Pekerja Rp 100,000.00 oh
Kenek Rp 100,000.00 oh
Tukang gali Rp 150,000.00 oh
Kepala tukang batu Rp 175,000.00 oh
Tukang batu Rp 150,000.00 oh
Kepala tukang kayu Rp 175,000.00 oh
Tukang kayu Rp 150,000.00 oh
Kepala tukang besi Rp 175,000.00 oh
Tukang besi Rp 150,000.00 oh
Kepala tukang cat Rp 175,000.00 oh
Tukang Cat Rp 150,000.00 oh
Tukang aspalt Rp 150,000.00 oh
Mandor Rp 160,000.00 oh
Instalator Rp 150,000.00 oh
Pembantu instalator Rp 100,000.00 oh
Tukang babat rumput Rp 150,000.00 oh
Tukang taman Rp 200,000.00 oh
Kepala tukang pasang pipa Rp 175,000.00 oh
Tukang pasang pipa Rp 150,000.00 oh
Operator alat besar Rp 250,000.00 oh
Pembantu operator alat besar Rp 120,000.00 oh
Tukang las Rp 200,000.00 oh
Akustik 30 x 30 cm lbr
Akustik 30 x 60 cm lbr
Akustik Arm Strong Ukuran 30 x 120 cm lbr
Akustik Armstrom 60 x 120cm lbr
Alang - alang ikat
Alluminium B Kg
Alluminium C Kg
Ampelas Rp 5,000.00 Lbr
Asbes lbr
Asbes Gelombang lbr
Atap Alluminium Gelombang tebal 0.55 m2
Asbes Motif 4mm x 40 Rp 57,500.00 bh
Badkip bh
Bahan Teraso Cor m3
Bak Teraso bh
Bak cuci Stainless steel Rp 600,000.00 bh
Bak cuci Teraso bh
Bak Fiberglass Rp 1,000,000.00 bh
Balok Kayu Borneo Rp 4,300,000.00 m3
Balok Kayu Jati Rp 26,000,000.00 m3
Balok Kayu Kamper m3
Balok Kayu Kruing m3
Bambu Ø 6 - 8 / 600 cm btg
Bata merah kelas I Rp 1,000.00 bh
Bata Pelapis Klinker Bh
Batacote Kg
Batu Apung Kg
Batu Belah 15 / 20 m3
Batu Belah 5 / 20 m3
Batu Belah 5 / 7 m3
Batu Granito Kg
Batu Kerikil m3
Batu Koral m3
Batu Paros Bh
Batu Tempel Hitam Bh
Batu Teraso Kg
BBM Ltr
Besi Beton Rp 11,000.00 Kg
Besi Beton ( Polos / Ulir ) Rp 12,000.00 Kg
Besi Beton Polos 11,000 Kg
Besi Jaring Kawat Baja Kg
Besi Profil WF Kg
Besi Strip Kg
Carpet m2
Carpet 80% Wool, 20% Nylon m2
Cat Tembok vinilex vinilex Rp 17,500.00 Kg
Cat Antara Kg
Cat Dasar Rp 10,000.00 Kg
Cat Meni Kg
Cat Penutup Kg
Cat Kayu glotek Kg
Cat Dulux Wheathershield Primer Rp 92,000.00 Liter
Cat ICI Dulux Wheathershield Rp 46,500.00 Liter
Cat Alkali Resisting Primer Rp 45,500.00 Liter
Cat ICI Dulux Pentalite Rp 56,000.00 Liter
Dempul Kg
Dempul Jadi Kg
Dolken Kayu Galam Ø 8 - 10 / 4m Rp 22,000.00 btg
Dolken Kayu Ø 8 - 10/400 cm btg
Dolken Ø 8 / 4 m Rp 28,000.00 btg
Door Closer Bh
Door Holder Bh
Door Stop Bh
Engsel Angin Bh
Engsel Jendela Bh
Engsel Pintu Bh
Feltex 100% Wool - T - 21 m2
Flincote / Meni Besi Kg
Floor Hardener Ferrovax Kg
Formika 4' x 3' lbr
Floor Drain Rp 125,000.00 #N/A
Formtie / penjaga jarak bekisting bh
Genteng Aspal lbr
Genteng Beton Rp 3,500.00 lbr
Genteng Bubung Kodok bh
Genteng Bubung Palentong bh
Genteng Decra Bond lbr
Genteng Kodok bh
Genteng Metal lbr
Genteng Palentong bh
Genteng Palentong Super bh
Genteng Sirap lbr
Genteng Keramik Rp 1,500.00 bh
Gypsum Rp 60,000.00 lbr
Hebel Rp 7,738.10 bh
Ijuk m3
Jendela Besi m2
Jendela Besi Tahan Api m2
Jendela Nako bh
Kaca Buram m2
Kaca Cermin m2
Kaca Patri m2
Kaca Polos m2
Kaca Wireglass m2
Kait Angin Bh
Kapur Padam m3
Kapur Sirih Kg
Kaso 5 / 7 ( albasiah ) m3
Kawat Beton Rp 20,000.00 Kg
Kawat Burung m2
Kawat Duri Kg
Kawat Harmonika m2
Kawat Kassa m2
Kawat Nyamuk m2
Kawat seng polos Kg
Kayu Albasiah m3
Kayu Balok Borneo 4300000 m3
Kayu Balok Damar Laut m3
Kayu Balok Jati Rp 26,000,000.00 m3
Kayu Kaso 5 / 7 (borneo) m3
Kayu Papan 3 / 20 borneo m3
Kayu Profil Rp 2,000.00 m'
Kayu Terentang 2800000 m3
Keramik 10 x 20 cm Bh
Keramik 15 x 15 cm Bh
Keramik 20 x 20 cm Rp 45,000.00 Bh
Keramik 20x30 cm Rp 200,000.00
Keramik Artistik 10 x 20 cm Bh
Keramik Artistik 5 x 20 cm Bh
Kloset Duduk / Monoblok Rp 2,000,000.00 bh
Kloset Jongkok Porselen bh
Kloset Jongkok Teraso bh
Kompresor, Blasting Pot , Selang Dan Nozzle hr
Koral Beton Rp 210,000.00 m3
Kran Air Rp 35,000.00 bh
Kuas Bh
Kunci Lemari Bh
Kunci Selot Bh
Kunci Tanam bh
Kunsi Silinder Bh
Kunsi Tanam Antik Bh
Kunsi Tanam Biasa Bh
Kunsi Tanam Kamar Mandi Bh
Lem Kg
Lem Kayu Lt
Lem Vinyl Kg
List Kayu Profil m'
lt. Vinyl Karet 30 x 30 kwl I bh
Marmer Rp 250,000.00 M2
Meni ( Read Lead ) A Kg
Meni ( Read Lead ) B Kg
MCB 2 MAXAIM - DOM11347SNI Rp 340,000.00 #N/A
Meni Besi Lt
Minyak Bekisting Rp 6,000.00 lt
Minyak Cat Kg
Mozaik 30 x 30 cm bh
Nok Paten lbr
Nok standar 40 cm 18, swg 22 m2
Nok Stel rata lbr
Paku Rp 18,000.00 Kg
Paku Biasa ½" - 1" Kg
Paku Biasa ½" - 1" atau Sekrup Kg
Paku Biasa 1/2" - 1" Kg
Paku Biasa 2" - 5" Rp 20,000.00 Kg
Paku Hak Pnjang 15 cm Kg
Paku Hak Pnjang 15 cm Kg
Paku Pancing 60 x 230 Kg
Paku Sekrup Kg
Paku Skrup 3.5" Kg
Papan Kayu Borneo m3
Papan Kayu Borneo tebal 3cm m3
Papan Kayu Jati Rp 24,000,000.00 m3
Papan Kayu Kamper m3
Papan Kayu Ramin lbr
Parquet Jati m2
Pasir Beton Rp 210,000.00 m3
Pasir Pasang Rp 250,000.00 m3
Pasir Silika Kg
Pasir Urug Rp 200,000.00 m3
Pasir Urug Darat m3
PC Warna Kg
Pelat Asbes tebal 4 mm lbr
Pelat Asbes tebal 5 mm lbr
Pelitur Ltr
Pelitur Jadi Ltr
Pengencer Ltr
Perancah Kayu m3
Perekat Kg
Pintu Allumunium m2
Pintu Besi Baja m2
Pintu gulung besi m2
Pintu Lipat m2
Pipa Beton bh
Pipa Galvanis Rp 20,000.00 m'
Pipa Tanah bh
Plamir Rp 5,000.00 Kg
Plamuur Tembok Kg
Plastic Aerator Bh
Plint Keramik Artistik 10 x 10 cm bh
Plint Keramik Artistik 10 x 20 cm bh
Plint Keramik Artistik 5 x 20 cm bh
Plint Ubin PC Abu - abu 10 x 40 cm bh
Plint Ubin Granito 10 x 30 cm bh
Plint Ubin Granito 10 x 40 cm bh
Plint Ubin PC Abu - abu 15 x 20 cm bh
Plint Ubin PC Abu -abu 10 x 30 cm bh
Plint Ubin PC Warna 10 x 20 cm bh
Plint Ubin PC Warna 10 x 30 cm bh
Plint Ubin PC Warna 10 x 40 cm bh
Plint Ubin Teralux Kerang 10 x 30 cm bh
Plint Ubin Teralux Kerang 10 x 40 cm bh
Plint Ubin Teralux Marmer 10 x 30 cm bh
Plint Ubin Teralux Marmer 10 x 40 cm bh
Plint Ubin Teralux Marmer 10 x 60 cm bh
Plint Ubin Teraso 10 x 30 cm bh
Plint Ubin Teraso 10 x 40 cm bh
Plywood 4 mm Rp 60,000.00 lbr
Plywood 9 mm Rp 110,000.00 lbr
Porselen ( 11 x 11 ) cm bh
Porselen 10 x 20 cm warna Bh
Porselen 11 x 11 cm putih Bh
Porselen 11 x 11 cm warna Bh
Porselen 15 x 15 cm putih Bh
Porselen 15 x 15 cm warna Bh
Porselen 20 x 20 cm warna Rp 2,300.00 Bh
Profil Alluminium " T " m'
Ramset / Dinabolt bh
Rapidrant gln
Rel Pintu Dorong Bh
Residu Lt
Residu atau Ter Ltr
Rolling Door m2
Roof Light Fiberglass lbr
Roster 22x22 Rp 18,000.00 bh
Sabun Kg
Seal tape Rp 3,000.00 bh
Semen Instant MM 101 Rp 1,762.50 kg
Semen Instant MM 201 Rp 1,126.25 kg
Semen Instant MU301 Rp 1,611.25 kg
Semen Abu -abu Rp 2,500.00 Kg
Semen Merah Kg
Semen Nat Kg
Semen Portland Rp 2,000.00 Kg
Semen Tanam Asam Kg
Semen Warna Rp 3,000.00 Kg
Seng Gelombang 3" x 6" BJLS 28 Lbr
Seng Gelombang BJLS 32 Rp 110,000.00 lbr
Seng Plat lbr
Seng Plat 3 x 6 BJLS 24 Lbr
Seng Plat 3" x 6" BJLS 28 Lbr
Shower Rp 1,500,000.00 bh
Sisalation / Alluminium Foil m2
Soda Api Kg
Softboard 4' x 8' x 4mm lbr
Spring Knip Bh
Strorox - 100 Kg
Suncreen Allumunium m2
Tali Ijuk Kg
Teak Oil Ltr
Teakwood 4' x 8' x 4mm lbr
Terali Besi 2 x 3 m'
Ubin Abu -abu 20 x 20 cm Rp 2,500.00 bh
Ubin Abu -abu 30 x 30 cm bh
Ubin Abu -abu 40 x40 cm bh
Ubin Granito 30 x 30 cm bh
Ubin Granito 40 x 40 cm Rp 17,647.20 bh
Ubin Keramik 10 x 33 cm bh
Ubin Keramik 15 x 15 cm bh
Ubin Keramik 15 x 20 cm bh
Ubin Keramik 20 x 20 cm Rp 1,600.00 bh
Ubin Keramik 25 x 25 cm Rp 2,100.00 bh
Ubin Keramik 33 x 33 cm Rp 7,000.00 bh
Ubin Keramik 33 x 33 cm anti slip bh
Ubin Keramik 60 x 60 cm Rp 32,397.41
Ubin Keramik 10 x 20 cm bh
Ubin Keramik Artistik 10 x 20 cm bh
Ubin Tahan Asam m2
Ubin Teralux Kerang 30 x 30 cm bh
Ubin Teralux Kerang 40 x 40 cm bh
Ubin Teralux Marmer 30 x 30 cm bh
Ubin Teralux Marmer 40 x 40 cm bh
Ubin Teralux Marmer 60 x 60 cm bh
Ubin Teraso 30 x 30 cm bh
Ubin Teraso 40 x 40 cm bh
Ubin Warna 20 x 20 cm bh
Ubin Warna 30 x 30 cm bh
Ubin Warna 40 x 40 cm bh
Underlyer, tebal 6 mm / Rubber Corrugated m2
Urinoir Rp 2,000,000.00 bh
Venetions Blinds m2
Vernis Ltr
Vinyl Asbes 30 x 30 cm bh
Vinyl Karet 30 x 30 cm KL I bh
Vinyl Karet 30 x 30 cm KL II bh
Vinyl Motif Kembang ex DN bh
Vinyl Wall Covering lebar 50 cm m2
Wall Paper m3
Water Drain + Asesories Rp 100,000.00 set
Waterstop lebar 150 mm m'
Waterstop lebar 200 mm m'
Waterstop lebar 230 mm m'
Waterstop lebar 250 mm m'
Waterstop lebar 300 mm m'
Waterstop lebar 320 mm m'
Wastafel Rp 2,000,000.00 m'
Pipa Galvanis D 4" m'
Pipa PVC D 1/2" Rp 4,500.00 m'
Pipa PVC tipe AW Ø ¾" Rp 6,000.00 m'
Pipa PVC tipe AW Ø 1½" m'
Pipa PVC tipe AW Ø 1" m'
Pipa PVC tipe AW Ø 2" Rp 17,500.00 m'
Pipa PVC tipe AW Ø 2½" m'
Pipa PVC tipe AW Ø 3" Rp 34,000.00 m'
Pipa PVC tipe AW Ø 4" Rp 55,500.00 m'
ANALISA HARGA SATUAN S.N.I 26012.987012987 180270
NO. URAIAN KOEF SAT HARGA SAT matrial HARGA SAT upah JUMLAH matrial JUMLAH upah TOTAL harga
A B C D E F G=(CXE) H = (C X F ) I=(G+H)
I PEKERJAAN PERSIAPAN
ANALISA 001 1 m' Pagar Sementara dari Kayu tinggi 2 m 9,140.00 76,700.00 85,840.00
Bahan
Dolken Kayu Ø 8 - 10/400 cm 1.250 btg 0.00 Rp -
Semen Portland 2.500 kg 2,000.00 Rp 5,000.00
Pasir Beton 0.005 m³ 210,000.00 Rp 1,050.00
Koral Beton 0.009 m³ 210,000.00 Rp 1,890.00
Kaso 5 / 7 ( albasiah ) 0.072 m³ 0.00 Rp -
Paku Biasa 2" - 5" 0.060 kg 20,000.00 Rp 1,200.00
Residu 0.400 lt 0.00 Rp -
Tenaga
Tukang Kayu 0.200 oh 150,000.00 Rp 30,000.00
Pekerja 0.400 oh 100,000.00 Rp 40,000.00
Kepala Tukang 0.020 oh 175,000.00 Rp 3,500.00
Mandor 0.020 oh 160,000.00 Rp 3,200.00
ANALISA 002 1 m' Pagar Sementara dari Seng Gelombang tinggi 2 m 260,090.00 76,700.00 336,790.00
Bahan
Dolken Kayu Ø 8 - 10/400 cm 1.250 btg 0.00 0.00
Semen Portland 2.500 kg 2,000.00 5,000.00
Pasir Beton 1.200 m³ 210,000.00 252,000.00
Koral Beton 0.009 m³ 210,000.00 1,890.00
Kaso 5 / 7 ( albasiah ) 0.072 m³ 0.00 0.00
Paku Biasa 2" - 5" 0.060 kg 20,000.00 1,200.00
Meni Besi 0.450 lt 0.00 0.00
Tenaga
Tukang Kayu 0.200 oh 150,000.00 Rp 30,000.00
Pekerja 0.400 oh 100,000.00 Rp 40,000.00
Kepala Tukang 0.020 oh 175,000.00 Rp 3,500.00
Mandor 0.020 oh 160,000.00 Rp 3,200.00
ANALISA 003 1 m' Pagar Sementara dari Kawat Duri tinggi 1.8 m 8,140.00 66,700.00 74,840.00
Bahan
Dolken Kayu Ø 8 - 10/400 cm 1.000 btg 0.00 0.00
Semen Portland 2.000 kg 2,000.00 4,000.00
Kawat Duri 25.000 kg 0.00 0.00
Pasir Beton 0.005 m³ 210,000.00 1,050.00
Koral Beton 0.009 m³ 210,000.00 1,890.00
Paku Biasa 2" - 5" 0.060 kg 20,000.00 1,200.00
Tenaga
Tukang Kayu 0.200 oh 150,000.00 30,000
Pekerja 0.300 oh 100,000.00 30,000
Kepala Tukang 0.020 oh 175,000.00 3,500
Mandor 0.020 oh 160,000.00 3,200
ANALISA 004 1 m' Pek. Pengukuran kembali (site) & Pemasangan Bowplank 400.00 27,550.00 27,950.00
Bahan
Kayu Kaso 5 / 7 (borneo) 0.012 m³ 0.00 0.00
Paku Biasa 2" - 5" 0.020 kg 20,000.00 400.00
Kayu Papan 3 / 20 borneo 0.007 m³ 0.00 0.00
Tenaga
Tukang Kayu 0.100 oh 150,000.00 15,000
Pekerja 0.100 oh 100,000.00 10,000
Kepala Tukang 0.010 oh 175,000.00 1,750
Mandor 0.005 oh 160,000.00 800
ANALISA 005 1 m² Pek. Kantor Direksi Keet , dengan lantai plesteran 982,900.00 710,500.00 1,693,400.00
Bahan
Dolken Kayu Ø 8 - 10/400 cm 1.250 btg 0.00 0.00
Kayu Balok Borneo 0.180 m³ 4,300,000.00 774,000.00
Paku 0.850 kg 18,000.00 15,300.00
Besi Strip 1.100 kg 0.00 0.00
Semen Portland 35.000 kg 2,000.00 70,000.00
Pasir Pasang 0.150 m³ 250,000.00 37,500.00
Pasir Beton 0.100 m³ 210,000.00 21,000.00
Koral Beton 0.150 m³ 210,000.00 31,500.00
Bata merah kelas I 30.000 bh 1,000.00 30,000.00
Seng Plat 0.250 lbr 0.00 0.00
Jendela Nako 2.000 bh 0.00 0.00
Kaca Polos 0.080 m² 0.00 0.00
Kunci Tanam 0.150 bh 0.00 0.00
Plywood 4 mm 0.060 lbr 60,000.00 3,600.00
Tenaga
Tukang Kayu 2.000 oh 150,000.00 300,000
Tukang Batu 1.000 oh 150,000.00 150,000
Pekerja 2.000 oh 100,000.00 200,000
Kepala Tukang 0.300 oh 175,000.00 52,500
Mandor 0.050 oh 160,000.00 8,000
ANALISA 006 1 m² Pembuatan Gudang Semen dan Alat - alat 1,111,200.00 443,000.00 1,554,200.00
Bahan
Dolken Kayu Ø 8 - 10/400 cm 1.700 btg 0.00 0.00
Kayu Balok Borneo 0.210 m³ 4,300,000.00 903,000.00
Paku 0.300 kg 18,000.00 5,400.00
Semen Portland 10.500 kg 2,000.00 21,000.00
Pasir Beton 0.030 m³ 210,000.00 6,300.00
Koral Beton 0.050 m³ 210,000.00 10,500.00
Seng Gelombang BJLS 32 1.500 lbr 110,000.00 165,000.00
Tenaga
Tukang Kayu 2.000 oh 150,000.00 300,000
Pekerja 1.000 oh 100,000.00 100,000
Kepala Tukang 0.200 oh 175,000.00 35,000
Mandor 0.050 oh 160,000.00 8,000
ANALISA 007 1 m² Pembuatan Rumah Jaga / Konstruksi Kayu 1,364,400.00 359,250.00 1,723,650.00
Bahan
Dolken Kayu Ø 8 - 10/400 cm 3.000 btg 0.00 0.00
Kayu Balok Borneo 0.276 m³ 4,300,000.00 1,186,800.00
Paku 0.700 kg 18,000.00 12,600.00
Seng Gelombang BJLS 32 1.500 lbr 110,000.00 165,000.00
Tenaga
Tukang Kayu 1.500 oh 150,000.00 225,000
Pekerja 1.000 oh 100,000.00 100,000
Kepala Tukang 0.150 oh 175,000.00 26,250
Mandor 0.050 oh 160,000.00 8,000
ANALISA 014 1 m³ Bongkaran Dinding Tembok Bata Merah 0.00 671,980.00 671,980.00
Tenaga
Pekerja 6.667 oh 100,000.00 666,700
Mandor 0.033 oh 160,000.00 5,280
II PEKERJAAN TANAH
ANALISA 015 1 m³ Pek. Galian Tanah Biasa Max Kedalaman 1 m' 0.00 46,400.00 46,400.00
Tenaga
Pekerja 0.400 oh 100,000.00 40,000
Tukang Gali oh 150,000.00 -
Kepala Tukang oh 175,000.00 -
Mandor 0.040 oh 160,000.00 6,400
ANALISA 016 1 m³ Pek. Galian Tanah Biasa Max Kedalaman 2 m' 0.00 60,820.00 60,820.00
Tenaga
Pekerja 0.525 oh 100,000.00 52,500
Tukang Gali oh 150,000.00 -
Kepala Tukang oh 175,000.00 -
Mandor 0.052 oh 160,000.00 8,320
ANALISA 017 1 m³ Pek. Galian Tanah Biasa Max Kedalaman 3 m' 0.00 85,180.00 85,180.00
Tenaga
Pekerja 0.735 oh 100,000.00 73,500
Tukang Gali 0.000 oh 150,000.00 -
Kepala Tukang 0.000 oh 175,000.00 -
Mandor 0.073 oh 160,000.00 11,680
ANALISA 018 1 m³ Pek. Galian Tanah Keras Max Kedalaman 1 m' 0.00 72,420.00 72,420.00
Tenaga
Pekerja 0.625 oh 100,000.00 62,500
Tukang Gali 0.000 oh 150,000.00 -
Kepala Tukang 0.000 oh 175,000.00 -
Mandor 0.062 oh 160,000.00 9,920
ANALISA 019 1 m³ Pek. Galian Tanah Cadas Max Kedalaman 1 m' 0.00 145,000.00 145,000.00
Tenaga
Pekerja 1.250 oh 100,000.00 125,000
Tukang Gali 0.000 oh 150,000.00 -
Kepala Tukang 0.000 oh 175,000.00 -
Mandor 0.125 oh 160,000.00 20,000
ANALISA 020 1 m³ Pek. Galian Tanah Lumpur Max Kedalaman 1 m' 0.00 95,580.00 95,580.00
Tenaga
Pekerja 0.823 oh 100,000.00 82,300
Tukang Gali 0.000 oh 150,000.00 -
Kepala Tukang 0.000 oh 175,000.00 -
Mandor 0.083 oh 160,000.00 13,280
IV PEKERJAAN DINDING
ANALISA 030 1 m² Pasangan Bata Merah 1Pc : 3Ps 1 Bata 228,650.00 103,300.00 331,950.00
Bahan
Bata merah kelas I 140.000 bh 1,000.00 140,000.00
Semen Portland 32.950 kg 2,000.00 65,900.00
Pasir Pasang 0.091 m³ 250,000.00 22,750.00
Tenaga
Pekerja 0.650 oh 100,000.00 65,000
Tukang Batu 0.200 oh 150,000.00 30,000
Kepala Tukang 0.020 oh 175,000.00 3,500
Mandor 0.030 oh 160,000.00 4,800
ANALISA 031 1 m² Pasangan Bata Merah 1Pc : 5Ps 1 Bata 209,900.00 103,300.00 313,200.00
Bahan
Bata merah kelas I 140.000 bh 1,000.00 140,000.00
Semen Portland 22.200 kg 2,000.00 44,400.00
Pasir Pasang 0.102 m³ 250,000.00 25,500.00
Tenaga
Pekerja 0.650 oh 100,000.00 65,000
Tukang Batu 0.200 oh 150,000.00 30,000
Kepala Tukang 0.020 oh 175,000.00 3,500
Mandor 0.030 oh 160,000.00 4,800
ANALISA 032 1 m² Pasangan Bata Merah 1Pc : 3Ps 1/2 Bata 108,740.00 51,150.00 159,890.00
Bahan
Bata merah kelas I 70.000 bh 1,000.00 70,000.00
Semen Portland 14.370 kg 2,000.00 28,740.00
Pasir Pasang 0.040 m³ 250,000.00 10,000.00
Tenaga
Pekerja 0.320 oh 100,000.00 32,000
Tukang Batu 0.100 oh 150,000.00 15,000
Kepala Tukang 0.010 oh 175,000.00 1,750
Mandor 0.015 oh 160,000.00 2,400
ANALISA 033 1 m² Pasangan Bata Merah 1Pc : 5Ps 1/2 Bata 100,610.00 51,150.00 151,760.00
Bahan
Bata merah kelas I 70.000 bh 1,000.00 70,000.00
Semen Portland 9.680 kg 2,000.00 19,360.00
Pasir Pasang 0.045 m³ 250,000.00 11,250.00
Tenaga
Pekerja 0.320 oh 100,000.00 32,000
Tukang Batu 0.100 oh 150,000.00 15,000
Kepala Tukang 0.010 oh 175,000.00 1,750
Mandor 0.015 oh 160,000.00 2,400
V PEKERJAAN PELESTERAN
ANALISA 034 1 m² Plesteran Dinding 1Pc : 3Ps 17,710.00 46,725.00 64,435.00
Bahan
Semen Portland 6.480 kg 2,000.00 12,960.00
Pasir Pasang 0.019 m³ 250,000.00 4,750.00
Tenaga
Pekerja 0.200 oh 100,000.00 20,000
Tukang Batu 0.150 oh 150,000.00 22,500
Kepala Tukang 0.015 oh 175,000.00 2,625
Mandor 0.010 oh 160,000.00 1,600
ANALISA 036 1 m² Plesteran Dinding 1Pc : 0. 5Kp : 3 Ps, tebal 15 mm 11,890.00 46,725.00 58,615.00
Bahan
Semen Portland 4.320 kg 2,000.00 8,640.00
Kapur Padam 0.003 m³ 0.00 0.00
Pasir Pasang 0.013 m³ 250,000.00 3,250.00
Tenaga
Pekerja 0.200 oh 100,000.00 20,000
Tukang Batu 0.150 oh 150,000.00 22,500
Kepala Tukang 0.015 oh 175,000.00 2,625
Mandor 0.010 oh 160,000.00 1,600
ANALISA 037 1 m² Plesteran Dinding 1Pc : 3Kp : 10Ps, tebal 15 mm 7,180.00 46,725.00 53,905.00
Bahan
Semen Portland 1.840 kg 2,000.00 3,680.00
Kapur Padam 0.006 m³ 0.00 0.00
Pasir Pasang 0.014 m³ 250,000.00 3,500.00
Tenaga
Pekerja 0.200 oh 100,000.00 20,000
Tukang Batu 0.150 oh 150,000.00 22,500
Kepala Tukang 0.015 oh 175,000.00 2,625
Mandor 0.010 oh 160,000.00 1,600
ANALISA 038 1 m² Plesteran 0.5Pc : 1Kp : 4Ps, tebal 15 mm 10,750.00 46,725.00 57,475.00
Bahan
Semen Portland 3.000 kg 2,000.00 6,000.00
Kapur Padam 0.005 m³ 0.00 0.00
Pasir Pasang 0.019 m³ 250,000.00 4,750.00
Tenaga
Pekerja 0.200 oh 100,000.00 20,000
Tukang Batu 0.150 oh 150,000.00 22,500
Kepala Tukang 0.015 oh 175,000.00 2,625
Mandor 0.010 oh 160,000.00 1,600
ANALISA 057 1 m² Pelesteran Beton 1Pc : 2Ps, tebal 15 mm 23,100.00 61,580.00 84,680.00
Bahan
Semen Portland 9.300 kg 2,000.00 18,600.00
Pasir Pasang 0.018 m³ 250,000.00 4,500.00
Tenaga
Pekerja 0.260 oh 100,000.00 26,000
Tukang Batu 0.200 oh 150,000.00 30,000
Kepala Tukang 0.020 oh 175,000.00 3,500
Mandor 0.013 oh 160,000.00 2,080
ANALISA 058 1 m² Pelesteran Beton 1Pc : 3Ps, tebal 15 mm 19,390.00 61,580.00 80,970.00
Bahan
Semen Portland 7.070 kg 2,000.00 14,140.00
Pasir Pasang 0.021 m³ 250,000.00 5,250.00
Tenaga
Pekerja 0.260 oh 100,000.00 26,000
Tukang Batu 0.200 oh 150,000.00 30,000
Kepala Tukang 0.020 oh 175,000.00 3,500
Mandor 0.013 oh 160,000.00 2,080
ANALISA 060 1 m² Pelesteran Granito 1Pc Warna : 2 Granito, tebal 10 mm 0.00 9,150.00 9,150.00
Bahan
PC Warna 0.144 kg 0.00 0.00
Batu Granito 15.000 kg 0.00 0.00
Tenaga
Pekerja 0.050 oh 100,000.00 5,000
Tukang Batu 0.020 oh 150,000.00 3,000
Kepala Tukang 0.002 oh 175,000.00 350
Mandor 0.005 oh 160,000.00 800
ANALISA 061 1 m² Pelesteran Teraso 1Pc Warna : 2 Batu Teraso, tebal 10 mm 0.00 82,500.00 82,500.00
Bahan
PC Warna 0.440 kg 0.00 0.00
Batu Teraso 11.500 kg 0.00 0.00
Tenaga
Pekerja 0.450 oh 100,000.00 45,000
Tukang Batu 0.200 oh 150,000.00 30,000
Kepala Tukang 0.020 oh 175,000.00 3,500
Mandor 0.025 oh 160,000.00 4,000
VI PEKERJAAN KAYU
ANALISA 066 1m³ Pasang Kusen Pintu dan Jendela Kayu Jati 28,600,000.00 3,998,000.00 32,598,000.00
Bahan
Kayu Balok Jati 1.100 m³ 26,000,000.00 28,600,000.00
Tenaga
Pekerja 6.000 oh 100,000.00 600,000
Tukang Kayu 20.000 oh 150,000.00 3,000,000
Kepala Tukang 2.000 oh 175,000.00 350,000
Mandor 0.300 oh 160,000.00 48,000
ANALISA 067 1m³ Pasang Kusen Pintu dan Jendela Kayu Borneo 5,160,000.00 3,698,000.00 8,858,000.00
Bahan
Kayu Balok Borneo 1.200 m³ 4,300,000.00 5,160,000.00
Tenaga
Pekerja 6.000 oh 100,000.00 600,000
Tukang Kayu 18.000 oh 150,000.00 2,700,000
Kepala Tukang 2.000 oh 175,000.00 350,000
Mandor 0.300 oh 160,000.00 48,000
ANALISA 068 1m³ Pasang Kusen Pintu dan Jendela Kayu Damar Laut 0.00 3,698,000.00 3,698,000.00
Bahan
Kayu Balok Damar Laut 1.200 m³ 0.00 0.00
Tenaga
Pekerja 6.000 oh 100,000.00 600,000
Tukang Kayu 18.000 oh 150,000.00 2,700,000
Kepala Tukang 2.000 oh 175,000.00 350,000
Mandor 0.300 oh 160,000.00 48,000
ANALISA 069 1m² Pasang Pintu Klamp Kayu Kamper 1,000.00 213,755.00 214,755.00
Bahan
Papan Kayu Kamper 0.036 m³ 0.00 0.00
Paku Biasa 2" - 5" 0.050 kg 20,000.00 1,000.00
Tenaga
Pekerja 0.350 oh 100,000.00 35,000
Tukang Kayu 1.050 oh 150,000.00 157,500
Kepala Tukang 0.105 oh 175,000.00 18,375
Mandor 0.018 oh 160,000.00 2,880
ANALISA 070 1m² Pasang Pintu Klamp Kayu Borneo 1,000.00 213,755.00 214,755.00
Bahan
Papan Kayu Borneo 0.036 m³ 0.00 0.00
Paku Biasa 2" - 5" 0.050 kg 20,000.00 1,000.00
Tenaga
Pekerja 0.350 oh 100,000.00 35,000
Tukang Kayu 1.050 oh 150,000.00 157,500
Kepala Tukang 0.105 oh 175,000.00 18,375
Mandor 0.018 oh 160,000.00 2,880
ANALISA 071 1m² Pasang Pintu Panel Kayu Jati 1,200,000.00 526,750.00 1,726,750.00
Bahan
Papan Kayu Jati 0.050 m³ 24,000,000.00 1,200,000.00
Tenaga
Pekerja 1.000 oh 100,000.00 100,000
Tukang Kayu 2.500 oh 150,000.00 375,000
Kepala Tukang 0.250 oh 175,000.00 43,750
Mandor 0.050 oh 160,000.00 8,000
ANALISA 072 1m² Pasang Pintu Panel Kayu Kamper 0.00 526,750.00 526,750.00
Bahan
Papan Kayu Kamper 0.040 m³ 0.00 0.00
Tenaga
Pekerja 1.000 oh 100,000.00 100,000
Tukang Kayu 2.500 oh 150,000.00 375,000
Kepala Tukang 0.250 oh 175,000.00 43,750
Mandor 0.050 oh 160,000.00 8,000
ANALISA 073 1m² Pasang Pintu dan Jendela Kaca Kayu Jati 840,000.00 421,400.00 1,261,400.00
Bahan
Papan Kayu Jati 0.035 m³ 24,000,000.00 840,000.00
Tenaga
Pekerja 0.800 oh 100,000.00 80,000
Tukang Kayu 2.000 oh 150,000.00 300,000
Kepala Tukang 0.200 oh 175,000.00 35,000
Mandor 0.040 oh 160,000.00 6,400
ANALISA 074 1m² Pasang Pintu dan Jendela Kaca Kayu Kamper 0.00 421,400.00 421,400.00
Bahan
Papan Kayu Kamper 0.035 m³ 0.00 0.00
Tenaga
Pekerja 0.800 oh 100,000.00 80,000
Tukang Kayu 2.000 oh 150,000.00 300,000
Kepala Tukang 0.200 oh 175,000.00 35,000
Mandor 0.040 oh 160,000.00 6,400
ANALISA 075 1m² Pasang Pintu dan Jendela Kaca Kayu Borneo 0.00 421,400.00 421,400.00
Bahan
Papan Kayu Borneo 0.035 m³ 0.00 0.00
Tenaga
Pekerja 0.800 oh 100,000.00 80,000
Tukang Kayu 2.000 oh 150,000.00 300,000
Kepala Tukang 0.200 oh 175,000.00 35,000
Mandor 0.040 oh 160,000.00 6,400
ANALISA 076 1m² Pasang Pintu dan Jendela Jalusi Kayu Borneo 0.00 650,500.00 650,500.00
Bahan
Papan Kayu Borneo 0.064 m³ 0.00 0.00
Tenaga
Pekerja 1.000 oh 100,000.00 100,000
Tukang Kayu 3.000 oh 150,000.00 450,000
Kepala Tukang 0.300 oh 175,000.00 52,500
Mandor 0.300 oh 160,000.00 48,000
ANALISA 077 1m² Pasang Pintu dan Jendela Jalusi Kayu Kamper 0.00 682,500.00 682,500.00
Bahan
Papan Kayu Borneo 0.064 m³ 0.00 0.00
Tenaga
Pekerja 1.000 oh 100,000.00 100,000
Tukang Kayu 3.000 oh 150,000.00 450,000
Kepala Tukang 0.300 oh 175,000.00 52,500
Mandor 0.500 oh 160,000.00 80,000
ANALISA 078 1m² Pasang Pintu Plywood rangkap, rangka kayu Jati 530,400.00 399,800.00 930,200.00
Bahan
Papan Kayu Jati 0.0196 m³ 24,000,000.00 470,400.00
Paku Biasa ½" - 1" 0.030 kg 0.00 0.00
Lem Kayu 0.300 lt 0.00 0.00
Plywood 4 mm 1.000 Lbr 60,000.00 60,000.00
Tenaga
Pekerja 0.600 oh 100,000.00 60,000
Tukang Kayu 2.000 oh 150,000.00 300,000
Kepala Tukang 0.200 oh 175,000.00 35,000
Mandor 0.030 oh 160,000.00 4,800
ANALISA 079 1m² Pasang Pintu Plywood rangkap, rangka kayu Kamper 530,400.00 399,800.00 930,200.00
Bahan
Papan Kayu Jati 0.0196 m³ 24,000,000.00 470,400.00
Paku Biasa ½" - 1" 0.030 kg 0.00 0.00
Lem Kayu 0.300 lt 0.00 0.00
Plywood 4 mm 1.000 Lbr 60,000.00 60,000.00
Tenaga
Pekerja 0.600 oh 100,000.00 60,000
Tukang Kayu 2.000 oh 150,000.00 300,000
Kepala Tukang 0.200 oh 175,000.00 35,000
Mandor 0.030 oh 160,000.00 4,800
ANALISA 080 1m² Pasang Jalusi Mati Kusen Kayu Jati 1,440,000.00 389,000.00 1,829,000.00
Bahan
Papan Kayu Jati 0.0600 m³ 24,000,000.00 1,440,000.00
Paku Biasa ½" - 1" 0.150 kg 0.00 0.00
Tenaga
Pekerja 0.500 oh 100,000.00 50,000
Tukang Kayu 2.000 oh 150,000.00 300,000
Kepala Tukang 0.200 oh 175,000.00 35,000
Mandor 0.025 oh 160,000.00 4,000
ANALISA 081 1m² Pasang Jalusi Mati Kusen Kayu Kamper 1,440,000.00 389,000.00 1,829,000.00
Bahan
Papan Kayu Jati 0.0600 m³ 24,000,000.00 1,440,000.00
Paku Biasa ½" - 1" 0.150 kg 0.00 0.00
Tenaga
Pekerja 0.500 oh 100,000.00 50,000
Tukang Kayu 2.000 oh 150,000.00 300,000
Kepala Tukang 0.200 oh 175,000.00 35,000
Mandor 0.025 oh 160,000.00 4,000
ANALISA 082 1m² Pasang Pintu Plywood Rangkap, rangka Kayu Borneo 60,000.00 399,800.00 459,800.00
Bahan
Papan Kayu Borneo 0.0196 m³ 0.00 0.00
Paku Biasa ½" - 1" 0.030 kg 0.00 0.00
Lem Kayu 0.300 lt 0.00 0.00
Plywood 4 mm 1.000 lbr 60,000.00 60,000.00
Tenaga
Pekerja 0.600 oh 100,000.00 60,000
Tukang Kayu 2.000 oh 150,000.00 300,000
Kepala Tukang 0.200 oh 175,000.00 35,000
Mandor 0.030 oh 160,000.00 4,800
ANALISA 083 1m² Pasang Pintu Teakwood Rangkap, rangka Kayu Jati 530,400.00 399,800.00 930,200.00
Bahan
Papan Kayu Jati 0.0196 m³ 24,000,000.00 470,400.00
Paku Biasa ½" - 1" 0.300 kg 0.00 0.00
Lem Kayu 0.300 lt 0.00 0.00
Plywood 4 mm 1.000 lbr 60,000.00 60,000.00
Tenaga
Pekerja 0.600 oh 100,000.00 60,000
Tukang Kayu 2.000 oh 150,000.00 300,000
Kepala Tukang 0.200 oh 175,000.00 35,000
Mandor 0.030 oh 160,000.00 4,800
ANALISA 084 1m² Pasang Pintu Teakwood Rangkap, rangka Kayu Kamper 530,400.00 399,800.00 930,200.00
Bahan
Papan Kayu Jati 0.0196 m³ 24,000,000.00 470,400.00
Paku Biasa ½" - 1" 0.300 kg 0.00 0.00
Lem Kayu 0.300 lt 0.00 0.00
Plywood 4 mm 1.000 lbr 60,000.00 60,000.00
ikal
Pekerja 0.600 oh 100,000.00 60,000
Tukang Kayu 2.000 oh 150,000.00 300,000
Kepala Tukang 0.200 oh 175,000.00 35,000
Mandor 0.030 oh 160,000.00 4,800
ANALISA 085 1m² Pasang Pintu Plywood & Formika, rangka Kayu Jati 530,400.00 505,150.00 1,035,550.00
Bahan
Papan Kayu Jati 0.0196 m³ 24,000,000.00 470,400.00
Paku Biasa ½" - 1" 0.300 kg 0.00 0.00
Lem Kayu 0.800 lt 0.00 0.00
Plywood 4 mm 1.000 lbr 60,000.00 60,000.00
Formika 4' x 3' 0.500 lbr 0.00 0.00
Tenaga
Pekerja 0.800 oh 100,000.00 80,000
Tukang Kayu 2.500 oh 150,000.00 375,000
Kepala Tukang 0.250 oh 175,000.00 43,750
Mandor 0.040 oh 160,000.00 6,400
ANALISA 086 1m² Pasang Pintu Plywood & Formika, rangka Kayu Kamper 60,000.00 505,150.00 565,150.00
Bahan
Papan Kayu Kamper 0.0196 m³ 0.00 0.00
Paku Biasa ½" - 1" 0.300 kg 0.00 0.00
Lem Kayu 0.800 lt 0.00 0.00
Plywood 4 mm 1.000 lbr 60,000.00 60,000.00
Formika 4' x 3' 0.500 lbr 0.00 0.00
Tenaga
Pekerja 0.800 oh 100,000.00 80,000
Tukang Kayu 2.500 oh 150,000.00 375,000
Kepala Tukang 0.250 oh 175,000.00 43,750
Mandor 0.040 oh 160,000.00 6,400
ANALISA 087 1m² Pasang Pintu Teakwood & Formika, rangka Kayu Jati 530,400.00 505,150.00 1,035,550.00
Bahan
Papan Kayu Jati 0.0196 m³ 24,000,000.00 470,400.00
Paku Biasa ½" - 1" 0.300 kg 0.00 0.00
Lem Kayu 0.800 lt 0.00 0.00
Plywood 4 mm 1.000 lbr 60,000.00 60,000.00
Formika 4' x 3' 0.500 lbr 0.00 0.00
Tenaga
Pekerja 0.800 oh 100,000.00 80,000
Tukang Kayu 2.500 oh 150,000.00 375,000
Kepala Tukang 0.250 oh 175,000.00 43,750
Mandor 0.040 oh 160,000.00 6,400
ANALISA 088 1m² Pasang Pintu Teakwood & Formika, rangka Kayu Kamper ( divernis ) 500,400.00 505,150.00 1,005,550.00
Bahan
Papan Kayu Jati 0.0196 m³ 24,000,000.00 470,400.00
Paku Biasa ½" - 1" 0.300 kg 0.00 0.00
Lem Kayu 0.800 lt 0.00 0.00
Plywood 4 mm 0.500 lbr 60,000.00 30,000.00
Formika 4' x 3' 0.500 lbr 0.00 0.00
Tenaga
Pekerja 0.800 oh 100,000.00 80,000
Tukang Kayu 2.500 oh 150,000.00 375,000
Kepala Tukang 0.250 oh 175,000.00 43,750
Mandor 0.040 oh 160,000.00 6,400
ANALISA 089 1m² Pasang Pintu Formika Double, rangka Kayu Jati 530,400.00 543,500.00 1,073,900.00
Bahan
Papan Kayu Jati 0.0196 m³ 24,000,000.00 470,400.00
Paku Biasa ½" - 1" 0.300 kg 0.00 0.00
Lem Kayu 1.200 lt 0.00 0.00
Plywood 4 mm 1.000 lbr 60,000.00 60,000.00
Formika 4' x 3' 1.000 lbr 0.00 0.00
Tenaga
Pekerja 1.000 oh 100,000.00 100,000
Tukang Kayu 2.600 oh 150,000.00 390,000
Kepala Tukang 0.260 oh 175,000.00 45,500
Mandor 0.050 oh 160,000.00 8,000
ANALISA 090 1m² Pasang Pintu Formika Double, rangka Kayu Kamper 60,000.00 543,500.00 603,500.00
Bahan
Papan Kayu Kamper 0.0196 m³ 0.00 0.00
Paku Biasa ½" - 1" 0.300 kg 0.00 0.00
Lem Kayu 1.200 lt 0.00 0.00
Plywood 4 mm 1.000 lbr 60,000.00 60,000.00
Formika 4' x 3' 1.000 lbr 0.00 0.00
Tenaga
Pekerja 1.000 oh 100,000.00 100,000
Tukang Kayu 2.600 oh 150,000.00 390,000
Kepala Tukang 0.260 oh 175,000.00 45,500
Mandor 0.050 oh 160,000.00 8,000
ANALISA 091 1m³ Pasang Konstruksi Kuda - kuda Kayu Jati 28,616,000.00 2,442,000.00 31,058,000.00
Bahan
Balok Kayu Jati 1.100 m³ 26,000,000.00 28,600,000.00
Besi Strip 15.000 0.00 0.00
Paku Biasa 2" - 5" 0.800 kg 20,000.00 16,000.00
Tenaga
Pekerja 4.000 oh 100,000.00 400,000
Tukang Kayu 12.000 oh 150,000.00 1,800,000
Kepala Tukang 1.200 oh 175,000.00 210,000
Mandor 0.200 oh 160,000.00 32,000
ANALISA 092 1m³ Pasang Konstruksi Kuda - kuda Kayu Kamper 16,000.00 2,442,000.00 2,458,000.00
Bahan
Balok Kayu Kamper 1.100 m³ 0.00 0.00
Besi Strip 15.000 kg 0.00 0.00
Paku Biasa 2" - 5" 0.800 kg 20,000.00 16,000.00
Tenaga
Pekerja 4.000 oh 100,000.00 400,000
Tukang Kayu 12.000 oh 150,000.00 1,800,000
Kepala Tukang 1.200 oh 175,000.00 210,000
Mandor 0.200 oh 160,000.00 32,000
ANALISA 093 1m³ Pasang Konstruksi Kuda - kuda Kayu Borneo 4,746,000.00 2,442,000.00 7,188,000.00
Bahan
Balok Kayu Borneo 1.100 m³ 4,300,000.00 4,730,000.00
Besi Strip 15.000 kg 0.00 0.00
Paku Biasa 2" - 5" 0.800 kg 20,000.00 16,000.00
Tenaga
Pekerja 4.000 oh 100,000.00 400,000
Tukang Kayu 12.000 oh 150,000.00 1,800,000
Kepala Tukang 1.200 oh 175,000.00 210,000
Mandor 0.200 oh 160,000.00 32,000
ANALISA 094 1m³ Pasang Konstruksi Kuda - kuda Kayu Kruing 16,000.00 2,442,000.00 2,458,000.00
Bahan
Balok Kayu Kruing 1.100 m³ 0.00 0.00
Besi Strip 15.000 kg 0.00 0.00
Paku Biasa 2" - 5" 0.800 kg 20,000.00 16,000.00
Tenaga
Pekerja 4.000 oh 100,000.00 400,000
Tukang Kayu 12.000 oh 150,000.00 1,800,000
Kepala Tukang 1.200 oh 175,000.00 210,000
Mandor 0.200 oh 160,000.00 32,000
ANALISA 095 1m² Pasang Kaso + Reng Genteng Kodok Kayu Kamper 3,000.00 27,550.00 30,550.00
Bahan
Balok Kayu Kamper 0.012 m³ 0.00 0.00
Paku Biasa 2" - 5" 0.150 kg 20,000.00 3,000.00
Tenaga
Pekerja 0.100 oh 100,000.00 10,000
Tukang Kayu 0.100 oh 150,000.00 15,000
Kepala Tukang 0.010 oh 175,000.00 1,750
Mandor 0.005 oh 160,000.00 800
ANALISA 096 1m² Pasang Kaso + Reng Genteng Kodok Kayu Borneo 54,600.00 27,550.00 82,150.00
Bahan
Balok Kayu Borneo 0.012 m³ 4,300,000.00 51,600.00
Paku Biasa 2" - 5" 0.150 kg 20,000.00 3,000.00
Tenaga
Pekerja 0.100 oh 100,000.00 10,000
Tukang Kayu 0.100 oh 150,000.00 15,000
Kepala Tukang 0.010 oh 175,000.00 1,750
Mandor 0.005 oh 160,000.00 800
ANALISA 097 1m² Pasang Kaso + Reng Genteng Monier Kayu Jati 367,000.00 27,550.00 394,550.00
Bahan
Balok Kayu Jati 0.014 m³ 26,000,000.00 364,000.00
Paku Biasa 2" - 5" 0.150 kg 20,000.00 3,000.00
Tenaga
Pekerja 0.100 oh 100,000.00 10,000
Tukang Kayu 0.100 oh 150,000.00 15,000
Kepala Tukang 0.010 oh 175,000.00 1,750
Mandor 0.005 oh 160,000.00 800
ANALISA 098 1m² Pasang Kaso + Reng Genteng Monier Kayu Kamper 3,000.00 27,550.00 30,550.00
Bahan
Balok Kayu Kamper 0.014 m³ 0.00 0.00
Paku Biasa 2" - 5" 0.150 kg 20,000.00 3,000.00
Tenaga
Pekerja 0.100 oh 100,000.00 10,000
Tukang Kayu 0.100 oh 150,000.00 15,000
Kepala Tukang 0.010 oh 175,000.00 1,750
Mandor 0.005 oh 160,000.00 800
ANALISA 099 1m² Pasang Kaso + Reng Genteng Beton Kayu Borneo 63,200.00 27,550.00 90,750.00
Bahan
Balok Kayu Borneo 0.014 m³ 4,300,000.00 60,200.00
Paku Biasa 2" - 5" 0.150 kg 20,000.00 3,000.00
Tenaga
Pekerja 0.100 oh 100,000.00 10,000
Tukang Kayu 0.100 oh 150,000.00 15,000
Kepala Tukang 0.010 oh 175,000.00 1,750
Mandor 0.005 oh 160,000.00 800
ANALISA 100 1m² Pasang Kaso + Reng Atap Sirap Kayu Kamper 4,000.00 33,060.00 37,060.00
Bahan
Balok Kayu Kamper 0.165 m³ 0.00 0.00
Paku Biasa 2" - 5" 0.200 kg 20,000.00 4,000.00
Tenaga
Pekerja 0.120 oh 100,000.00 12,000
Tukang Kayu 0.120 oh 150,000.00 18,000
Kepala Tukang 0.012 oh 175,000.00 2,100
Mandor 0.006 oh 160,000.00 960
ANALISA 101 1m² Pasang Kaso + Reng Atap Sirap Kayu Borneo 4,000.00 33,060.00 37,060.00
Bahan
Balok Kayu Kamper 0.165 m³ 0.00 0.00
Paku Biasa 2" - 5" 0.200 kg 20,000.00 4,000.00
Tenaga
Pekerja 0.120 oh 100,000.00 12,000
Tukang Kayu 0.120 oh 150,000.00 18,000
Kepala Tukang 0.012 oh 175,000.00 2,100
Mandor 0.006 oh 160,000.00 960
ANALISA 102 1m² Pasang Rangka Langit - langit ( 1 x 1 ) m Kayu Jati 314,000.00 68,875.00 382,875.00
Bahan
Balok Kayu Jati 0.012 m³ 26,000,000.00 312,000.00
Paku Biasa 2" - 5" 0.100 kg 20,000.00 2,000.00
Tenaga
Pekerja 0.150 oh 100,000.00 15,000
Tukang Kayu 0.250 oh 150,000.00 37,500
Kepala Tukang 0.025 oh 175,000.00 4,375
Mandor 0.075 oh 160,000.00 12,000
ANALISA 103 1m' Pasang papan ruiter ( 3 x 20 )cm Kayu Borneo 1,000.00 45,175.00 46,175.00
Bahan
Kayu Papan 3 / 20 borneo 0.0072 m³ 0.00 0.00
Paku Biasa 2" - 5" 0.050 kg 20,000.00 1,000.00
Tenaga
Pekerja 0.100 oh 100,000.00 10,000
Tukang Kayu 0.200 oh 150,000.00 30,000
Kepala Tukang 0.025 oh 175,000.00 4,375
Mandor 0.005 oh 160,000.00 800
ANALISA 104 1m² Pasang Rangka Langit - langit ( 1 x 1 ) m Kayu Kamper 2,000.00 68,875.00 70,875.00
Bahan
Balok Kayu Kamper 0.012 m³ 0.00 0.00
Paku Biasa 2" - 5" 0.100 kg 20,000.00 2,000.00
Tenaga
Pekerja 0.150 oh 100,000.00 15,000
Tukang Kayu 0.250 oh 150,000.00 37,500
Kepala Tukang 0.025 oh 175,000.00 4,375
Mandor 0.075 oh 160,000.00 12,000
ANALISA 105 1m² Pasang Rangka Langit - langit ( 1 x 1 ) m Kayu Borneo 2,000.00 68,875.00 70,875.00
Bahan
Balok Kayu Kamper 0.012 m³ 0.00 0.00
Paku Biasa 2" - 5" 0.100 kg 20,000.00 2,000.00
Tenaga
Pekerja 0.150 oh 100,000.00 15,000
Tukang Kayu 0.250 oh 150,000.00 37,500
Kepala Tukang 0.025 oh 175,000.00 4,375
Mandor 0.075 oh 160,000.00 12,000
ANALISA 106 1m² Pasang Rangka Langit - langit ( 30 x 60 )cm Kayu Jati 601,000.00 71,850.00 672,850.00
Bahan
Balok Kayu Jati 0.023 m³ 26,000,000.00 598,000.00
Paku Biasa 2" - 5" 0.150 kg 20,000.00 3,000.00
Tenaga
Pekerja 0.200 oh 100,000.00 20,000
Tukang Kayu 0.300 oh 150,000.00 45,000
Kepala Tukang 0.030 oh 175,000.00 5,250
Mandor 0.010 oh 160,000.00 1,600
ANALISA 107 1m² Pasang Rangka Langit - langit ( 30 x 60 )cm Kayu Kamper 3,000.00 71,850.00 74,850.00
Bahan
Balok Kayu Kamper 0.023 m³ 0.00 0.00
Paku Biasa 2" - 5" 0.150 kg 20,000.00 3,000.00
Tenaga
Pekerja 0.200 oh 100,000.00 20,000
Tukang Kayu 0.300 oh 150,000.00 45,000
Kepala Tukang 0.030 oh 175,000.00 5,250
Mandor 0.010 oh 160,000.00 1,600
ANALISA 108 1m² Pasang Rangka Langit - langit ( 30 x 60 )cm Kayu Borneo 101,900.00 71,850.00 173,750.00
Bahan
Balok Kayu Borneo 0.023 m³ 4,300,000.00 98,900.00
Paku Biasa 2" - 5" 0.150 kg 20,000.00 3,000.00
Tenaga
Pekerja 0.200 oh 100,000.00 20,000
Tukang Kayu 0.300 oh 150,000.00 45,000
Kepala Tukang 0.030 oh 175,000.00 5,250
Mandor 0.010 oh 160,000.00 1,600
ANALISA 109 1m² Pasang Rangka Langit - langit ( 30 x 30 )cm Kayu Jati 706,000.00 85,625.00 791,625.00
Bahan
Balok Kayu Jati 0.027 m³ 26,000,000.00 702,000.00
Paku Biasa 2" - 5" 0.200 kg 20,000.00 4,000.00
Tenaga
Pekerja 0.250 oh 100,000.00 25,000
Tukang Kayu 0.350 oh 150,000.00 52,500
Kepala Tukang 0.035 oh 175,000.00 6,125
Mandor 0.0125 oh 160,000.00 2,000
ANALISA 110 1m² Pasang Rangka Langit - langit ( 30 x 30 )cm Kayu Kamper 4,000.00 85,625.00 89,625.00
Bahan
Balok Kayu Kamper 0.027 m³ 0.00 0.00
Paku Biasa 2" - 5" 0.200 kg 20,000.00 4,000.00
Tenaga
Pekerja 0.250 oh 100,000.00 25,000
Tukang Kayu 0.350 oh 150,000.00 52,500
Kepala Tukang 0.035 oh 175,000.00 6,125
Mandor 0.0125 oh 160,000.00 2,000
ANALISA 111 1m² Pasang Rangka Langit - langit ( 30 x 30 )cm Kayu Borneo 120,100.00 85,625.00 205,725.00
Bahan
Balok Kayu Borneo 0.027 m³ 4,300,000.00 116,100.00
Paku Biasa 2" - 5" 0.200 kg 20,000.00 4,000.00
Tenaga
Pekerja 0.250 oh 100,000.00 25,000
Tukang Kayu 0.350 oh 150,000.00 52,500
Kepala Tukang 0.035 oh 175,000.00 6,125
Mandor 0.0125 oh 160,000.00 2,000
ANALISA 112 1m' Pasang Lisplank ( 3 x 20 )cm GRC 10.80 45,175.00 45,185.80
edit Bahan
GRC 0.0072 m³ 1,500.00 10.80
Baut 0.050 kg 0.00 0.00
Tenaga
Pekerja 0.100 oh 100,000.00 10,000
Tukang Kayu 0.200 oh 150,000.00 30,000
Kepala Tukang 0.025 oh 175,000.00 4,375
Mandor 0.005 oh 160,000.00 800
ANALISA 113 1m' Pasang Lisplank ( 3 x 20 )cm Kayu Jati 173,800.00 45,175.00 218,975.00
Bahan
Papan Kayu Jati 0.0072 m³ 24,000,000.00 172,800.00
Paku Biasa 2" - 5" 0.050 kg 20,000.00 1,000.00
Tenaga
Pekerja 0.100 oh 100,000.00 10,000
Tukang Kayu 0.200 oh 150,000.00 30,000
Kepala Tukang 0.025 oh 175,000.00 4,375
Mandor 0.005 oh 160,000.00 800
ANALISA 113 1m' Pasang Lisplank ( 3 x 20 )cm Kayu Kamper 1,000.00 45,175.00 46,175.00
Bahan
Papan Kayu Kamper 0.0072 m³ 0.00 0.00
Paku Biasa 2" - 5" 0.050 kg 20,000.00 1,000.00
Tenaga
Pekerja 0.100 oh 100,000.00 10,000
Tukang Kayu 0.200 oh 150,000.00 30,000
Kepala Tukang 0.025 oh 175,000.00 4,375
Mandor 0.005 oh 160,000.00 800
ANALISA 114 1m' Pasang Lisplank ( 3 x 30 )cm Kayu Jati 265,000.00 48,650.00 313,650.00
Bahan
Papan Kayu Jati 0.0110 m³ 24,000,000.00 264,000.00
Paku Biasa 2" - 5" 0.050 kg 20,000.00 1,000.00
Tenaga
Pekerja 0.110 oh 100,000.00 11,000
Tukang Kayu 0.220 oh 150,000.00 33,000
Kepala Tukang 0.022 oh 175,000.00 3,850
Mandor 0.005 oh 160,000.00 800
ANALISA 115 1m' Pasang Lisplank ( 3 x 30 )cm Kayu Kamper 1,000.00 48,650.00 49,650.00
Bahan
Papan Kayu Kamper 0.0110 m³ 0.00 0.00
Paku Biasa 2" - 5" 0.050 kg 20,000.00 1,000.00
Tenaga
Pekerja 0.110 oh 100,000.00 11,000
Tukang Kayu 0.220 oh 150,000.00 33,000
Kepala Tukang 0.022 oh 175,000.00 3,850
Mandor 0.005 oh 160,000.00 800
ANALISA 116 1m' Pasang Lisplank 2 x( 3 x 20 )cm Kayu Kamper 1,200.00 68,875.00 70,075.00
Bahan
Papan Kayu Kamper 0.0145 m³ 0.00 0.00
Paku Biasa 2" - 5" 0.060 kg 20,000.00 1,200.00
Tenaga
Pekerja 0.150 oh 100,000.00 15,000
Tukang Kayu 0.250 oh 150,000.00 37,500
Kepala Tukang 0.025 oh 175,000.00 4,375
Mandor 0.075 oh 160,000.00 12,000
ANALISA 117 1m' Pasang Lisplank 2 x( 2 x 20 )cm Kayu Kamper 1,200.00 34,750.00 35,950.00
Bahan
Papan Kayu Kamper 0.0086 m³ 0.00 0.00
Paku Biasa 2" - 5" 0.060 kg 20,000.00 1,200.00
Tenaga
Pekerja 0.100 oh 100,000.00 10,000
Tukang Kayu 0.100 oh 150,000.00 15,000
Kepala Tukang 0.010 oh 175,000.00 1,750
Mandor 0.050 oh 160,000.00 8,000
ANALISA 118 1m' Pasang Lisplank 2 x( 2 x 20 )cm Kayu Borneo 1,200.00 34,750.00 35,950.00
Bahan
Papan Kayu Borneo 0.0088 m³ 0.00 0.00
Paku Biasa 2" - 5" 0.060 kg 20,000.00 1,200.00
Tenaga
Pekerja 0.100 oh 100,000.00 10,000
Tukang Kayu 0.100 oh 150,000.00 15,000
Kepala Tukang 0.010 oh 175,000.00 1,750
Mandor 0.050 oh 160,000.00 8,000
ANALISA 119 1m² Pasang Rangka Dinding Pemisah Kayu Kamper 2,000.00 102,375.00 104,375.00
Bahan
Balok Kayu Kamper 0.0195 m³ 0.00 0.00
Papan Kayu Kamper 0.007 m³ 0.00 0.00
Paku Biasa 2" - 5" 0.100 kg 20,000.00 2,000.00
Tenaga
Pekerja 0.150 oh 100,000.00 15,000
Tukang Kayu 0.450 oh 150,000.00 67,500
Kepala Tukang 0.045 oh 175,000.00 7,875
Mandor 0.075 oh 160,000.00 12,000
ANALISA 120 1m² Pasang Rangka Dinding Pemisah Kayu Borneo 85,850.00 102,375.00 188,225.00
Bahan
Balok Kayu Borneo 0.0195 m³ 4,300,000.00 83,850.00
Papan Kayu Borneo 0.007 m³ 0.00 0.00
Paku Biasa 2" - 5" 0.100 kg 20,000.00 2,000.00
Tenaga
Pekerja 0.150 oh 100,000.00 15,000
Tukang Kayu 0.450 oh 150,000.00 67,500
Kepala Tukang 0.045 oh 175,000.00 7,875
Mandor 0.075 oh 160,000.00 12,000
ANALISA 121 1m² Pasang Dinding Pemisah Teakwood Rangkap, RangkaKayu Kamper 2,000.00 102,375.00 104,375.00
Bahan
Balok Kayu Kamper 0.0195 m³ 0.00 0.00
Papan Kayu Kamper 0.007 m³ 0.00 0.00
Paku Biasa 2" - 5" 0.100 kg 20,000.00 2,000.00
Tenaga
Pekerja 0.150 oh 100,000.00 15,000
Tukang Kayu 0.450 oh 150,000.00 67,500
Kepala Tukang 0.045 oh 175,000.00 7,875
Mandor 0.075 oh 160,000.00 12,000
ANALISA 122 1m² Pasang Dinding Pemisah Teakwood Rangkap, Rangka Kayu Kamper 2,000.00 102,375.00 104,375.00
Bahan
Balok Kayu Kamper 0.0195 m³ 0.00 0.00
Papan Kayu Kamper 0.007 m³ 0.00 0.00
Paku Biasa 2" - 5" 0.100 kg 20,000.00 2,000.00
Tenaga
Pekerja 0.150 oh 100,000.00 15,000
Tukang Kayu 0.450 oh 150,000.00 67,500
Kepala Tukang 0.045 oh 175,000.00 7,875
Mandor 0.075 oh 160,000.00 12,000
ANALISA 123 1m² Pasang Dinding Pemisah Plywood Rangkap, Rangka Kayu Kamper 62,000.00 122,100.00 184,100.00
Bahan
Balok Kayu Kamper 0.0195 m³ 0.00 0.00
Papan Kayu Kamper 0.007 m³ 0.00 0.00
Paku Biasa 2" - 5" 0.100 kg 20,000.00 2,000.00
Lem Kayu 0.560 lt 0.00 0.00
Plywood 4 mm 1.000 lbr 60,000.00 60,000.00
Tenaga
Pekerja 0.200 oh 100,000.00 20,000
Tukang Kayu 0.600 oh 150,000.00 90,000
Kepala Tukang 0.060 oh 175,000.00 10,500
Mandor 0.010 oh 160,000.00 1,600
ANALISA 124 1m² Pasang Dinding Lambriziring dari papan Kayu jati 170,000.00 366,300.00 536,300.00
Bahan
Papan Kayu Jati 0.007 m³ 24,000,000.00 168,000.00
Paku Biasa 2" - 5" 0.100 kg 20,000.00 2,000.00
Paku Skrup 3.5" 0.150 kg 0.00 0.00
Tenaga
Pekerja 0.600 oh 100,000.00 60,000
Tukang Kayu 1.800 oh 150,000.00 270,000
Kepala Tukang 0.180 oh 175,000.00 31,500
Mandor 0.030 oh 160,000.00 4,800
ANALISA 125 1m² Pasang Plywood tebal 4mm, untuk dinding 24,000.00 15,270.50 39,270.50
Bahan
Plywood 4 mm 0.400 lbr 60,000.00 24,000.00
Paku Biasa ½" - 1" 0.050 kg 0.00 0.00
Tenaga
Pekerja 0.025 oh 100,000.00 2,500
Tukang Kayu 0.075 oh 150,000.00 11,250
Kepala Tukang 0.0075 oh 175,000.00 1,313
Mandor 0.0013 oh 160,000.00 208
ANALISA 126 1m² Pasang List Plafond Kayu Profil 2,100.00 5,760.00 7,860.00
Bahan
Kayu Profil 1.050 m' 2,000.00 2,100.00
Tenaga
Pekerja 0.021 oh 100,000.00 2,100
Tukang Kayu 0.021 oh 150,000.00 3,150
Kepala Tukang 0.0020 oh 175,000.00 350
Mandor 0.0010 oh 160,000.00 160
ANALISA 134 1 m³ Membuat Beton Bertulang 1 Pc : 1.5 Ps : 3Kr 915,600.00 219,675.00 1,135,275.00
Bahan
Semen Portland 357.000 kg 2,000.00 714,000.00
Pasir Beton 0.420 m³ 210,000.00 88,200.00
Koral Beton 0.540 m³ 210,000.00 113,400.00
Tenaga
Pekerja 1.650 oh 100,000.00 165,000
Tukang Batu 0.250 oh 150,000.00 37,500
Kepala Tukang 0.025 oh 175,000.00 4,375
Mandor 0.080 oh 160,000.00 12,800
ANALISA 135 1 m³ Membuat Beton Bertulang 1 Pc : 1.5 Ps : 2.5Kr 1,034,500.00 219,675.00 1,254,175.00
Bahan
Semen Portland 386.000 kg 2,000.00 772,000.00
Pasir Beton 0.470 m³ 210,000.00 98,700.00
Koral Beton 0.780 m³ 210,000.00 163,800.00
Tenaga
Pekerja 1.650 oh 100,000.00 165,000
Tukang Batu 0.250 oh 150,000.00 37,500
Kepala Tukang 0.025 oh 175,000.00 4,375
Mandor 0.080 oh 160,000.00 12,800
ANALISA 137 1 m³ Membuat Tiang Pancang Prestressed Beton 1,191,100.00 219,675.00 1,410,775.00
Bahan
Semen Portland 479.000 kg 2,000.00 958,000.00
Pasir Beton 0.370 m³ 210,000.00 77,700.00
Koral Beton 0.740 m³ 210,000.00 155,400.00
Rapidrant 2.460 gln 0.00 0.00
Tenaga
Pekerja 1.650 oh 100,000.00 165,000
Tukang Batu 0.250 oh 150,000.00 37,500
Kepala Tukang 0.025 oh 175,000.00 4,375
Mandor 0.080 oh 160,000.00 12,800
ANALISA 138 1 m³ Membuat Beton Bertulang 1 Pc : 2Ps : 3 Splt 955,500.00 418,625.00 1,374,125.00
Bahan
Semen Portland 336.000 kg 2,000.00 672,000.00
Pasir Beton 0.540 m³ 210,000.00 113,400.00
Koral Beton 0.810 m³ 210,000.00 170,100.00
Tenaga
Pekerja 2.000 oh 100,000.00 200,000
Tukang Batu 0.350 oh 150,000.00 52,500
Kepala Tukang 0.035 oh 175,000.00 6,125
Mandor 1.000 oh 160,000.00 160,000
ANALISA 139 1 m³ Membuat Beton Bertulang 1 Pc : 2Ps : 4 Splt 876,000.00 418,625.00 1,294,625.00
Bahan
Semen Portland 291.000 kg 2,000.00 582,000.00
Pasir Beton 0.470 m³ 210,000.00 98,700.00
Koral Beton 0.930 m³ 210,000.00 195,300.00
Tenaga
Pekerja 2.000 oh 100,000.00 200,000
Tukang Batu 0.350 oh 150,000.00 52,500
Kepala Tukang 0.035 oh 175,000.00 6,125
Mandor 1.000 oh 160,000.00 160,000
ANALISA 140 1 m³ Membuat Beton Bertulang 1 Pc : 1.5Ps : 3 Splt 1,011,200.00 418,625.00 1,429,825.00
Bahan
Semen Portland 367.000 kg 2,000.00 734,000.00
Pasir Beton 0.440 m³ 210,000.00 92,400.00
Koral Beton 0.880 m³ 210,000.00 184,800.00
Tenaga
Pekerja 2.000 oh 100,000.00 200,000
Tukang Batu 0.350 oh 150,000.00 52,500
Kepala Tukang 0.035 oh 175,000.00 6,125
Mandor 1.000 oh 160,000.00 160,000
ANALISA 141 1 m³ Membuat Beton Bertulang 1 Pc : 1.5Ps : 2.5 Splt 1,068,800.00 418,625.00 1,487,425.00
Bahan
Semen Portland 400.000 kg 2,000.00 800,000.00
Pasir Beton 0.480 m³ 210,000.00 100,800.00
Koral Beton 0.800 m³ 210,000.00 168,000.00
Tenaga
Pekerja 2.000 oh 100,000.00 200,000
Tukang Batu 0.350 oh 150,000.00 52,500
Kepala Tukang 0.035 oh 175,000.00 6,125
Mandor 1.000 oh 160,000.00 160,000
ANALISA 142 1 m³ Membuat Beton Bertulang 1 Pc : 1Ps : 1Splt 1,448,400.00 418,625.00 1,867,025.00
Bahan
Semen Portland 615.000 kg 2,000.00 1,230,000.00
Pasir Beton 0.520 m³ 210,000.00 109,200.00
Koral Beton 0.520 m³ 210,000.00 109,200.00
Tenaga
Pekerja 2.000 oh 100,000.00 200,000
Tukang Batu 0.350 oh 150,000.00 52,500
Kepala Tukang 0.035 oh 175,000.00 6,125
Mandor 1.000 oh 160,000.00 160,000
ANALISA 143 1 m³ Membuat Beton Kedap Air dengan Strorox - 100 1,068,800.00 418,625.00 1,487,425.00
Bahan
Semen Portland 400.000 kg 2,000.00 800,000.00
Pasir Beton 0.480 m³ 210,000.00 100,800.00
Koral Beton 0.800 m³ 210,000.00 168,000.00
Strorox - 100 1.200 kg 0.00 0.00
Tenaga
Pekerja 2.000 oh 100,000.00 200,000
Tukang Batu 0.350 oh 150,000.00 52,500
Kepala Tukang 0.035 oh 175,000.00 6,125
Mandor 1.000 oh 160,000.00 160,000
ANALISA 144 1 m' Memasang PVC Waterstop lebar 150 mm 58,275.00 10,345.00 68,620.00
Bahan
Waterstop lebar 150 mm 1.050 m' 55,500.00 58,275.00
Tenaga
Pekerja 0.050 oh 100,000.00 5,000
Tukang Batu 0.030 oh 150,000.00 4,500
Kepala Tukang 0.003 oh 175,000.00 525
Mandor 0.002 oh 160,000.00 320
ANALISA 145 1 m' Memasang PVC Waterstop lebar 200 mm 58,275.00 10,432.50 68,707.50
Bahan
Waterstop lebar 200 mm 1.050 m' 55,500.00 58,275.00
Tenaga
Pekerja 0.050 oh 100,000.00 5,000
Tukang Batu 0.030 oh 150,000.00 4,500
Kepala Tukang 0.0035 oh 175,000.00 613
Mandor 0.002 oh 160,000.00 320
ANALISA 146 1 m' Memasang PVC Waterstop lebar 230 mm 58,275.00 107,980.00 166,255.00
Bahan
Waterstop lebar 230 mm 1.050 m' 55,500.00 58,275.00
Tenaga
Pekerja 0.550 oh 100,000.00 55,000
Tukang Batu 0.350 oh 150,000.00 52,500
Mandor 0.003 oh 160,000.00 480
ANALISA 147 1 m' Memasang PVC Waterstop lebar 250 mm 58,275.00 107,980.00 166,255.00
Bahan
Waterstop lebar 250 mm 1.050 m' 55,500.00 58,275.00
Tenaga
Pekerja 0.550 oh 100,000.00 55,000
Tukang Batu 0.350 oh 150,000.00 52,500
Mandor 0.003 oh 160,000.00 480
ANALISA 148 1 m' Memasang PVC Waterstop lebar 300 mm 58,275.00 107,980.00 166,255.00
Bahan
Waterstop lebar 300 mm 1.050 m' 55,500.00 58,275.00
Tenaga
Pekerja 0.550 oh 100,000.00 55,000
Tukang Batu 0.350 oh 150,000.00 52,500
Mandor 0.003 oh 160,000.00 480
ANALISA 149 1 m' Memasang PVC Waterstop lebar 320 mm 58,275.00 107,980.00 166,255.00
Bahan
Waterstop lebar 320 mm 1.050 m' 55,500.00 58,275.00
Tenaga
Pekerja 0.550 oh 100,000.00 55,000
Tukang Batu 0.350 oh 150,000.00 52,500
Mandor 0.003 oh 160,000.00 480
ANALISA 150 1 kg Pembesian dengan Besi Polos atau Besi Ulir 12,900.00 1,920.50 14,820.50
Bahan
Besi Beton ( Polos / Ulir ) 1.050 kg 12,000.00 12,600.00
Kawat Beton 0.015 kg 20,000.00 300.00
Tenaga
Pekerja 0.007 oh 100,000.00 700
Tukang Besi 0.007 oh 150,000.00 1,050
Kepala Tukang 0.0007 oh 175,000.00 123
Mandor 0.0003 oh 160,000.00 48
ANALISA 162 1 m³ Membuat Pondasi Beton Bertulang F1 ( 116 kg + bekisting ) 2,730,195.56 825,275.00 3,555,470.56
Bahan
Kayu Terentang 0.200 m³ 2,288,000.00 457,600.00
Paku Biasa 2" - 5" 1.500 kg 20,000.00 30,000.00
Minyak Bekisting 0.400 lt 6,000.00 2,400.00
Besi Beton Polos 116.018 kg 11,000.00 1,276,195.56
Kawat Beton 2.250 kg 20,000.00 45,000.00
Semen Portland 323.000 kg 2,000.00 646,000.00
Pasir Beton 0.520 m³ 210,000.00 109,200.00
Koral Beton 0.780 m³ 210,000.00 163,800.00
Tenaga
Pekerja 3.900 oh 100,000.00 390,000
Tukang Batu 0.350 oh 150,000.00 52,500
Tukang Kayu 1.040 oh 150,000.00 156,000
Tukang Besi 1.050 oh 150,000.00 157,500
Kepala Tukang 0.245 oh 175,000.00 42,875
Mandor 0.165 oh 160,000.00 26,400
ANALISA 163 1 m³ Membuat Sloof/RB Beton Bertulang ( 15x20 + bekisting ) 3,001,518.33 1,066,625.00 4,068,143.33
Bahan
Kayu Terentang 0.270 m³ 2,288,000.00 617,760.00
Paku Biasa 2" - 5" 2.000 kg 20,000.00 40,000.00
Minyak Bekisting 0.600 lt 6,000.00 3,600.00
Besi Beton Polos 123.742 kg 11,000.00 1,361,158.33
Kawat Beton 3.000 kg 20,000.00 60,000.00
Semen Portland 323.000 kg 2,000.00 646,000.00
Pasir Beton 0.520 m³ 210,000.00 109,200.00
Koral Beton 0.780 m³ 210,000.00 163,800.00
Tenaga
Pekerja 4.850 oh 100,000.00 485,000
Tukang Batu 0.350 oh 150,000.00 52,500
Tukang Kayu 1.560 oh 150,000.00 234,000
Tukang Besi 1.400 oh 150,000.00 210,000
Kepala Tukang 0.331 oh 175,000.00 57,925
Mandor 0.170 oh 160,000.00 27,200
ANALISA 164 1 m³ Membuat Sloof Beton Bertulang ( 20x30 + bekisting ) 3,602,228.33 1,066,625.00 4,668,853.33
Bahan
Kayu Terentang 0.270 m³ 2,288,000.00 617,760.00
Paku Biasa 2" - 5" 2.000 kg 20,000.00 40,000.00
Minyak Bekisting 0.600 lt 6,000.00 3,600.00
Besi Beton Polos 178.352 kg 11,000.00 1,961,868.33
Kawat Beton 3.000 kg 20,000.00 60,000.00
Semen Portland 323.000 kg 2,000.00 646,000.00
Pasir Beton 0.520 m³ 210,000.00 109,200.00
Koral Beton 0.780 m³ 210,000.00 163,800.00
Tenaga
Pekerja 4.850 oh 100,000.00 485,000
Tukang Batu 0.350 oh 150,000.00 52,500
Tukang Kayu 1.560 oh 150,000.00 234,000
Tukang Besi 1.400 oh 150,000.00 210,000
Kepala Tukang 0.331 oh 175,000.00 57,925
Mandor 0.170 oh 160,000.00 27,200
ANALISA 164 1 m³ Membuat Kolom Beton Bertulang ( K20x35 + bekisting ) 5,849,040.29 1,732,250.00 7,581,290.29
Bahan
Kayu Terentang 0.400 m³ 2,288,000.00 915,200.00
Paku Biasa 2" - 5" 4.000 kg 20,000.00 80,000.00
Minyak Bekisting 2.000 lt 6,000.00 12,000.00
Besi Beton Polos 203.895 kg 11,000.00 2,242,840.29
Kawat Beton 4.500 kg 20,000.00 90,000.00
Semen Portland 323.000 kg 2,000.00 646,000.00
Pasir Beton 0.520 m³ 210,000.00 109,200.00
Koral Beton 0.780 m³ 210,000.00 163,800.00
Kayu Balok Borneo 0.150 m³ 4,300,000.00 645,000.00
Plywood 9 mm 3.500 lbr 110,000.00 385,000.00
Dolken Ø 8 / 4 m 20.000 btg 28,000.00 560,000.00
Tenaga
Pekerja 7.300 oh 100,000.00 730,000
Tukang Batu 0.350 oh 150,000.00 52,500
Tukang Kayu 3.300 oh 150,000.00 495,000
Tukang Besi 2.100 oh 150,000.00 315,000
Kepala Tukang 0.570 oh 175,000.00 99,750
Mandor 0.250 oh 160,000.00 40,000
ANALISA 001 1 m³ Membuat Kolom Beton Bertulang ( K30x40 + bekisting ) 4,755,113.33 1,732,250.00 6,487,363.33
Bahan
Kayu Terentang 0.400 m³ 2,288,000.00 915,200.00
Paku Biasa 2" - 5" 4.000 kg 20,000.00 80,000.00
Minyak Bekisting 2.000 lt 6,000.00 12,000.00
Besi Beton Polos 104.447 kg 11,000.00 1,148,913.33
Kawat Beton 4.500 kg 20,000.00 90,000.00
Semen Portland 323.000 kg 2,000.00 646,000.00
Pasir Beton 0.520 m³ 210,000.00 109,200.00
Koral Beton 0.780 m³ 210,000.00 163,800.00
Kayu Balok Borneo 0.150 m³ 4,300,000.00 645,000.00
Plywood 9 mm 3.500 lbr 110,000.00 385,000.00
Dolken Ø 8 / 4 m 20.000 btg 28,000.00 560,000.00
Tenaga
Pekerja 7.300 oh 100,000.00 730,000
Tukang Batu 0.350 oh 150,000.00 52,500
Tukang Kayu 3.300 oh 150,000.00 495,000
Tukang Besi 2.100 oh 150,000.00 315,000
Kepala Tukang 0.570 oh 175,000.00 99,750
Mandor 0.250 oh 160,000.00 40,000
ANALISA 001 1 m³ Membuat Kolom Beton Bertulang ( K20x20 + bekisting ) 4,791,816.67 1,732,250.00 6,524,066.67
Bahan
Kayu Terentang 0.400 m³ 2,288,000.00 915,200.00
Paku Biasa 2" - 5" 4.000 kg 20,000.00 80,000.00
Minyak Bekisting 2.000 lt 6,000.00 12,000.00
Besi Beton Polos 107.783 kg 11,000.00 1,185,616.67
Kawat Beton 4.500 kg 20,000.00 90,000.00
Semen Portland 323.000 kg 2,000.00 646,000.00
Pasir Beton 0.520 m³ 210,000.00 109,200.00
Koral Beton 0.780 m³ 210,000.00 163,800.00
Kayu Balok Borneo 0.150 m³ 4,300,000.00 645,000.00
Plywood 9 mm 3.500 lbr 110,000.00 385,000.00
Dolken Ø 8 / 4 m 20.000 btg 28,000.00 560,000.00
Tenaga
Pekerja 7.300 oh 100,000.00 730,000
Tukang Batu 0.350 oh 150,000.00 52,500
Tukang Kayu 3.300 oh 150,000.00 495,000
Tukang Besi 2.100 oh 150,000.00 315,000
Kepala Tukang 0.570 oh 175,000.00 99,750
Mandor 0.250 oh 160,000.00 40,000
ANALISA 001 1 m³ Membuat Kolom Beton Bertulang ( K15x15 + bekisting ) 5,186,431.11 1,732,250.00 6,918,681.11
Bahan
Kayu Terentang 0.400 m³ 1,600,000.00 640,000.00
Paku Biasa 2" - 5" 4.000 kg 20,000.00 80,000.00
Minyak Bekisting 2.000 lt 6,000.00 12,000.00
Besi Beton Polos 168.676 kg 11,000.00 1,855,431.11
Kawat Beton 4.500 kg 20,000.00 90,000.00
Semen Portland 323.000 kg 2,000.00 646,000.00
Pasir Beton 0.520 m³ 210,000.00 109,200.00
Koral Beton 0.780 m³ 210,000.00 163,800.00
Kayu Balok Borneo 0.150 m³ 4,300,000.00 645,000.00
Plywood 9 mm 3.500 lbr 110,000.00 385,000.00
Dolken Ø 8 / 4 m 20.000 btg 28,000.00 560,000.00
Tenaga
Pekerja 7.300 oh 100,000.00 730,000
Tukang Batu 0.350 oh 150,000.00 52,500
Tukang Kayu 3.300 oh 150,000.00 495,000
Tukang Besi 2.100 oh 150,000.00 315,000
Kepala Tukang 0.570 oh 175,000.00 99,750
Mandor 0.250 oh 160,000.00 40,000
ANALISA 165 1 m³ Membuat Balok Beton Bertulang ( B20x40+ bekisting ) 5,009,033.75 1,391,405.00 6,400,438.75
Bahan
Kayu Terentang 0.320 m³ 2,288,000.00 732,160.00
Paku Biasa 2" - 5" 3.200 kg 20,000.00 64,000.00
Minyak Bekisting 1.600 lt 6,000.00 9,600.00
Besi Beton Polos 169.661 kg 11,000.00 1,866,273.75
Kawat Beton 3.000 kg 20,000.00 60,000.00
Semen Portland 323.000 kg 2,000.00 646,000.00
Pasir Beton 0.520 m³ 210,000.00 109,200.00
Koral Beton 0.780 m³ 210,000.00 163,800.00
Kayu Balok Borneo 0.140 m³ 4,300,000.00 602,000.00
Plywood 9 mm 2.800 lbr 110,000.00 308,000.00
Dolken Ø 8 / 4 m 16.000 btg 28,000.00 448,000.00
Tenaga
Pekerja 5.960 oh 100,000.00 596,000
Tukang Batu 0.350 oh 150,000.00 52,500
Tukang Kayu 2.800 oh 150,000.00 420,000
Tukang Besi 1.400 oh 150,000.00 210,000
Kepala Tukang 0.455 oh 175,000.00 79,625
Mandor 0.208 oh 160,000.00 33,280
ANALISA 166 1 m³ Membuat Balok Beton Bertulang ( 150 kg + bekisting ) 5,139,760.00 1,313,100.00 6,452,860.00
Bahan
Kayu Terentang 0.320 m³ 2,288,000.00 732,160.00
Paku Biasa 2" - 5" 3.200 kg 20,000.00 64,000.00
Minyak Bekisting 1.600 lt 6,000.00 9,600.00
Besi Beton Polos 150.000 kg 11,000.00 1,650,000.00
Kawat Beton 2.250 kg 20,000.00 45,000.00
Semen Portland 323.000 kg 2,000.00 646,000.00
Pasir Beton 0.520 m³ 210,000.00 109,200.00
Koral Beton 0.780 m³ 210,000.00 163,800.00
Kayu Balok Borneo 0.120 m³ 4,300,000.00 516,000.00
Plywood 9 mm 2.800 lbr 110,000.00 308,000.00
Dolken Ø 8 / 4 m 32.000 btg 28,000.00 896,000.00
Tenaga
Pekerja 5.800 oh 100,000.00 580,000
Tukang Batu 0.350 oh 150,000.00 52,500
Tukang Kayu 2.800 oh 150,000.00 420,000
Tukang Besi 1.050 oh 150,000.00 157,500
Kepala Tukang 0.420 oh 175,000.00 73,500
Mandor 0.185 oh 160,000.00 29,600
ANALISA 002 1 m³ Membuat Balok Beton Bertulang ( B20x30+ bekisting ) 5,696,061.67 1,391,405.00 7,087,466.67
Bahan
Kayu Terentang 0.320 m³ 2,288,000.00 732,160.00
Paku Biasa 2" - 5" 3.200 kg 20,000.00 64,000.00
Minyak Bekisting 1.600 lt 6,000.00 9,600.00
Besi Beton Polos 232.118 kg 11,000.00 2,553,301.67
Kawat Beton 3.000 kg 20,000.00 60,000.00
Semen Portland 323.000 kg 2,000.00 646,000.00
Pasir Beton 0.520 m³ 210,000.00 109,200.00
Koral Beton 0.780 m³ 210,000.00 163,800.00
Kayu Balok Borneo 0.140 m³ 4,300,000.00 602,000.00
Plywood 9 mm 2.800 lbr 110,000.00 308,000.00
Dolken Ø 8 / 4 m 16.000 btg 28,000.00 448,000.00
Tenaga
Pekerja 5.960 oh 100,000.00 596,000
Tukang Batu 0.350 oh 150,000.00 52,500
Tukang Kayu 2.800 oh 150,000.00 420,000
Tukang Besi 1.400 oh 150,000.00 210,000
Kepala Tukang 0.455 oh 175,000.00 79,625
Mandor 0.208 oh 160,000.00 33,280
ANALISA 002 1 m³ Membuat Balok Beton Bertulang ( B20x30 kantilever+ bekisting ) 5,696,061.67 1,391,405.00 7,087,466.67
Bahan
Kayu Terentang 0.320 m³ 2,288,000.00 732,160.00
Paku Biasa 2" - 5" 3.200 kg 20,000.00 64,000.00
Minyak Bekisting 1.600 lt 6,000.00 9,600.00
Besi Beton Polos 232.118 kg 11,000.00 2,553,301.67
Kawat Beton 3.000 kg 20,000.00 60,000.00
Semen Portland 323.000 kg 2,000.00 646,000.00
Pasir Beton 0.520 m³ 210,000.00 109,200.00
Koral Beton 0.780 m³ 210,000.00 163,800.00
Kayu Balok Borneo 0.140 m³ 4,300,000.00 602,000.00
Plywood 9 mm 2.800 lbr 110,000.00 308,000.00
Dolken Ø 8 / 4 m 16.000 btg 28,000.00 448,000.00
Tenaga
Pekerja 5.960 oh 100,000.00 596,000
Tukang Batu 0.350 oh 150,000.00 52,500
Tukang Kayu 2.800 oh 150,000.00 420,000
Tukang Besi 1.400 oh 150,000.00 210,000
Kepala Tukang 0.455 oh 175,000.00 79,625
Mandor 0.208 oh 160,000.00 33,280
ANALISA 167 1 m³ Membuat Dinding Beton Bertulang ( 150 kg + bekisting ) 4,904,720.00 1,266,880.00 6,171,600.00
Bahan
Kayu Terentang 0.240 m³ 2,288,000.00 549,120.00
Paku Biasa 2" - 5" 3.200 kg 20,000.00 64,000.00
Minyak Bekisting 1.600 lt 6,000.00 9,600.00
Besi Beton Polos 150.000 kg 11,000.00 1,650,000.00
Kawat Beton 2.250 kg 20,000.00 45,000.00
Semen Portland 323.000 kg 2,000.00 646,000.00
Pasir Beton 0.520 m³ 210,000.00 109,200.00
Koral Beton 0.780 m³ 210,000.00 163,800.00
Kayu Balok Borneo 0.160 m³ 4,300,000.00 688,000.00
Plywood 9 mm 2.800 lbr 110,000.00 308,000.00
Dolken Ø 8 / 4 m 24.000 btg 28,000.00 672,000.00
Tenaga
Pekerja 5.600 oh 100,000.00 560,000
Tukang Batu 0.350 oh 150,000.00 52,500
Tukang Kayu 2.640 oh 150,000.00 396,000
Tukang Besi 1.050 oh 150,000.00 157,500
Kepala Tukang 0.400 oh 175,000.00 70,000
Mandor 0.193 oh 160,000.00 30,880
ANALISA 168 1 m³ Membuat Tangga Beton Bertulang ( 212 kg + bekisting ) 5,078,215.00 1,270,695.00 6,348,910.00
Bahan
Kayu Terentang 0.250 m³ 2,288,000.00 572,000.00
Paku Biasa 2" - 5" 3.000 kg 20,000.00 60,000.00
Minyak Bekisting 1.200 lt 6,000.00 7,200.00
Besi Beton Polos 212.865 kg 11,000.00 2,341,515.00
Kawat Beton 3.000 kg 20,000.00 60,000.00
Semen Portland 323.000 kg 2,000.00 646,000.00
Pasir Beton 0.520 m³ 210,000.00 109,200.00
Koral Beton 0.780 m³ 210,000.00 163,800.00
Kayu Balok Borneo 0.105 m³ 4,300,000.00 451,500.00
Plywood 9 mm 2.500 lbr 110,000.00 275,000.00
Dolken Ø 8 / 4 m 14.000 btg 28,000.00 392,000.00
Tenaga
Pekerja 5.600 oh 100,000.00 560,000
Tukang Batu 0.350 oh 150,000.00 52,500
Tukang Kayu 2.300 oh 150,000.00 345,000
Tukang Besi 1.400 oh 150,000.00 210,000
Kepala Tukang 0.405 oh 175,000.00 70,875
Mandor 0.202 oh 160,000.00 32,320
ANALISA 169 1 m³ Membuat Kolom Penguat Beton Bertulang (11 x 11) cm 57,926.00 16,530.00 74,456.00
Bahan
Kayu Terentang 0.002 m³ 2,288,000.00 4,576.00
Paku Biasa 2" - 5" 0.010 kg 20,000.00 200.00
Besi Beton Polos 3.000 kg 11,000.00 33,000.00
Kawat Beton 0.450 kg 20,000.00 9,000.00
Semen Portland 4.000 kg 2,000.00 8,000.00
Pasir Beton 0.006 m³ 210,000.00 1,260.00
Koral Beton 0.009 m³ 210,000.00 1,890.00
Tenaga
Pekerja 0.060 oh 100,000.00 6,000
Tukang Batu 0.020 oh 150,000.00 3,000
Tukang Kayu 0.020 oh 150,000.00 3,000
Tukang Besi 0.020 oh 150,000.00 3,000
Kepala Tukang 0.006 oh 175,000.00 1,050
Mandor 0.003 oh 160,000.00 480
ANALISA 170 1 m³ Membuat Ring Balok Beton Bertulang (10 x 15) cm 67,504.00 71,950.00 139,454.00
Bahan
Kayu Albasiah 0.003 m³ 2,288,000.00 6,864.00
Paku Biasa 2" - 5" 0.200 kg 20,000.00 4,000.00
Besi Beton Polos 3.600 kg 11,000.00 39,600.00
Kawat Beton 0.050 kg 20,000.00 1,000.00
Semen Portland 5.500 kg 2,000.00 11,000.00
Pasir Beton 0.009 m³ 210,000.00 1,890.00
Koral Beton 0.015 m³ 210,000.00 3,150.00
Tenaga
Pekerja 0.100 oh 100,000.00 10,000
Tukang Batu 0.330 oh 150,000.00 49,500
Tukang Kayu 0.033 oh 150,000.00 4,950
Tukang Besi 0.033 oh 150,000.00 4,950
Kepala Tukang 0.010 oh 175,000.00 1,750
Mandor 0.005 oh 160,000.00 800
ANALISA 172 1m² Pasang Atap Genteng Kodok / Glazzur 0.00 28,930.00 28,930.00
Bahan
Genteng Kodok 25.000 bh 0.00 0.00
Tenaga
Pekerja 0.150 oh 100,000.00 15,000
Tukang Kayu 0.075 oh 150,000.00 11,250
Kepala Tukang 0.008 oh 175,000.00 1,400
Mandor 0.008 oh 160,000.00 1,280
ANALISA 173 1m² Pasang Atap Genteng Palentong Super / Besar 0.00 26,330.00 26,330.00
Bahan
Genteng Palentong Super 12.000 bh 0.00 0.00
Tenaga
Pekerja 0.150 oh 100,000.00 15,000
Tukang Kayu 0.060 oh 150,000.00 9,000
Kepala Tukang 0.006 oh 175,000.00 1,050
Mandor 0.008 oh 160,000.00 1,280
ANALISA 174 1m' Pasang Genteng Bubung Palentong 24,000.00 73,820.00 97,820.00
Bahan
Genteng Bubung Palentong 5.000 bh 0.00 0.00
Semen Portland 8.000 kg 2,000.00 16,000.00
Pasir Pasang 0.032 m³ 250,000.00 8,000.00
Tenaga
Pekerja 0.400 oh 100,000.00 40,000
Tukang Kayu 0.200 oh 150,000.00 30,000
Kepala Tukang 0.020 oh 175,000.00 3,500
Mandor 0.002 oh 160,000.00 320
ANALISA 175 1m' Pasang Genteng Bubung Kodok Glazzur 24,000.00 73,820.00 97,820.00
Bahan
Genteng Bubung Kodok 5.000 bh 0.00 0.00
Semen Portland 8.000 kg 2,000.00 16,000.00
Pasir Pasang 0.032 m³ 250,000.00 8,000.00
Tenaga
Pekerja 0.400 oh 100,000.00 40,000
Tukang Kayu 0.200 oh 150,000.00 30,000
Kepala Tukang 0.020 oh 175,000.00 3,500
Mandor 0.002 oh 160,000.00 320
ANALISA 176 1m' Pasang Genteng Bubung Palentong Besar 24,000.00 73,820.00 97,820.00
Bahan
Genteng Bubung Palentong 4.000 bh 0.00 0.00
Semen Portland 8.000 kg 2,000.00 16,000.00
Pasir Pasang 0.032 m³ 250,000.00 8,000.00
Tenaga
Pekerja 0.400 oh 100,000.00 40,000
Tukang Kayu 0.200 oh 150,000.00 30,000
Kepala Tukang 0.020 oh 175,000.00 3,500
Mandor 0.002 oh 160,000.00 320
ANALISA 177 1m' Pasang Rooflight Fiberglass ( 180 x 90 ) cm 900.00 26,395.00 27,295.00
Bahan
Roof Light Fiberglass 0.600 lbr 0.00 0.00
Paku 0.050 kg 18,000.00 900.00
Tenaga
Pekerja 0.140 oh 100,000.00 14,000
Tukang Kayu 0.067 oh 150,000.00 10,050
Kepala Tukang 0.007 oh 175,000.00 1,225
Mandor 0.007 oh 160,000.00 1,120
ANALISA 178 1m' Pasang Atap Asbes Gelombang ( 2.50 x 0.92 m ) X 5mm 0.00 27,930.00 27,930.00
Bahan
Asbes Gelombang 0.500 lbr 0.00 0.00
Paku Pancing 60 x 230 0.120 kg 0.00 0.00
Tenaga
Pekerja 0.140 oh 100,000.00 14,000
Tukang Kayu 0.075 oh 150,000.00 11,250
Kepala Tukang 0.008 oh 175,000.00 1,400
Mandor 0.008 oh 160,000.00 1,280
ANALISA 179 1m' Pasang Atap Asbes Gelombang ( 2.25 x 0.92 m ) X 5mm 0.00 27,930.00 27,930.00
Bahan
Asbes Gelombang 0.600 lbr 0.00 0.00
Paku Pancing 60 x 230 0.120 kg 0.00 0.00
Tenaga
Pekerja 0.140 oh 100,000.00 14,000
Tukang Kayu 0.075 oh 150,000.00 11,250
Kepala Tukang 0.008 oh 175,000.00 1,400
Mandor 0.008 oh 160,000.00 1,280
ANALISA 180 1m' Pasang Atap Asbes Gelombang ( 2.00 x 0.92 m ) X 5mm 0.00 26,845.00 26,845.00
Bahan
Asbes Gelombang 0.600 lbr 0.00 0.00
Paku Pancing 60 x 230 0.120 kg 0.00 0.00
Tenaga
Pekerja 0.140 oh 100,000.00 14,000
Tukang Kayu 0.070 oh 150,000.00 10,500
Kepala Tukang 0.007 oh 175,000.00 1,225
Mandor 0.007 oh 160,000.00 1,120
ANALISA 181 1m' Pasang Atap Asbes Gelombang ( 1.80 x 0.92 m ) X 5mm 0.00 26,845.00 26,845.00
Bahan
Asbes Gelombang 0.750 lbr 0.00 0.00
Paku Pancing 60 x 230 0.120 kg 0.00 0.00
Tenaga
Pekerja 0.140 oh 100,000.00 14,000
Tukang Kayu 0.070 oh 150,000.00 10,500
Kepala Tukang 0.007 oh 175,000.00 1,225
Mandor 0.007 oh 160,000.00 1,120
ANALISA 182 1m² Pasang Atap Asbes Gelombang ( 300 x 1.05 m ) X 4mm 0.00 26,845.00 26,845.00
Bahan
Asbes Gelombang 0.350 lbr 0.00 0.00
Paku Pancing 60 x 230 0.120 kg 0.00 0.00
Tenaga
Pekerja 0.140 oh 100,000.00 14,000
Tukang Kayu 0.070 oh 150,000.00 10,500
Kepala Tukang 0.007 oh 175,000.00 1,225
Mandor 0.007 oh 160,000.00 1,120
ANALISA 183 1m² Pasang Atap Asbes Gelombang ( 270 x 1.05 m ) X 4mm 0.00 26,845.00 26,845.00
Bahan
Asbes Gelombang 0.420 lbr 0.00 0.00
Paku Pancing 60 x 230 0.120 kg 0.00 0.00
Tenaga
Pekerja 0.140 oh 100,000.00 14,000
Tukang Kayu 0.070 oh 150,000.00 10,500
Kepala Tukang 0.007 oh 175,000.00 1,225
Mandor 0.007 oh 160,000.00 1,120
ANALISA 184 1m² Pasang Atap Asbes Gelombang ( 240 x 1.05 m ) X 4mm 0.00 26,395.00 26,395.00
Bahan
Asbes Gelombang 0.440 lbr 0.00 0.00
Paku Pancing 60 x 230 0.120 kg 0.00 0.00
Tenaga
Pekerja 0.140 oh 100,000.00 14,000
Tukang Kayu 0.067 oh 150,000.00 10,050
Kepala Tukang 0.007 oh 175,000.00 1,225
Mandor 0.007 oh 160,000.00 1,120
ANALISA 185 1m² Pasang Atap Asbes Gelombang ( 210 x 1.05 m ) X 4mm 0.00 26,395.00 26,395.00
Bahan
Asbes Gelombang 0.510 lbr 0.00 0.00
Paku Pancing 60 x 230 0.120 kg 0.00 0.00
Tenaga
Pekerja 0.140 oh 100,000.00 14,000
Tukang Kayu 0.067 oh 150,000.00 10,050
Kepala Tukang 0.007 oh 175,000.00 1,225
Mandor 0.007 oh 160,000.00 1,120
ANALISA 186 1m² Pasang Atap Asbes Gelombang ( 1.5 x 1.05 m ) X 4mm 0.00 26,395.00 26,395.00
Bahan
Asbes Gelombang 0.800 lbr 0.00 0.00
Paku Pancing 60 x 230 0.120 kg 0.00 0.00
Tenaga
Pekerja 0.140 oh 100,000.00 14,000
Tukang Kayu 0.067 oh 150,000.00 10,050
Kepala Tukang 0.007 oh 175,000.00 1,225
Mandor 0.007 oh 160,000.00 1,120
ANALISA 187 1m² Pasang Atap Asbes Gelombang ( 3.00 x 1.08 m ) X 6mm 0.00 26,395.00 26,395.00
Bahan
Asbes Gelombang 0.370 lbr 0.00 0.00
Paku Pancing 60 x 230 0.120 kg 0.00 0.00
Tenaga
Pekerja 0.140 oh 100,000.00 14,000
Tukang Kayu 0.067 oh 150,000.00 10,050
Kepala Tukang 0.007 oh 175,000.00 1,225
Mandor 0.007 oh 160,000.00 1,120
ANALISA 188 1m² Pasang Atap Asbes Gelombang ( 2.7 x 1.08 m ) X 6mm 0.00 26,395.00 26,395.00
Bahan
Asbes Gelombang 0.380 lbr 0.00 0.00
Paku Pancing 60 x 230 0.120 kg 0.00 0.00
Tenaga
Pekerja 0.140 oh 100,000.00 14,000
Tukang Kayu 0.067 oh 150,000.00 10,050
Kepala Tukang 0.007 oh 175,000.00 1,225
Mandor 0.007 oh 160,000.00 1,120
ANALISA 189 1m² Pasang Atap Asbes Gelombang ( 2.4 x 1.08 m ) X 6mm 0.00 26,395.00 26,395.00
Bahan
Asbes Gelombang 0.460 lbr 0.00 0.00
Paku Pancing 60 x 230 0.120 kg 0.00 0.00
Tenaga
Pekerja 0.140 oh 100,000.00 14,000
Tukang Kayu 0.067 oh 150,000.00 10,050
Kepala Tukang 0.007 oh 175,000.00 1,225
Mandor 0.007 oh 160,000.00 1,120
ANALISA 190 1m² Pasang Atap Asbes Gelombang ( 2.1 x 1.08 m ) X 6mm 0.00 26,395.00 26,395.00
Bahan
Asbes Gelombang 0.490 lbr 0.00 0.00
Paku Pancing 60 x 230 0.120 kg 0.00 0.00
Tenaga
Pekerja 0.140 oh 100,000.00 14,000
Tukang Kayu 0.067 oh 150,000.00 10,050
Kepala Tukang 0.007 oh 175,000.00 1,225
Mandor 0.007 oh 160,000.00 1,120
ANALISA 191 1m² Pasang Atap Asbes Gelombang ( 1.80 x 1.08 m ) X 6mm 0.00 26,395.00 26,395.00
Bahan
Asbes Gelombang 0.570 lbr 0.00 0.00
Paku Pancing 60 x 230 0.120 kg 0.00 0.00
Tenaga
Pekerja 0.140 oh 100,000.00 14,000
Tukang Kayu 0.067 oh 150,000.00 10,050
Kepala Tukang 0.007 oh 175,000.00 1,225
Mandor 0.007 oh 160,000.00 1,120
ANALISA 192 1m' Pasang Bubung Stel Gelombang 0.92m 0.00 30,065.00 30,065.00
Bahan
Asbes Gelombang 2.400 lbr 0.00 0.00
Paku Pancing 60 x 230 6.000 kg 0.00 0.00
Tenaga
Pekerja 0.084 oh 100,000.00 8,400
Tukang Kayu 0.125 oh 150,000.00 18,750
Kepala Tukang 0.013 oh 175,000.00 2,275
Mandor 0.004 oh 160,000.00 640
ANALISA 193 1m' Pasang Nok Stel Gelombang 0.92m 0.00 30,065.00 30,065.00
Bahan
Asbes Gelombang 2.400 lbr 0.00 0.00
Paku Skrup 3.5" 6.000 bh 0.00 0.00
Tenaga
Pekerja 0.084 oh 100,000.00 8,400
Tukang Kayu 0.125 oh 150,000.00 18,750
Kepala Tukang 0.013 oh 175,000.00 2,275
Mandor 0.004 oh 160,000.00 640
ANALISA 194 1m' Pasang Nok Stel Gelombang 1.05m 0.00 30,065.00 30,065.00
Bahan
Asbes Gelombang 2.100 lbr 0.00 0.00
Paku Skrup 3.5" 6.000 bh 0.00 0.00
Tenaga
Pekerja 0.084 oh 100,000.00 8,400
Tukang Kayu 0.125 oh 150,000.00 18,750
Kepala Tukang 0.013 oh 175,000.00 2,275
Mandor 0.004 oh 160,000.00 640
ANALISA 195 1m' Pasang Nok Stel Gelombang 1.08m 0.00 30,065.00 30,065.00
Bahan
Asbes Gelombang 2.050 lbr 0.00 0.00
Paku Skrup 3.5" 6.000 bh 0.00 0.00
Tenaga
Pekerja 0.084 oh 100,000.00 8,400
Tukang Kayu 0.125 oh 150,000.00 18,750
Kepala Tukang 0.013 oh 175,000.00 2,275
Mandor 0.004 oh 160,000.00 640
ANALISA 196 1m' Pasang Nok Paten 0.92m 0.00 30,065.00 30,065.00
Bahan
Nok Paten 1.200 lbr 0.00 0.00
Paku Skrup 3.5" 6.000 bh 0.00 0.00
Tenaga
Pekerja 0.084 oh 100,000.00 8,400
Tukang Kayu 0.125 oh 150,000.00 18,750
Kepala Tukang 0.013 oh 175,000.00 2,275
Mandor 0.004 oh 160,000.00 640
ANALISA 197 1m' Pasang Nok Paten 1.05m 0.00 30,065.00 30,065.00
Bahan
Nok Paten 1.200 lbr 0.00 0.00
Paku Skrup 3.5" 6.000 bh 0.00 0.00
Tenaga
Pekerja 0.084 oh 100,000.00 8,400
Tukang Kayu 0.125 oh 150,000.00 18,750
Kepala Tukang 0.013 oh 175,000.00 2,275
Mandor 0.004 oh 160,000.00 640
ANALISA 198 1m' Pasang Nok Paten 1.08m 0.00 30,065.00 30,065.00
Bahan
Nok Paten 1.200 lbr 0.00 0.00
Paku Skrup 3.5" 6.000 bh 0.00 0.00
Tenaga
Pekerja 0.084 oh 100,000.00 8,400
Tukang Kayu 0.125 oh 150,000.00 18,750
Kepala Tukang 0.013 oh 175,000.00 2,275
Mandor 0.004 oh 160,000.00 640
ANALISA 199 1m' Pasang Nok Stel rata 0.92m 0.00 35,415.00 35,415.00
Bahan
Nok Stel rata 1.100 lbr 0.00 0.00
Paku Skrup 3.5" 6.000 bh 0.00 0.00
Tenaga
Pekerja 0.100 oh 100,000.00 10,000
Tukang Kayu 0.150 oh 150,000.00 22,500
Kepala Tukang 0.013 oh 175,000.00 2,275
Mandor 0.004 oh 160,000.00 640
ANALISA 200 1m' Pasang Nok Stel rata 1.05m 0.00 30,065.00 30,065.00
Bahan
Nok Stel rata 1.100 lbr 0.00 0.00
Paku Skrup 3.5" 6.000 bh 0.00 0.00
Tenaga
Pekerja 0.084 oh 100,000.00 8,400
Tukang Kayu 0.125 oh 150,000.00 18,750
Kepala Tukang 0.013 oh 175,000.00 2,275
Mandor 0.004 oh 160,000.00 640
ANALISA 201 1m² Pasang Atap Genteng Beton 39,100.00 38,350.00 77,450.00
Bahan
Genteng Beton 11.000 lbr 3,500.00 38,500.00
Paku Biasa 2" - 5" 0.030 bh 20,000.00 600.00
Tenaga
Pekerja 0.200 oh 100,000.00 20,000
Tukang Kayu 0.100 oh 150,000.00 15,000
Kepala Tukang 0.010 oh 175,000.00 1,750
Mandor 0.010 oh 160,000.00 1,600
ANALISA 202 1m² Pasang Atap Genteng Aspal 21,000.00 67,125.00 88,125.00
Bahan
Genteng Aspal 6.900 lbr 0.00 0.00
Plywood 4 mm 0.350 lbr 60,000.00 21,000.00
Paku Biasa 1/2" - 1" 0.030 kg 0.00 0.00
Plastic Aerator 0.500 bh 0.00 0.00
Tenaga
Pekerja 0.200 oh 100,000.00 20,000
Tukang Kayu 0.300 oh 150,000.00 45,000
Kepala Tukang 0.003 oh 175,000.00 525
Mandor 0.010 oh 160,000.00 1,600
ANALISA 203 1m² Pasang Atap Genteng Metal 4,000.00 36,910.00 40,910.00
Bahan
Genteng Metal 1.020 lbr 0.00 0.00
Paku Biasa 2" - 5" 0.200 kg 20,000.00 4,000.00
Tenaga
Pekerja 0.200 oh 100,000.00 20,000
Tukang Kayu 0.100 oh 150,000.00 15,000
Kepala Tukang 0.010 oh 175,000.00 1,750
Mandor 0.001 oh 160,000.00 160
ANALISA 205 1m' Pasang Nok Genteng Beton 56,650.00 76,700.00 133,350.00
Bahan
Genteng Beton 3.500 lbr 3,500.00 12,250.00
Paku Biasa 2" - 5" 0.050 kg 20,000.00 1,000.00
Semen abu -abu 10.800 kg 3,000.00 32,400.00
Pasir Pasang 0.032 m³ 250,000.00 8,000.00
Semen Warna 1.000 kg 3,000.00 3,000.00
Tenaga
Pekerja 0.400 oh 100,000.00 40,000
Tukang Kayu 0.200 oh 150,000.00 30,000
Kepala Tukang 0.020 oh 175,000.00 3,500
Mandor 0.020 oh 160,000.00 3,200
ANALISA 206 1m' Pasang Nok Genteng Aspal 15,050.00 55,335.00 70,385.00
Bahan
Genteng Aspal 2.000 lbr 0.00 0.00
Paku Biasa ½" - 1" 0.050 kg 0.00 0.00
Balok Kayu Borneo 0.0035 kg 4,300,000.00 15,050.00
Tenaga
Pekerja 0.125 oh 100,000.00 12,500
Tukang Kayu 0.250 oh 150,000.00 37,500
Kepala Tukang 0.025 oh 175,000.00 4,375
Mandor 0.006 oh 160,000.00 960
ANALISA 207 1m' Pasang Nok Genteng Metal 0.00 52,205.00 52,205.00
Bahan
Genteng Decra Bond 1.100 lbr 0.00 0.00
Paku Biasa ½" - 1" 0.050 kg 0.00 0.00
Tenaga
Pekerja 0.250 oh 100,000.00 25,000
Tukang Kayu 0.150 oh 150,000.00 22,500
Kepala Tukang 0.015 oh 175,000.00 2,625
Mandor 0.013 oh 160,000.00 2,080
ANALISA 208 1m' Pasang Nok Genteng Metal 0.00 52,205.00 52,205.00
Bahan
Genteng Decra Bond 1.100 lbr 0.00 0.00
Paku Biasa ½" - 1" 0.050 kg 0.00 0.00
Tenaga
Pekerja 0.250 oh 100,000.00 25,000
Tukang Kayu 0.150 oh 150,000.00 22,500
Kepala Tukang 0.015 oh 175,000.00 2,625
Mandor 0.013 oh 160,000.00 2,080
ANALISA 210 1m² Pasang Atap Seng Gelombang 0.00 23,010.00 23,010.00
Bahan
Seng Gelombang 3" x 6" BJLS 28 0.700 Lbr 0.00 0.00
Paku Biasa ½" - 1" 0.020 kg 0.00 0.00
Tenaga
Pekerja 0.120 oh 100,000.00 12,000
Tukang Kayu 0.060 oh 150,000.00 9,000
Kepala Tukang 0.006 oh 175,000.00 1,050
Mandor 0.006 oh 160,000.00 960
ANALISA 211 1m² Pasang Atap Nok Seng 0.00 14,360.00 14,360.00
Bahan
Seng Plat 3" x 6" BJLS 28 0.300 Lbr 0.00 0.00
Paku Biasa ½" - 1" 0.040 kg 0.00 0.00
Tenaga
Pekerja 0.015 oh 100,000.00 1,500
Tukang Kayu 0.070 oh 150,000.00 10,500
Kepala Tukang 0.008 oh 175,000.00 1,400
Mandor 0.006 oh 160,000.00 960
ANALISA 214 1m² Pasang Alluminium Foil / Sisalation 0.00 24,655.00 24,655.00
Bahan
Sisalation / Alluminium Foil 1.050 m² 0.00 0.00
Tenaga
Pekerja 0.150 oh 100,000.00 15,000
Tukang Kayu 0.050 oh 150,000.00 7,500
Kepala Tukang 0.005 oh 175,000.00 875
Mandor 0.008 oh 160,000.00 1,280
ANALISA 216 1 m² Langit - langit Asbes ( 1.00 x 1.00 )m tebal 5 mm 180.00 14,965.00 15,145.00
Bahan
Pelat Asbes tebal 5 mm 1.100 lbr 0.00 0.00
Paku 0.010 kg 18,000.00 180.00
Tenaga
Pekerja 0.030 oh 100,000.00 3,000
Tukang Kayu 0.070 oh 150,000.00 10,500
Kepala Tukang 0.007 oh 175,000.00 1,225
Mandor 0.0015 oh 160,000.00 240
ANALISA 217 1 m² Langit - langit Asbes ( 1.00 x 1.00 )m tebal 4 mm 180.00 14,965.00 15,145.00
Bahan
Pelat Asbes tebal 4 mm 1.100 lbr 0.00 0.00
Paku 0.010 kg 18,000.00 180.00
Tenaga
Pekerja 0.030 oh 100,000.00 3,000
Tukang Kayu 0.070 oh 150,000.00 10,500
Kepala Tukang 0.007 oh 175,000.00 1,225
Mandor 0.0015 oh 160,000.00 240
ANALISA 218 1 m² Langit - langit Asbes ( 1.00 x 1.00 )m tebal 3.5 mm 180.00 14,965.00 15,145.00
Bahan
Pelat Asbes tebal 4 mm 1.100 lbr 0.00 0.00
Paku 0.010 kg 18,000.00 180.00
Tenaga
Pekerja 0.030 oh 100,000.00 3,000
Tukang Kayu 0.070 oh 150,000.00 10,500
Kepala Tukang 0.007 oh 175,000.00 1,225
Mandor 0.0015 oh 160,000.00 240
ANALISA 221 1 m² Langit - langit Akustik ( 60 x 120 )cm 900.00 23,230.00 24,130.00
Bahan
Akustik Arm Strong Ukuran 30 x 120 cm 1.500 lbr 0.00 0.00
Paku 0.050 kg 18,000.00 900.00
Tenaga
Pekerja 0.060 oh 100,000.00 6,000
Tukang Kayu 0.100 oh 150,000.00 15,000
Kepala Tukang 0.010 oh 175,000.00 1,750
Mandor 0.0030 oh 160,000.00 480
ANALISA 222 1 m² Langit - langit Plywood ( 30 x 60 )cm, tebal 4 mm 22,140.00 24,310.00 46,450.00
Bahan
Plywood 4 mm 0.360 lbr 60,000.00 21,600.00
Paku 0.030 kg 18,000.00 540.00
Tenaga
Pekerja 0.070 oh 100,000.00 7,000
Tukang Kayu 0.100 oh 150,000.00 15,000
Kepala Tukang 0.010 oh 175,000.00 1,750
Mandor 0.0035 oh 160,000.00 560
ANALISA 223 1 m² Langit - langit Plywood ( 30 x 60 )cm, tebal 6 mm 22,140.00 24,310.00 46,450.00
Bahan
Plywood 4 mm 0.360 lbr 60,000.00 21,600.00
Paku 0.030 kg 18,000.00 540.00
Tenaga
Pekerja 0.070 oh 100,000.00 7,000
Tukang Kayu 0.100 oh 150,000.00 15,000
Kepala Tukang 0.010 oh 175,000.00 1,750
Mandor 0.0035 oh 160,000.00 560
ANALISA 224 1 m² Langit - langit Plywood ( 60 x 120 )cm, tebal 4 mm 22,140.00 24,310.00 46,450.00
Bahan
Plywood 4 mm 0.360 lbr 60,000.00 21,600.00
Paku 0.030 kg 18,000.00 540.00
Tenaga
Pekerja 0.070 oh 100,000.00 7,000
Tukang Kayu 0.100 oh 150,000.00 15,000
Kepala Tukang 0.010 oh 175,000.00 1,750
Mandor 0.0035 oh 160,000.00 560
ANALISA 225 1 m² Langit - langit Plywood ( 60 x 120 )cm, tebal 6 mm 22,140.00 24,310.00 46,450.00
Bahan
Plywood 4 mm 0.360 lbr 60,000.00 21,600.00
Paku 0.030 kg 18,000.00 540.00
Tenaga
Pekerja 0.070 oh 100,000.00 7,000
Tukang Kayu 0.100 oh 150,000.00 15,000
Kepala Tukang 0.010 oh 175,000.00 1,750
Mandor 0.0035 oh 160,000.00 560
ANALISA 226 1 m² Langit - langit Teakwood ( 30 x 60 )cm, tebal 4 mm 540.00 24,310.00 24,850.00
Bahan
Teakwood 4' x 8' x 4mm 0.360 lbr 0.00 0.00
Paku 0.030 kg 18,000.00 540.00
Tenaga
Pekerja 0.070 oh 100,000.00 7,000
Tukang Kayu 0.100 oh 150,000.00 15,000
Kepala Tukang 0.010 oh 175,000.00 1,750
Mandor 0.0035 oh 160,000.00 560
ANALISA 227 1 m² Langit - langit Teakwood ( 60 x 120 )cm, tebal 4 mm 540.00 24,310.00 24,850.00
Bahan
Teakwood 4' x 8' x 4mm 0.360 lbr 0.00 0.00
Paku 0.030 kg 18,000.00 540.00
Tenaga
Pekerja 0.070 oh 100,000.00 7,000
Tukang Kayu 0.100 oh 150,000.00 15,000
Kepala Tukang 0.010 oh 175,000.00 1,750
Mandor 0.0035 oh 160,000.00 560
ANALISA 233 1 m² Langit - langit Akustik 60 x 120 cm + rangka Alluminium 0.00 99,950.00 99,950.00
Bahan
Profil Alluminium " T " 3.600 m' 0.00 0.00
Kawat seng polos 0.150 kg 0.00 0.00
Ramset / Dinabolt 1.000 bh 0.00 0.00
Akustik Armstrom 60 x 120cm 1.500 lbr 0.00 0.00
Tenaga
Pekerja 0.150 oh 100,000.00 15,000
Tukang Kayu 0.500 oh 150,000.00 75,000
Kepala Tukang 0.050 oh 175,000.00 8,750
Mandor 0.0075 oh 160,000.00 1,200
ANALISA 234 1 m² List Langit - langit Kayu Profil 180.00 13,855.00 14,035.00
Bahan
List Kayu Profil 1.100 m' 0.00 0.00
Paku 0.010 kg 18,000.00 180.00
Tenaga
Pekerja 0.050 oh 100,000.00 5,000
Tukang Kayu 0.050 oh 150,000.00 7,500
Kepala Tukang 0.005 oh 175,000.00 875
Mandor 0.0030 oh 160,000.00 480
ANALISA 235 1 m² Langit - langit Plywood 4 mm + RangkaKayu Borneo 123,380.00 96,160.00 219,540.00
Bahan
Balok Kayu Borneo 0.023 m³ 4,300,000.00 98,900.00
Paku 0.060 kg 18,000.00 1,080.00
Plywood 4 mm 0.390 lbr 60,000.00 23,400.00
Tenaga
Pekerja 0.270 oh 100,000.00 27,000
Tukang Kayu 0.400 oh 150,000.00 60,000
Kepala Tukang 0.040 oh 175,000.00 7,000
Mandor 0.0135 oh 160,000.00 2,160
ANALISA 236 1 m² Langit - langit Asbes ( 1.00 x 1.00 )m, tebal 3.2mm Rangka Borneo 52,680.00 73,040.00 125,720.00
Bahan
Balok Kayu Borneo 0.012 m³ 4,300,000.00 51,600.00
Paku 0.060 kg 18,000.00 1,080.00
Asbes 1.100 lbr 0.00 0.00
Tenaga
Pekerja 0.180 oh 100,000.00 18,000
Tukang Kayu 0.320 oh 150,000.00 48,000
Kepala Tukang 0.032 oh 175,000.00 5,600
Mandor 0.0090 oh 160,000.00 1,440
ANALISA 237 1 m² Langit - langit Akustik ( 30 x 60 )cm + Rangka Kayu Borneo 99,980.00 95,080.00 195,060.00
Bahan
Balok Kayu Borneo 0.023 m³ 4,300,000.00 98,900.00
Paku 0.060 kg 18,000.00 1,080.00
Akustik 30 x 60 cm 5.800 lbr 0.00 0.00
Tenaga
Pekerja 0.260 oh 100,000.00 26,000
Tukang Kayu 0.400 oh 150,000.00 60,000
Kepala Tukang 0.040 oh 175,000.00 7,000
Mandor 0.0130 oh 160,000.00 2,080
ANALISA 238 1 m² Langit - langit Akustik ( 30 x 30 )cm + Rangka Kayu Borneo 117,180.00 112,205.00 229,385.00
Bahan
Balok Kayu Borneo 0.027 m³ 4,300,000.00 116,100.00
Paku 0.060 kg 18,000.00 1,080.00
Akustik 30 x 30 cm 11.500 lbr 0.00 0.00
Tenaga
Pekerja 0.310 oh 100,000.00 31,000
Tukang Kayu 0.470 oh 150,000.00 70,500
Kepala Tukang 0.047 oh 175,000.00 8,225
Mandor 0.0155 oh 160,000.00 2,480
X PEKERJAAN SANITASI
ANALISA 239 Memasang 1 buah Kloset Duduk / Monoblok 2,600,000.00 520,775.00 3,120,775.00
Bahan
Kloset Duduk / Monoblok 1.000 bh 2,000,000.00 2,000,000.00
Perlengkapan 30% Dari bahan 600,000.00 600,000.00
Tenaga
Pekerja 3.300 oh 100,000.00 330,000
Tukang Batu 1.100 oh 150,000.00 165,000
Kepala Tukang 0.001 oh 175,000.00 175
Mandor 0.1600 oh 160,000.00 25,600
ANALISA 240 Memasang 1 buah Kloset Jongkok Porselen 14,500.00 613,100.00 627,600.00
Bahan
Kloset Jongkok Porselen 1.000 bh 0.00 0.00
Semen Portland 6.000 kg 2,000.00 12,000.00
Pasir Pasang 0.010 m³ 250,000.00 2,500.00
Tenaga
Pekerja 1.000 oh 100,000.00 100,000
Tukang Batu 1.500 oh 150,000.00 225,000
Kepala Tukang 1.500 oh 175,000.00 262,500
Mandor 0.1600 oh 160,000.00 25,600
ANALISA 241 Memasang 1 buah Kloset Jongkok Teraso 21,500.00 395,100.00 416,600.00
Bahan
Kloset Jongkok Teraso 1.000 bh 0.00 0.00
Bata merah kelas I 7.000 bh 1,000.00 7,000.00
Semen Portland 6.000 kg 2,000.00 12,000.00
Pasir Pasang 0.010 m³ 250,000.00 2,500.00
Tenaga
Pekerja 1.000 oh 100,000.00 100,000
Tukang Batu 1.500 oh 150,000.00 225,000
Kepala Tukang 0.300 oh 175,000.00 52,500
Mandor 0.1100 oh 160,000.00 17,600
ANALISA 244 Memasang 1 buah Bak Mandi Teraso, volume 0.30 m³ 14,500.00 352,350.00 366,850.00
Bahan
Bak Teraso 1.000 bh 0.00 0.00
Semen Portland 6.000 kg 2,000.00 12,000.00
Pasir Pasang 0.010 m³ 250,000.00 2,500.00
Tenaga
Pekerja 2.100 oh 100,000.00 210,000
Tukang Batu 0.750 oh 150,000.00 112,500
Kepala Tukang 0.070 oh 175,000.00 12,250
Mandor 0.1100 oh 160,000.00 17,600
ANALISA 245 Memasang 1 buah Bak Mandi Fiberglass, volume 0.30 m³ 1,180,000.00 697,100.00 1,877,100.00
Bahan
Bak Fiberglass 1.000 bh 1,000,000.00 1,000,000.00
Perlengkapan 18% Harga Bak 180,000.00 180,000.00
Tenaga
Pekerja 1.800 oh 100,000.00 180,000
Tukang Batu 2.700 oh 150,000.00 405,000
Kepala Tukang 0.540 oh 175,000.00 94,500
Mandor 0.1100 oh 160,000.00 17,600
ANALISA 246 Memasang 1 buah Bak Mandi Batu bata, volume 0.30 m³ 315,400.00 1,150,500.00 1,465,900.00
Bahan
Bata merah kelas I 0.400 m³ 1,000.00 400.00
Semen Portland 120.000 kg 2,000.00 240,000.00
Pasir Pasang 0.300 m³ 250,000.00 75,000.00
Porselen ( 11 x 11 ) cm 360.000 bh 0.00 0.00
Semen Nat 6.000 kg 0.00 0.00
Tenaga
Pekerja 6.000 oh 100,000.00 600,000
Tukang Batu 3.000 oh 150,000.00 450,000
Kepala Tukang 0.300 oh 175,000.00 52,500
Mandor 0.3000 oh 160,000.00 48,000
ANALISA 248 Memasang 1 buah Bak Fiberglass volume 1 m³ air 1,120,000.00 1,276,500.00 2,396,500.00
Bahan
Bak Fiberglass 1.000 bh 1,000,000.00 1,000,000.00
Perlengkapan 12% Harga Bak 120,000.00
Tenaga
Pekerja 3.000 oh 100,000.00 300,000
Tukang Batu 4.500 oh 150,000.00 675,000
Kepala Tukang 0.900 oh 175,000.00 157,500
Mandor 0.9000 oh 160,000.00 144,000
ANALISA 249 Memasang 1 m' Pipa Penyalur Air limbah jenis Pipa Tanah Ø15 cm 6,810.00 11,425.00 18,235.00
Bahan
Pipa Tanah 1.600 bh 0.00 0.00
Semen Portland 0.680 kg 2,000.00 1,360.00
Pasir Pasang 0.013 m³ 250,000.00 3,250.00
Pasir Urug 0.011 m³ 200,000.00 2,200.00
Tenaga
Pekerja 0.060 oh 100,000.00 6,000
Tukang Batu 0.030 oh 150,000.00 4,500
Kepala Tukang 0.003 oh 175,000.00 525
Mandor 0.0025 oh 160,000.00 400
ANALISA 250 Memasang 1 m' Pipa Penyalur Air limbah jenis Pipa Tanah Ø 20 cm 8,040.00 15,820.00 23,860.00
Bahan
Pipa Tanah 1.600 bh 0.00 0.00
Semen Portland 0.870 kg 2,000.00 1,740.00
Pasir Pasang 0.014 m³ 250,000.00 3,500.00
Pasir Urug 0.014 m³ 200,000.00 2,800.00
Tenaga
Pekerja 0.080 oh 100,000.00 8,000
Tukang Batu 0.040 oh 150,000.00 6,000
Kepala Tukang 0.004 oh 175,000.00 700
Mandor 0.0070 oh 160,000.00 1,120
ANALISA 252 Memasang 1 m' Pipa Beton Ø 30 cm - 100 cm 50,200.00 72,865.00 123,065.00
Bahan
Pipa Beton 1.100 bh 0.00 0.00
Bata merah kelas I 0.550 m³ 1,000.00 550.00
Semen Portland 10.300 kg 2,000.00 20,600.00
Pasir Pasang 0.061 m³ 250,000.00 15,250.00
Pasir Urug 0.069 m³ 200,000.00 13,800.00
Tenaga
Pekerja 0.380 oh 100,000.00 38,000
Tukang Batu 0.190 oh 150,000.00 28,500
Kepala Tukang 0.019 oh 175,000.00 3,325
Mandor 0.0190 oh 160,000.00 3,040
ANALISA 253 Memasang 1 m' buah Bak Kontrol pasangan Batu Bata ukuran (30 x 30 )cm, t = 35cm 135,845.00 475,072.50 610,917.50
Bahan
Bata merah kelas I 0.145 m³ 1,000.00 145.00
Semen Portland 44.000 kg 2,000.00 88,000.00
Pasir Pasang 0.070 m³ 250,000.00 17,500.00
Batu Kerikil 0.070 m³ 0.00 0.00
Besi Beton 1.600 kg 11,000.00 17,600.00
Pasir Beton 0.060 m³ 210,000.00 12,600.00
Tenaga
Pekerja 3.200 oh 100,000.00 320,000
Tukang Batu 1.015 oh 150,000.00 152,250
Kepala Tukang 0.0015 oh 175,000.00 263
Mandor 0.0160 oh 160,000.00 2,560
ANALISA 254 Memasang 1 m' buah Bak Kontrol pasangan Batu Bata ukuran (45 x 45 )cm, t = 50cm 234,250.00 232,535.00 466,785.00
Bahan
Bata merah kelas I 0.250 m³ 1,000.00 250.00
Semen Portland 77.000 kg 2,000.00 154,000.00
Pasir Pasang 0.130 m³ 250,000.00 32,500.00
Batu Kerikil 0.020 m³ 0.00 0.00
Besi Beton 2.600 kg 11,000.00 28,600.00
Pasir Beton 0.090 m³ 210,000.00 18,900.00
Tenaga
Pekerja 1.420 oh 100,000.00 142,000
Tukang Batu 0.473 oh 150,000.00 70,950
Kepala Tukang 0.0470 oh 175,000.00 8,225
Mandor 0.0710 oh 160,000.00 11,360
ANALISA 255 Memasang 1 m' buah Bak Kontrol pasangan Batu Bata ukuran (60 x 60 )cm, t = 65cm 352,921.00 368,880.00 721,801.00
Bahan
Bata merah kelas I 0.371 m³ 1,000.00 371.00
Semen Portland 114.000 kg 2,000.00 228,000.00
Pasir Pasang 0.184 m³ 250,000.00 46,000.00
Batu Koral 0.033 m³ 0.00 0.00
Besi Beton 4.850 kg 11,000.00 53,350.00
Pasir Beton 0.120 m³ 210,000.00 25,200.00
Tenaga
Pekerja 2.160 oh 100,000.00 216,000
Tukang Batu 0.720 oh 150,000.00 108,000
Kepala Tukang 0.0720 oh 175,000.00 12,600
Mandor 0.1080 oh 160,000.00 17,280
Tukang Gali 0.1000 oh 150,000.00 15,000
ANALISA 256 Memasang 1 m' Pipa Galvanis Ø ½" 7,750.00 24,795.00 32,545.00
Bahan
Pipa Galvanis 1.200 m' 5,000.00 6,000.00
Perlengkapan 35% Harga Pipa 1,750.00 1,750.00
Tenaga
Pekerja 0.054 oh 100,000.00 5,400
Tukang Batu 0.090 oh 150,000.00 13,500
Kepala Tukang 0.0090 oh 175,000.00 1,575
Mandor 0.0270 oh 160,000.00 4,320
ANALISA 257 Memasang 1 m' Pipa Galvanis Ø ¾" 31,000.00 24,795.00 55,795.00
Bahan
Pipa Galvanis 1.200 m' 20,000.00 24,000.00
Perlengkapan 35% Harga Pipa 7,000.00 7,000.00
Tenaga
Pekerja 0.054 oh 100,000.00 5,400
Tukang Batu 0.090 oh 150,000.00 13,500
Kepala Tukang 0.0090 oh 175,000.00 1,575
Mandor 0.0270 oh 160,000.00 4,320
ANALISA 258 Memasang 1 m' Pipa Galvanis Ø 1" 31,000.00 24,795.00 55,795.00
Bahan
Pipa Galvanis 1.200 m' 20,000.00 24,000.00
Perlengkapan 35% Harga Pipa 7,000.00 7,000.00
Tenaga
Pekerja 0.054 oh 100,000.00 5,400
Tukang Batu 0.090 oh 150,000.00 13,500
Kepala Tukang 0.0090 oh 175,000.00 1,575
Mandor 0.0270 oh 160,000.00 4,320
ANALISA 259 Memasang 1 m' Pipa Galvanis Ø 1½" 31,000.00 41,814.00 72,814.00
Bahan
Pipa Galvanis 1.200 m' 20,000.00 24,000.00
Perlengkapan 35% Harga Pipa 7,000.00 7,000.00
Tenaga
Pekerja 0.108 oh 100,000.00 10,800
Tukang Batu 0.180 oh 150,000.00 27,000
Kepala Tukang 0.0180 oh 175,000.00 3,150
Mandor 0.0054 oh 160,000.00 864
ANALISA 260 Memasang 1 m' Pipa Galvanis Ø 3" 62,000.00 41,814.00 103,814.00
Bahan
Pipa Galvanis 1.200 m' 40,000.00 48,000.00
Perlengkapan 35% Harga Pipa 14,000.00 14,000.00
Tenaga
Pekerja 0.108 oh 100,000.00 10,800
Tukang Batu 0.180 oh 150,000.00 27,000
Kepala Tukang 0.0180 oh 175,000.00 3,150
Mandor 0.0054 oh 160,000.00 864
ANALISA 261 Memasang 1 m' Pipa Galvanis Ø 4" 85,250.00 52,275.50 137,525.50
Bahan
Pipa Galvanis D 4" 1.200 m' 55,000.00 66,000.00
Perlengkapan 35% Harga Pipa 19,250.00 19,250.00
Tenaga
Pekerja 0.135 oh 100,000.00 13,500
Tukang Batu 0.225 oh 150,000.00 33,750
Kepala Tukang 0.0225 oh 175,000.00 3,938
Mandor 0.0068 oh 160,000.00 1,088
ANALISA 262 Memasang 1 m' Pipa PVC tipe AW Ø ½" 6,975.00 13,938.00 20,913.00
Bahan
Pipa PVC D 1/2" 1.200 m' 4,500.00 5,400.00
Perlengkapan 35% Harga Pipa 1,575.00 1,575.00
Tenaga
Pekerja 0.036 oh 100,000.00 3,600
Tukang Batu 0.060 oh 150,000.00 9,000
Kepala Tukang 0.0060 oh 175,000.00 1,050
Mandor 0.0018 oh 160,000.00 288
ANALISA 263 Memasang 1 m' Pipa PVC tipe AW Ø ¾" 9,300.00 13,938.00 23,238.00
Bahan
Pipa PVC tipe AW Ø ¾" 1.200 m' 6,000.00 7,200.00
Perlengkapan 35% Harga Pipa 2,100.00 2,100.00
Tenaga
Pekerja 0.036 oh 100,000.00 3,600
Tukang Batu 0.060 oh 150,000.00 9,000
Kepala Tukang 0.0060 oh 175,000.00 1,050
Mandor 0.0018 oh 160,000.00 288
ANALISA 264 Memasang 1 m' Pipa PVC tipe AW Ø 1" 31,000.00 13,938.00 44,938.00
Bahan
Pipa PVC tipe AW Ø 1" 1.200 m' 20,000.00 24,000.00
Perlengkapan 35% Harga Pipa 7,000.00 7,000.00
Tenaga
Pekerja 0.036 oh 100,000.00 3,600
Tukang Batu 0.060 oh 150,000.00 9,000
Kepala Tukang 0.0060 oh 175,000.00 1,050
Mandor 0.0018 oh 160,000.00 288
ANALISA 265 Memasang 1 m' Pipa PVC tipe AW Ø 1½" 31,000.00 13,938.00 44,938.00
Bahan
Pipa PVC tipe AW Ø 1½" 1.200 m' 20,000.00 24,000.00
Perlengkapan 35% Harga Pipa 7,000.00 7,000.00
Tenaga
Pekerja 0.036 oh 100,000.00 3,600
Tukang Batu 0.060 oh 150,000.00 9,000
Kepala Tukang 0.0060 oh 175,000.00 1,050
Mandor 0.0018 oh 160,000.00 288
ANALISA 266 Memasang 1 m' Pipa PVC tipe AW Ø 2" 27,125.00 20,907.00 48,032.00
Bahan
Pipa PVC tipe AW Ø 2" 1.200 m' 17,500.00 21,000.00
Perlengkapan 35% Harga Pipa 6,125.00 6,125.00
Tenaga
Pekerja 0.054 oh 100,000.00 5,400
Tukang Batu 0.090 oh 150,000.00 13,500
Kepala Tukang 0.0090 oh 175,000.00 1,575
Mandor 0.0027 oh 160,000.00 432
ANALISA 267 Memasang 1 m' Pipa PVC tipe AW Ø 2½" 31,000.00 13,938.00 44,938.00
Bahan
Pipa PVC tipe AW Ø 2½" 1.200 m' 20,000.00 24,000.00
Perlengkapan 35% Harga Pipa 7,000.00 7,000.00
Tenaga
Pekerja 0.036 oh 100,000.00 3,600
Tukang Batu 0.060 oh 150,000.00 9,000
Kepala Tukang 0.0060 oh 175,000.00 1,050
Mandor 0.0018 oh 160,000.00 288
ANALISA 268 Memasang 1 m' Pipa PVC tipe AW Ø 3" 52,700.00 31,368.50 84,068.50
Bahan
Pipa PVC tipe AW Ø 3" 1.200 m' 34,000.00 40,800.00
Perlengkapan 35% Harga Pipa 11,900.00 11,900.00
Tenaga
Pekerja 0.081 oh 100,000.00 8,100
Tukang Batu 0.135 oh 150,000.00 20,250
Kepala Tukang 0.0135 oh 175,000.00 2,363
Mandor 0.0041 oh 160,000.00 656
ANALISA 269 Memasang 1 m' Pipa PVC tipe AW Ø 4" 86,025.00 31,368.50 117,393.50
Bahan
Pipa PVC tipe AW Ø 4" 1.200 m' 55,500.00 66,600.00
Perlengkapan 35% Harga Pipa 19,425.00 19,425.00
Tenaga
Pekerja 0.081 oh 100,000.00 8,100
Tukang Batu 0.135 oh 150,000.00 20,250
Kepala Tukang 0.0135 oh 175,000.00 2,363
Mandor 0.0041 oh 160,000.00 656
ANALISA 270 Memasang 1 bh Bak Cuci Piring Stainles Steel 700,000.00 53,490.00 753,490.00
Bahan
Bak cuci Stainless steel 1.000 bh 600,000.00 600,000.00
Water Drain + Asesories 1.000 set 100,000.00 100,000.00
Tenaga
Pekerja 0.030 oh 100,000.00 3,000
Tukang Batu 0.300 oh 150,000.00 45,000
Kepala Tukang 0.0300 oh 175,000.00 5,250
Mandor 0.0015 oh 160,000.00 240
ANALISA 271 Memasang 1 bh Bak Cuci Piring Teraso 108,000.00 89,150.00 197,150.00
Bahan
Bak cuci Teraso 1.000 bh 0.00 0.00
Water Drain + Asesories 1.000 set 55,500.00 55,500.00
Semen Portland 20.000 kg 2,000.00 40,000.00
Pasir Pasang 0.050 m³ 250,000.00 12,500.00
Tenaga
Pekerja 0.050 oh 100,000.00 5,000
Tukang Batu 0.500 oh 150,000.00 75,000
Kepala Tukang 0.0500 oh 175,000.00 8,750
Mandor 0.0025 oh 160,000.00 400
ANALISA 272 Memasang 1 bh Kran Ø ¾" atau ½" 35,075.00 18,550.00 53,625.00
Bahan
Kran Air 1.000 bh 35,000.00 35,000.00
Seal tape 0.025 bh 3,000.00 75.00
Tenaga
Pekerja 0.010 oh 100,000.00 1,000
Tukang Batu 0.100 oh 150,000.00 15,000
Kepala Tukang 0.0100 oh 175,000.00 1,750
Mandor 0.0050 oh 160,000.00 800
ANALISA 277 1 m² Pasang Jendela Besi Tahan Api 0.00 304,160.00 304,160.00
Bahan
Jendela Besi Tahan Api 1.000 m² 0.00 0.00
Tenaga
Pekerja 1.022 oh 100,000.00 102,200
Tukang Besi Konstruksi 1.200 oh 150,000.00 180,000
Kepala Tukang 0.1200 oh 175,000.00 21,000
Mandor 0.0060 oh 160,000.00 960
ANALISA 290 1 m² Pasang Jendela Nako & Tralis 0.00 53,660.00 53,660.00
Bahan
Jendela Nako 1.100 m² 0.00 0.00
Paku Biasa ½" - 1" atau Sekrup 0.020 kg 0.00 0.00
Besi Strip 0.0250 m² 0.00 0.00
Tenaga
Pekerja 0.200 oh 100,000.00 20,000
Tukang Kayu 0.200 oh 150,000.00 30,000
Kepala Tukang 0.020 oh 175,000.00 3,500
Mandor 0.0010 oh 160,000.00 160
ANALISA 291 1 m² Pasang Talang Datar , Seng BJLS 28 0.00 79,575.00 79,575.00
Bahan
Seng Plat 3" x 6" BJLS 28 0.500 Lbr 0.00 0.00
Paku Biasa ½" - 1" atau Sekrup 0.015 kg 0.00 0.00
Papan Kayu Borneo 0.0096 m³ 0.00 0.00
Flincote / Meni Besi 0.2500 kg 0.00 0.00
Tenaga
Pekerja 0.150 oh 100,000.00 15,000
Tukang Kayu 0.400 oh 150,000.00 60,000
Kepala Tukang 0.025 oh 175,000.00 4,375
Mandor 0.00125 oh 160,000.00 200
ANALISA 292 1 m² Pasang Talang Miring , Seng BJLS 28 0.00 68,575.00 68,575.00
Bahan
Seng Plat 3" x 6" BJLS 28 0.500 Lbr 0.00 0.00
Paku Biasa ½" - 1" atau Sekrup 0.015 kg 0.00 0.00
Papan Kayu Borneo 0.0190 m³ 0.00 0.00
Flincote / Meni Besi 0.3000 kg 0.00 0.00
Tenaga
Pekerja 0.040 oh 100,000.00 4,000
Tukang Kayu 0.400 oh 150,000.00 60,000
Kepala Tukang 0.025 oh 175,000.00 4,375
Mandor 0.00125 oh 160,000.00 200
ANALISA 293 1 m² Pasang Talang ½ Lingkaran Ø 10 cm, Seng BJLS 28 0.00 57,075.00 57,075.00
Bahan
Seng Gelombang 3" x 6" BJLS 28 0.300 Lbr 0.00 0.00
Paku Biasa ½" - 1" atau Sekrup 0.100 kg 0.00 0.00
Papan Kayu Borneo 0.0190 m³ 0.00 0.00
Besi Strip 0.5000 kg 0.00 0.00
Tenaga
Pekerja 0.150 oh 100,000.00 15,000
Tukang Kayu 0.250 oh 150,000.00 37,500
Kepala Tukang 0.025 oh 175,000.00 4,375
Mandor 0.00125 oh 160,000.00 200
ANALISA 294 1 m² Pasang Talang ½ Lingkaran Ø 10 cm, Seng BJLS 24 0.00 57,075.00 57,075.00
Bahan
Seng Plat 3 x 6 BJLS 24 0.300 Lbr 0.00 0.00
Paku Biasa ½" - 1" atau Sekrup 0.100 kg 0.00 0.00
Papan Kayu Borneo 0.0190 m³ 0.00 0.00
Besi Strip 0.5000 kg 0.00 0.00
Tenaga
Pekerja 0.150 oh 100,000.00 15,000
Tukang Kayu 0.250 oh 150,000.00 37,500
Kepala Tukang 0.025 oh 175,000.00 4,375
Mandor 0.00125 oh 160,000.00 200
ANALISA 296 1 Buah Pasang Kunci Tanam Biasa 0.00 78,550.00 78,550.00
Bahan
Kunci Tanam Biasa 1.000 bh 0.00 0.00
Tenaga
Pekerja 0.010 oh 100,000.00 1,000
Tukang Kayu 0.500 oh 150,000.00 75,000
Kepala Tukang 0.010 oh 175,000.00 1,750
Mandor 0.005 oh 160,000.00 800
ANALISA 297 1 Buah Pasang Kunci Tanam Kamar Mandi 0.00 76,775.00 76,775.00
Bahan
Kunci Tanam Kamar Mandi 1.000 bh 0.00 0.00
Tenaga
Pekerja 0.005 oh 100,000.00 500
Tukang Kayu 0.500 oh 150,000.00 75,000
Kepala Tukang 0.005 oh 175,000.00 875
Mandor 0.0025 oh 160,000.00 400
ANALISA 300 1 Buah Pasang Engsel Jendela Kupu - kupu 0.00 17,830.00 17,830.00
Bahan
Engsel Jendela 1.000 bh 0.00 0.00
Tenaga
Pekerja 0.010 oh 100,000.00 1,000
Tukang Kayu 0.100 oh 150,000.00 15,000
Kepala Tukang 0.010 oh 175,000.00 1,750
Mandor 0.00050 oh 160,000.00 80
ANALISA 306 1 Buah Pasang Pegangan Pintu / Door Holder 0.00 89,150.00 89,150.00
Bahan
Door Holder 1.000 bh 0.00 0.00
Tenaga
Pekerja 0.050 oh 100,000.00 5,000
Tukang Kayu 0.500 oh 150,000.00 75,000
Kepala Tukang 0.050 oh 175,000.00 8,750
Mandor 0.0025 oh 160,000.00 400
ANALISA 308 1 Buah Pasang Rel Pintu Dorong 0.00 106,980.00 106,980.00
Bahan
Rel Pintu Dorong 1.000 bh 0.00 0.00
Tenaga
Pekerja 0.060 oh 100,000.00 6,000
Tukang Kayu 0.600 oh 150,000.00 90,000
Kepala Tukang 0.060 oh 175,000.00 10,500
Mandor 0.0030 oh 160,000.00 480
ANALISA 313 1 Buah Pasang Kaca Buram tebal 12 mm 0.00 44,575.00 44,575.00
Bahan
Kaca Buram 1.100 m² 0.00 0.00
Tenaga
Pekerja 0.0250 oh 100,000.00 2,500
Tukang Kayu 0.250 oh 150,000.00 37,500
Kepala Tukang 0.0250 oh 175,000.00 4,375
Mandor 0.00125 oh 160,000.00 200
ANALISA 314 1 Buah Pasang Kaca Cermin tebal 5 mm 0.00 26,745.00 26,745.00
Bahan
Kaca Cermin 1.100 m² 0.00 0.00
Tenaga
Pekerja 0.0150 oh 100,000.00 1,500
Tukang Kayu 0.150 oh 150,000.00 22,500
Kepala Tukang 0.0150 oh 175,000.00 2,625
Mandor 0.00075 oh 160,000.00 120
ANALISA 315 1 Buah Pasang Kaca Cermin tebal 6 mm 0.00 26,745.00 26,745.00
Bahan
Kaca Cermin 1.100 m² 0.00 0.00
Tenaga
Pekerja 0.0150 oh 100,000.00 1,500
Tukang Kayu 0.150 oh 150,000.00 22,500
Kepala Tukang 0.0150 oh 175,000.00 2,625
Mandor 0.00075 oh 160,000.00 120
ANALISA 316 1 Buah Pasang Kaca Cermin tebal 8 mm 0.00 29,415.50 29,415.50
Bahan
Kaca Cermin 1.100 m² 0.00 0.00
Tenaga
Pekerja 0.0165 oh 100,000.00 1,650
Tukang Kayu 0.165 oh 150,000.00 24,750
Kepala Tukang 0.0165 oh 175,000.00 2,888
Mandor 0.00080 oh 160,000.00 128
ANALISA 317 1 Buah Pasang Kaca Wireglass tebal 5 mm 0.00 26,745.00 26,745.00
Bahan
Kaca Wireglass 1.100 m² 0.00 0.00
Tenaga
Pekerja 0.0150 oh 100,000.00 1,500
Tukang Kayu 0.150 oh 150,000.00 22,500
Kepala Tukang 0.0150 oh 175,000.00 2,625
Mandor 0.00075 oh 160,000.00 120
ANALISA 318 1 Buah Pasang Kaca Patri tebal 5 mm 0.00 26,745.00 26,745.00
Bahan
Kaca Patri 1.100 m² 0.00 0.00
Tenaga
Pekerja 0.0150 oh 100,000.00 1,500
Tukang Kayu 0.150 oh 150,000.00 22,500
Kepala Tukang 0.0150 oh 175,000.00 2,625
Mandor 0.00075 oh 160,000.00 120
Tenaga
Pekerja 0.2500 oh 100,000.00 25,000
Tukang Batu 0.120 oh 150,000.00 18,000
Kepala Tukang 0.0120 oh 175,000.00 2,100
Mandor 0.0125 oh 160,000.00 2,000
ANALISA 320 1 m² Pasang Lantai Ubin PC Abu - abu ukuran 30 x 30 cm 25,375.00 49,017.50 74,392.50
Bahan
Ubin Abu -abu 30 x 30 cm 11.870 bh 0.00 0.00
Semen Portland 10.000 kg 2,000.00 20,000.00
Pasir Pasang 0.0215 m³ 250,000.00 5,375.00
Tenaga
Pekerja 0.2600 oh 100,000.00 26,000
Tukang Batu 0.125 oh 150,000.00 18,750
Kepala Tukang 0.0125 oh 175,000.00 2,188
Mandor 0.0130 oh 160,000.00 2,080
ANALISA 321 1 m² Pasang Lantai Ubin PC Abu - abu ukuran 20 x 20 cm 90,425.00 50,935.00 141,360.00
Bahan
Ubin Abu -abu 20 x 20 cm 26.500 bh 2,500.00 66,250.00
Semen Portland 10.400 kg 2,000.00 20,800.00
Pasir Pasang 0.0135 m³ 250,000.00 3,375.00
Tenaga
Pekerja 0.2700 oh 100,000.00 27,000
Tukang Batu 0.130 oh 150,000.00 19,500
Kepala Tukang 0.0130 oh 175,000.00 2,275
Mandor 0.0135 oh 160,000.00 2,160
ANALISA 322 1 m² Pasang Lantai Ubin Warna ukuran 40 x 40 cm 24,770.00 47,100.00 71,870.00
Bahan
Ubin Warna 40 x 40 cm 6.630 bh 0.00 0.00
Semen Portland 8.160 kg 2,000.00 16,320.00
Pasir Pasang 0.0230 m³ 250,000.00 5,750.00
Semen Warna 0.9000 kg 3,000.00 2,700.00
Tenaga
Pekerja 0.2500 oh 100,000.00 25,000
Tukang Batu 0.120 oh 150,000.00 18,000
Kepala Tukang 0.0120 oh 175,000.00 2,100
Mandor 0.0125 oh 160,000.00 2,000
ANALISA 323 1 m² Pasang Lantai Ubin Warna ukuran 30 x 30 cm 25,170.00 47,100.00 72,270.00
Bahan
Ubin Warna 30 x 30 cm 11.870 bh 0.00 0.00
Semen Portland 8.360 kg 2,000.00 16,720.00
Pasir Pasang 0.0230 m³ 250,000.00 5,750.00
Semen Warna 0.9000 kg 3,000.00 2,700.00
Tenaga
Pekerja 0.2500 oh 100,000.00 25,000
Tukang Batu 0.120 oh 150,000.00 18,000
Kepala Tukang 0.0120 oh 175,000.00 2,100
Mandor 0.0125 oh 160,000.00 2,000
ANALISA 324 1 m² Pasang Lantai Ubin Warna ukuran 20 x 20 cm 25,970.00 50,935.00 76,905.00
Bahan
Ubin Warna 20 x 20 cm 26.500 bh 0.00 0.00
Semen Portland 8.760 kg 2,000.00 17,520.00
Pasir Pasang 0.0230 m³ 250,000.00 5,750.00
Semen Warna 0.9000 kg 3,000.00 2,700.00
Tenaga
Pekerja 0.2700 oh 100,000.00 27,000
Tukang Batu 0.130 oh 150,000.00 19,500
Kepala Tukang 0.0130 oh 175,000.00 2,275
Mandor 0.0135 oh 160,000.00 2,160
ANALISA 325 1 m² Pasang Lantai Ubin Teraso ukuran 40 x 40 cm 25,675.00 47,100.00 72,775.00
Bahan
Ubin Teraso 40 x 40 cm 6.250 bh 0.00 0.00
Semen Portland 8.800 kg 2,000.00 17,600.00
Pasir Pasang 0.0215 m³ 250,000.00 5,375.00
Semen Warna 0.9000 kg 3,000.00 2,700.00
Tenaga
Pekerja 0.2500 oh 100,000.00 25,000
Tukang Batu 0.120 oh 150,000.00 18,000
Kepala Tukang 0.0120 oh 175,000.00 2,100
Mandor 0.0125 oh 160,000.00 2,000
ANALISA 326 1 m² Pasang Lantai Ubin Teraso ukuran 30 x 30 cm 29,995.00 49,017.50 79,012.50
Bahan
Ubin Teraso 30 x 30 cm 1.870 bh 0.00 0.00
Semen Portland 10.000 kg 2,000.00 20,000.00
Pasir Pasang 0.0215 m³ 250,000.00 5,375.00
Semen Warna 1.5400 kg 3,000.00 4,620.00
Tenaga
Pekerja 0.2600 oh 100,000.00 26,000
Tukang Batu 0.125 oh 150,000.00 18,750
Kepala Tukang 0.0125 oh 175,000.00 2,188
Mandor 0.0130 oh 160,000.00 2,080
ANALISA 327 1 m² Pasang Lantai Ubin Granito ukuran 40 x 40 cm 151,170.10 47,187.50 198,357.60
Bahan
Ubin Granito 40 x 40 cm 6.930 bh 17,647.20 122,295.10
Semen Portland 9.800 kg 2,000.00 19,600.00
Pasir Pasang 0.0215 m³ 250,000.00 5,375.00
Semen Warna 1.3000 kg 3,000.00 3,900.00
Tenaga
Pekerja 0.2500 oh 100,000.00 25,000
Tukang Batu 0.120 oh 150,000.00 18,000
Kepala Tukang 0.0125 oh 175,000.00 2,188
Mandor 0.0125 oh 160,000.00 2,000
ANALISA 328 1 m² Pasang Lantai Ubin Granito ukuran 30 x 30 cm 29,875.00 49,017.50 78,892.50
Bahan
Ubin Granito 30 x 30 cm 11.870 bh 0.00 0.00
Semen Portland 10.000 kg 2,000.00 20,000.00
Pasir Pasang 0.0215 m³ 250,000.00 5,375.00
Semen Warna 1.5000 kg 3,000.00 4,500.00
Tenaga
Pekerja 0.2600 oh 100,000.00 26,000
Tukang Batu 0.125 oh 150,000.00 18,750
Kepala Tukang 0.0125 oh 175,000.00 2,188
Mandor 0.0130 oh 160,000.00 2,080
ANALISA 329 1 m² Pasang Lantai Ubin Teralux Kerang ukuran 40 x 40 cm 26,875.00 47,100.00 73,975.00
Bahan
Ubin Teralux Kerang 40 x 40 cm 6.250 bh 0.00 0.00
Semen Portland 8.800 kg 2,000.00 17,600.00
Pasir Pasang 0.0215 m³ 250,000.00 5,375.00
Semen Warna 1.3000 kg 3,000.00 3,900.00
Tenaga
Pekerja 0.2500 oh 100,000.00 25,000
Tukang Batu 0.120 oh 150,000.00 18,000
Kepala Tukang 0.0120 oh 175,000.00 2,100
Mandor 0.0125 oh 160,000.00 2,000
ANALISA 330 1 m² Pasang Lantai Ubin Teralux Kerang ukuran 30 x 30 cm 28,750.00 47,100.00 75,850.00
Bahan
Ubin Teralux Kerang 30 x 30 cm 11.807 bh 0.00 0.00
Semen Portland 10.000 kg 2,000.00 20,000.00
Pasir Pasang 0.0215 m³ 250,000.00 5,375.00
Semen Warna 1.1250 kg 3,000.00 3,375.00
Tenaga
Pekerja 0.2500 oh 100,000.00 25,000
Tukang Batu 0.120 oh 150,000.00 18,000
Kepala Tukang 0.0120 oh 175,000.00 2,100
Mandor 0.0125 oh 160,000.00 2,000
ANALISA 331 1 m² Pasang Lantai Ubin Teralux Marmer ukuran 60 x 60 cm 30,630.00 47,100.00 77,730.00
Bahan
Ubin Teralux Marmer 60 x 60 cm 5.600 bh 0.00 0.00
Semen Portland 8.190 kg 2,000.00 16,380.00
Pasir Pasang 0.0450 m³ 250,000.00 11,250.00
Semen Warna 1.0000 kg 3,000.00 3,000.00
Tenaga
Pekerja 0.2500 oh 100,000.00 25,000
Tukang Batu 0.120 oh 150,000.00 18,000
Kepala Tukang 0.0120 oh 175,000.00 2,100
Mandor 0.0125 oh 160,000.00 2,000
ANALISA 332 1 m² Pasang Lantai Ubin Teralux Marmer ukuran 40 x 40 cm 26,875.00 110,090.00 136,965.00
Bahan
Ubin Teralux Marmer 40 x 40 cm 6.250 bh 0.00 0.00
Semen Portland 8.800 kg 2,000.00 17,600.00
Pasir Pasang 0.0215 m³ 250,000.00 5,375.00
Semen Warna 1.3000 kg 3,000.00 3,900.00
Tenaga
Pekerja 0.6720 oh 100,000.00 67,200
Tukang Batu 0.224 oh 150,000.00 33,600
Kepala Tukang 0.0220 oh 175,000.00 3,850
Mandor 0.0340 oh 160,000.00 5,440
ANALISA 333 1 m² Pasang Lantai Ubin Teralux Marmer ukuran 30 x 30 cm 29,875.00 132,550.00 162,425.00
Bahan
Ubin Teralux Marmer 30 x 30 cm 11.870 bh 0.00 0.00
Semen Portland 10.000 kg 2,000.00 20,000.00
Pasir Pasang 0.0215 m³ 250,000.00 5,375.00
Semen Warna 1.5000 kg 3,000.00 4,500.00
Tenaga
Pekerja 0.7000 oh 100,000.00 70,000
Tukang Batu 0.340 oh 150,000.00 51,000
Kepala Tukang 0.0340 oh 175,000.00 5,950
Mandor 0.0350 oh 160,000.00 5,600
ANALISA 334 1 m² Pasang Plint Ubin PC Abu - abu ukuran 15 x 20 cm 4,120.00 11,505.00 15,625.00
Bahan
Plint Ubin PC Abu - abu 15 x 20 cm 5.300 bh 0.00 0.00
Semen Portland 1.560 kg 2,000.00 3,120.00
Pasir Pasang 0.0040 m³ 250,000.00 1,000.00
Tenaga
Pekerja 0.0600 oh 100,000.00 6,000
Tukang Batu 0.030 oh 150,000.00 4,500
Kepala Tukang 0.0030 oh 175,000.00 525
Mandor 0.0030 oh 160,000.00 480
ANALISA 335 1 m² Pasang Plint Ubin PC Abu - abu ukuran 10 x 30 cm 3,870.00 11,505.00 15,375.00
Bahan
Plint Ubin PC Abu -abu 10 x 30 cm 3.530 bh 0.00 0.00
Semen Portland 1.560 kg 2,000.00 3,120.00
Pasir Pasang 0.0030 m³ 250,000.00 750.00
Tenaga
Pekerja 0.0600 oh 100,000.00 6,000
Tukang Batu 0.030 oh 150,000.00 4,500
Kepala Tukang 0.0030 oh 175,000.00 525
Mandor 0.0030 oh 160,000.00 480
ANALISA 336 1 m² Pasang Plint Ubin PC Abu - abu ukuran 10 x 40 cm 3,870.00 11,505.00 15,375.00
Bahan
Plint Ubin PC Abu - abu 10 x 40 cm 2.650 bh 0.00 0.00
Semen Portland 1.560 kg 2,000.00 3,120.00
Pasir Pasang 0.0030 m³ 250,000.00 750.00
Tenaga
Pekerja 0.0600 oh 100,000.00 6,000
Tukang Batu 0.030 oh 150,000.00 4,500
Kepala Tukang 0.0030 oh 175,000.00 525
Mandor 0.0030 oh 160,000.00 480
ANALISA 337 1 m² Pasang Plint Ubin PC Warna ukuran 10 x 20 cm 3,720.00 11,505.00 15,225.00
Bahan
Plint Ubin PC Warna 10 x 20 cm 5.300 bh 0.00 0.00
Semen Portland 1.200 kg 2,000.00 2,400.00
Pasir Pasang 0.0030 m³ 250,000.00 750.00
Semen Warna 0.1900 kg 3,000.00 570.00
Tenaga
Pekerja 0.0600 oh 100,000.00 6,000
Tukang Batu 0.030 oh 150,000.00 4,500
Kepala Tukang 0.0030 oh 175,000.00 525
Mandor 0.0030 oh 160,000.00 480
ANALISA 338 1 m² Pasang Plint Ubin PC Warna ukuran 10 x 30 cm 4,400.00 11,505.00 15,905.00
Bahan
Plint Ubin PC Warna 10 x 30 cm 3.330 bh 0.00 0.00
Semen Portland 1.650 kg 2,000.00 3,300.00
Pasir Pasang 0.0032 m³ 250,000.00 800.00
Semen Warna 0.1000 kg 3,000.00 300.00
Tenaga
Pekerja 0.0600 oh 100,000.00 6,000
Tukang Batu 0.030 oh 150,000.00 4,500
Kepala Tukang 0.0030 oh 175,000.00 525
Mandor 0.0030 oh 160,000.00 480
ANALISA 339 1 m² Pasang Plint Ubin PC Warna ukuran 10 x 40 cm 3,450.00 15,340.00 18,790.00
Bahan
Plint Ubin PC Warna 10 x 40 cm 2.650 bh 0.00 0.00
Semen Portland 1.200 kg 2,000.00 2,400.00
Pasir Pasang 0.0030 m³ 250,000.00 750.00
Semen Warna 0.1000 kg 3,000.00 300.00
Tenaga
Pekerja 0.0800 oh 100,000.00 8,000
Tukang Batu 0.040 oh 150,000.00 6,000
Kepala Tukang 0.0040 oh 175,000.00 700
Mandor 0.0040 oh 160,000.00 640
ANALISA 340 1 m² Pasang Plint Ubin Teraso ukuran 10 x 30 cm 4,440.00 15,340.00 19,780.00
Bahan
Plint Ubin Teraso 10 x 30 cm 3.530 bh 0.00 0.00
Semen Portland 1.560 kg 2,000.00 3,120.00
Pasir Pasang 0.0030 m³ 250,000.00 750.00
Semen Warna 0.1900 kg 3,000.00 570.00
Tenaga
Pekerja 0.0800 oh 100,000.00 8,000
Tukang Batu 0.040 oh 150,000.00 6,000
Kepala Tukang 0.0040 oh 175,000.00 700
Mandor 0.0040 oh 160,000.00 640
ANALISA 341 1 m² Pasang Plint Ubin Teraso ukuran 10 x 40 cm 3,450.00 15,340.00 18,790.00
Bahan
Plint Ubin Teraso 10 x 40 cm 2.650 bh 0.00 0.00
Semen Portland 1.200 kg 2,000.00 2,400.00
Pasir Pasang 0.0030 m³ 250,000.00 750.00
Semen Warna 0.1000 kg 3,000.00 300.00
Tenaga
Pekerja 0.0800 oh 100,000.00 8,000
Tukang Batu 0.040 oh 150,000.00 6,000
Kepala Tukang 0.0040 oh 175,000.00 700
Mandor 0.0040 oh 160,000.00 640
ANALISA 342 1 m² Pasang Plint Ubin Granito ukuran 10 x 40 cm 3,450.00 11,505.00 14,955.00
Bahan
Plint Ubin Granito 10 x 40 cm 2.650 bh 0.00 0.00
Semen Portland 1.200 kg 2,000.00 2,400.00
Pasir Pasang 0.0030 m³ 250,000.00 750.00
Semen Warna 0.1000 kg 3,000.00 300.00
Tenaga
Pekerja 0.0600 oh 100,000.00 6,000
Tukang Batu 0.030 oh 150,000.00 4,500
Kepala Tukang 0.0030 oh 175,000.00 525
Mandor 0.0030 oh 160,000.00 480
ANALISA 343 1 m² Pasang Plint Ubin Granito ukuran 10 x 30 cm 4,400.00 105,795.00 110,195.00
Bahan
Plint Ubin Granito 10 x 30 cm 3.330 bh 0.00 0.00
Semen Portland 1.650 kg 2,000.00 3,300.00
Pasir Pasang 0.0032 m³ 250,000.00 800.00
Semen Warna 0.1000 kg 3,000.00 300.00
Tenaga
Pekerja 0.9000 oh 100,000.00 90,000
Tukang Batu 0.090 oh 150,000.00 13,500
Kepala Tukang 0.0090 oh 175,000.00 1,575
Mandor 0.0045 oh 160,000.00 720
ANALISA 344 1 m² Pasang Plint Ubin Teralux Kerang ukuran 10 x 40 cm 4,400.00 105,795.00 110,195.00
Bahan
Plint Ubin Teralux Kerang 10 x 40 cm 2.500 bh 0.00 0.00
Semen Portland 1.650 kg 2,000.00 3,300.00
Pasir Pasang 0.0032 m³ 250,000.00 800.00
Semen Warna 0.1000 kg 3,000.00 300.00
Tenaga
Pekerja 0.9000 oh 100,000.00 90,000
Tukang Batu 0.090 oh 150,000.00 13,500
Kepala Tukang 0.0090 oh 175,000.00 1,575
Mandor 0.0045 oh 160,000.00 720
ANALISA 345 1 m² Pasang Plint Ubin Teralux Kerang ukuran 10 x 30 cm 4,400.00 105,795.00 110,195.00
Bahan
Plint Ubin Teralux Kerang 10 x 30 cm 3.330 bh 0.00 0.00
Semen Portland 1.650 kg 2,000.00 3,300.00
Pasir Pasang 0.0032 m³ 250,000.00 800.00
Semen Warna 0.1000 kg 3,000.00 300.00
Tenaga
Pekerja 0.9000 oh 100,000.00 90,000
Tukang Batu 0.090 oh 150,000.00 13,500
Kepala Tukang 0.0090 oh 175,000.00 1,575
Mandor 0.0045 oh 160,000.00 720
ANALISA 346 1 m² Pasang Plint Ubin Teralux Marmer ukuran 10 x 60 cm 4,400.00 105,795.00 110,195.00
Bahan
Plint Ubin Teralux Marmer 10 x 60 cm 1.700 bh 0.00 0.00
Semen Portland 1.650 kg 2,000.00 3,300.00
Pasir Pasang 0.0032 m³ 250,000.00 800.00
Semen Warna 0.1000 kg 3,000.00 300.00
Tenaga
Pekerja 0.9000 oh 100,000.00 90,000
Tukang Batu 0.090 oh 150,000.00 13,500
Kepala Tukang 0.0090 oh 175,000.00 1,575
Mandor 0.0045 oh 160,000.00 720
ANALISA 347 1 m² Pasang Plint Ubin Teralux Marmer ukuran 10 x 40 cm 4,400.00 105,795.00 110,195.00
Bahan
Plint Ubin Teralux Marmer 10 x 40 cm 2.500 bh 0.00 0.00
Semen Portland 1.650 kg 2,000.00 3,300.00
Pasir Pasang 0.0032 m³ 250,000.00 800.00
Semen Warna 0.1000 kg 3,000.00 300.00
Tenaga
Pekerja 0.9000 oh 100,000.00 90,000
Tukang Batu 0.090 oh 150,000.00 13,500
Kepala Tukang 0.0090 oh 175,000.00 1,575
Mandor 0.0045 oh 160,000.00 720
ANALISA 348 1 m² Pasang Plint Ubin Teralux Marmer ukuran 10 x 30 cm 4,400.00 105,795.00 110,195.00
Bahan
Plint Ubin Teralux Marmer 10 x 30 cm 3.330 bh 0.00 0.00
Semen Portland 1.650 kg 2,000.00 3,300.00
Pasir Pasang 0.0032 m³ 250,000.00 800.00
Semen Warna 0.1000 kg 3,000.00 300.00
Tenaga
Pekerja 0.9000 oh 100,000.00 90,000
Tukang Batu 0.090 oh 150,000.00 13,500
Kepala Tukang 0.0090 oh 175,000.00 1,575
Mandor 0.0045 oh 160,000.00 720
Tenaga
Pekerja 0.9000 oh 100,000.00 90,000
Tukang Batu 0.090 oh 150,000.00 13,500
Kepala Tukang 0.0090 oh 175,000.00 1,575
Mandor 0.0045 oh 160,000.00 720
ANALISA 350 1 m² Pasang Teralux Cor ditempat, tebal 3 cm 0.00 105,795.00 105,795.00
Bahan
Bahan Teraso Cor 0.0036 m³ 0.00 0.00
Tenaga
Pekerja 0.9000 oh 100,000.00 90,000
Tukang Batu 0.090 oh 150,000.00 13,500
Kepala Tukang 0.0090 oh 175,000.00 1,575
Mandor 0.0045 oh 160,000.00 720
Tenaga
Pekerja 0.2700 oh 100,000.00 27,000
Tukang Batu 0.150 oh 150,000.00 22,500
Kepala Tukang 0.0150 oh 175,000.00 2,625
Mandor 0.0135 oh 160,000.00 2,160
Tenaga
Pekerja 0.6200 oh 100,000.00 62,000
Tukang Batu 0.350 oh 150,000.00 52,500
Kepala Tukang 0.0350 oh 175,000.00 6,125
Mandor 0.0300 oh 160,000.00 4,800
ANALISA 353 1 m' Pasang Plint Keramik Artistik ukuran 10 x 20 cm 4,400.00 24,795.00 29,195.00
Bahan
Plint Keramik Artistik 10 x 20 cm 5.000 bh 0.00 0.00
Semen Portland 1.650 kg 2,000.00 3,300.00
Pasir Pasang 0.0032 m³ 250,000.00 800.00
Semen Warna 0.1000 kg 3,000.00 300.00
Tenaga
Pekerja 0.0900 oh 100,000.00 9,000
Tukang Batu 0.090 oh 150,000.00 13,500
Kepala Tukang 0.0090 oh 175,000.00 1,575
Mandor 0.0045 oh 160,000.00 720
ANALISA 354 1 m' Pasang Plint Keramik Artistik ukuran 10 x 10 cm 4,460.00 24,795.00 29,255.00
Bahan
Plint Keramik Artistik 10 x 10 cm 5.000 bh 0.00 0.00
Semen Portland 1.650 kg 2,000.00 3,300.00
Pasir Pasang 0.0032 m³ 250,000.00 800.00
Semen Warna 0.1200 kg 3,000.00 360.00
Tenaga
Pekerja 0.0900 oh 100,000.00 9,000
Tukang Batu 0.090 oh 150,000.00 13,500
Kepala Tukang 0.0090 oh 175,000.00 1,575
Mandor 0.0045 oh 160,000.00 720
ANALISA 355 1 m' Pasang Plint Keramik Artistik ukuran 5 x 20 cm 2,490.00 24,795.00 27,285.00
Bahan
Plint Keramik Artistik 5 x 20 cm 5.000 bh 0.00 0.00
Semen Portland 0.850 kg 2,000.00 1,700.00
Pasir Pasang 0.0022 m³ 250,000.00 550.00
Semen Warna 0.0800 kg 3,000.00 240.00
Tenaga
Pekerja 0.0900 oh 100,000.00 9,000
Tukang Batu 0.090 oh 150,000.00 13,500
Kepala Tukang 0.0090 oh 175,000.00 1,575
Mandor 0.0045 oh 160,000.00 720
ANALISA 356 1 m' Pasang Plint Vinyl tanpa adukan 0.00 22,040.00 22,040.00
Bahan
lt. Vinyl Karet 30 x 30 kwl I 3.500 bh 0.00 0.00
Lem Vinyl 0.080 kg 0.00 0.00
Tenaga
Pekerja 0.0800 oh 100,000.00 8,000
Tukang Batu 0.080 oh 150,000.00 12,000
Kepala Tukang 0.0080 oh 175,000.00 1,400
Mandor 0.0040 oh 160,000.00 640
Tenaga
Pekerja 0.6200 oh 100,000.00 62,000
Tukang Batu 0.350 oh 150,000.00 52,500
Kepala Tukang 0.0350 oh 175,000.00 6,125
Mandor 0.0300 oh 160,000.00 4,800
Tenaga
Pekerja 0.6200 oh 100,000.00 62,000
Tukang Batu 0.350 oh 150,000.00 52,500
Kepala Tukang 0.0350 oh 175,000.00 6,125
Mandor 0.0300 oh 160,000.00 4,800
Tenaga
Pekerja 0.6200 oh 100,000.00 62,000
Tukang Batu 0.350 oh 150,000.00 52,500
Kepala Tukang 0.0350 oh 175,000.00 6,125
Mandor 0.0300 oh 160,000.00 4,800
Tenaga
Pekerja 0.6200 oh 100,000.00 62,000
Tukang Batu 0.350 oh 150,000.00 52,500
Kepala Tukang 0.0350 oh 175,000.00 6,125
Mandor 0.0300 oh 160,000.00 4,800
Tenaga
Pekerja 0.6200 oh 100,000.00 62,000
Tukang Batu 0.350 oh 150,000.00 52,500
Kepala Tukang 0.0350 oh 175,000.00 6,125
Mandor 0.0300 oh 160,000.00 4,800
Tenaga
Pekerja 0.6200 oh 100,000.00 62,000
Tukang Batu 0.350 oh 150,000.00 52,500
Kepala Tukang 0.0350 oh 175,000.00 6,125
Mandor 0.0300 oh 160,000.00 4,800
Tenaga
Pekerja 0.6200 oh 100,000.00 62,000
Tukang Batu 0.350 oh 150,000.00 52,500
Kepala Tukang 0.0350 oh 175,000.00 6,125
Mandor 0.0300 oh 160,000.00 4,800
ANALISA 363 1 m² Pasang Lantai Keramik 33 x 33 cm anti slip 37,760.00 125,425.00 163,185.00
Bahan
Ubin Keramik 33 x 33 cm anti slip 10.000 bh 0.00 0.00
Semen Portland 11.380 kg 2,000.00 22,760.00
Pasir Pasang 0.042 m³ 250,000.00 10,500.00
Semen Warna 1.500 kg 3,000.00 4,500.00
Tenaga
Pekerja 0.6200 oh 100,000.00 62,000
Tukang Batu 0.350 oh 150,000.00 52,500
Kepala Tukang 0.0350 oh 175,000.00 6,125
Mandor 0.0300 oh 160,000.00 4,800
Tenaga
Pekerja 0.6200 oh 100,000.00 62,000
Tukang Batu 0.350 oh 150,000.00 52,500
Kepala Tukang 0.0350 oh 175,000.00 6,125
Mandor 0.0300 oh 160,000.00 4,800
ANALISA 365 1 m² Pasang Lantai Mozaik 30 x 30 cm, ex lokal 44,050.00 125,425.00 169,475.00
Bahan
Mozaik 30 x 30 cm 12.000 bh 0.00 0.00
Semen Portland 14.150 kg 2,000.00 28,300.00
Pasir Pasang 0.039 m³ 250,000.00 9,750.00
Semen Warna 2.000 kg 3,000.00 6,000.00
Tenaga
Pekerja 0.6200 oh 100,000.00 62,000
Tukang Batu 0.350 oh 150,000.00 52,500
Kepala Tukang 0.0350 oh 175,000.00 6,125
Mandor 0.0300 oh 160,000.00 4,800
Tenaga
Pekerja 0.6200 oh 100,000.00 62,000
Tukang Batu 0.350 oh 150,000.00 52,500
Kepala Tukang 0.0350 oh 175,000.00 6,125
Mandor 0.0300 oh 160,000.00 4,800
ANALISA 367 1 m² Pasang Lantai Karpet 100% Wool 0.00 46,835.00 46,835.00
Bahan
Feltex 100% Wool - T - 21 1.050 m² 0.00 0.00
Lem Vinyl 0.350 kg 0.00 0.00
Tenaga
Pekerja 0.1700 oh 100,000.00 17,000
Tukang Batu 0.170 oh 150,000.00 25,500
Kepala Tukang 0.0170 oh 175,000.00 2,975
Mandor 0.0085 oh 160,000.00 1,360
ANALISA 368 1 m² Pasang Lantai Karpet 100% Wool, 20% Nylon 0.00 46,835.00 46,835.00
Bahan
Carpet 80% Wool, 20% Nylon 1.050 m² 0.00 0.00
Lem Vinyl 0.350 kg 0.00 0.00
Tenaga
Pekerja 0.1700 oh 100,000.00 17,000
Tukang Batu 0.170 oh 150,000.00 25,500
Kepala Tukang 0.0170 oh 175,000.00 2,975
Mandor 0.0085 oh 160,000.00 1,360
Tenaga
Pekerja 0.1200 oh 100,000.00 12,000
Tukang Batu 0.120 oh 150,000.00 18,000
Kepala Tukang 0.0120 oh 175,000.00 2,100
Mandor 0.0060 oh 160,000.00 960
Tenaga
Pekerja 0.1700 oh 100,000.00 17,000
Tukang Batu 0.170 oh 150,000.00 25,500
Kepala Tukang 0.0170 oh 175,000.00 2,975
Mandor 0.0085 oh 160,000.00 1,360
Tenaga
Pekerja 0.6500 oh 100,000.00 65,000
Tukang Batu 0.350 oh 150,000.00 52,500
Kepala Tukang 0.0350 oh 175,000.00 6,125
Mandor 0.0325 oh 160,000.00 5,200
ANALISA 372 1 m² Pasang Dinding Porselen 11 x 11 cm, putih 36,900.00 150,550.00 187,450.00
Bahan
Porselen 11 x 11 cm putih 83.000 bh 0.00 0.00
Semen Abu -abu 9.300 kg 3,000.00 27,900.00
Pasir Pasang 0.018 m³ 250,000.00 4,500.00
Semen Warna 1.500 kg 3,000.00 4,500.00
Tenaga
Pekerja 0.6200 oh 100,000.00 62,000
Tukang Batu 0.500 oh 150,000.00 75,000
Kepala Tukang 0.0500 oh 175,000.00 8,750
Mandor 0.0300 oh 160,000.00 4,800
ANALISA 373 1 m² Pasang Dinding Porselen 11 x 11 cm, warna 36,900.00 150,550.00 187,450.00
Bahan
Porselen 11 x 11 cm warna 83.000 bh 0.00 0.00
Semen Abu -abu 9.300 kg 3,000.00 27,900.00
Pasir Pasang 0.018 m³ 250,000.00 4,500.00
Semen Warna 1.500 kg 3,000.00 4,500.00
Tenaga
Pekerja 0.6200 oh 100,000.00 62,000
Tukang Batu 0.500 oh 150,000.00 75,000
Kepala Tukang 0.0500 oh 175,000.00 8,750
Mandor 0.0300 oh 160,000.00 4,800
ANALISA 374 1 m² Pasang Dinding Porselen 15 x 15 cm, putih 36,900.00 140,175.00 177,075.00
Bahan
Porselen 15 x 15 cm putih 45.000 bh 0.00 0.00
Semen Abu -abu 9.300 kg 3,000.00 27,900.00
Pasir Pasang 0.018 m³ 250,000.00 4,500.00
Semen Warna 1.500 kg 3,000.00 4,500.00
Tenaga
Pekerja 0.6000 oh 100,000.00 60,000
Tukang Batu 0.450 oh 150,000.00 67,500
Kepala Tukang 0.0450 oh 175,000.00 7,875
Mandor 0.0300 oh 160,000.00 4,800
ANALISA 375 1 m² Pasang Dinding Porselen 15 x 15 cm, warna 36,900.00 140,175.00 177,075.00
Bahan
Porselen 15 x 15 cm warna 45.000 bh 0.00 0.00
Semen Abu -abu 9.300 kg 3,000.00 27,900.00
Pasir Pasang 0.018 m³ 250,000.00 4,500.00
Semen Warna 1.500 kg 3,000.00 4,500.00
Tenaga
Pekerja 0.6000 oh 100,000.00 60,000
Tukang Batu 0.450 oh 150,000.00 67,500
Kepala Tukang 0.0450 oh 175,000.00 7,875
Mandor 0.0300 oh 160,000.00 4,800
ANALISA 376 1 m² Pasang Dinding Porselen 10 x 20 cm, warna 36,900.00 140,175.00 177,075.00
Bahan
Porselen 10 x 20 cm warna 50.000 bh 0.00 0.00
Semen Abu -abu 9.300 kg 3,000.00 27,900.00
Pasir Pasang 0.018 m³ 250,000.00 4,500.00
Semen Warna 1.500 kg 3,000.00 4,500.00
Tenaga
Pekerja 0.6000 oh 100,000.00 60,000
Tukang Batu 0.450 oh 150,000.00 67,500
Kepala Tukang 0.0450 oh 175,000.00 7,875
Mandor 0.0300 oh 160,000.00 4,800
ANALISA 377 1 m² Pasang Dinding Porselen 20 x 20 cm, warna 94,400.00 140,175.00 234,575.00
Bahan
Porselen 20 x 20 cm warna 25.000 bh 2,300.00 57,500.00
Semen Abu -abu 9.300 kg 3,000.00 27,900.00
Pasir Pasang 0.018 m³ 250,000.00 4,500.00
Semen Warna 1.500 kg 3,000.00 4,500.00
Tenaga
Pekerja 0.6000 oh 100,000.00 60,000
Tukang Batu 0.450 oh 150,000.00 67,500
Kepala Tukang 0.0450 oh 175,000.00 7,875
Mandor 0.0300 oh 160,000.00 4,800
ANALISA 378 1 m² Pasang Dinding Keramik Artistik 10 x 20 cm, warna 36,900.00 140,175.00 177,075.00
Bahan
Keramik Artistik 10 x 20 cm 100.000 bh 0.00 0.00
Semen Abu -abu 9.300 kg 3,000.00 27,900.00
Pasir Pasang 0.018 m³ 250,000.00 4,500.00
Semen Warna 1.500 kg 3,000.00 4,500.00
Tenaga
Pekerja 0.6000 oh 100,000.00 60,000
Tukang Batu 0.450 oh 150,000.00 67,500
Kepala Tukang 0.0450 oh 175,000.00 7,875
Mandor 0.0300 oh 160,000.00 4,800
ANALISA 379 1 m² Pasang Dinding Keramik Artistik 5 x 20 cm, warna 36,900.00 140,175.00 177,075.00
Bahan
Keramik Artistik 5 x 20 cm 100.000 bh 0.00 0.00
Semen Abu -abu 9.300 kg 3,000.00 27,900.00
Pasir Pasang 0.018 m³ 250,000.00 4,500.00
Semen Warna 1.500 kg 3,000.00 4,500.00
Tenaga
Pekerja 0.6000 oh 100,000.00 60,000
Tukang Batu 0.450 oh 150,000.00 67,500
Kepala Tukang 0.0450 oh 175,000.00 7,875
Mandor 0.0300 oh 160,000.00 4,800
ANALISA 387 1 m² Pasang Dinding Batu Tempel Hitam 96,500.00 125,425.00 221,925.00
Bahan
Batu Tempel Hitam 1.050 bh 50,000.00 52,500.00
Semen Abu -abu 11.750 kg 3,000.00 35,250.00
Pasir Pasang 0.035 m³ 250,000.00 8,750.00
Tenaga
Pekerja 0.6200 oh 100,000.00 62,000
Tukang Batu 0.350 oh 150,000.00 52,500
Kepala Tukang 0.0350 oh 175,000.00 6,125
Mandor 0.0300 oh 160,000.00 4,800
ANALISA 388 1 m² Pasang Lantai Vinyl Karet 30 x 30 cm KL I 0.00 41,325.00 41,325.00
Bahan
Vinyl Karet 30 x 30 cm KL I 11.050 bh 0.00 0.00
Lem Vinyl 0.350 kg 0.00 0.00
Tenaga
Pekerja 0.1500 oh 100,000.00 15,000
Tukang Batu 0.150 oh 150,000.00 22,500
Kepala Tukang 0.0150 oh 175,000.00 2,625
Mandor 0.0075 oh 160,000.00 1,200
ANALISA 391 1 m² Pasang Lantai Vinyl Motif Kembang 30 x 30 cm 0.00 41,325.00 41,325.00
Bahan
Vinyl Motif Kembang ex DN 11.050 bh 0.00 0.00
Lem Vinyl 0.350 kg 0.00 0.00
Tenaga
Pekerja 0.1500 oh 100,000.00 15,000
Tukang Batu 0.150 oh 150,000.00 22,500
Kepala Tukang 0.0150 oh 175,000.00 2,625
Mandor 0.0075 oh 160,000.00 1,200
ANALISA 397 1 m² Mencuci Bidang Permukaan Tembok yang Pernah dicat 0.00 15,400.00 15,400.00
Bahan
Sabun 0.050 kg 0.00 0.00
Tenaga
Pekerja 0.1500 oh 100,000.00 15,000
Tukang Cat 0.000 oh 150,000.00 -
Kepala Tukang 0.0000 oh 175,000.00 -
Mandor 0.0025 oh 160,000.00 400
ANALISA 398 1 m² Mengerok Karat Cat Lama Permukaan Baja dengan Cara Manual 0.00 15,400.00 15,400.00
Bahan
Sabun 0.050 kg 0.00 0.00
Tenaga
Pekerja 0.1500 oh 100,000.00 15,000
Tukang Cat 0.000 oh 150,000.00 -
Kepala Tukang 0.0000 oh 175,000.00 -
Mandor 0.0025 oh 160,000.00 400
ANALISA 400 1 m² Mengerok Karat atau Cat Lama Permukaan Baja dgn Pancar Pasir ( Sanblasting ) dgn Tingkat Kebersihan Sa 2½. 0.00 620,000.00 620,000.00
Bahan
Pasir Silika 40.000 kg 0.00 0.00
BBM 10.000 lt 0.00 0.00
Peralatan
Kompresor, Blasting Pot , Selang Dan Nozzle sewa / Hr
Tenaga
Pekerja 1.6000 oh 100,000.00 160,000
Tukang Cat 1.600 oh 150,000.00 240,000
Kepala Tukang 0.8000 oh 175,000.00 140,000
Mandor 0.5000 oh 160,000.00 80,000
ANALISA 403 1 m² Mengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 2 Lapis Cat Penutup 13,650.00 9,800.00 23,450.00
Bahan
Cat Meni 0.200 kg 56,000.00 11,200.00
Plamir 0.150 kg 5,000.00 750.00
Cat Dasar 0.170 kg 10,000.00 1,700.00
Cat Kayu glotek 0.260 kg 0.00 0.00
Tenaga
Pekerja 0.0700 oh 100,000.00 7,000
Tukang Cat 0.009 oh 150,000.00 1,350
Kepala Tukang 0.0060 oh 175,000.00 1,050
Mandor 0.0025 oh 160,000.00 400
ANALISA 404 1 m² Mengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 3 Lapis Cat Penutup 13,650.00 23,850.00 37,500.00
Bahan
Cat Meni 0.200 kg 56,000.00 11,200.00
Plamir 0.150 kg 5,000.00 750.00
Cat Dasar 0.170 kg 10,000.00 1,700.00
Cat Kayu glotek 0.350 kg 0.00 0.00
Tenaga
Pekerja 0.0700 oh 100,000.00 7,000
Tukang Cat 0.105 oh 150,000.00 15,750
Kepala Tukang 0.0040 oh 175,000.00 700
Mandor 0.0025 oh 160,000.00 400
ANALISA 405 1 m² Mengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 3 Lapis Cat Penutup 13,650.00 23,850.00 37,500.00
Bahan
Cat Meni 0.200 kg 56,000.00 11,200.00
Plamir 0.150 kg 5,000.00 750.00
Cat Dasar 0.170 kg 10,000.00 1,700.00
Cat Kayu glotek 0.350 kg 0.00 0.00
Tenaga
Pekerja 0.0700 oh 100,000.00 7,000
Tukang Cat 0.105 oh 150,000.00 15,750
Kepala Tukang 0.0040 oh 175,000.00 700
Mandor 0.0025 oh 160,000.00 400
ANALISA 406 1 m² Pelaburan Bidang Kayu dengan Teak Oil 0.00 24,875.00 24,875.00
Bahan
Teak Oil 0.360 lt 0.00 0.00
Tenaga
Pekerja 0.0400 oh 100,000.00 4,000
Tukang Cat 0.063 oh 150,000.00 9,450
Kepala Tukang 0.0630 oh 175,000.00 11,025
Mandor 0.0025 oh 160,000.00 400
ANALISA 407 1 m² Pelaburan Bidang Kayu dengan Pelitur 10,000.00 24,875.00 34,875.00
Bahan
Pelitur 0.150 lt 0.00 0.00
Pelitur Jadi 0.372 lt 0.00 0.00
Ampelas 2.000 Lbr 5,000.00 10,000.00
Tenaga
Pekerja 0.0400 oh 100,000.00 4,000
Tukang Cat 0.063 oh 150,000.00 9,450
Kepala Tukang 0.0630 oh 175,000.00 11,025
Mandor 0.0025 oh 160,000.00 400
ANALISA 408 1 m² Pelaburan Bidang Kayu dengan Cat Residu dan Ter 0.00 10,960.00 10,960.00
Bahan
Residu atau Ter 0.350 lt 0.00 0.00
Tenaga
Pekerja 0.1000 oh 100,000.00 10,000
Tukang Cat 0.000 oh 150,000.00 -
Kepala Tukang 0.0000 oh 175,000.00 -
Mandor 0.0060 oh 160,000.00 960
ANALISA 409 1 m² Pelaburan Bidang Kayu dengan Vernis 500.00 43,200.00 43,700.00
Bahan
Vernis 0.150 lt 0.00 0.00
Dempul 0.050 kg 0.00 0.00
Ampelas 0.100 Lbr 5,000.00 500.00
Kuas 0.010 bh 0.00 0.00
Tenaga
Pekerja 0.1600 oh 100,000.00 16,000
Tukang Cat 0.160 oh 150,000.00 24,000
Kepala Tukang 0.0160 oh 175,000.00 2,800
Mandor 0.0025 oh 160,000.00 400
ANALISA 410 1 m² Pengecatan Tembok Baru ( 1 Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup ) 6,050.00 12,952.50 19,002.50
Bahan
Plamir 0.100 kg 5,000.00 500.00
Cat Dasar 0.100 kg 10,000.00 1,000.00
Cat Tembok vinilex 0.260 kg 17,500.00 4,550.00
Tenaga
Pekerja 0.0200 oh 100,000.00 2,000
Tukang Cat 0.063 oh 150,000.00 9,450
Kepala Tukang 0.0063 oh 175,000.00 1,103
Mandor 0.0025 oh 160,000.00 400
ANALISA 411 1 m² Melabur Tembok dengan Kapur Sirih 500.00 15,567.50 16,067.50
Bahan
Ampelas 0.100 Lbr 5,000.00 500.00
Alang - alang 0.250 ikat 0.00 0.00
Perancah Kayu 0.002 m³ 0.00 0.00
Kapur Sirih 0.150 kg 0.00 0.00
Tenaga
Pekerja 0.1500 oh 100,000.00 15,000
Tukang Cat 0.001 oh 150,000.00 150
Kepala Tukang 0.0001 oh 175,000.00 18
Mandor 0.0025 oh 160,000.00 400
ANALISA 412 1 m² Melabur Tembok Lama dengan Kapur Sirih ( untuk pemeliharaan ) 0.00 5,237.50 5,237.50
Bahan
Perancah Kayu 0.002 m³ 0.00 0.00
Kapur Sirih 0.300 kg 0.00 0.00
Tenaga
Pekerja 0.0400 oh 100,000.00 4,000
Tukang Cat 0.005 oh 150,000.00 750
Kepala Tukang 0.0005 oh 175,000.00 88
Mandor 0.0025 oh 160,000.00 400
ANALISA 414 1 m² Pengecatan Permukaan Baja dengan Meni Besi 0.00 37,100.00 37,100.00
Bahan
Meni Besi 0.100 kg 0.00 0.00
Kuas 0.010 bh 0.00 0.00
Tenaga
Pekerja 0.0200 oh 100,000.00 2,000
Tukang Cat 0.200 oh 150,000.00 30,000
Kepala Tukang 0.0200 oh 175,000.00 3,500
Mandor 0.0100 oh 160,000.00 1,600
ANALISA 415 1 m² Pengecatan Permukaan Baja dengan Meni Besi dan Perancah 0.00 63,887.50 63,887.50
Bahan
Meni Besi 0.100 kg 0.00 0.00
Kuas 0.010 bh 0.00 0.00
Perancah Kayu 0.002 m³ 0.00 0.00
Tenaga
Pekerja 0.2500 oh 100,000.00 25,000
Tukang Cat 0.225 oh 150,000.00 33,750
Kepala Tukang 0.0225 oh 175,000.00 3,938
Mandor 0.0075 oh 160,000.00 1,200
ANALISA 416 1 m² Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual Sistem 4 Lapis Cat Konvensional, tebal 200 um 68,000.00 6,637.50 74,637.50
Bahan
Meni ( Read Lead ) A 0.100 kg 340,000.00 34,000.00
Meni ( Read Lead ) B 0.100 kg 340,000.00 34,000.00
Alluminium C 0.040 kg 0.00 0.00
Alluminium B 0.040 kg 0.00 0.00
Pengencer 0.010 lt 0.00 0.00
Perancah Kayu 0.002 m³ 0.00 0.00
Tenaga
Pekerja 0.0060 oh 100,000.00 600
Tukang Cat 0.006 oh 150,000.00 900
Kepala Tukang 0.0225 oh 175,000.00 3,938
Mandor 0.0075 oh 160,000.00 1,200
ANALISA 417 1 m² Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual Sistem 1 Lapis Cat Mutakhir, tebal 200 um 0.00 12,660.00 12,660.00
Bahan
Meni Besi 0.300 kg 0.00 0.00
Tenaga
Pekerja 0.0060 oh 100,000.00 600
Tukang Cat 0.060 oh 150,000.00 9,000
Kepala Tukang 0.0120 oh 175,000.00 2,100
Mandor 0.0060 oh 160,000.00 960
ANALISA 418 1 m² Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual Sistem 3 Lapis Cat Konvensional, tebal 200 um 5,580.00 254,500.00 260,080.00
Bahan
Cat Dasar 0.110 kg 10,000.00 1,100.00
Cat Antara 0.170 kg 0.00 0.00
Cat Penutup 0.080 kg 56,000.00 4,480.00
Tenaga
Pekerja 0.5000 oh 100,000.00 50,000
Tukang Cat 0.800 oh 150,000.00 120,000
Kepala Tukang 0.3000 oh 175,000.00 52,500
Mandor 0.2000 oh 160,000.00 32,000
ANALISA 419 1 m² Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Semprot ( Airless Spray ) dgn Sistem 1 Lapis Cat Mutakhir, tebal 200 um 3,000.00 212,000.00 215,000.00
Bahan
Cat Dasar 0.300 kg 10,000.00 3,000.00
Tenaga
Pekerja 0.4000 oh 100,000.00 40,000
Tukang Cat 0.700 oh 150,000.00 105,000
Kepala Tukang 0.2000 oh 175,000.00 35,000
Mandor 0.2000 oh 160,000.00 32,000
ANALISA 420 1 ttk pekerjaan istalasi lampu dan kotak kontak 165,000.00 63,600.00 228,600.00
Bahan
Kabel lilstrik 3x2.5mm 11.000 kg 15,000.00 165,000.00
Instalasi lampu dan stop kontak 1.000 ttk 65,000.00
Tenaga
Pembatu tukang listrik 0.4800 oh 100,000.00 48,000
Tukang Listrik 0.0480 oh 150,000.00 7,200
Kepala Tukang Listrik 0.0480 oh 175,000.00 8,400
ANALISA 422 1 buah pekerjaan lampu SL 18 dan fitting 50,000.00 26,500.00 76,500.00
Bahan
lampu SL 18 dan fitting 1.000 bh 50,000.00 50,000.00
Tenaga
Pembatu tukang listrik 0.2000 oh 100,000.00 20,000
Tukang Listrik 0.0200 oh 150,000.00 3,000
Kepala Tukang Listrik 0.0200 oh 175,000.00 3,500
Tenaga
Pekerja 0.2500 oh 100,000.00 25,000
Tenaga
Pekerja 0.2500 oh 100,000.00 25,000
Tukang Batu 0.120 oh 150,000.00 18,000
Kepala Tukang 0.0120 oh 175,000.00 2,100
Mandor 0.0125 oh 160,000.00 2,000
ANALISA 431 1 m² Pasang Dinding Porselen 20 x 20 cm, warna 94,400.00 140,175.00 234,575.00
Bahan
Porselen 20 x 20 cm warna 25.000 bh 2,300.00 57,500.00
Semen Abu -abu 9.300 kg 3,000.00 27,900.00
Pasir Pasang 0.018 m³ 250,000.00 4,500.00
Semen Warna 1.500 kg 3,000.00 4,500.00
Tenaga
Pekerja 0.6000 oh 100,000.00 60,000
Tukang Batu 0.450 oh 150,000.00 67,500
Kepala Tukang 0.0450 oh 175,000.00 7,875
Mandor 0.0300 oh 160,000.00 4,800
ANALISA 431 1 m² Pasang Dinding Porselen 20 x 25 cm, warna 82,900.00 140,175.00 223,075.00
Bahan
Porselen 20 x 25 cm warna 20.000 bh 2,300.00 46,000.00
Semen Abu -abu 9.300 kg 3,000.00 27,900.00
Pasir Pasang 0.018 m³ 250,000.00 4,500.00
Semen Warna 1.500 kg 3,000.00 4,500.00
Tenaga
Pekerja 0.6000 oh 100,000.00 60,000
Tukang Batu 0.450 oh 150,000.00 67,500
Kepala Tukang 0.0450 oh 175,000.00 7,875
Mandor 0.0300 oh 160,000.00 4,800
ANALISA 432 1m² Pasang Atap Genteng Keramik 21,750.00 28,930.00 50,680.00
Bahan
Genteng Keramik 14.500 bh 1,500.00 21,750.00
Tenaga
Pekerja 0.150 oh 100,000.00 15,000
Tukang Kayu 0.075 oh 150,000.00 11,250
Kepala Tukang 0.008 oh 175,000.00 1,400
Mandor 0.008 oh 160,000.00 1,280
ANALISA 433 1 m³ Membuat Dak Beton Bertulang ( 163 kg + bekisting ) 4,663,530.00 1,270,695.00 5,934,225.00
Bahan
Kayu Terentang 0.250 m³ 2,800,000.00 700,000.00
Paku Biasa 2" - 5" 3.000 kg 20,000.00 60,000.00
Minyak Bekisting 1.200 lt 6,000.00 7,200.00
Besi Beton Polos 163.530 kg 11,000.00 1,798,830.00
Kawat Beton 3.000 kg 20,000.00 60,000.00
Semen Portland 323.000 kg 2,000.00 646,000.00
Pasir Beton 0.520 m³ 210,000.00 109,200.00
Koral Beton 0.780 m³ 210,000.00 163,800.00
Kayu Balok Borneo 0.105 m³ 4,300,000.00 451,500.00
Plywood 9 mm 2.500 lbr 110,000.00 275,000.00
Dolken Ø 8 / 4 m 14.000 btg 28,000.00 392,000.00
Tenaga
Pekerja 5.600 oh 100,000.00 560,000
Tukang Batu 0.350 oh 150,000.00 52,500
Tukang Kayu 2.300 oh 150,000.00 345,000
Tukang Besi 1.400 oh 150,000.00 210,000
Kepala Tukang 0.405 oh 175,000.00 70,875
Mandor 0.202 oh 160,000.00 32,320
ANALISA 434 1 m² Pasang keramik dinding roman interlcok ukuran 30 x 60 cm 632,800.00 47,100.00 679,900.00
Bahan
Keramik 30 x 60 cm 5.556 bh 45,000.00 250,000.00
Keramik 30 x 60 cm 8.190 kg 45,000.00 368,550.00
Pasir Pasang 0.0450 m³ 250,000.00 11,250.00
Semen Warna 1.0000 kg 3,000.00 3,000.00
Tenaga
Pekerja 0.2500 oh 100,000.00 25,000
Tukang Batu 0.120 oh 150,000.00 18,000
Kepala Tukang 0.0120 oh 175,000.00 2,100
Mandor 0.0125 oh 160,000.00 2,000
jarak
panjang 1 antar
sengkang sengkang
SL15x20 cm cm b h t volume
SL sengkang 8 0.395 0.63 0.15 0.15 0.2 1 0.03
SL pokok 10 0.617 0.15 0.2 1 0.03
0.03
maka jika 1
jarak
panjang 1 antar
sengkang sengkang
KP15x15 cm cm b h t volume
SL sengkang 6 0.222 0.53 0.15 0.15 0.15 1 0.0225
SL pokok 8 0.395 0.15 0.15 1 0.0225
0.0225
maka jika 1
jarak
panjang 1 antar
sengkang sengkang
K40x40 cm cm b h t volume
SL sengkang 10 0.617 1.52 0.15 0.4 0.4 1 0.16
SL pokok 12 0.888 0.4 0.4 1 0.16
0.16
maka jika 1
jarak
panjang 1 antar
sengkang sengkang
K30x40 cm cm b h t volume
SL sengkang 10 0.617 1.32 0.15 0.3 0.4 1 0.12
SL pokok 12 0.888 0.3 0.4 1 0.12
0.12
maka jika 1
jarak
panjang 1 antar
sengkang sengkang
K20x20 cm cm b h t volume
SL sengkang 8 0.395 0.7 0.15 0.2 0.2 1 0.04
SL pokok 10 0.617 0.2 0.2 1 0.04
0.04
maka jika 1
jarak
panjang 1 antar
sengkang sengkang
B120X40+ TORSI cm cm b h t volume
SL sengkang 10 0.617 1.09 0.15 0.2 0.4 1 0.08
SL pokok 12 0.888 0.2 0.4 1 0.08
0.08
maka jika 1
jarak
panjang 1 antar
sengkang sengkang
B120X30+ TORSI cm cm b h t volume
SL sengkang 10 0.617 0.81 0.15 0.2 0.3 1 0.06
SL pokok 12 0.888 0.2 0.3 1 0.06
0.06
maka jika 1
jarak
panjang 1 antar
sengkang sengkang
B120X40 KANTILEVER cm cm b h t volume
SL sengkang 10 0.617 1.09 0.15 0.2 0.4 1 0.08
SL pokok 12 0.888 0.2 0.4 1 0.08
0.08
maka jika 1
Pek pondasi uk tul berat kg/mJARAK m P beton m L beton m T Beton m Volume m3Jumlah Tul
F1 Atas 13 1.004 0.15 1.2 1.2 0.25 0.36 8
F1 Bawah 13 1.004 0.15 1.2 1.2 0.25 0.36 8
Volume
maka jika
Pek pondasi uk tul berat kg/mJARAK m P beton m L beton m T Beton m Volume m3jumlah Tul
F2 Atas 8 0.395 0.15 0.65 1 0.2 0.13 5
F2 Bawah 13 1.004 0.15 0.65 1 0.2 0.13 5
Volume
maka jika
jarak
panjang 1 antar
sengkang sengkang
SL2/RB15x20 uk tul berat kg/m m m b h t volume
Sengkang 8 0.395 0.63 0.2 0.15 0.2 1 0.03
Pokok 10 0.617 0.15 0.2 1 0.03
0.03
maka jika 1
jarak
panjang 1 antar
sengkang sengkang
SL1 20x30 uk tul berat kg/m m m b h t volume
Sengkang 10 0.617 0.9 0.15 0.2 0.3 1 0.06
Pokok 13 1.004 0.2 0.3 1 0.06
Torsi 8 0.395 0.2 0.3 1 0.06
0.06
maka jika 1
jarak
panjang 1 antar
sengkang sengkang
B1 20x40 uk tul berat kg/m m m b h t volume
Sengkang 10 0.617 1.1 0.15 0.2 0.4 1 0.08
Pokok 13 1.004 0.2 0.4 1 0.08
Torsi 8 0.395 0.2 0.4 1 0.08
0.08
maka jika 1
jarak
panjang 1 antar
sengkang sengkang
B2 20x30 uk tul berat kg/m m m b h t volume
Sengkang 10 0.617 0.9 0.15 0.2 0.3 1 0.06
Pokok 13 1.004 0.2 0.3 1 0.06
Torsi 8 1.004 0.2 0.3 1 0.06
0.06
maka jika 1
jarak
panjang 1 antar
sengkang sengkang
K1 20x35 uk tul berat kg/m m m b h t volume
Sengkang 10 0.617 0.98 0.15 0.2 0.35 1 0.07
Pokok 13 1.004 0.2 0.35 1 0.07
0.07
maka jika 1
jarak
panjang 1 antar
sengkang sengkang
KP 15x15 uk tul berat kg/m m m b h t volume
Sengkang 8 0.395 0.48 0.15 0.15 0.15 1 0.0225
Pokok 10 0.617 0.15 0.15 1 0.0225
0.0225
maka jika 1
Pek PELAT uk tul berat kg/mJARAK m P beton m L beton m T Beton m Volume m3jumlah Tul
Atas 8 0.395 0.1 1 1 0.1 0.1 5
Bwah 8 0.395 0.1 1 1 0.1 0.1 5
Volume
maka jika
Pek PELAT t uk tul berat kg/mJARAK m P beton m L beton m T Beton m Volume m3jumlah Tul
Atas 10 0.617 0.1 1 1 0.12 0.12 5
Bwah 10 0.617 0.1 1 1 0.12 0.12 5
Volume
maka jika
berat kg L 2 arah
3.792 7.584 kg
10.752 21.504 kg
berat total 29.088 kg LUAS PENAMAPNG CM2 BERAT KG/M
beratnya 101 kg
P6 6 0.2827 0.222
P8 8 0.5027 0.395
P10 10 0.7854 0.617
P12 12 1.131 0.888
P14 14 1.539 1.12
P16 16 2.011 1.58
P19 19 2.825 2.23
P22 22 3.801 2.98
jumlah panjang
sengkang 1 total
m/tulangan sengkang berat toal
6.6666666667 4.2 1.659 kg
4 2.468 kg
m³ berat total 4.127 kg
m³ beratnya 137.5667 kg
jumlah panjang
sengkang 1 total
m/tulangan sengkang berat toal
6.6666666667 3.533333 0.7844 kg
4 1.58 kg
m³ berat total 2.3644 kg
m³ beratnya 105.0844 kg
jumlah panjang
sengkang 1 total
m/tulangan sengkang berat toal
6.6666666667 10.13333 6.252267 kg
8 7.104 kg
m³ berat total 13.35627 kg
m³ beratnya 83.47667 kg
jumlah panjang
sengkang 1 total
m/tulangan sengkang berat toal
6.6666666667 8.8 5.4296 kg
8 7.104 kg
m³ berat total 12.5336 kg
m³ beratnya 104.4467 kg
jumlah panjang
sengkang 1 total
m/tulangan sengkang berat toal
6.6666666667 4.666667 1.843333 kg
4 2.468 kg
m³ berat total 4.311333 kg
m³ beratnya 107.7833 kg
jumlah panjang
sengkang 1 total
m/tulangan sengkang berat toal
6.6666666667 9.266667 5.717533 kg
8 7.104 kg
m³ berat total 12.82153 kg
m³ beratnya 160.2692 kg
jumlah panjang
sengkang 1 total
m/tulangan sengkang berat toal
6.6666666667 7.4 4.5658 kg
5 4.44 kg
m³ berat total 9.0058 kg
m³ beratnya 150.0967 kg
jumlah panjang
sengkang 1 total
m/tulangan sengkang berat toal
6.6666666667 9.266667 5.717533 kg
8 7.104 kg
m³ berat total 12.82153 kg
m³ beratnya 160.2692 kg
jumlah panjang
sengkang 1 total
m/tulangan sengkang berat total
5 3.15 1.24425 kg
4 2.468 kg
m³ berat total 3.71225 kg
m³ beratnya 123.7417 kg
jumlah panjang
sengkang 1 total
m/tulangan sengkang berat total
7 6.3 3.8871 kg
6 6.024 kg
2 0.79 kg
m³ berat total 10.7011 kg
m³ beratnya 178.3517 kg
jumlah panjang
sengkang 1 total
m/tulangan sengkang berat total
7 7.7 4.7509 kg
8 8.032 kg
2 0.79 kg
m³ berat total 13.5729 kg
m³ beratnya 169.6613 kg
jumlah panjang
sengkang 1 total
m/tulangan sengkang berat total
7 6.3 3.8871 kg
8 8.032 kg
2 2.008 kg
m³ berat total 13.9271 kg
m³ beratnya 232.1183 kg
jumlah panjang
sengkang 1 total
m/tulangan sengkang berat total
7 6.86 4.23262 kg
10 10.04 kg
m³ berat total 14.27262 kg
m³ beratnya 203.8946 kg
jumlah panjang
sengkang 1 total
m/tulangan sengkang berat total
7 3.36 1.3272 kg
4 2.468 kg
m³ berat total 3.7952 kg
m³ beratnya 168.6756 kg
I PEKERJAAN PENDAHULUAN
1 Pembersihan lokasi sebelum dan sesudah 208.00 m²
2 Bowplank 58.00 m'
3 Pembuatan gudang dan alat-alat 12.00 m²
4 Bedeng buruh 9.00 m²
5 Sewa air, alat dan listrik 1.00 Ls
IX PEKERJAAN ELEKTRIKAL
1 Instalasi Lampu 36.000 unit
2 MCB + MCB Box 2.000 unit
3 Memasang Stop Kontak 13.000 unit
4 Memasang Lampu dan Fitting 31.00 unit
5 Lampu Taman 4.00 Unit
6 Memasang Saklar Tunggal 11.00 unit
7 Memasang Saklar Ganda 6.00 unit
X PEKERJAAN SANITASI
1 Memasang floor drain 4.000 unit
2 Memasang Bak Cuci Stainles + Accesorires 1.000 unit
3 Memasang Pipa PVC 4' 20.900 m'
4 Memasang Pipa PVC 3' 44.800 m'
5 Memasang Pipa PVC 2' 49.900 m'
6 Memasang Pipa 3/4' 74.500 m'
7 Memasang kran 6.00 unit
8 Membuat Septictank 1.00 unit
9 Membuat Sumur Resapan 2.00 unit
10 Memasang Kloset Duduk 3.00 unit
11 Memasang Shower 3.00 unit
12 Memasang Wastafel 3.00 unit
Panjang Lebar Tinggi Jumlah keterangan
16.00 13.00
16.00 13.00
3.00 4.00
3.00 3.00
5.00 0.60
keliling atap, tritisan 0,7, hitung mulai sisi bawah lalu kanan dst
perhitungan dengan program dengan menjumlahkan masing-masing sisi
perhitungan dengan program dengan menjumlahkan masing-masing sisi
3.00 2.00
lantai 1 luas sama dengan area pelat hebel + teras lt 1samping
luas lantai 2 = luas lantai 1 + balkon kecil depan - lubang jemuran
PERHITUNGAN DINDING
ukuran pintu jendela luas
P1 2.20
P2 3.70
P3/P6 2.20
P4 3.77
P5 1.53
J1 1.60
J2 1.35
J3 2.25
J4 1.21
J5 3.14
J6 3.50
na bolak-balik
na bolak-balik
ela 2 jendela bulat
di kurangi P/J
di kurangi P/J
di kurangi P/J
g keramik interlock
s keramik dinding KM
hitung dari balkon lt 2 K anak, balkon kecil lt 2 depan, balkon KM utama, dan tangga
e Septictank + KM lt 2 ke Septictank
apan + Wastafel K l 2+ KM lt 2 ke sumur resapan + cuci dapur + air hujan dari tempat jemur ke jalan
n balkon KM utama + Balkon Kecil depan + Dak atas tangga + balkon KM anak
et + shower)+ kran belakang + ke dapur + saluran KM lt 1 ke KM lt 2 (wasteafel, closet, shower) + (dari saluran ke belakang nai
luran ke belakang naik ke KM lt 2 dekat tangga (wastafel, shower dan closet)
PEKERJAAN : RUMAH 2 LANTAI Type 125/91, Blok A3
LOKASI : Khalifa Residence, Tanjung Barangan, Palembang
2 Pintu Kaca Geser Aluminium UPVC Putih/coklat (dapur + tangga) 2.00 Set 5,557,500 11,115,000
Sub Jumlah 14,715,000
VIII PEKERJAAN ELEKTRIKAL
1 Instalasi Lampu + Stop Kontak 7.00 titik 110,500 773,500
2 Pasang Tuas Handle Genset + Accesories 1.00 set 675,000 675,000
3 Memasang Stop Kontak Panasonic 2.00 bh 45,500 91,000
4 Memasang Lampu dan Fitting 5.00 bh 63,000 315,000
5 Memasang Saklar Tunggal Panasonic 1.00 bh 45,500 45,500
6 Memasang Saklar Ganda Panasonic 2.00 bh 71,500 143,000
Sub Jumlah 2,043,000
IX PEKERJAAN SANITASI
1 Memasang floor drain 1.00 unit 187,000 187,000
2 Memasang Pipa PVC 4' + Accesories 10.00 m' 153,000 1,530,000
3 Memasang Pipa PVC 2,5' + Accesories 10.00 m' 110,000 1,100,000
4 Memasang Pipa 1/2' + Accesories 12.00 m' 30,000 360,000
5 Memasang Krant Air 1.00 unit 448,500 448,500
6 Pasang Wastafel 1.00 unit 638,000 638,000
7 Memasang Kloset Duduk 1.00 unit 3,372,500 3,372,500
8 Memasang Hand Shower 1.00 unit 617,500 617,500
Sub Jumlah 8,253,500
VI PEKERJAAN CAT, FINISHING
1 Cat dinding eksterior vinilex 42.00 m² 57,000 2,394,000
2 Cat dinding interior vinilex 94.00 m² 51,000 4,794,000
3 Railing balkon belakang 2.25 m² 845,500 1,902,375
4 Anak Tangga Besi Naik ke atap Tedmon 9.00 pinjakan 455,000 4,095,000
5 Railing Tedmon Atas 10.50 m² 845,500 8,877,750
6 Perubahan Railing Tangga Hollow menjadi Stailess Stell 12.50 m² 635,000 7,937,500
7 List profil beton 2.25 m' 195,000 438,750
Sub Jumlah 30,439,375
Jumlah Total 158,855,455
Dibulatkan 158,855,000
TERBILANG : # SERATUS EMPAT PULUH TIGA JUTA DELAPAN RATUS ENAM PULUH LIMA RIBU RUPIAH #
MENGETAHUI, MENYETUJUI,
4.86 0.075
2.25 0.375
2.25 1.875
4
13.36
2.004
4
2.25
2.25
4.86
13.36
0.8016
PEKERJAAN : Penambahan Luas Rumah Blok A2
LOKASI : Khalifa Residence, Tanjung Barangan, Palembang Tambahan A2
Lantai II
1 Granit glossy lantai 60x60 6.75 m² 278,200 1,877,850
2 Granit kasar 60x60 Balkon 2.50 m² 305,500 763,750
3 Pagar Balkon Belakang Stainless Kaca 12 mm 2.25 m² 2,100,000 4,725,000
4 Pekerjaan Pasang Tangga Besi Naik Ke Tedmond 1.00 unit 3,750,000 3,750,000
5 Pekerjaan Plafon PVC dan Rangka 6.75 m² 325,000 2,193,750
Sub Jumlah 23,202,700
VII PEKERJAAN PINTU, JENDELA DAN KACA
Lantai I
1 Jendela Kaca Mati dinding tangga Aluminium UPVC 1.00 Set 2,700,000 2,700,000
2 Pintu Single Kaca Aluminium UPVC 1.00 Set 2,650,000 2,650,000
3 Bovenlight KM/WC 30x60 1.00 Set 350,000 350,000
4 Pasang Sekat Kaca Sunglaas utk Ruang Mandi 1.00 set 3,150,000 3,150,000
Lantai II
1 Pasang Kusen + Daun Pintu Kayu Panel 1.00 set 1,900,000 1,900,000
2 Pasang Jendela Kaca Double Aluminium UPVC Balkon 1.00 Set 2,650,000 2,650,000
Sub Jumlah 13,400,000
VIII PEKERJAAN ELEKTRIKAL
1 Instalasi Lampu + Stop Kontak 8.00 titik 130,500 1,044,000
2 Memasang Stop Kontak Panasonic 4.00 bh 45,500 182,000
3 Memasang Lampu dan Fitting 4.00 bh 63,050 252,200
4 Memasang Saklar Tunggal Panasonic 2.00 bh 45,500 91,000
5 Memasang Saklar Ganda Panasonic 1.00 bh 71,500 71,500
Sub Jumlah 1,640,700
IX PEKERJAAN SANITASI
Lantai I
1 Pasang Shower Coloum Set Tiang Wasser/Enchanting E150 1.00 set 2,980,000 2,980,000
2 Memasang Wastafel + Kaca Cermin 1.00 unit 1,374,000 1,374,000
3 Pasang Krant Air 2.00 bh 325,000 650,000
4 Pasang Floor Drain 2.00 bh 280,000 560,000
Sub Jumlah 5,564,000
X PEKERJAAN CAT DAN FINISHING
1 Cat dinding eksterior + interior Jotun dan vinilex 91.26 m² 57,223 5,222,207
2 List profil beton 2.25 m' 195,097 438,969
Sub Jumlah 5,661,176
Jumlah Total 97,642,511
Dibulatkan 97,640,000
TERBILANG : # SEMBILAN PULUH TUJUH JUTA ENAM RATUS EMPAT PULUH RIBU RUPIAH #
MENGETAHUI, MENYETUJUI,
FAHMI SEPTY DEPDIKA