabeton.co.id
DOKUMENTASI PEMASANGAN SENSOR

Deflection Multi
Unit Processing
Meter
www.wikabeton.co.id
DOKUMENTASI PEMASANGAN SENSOR

ATRH Sensor Sensor Tiltmeter


Accelerometer
www.wikabeton.co.id
www.wikabeton.co.id
TERIMA KASIH

PT Wijaya Karya Beton Tbk.


WIKA Tower 1 Lt. 2-4
Jl. D.I. Panjaitan Kav. 9-10 Jakarta 13340
(+62 21) 819 2802
Humas : sekper@wika-beton.co.id
Pemasaran : marketing@wika-beton.co.id

www.wikabeton.co.id

Anda mungkin juga menyukai