A. IDENTITAS/DATA PERALATAN
No. Failure :-
Nama Equipment : Chiller 01 & Chiller 03
Stasiun : ST. STB
Area Spesifik : ECS
Tanggal & Waktu Mulai Gangguan :-
Tanggal & Waktu Selesai Gangguan : 6 Desember 2022

B. DESKRIPSI GANGGUAN
-

C. TINDAKAN PEERBAIKAN
- Tools Box Meeting
- Emergency Stop & shutdown control panel
- Replacement Vane Motor Positioner CH03 #Compressor 2, CH1 #Compressor 2
OLD
- Instal Wiring Electrical External
- Manual close vane motor Positioner & Kalibrasi
- Install Vane Actuator Positioner To CH03 #Compressor 2, CH1 #Compressor 2
NEW
- Connect wiring electrical to actual
- Re-checking electrical control
- Switch Off CH02
- Test Running CH3& CH1
- Monitoring and Record Data CH3, CH1
- log sheet CH3 & CH1
- Cleaning Area

D. PENYEBAB GANGGUAN / ANALISA MASALAH (Root Cause)


-

E. PERGANTIAN PART / PEMASANGAN PART


- Penggantian actuator van positioner Unit
1. Chiller 01 #Compresor 2
2. Chiller 03 #Compresor 2
.

F. RENCANA IMPROVEMENT
Melakukan perawatan Maintenance Predictive pada chiller System.
Menyediakan Spare Part fast moving seperti sensor water, sensor Pressure, sensor
temperature.

G. LAMPIRAN FOTO

Replacement & Install Actuator vane positioner CH 01 #Comp2

New

Old

Vane Actuator NEW CH01


Penggantian Vane Actuator NEW
#Compresor 02
Replacement & Install Actuator vane positioner CH 03 #Comp2

Old

New

Vane Actuator NEW CH03


Lepas Vane Actuator Old
#Compresor 02

Demikian Laporan Perbaikan ini dibuat dengan sebenar – benarnya, dan dapat di
gunakan sebagaimana mestinya.

Dibuat Oleh, Diketahui Oleh,


Engineer Manager Project ME MRT Jakarta Sect. Head GE UG

Imam Lukmansyah Erman Deniarsah Agung Disa Dwiyarto