CONVERSION FACTOR

KONDISI CONVERSION FACTOR


JENIS TANAH AWAL
TANAH ASLI LEPAS PADAT
(A) (B) (C)
1 2 3 4 5
Sand (A) 1.00 1.11 0.95
(B) 0.90 1.00 0.86
(C) 1.05 1.17 1.00
Common Casth (A) 1.00 1.25 0.90
(B) 0.80 1.00 0.72
(C) 1.11 1.39 1.00
Clay (A) 1.00 1.43 0.90
(B) 0.70 1.00 0.63
(C) 1.11 1.59 1.00
Gravelly Soil (A) 1.00 1.18 1.08
(B) 0.85 1.00 0.91
(C) 0.93 1.09 1.00
Gravels (A) 1.00 1.13 1.03
(B) 0.88 1.00 0.91
(C) 0.97 1.10 1.00
Solid or Rugged Gravels (A) 1.00 1.42 1.29
(B) 0.70 1.00 0.91
(C) 0.77 1.11 1.00
Broken Limstone, Sandstone and other soft rocks (A) 1.00 1.65 1.22
(B) 0.61 1.00 0.74
(C) 0.82 1.35 1.00
Broken Granite, basalt and other hard rocks (A) 1.00 1.70 1.31
(B) 0.59 1.00 0.77
(C) 0.76 1.30 1.00
Broken rocks (A) 1.00 1.75 1.40
(B) 0.57 1.00 0.80
(C) 0.71 1.24 1.00
Blasted bulky rocks (A) 1.00 1.80 1.30
(B) 0.56 1.00 0.72
(C) 0.77 1.38 1.00
Sumber : P5 halaman 17.

FAKTOR GABUNGAN ALAT DAN MEDAN (EAM)

KONDISI ALAT
NO KONDISI MEDAN
PRIMA BAIK CUKUP SEDANG
1 Ideal 0.950 0.900 0.850 0.800
2 Ringan 0.900 0.852 0.805 0.757
3 Sedang 0.850 0.805 0.760 0.715
4 Berat 0.800 0.715 0.715 0.673
Sumber : P5 halaman 11.
FAKTOR GABUNGAN CUACA DAN OPERATOR (Eco)

OPERATOR DAN MEKANIK


NO CUACA
TRAMPIL BAIK CUKUP SEDANG
1 Terang, Segar 0.900 0.850 0.800 0.750
2 Terang, Panas, Berdebu 0.830 0.783 0.737 0.691
3 Dingin, Mendung, Gerimis 0.750 0.708 0.666 0.624
4 Gelap 0.666 0.629 0.592 0.555
Sumber : P5 halaman 15.

FAKTOR MATERIAL (Em)

FAKTOR
TINGKAT
PENGERJAAN MATERIAL KONDISI DAN JENIS MATERIAL
KESULITAN
(Em)
Mudah 1.10 Dapat digusur secara sempurna penuh blade, kadar
air rendah, bukan tanah pasir dipadatkan, tanah
biasa, onggokan material.
Sedang 0.90 Tanah lepas tetapi tidak digusur sepenuh blade,
Dozing tanah kerikil, pasir, batu pecah halus.
Agak Sulit 0.70 Kadar air tinggi, liat lengket, tanah liat keras kering;
pasir kerikil.
Sulit 0.60 Batu hasil peledakan atau batu berukuran kasar dan
lumpur.
Mudah 1.20 Kondisi alam ; tanah biasa atau tanah lunak.
Sedang 1.10 Kondisi alam tanah liat, tanah pasir atau pasir kering.
Excavating
Agak Sulit 0.90 Kondisi alam tanah pasir dengan kerikil.
Sulit 0.80 Onggokan batu hasil peledakan, lumpur.
Mudah 1,00-1,10 Onggokan material, hasil galian, dapat munjung,
pasir, tanah pasir, tanah liat lembek basah (kadar air
sedang).
Sedang 0,85-0,95 Onggokan tanah material tetapi untuk mengambilnya
agak diforsir, pasir kering, tanah liat, batu pecah,
kerikil halus.
Loading
Agak Sulit 0,80-0,85 Batu pecah halus, tanah liat keras, sirtu, tanah pasir,
tanah liat yang semuanya sulit disodok dan lumpur

Sulit 0,75-,80 Batu pecah kasar, hasil peledakan, batu kali, sirtu,
tanah pasir, tanah liat yang semuanya sulit disodok
dan lumpur.
Pengisian 1,10-1,20 - Semua material yang diangkut adalah material
oleh loader lepas.
Hauling
- Alat hanya berpungsi pengangkutan, bukan
pengisian.
Sumber : P5 halaman 16.
FAKTOR MANAJEMEN (EM)

NILAI
NO KUALIFIKASI CURRICULUM VITAE
FAKTOR
1 Sangat Baik Pendidikan :
a. Formal : S1-Teknik
b. Informal :
1. Large Project Management
2. Management Audit
3. Project Administration
Pengalaman :
1. Proyek :
Nilai : 1,00 M
2. Proyek :
Nilai : 1,50 M 0.95
2 Baik Pendidikan :
a. Formal : S1-Teknik
b. Informal :
1. Construction Management
2. Engineering Management
3. Similiar Project Management
Pengalaman :
1. Proyek :
Nilai : 0,50 M
2. Proyek :
Nilai : 1,00 M 0.90
3 Cukup Pendidikan :
a. Formal : S1-Teknik
b. Informal :
1. Engineering Management
2. Construction Management
3. ......................................
Pengalaman :
1. Proyek :
Nilai : 0,25 M
2. Proyek :
Nilai : 0,50 M 0.85
4 Sedang Pendidikan :
a. Formal : SM-Teknik
b. Informal :
1. Engineering Management
2. ......................................
3. ......................................
Pengalaman :
1. Proyek :
Nilai : 0,10 M
2. Proyek :
Nilai : 0,25 M 0.80
Sumber : P5 halaman 19.
TABEL WAKTU SIKLUS EXCAVATOR (Menit)

SUDUT KAPASITAS BUCKET (M3)


BUANG 0.25 0.40 0.45 0.50 0.55 0.60 0.70 0.80 0.90 1.00 1.20 1.50 1.70
90O 0.20 0.20 0.23 0.23 0.23 0.26 0.26 0.26 0.26 0.28 0.30 0.31 0.33
180O 0.25 0.25 0.28 0.28 0.28 0.31 0.31 0.31 0.31 0.33 0.35 0.36 0.38
Sumber : P5 halaman 24.

TABEL FAKTOR KEDALAMAN GALIAN

R (%) Mudah Sedang Agak Sulit Sulit

< 40 0.7 0.9 1.1 1.4


40 - 75 0.8 1.0 1.3 1.6
> 75 0.9 1.1 1.5 1.8
Sumber : P5 halaman 24.
TABEL JOB FAKTOR

JOB FAKTOR
NO PEKERJAAN JENIS ALAT KAPASITAS
EAM Em EM ECO ETOT

1 Galian Type-A Excavator 0.80 M3 0.805 1.100 0.950 0.783 0.659


(Tanah Biasa) Buldozer 2.00 M3 0.805 0.900 0.900 0.783 0.511
Dump Truck 5.00 M3 0.805 1.100 0.900 0.783 0.624

2 Galian Type-B Excavator (standard) 0.80 M3 0.715 0.800 0.900 0.783 0.403
(Rawa/ lumpur) Excavator (long arm) 0.45 M3 0.715 0.800 0.900 0.783 0.403
Ponton Apung 40.00 Ton - - - - -

3 Galian Type-C Excavator+Breaker 0.25 M3 0.805 0.800 0.950 0.783 0.479


(Batuan) Excavator 0.80 M3 0.805 0.750 0.900 0.783 0.425
Dump Truck 5.00 M3 0.805 1.100 0.900 0.783 0.624
Buldozer 2.00 M3 0.805 0.600 0.900 0.783 0.340

4 Timbunan Tanah Excavator 0.80 M3 0.805 1.100 0.900 0.783 0.624


Dump Truck 5.00 M3 0.805 1.100 0.900 0.783 0.624
Buldozer 2.00 M3 0.805 0.900 0.900 0.783 0.511
Compactor Ton 0.805 - 0.900 0.783 0.567
Water Tank Truck 5.00 Ton 0.805 1.100 0.900 0.783 0.624
-
5 Beton Batching Plant 75.00 M3/Hr 0.805 - 0.900 0.783 0.567
Concrete Mixer 250.00 Ltr 0.805 - 0.900 0.783 0.567
Concrete Vibrator 0.805 - 0.900 0.783 0.567
Water Pump 0.805 - 0.900 0.783 0.567
Wheel Loader 1.00 M3 0.805 0.850 0.900 0.783 0.482
Agitator Truck 6.00 M3 0.805 1.100 0.900 0.783 0.624
Concrete Pump 30.00 M3 0.805 - 0.900 0.783 0.567
-
REKAPITULASI
RENCANA ANGGARAN BIAYA

Kegiatan : PELAKSANAAN REHABILATASI SALURAN SUNGAI


Pekerjaan : REHABILITASI SUNGAI TAPIN - GADUNG KEC. BAKARANGAN
Lokasi : KEC. BAKARANGAN
Tahun Anggaran : 2019

JUMLAH
NO. PEKERJAAN
Rp.

A BIAYA UMUM Rp 23,500,000.00

B PEK. GALIAN TANAH DENGAN ALAT LONG ARM & PC-200 Rp 1,340,136,789.60

JUMLAH A + B Rp 1,363,636,789.60
PPN 10% Rp 136,363,678.96
TOTAL JUMLAH Rp 1,500,000,468.56
DIBULATKAN Rp 1,500,000,000.00

Terbilang :
# Satu Milyar Lima Ratus Juta Rupiah #

Rantau, 2019
CV. GEOTEK INTERMEDIA CONSULTAN

JOHAN WAHYUDI, ST
Direktur
RENCANA ANGGARAN BIAYA
Kegiatan : PELAKSANAAN REHABILATASI SALURAN SUNGAI
Pekerjaan : REHABILITASI SUNGAI TAPIN - GADUNG KEC. BAKARANGAN
Lokasi : KEC. BAKARANGAN
Tahun Anggaran : 2019

HARGA SATUAN JUMLAH HARGA


NO URAIAN PEKERJAAN ANALISA VOLUME
(Rp) (Rp)

1 2 3 4 5 6
A BIAYA UMUM
1 Administrasi Teknis 1.00 Ls 4,000,000.00 4,000,000.00

2 Pekerjaan Pengukuran/Pasang Patok -- 1.00 Ls 3,000,000.00 3,000,000.00

3 Mobilisasi dan Demobilisasi Alat -- 1.00 Ls 16,000,000.00 16,000,000.00

4 Pembuatan Papan Nama Proyek -- 1.00 Ls 500,000.00 500,000.00

TOTAL - A 23,500,000.00

B PEK. GALIAN TANAH DENGAN ALAT LONG ARM & PC-200

1 Galian Tanah Menggunakan Excavator LONG ARM A.1.2.a.Mek 30,003.15 M3 28,839.12 865,264,580.76

Segmen A ( Panjang = 2.876 M')

2 Galian Tanah Menggunakan Excavator LONG ARM A.1.2.a.Mek 16,466.25 M3 28,839.12 474,872,208.84

Segmen B ( Panjang = 1.800 M')

TOTAL - B 1,340,136,789.60
PERHITUNGAN VOLUME GALIAN

Kegiatan : PELAKSANAAN REHABILATASI SALURAN SUNGAI


Pekerjaan : REHABILITASI SUNGAI TAPIN - GADUNG KEC. BAKARANGAN
Lokasi : KEC. BAKARANGAN
Tahun Anggaran : 2019

Penampang Existing Saluran Penampang Rencana Saluran Penampang Galian Tanah


Jarak Lebar Ats Lebar Bwh Tinggi Luas Luas Rata-rata Lebar Ats Lebar Bwh Tinggi Luas Luas Rata-rata Luas Galian Vol. Galian
No. Stasion Ket.
LA LB HEx AExisting AEx rata-rata LA LB HRen ARen ARen. rata-rata AGalian VGalian
(m) (m) (m) (m) (m )2
(m ) 2
(m) (m) (m ) 2
(m )2
(m )2
(m )2
(m )
3

a b c d e f g = (d+e)*1/2*f h i j k l = (i+j)*1/2*k m n=m-h o=c*n p

1 0 7.00 3.50 1.60 8.40 8.00 4.00 2.50 15.00


100.00 8.08 15.00 6.92 692.00
2 100 7.00 2.70 1.60 7.76 8.00 4.00 2.50 15.00
100.00 7.75 15.00 7.25 724.80
3 200 7.00 2.68 1.60 7.74 8.00 4.00 2.50 15.00
100.00 7.30 15.00 7.70 769.80
4 300 7.00 2.80 1.40 6.86 8.00 4.00 2.50 15.00
100.00 6.65 15.00 8.35 835.25
5 400 7.00 2.90 1.30 6.44 8.00 4.00 2.50 15.00
100.00 6.45 15.00 8.55 854.93
6 500 7.00 2.58 1.35 6.47 8.00 4.00 2.50 15.00
100.00 7.18 15.00 7.82 781.88
7 600 7.00 2.87 1.60 7.90 8.00 4.00 2.50 15.00
100.00 6.92 15.00 8.08 808.20
8 700 7.00 2.90 1.20 5.94 8.00 4.00 2.50 15.00
100.00 6.15 15.00 8.85 885.48
9 800 7.00 2.77 1.30 6.35 8.00 4.00 2.50 15.00
100.00 6.13 15.00 8.87 886.98
10 900 7.00 2.85 1.20 5.91 8.00 4.00 2.50 15.00
100.00 6.39 15.00 8.62 861.50
11 1,000 7.00 2.80 1.40 6.86 8.00 4.00 2.50 15.00
100.00 5.91 15.00 9.10 909.50
12 1,100 7.00 2.90 1.00 4.95 8.00 4.00 2.50 15.00
100.00 6.42 15.00 8.58 858.10
13 1,200 7.00 2.86 1.60 7.89 8.00 4.00 2.50 15.00
100.00 7.62 15.00 7.38 738.48 ###
14 1,300 7.00 2.79 1.50 7.34 8.00 4.00 2.50 15.00
100.00 7.09 15.00 7.91 790.58
15 1,400 8.50 2.91 1.20 6.85 8.00 4.00 2.50 15.00
100.00 6.84 15.00 8.16 816.30
16 1,500 8.50 2.88 1.20 6.83 8.00 4.00 2.50 15.00
100.00 7.10 15.00 7.90 790.05
17 1,600 8.50 2.84 1.30 7.37 8.00 4.00 2.50 15.00
100.00 7.96 15.00 7.04 703.95
18 1,700 8.50 2.90 1.50 8.55 8.00 4.00 2.50 15.00
100.00 8.54 15.00 6.46 646.13
19 1,800 8.50 2.87 1.50 8.53 8.00 4.00 2.50 15.00
100.00 8.26 15.00 6.74 673.93
20 1,900 8.50 2.92 1.40 7.99 8.00 4.00 2.50 15.00
100.00 8.27 15.00 6.73 673.18
21 2,000 8.50 2.89 1.50 8.54 8.00 4.00 2.50 15.00
100.00 8.74 15.00 6.26 626.08
22 2,100 8.50 2.67 1.60 8.94 8.00 4.00 2.50 15.00
100.00 9.19 15.00 5.81 581.45
23 2,200 8.50 2.60 1.70 9.44 8.00 4.00 2.50 15.00
100.00 9.51 15.00 5.49 548.72
24 2,300 8.50 2.83 1.69 9.59 8.00 4.00 2.50 15.00
100.00 9.36 15.00 5.64 564.47
25 2,400 8.50 2.90 1.60 9.12 8.00 4.00 2.50 15.00

Panjang 2,400.00 m 18,021.68 m3


PERHITUNGAN VOLUME GALIAN

Kegiatan : PELAKSANAAN REHABILATASI SALURAN SUNGAI


Pekerjaan : REHABILITASI SUNGAI TAPIN - GADUNG KEC. BAKARANGAN
Lokasi : KEC. BAKARANGAN
Tahun Anggaran : 2019

Penampang Existing Saluran Penampang Rencana Saluran Penampang Galian Tanah


Jarak Lebar Ats Lebar Bwh Tinggi Luas Luas Rata-rata Lebar Ats Lebar Bwh Tinggi Luas Luas Rata-rata Luas Galian Vol. Galian
No. Stasion Ket.
LA LB HEx AExisting AEx rata-rata LA LB HRen ARen ARen. rata-rata AGalian VGalian
(m) (m) (m) (m) (m )2
(m ) 2
(m) (m) (m ) 2
(m )2
(m )2
(m )2
(m )
3

a b c d e f g = (d+e)*1/2*f h i j k l = (i+j)*1/2*k m n=m-h o=c*n p

1 2,500 8.50 2.90 1.50 8.55 8.00 4.00 2.50 15.00


0.00 10.23 15.00 4.77 0.00
2 2,600 9.00 3.41 1.92 11.91 8.00 4.00 2.50 15.00
0.00 11.45 15.00 3.55 0.00
3 2,700 8.50 3.38 1.85 10.99 8.00 4.00 2.50 15.00
0.00 11.12 15.00 3.88 0.00 ###
4 2,800 8.00 3.42 1.97 11.24 8.00 4.00 2.50 15.00
0.00 10.68 15.00 4.32 0.00
5 2,900 9.00 3.50 1.62 10.13 8.00 4.00 2.50 15.00
0.00 10.86 15.00 4.14 0.00
6 2,960 9.10 3.90 1.78 11.59 8.00 4.00 2.50 15.00

Panjang 0.00 m 0.00 m3


PERHITUNGAN VOLUME GALIAN

Kegiatan : PELAKSANAAN REHABILATASI SALURAN SUNGAI


Pekerjaan : REHABILITASI SUNGAI TAPIN - GADUNG KEC. BAKARANGAN
Lokasi : KEC. BAKARANGAN
Tahun Anggaran : 2019

Penampang Existing Saluran Penampang Rencana Saluran Penampang Galian Tanah


Jarak Lebar Ats Lebar Bwh Tinggi Luas Luas Rata-rata Lebar Ats Lebar Bwh Tinggi Luas Luas Rata-rata Luas Galian Vol. Galian
No. Stasion Ket.
LA LB HEx AExisting AEx rata-rata LA LB HRen ARen ARen. rata-rata A Galian VGalian
(m) (m) (m) (m) (m2) (m2) (m) (m) (m2) (m2) (m2) (m2) (m3)
a b c d e f g = (d+e)*1/2*f h i j k l = (i+j)*1/2*k m n=m-h o=c*n p

1 0 2.80 1.40 1.00 2.10 3.00 1.50 2.00 4.50


50.00 2.12 4.50 2.38 119.00
2 50 2.90 1.38 1.00 2.14 3.00 1.50 2.00 4.50

3 0 2.90 1.38 0.90 1.93 4.00 2.00 2.00 6.00


50.00 2.20 6.00 3.80 189.99
4 100 3.65 1.40 0.98 2.47 4.00 2.00 2.00 6.00
100.00 2.38 6.00 3.62 361.75
5 200 3.70 1.39 0.90 2.29 4.00 2.00 2.00 6.00
100.00 2.32 6.00 3.68 367.83
6 300 3.68 1.38 0.93 2.35 4.00 2.00 2.00 6.00
100.00 2.40 6.00 3.60 360.04
7 400 3.78 1.37 0.95 2.45 4.00 2.00 2.00 6.00
100.00 2.39 6.00 3.61 360.69
8 500 3.80 1.40 0.90 2.34 4.00 2.00 2.00 6.00
100.00 2.33 6.00 3.67 367.35
9 600 3.75 1.39 0.90 2.31 4.00 2.00 2.00 6.00
100.00 2.46 6.00 3.54 354.35
10 700 3.80 1.40 1.00 2.60 4.00 2.00 2.00 6.00
100.00 2.57 6.00 3.43 343.03
11 800 3.75 1.38 0.99 2.54 4.00 2.00 2.00 6.00
100.00 2.45 6.00 3.55 355.16
12 900 3.70 1.37 0.93 2.36 4.00 2.00 2.00 6.00
100.00 2.40 6.00 3.60 359.81
13 1,000 3.75 1.40 0.95 2.45 4.00 2.00 2.00 6.00
100.00 2.41 6.00 3.59 358.55
14 1,100 3.78 1.40 0.92 2.38 4.00 2.00 2.00 6.00
100.00 2.47 6.00 3.53 353.11
15 1,200 3.76 1.35 1.00 2.56 4.00 2.00 2.00 6.00
100.00 2.57 6.00 3.43 343.00
16 1,300 3.79 1.38 1.00 2.59 4.00 2.00 2.00 6.00

Panjang 1,300.00 m 4,593.65 m3


PERHITUNGAN VOLUME GALIAN

Kegiatan : PELAKSANAAN REHABILATASI SALURAN SUNGAI


Pekerjaan : REHABILITASI SUNGAI TAPIN - GADUNG KEC. BAKARANGAN
Lokasi : KEC. BAKARANGAN
Tahun Anggaran : 2019

Penampang Existing Saluran Penampang Rencana Saluran Penampang Galian Tanah


Jarak Lebar Ats Lebar Bwh Tinggi Luas Luas Rata-rata Lebar Ats Lebar Bwh Tinggi Luas Luas Rata-rata Luas Galian Vol. Galian
No. Stasion Ket.
LA LB HEx AExisting AEx rata-rata LA LB HRen ARen ARen. rata-rata A Galian VGalian
(m) (m) (m) (m) (m2) (m2) (m) (m) (m2) (m2) (m2) (m2) (m3)
a b c d e f g = (d+e)*1/2*f h i j k l = (i+j)*1/2*k m n=m-h o=c*n p

1 0 2.50 1.00 0.85 1.49 2.50 1.50 2.00 4.00


100.00 1.04 4.00 2.96 295.70
2 100 1.80 0.86 0.45 0.60 2.50 1.50 2.00 4.00
41.00 0.75 4.00 3.25 133.08
3 141 2.40 1.10 0.52 0.91 2.50 1.50 2.00 4.00
59.00 0.92 4.00 3.08 181.72
4 200 2.10 1.00 0.60 0.93 2.50 1.50 2.00 4.00
100.00 0.97 4.00 3.03 302.75
5 300 2.10 0.80 0.70 1.02 2.50 1.50 2.00 4.00
100.00 0.80 4.00 3.20 320.25
6 400 1.50 0.50 0.58 0.58 2.50 1.50 2.00 4.00
100.00 0.76 4.00 3.25 324.50
7 500 2.10 1.00 0.60 0.93 2.50 1.50 2.00 4.00
100.00 0.98 4.00 3.03 302.50
8 600 2.50 1.50 0.51 1.02 2.50 1.50 2.00 4.00
100.00 1.44 4.00 2.56 256.38
9 700 2.50 1.40 0.95 1.85 2.50 1.50 2.00 4.00
54.00 1.16 4.00 2.84 153.23
10 754 1.00 0.50 0.63 0.47 2.50 1.50 2.00 4.00
60.00 0.41 2.86 2.46 147.45
11 814 0.50 0.40 0.75 0.34 1.50 0.80 1.50 1.73

Panjang 814.00 m 2,417.55 m3


PERHITUNGAN VOLUME GALIAN

Kegiatan : PELAKSANAAN REHABILATASI SALURAN SUNGAI


Pekerjaan : REHABILITASI SUNGAI TAPIN - GADUNG KEC. BAKARANGAN
Lokasi : KEC. BAKARANGAN
Tahun Anggaran : 2019

Penampang Existing Saluran Penampang Rencana Saluran Penampang Galian Tanah


Jarak Lebar Ats Lebar Bwh Tinggi Luas Luas Rata-rata Lebar Ats Lebar Bwh Tinggi Luas Luas Rata-rata Luas Galian Vol. Galian
No. Stasion Ket.
LA LB HEx AExisting AEx rata-rata LA LB HRen ARen ARen. rata-rata A Galian VGalian
(m) (m) (m) (m) (m2) (m2) (m) (m) (m2) (m2) (m2) (m2) (m3)
a b c d e f g = (d+e)*1/2*f h i j k l = (i+j)*1/2*k m n=m-h o=c*n p

1 0 1.60 0.70 0.53 0.61 2.50 1.50 2.00 4.00


100.00 0.46 4.00 3.54 353.90
2 100 1.50 1.00 0.25 0.31 2.50 1.50 2.00 4.00
100.00 0.33 4.00 3.67 366.83
3 200 1.60 1.00 0.27 0.35 2.50 1.50 2.00 4.00
100.00 0.48 4.00 3.52 352.45
4 300 2.00 1.00 0.40 0.60 2.50 1.50 2.00 4.00
61.00 1.00 4.00 3.00 183.00
5 361 2.00 1.50 0.80 1.40 2.50 1.50 2.00 4.00

1 0.00 1.80 0.90 0.70 0.95 2.50 1.50 2.00 4.00


100.00 1.00 4.00 3.00 299.63
2 100 1.80 0.70 0.85 1.06 2.50 1.50 2.00 4.00
89.00 1.85 4.00 2.15 191.24
3 189 2.50 0.80 1.60 2.64 2.50 1.50 2.00 4.00

Panjang 550.00 m 1,747.04 m3


PERHITUNGAN LUASAN PEKERJAAN GALIAN MEKANIS

Kegiatan : PELAKSANAAN REHABILATASI SALURAN SUNGAI


Pekerjaan : REHABILITASI SUNGAI TAPIN - GADUNG KEC. BAKARANGAN
Konsuultan : CV. GEOTEK INTERMEDIA CONSULTANT

LOKASI : SUNGAI TAPIN - GADUNG SEGMEN A

P.0 9.300 P.1 9.000


ELEVASI X Y (XnYn+1)-(Xn+1Yn) ELEVASI X Y (XnYn+1)-(Xn+1Yn)
NO JARAK NO JARAK
(M1) (M1) (M1) (M2) (M1) (M1) (M1) (M2)
0 10.698 0.00 0 10.570 0.00
10.698 1.70 0.000 0.000 0.000 10.570 1.70 0.000 0.000 0.000
1 7.571 1.70 1.700 3.127 (10.875) 1 7.432 1.70 1.700 3.138 (11.312)
2 7.282 3.64 5.335 3.416 (12.182) 2 7.118 3.78 5.475 3.452 (12.769)
3 7.238 3.64 8.970 3.460 (3.658) 3 7.070 3.78 9.250 3.500 (2.685)
7.266 3.64 10.000 3.449 15.236 7.090 3.78 10.000 3.494 14.064
4 7.249 1.37 9.000 4.628 32.397 4 7.076 1.23 9.000 4.551 31.854
5 6.070 1.00 2.000 4.628 0.000 5 6.019 1.00 2.000 4.551 0.000
6 6.070 7.00 0.000 0.000 0.000 6 6.019 7.00 0.000 0.000 0.000
0 10.698 2.00 0 10.570 2.00
2A 20.918 2A 19.152
A 10.459 A 9.576
LUAS 10.459 LUAS 9.576

P.2 9.300 P.3 9.300


ELEVASI X Y (XnYn+1)-(Xn+1Yn) ELEVASI X Y (XnYn+1)-(Xn+1Yn)
NO JARAK NO JARAK
(M1) (M1) (M1) (M2) (M1) (M1) (M1) (M2)
0 10.627 0.00 0 10.490 0.00
10.627 1.80 0.000 0.000 0.000 10.490 1.70 0.000 0.000 0.000
1 7.408 1.80 1.800 3.219 (11.501) 1 7.417 1.70 1.700 3.073 (10.740)
2 7.136 3.73 5.525 3.491 (12.772) 2 7.137 3.65 5.350 3.353 (11.987)
3 7.094 3.73 9.250 3.533 (2.764) 3 7.090 3.65 9.000 3.400 (3.490)
7.130 3.73 10.000 3.521 14.893 7.117 3.65 10.000 3.390 15.203
4 7.106 1.28 9.000 4.658 32.606 4 7.100 1.35 9.000 4.571 31.999
5 5.969 1.00 2.000 4.658 0.000 5 5.919 1.00 2.000 4.571 0.000
6 5.969 7.00 0.000 0.000 0.000 6 5.919 7.00 0.000 0.000 0.000
0 10.627 2.00 0 10.490 2.00
2A 20.462 2A 20.985
A 10.231 A 10.493
LUAS 10.231 LUAS 10.493

P.4 9.300 P.5 9.300


ELEVASI X Y (XnYn+1)-(Xn+1Yn) ELEVASI X Y (XnYn+1)-(Xn+1Yn)
NO JARAK NO JARAK
(M1) (M1) (M1) (M2) (M1) (M1) (M1) (M2)
0 10.520 0.00 0 10.391 0.00
10.520 2.40 0.000 0.000 0.000 10.391 1.70 0.000 0.000 0.000
1 7.303 2.40 2.400 3.217 (10.519) 1 7.238 1.70 1.700 3.153 (11.766)
2 7.028 3.48 5.875 3.492 (11.853) 2 6.972 3.88 5.575 3.419 (12.797)
3 6.980 3.48 9.350 3.540 (2.399) 3 6.891 3.88 9.450 3.500 (2.003)
7.004 3.48 10.000 3.529 14.752 6.919 3.88 10.000 3.492 14.305
4 6.991 1.53 9.000 4.652 32.562 4 6.899 1.13 9.000 4.573 32.012
5 5.868 1.00 2.000 4.652 0.000 5 5.818 1.00 2.000 4.573 0.000
6 5.868 7.00 0.000 0.000 0.000 6 5.818 7.00 0.000 0.000 0.000
0 10.520 2.00 0 10.391 2.00
2A 22.543 2A 19.751
A 11.271 A 9.876
LUAS 11.271 LUAS 9.876
PERHITUNGAN LUASAN PEKERJAAN GALIAN MEKANIS

Kegiatan : PELAKSANAAN REHABILATASI SALURAN SUNGAI


Pekerjaan : REHABILITASI SUNGAI TAPIN - GADUNG KEC. BAKARANGAN
Konsuultan : CV. GEOTEK INTERMEDIA CONSULTANT

LOKASI : SUNGAI TAPIN - GADUNG SEGMEN A

P.6 9.300 P.7 9.000


ELEVASI X Y (XnYn+1)-(Xn+1Yn) ELEVASI X Y (XnYn+1)-(Xn+1Yn)
NO JARAK NO JARAK
(M1) (M1) (M1) (M2) (M1) (M1) (M1) (M2)
0 10.330 0.00 0 10.360 0.00
10.330 1.70 0.000 0.000 0.000 10.360 1.80 0.000 0.000 0.000
1 7.308 1.70 1.700 3.022 (11.342) 1 7.427 1.80 1.800 2.933 (10.926)
2 7.002 3.93 5.625 3.328 (12.657) 2 7.101 3.93 5.725 3.259 (12.555)
3 6.930 3.93 9.550 3.400 (1.603) 3 7.060 3.93 9.650 3.300 (1.340)
6.958 3.93 10.000 3.392 15.094 7.130 3.93 10.000 3.281 16.901
4 6.938 1.08 9.000 4.562 31.937 4 7.079 1.08 9.000 4.643 32.500
5 5.768 1.00 2.000 4.562 0.000 5 5.717 1.00 2.000 4.643 0.000
6 5.768 7.00 0.000 0.000 0.000 6 5.717 7.00 0.000 0.000 0.000
0 10.330 2.00 0 10.360 2.00
2A 21.429 2A 24.581
A 10.714 A 12.290
LUAS 10.714 LUAS 12.290

P.8 9.300 P.9 9.300


ELEVASI X Y (XnYn+1)-(Xn+1Yn) ELEVASI X Y (XnYn+1)-(Xn+1Yn)
NO JARAK NO JARAK
(M1) (M1) (M1) (M2) (M1) (M1) (M1) (M2)
0 10.320 0.00 0 10.255 0.00
10.320 1.80 0.000 0.000 0.000 10.255 1.70 0.000 0.000 0.000
1 7.144 1.80 1.800 3.176 (11.565) 1 7.105 1.70 1.700 3.150 (11.695)
2 6.863 3.80 5.600 3.457 (12.896) 2 6.804 3.88 5.575 3.451 (13.099)
3 6.820 3.80 9.400 3.500 (2.361) 3 6.755 3.88 9.450 3.500 (1.991)
6.908 3.80 10.000 3.472 15.282 6.779 3.88 10.000 3.493 14.949
4 6.848 1.20 9.000 4.653 32.573 4 6.762 1.13 9.000 4.639 32.470
5 5.667 1.00 2.000 4.653 0.000 5 5.616 1.00 2.000 4.639 0.000
6 5.667 7.00 0.000 0.000 0.000 6 5.616 7.00 0.000 0.000 0.000
0 10.320 2.00 0 10.255 2.00
2A 21.033 2A 20.634
A 10.517 A 10.317
LUAS 10.517 LUAS 10.317

P.10 9.300 P.11 9.300


ELEVASI X Y (XnYn+1)-(Xn+1Yn) ELEVASI X Y (XnYn+1)-(Xn+1Yn)
NO JARAK NO JARAK
(M1) (M1) (M1) (M2) (M1) (M1) (M1) (M2)
0 10.240 0.00 0 10.160 0.00
10.240 1.80 0.000 0.000 0.000 10.160 1.80 0.000 0.000 0.000
1 7.064 1.80 1.800 3.176 (11.495) 1 6.986 1.80 1.800 3.174 (11.162)
2 6.789 3.78 5.575 3.451 (12.754) 2 6.752 3.65 5.450 3.408 (11.938)
3 6.740 3.78 9.350 3.500 (2.354) 3 6.660 3.65 9.100 3.500 (3.342)
6.766 3.78 10.000 3.492 15.316 6.717 3.65 10.000 3.479 5.070
4 6.748 1.23 9.000 4.674 32.718 4 6.681 1.35 9.000 3.638 25.466
5 5.566 1.00 2.000 4.674 0.000 5 6.522 1.00 2.000 3.638 0.000
6 5.566 7.00 0.000 0.000 0.000 6 6.522 7.00 0.000 0.000 0.000
0 10.240 2.00 0 10.160 2.00
2A 21.431 2A 4.094
A 10.716 A 2.047
LUAS 10.716 LUAS 2.047
PERHITUNGAN LUASAN PEKERJAAN GALIAN MEKANIS

Kegiatan : PELAKSANAAN REHABILATASI SALURAN SUNGAI


Pekerjaan : REHABILITASI SUNGAI TAPIN - GADUNG KEC. BAKARANGAN
Konsuultan : CV. GEOTEK INTERMEDIA CONSULTANT

LOKASI : SUNGAI TAPIN - GADUNG SEGMEN A

P.12 9.300 P.13 9.000


ELEVASI X Y (XnYn+1)-(Xn+1Yn) ELEVASI X Y (XnYn+1)-(Xn+1Yn)
NO JARAK NO JARAK
(M1) (M1) (M1) (M2) (M1) (M1) (M1) (M2)
0 10.120 0.00 0 10.075 0.00
10.120 1.70 0.000 0.000 0.000 10.075 1.70 0.000 0.000 0.000
1 6.947 1.70 1.700 3.173 (11.097) 1 6.904 1.70 1.700 3.171 (11.162)
2 6.662 3.65 5.350 3.458 (12.397) 2 6.615 3.68 5.375 3.460 (12.501)
3 6.620 3.65 9.000 3.500 (3.593) 3 6.575 3.68 9.050 3.500 (3.410)
6.648 3.65 10.000 3.490 15.141 6.601 3.68 10.000 3.491 15.186
4 6.630 1.35 9.000 4.655 32.583 4 6.584 1.33 9.000 4.660 32.621
5 5.465 1.00 2.000 4.655 0.000 5 5.415 1.00 2.000 4.660 0.000
6 5.465 7.00 0.000 0.000 0.000 6 5.415 7.00 0.000 0.000 0.000
0 10.120 2.00 0 10.075 2.00
2A 20.637 2A 20.734
A 10.319 A 10.367
LUAS 10.319 LUAS 10.367

P.14 9.300 P.15 9.300


ELEVASI X Y (XnYn+1)-(Xn+1Yn) ELEVASI X Y (XnYn+1)-(Xn+1Yn)
NO JARAK NO JARAK
(M1) (M1) (M1) (M2) (M1) (M1) (M1) (M2)
0 10.035 0.00 0 9.975 0.00
10.035 1.70 0.000 0.000 0.000 9.975 1.65 0.000 0.000 0.000
1 6.863 1.70 1.700 3.172 (11.655) 1 6.981 1.65 1.650 2.994 (10.866)
2 6.582 3.83 5.525 3.453 (12.948) 2 6.703 3.78 5.433 3.272 (11.844)
3 6.535 3.83 9.350 3.500 (2.353) 3 6.605 3.78 9.215 3.370 (2.731)
6.562 3.83 10.000 3.492 15.280 6.634 3.78 10.000 3.361 16.363
4 6.543 1.18 9.000 4.671 32.694 4 6.614 1.22 9.000 4.661 32.626
5 5.364 1.00 2.000 4.671 0.000 5 5.314 1.00 2.000 4.661 0.000
6 5.364 7.00 0.000 0.000 0.000 6 5.314 7.00 0.000 0.000 0.000
0 10.035 2.00 0 9.975 2.00
2A 21.018 2A 23.548
A 10.509 A 11.774
LUAS 10.509 LUAS 11.774

P.16 9.300 P.17 9.300


ELEVASI X Y (XnYn+1)-(Xn+1Yn) ELEVASI X Y (XnYn+1)-(Xn+1Yn)
NO JARAK NO JARAK
(M1) (M1) (M1) (M2) (M1) (M1) (M1) (M2)
0 9.928 0.00 0 9.867 0.00
9.928 1.70 0.000 0.000 0.000 9.867 1.80 0.000 0.000 0.000
1 6.807 1.70 1.700 3.121 (11.184) 1 6.788 1.80 1.800 3.079 (10.897)
2 6.524 3.74 5.438 3.404 (12.472) 2 6.513 3.70 5.500 3.354 (12.157)
3 6.478 3.74 9.175 3.450 (2.930) 3 6.467 3.70 9.200 3.400 (2.807)
6.505 3.74 10.000 3.441 15.675 6.494 3.70 10.000 3.391 16.022
4 6.487 1.26 9.000 4.664 32.650 4 6.476 1.30 9.000 4.654 32.576
5 5.264 1.00 2.000 4.664 0.000 5 5.213 1.00 2.000 4.654 0.000
6 5.264 7.00 0.000 0.000 0.000 6 5.213 7.00 0.000 0.000 0.000
0 9.928 2.00 0 9.867 2.00
2A 21.739 2A 22.737
A 10.870 A 11.368
LUAS 10.870 LUAS 11.368
PERHITUNGAN LUASAN PEKERJAAN GALIAN MEKANIS

Kegiatan : PELAKSANAAN REHABILATASI SALURAN SUNGAI


Pekerjaan : REHABILITASI SUNGAI TAPIN - GADUNG KEC. BAKARANGAN
Konsuultan : CV. GEOTEK INTERMEDIA CONSULTANT

LOKASI : SUNGAI TAPIN - GADUNG SEGMEN A

P.18 9.300 P.19 9.000


ELEVASI X Y (XnYn+1)-(Xn+1Yn) ELEVASI X Y (XnYn+1)-(Xn+1Yn)
NO JARAK NO JARAK
(M1) (M1) (M1) (M2) (M1) (M1) (M1) (M2)
0 9.820 0.00 0 9.758 0.00
9.820 1.76 0.000 0.000 0.000 9.758 1.70 0.000 0.000 0.000
1 6.678 1.76 1.760 3.142 (10.834) 1 6.620 1.70 1.700 3.138 (11.014)
2 6.362 3.63 5.385 3.458 (12.309) 2 6.344 3.66 5.360 3.414 (12.250)
3 6.320 3.63 9.010 3.500 (3.550) 3 6.298 3.66 9.020 3.460 (3.486)
6.345 3.63 10.000 3.491 15.156 6.327 3.66 10.000 3.449 15.409
4 6.329 1.38 9.000 4.657 32.599 4 6.309 1.34 9.000 4.645 32.518
5 5.163 1.00 2.000 4.657 0.000 5 5.113 1.00 2.000 4.645 0.000
6 5.163 7.00 0.000 0.000 0.000 6 5.113 7.00 0.000 0.000 0.000
0 9.820 2.00 0 9.758 2.00
2A 21.062 2A 21.177
A 10.531 A 10.588
LUAS 10.531 LUAS 10.588

P.20 9.300 P.21 9.300


ELEVASI X Y (XnYn+1)-(Xn+1Yn) ELEVASI X Y (XnYn+1)-(Xn+1Yn)
NO JARAK NO JARAK
(M1) (M1) (M1) (M2) (M1) (M1) (M1) (M2)
0 9.725 0.00 0 9.663 0.00
9.725 1.68 0.000 0.000 0.000 9.663 1.74 0.000 0.000 0.000
1 6.570 1.68 1.680 3.155 (10.989) 1 6.564 1.74 1.740 3.099 (11.282)
2 6.294 3.63 5.310 3.431 (12.194) 2 6.289 3.80 5.535 3.374 (12.550)
3 6.245 3.63 8.940 3.480 (3.777) 3 6.243 3.80 9.330 3.420 (2.371)
6.271 3.63 10.000 3.470 15.397 6.270 3.80 10.000 3.411 15.809
4 6.255 1.37 9.000 4.663 32.640 4 6.252 1.21 9.000 4.651 32.558
5 5.062 1.00 2.000 4.663 0.000 5 5.012 1.00 2.000 4.651 0.000
6 5.062 7.00 0.000 0.000 0.000 6 5.012 7.00 0.000 0.000 0.000
0 9.725 2.00 0 9.663 2.00
2A 21.077 2A 22.164
A 10.538 A 11.082
LUAS 10.538 LUAS 11.082

P.22 9.300 P.23 9.300


ELEVASI X Y (XnYn+1)-(Xn+1Yn) ELEVASI X Y (XnYn+1)-(Xn+1Yn)
NO JARAK NO JARAK
(M1) (M1) (M1) (M2) (M1) (M1) (M1) (M2)
0 9.632 0.00 0 9.553 0.00
9.632 1.80 0.000 0.000 0.000 9.553 1.75 0.000 0.000 0.000
1 6.410 1.80 1.800 3.222 (11.368) 1 6.439 1.75 1.750 3.114 (10.845)
2 6.125 3.69 5.488 3.507 (12.696) 2 6.159 3.64 5.390 3.394 (12.106)
3 6.082 3.69 9.175 3.550 (3.017) 3 6.113 3.64 9.030 3.440 (3.428)
6.109 3.69 10.000 3.540 14.842 6.140 3.64 10.000 3.430 15.553
4 6.092 1.31 9.000 4.671 32.694 4 6.123 1.36 9.000 4.642 32.495
5 4.961 1.00 2.000 4.671 0.000 5 4.911 1.00 2.000 4.642 0.000
6 4.961 7.00 0.000 0.000 0.000 6 4.911 7.00 0.000 0.000 0.000
0 9.632 2.00 0 9.553 2.00
2A 20.455 2A 21.669
A 10.228 A 10.834
LUAS 10.228 LUAS 10.834
PERHITUNGAN LUASAN PEKERJAAN GALIAN MEKANIS

Kegiatan : PELAKSANAAN REHABILATASI SALURAN SUNGAI


Pekerjaan : REHABILITASI SUNGAI TAPIN - GADUNG KEC. BAKARANGAN
Konsuultan : CV. GEOTEK INTERMEDIA CONSULTANT

LOKASI : SUNGAI TAPIN - GADUNG SEGMEN A

P.24 9.300 P.25 9.000


ELEVASI X Y (XnYn+1)-(Xn+1Yn) ELEVASI X Y (XnYn+1)-(Xn+1Yn)
NO JARAK NO JARAK
(M1) (M1) (M1) (M2) (M1) (M1) (M1) (M2)
0 9.532 0.00 0 9.472 0.00
9.532 1.70 0.000 0.000 0.000 9.472 1.80 0.000 0.000 0.000
1 6.378 1.70 1.700 3.154 (10.927) 1 6.348 1.80 1.800 3.124 (11.096)
2 6.080 3.63 5.325 3.452 (12.258) 2 6.039 3.73 5.530 3.433 (12.545)
3 6.032 3.63 8.950 3.500 (3.763) 3 5.992 3.73 9.260 3.480 (2.654)
6.058 3.63 10.000 3.490 15.302 6.017 3.73 10.000 3.471 15.374
4 6.042 1.38 9.000 4.671 32.700 4 6.001 1.27 9.000 4.662 32.632
5 4.861 1.00 2.000 4.671 0.000 5 4.810 1.00 2.000 4.662 0.000
6 4.861 7.00 0.000 0.000 0.000 6 4.810 7.00 0.000 0.000 0.000
0 9.532 2.00 0 9.472 2.00
2A 21.054 2A 21.711
A 10.527 A 10.855
LUAS 10.527 LUAS 10.855

P.26 9.300 P.27 9.300


ELEVASI X Y (XnYn+1)-(Xn+1Yn) ELEVASI X Y (XnYn+1)-(Xn+1Yn)
NO JARAK NO JARAK
(M1) (M1) (M1) (M2) (M1) (M1) (M1) (M2)
0 9.430 0.00 0 9.370 0.00
9.430 1.70 0.000 0.000 0.000 9.370 1.85 0.000 0.000 0.000
1 6.356 1.70 1.700 3.074 (10.900) 1 6.244 1.85 1.850 3.126 (11.253)
2 6.077 3.70 5.400 3.353 (12.152) 2 5.969 3.76 5.613 3.401 (12.521)
3 6.030 3.70 9.100 3.400 (3.153) 3 5.920 3.76 9.375 3.450 (2.233)
6.059 3.70 10.000 3.390 16.193 5.945 3.76 10.000 3.442 15.629
4 6.040 1.30 9.000 4.670 32.691 4 5.928 1.24 9.000 4.661 32.624
5 4.760 1.00 2.000 4.670 0.000 5 4.709 1.00 2.000 4.661 0.000
6 4.760 7.00 0.000 0.000 0.000 6 4.709 7.00 0.000 0.000 0.000
0 9.430 2.00 0 9.370 2.00
2A 22.679 2A 22.245
A 11.340 A 11.123
LUAS 11.340 LUAS 11.123

P.28 9.300 P.28+76 9.300


ELEVASI X Y (XnYn+1)-(Xn+1Yn) ELEVASI X Y (XnYn+1)-(Xn+1Yn)
NO JARAK NO JARAK
(M1) (M1) (M1) (M2) (M1) (M1) (M1) (M2)
0 9.335 0.00 0 9.320 0.00
9.335 1.85 0.000 0.000 0.000 9.320 1.76 0.000 0.000 0.000
1 6.209 1.85 1.850 3.126 (10.862) 1 6.106 1.76 1.760 3.214 (11.129)
2 5.934 3.64 5.488 3.401 (12.102) 2 5.828 3.62 5.375 3.492 (12.366)
3 5.885 3.64 9.125 3.450 (3.104) 3 5.780 3.62 8.990 3.540 (3.668)
5.910 3.64 10.000 3.441 15.793 5.807 3.62 10.000 3.530 15.346
4 5.894 1.36 9.000 4.676 32.731 4 5.790 1.39 9.000 4.711 32.979
5 4.659 1.00 2.000 4.676 0.000 5 4.609 1.00 2.000 4.711 0.000
6 4.659 7.00 0.000 0.000 0.000 6 4.609 7.00 0.000 0.000 0.000
0 9.335 2.00 0 9.320 2.00
2A 22.456 2A 21.161
A 11.228 A 10.581
LUAS 11.228 LUAS 10.581
PERHITUNGAN LUASAN PEKERJAAN GALIAN MEKANIS

Kegiatan : PELAKSANAAN REHABILATASI SALURAN SUNGAI


Pekerjaan : REHABILITASI SUNGAI TAPIN - GADUNG KEC. BAKARANGAN
Konsuultan : CV. GEOTEK INTERMEDIA CONSULTANT

LOKASI : SUNGAI TAPIN - GADUNG SEGMEN B

P.0 9.300 P.1 9.300


ELEVASI X Y (XnYn+1)-(Xn+1Yn) ELEVASI X Y (XnYn+1)-(Xn+1Yn)
NO JARAK NO JARAK
(M1) (M1) (M1) (M2) (M1) (M1) (M1) (M2)
0 7.039 0.00 0 6.832 0.00
7.286 0.30 0.000 0.000 0.000 7.081 0.28 0.000 0.000 0.000
1 7.008 2.70 0.300 0.031 (0.069) 1 6.803 2.68 0.275 0.029 (0.063)
2 6.960 2.70 3.000 0.079 (0.294) 2 6.755 2.68 2.950 0.077 (0.285)
3 6.987 2.70 5.700 0.052 (2.010) 3 6.782 2.68 5.625 0.050 (1.978)
4 7.315 2.70 8.400 (0.276) (23.431) 4 7.110 2.68 8.300 (0.278) (23.945)
10.157 1.60 10.000 (3.118) 37.116 10.052 1.70 10.000 (3.220) 36.536
5 11.400 2.30 8.000 1.217 8.520 5 11.134 2.33 8.000 1.077 7.541
6 5.822 2.00 1.000 1.217 0.000 6 5.754 2.00 1.000 1.077 0.000
7 5.822 7.00 0.000 0.000 0.000 7 5.754 7.00 0.000 0.000 0.000
0 7.039 1.00 0 6.832 1.00
2A 19.833 2A 17.806
A 9.916 A 8.903
LUAS 9.916 LUAS 8.903

P.2 9.300 P.3 9.300


ELEVASI X Y (XnYn+1)-(Xn+1Yn) ELEVASI X Y (XnYn+1)-(Xn+1Yn)
NO JARAK NO JARAK
(M1) (M1) (M1) (M2) (M1) (M1) (M1) (M2)
0 6.824 0.00 0 6.677 0.00
7.063 0.37 0.000 0.000 0.000 6.912 0.40 0.000 0.000 0.000
1 6.785 2.68 0.375 0.039 (0.086) 1 6.634 2.60 0.400 0.043 (0.092)
2 6.737 2.68 3.050 0.087 (0.315) 2 6.586 2.60 3.000 0.091 (0.317)
3 6.764 2.68 5.725 0.060 (2.038) 3 6.613 2.60 5.600 0.064 (2.003)
4 7.092 2.68 8.400 (0.268) (24.284) 4 6.941 2.60 8.200 (0.264) (24.469)
10.034 1.60 10.000 (3.210) 37.050 9.983 1.80 10.000 (3.306) 37.022
5 11.367 2.33 8.000 1.137 7.959 5 10.997 2.40 8.000 1.057 7.400
6 5.687 2.00 1.000 1.137 0.000 6 5.620 2.00 1.000 1.057 0.000
7 5.687 7.00 0.000 0.000 0.000 7 5.620 7.00 0.000 0.000 0.000
0 6.824 1.00 0 6.677 1.00
2A 18.286 2A 17.542
A 9.143 A 8.771
LUAS 9.143 LUAS 8.771

P.4 9.300 P.5 9.300


ELEVASI X Y (XnYn+1)-(Xn+1Yn) ELEVASI X Y (XnYn+1)-(Xn+1Yn)
NO JARAK NO JARAK
(M1) (M1) (M1) (M2) (M1) (M1) (M1) (M2)
0 6.583 0.00 0 6.518 0.00
6.828 0.32 0.000 0.000 0.000 6.749 0.44 0.000 0.000 0.000
1 6.550 2.62 0.315 0.033 (0.072) 1 6.472 2.64 0.438 0.046 (0.101)
2 6.502 2.62 2.930 0.081 (0.292) 2 6.425 2.64 3.075 0.093 (0.331)
3 6.529 2.62 5.545 0.054 (1.961) 3 6.453 2.64 5.713 0.065 (2.034)
4 6.857 2.62 8.160 (0.274) (24.646) 4 6.779 2.64 8.350 (0.261) (25.396)
9.939 1.84 10.000 (3.356) 37.157 9.872 1.65 10.000 (3.354) 37.164
5 10.852 2.39 8.000 1.031 7.219 5 11.208 2.36 8.000 1.033 7.232
6 5.552 2.00 1.000 1.031 0.000 6 5.485 2.00 1.000 1.033 0.000
7 5.552 7.00 0.000 0.000 0.000 7 5.485 7.00 0.000 0.000 0.000
0 6.583 1.00 0 6.518 1.00
2A 17.405 2A 16.535
A 8.702 A 8.267
LUAS 8.702 LUAS 8.267
PERHITUNGAN LUASAN PEKERJAAN GALIAN MEKANIS

Kegiatan : PELAKSANAAN REHABILATASI SALURAN SUNGAI


Pekerjaan : REHABILITASI SUNGAI TAPIN - GADUNG KEC. BAKARANGAN
Konsuultan : CV. GEOTEK INTERMEDIA CONSULTANT

LOKASI : SUNGAI TAPIN - GADUNG SEGMEN B

P.6 9.300 P.7 9.300


ELEVASI X Y (XnYn+1)-(Xn+1Yn) ELEVASI X Y (XnYn+1)-(Xn+1Yn)
NO JARAK NO JARAK
(M1) (M1) (M1) (M2) (M1) (M1) (M1) (M2)
0 6.501 0.00 0 6.396 0.00
6.703 0.70 0.000 0.000 0.000 6.618 0.51 0.000 0.000 0.000
1 6.425 2.54 0.698 0.076 (0.163) 1 6.341 2.56 0.505 0.055 (0.116)
2 6.380 2.54 3.235 0.121 (0.399) 2 6.294 2.56 3.060 0.102 (0.343)
3 6.408 2.54 5.773 0.093 (2.142) 3 6.321 2.56 5.615 0.075 (2.027)
4 6.738 2.54 8.310 (0.237) (25.270) 4 6.648 2.56 8.170 (0.252) (25.053)
9.827 1.69 10.000 (3.326) 37.445 9.771 1.83 10.000 (3.375) 37.459
5 11.239 2.46 8.000 1.084 7.588 5 10.821 2.45 8.000 1.046 7.320
6 5.417 2.00 1.000 1.084 0.000 6 5.350 2.00 1.000 1.046 0.000
7 5.417 7.00 0.000 0.000 0.000 7 5.350 7.00 0.000 0.000 0.000
0 6.501 1.00 0 6.396 1.00
2A 17.060 2A 17.240
A 8.530 A 8.620
LUAS 8.530 LUAS 8.620

P.8 9.300 P.9 9.300


ELEVASI X Y (XnYn+1)-(Xn+1Yn) ELEVASI X Y (XnYn+1)-(Xn+1Yn)
NO JARAK NO JARAK
(M1) (M1) (M1) (M2) (M1) (M1) (M1) (M2)
0 6.423 0.00 0 6.351 0.00
6.663 0.39 0.000 0.000 0.000 6.558 0.64 0.000 0.000 0.000
1 6.382 2.64 0.388 0.041 (0.091) 1 6.281 2.53 0.643 0.070 (0.148)
2 6.335 2.64 3.025 0.088 (0.311) 2 6.234 2.53 3.175 0.117 (0.386)
3 6.361 2.64 5.663 0.062 (2.022) 3 6.262 2.53 5.708 0.089 (2.092)
4 6.689 2.64 8.300 (0.266) (24.805) 4 6.589 2.53 8.240 (0.238) (25.142)
9.732 1.70 10.000 (3.309) 37.876 9.691 1.76 10.000 (3.340) 38.078
5 10.918 2.36 8.000 1.141 7.985 5 10.938 2.47 8.000 1.136 7.952
6 5.283 2.00 1.000 1.141 0.000 6 5.215 2.00 1.000 1.136 0.000
7 5.283 7.00 0.000 0.000 0.000 7 5.215 7.00 0.000 0.000 0.000
0 6.423 1.00 0 6.351 1.00
2A 18.632 2A 18.262
A 9.316 A 9.131
LUAS 9.316 LUAS 9.131

P.10 9.300 P.11 9.300


ELEVASI X Y (XnYn+1)-(Xn+1Yn) ELEVASI X Y (XnYn+1)-(Xn+1Yn)
NO JARAK NO JARAK
(M1) (M1) (M1) (M2) (M1) (M1) (M1) (M2)
0 6.225 0.00 0 6.145 0.00
6.456 0.45 0.000 0.000 0.000 6.390 0.32 0.000 0.000 0.000
1 6.178 2.63 0.448 0.047 (0.103) 1 6.111 2.62 0.320 0.034 (0.074)
2 6.130 2.63 3.075 0.095 (0.334) 2 6.064 2.62 2.940 0.081 (0.289)
3 6.157 2.63 5.703 0.068 (2.056) 3 6.090 2.62 5.560 0.055 (1.968)
4 6.486 2.63 8.330 (0.261) (25.646) 4 6.418 2.62 8.180 (0.273) (25.377)
9.617 1.67 10.000 (3.392) 37.908 9.581 1.82 10.000 (3.436) 38.134
5 10.934 2.37 8.000 1.078 7.543 5 10.554 2.38 8.000 1.065 7.452
6 5.148 2.00 1.000 1.078 0.000 6 5.080 2.00 1.000 1.065 0.000
7 5.148 7.00 0.000 0.000 0.000 7 5.080 7.00 0.000 0.000 0.000
0 6.225 1.00 0 6.145 1.00
2A 17.313 2A 17.878
A 8.656 A 8.939
LUAS 8.656 LUAS 8.939
PERHITUNGAN LUASAN PEKERJAAN GALIAN MEKANIS

Kegiatan : PELAKSANAAN REHABILATASI SALURAN SUNGAI


Pekerjaan : REHABILITASI SUNGAI TAPIN - GADUNG KEC. BAKARANGAN
Konsuultan : CV. GEOTEK INTERMEDIA CONSULTANT

LOKASI : SUNGAI TAPIN - GADUNG SEGMEN B

P.12 9.300 P.13 9.300


ELEVASI X Y (XnYn+1)-(Xn+1Yn) ELEVASI X Y (XnYn+1)-(Xn+1Yn)
NO JARAK NO JARAK
(M1) (M1) (M1) (M2) (M1) (M1) (M1) (M2)
0 6.122 0.00 0 6.068 0.00
6.366 0.33 0.000 0.000 0.000 6.324 0.22 0.000 0.000 0.000
1 6.088 2.63 0.325 0.034 (0.074) 1 6.045 2.68 0.218 0.023 (0.051)
2 6.039 2.63 2.950 0.083 (0.296) 2 5.999 2.68 2.895 0.069 (0.265)
3 6.065 2.63 5.575 0.057 (1.996) 3 6.027 2.68 5.573 0.041 (1.926)
4 6.396 2.63 8.200 (0.274) (25.256) 4 6.353 2.68 8.250 (0.285) (25.348)
9.536 1.80 10.000 (3.414) 38.402 9.486 1.75 10.000 (3.418) 38.567
5 10.539 2.38 8.000 1.109 7.765 5 10.511 2.32 8.000 1.122 7.854
6 5.013 2.00 1.000 1.109 0.000 6 4.946 2.00 1.000 1.122 0.000
7 5.013 7.00 0.000 0.000 0.000 7 4.946 7.00 0.000 0.000 0.000
0 6.122 1.00 0 6.068 1.00
2A 18.546 2A 18.832
A 9.273 A 9.416
LUAS 9.273 LUAS 9.416

P.14 9.300 P.15 9.300


ELEVASI X Y (XnYn+1)-(Xn+1Yn) ELEVASI X Y (XnYn+1)-(Xn+1Yn)
NO JARAK NO JARAK
(M1) (M1) (M1) (M2) (M1) (M1) (M1) (M2)
0 6.090 0.00 0 5.970 0.00
6.316 0.49 0.000 0.000 0.000 6.202 0.45 0.000 0.000 0.000
1 6.038 2.59 0.487 0.052 (0.113) 1 5.922 2.60 0.450 0.048 (0.105)
2 5.992 2.59 3.075 0.098 (0.341) 2 5.875 2.60 3.050 0.095 (0.331)
3 6.020 2.59 5.663 0.070 (2.034) 3 5.902 2.60 5.650 0.068 (2.043)
4 6.347 2.59 8.250 (0.257) (25.060) 4 6.232 2.60 8.250 (0.262) (25.447)
9.439 1.75 10.000 (3.349) 38.910 9.372 1.75 10.000 (3.402) 38.808
5 10.610 2.41 8.000 1.212 8.485 5 10.538 2.40 8.000 1.160 8.117
6 4.878 2.00 1.000 1.212 0.000 6 4.811 2.00 1.000 1.160 0.000
7 4.878 7.00 0.000 0.000 0.000 7 4.811 7.00 0.000 0.000 0.000
0 6.090 1.00 0 5.970 1.00
2A 19.847 2A 19.000
A 9.924 A 9.500
LUAS 9.924 LUAS 9.500

P.16 9.300 P.17 9.300


ELEVASI X Y (XnYn+1)-(Xn+1Yn) ELEVASI X Y (XnYn+1)-(Xn+1Yn)
NO JARAK NO JARAK
(M1) (M1) (M1) (M2) (M1) (M1) (M1) (M2)
0 5.919 0.00 0 5.862 0.00
6.154 0.42 0.000 0.000 0.000 6.102 0.38 0.000 0.000 0.000
1 5.874 2.60 0.415 0.045 (0.096) 1 5.822 2.63 0.375 0.040 (0.088)
2 5.826 2.60 3.010 0.093 (0.325) 2 5.776 2.63 3.000 0.086 (0.304)
3 5.854 2.60 5.605 0.065 (2.001) 3 5.802 2.63 5.625 0.060 (2.008)
4 6.181 2.60 8.200 (0.262) (25.456) 4 6.131 2.63 8.250 (0.269) (25.451)
9.343 1.80 10.000 (3.424) 39.146 9.273 1.75 10.000 (3.411) 39.147
5 10.406 2.41 8.000 1.175 8.227 5 10.395 2.38 8.000 1.186 8.301
6 4.744 2.00 1.000 1.175 0.000 6 4.676 2.00 1.000 1.186 0.000
7 4.744 7.00 0.000 0.000 0.000 7 4.676 7.00 0.000 0.000 0.000
0 5.919 1.00 0 5.862 1.00
2A 19.495 2A 19.598
A 9.747 A 9.799
LUAS 9.747 LUAS 9.799
PERHITUNGAN LUASAN PEKERJAAN GALIAN MEKANIS

Kegiatan : PELAKSANAAN REHABILATASI SALURAN SUNGAI


Pekerjaan : REHABILITASI SUNGAI TAPIN - GADUNG KEC. BAKARANGAN
Konsuultan : CV. GEOTEK INTERMEDIA CONSULTANT

LOKASI : SUNGAI TAPIN - GADUNG SEGMEN B

P.18 9.300
ELEVASI X Y (XnYn+1)-(Xn+1Yn)
NO JARAK
(M1) (M1) (M1) (M2)
0 5.835 0.00
6.073 0.38 0.000 0.000 0.000
1 5.795 2.63 0.375 0.040 (0.086)
2 5.747 2.63 3.000 0.088 (0.311)
3 5.774 2.63 5.625 0.061 (2.010)
4 6.103 2.63 8.250 (0.268) (25.444)
9.244 1.75 10.000 (3.409) 39.534
5 10.366 2.38 8.000 1.226 8.582
6 4.609 2.00 1.000 1.226 0.000
7 4.609 7.00 0.000 0.000 0.000
0 5.835 1.00
2A 20.265
A 10.132
LUAS 10.132
PERHITUNGAN VOLUME PEKERJAAN GALIAN MEKANIS

Kegiatan : PELAKSANAAN REHABILATASI SALURAN SUNGAI


Pekerjaan : REHABILITASI SUNGAI TAPIN - GADUNG KEC. BAKARANGAN
Lokasi : KEC. BAKARANGAN
Tahun Anggaran : 2019

LOKASI : SUNGAI TAPIN - GADUNG SEGMEN A

LUAS RATA-
LUAS VOLUME
NO RATA JARAK (M1)
EXISTING (M2) (M3)
(M2)

P.0 10.459
10.018 100.000 1001.751
P.1 9.576
9.904 100.000 990.359
P.2 10.231
10.362 100.000 1036.180
P.3 10.493
10.882 100.000 1088.192
P.4 11.271
10.573 100.000 1057.342
P.5 9.876
10.295 100.000 1029.496
P.6 10.714
11.502 100.000 1150.232
P.7 12.290
11.404 100.000 1140.351
P.8 10.517
10.417 100.000 1041.697
P.9 10.317
10.516 100.000 1051.636
P.10 10.716
6.381 100.000 638.121
P.11 2.047
6.183 100.000 618.273
P.12 10.319
10.343 100.000 1034.289
P.13 10.367
10.438 100.000 1043.809
P.14 10.509
11.141 100.000 1114.149
P.15 11.774
11.322 100.000 1132.183
P.16 10.870
11.119 100.000 1111.896
P.17 11.368
10.950 100.000 1094.972
P.18 10.531
10.560 100.000 1055.973
P.19 10.588
10.563 100.000 1056.329
P.20 10.538
10.810 100.000 1081.024
P.21 11.082
10.655 100.000 1065.496
P.22 10.228
10.531 100.000 1053.103
P.23 10.834
10.681 100.000 1068.068
P.24 10.527
10.691 100.000 1069.117
P.25 10.855
11.097 100.000 1109.748
P.26 11.340
11.231 100.000 1123.111
P.27 11.123
11.175 100.000 1117.526
P.28 11.228
10.904 76.000 828.727
P.8 +76 10.581
JUMLAH 2876.000 30003.151
SUB TOTAL 30003.151
PERHITUNGAN VOLUME PEKERJAAN GALIAN MEKANIS

Kegiatan : PELAKSANAAN REHABILATASI SALURAN SUNGAI


Pekerjaan : REHABILITASI SUNGAI TAPIN - GADUNG KEC. BAKARANGAN
Lokasi : KEC. BAKARANGAN
Tahun Anggaran : 2019

LOKASI : SUNGAI TAPIN - GADUNG SEGMEN B

LUAS RATA-
LUAS VOLUME
NO RATA JARAK (M1)
EXISTING (M2) (M3)
(M2)

P.0 9.916
9.410 100.000 940.966
P.1 8.903
9.023 100.000 902.297
P.2 9.143
8.957 100.000 895.702
P.3 8.771
8.737 100.000 873.666
P.4 8.702
8.485 100.000 848.490
P.5 8.267
8.399 100.000 839.875
P.6 8.530
8.575 100.000 857.514
P.7 8.620
8.968 100.000 896.815
P.8 9.316
9.224 100.000 922.362
P.9 9.131
8.894 100.000 889.377
P.10 8.656
8.798 100.000 879.775
P.11 8.939
9.106 100.000 910.607
P.12 9.273
9.344 100.000 934.437
P.13 9.416
9.670 100.000 966.966
P.14 9.924
9.712 100.000 971.171
P.15 9.500
9.624 100.000 962.361
P.16 9.747
9.773 100.000 977.308
P.17 9.799
9.966 100.000 996.559
P.18 10.132

JUMLAH 1800.000 16466.249


SUB TOTAL 16466.249
A.1.2.a.Mek Menggali tanah 1m3 dengan Excavator LONG ARM

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah


(Rp) (Rp)

1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.029 91,000.00 2,644.44
2 Mandor L.02 OH 0.003 103,000.00 299.32
Jumlah Harga Tenaga Kerja 2,943.76
B Bahan
Jumlah Harga Bahan
C Peralatan
1 Biaya Operasi Exacavator - jam 0.0291 761,661.00 22,133.74
(standar arm)
2 Alat Bantu (malting) - Ls 1.0000 - -
Jumlah Harga Peralatan 22,133.74
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 25,077.50
E Overhead + Profit (15%) 15% x D 3,761.62
F Harga Satuan Pekerjaan per - m3 (D+E) 28,839.12

A.1.2.Mek Menggali tanah 1m3 dengan Excavator

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah


(Rp) (Rp)

1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.016 91,000.00 1,469.14
2 Mandor L.02 OH 0.002 103,000.00 166.29
Jumlah Harga Tenaga Kerja 1,635.42
B Bahan
Jumlah Harga Bahan
C Peralatan
1 Biaya Operasi Exacavator - jam 0.0161 751,000.00 12,124.41
(standar arm)
Jumlah Harga Peralatan 12,124.41
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 13,759.83
E Overhead + Profit (15%) 15% x D 2,063.97
F Harga Satuan Pekerjaan per - m3 (D+E) 15,823.80
ANALISIS BIAYA OPERASI ALAT BERAT PENGGALIAN TANAH DI SUNGAI DENGAN EXCAVATOR
JENIS ALAT : Excavator Long Arm
SATUAN PEMBAYARAN : Rupiah / Jam URAIAN ANALISA HARGA SATUAN
NO URAIAN KODE KOEF. SATUAN KET
A. URAIAN PERALATAN
1 Jenis Peralatan Excavator Long Arm E10
2 Merk/Type 133 HP
2 Tenaga Pw 133.0 HP
3 Kapasitas Cp 0.9 M3
4 Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,814,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA Tingkat Suku Bunga


1 Nilai Sisa Alat = 10 % x B C 181,400,000 Rupiah I = 6,00 %
2 Faktor Angsuran Modal = i x (1 + i)^A D 0.23740 - ( data BI rate )
(1 + i)^A-1
3 Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B - C) x D E 193,786.68 Rp/jam
W
b. Asuransi, dll = p x (B/W) F 18,140.00 Rp/jam Asuransi
p = 2%
Biaya Pasti per Jam : G = ( E + F ) G 211,926.68 Rupiah

C. BIAYA OPERASI PER JAM KERJA


1 Bahan Bakar = (12%-14%) x Pw x Ms H 191,520.00 Rp/jam 12%
2 Pelumas = (2,5%-3%) x Pw x Mp I 124,355.00 Rp/jam 2.50%
3 Biaya bengkel = (6,25%-8,75%) x (B/W) J 57,141.00 Rp/jam 6.30%
4 Perawatan dan = (12.5% - 17.5%) x (B/W) K 113,375.00 Rp/jam 12.50%

4 Operator = (1 Orang / Jam) x U1 L 34,285.71 Rp/jam


5 Pembantu Operator = (1 Orang / Jam) x U2 M 23,571.43 Rp/jam

6 Matting ( bantalan alat ) = (3 batang x 16 hari) N 5,485.71 Rp/jam


(25 hari kerja x 7 jam)
Biaya Operasi per Jam = (H+I+K+L+M+N) P 549,733.86 Rp/jam

D. BIAYA OPERASI ALAT/JAM = G+P S 761,661.00 Rp/jam

E. LAIN - LAIN
1 Tingkat Suku Bunga i 6.00% / Tahun
2 Upah Operator / Sopir U1 34,285.71 Rp/Jam
3 Upah Pembantu Operator / Pmb. Sopir U2 23,571.43 Rp/Jam
4 Bahan Bakar Bensin Mb 8,800.00 Liter
5 Bahan Bakar Solar Ms 12,000.00 Liter
6 Minyak Pelumas Mp 37,400.00 Liter
7 PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
8 Asuransi p 2.00% / Tahun
9 Matting 20,000.00 batang
ANALISIS BIAYA OPERASI ALAT BERAT PENGGALIAN TANAH DI SUNGAI DENGAN EXCAVATOR
JENIS ALAT : Excavator
SATUAN PEMBAYARAN : Rupiah / Jam URAIAN ANALISA HARGA SATUAN
NO URAIAN KODE KOEF. SATUAN KET
A. URAIAN PERALATAN
1 Jenis Peralatan Excavator E10
2 Merk/Type 80-140 HP
2 Tenaga Pw 140.0 HP
3 Kapasitas Cp 0.9 M3
4 Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,678,050,000 Rupiah

B. BIAYA PASTI PER JAM KERJA Tingkat Suku Bunga


1 Nilai Sisa Alat = 10 % x B C 167,805,000 Rupiah I = 6,00 %
2 Faktor Angsuran Modal = i x (1 + i)^A D 0.23740 - ( data BI rate )
(1 + i)^A-1
3 Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B - C) x D E 179,263.36 Rp/jam
W
b. Asuransi, dll = p x (B/W) F 16,780.50 Rp/jam Asuransi
p = 2%
Biaya Pasti per Jam : G = ( E + F ) G 196,043.86 Rupiah

C. BIAYA OPERASI PER JAM KERJA


1 Bahan Bakar = (12%-15%) x Pw x Ms H 201,600.00 Rp/jam 12%
2 Pelumas = (2,5%-3%) x Pw x Mp I 130,900.00 Rp/jam 2.50%
3 Biaya bengkel = (6,25%-8,75%) x (B/W) J 52,858.58 Rp/jam 6.30%
4 Perawatan dan = (12.5% - 17.5%) x (B/W) K 104,878.13 Rp/jam 12.50%

4 Operator = (1 Orang / Jam) x U1 L 34,285.71 Rp/jam


5 Pembantu Operator = (1 Orang / Jam) x U2 M 23,571.43 Rp/jam
6 Matting ( bantalan alat ) = (3 batang x 16 hari) N 6,857.14 Rp/jam
(25 hari kerja x 7 jam)
Biaya Operasi per Jam = (H+I+K+L+M) P 554,950.99 Rp/jam

D. BIAYA OPERASI ALAT/JAM = G+P S 751,000.00 Rp/jam

E. LAIN - LAIN
1 Tingkat Suku Bunga i 6.00% / Tahun
2 Upah Operator / Sopir U1 34,285.71 Rp/Jam
3 Upah Pembantu Operator / Pmb. Sopir U2 23,571.43 Rp/Jam
4 Bahan Bakar Bensin Mb 8,800.00 Liter
5 Bahan Bakar Solar Ms 12,000.00 Liter
6 Minyak Pelumas Mp 37,400.00 Liter
7 PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
8 Asuransi p 2.00% / Tahun
9 Matting 25,000.00 batang
ANALIS PRODUKTIFITAS ALAT BERAT PENGGALIAN TANAH DI SUNGAI
DENGAN EXCAVATOR LONG ARM
JENIS PEKERJAAN : GALIAN TANAH / PENGERUKAN SUNGAI
JARAK ANGKUT : -
SATUAN PEMBAYA : M3

NO URAIAN KODE KOEF SATUAN KETERANGAN


I. ASUMSI

1. Jam kerja efektif per hari Tk 7.00 jam


2. Faktor pengembangan tanah Fk 1.20
3. Faktor tanah lepas Fk.1 1.00
4. Jarak angkut L - km
5. Tahapan kerja.
a. Posisi Excavator didarat/di tebing sungai
b. Excavator mengeruk/menggali tanah kemudian
ditumpuk di tebing sungai dan menjandi tanggul

II. ALAT
Excavator Long Arm
kapasitas Bucket V 0.50 m3
Faktor Bucket Fb 0.60 Kondisi pemuatan Sedang
Faktor Efisiensi Alat Fa 0.65 Kondisi Operasi alat Sedang
Pemeliharaan mesin Sedang

Waktu Siklus Ts Menit


Menggali, Swing dan menumpuk di tebing T.1 0.18 Menit Kedalaman Gali 2 m - 4 m (Tabel 6.3)
Kondisi Gali Sedang (Tabel 6.3)
Swing kembali dan lain-lain T.2 0.10 Menit Sudut Putar 90o + 180o (Tabel 6.4)
Ts 0.28 Menit

Kapasitas Produksi/jam= (VxFbxFax60)/(Ts.1xFk) Q 34.41 m3/jam

Koefisien Alat/m3 = 1/Q 0.0291 Jam


III. TENAGA
Membantu Merapikan Timbunan hasil galian Excavator Long Arm
Produksi yang menentukan : Excavator Q 34.41 m3/jam
Produksi / hari = Tk x Q Q' 240.88 m3/hari
Kebutuhan tenaga
- Pekerja P 1.00 Orang
- Mandor M 0.10 Orang

Koefisien Tenaga / m3
- Pekerja : (Tk x P)/Q' 0.0291 jam
- Mandor (Tk x M)/Q' 0.0029 jam
ANALIS PRODUKTIFITAS ALAT BERAT PENGGALIAN TANAH DI SUNGAI
DENGAN EXCAVATOR
JENIS PEKERJAAN : GALIAN TANAH / PENGERUKAN SUNGAI
JARAK ANGKUT : -
SATUAN PEMBAYA : M3

NO URAIAN KODE KOEF SATUAN KETERANGAN


I. ASUMSI

1. Jam kerja efektif per hari Tk 7.00 jam


2. Faktor pengembangan tanah Fk 1.20
3. Faktor tanah lepas Fk.1 1.00
4. Jarak angkut L - km
5. Tahapan kerja.
a. Posisi Excavator didarat/di tebing sungai
b. Excavator mengeruk/menggali tanah kemudian
ditumpuk di tebing sungai dan menjandi tanggul

II. ALAT
Excavator Standar Arm
kapasitas Bucket V 0.90 m3
Faktor Bucket Fb 0.60 Kondisi pemuatan Sedang
Faktor Efisiensi Alat Fa 0.65 Kondisi Operasi alat Sedang
Pemeliharaan mesin Sedang

Waktu Siklus Ts Menit


Menggali, Swing dan menumpuk di tebing T.1 0.18 Menit Kedalaman Gali 2 m - 4 m (Tabel 6.3)
Kondisi Gali Sedang (Tabel 6.3)
Swing kembali dan lain-lain T.2 0.10 Menit Sudut Putar 90o + 180o (Tabel 6.4)
Ts 0.28 Menit

Kapasitas Produksi/jam= (VxFbxFax60)/(Ts.1xFk) Q 61.94 m3/jam

Koefisien Alat/m3 = 1/Q 0.0161 Jam


III. TENAGA
Membantu Merapikan Timbunan hasil galian Excavator Standar
Produksi yang menentukan : Excavator Q 61.94 m3/jam
Produksi / hari = Tk x Q Q' 433.59 m3/hari
Kebutuhan tenaga
- Pekerja P 1.00 Orang
- Mandor M 0.10 Orang

Koefisien Tenaga / m3
- Pekerja : (Tk x P)/Q' 0.0161 jam
- Mandor (Tk x M)/Q' 0.0016 jam
Tabel 4 - Faktor Efisiensi Alat

Pemeliharaan Mesin
Kondisi Operasi

Baik Sekali Baik Sedang Buruk Buruk Sekali


Baik Sekali 0.83 0.81 0.76 0.70 0.63
Baik 0.78 0.75 0.71 0.65 0.60
Sedang 0.72 0.69 0.65 0.60 0.54
Buruk 0.63 0.61 0.57 0.52 0.45
Buruk Sekali 0.53 0.50 0.47 0.42 0.32
Angka dalam warna kelabu adalah tidak disarankan. Faktor efisiensi ini adalah didasarkan atas kondisi
operasi dan pemeliharaan secara umum.
Tabel 6.2 Faktor Bucket untuk Excavator dan Loader

Kondisi Jenis Material Faktor


Pemuatan Bucket

Pemuatan Pembuatan material / bahan dari stockpile atau material yang


Ringan atau telah dikeruk oleh excavator lain, dengan tidak memerlukan lagi
Mudah daya gali dan bahan dapat dimuat munjung ke dalam bucket.
1 - 0,8
Contoh :
Pasir, tanah berpasir, tanah colloidal dengan kadar air sedang,
dan lain-lain.
Pemuatan Pembuatan dari stockpile tanah lepas yang lebih sukar diker
Sedang dan dimasukkan ke dalam bucket tetapi dapat dimuat hampir
munjung (penuh).
Contoh : 0,8 - 0,6
Pasir kering, tanah yang berpasir, tanah campur tanah liat,
tanah liat, gravel yang belum disaring, pasir padat dan
sebagainya atau menggali dan memuat gravel lunak langsung
dari bukti asli.
Pemuatan yang Pembuatan batu belah atau batu cadas belah, tanah liat yang
agak sulit keras, pasir campur gravel, tanah berpasir, tanah colloidal yang
liat, tanah liat dengan kadar air yang tinggi, bahan-bahan 0,6 - 0,5
tersebut telah ada pada stockpile / persediaan sulit untuk
mengisi bucket dengan material-material tersebut.
Pemuatan yang Batu bongkah besar-besar dengan bentuk yang tidak beraturan
sulit dengan banyak ruangan di antara tumpukannya, batu hasil
ledakan, batu-batu bundar yang besar-besar, pasir campuran 0,5 - 0,4
batu-batu bundar tersebut, tanah berpasir, tanah campur
lempung, tanah liat yang dimuat – gusur ke dalam bucket.
Tabel 6.3 Waktu Gali (detik) (T.1)
………...Kondisi Gali/
No Kedalaman Ringan Sedang Agak Sulit Sulit
Gali…….

1. 0-2m 6 9 15 26
2. 2m-4m 7 11 17 28
3. 4 m - lebih 8 13 19 30

Tabel 6.4 Waktu Putar (detik) (T.2)


No Sudut Putar Waktu Putar
1. 45o + 90o 4-7
2. 90o + 180o 5-8
HARGA SATUAN PEKERJAAN 2019

No Uraian satuan Harga satuan 2019

1 Bensin ltr 8,800

2 Solar ltr 12,000

3 Oli Mesin ltr 37,400

4 Oli Transmisi ltr 37,400

5 Oli Hydraulik ltr 45,000

6 Grease/ Gemuk kg 25,000

7 Excavator Long Arm (HP 133) unit 1,814,000,000

8 Excavator PC.200 (HP 140) unit 1,678,050,000

UPAH

1 Operator excavator hari 240,000

2 Pembantu Operator hari 165,000

3 Sopir hari 200,000

4 Pembantu Sopir hari 121,000

5 Pekerja hari 91,000

6 Mandor hari 103,000