No.

7 Jalan PTP 1/3, Taman Perindustrian Tasik Perdana,


Putra Perdana, 47120 Puchong, Selangor, Malaysia.

Tel : +603 – 8090 9222


Fax : +603 – 8090 9111
E-Mail : admin@casamaya.com.my
Website : www.casamaya.com.my
Ø CORPORATE INFORMATION

Date of Incorporation : 04th April 2012


Paid Up Capital : RM 2.5 million
Bankers : Public Bank Berhad
Share Holding and Equity : Mr Chia Yee Wah 60%
: Mr Cheong Meng Wai 30%
: Mr Chan Yee Fatt 10%
Total 100%

Board of Director : Mr Chia Yee Wah


: Mr Cheong Meng Wai
: Mr Chan Yee Fatt

No. of Employee : 75 persons


Company Activity : a) Sales of new elevator and escalator
b) Installation, testing and commissioning
c) Services and maintenance
d) Modernization of existing old lift systerm
e) Sales of elevator and escalator part,
Accessories and components.
f) Repairing works elevator and escalator
g) Other works
PERAKUAN PENDAFTARAN
Adalah dengan ini diperakui bahawa kontraktor yang dinyatakan di bawah ini telah berdaftar dengan
Lembaga mengikut Bahagian VI Akta Lembaga Pembangunan Industri Pembinaan Malaysia 1994.
Pendaftaran ini adalah tertakluk kepada syarat-syarat yang telah ditetapkan bersama perakuan ini.

No. Pendaftaran : 0120140902-KN158558

Nama Kontraktor : CASA MAYA SDN. BHD.

Alamat Berdaftar : B3-2-32,JALAN PINGGIRAN 1/3,TAMAN PINGGIRAN PUTRA,SEKSYEN 1,


43300 SERI KEMBANGAN
SELANGOR

Daerah : PETALING

Tarikh Mula Berdaftar : 02/09/2014

GRED KATEGORI PENGKHUSUSAN


G7 B B04
G7 CE CE21
G7 ME M03 M15

Tarikh Mula Berkuatkuasa : 19/11/2020

Tarikh Habis Tempoh Perakuan : 17/04/2023

STATUS: AKTIF

Ketua Eksekutif
Lembaga Pembangunan Industri Pembinaan Malaysia
Tarikh: 19/11/2020
SYARAT-SYARAT PENDAFTARAN

1.Syarat Am 3.Tindakan Tatatertib


a) Perakuan ini tidak boleh dipindah milik. Pendaftaran kontraktor hendaklah dibatal atau digantung jika:-
b) Lembaga mempunyai hak mengkaji semula gred a) kontraktor tidak mematuhi kehendak mana-mana
pendaftaran kontraktor dari semasa ke semasa. undang bertulis yang lain;
2.Tanggungjawab dan Obligasi Kontraktor b) kontraktor telah dihukum menjadi bankrap;
a) Kontraktor hendaklah mematuhi peruntukan-peruntukan c) petisyen penggulungan berhubungan dengan kontraktor
Akta Lembaga Pembangunan Industri Pembinaan telah diserahkan;
Malaysia 1994 ('Akta'), peraturan-peraturan yang dibuat d) kontraktor melanggar atau tidak mematuhi mana-mana
di bawahnya dan apa-apa terma, syarat-syarat atau peruntukan Akta;
sekatan yang dikenakan oleh Lembaga dari semasa ke
e) kontraktor telah mendapat Perakuan dengan membuat
semasa.
atau menyebabkan dibuat apa-apa akuan, pemerakuan
b) Kontraktor tidaklah boleh menyertai mana-mana tender atau representasi palsu atau fraud secara bertulis atau
atau melaksanakan apa-apa kerja pembinaan selepas selainnya;
habis tempoh Perakuan ini dan sehingga ianya
f) kontraktor meninggalkan apa-apa kerja pembinaan yang
diperbaharui.
diakujanji tanpa apa-apa sebab yang munasabah;
c) Kontraktor tidaklah boleh mengakujanji membina apa-
g) kontraktor telah didapati bersalah kerana cuai oleh
apa projek pembinaan yang melebihi nilai kerja
mahkamah atau mana-mana lembaga penyiasatan yang
pembinaan yang dinyatakan di bawah gred pendaftaran
ditubuhkan di bawah mana-mana undang-undang
dan tidaklah boleh melaksanakan apa-apa projek
bertulis berhubungan dengan apa-apa kerja pembinaan
pembinaan di luar kategori pendaftarannya.
yang diakujanji; atau
d) Kontraktor hendaklah mengemukakan maklumat
h) kontraktor telah melanggar mana-mana terma dan
mengenai apa-apa kerja pembinaan atau kontrak dalam
syarat-syarat Tanggungjawab dan Obligasi Kontraktor
tempoh empat belas hari selepas diaward atau sebelum
yang dinyatakan dalam perenggan 2.
mula kerja atau mana-mana terdahulu.
a.Jadual Gred & Had Tender
e) Kontraktor hendaklah mengemukakan apa-apa
maklumat yang dikehendaki oleh Lembaga dari semasa Gred Keupayaan Menender / Menjalankan Kerja (RM)
ke semasa. G7 Tiada Had
f) Kontraktor hendaklah mempamerkan Perakuan G6 Tidak melebihi 10 juta
Pendaftarannya yang dikeluarkan oleh Lembaga atau
G5 Tidak melebihi 5 juta
salinan Perakuan Pendaftaran yang diperakui oleh
Lembaga di tempat perniagaannya. G4 Tidak melebihi 3 juta

g) Kontraktor hendaklah mempamerkan nombor G3 Tidak melebihi 1 juta


pendaftaran atas papan tanda di setiap tapak G2 Tidak melebihi 5 ratus ribu
pembinaannya.
G1 Tidak melebihi 2 ratus ribu
h) Kontraktor hendaklah memohon untuk memperbaharui
pendaftaran dalam tempoh enam puluh hari sebelum
4.Definisi Status
tarikh habis tempoh yang dinyatakan dalam Perakuan
itu. a) Baru: Kontraktor yang baru berdaftar

i) Kontraktor hendaklah mematuhi semua kehendak dan b) Aktif: Kontraktor tempatan yang di anugerah projek
ketetapan di dalam Kod Etika Kontraktor. dalam tempoh tiga (3) tahun terkini atau mempunyai
projek sepanjang tempoh pendaftaran berkuatkuasa.
j) Kontraktor hendaklah melantik pekerja binaan mahir
dan penyelia tapak yang diakreditasi dan diperakui oleh c) Dorman: Kontraktor yang tidak di anugerah sebarang
Lembaga. projek dalam tempoh tiga (3) tahun terkini.

k) Semua pekerja di tapak bina hendaklah mempunyai Kad


Personel Binaan yang masih sah.
SIJIL PEROLEHAN KERJA KERAJAAN

Adalah disahkan syarikat/Firma ini adalah berdaftar dengan Lembaga Pembangunan Industri Pembinaan
Malaysia dan tertakluk kepada syarat-syarat termaktub bersama sijil ini.

No. Pendaftaran : 0120140902-KN158558


Nama Kontraktor : CASA MAYA SDN. BHD.
Alamat Berdaftar : B3-2-32,JALAN PINGGIRAN 1/3,TAMAN PINGGIRAN
PUTRA,SEKSYEN 1,
43300 SERI KEMBANGAN
SELANGOR
Daerah : PETALING
Tarikh Mula Berdaftar : 02/09/2014

GRED KATEGORI

G7 B (Pembinaan Bangunan)
G7 CE (Pembinaan Kejuruteraan Awam)
G7 ME (Mekanikal dan Elektrikal)

PEGAWAI SYARIKAT YANG DITAULIAHKAN NO. K/P

MOHD YUSRI BIN MD JALIL 880725265283


OOI CHIN BOON 610710025455
CHEONG MENG WAI 810310145155
NUR SHANAFIZA BINTI ROSLIN 940317146308
CHIA YEE WAH 720904065049

Tarikh Mula Berkuatkuasa : 19/11/2020


Tarikh Habis Tempoh Perakuan : 17/04/2023

Ketua Eksekutif
Lembaga Pembangunan Industri Pembinaan Malaysia
Tarikh: 19/11/2020
SYARAT-SYARAT PENDAFTARAN

1.Syarat Am 3.5. Syarikat/Pemegang sijil yang dikenakan tindakan senarai hitam/gantung


melalui prosiding tatatertib tidak akan dikeluarkan dari senarai daftar
1.1. Sijil ini dikeluarkan berdasarkan maklumat-maklumat yang telah
CIDB. Syarikat/Pemegang sijil berkaitan hanya di benar menyertai
diberikan oleh Pemohon/Syarikat.
tender atau terlibat dengan perolehan Kerajaan selepas tempoh senarai
1.2. Sijil ini tidak boleh digunakan sebagai perakuan bagi hitam/penggantungan selesai.
memulakan/mengakujanji untuk melaksanakan kerja-kerja pembinaan.
4.HAD KEWANGAN (KOS KERJA)
Sijil ini hanya boleh digunakan untuk menyertai perolehan kerja
Kerajaan atau agensi yang berkaitan dengan kerajaan sahaja. 4.1 Kontraktor yang berdaftar di bawah Sijil Perolehan Kerja Kerajaan
hanya dibenarkan menyertai tender yang dipelawa bagi Gred
1.3. Sijil ini akan terbatal dengan sendirinya jika Perakuan Pendaftaran
pendaftaran yang ianya didaftarkan.
Kontraktor telah tamat tempoh sahlaku atau dibatal/digantung menurut
Peraturan 15, Peraturan Pendaftaran Kontraktor (Industri Pembinaan) 4.2.Had Nilai Perolehan Kerja (Bangunan/Awam/Mekanikal)
1995.
Gred Pendaftaran Had Nilai Perolehan Kerja (RM)
1.4. Sijil ini hendaklah dikemukakan bersama-sama Perakuan Pendaftaran
G1 200,000.00 dan ke bawah
Kontraktor semasa menyertai tender kerja Kerajaan atau agensi yang
berkaitan dengan kerajaan sahaja. G2 200,001.00 hingga 500,000.00

1.5. Sijil ini hendaklah diperbaharui bersama-sama dengan Perakuan G3 500,001.00 hingga 1,000,000.00
Pendaftaran Kontraktor yang dikeluarkan oleh Lembaga Pembangunan G4 1,000,001.00 hingga 3,000,000.00
Industri Pembinaan Malaysia (CIDB).
G5 3,000,001.00 hingga 5,000,000.00
2.Tanggungjawab Syarikat/Pemegang Sijil
G6 5,000,001.00 hingga 10,000,000.00
2.1. Syarikat/Pemegang sijil ini tidak boleh meminjamkan, memajak,
G7 Melebihi 10,000,000.00
memindahmilik, membenarkan atau menyebabkan apa-apa perkara yang
menyebabkan sijil ini digunakan oleh seseorang yang tidak dinamakan 4.3.Had Nilai Perolehan Kerja (Fasiliti)
untuk menggunakan sijil ini bagi tujuan mendapatkan perolehan Gred Pendaftaran Had Nilai Perolehan Kerja (RM)
Kerajaan.
G4 Sehingga 3,000,000.00
b) Kontraktor tidaklah boleh menyertai mana-mana tender atau
G5 3,000,001.00 hingga 5,000,000.00
melaksanakan apa-apa kerja pembinaan selepas habis tempoh Perakuan
ini dan sehingga ianya diperbaharui. G6 5,000,001.00 hingga 10,000,000.00

2.2. Hanya pegawai-pegawai syarikat yang dinamakan di dalam sijil ini G7 Melebihi 10,000,000.00
dibenarkan untuk menandatangani dokumen kontrak syarikat dan
4.4.Had Nilai Perolehan Kerja (Elektrikal)
mengambil dokumen tawaran serta menghadiri lawatan tapak bagi kerja
undi, sebut harga dan Tender. Syarikat juga tidak boleh mewakilkan Gred Pendaftaran Had Nilai Perolehan Kerja (RM)
pegawai lain bagi perkara dinyatakan. G1 Sehingga 200,000.00
2.3. Syarikat/Pemegang sijil hendaklah memastikan semua syarat-syarat G2 Sehingga 500,000.00
yang ditetapkan bagi mendapatkan sijil ini dipatuhi di sepanjang tempoh
G3 Sehingga 1,000,000.00
sahlaku sijil ini.
G4 200,001.00 hingga 3,000,000.00
2.4. Sebarang Perubahan maklumat hendaklah dimaklumkan kepada
Lembaga Pembangunan Industri Pembinaan Malaysia (CIDB) dalam G5 200,001.00 hingga 5,000,000.00
tempoh 30 hari dari tarikh perubahan tersebut itu berlaku. G6 200,001.00 hingga 10,000,000.00
2.5. Syarikat/Pemegang sijil hendaklah mematuhi semua arahan dan G7 200,001.00 dan ke atas
ketetapan yang dikeluarkan oleh Kerajaan melalui Arahan
Perbendaharaan, Surat Pekeliling CIDB yang dikeluarkan dari semasa 5.Kawasan Operasi
ke semasa. Jenis Perolehan Kawasan Operasi Gred
3.Tindakan Atas Keingkaran
Tender Di Seluruh Negara a) G7,G6,G5 dan G4
3.1. Syarikat/Pemegang sijil yang gagal mematuhi perkara 2; b) G3 (Taraf
Tanggungjawab Syarikat/Pemegang Sijil akan dikenakan tindakan Bumiputera)
tatatertib sebagaimana yang ditetapkan di dalam Peraturan 15, Peraturan
Pendaftaran Kontraktor (Industri Pembinaan) 1995 Di Negeri Berdaftar G3

3.2. Lembaga ini berhak mengambil tindakan tatatertib dan mengenakan Sebutharga Di Daerah didaftarkan G1
apa-apa hukuman yang sewajarnya terhadap kontraktor berdaftar.
Di Negeri berdaftar G2
3.3. Syarikat/Pemegang sijil yang dijatuhi tindakan gantung, atau tarik balik
Kerja Undi & Di Daerah didaftarkan G1
Sijil Perolehan Kerja Kerajaan melalui prosiding tatatertib tidak boleh
menyertai tender atau terlibat dengan perolehan Kerajaan dalam tempoh ‘Requisition’
yang telah ditetapkan.

3.4. Syarikat/Pemegang sijil yang dikenakan tindakan batal/tarik balik Sijil


Perolehan Kerja Kerajaan akan dikeluarkan dari senarai daftar CIDB.
Syarikat/Pemegang sijil berkaitan yang ingin mendapatkan semula Sijil
Perolehan Kerja Kerajaan dikehendaki untuk mematuhi syarat-syarat
pengeluaran Sijil Perolehan Kerja Kerajaan bagi permohonan baru.
Pegawai pengurusan utama syarikat yang di senarai hitam akan dihalang
untuk mendapatkan Sijil Perolehan Kerja Kerajaan untuk tempoh 3
tahun.
KEMENTERIAN KEWANGAN MALAYSIA
SIJIL AKUAN PENDAFTARAN SYARIKAT

NO. SIJIL : K66027079292086674

NO. RUJUKAN PENDAFTARAN : 357-02223999

TEMPOH SAH LAKU : 21/11/2018 - 20/11/2021

Bahawa dengan ini diperakui syarikat :


CASA MAYA SDN BHD ( 985422-X )
B3-2-32, JLN PINGGIRAN 1/3,
TMN PINGGIRAN PUTRA,SEKSYEN 1,
ULU LANGAT
43300 ULU LANGAT
SELANGOR, MALAYSIA

Telah berdaftar dengan Kementerian Kewangan Malaysia dalam bidang bekalan/perkhidmatan di bawah sektor, bidang
dan sub-bidang seperti di Lampiran A. Kelulusan ini adalah tertakluk kepada syarat-syarat seperti yang dinyatakan di
Lampiran B. Individu yang diberi kuasa oleh syarikat bagi urusan perolehan Kerajaan adalah seperti berikut :

MOHD DZUKARNA'IN BIN KAMIS 750126015201 PROJECT MANAGER


CHIA YEE WAH 720904065049 OPERATION OFFICER

t.t

DATO' OTHMAN BIN SEMAIL


Perbendaharaan Malaysia Semenanjung
b.p. Ketua Setiausaha Perbendaharaan
Kementerian Kewangan Malaysia

Tarikh Berdaftar Dengan Kementerian Kewangan Malaysia : 21/11/2018

(Sijil ini adalah cetakan komputer dan tidak memerlukan tandatangan)


LAMPIRAN A

NO SIJIL : K66027079292086674
NO RUJUKAN PENDAFTARAN : 357-02223999
TEMPOH SAH LAKU : 21/11/2018 - 20/11/2021

BIL TARIKH KOD


DAFTAR BIDANG KETERANGAN STATUS
BIDANG

1 19/11/2018 080101 KEJURUTERAAN AWAM, BINAAN DAN KELENGKAPAN Aktif


KEMUDAHAN AWAM/ KELENGKAPAN/KEMUDAHAN AWAM/
KELENGKAPAN/KEMUDAHAN AWAM
2 19/11/2018 220113 PERKHIDMATAN/ PENYELENGGARAAN DAN PEMBAIKAN Aktif
KENDERAAN/ MEMBAIK PULIH TAYAR
3 19/11/2018 220505 PERKHIDMATAN/ PENYELENGGARAAN/PEMBAIKAN Aktif
KEJURUTERAAN DAN KOMUNIKASI/ MECHANISATION SYSTEM
(CONVEYOR, LIFT DLL)

Nota :
1. Bilangan Tambah Bidang Pada 19/11/2018 : 3

Tarikh Berdaftar Dengan Kementerian Kewangan Malaysia : 21/11/2018


LAMPIRAN B
SYARAT KELULUSAN SIJIL AKUAN PENDAFTARAN SYARIKAT

1. SYARAT AM
1.1 Kelulusan ini diberi berdasarkan maklumat-maklumat yang telah disampaikan oleh pihak syarikat tuan.

1.2 Apa-apa perubahan ke atas maklumat-maklumat tersebut hendaklah dibuat kemaskini secara online di Modul Kemaskini Profil di
alamat www.eperolehan.gov.my dalam tempoh masa dua puluh satu (21) hari dari tarikh perubahan tersebut berlaku dan
sekiranya gagal berbuat demikian boleh mengakibatkan tindakan seperti di para 1.5 di bawah.

1.3 Syarikat hendaklah mengemukakan segala maklumat dalam tempoh yang ditetapkan apabila diminta oleh Kementerian Kewangan Malaysia.
Kegagalan berbuat demikian akan mengakibatkan tindakan seperti di para 1.5 di bawah.

1.4 Syarikat hendaklah memastikan bahawa bidang yang telah didaftarkan dalam sijil ini tidak bertindih dengan bidang yang telah diluluskan ke atas
mana-mana syarikat seperti berikut:
1.4.1 Mempunyai Pemilik atau Lembaga Pengarah/Pengarah, Pengurusan dan Pekerja yang sama; atau
1.4.2 Beroperasi di premis yang sama.

1.5 Kementerian Kewangan Malaysia berhak untuk membuat lawatan atau pemeriksaan audit pada bila-bila masa tanpa dimaklumkan terlebih
dahulu. Kegagalan mematuhi syarat-syarat pendaftaran, kod bidang dan/atau pendaftaran syarikat tuan boleh digantung/dibatalkan dan
syarikat, Pemilik serta Lembaga Pengarah/Pengarah diambil tindakan tatatertib termasuk disenaraihitamkan tanpa apa-apa notis jika didapati
maklumat yang diberi tidak benar.

1.6 Syarikat yang baru didaftarkan tidak dibenarkan membuat sebarang perubahan ke atas Pemilik atau Pengarah dalam tempoh
enam (6) bulan daripada tarikh syarikat didaftarkan.

1.7 Kegagalan syarikat membuat permohonan pembaharuan pendaftaran selepas satu (1) tahun dari tarikh tamat tempoh pendaftaran boleh
mengakibatkan pendaftaran syarikat dengan Kementerian Kewangan Malaysia akan dibatalkan dan dikeluarkan secara automatik daripada
Sistem ePerolehan. Syarikat hendaklah membuat permohonan baru.

2. PENGGANTUNGAN/PEMBATALAN PENDAFTARAN
2.1 Pendaftaran syarikat akan digantung/dibatalkan sekiranya didapati syarikat melakukan kesalahan seperti berikut:

2.1.1 Syarikat/pemilik/perkongsian/pengarah/mana-mana ahli pengurusan telah melakukan jenayah dan didapati bersalah oleh mahkamah di
Malaysia atau luar negeri atau mengalami tanggungan sivil.
2.1.2 Syarikat menarik balik tawaran sebelum tender dipertimbangkan atau menolak setelah tawaran dibuat.

2.1.3 Syarikat gagal melaksanakan obligasi kontrak-kontrak yang telah ditandatangani dengan Kerajaan.

2.1.4 Syarikat didapati meminda Sijil Akuan Pendaftaran Syarikat dengan tujuan menipu atau lain-lain maksud.

2.1.5 Syarikat membenarkan Sijil Akuan Pendaftaran Syarikat disalahgunakan oleh individu/syarikat lain.

2.1.5 Syarikat didapati membuat pakatan harga dengan syarikat-syarikat lain semasa memasuki tender Kerajaan atau subkontrak tanpa
persetujuan terlebih dahulu daripada Agensi Kerajaan yang terlibat.

3. PEMBAHARUAN

3.1 Syarikat tuan hendaklah mengemukakan permohonan pembaharuan pendaftaran tiga (3) bulan sebelum tamat tempoh pendaftaran.

3.2 Permohonan yang diterima selepas tamat tempoh pendaftaran adalah dianggap pendaftaran pembaharuan.

4. HAK KERAJAAN
4.1 Sijil Akuan Pendaftaran Syarikat yang dikeluarkan secara Virtual adalah HAK KERAJAAN .Kerajaan berhak untuk menarik balik
pendaftaran/digantung/dibatalkan sekiranya syarikat dikenakan tindakan tatatertib selaras dengan 1PP/PK8 (Pekeliling Perbendaharaan/
Perolehan Kerajaan 8) .

5. PENYERTAAN PEROLEHAN KERAJAAN


5.1 Dengan pengeluaran Sijil Virtual, Sijil ini tidak lagi perlu ditunjukkan semasa mengambil dokumen perolehan Kerajaan (pembelian terus,
tender/sebut harga dan lain-lain kaedah perolehan) kecuali bagi Agensi Kerajaan yang tiada capaian internet.
5.2 Syarikat hendaklah memastikan pendaftaran dengan Kementerian Kewangan Malaysia masih sah laku sepanjang tempoh
kontrak berkuat kuasa.

6. PERINGATAN MENGENAI KESALAHAN RASUAH


6.1 Sebarang perbuatan atau percubaan rasuah untuk menawar atau memberi, meminta atau menerima apa-apa suapan secara rasuah kepada dan
daripada mana-mana orang berkaitan perolehan Kerajaan merupakan suatu kesalahan jenayah di bawah Akta Suruhanjaya Pencegahan Rasuah
Malaysia 2009 [Akta 694].
Ente Certificazione Macchine
2. Certificate of Compliance of Certification
1. Manufacturer/Holder
Mark
Corporate Name ORIENTAL (GUANGZHOU)
ELEVATOR CO., LTD.
Address 7/1 Yongxing Road,
EC Type Examination of Compliance
Wenquan Town, Conghua, of Certification Mark
Guangzhou, Guangdong, No. 0O160726.OEDN66
Country China
Holder As above

3. Certification Mark 4. Verification to Standard

EN 81-20:2014
European Type
Conformity Approved Related to Directive:
2014/33/EU
(Lifts and safety components for lifts)
5. Product Type – Model(s)
Type Elevator With Machine Room
TKJF-400kg~TKJF-1600kg
Model(s)
1.0m/s~2.5m/s
6. Technical data
***
7. Remark
The product(s) has been verified on a voluntary basis. The product(s) satisfies the requirements of the Safety
Compliance Mark of ECM, in reference to the above listed Standard(s). The above Certification Safety Mark can be
affixed on the product(s) accordingly to the ECM regulation (see www.entecerma.it) about its release and its use.
Whereas the Manufacturer is responsible of the CE certification of the product(s) and not exempted to perform all
the necessary activities before placing the product(s) on the market. The Manufacturer is also responsible to
maintain efficient the internal production control to ensure the product(s) is in compliance with the Safety
Compliance Mark.
This certificate can be checked for validity at www.entecerma.it
8. Release date
Place: Valsamoggia (BO) - ITALY ECM – Ente Certificazione Macchine Srl
Date: 26/07/2016
Expiry date 25/07/2021
_________________________________
Tim Mahan (Certification Manager)

Ente Certificazione Macchine Srl


Via Ca’ Bella, 243 – Loc. Castello di Serravalle – 40053 Valsamoggia (BO) - ITALY
 +39 051 6705141  +39 051 6705156  info@entecerma.it  www.entecerma.it
Technical Specifications Parameters Of Passenger Machine Room Elevator

Lift Type Machine Room Elevator

Type of Driving AC VVVF Driving

Traction machine type: Traction Gearless

Elevator Model TKJF 630 TKJF 800 TKJF 1000 TKJF 1600

Rated Load 400kg-630kg 675kg-800kg 816kg-1025kg 1030kg-1600kg

Max. Useful Car Area 1.11㎡-1.6㎡ 1.76㎡-1.9㎡ 2.05㎡-2.48㎡ 2.48㎡-3.5㎡

Max. useful Car Area(m2) 60m-80m 80m 120m

Rated Speed 1.0m/s-1.75m/s 1.0m/s-2.5m/s 1.0m/s-2.5m/s 1.0m/s-2.5m/s


Diameter Of The Traction
400mm-410mm
Sheave
Balance Coefficient 0.4-0.5
Suspension Ration 2:1
Diameter Of The Suspension
10mm
Rope
Number Of Suspension Rope 4 5 5 7-8
Guide Rail Of The Car T75/B T89/B T89/B T114/B

Guide Rail Of Counter Weight TK5A TK5A-T75/B TK5A-T75/B TK5A-T75/B

Compensation Chain Provided if travel ≥ 30m

Distance Between Bracket ≤ 2500mm

Permissible Total System Mass


1000kg(min)-4000kg(max)
P+Q(kg)

Permissible Rated Load Mass 408kg(min)-1600kg(max)

Car Weight(kg) 650kg(min)-1800kg(max)

Safety Gear Type Progressive

Overspeed Governer OX-240F


Brake Type Electromagnetic Type

Landing Door Locking Devices IL-32161-1

Ente Certificazione Macchine Srl


Via Ca’ Bella, 243 – Loc. Castello di Serravalle – 40053 Valsamoggia (BO) - ITALY
 +39 051 6705141  +39 051 6705156  info@entecerma.it  www.entecerma.it
Passenger Elevator
2.1 Safety Gear
Model Type Certificate No. Notified Body Permissible Total System Manufacturer

Hangzhou Huning Elevator Accessories


QJB2500 PSG 071-2008-CHI NB 0036 0.25m/s-2.5m/s
CO.,Ltd.

2.2 Overspeed Governor


Model Type Certificate No. Notified Body Permissible Total System Manufacturer
Ningbo Aodepu Elevator Components
OX-240F CN.CE.0660.02-01/12 NB 1128 0.25-2.5m/s
Co.,Ltd.

2.3 Traction Machine


Model Type Certificate No. Notified Body Permissible Total System Manufacturer

GTW7 TM037-2010-CHI NB 0036 0.2-1.75m/s Suzhou Torin Drive Equipment Co.,Ltd.

GTW9 EU-BD 991 NB 0036 0.2-2.0m/s Suzhou Torin Drive Equipment Co.,Ltd.

GTS BDU 008/1-2009-CHI NB 0036 0.2-3m/s Suzhou Torin Drive Equipment Co.,Ltd.

2.4 Buffer
Model Type Certificate No. Notified Body Permissible Total System Manufacturer
Hebei Dongfang Fuda Machinery
YH51/80 BSI-LB-516942 NB 0086 Max Impact Speed 1.15m/s
Co.,Ltd.
Hebei Dongfang Fuda Machinery
YH52/175 BSI-LB-516943 NB 0086 Max Impact Speed 1.84m/s
Co.,Ltd.
Hebei Dongfang Fuda Machinery
YH53/220 BSI-LB-516945 NB 0086 Max Impact Speed 2.07m/s
Co.,Ltd.
Hebei Dongfang Fuda Machinery
YH54/280 BSI-LB-516946 NB 0086 Max Impact Speed 2.07m/s
Co.,Ltd.
Hebei Dongfang Fuda Machinery
YH55/435 BSI-LB-516947 NB 0086 Max Impact Speed 2.08m/s
Co.,Ltd.

2.5 Landing Door Locking Devices


Model Type Certificate No. Notified Body Permissible Total System Manufacturer
Ningbo Ouling Elevator Components
IL-32161-1 SCMB.0010 NB 1128 AC230V / DC110V
Co.,Ltd.

Ente Certificazione Macchine Srl


Via Ca’ Bella, 243 – Loc. Castello di Serravalle – 40053 Valsamoggia (BO) - ITALY
 +39 051 6705141  +39 051 6705156  info@entecerma.it  www.entecerma.it
Ente Certificazione Macchine
2. Certificate of Compliance of Certification
1. Manufacturer/Holder
Mark
Corporate Name GOSHIN ELEVATOR
TECHNOLOGY CO.,LTD.
Address No.1718 Hengtong Avenue, EC Type Examination of Compliance
Qidu Town, Wujiang District, of Certification Mark
Suzhou City,
Jiangsu Province No. 0O180201.GET0T92
Country China
Holder As above

3. Certification Mark 4. Verification to Standard

EN 81-20:2014
European Type
Conformity Approved Related to Directive:
2014/33/EU
(Lifts and safety components for lifts)
5. Product Type – Model(s)
Type Machine Room Type Elevator
Model(s) AP600~AP1600, 400kg~1700kg, 1.0m/s~8.0m/s.
6. Technical data
See the annex

7. Remark
The product(s) has been verified on a voluntary basis. The product(s) satisfies the requirements of the Safety
Compliance Mark of ECM, in reference to the above listed Standard(s). The above Certification Safety Mark can be
affixed on the product(s) accordingly to the ECM regulation (see www.entecerma.it) about its release and its use.
Whereas the Manufacturer is responsible of the CE certification of the product(s) and not exempted to perform all
the necessary activities before placing the product(s) on the market. The Manufacturer is also responsible to
maintain efficient the internal production control to ensure the product(s) is in compliance with the Safety
Compliance Mark.
This certificate can be checked for validity at www.entecerma.it
8. Release date
Place: Valsamoggia (BO) - ITALY ECM – Ente Certificazione Macchine Srl
Date: 01/02/2018
Expiry date 31/01/2023
_________________________________
Amanda Payne
(Deputy Manager)

Ente Certificazione Macchine Srl


Via Ca’ Bella, 243 – Loc. Castello di Serravalle – 40053 Valsamoggia (BO) - ITALY
 +39 051 6705141  +39 051 6705156  info@entecerma.it  www.entecerma.it
Technical Specifications Parameters Of Motor Room Type Elevator
Lift Type Machine Room Type Elevator
Type of Driving AC VVVF Traction Machine
Traction machine type: Permanent Magnet Synchronous Gearless Motor
Elevator Model AP 600 AP 800 AP 1000 AP 1600
Rated Load(kg) 400~680kg 700~860kg 900~1200kg 1250~1700kg
Rated Speed(m/sec) 1.0~3.0m/s 1.0~5.0m/s 1.0~8.0m/s 1.0~8.0m/s
Max. useful Car Area
1.11~1.76m2 1.80~2.13m2 2.20~2.76m2 2.85~3.73m2
(m2)
Max. Traveling Height (m) ≤550 m
Control Type Fully Collective &Selective Control
Machine Type
Diameter of Traction
320~520mm 400~700mm
Sheave(mm)
Suspension Ration 2:1 2:1&4:1
Balance coefficient 0.4-0.5 0.4-0.5
Diameter of Suspension Ropes
8 &10mm 10, 12, 14 & 16mm
[mm]
Number of Suspension
4-8 6-10 7-12 8-16
Ropes
Guide Rail of the Car T75/B T89/B T89/B T114/B
Guide Rail of the
TK5A TK5A TK5KA~T75/B T75/B~T89/B
Counterweight
Distance Between
< 2500 mm
Brackets(m)
Compensation Chain Provided for travel>30m
Permissible Total
1000~4000kg
System mass(kg)
Permissible Rated Load Mass(kg) 400~1800kg
Car Weight(kg) 650~2400kg
Safety Gear(Type) Progressive - AQ10A
Over speed Governor OX-240 XS-250 XS-250 XS-9D
Diameter of Governor Rope
6~8mm 8~12mm
[mm]
Brake(Type) Electromagnetic-Mechanical Type
Buffer(Type) YH51~YH88/1740
Landing Door Locking
IL-32161-1
Device

Ente Certificazione Macchine Srl


Via Ca’ Bella, 243 – Loc. Castello di Serravalle – 40053 Valsamoggia (BO) - ITALY
 +39 051 6705141  +39 051 6705156  info@entecerma.it  www.entecerma.it
COMPANY ORGANIZATION CHART
CASA MAYA SDN BHD

MR. CHIA YEE WAH


Managing Director
Safety and Health official

MR. CHEONG MENG WAI


General Manager

MR. CHAN YEE FATT


Manager

Repair and
Sale Installation Maintenance Finance QC & QA Procurement R&D
Upgrading
Department Department Department Department Department Department Department
Department

Department Department Department Department Department Department Department Department


Manager Manager Manager Manager Manager Manager Manager Manager

Service Testing Account Purchasing Design


Sale Personnel Project Team QC & QA Team
Team Team Dept. Dept. Dept.

Research & Testing Call Back Repair Safety & Health Inventory
Human
Design Team Team Team Team Team Dept.
Resource

Upgrading Forwarding Customer Part’s QC


Team Dept. Service Dept. &QA Team

CASA MAYA SDN. BHD.


CHEONG MENG WAI
GENERAL MANAGER
CP LIF 01/15/117

MOHD SHAHRUL MOHD YUSRI BIN MD JURIMUZILAH BINTI


MUHAMMAD
HAKIMI JALIL MUSALI
HARIS
PROJECT ENGINEER PROJECT COORDINATOR PROJECT ADMIN
PROJECT ENGINEER CP LIF 02/20/140
MAINTENANCE ORGANIZATION CHART

SERVICING

A
TEAM

LIE DIN SHAZWI AZRIL NAZRIIN

TECHNICAL

B
TEAM
KHAIRUL VASAN MIE EDDIE
SUKRI

CHEONG MENG WAI CHAN YEE FATT


GENERAL MANAGER MAINT. MANAGER
MPSJ/
JKR
MALINDO DANIALL HAKIM
FARIQ
MAINT. ENGINEER

MEGAN, UE3, SURIA & FAWINA COURT, LCS

ZUL FENDI BOY IZZAT SIDDIQ

NABIL HAIMAN RIZAL AFNAN HAFUZA


MAINTENANCE ORGANIZATION CHART (JB BRANCH)

A
TEAM

DZUL SUHIRMAN SULAIMAN SELAMAT YASIR

CHEONG MENG WAI CHAN YEE FATT


GENERAL MANAGER MAINT. MANAGER

B
TEAM

ERIC AW SUHAIDI FIRDAUS DESMOND DAING

TAN CHENG
AZLI HOE
MAINTENANCE ORGANIZATION
MAINTENANCE CHART
ORGANIZATION CHRT (PENANG
(PENANG BRANCH)
BRANCH)

SHANKAR
AH BI
RAMAKRISHNAN

SIMON OOI DEVADOSS


DIRECTOR MANAGER

DURAI OSMAN
SHANEMOUGAVEL
COMPANY SUBSIDIARY CHART
CASA MAYA SDN. BHD.
B3-2-32, Jalan Pinggiran 1/3, Taman Pinggiran Putra,
Seksyen 1, 43300, Seri Kembangan, Selangor.

MR. CHIA YEE WAH


Managing Director
Safety and Health official
MR. CHEONG MENG WAI
General Manager

MR. CHAN YEE FATT


Manager

Pahang /
Penang Kelantan Melaka Johor
Terengganu
Branch Branch Branch Branch
Branch

Mr. Calvin Kang Chee Kok Encik. Syazwan Mr. Kumar Encik Dzul
Mr. Simon Ooi CB
No. 18, Jalan Indera No. 47, Jalan BPM 8, Taman
1-L5-9 Ltg Hajjah Rehamah, 3823, Tingkat 1, Jalan No. 153, Jalan Sentral 24, Taman
Mahkota 16/4, Taman Seri Bukit Piatu Mutiara, 75150,
Metro Avenue, 11600 Hamzah, 15050, Kota Nusa sentral, 79100, Iskandar
Perdana , Bandar Indera, Melaka.
Penang Bharu, Kelantan. Puteri, Johor.
25200, Kuantan, Pahang
LIST FOR PROJECT OF NEW SALES (NEW INSTALLATION)

SELANGOR
Total unit of lift per
No Project Name / Client Name Specification Status
project

1 Azhar System Resources (Laksamana Jaya KPKT) P15-C105-11Stops 1 Completed

2 Cuang Cheng Mao Yi Sdn Bhd, My Dear F2000-CO45-3Stops 1 Completed

3 Dato' Hiew Fook Sang P6-CO60-4Stops 1 Completed

4 Foodlink Kitchen Planner Sdn Bhd Dumbwaiter 2P-2stops 1 Completed

5 Hatitech International Sdn. Bhd. (Kepong) P6-C030-4Stops 1 Completed

6 Hatitech International SB - Puchong DW-150kg-2Stops 1 Completed

7 Jet Yang Construction & Trading S/B P20-C105-7Stops 4 Completed

8 Klinik Pakar Kulit Ko Sdn Bhd HIRO 160 1 Completed


JMB Pangsapuri Spring Court Blok G & J (Taman
9 P15-CO105-13Stops 2 Completed
Mas KPKT)

10 JMB Rumah Pangsa Taman Segar Perdana (KPKT) P15-C060-9Stops 2 Completed

11 Levo Interior Design Sdn Bhd, Go Hotel usj P6-CO30-3Stops 1 Completed

12 Lim Kee Ann - Jenjarom P6-C30-4Stops 1 Completed

13 Mainstream Mediacomm Sdn Bhd P6-2S30 - 2Stops 1 Completed

14 Ming Qu Antique House SB P22-CO60-6Stops 1 Completed

15 Mr. Tony Lee P8-CO60-3Stops 1 Completed

16 Myrelo Sdn Bhd P15-CO60-5Stops 1 Completed

17 Nano Meditron (AP) Sdn Bhd P5-CO30-3Stops 1 Completed

18 PA Builder Sdn Bhd P6-2S45-6Stops 1 Completed

19 Pembinaan Saujana Impian P6-2S30-3Stops 1 Completed


Persatuan Alumni Taiwan, Selangor & Wilayah
20 P8-CO60-6Stops 1 Completed
Persekutuan
P12-CO60-5Stops x 2
21 PPEC (M) Sdn Bhd 3 Completed
OB15-CO60-3Stops x 1
22 Sin Huat Hin Logistic Sdn Bhd P6-2S30-4Stops 2 Completed

23 Sinar Interior Decoration, (Assunta Hindu) P8-CO30-4Stops 1 Completed

24 Surialand Development Sdn Bhd P6-CO30-4Stops 1 Completed

25 Taner Industrial Technology (M) S/B P6-C30-4Stops 1 Completed

26 Top Home Builder Development SB P8-CO60-4Stops 1 Completed

27 Unique Design (M) Sdn Bhd, Lot 110 P6-C30-3S-3Stops 1 Completed

28 Unique Design (M) Sdn Bhd, Lot 118 P6-2S30-3Stops 1 Completed

29 Unique Design (M) Sdn Bhd, Lot 36 P8-2S45-3Stops 1 Completed

30 Unique Design (M) Sdn Bhd, Lot 47E P6-2S30-4Stops 1 Completed

31 Unique Design (M) Sdn Bhd, Lot 78E P6-CO30-3Stops 1 Completed

32 Unique Design (M) Sdn Bhd, Lot 79 P6-2S30-4Stops 1 Completed

Page 1 of 13
UPDATED ON 10/12/2020
LIST FOR PROJECT OF NEW SALES (NEW INSTALLATION)

SELANGOR
Total unit of lift per
No Project Name / Client Name Specification Status
project
33 Unique Design (M) Sdn Bhd, Lot 90 P6-2S30-3Stops 1 Completed

34 Unique Design (M) Sdn Bhd, Lot BK9 P10-CO60-3Stops 1 Completed

35 Unique Design (M) Sdn Bhd, No 28 P8-2S45-3Stops 1 Completed

36 Unique Design (M) Sdn Bhd, No 5 P8-CO60-3Stops 1 Completed

37 Wei Hung Powder Coating SB P8-CO60-3Stops 1 Completed

38 White Cube Sdn Bhd P65-2S30-4Stops 1 Completed

ESCALATOR 8 Completed
39 Worldland Properties Sdn. Bhd.
P22-CO90-7Stops 2 Completed

40 Zeltis Construction Sdn Bhd P6-2S30-2Stops 1 Completed

41 Z-Hong Renovation P6-2S30-2Stops 1 Completed

42 Bandar Murni Sdn Bhd P12-C060-5stops 1 In Progress


P22-CO60-3 Stops
43 Alpine Affluent Sdn Bhd (Kitacon) P22-CO60-4 Stops 12 In Progress

44 HXC Catering Sdn Bhd - Sekinchan PL30 (Indoor Esc) 2 In Progress


P17-C105-13Stops
45 JMB Desa Perangsang (KPKT) 4 Completed
P17-C105-14Stops
46 JMB Pangsapuri Kota Pendamar (KPKT) P15-CO105-10Stops 2 Completed

47 JMB Pangsapuri Permai Indah (KPKT) P15-CO105-12Stops 8 In Progress


JMB Pangsapuri Puchong Permai (Puchong
48 P17-C105-11Stops 6 In Progress
Permai KPKT)
49 JMB Pangsapuri Seri Era (KPKT) P15-CO105-9Stops 2 Completed

50 Muara Canggih SB (Sepang) P12-C060-5stops 1 In Progress

51 Sim See Hua Brothers Sdn Bhd (Simfoni) P17-CO105-23stops 4 In Progress


P10-CO60-4Stops
52 Stoneace Industries Sdn Bhd (Lot 7950) 2 In Progress
3000KG-CO60-4Stops
P20-CO105-14Stop
53 Kpkt - JMB Pangsapuri Buginvilla 4 In Progress
P17-CO105-14Stop
Bandar Pengurusan Bersama Apartment Golden
54 P12-CO105-9Stop 2 Completed
Villa (KPKT)
55 Angkara Setia Development Sdn Bhd P10-CP60-4Stop 1 Completed

56 Wing Hong Lim Lip Sdn Bhd - Petaling Street P17-2S60-5Stop 1 In Progress
P15-CO90-15Stops
57 LPHS - Ampang Mewah 6 In Progress
P15-CO90-5Stops
58 NSL Global Enterprise (Kuala Selangor) P10-C60-3Stops 1 In Progress
Wong Sau Yin & Kong Cheng Chieh (EVA)
59 P6-C60-3Stops 1 In Progress
- Alam Damai 33
P15-CO105-13Stops
60 Segaman Sdn Bhd (Rumah Selangorku) 3 In Progress
B17-CO105-13Stops
61 GMI (German Malaysia Institute) P6-CO60-10Stops 1 In Progress

62 GMI (German Malaysia Institute) P6-CO60-11Stops 2 In Progress


Page 2 of 13
UPDATED ON 10/12/2020
LIST FOR PROJECT OF NEW SALES (NEW INSTALLATION)

SELANGOR

63 Xin Hwa Trading TKJF5000-2CO30-3Stops 1 In Progress

P7-CO60-5Stops
64 PJ Hotel 2 In Progress
P15-CO60-6Stops
65 Scenic Marina Sdn Bhd P15-CO015-20Stops 4 In Progress

Total unit of lift per project : 123

KUALA LUMPUR
Total unit of lift per
No Project Name / Client Name Specification Status
project
1 Beef Innovations Sdn Bhd DB150KG-2Stops 1 Completed

2 Dato' Seri Mat Shah Bin Safuan P6-2S45-2Stops 1 Completed

3 GBC Interior & Engineering Works P10-60-3Stops 1 Completed

4 Madam Karen Lim P6-2S30-3Stops 1 Completed

5 Ng Construction & Engineering Sdn Bhd P6-C060-3Stops 1 Completed

6 Regency Hotel P15-CO150-27Stops 6 Completed

7 Shinryu Co. Sdn Bhd P8-CO60-3Stops 1 Completed

8 Sun Bee Wah, Alam Damai P6-CO30-3Stops 1 Completed

9 YSK Construction & Electrical SB - Fomema P12-CO60-4Stops 1 Completed


P6-SD30-5stops
10 YSK Construction & Electrical SB - Uthant 3 Completed
ZX-Turning Table
11 YSK Construction & Electrical SB - Yulek P6-2S30-4Stops 1 Completed
Casa Suria Cheras Condominium P15-CO90-15Stops
12 2 In Progress
(SHH Construction) P15-CO105-15Stops
P17-CO60-6Stops
Euroland & Development Sdn Bhd
13 P17-OC150-25Stops 5 In Progress
(Alam Damai)
P17-CO150-25Stops

14 LP Teamwork Sdn Bhd (Ng Eng Phang) P8-C60-4Stops 1 In Progress


P15-CO90-7Stops
15 Tans Construction 2 In Progress
C2000-CO60-7Stops
16 Unique Square Sdn Bhd - Gong Ho Herbal Tea P9-CO60-6Stops 1 In Progress

17 Senaricon Sdn Bhd P17-CO60-4Stops 1 In Progress

Total unit of lift per project : 30

TERENGGANU
Total unit of lift per
No Project Name / Client Name Specification Status
project
1 CKJ Engineering & Services Sdn Bhd P6-2S60-2Stops 1 Completed

2 K.Leong air-Cond Sdn Bhd P6-C030-4Stops 1 Completed

3 Pasifik Idaman Sdn Bhd P15-C060-4stops 4 Completed

Page 3 of 13
UPDATED ON 10/12/2020
LIST FOR PROJECT OF NEW SALES (NEW INSTALLATION)

TERENGGANU

P15-C060-7Stops
4 Sp Juta Sdn Bhd (Bentong Mall) 4 In Progress
Car Lift-3500-CO60-4Stop

5 Trek Development Sdn Bhd (Wisma Q&Q) P12-C060-5stops 1 In Progress

Total unit of lift per project : 11

PAHANG
Total unit of lift per
No Project Name / Client Name Specification Status
project
1 Citilite Hotel P8-C060-4Stops 1 Completed

2 Exact Development Sdn. Bhd., MPK Kuantan P10-CO60-7Stops 2 Completed

3 Paw Kong Holding Sdn Bhd P8-CO-30-3stops 1 Completed

4 Rawson Enterprise Sdn Bhd P6-CO60-3Stops 1 Completed

5 SJKC Triang 2 P10-CO60-5Stops 1 Completed

P15-CO60-4Stops x 2
6 SP Jutajaya Sdn. Bhd. , Bentong Mall (SP Smart) P8-CO60-4Stops x 1 4 Completed
P8-CO60-3Stops x 1
Sri Kancil Mas Land Development
7 P6-2S30-2Stops 1 Completed
(PHG) Sdn Bhd
8 Syarikat Boon Sin, Hotel Raub P8-CO30-3Stops 1 Completed

9 SYL Holdings Sdn Bhd P6-C30-4Stops 1 Completed

10 U Boutique Hotel Mgmt (K Lipis) SB P6-C30-4Stops 1 Completed

11 Genting View Resort P14-CO60-7Stops 2 In Progress

Total unit of lift per project : 16

KELANTAN
Total unit of lift per
No Project Name / Client Name Specification Status
project
1 A&L Marketing And Trading (Timur Barat) P6-CO60-5Stops 1 Completed

2 Darson Electronics Sdn Bhd P8-CO60-4Stops 1 Completed

3 Lembaga Kemajuan Ikan Malaysia (LKIM) P9-C60-5Stops 1 Completed

4 T & C Construction P10-CO60-3Stops 1 Completed

5 GM Yap Brothers Sdn Bhd (Gua Musang) P8-C060-5Stops 1 In Progress

6 MSO Corporation Sdn Bhd S15-CO60-7Stops 1 Completed

P15-CO60-11stops 4 In Progress
7 Pembinaan Lznar Sdn Bhd
P17-2S60-11stops 3 In Progress

8 Pon Chok Loon - Kelantan P8-C60-4Stops 1 In Progress

9 Setia Hartamas Sdn Bhd (Phase 1) P6-CO60-4Stops 10 Completed

10 Setia Hartamas Sdn Bhd (Phase 2) P6-CO60-4Stops 9 In Progress

11 CKJ Engineering (Masjid Razaleigh) Dumbwaiter (1 Lot) 1 In Progress

Page 4 of 13
UPDATED ON 10/12/2020
LIST FOR PROJECT OF NEW SALES (NEW INSTALLATION)

KELANTAN

12 VA2 Development Sdn Bhd (VARNA) P11-CO60-5Stops 1 In Progress

Total unit of lift per project : 35

MELAKA
Total unit of lift per
No Project Name / Client Name Specification Status
project
1 EL Sanctuary Sdn Bhd P6-2S30-2Stops 1 Completed

2 Lim Meng Poh P6-C60-3Stops 1 Completed

3 Mr. Terk Yew Tee - Melacca P6-CO30-4Stops 1 Completed

4 WFT Teknologi Sdn Bhd P8-C60-3Stops 1 Completed


Christee Holding Sdn Bhd
9 P8-C060-4Stops 2 In Progress
(Melacca Strait Hotel)
Total unit of lift per project : 6

JOHOR BHARU
Total unit of lift per
No Project Name / Client Name Specification Status
project
1 Good View - Plentong P17-C0150-38Stops 3 Completed

2 Mr Lee Kien Min P9-C60-3Stops 1 Completed

3 Newlift Holdings Pte Ltd, Restoran JB P10-CO60-3Stops 1 Completed

4 Perbadanan Pengurusan Holiday Plaza ESCALATOR 4 Completed

5 Rotary Club Of Batu Pahat P22-C060-3Stops 1 Completed

6 Super One Restaurant SB (128) P8-C060-2Stops 1 Completed

7 Dato Goh Khai Beng P9-C60-3Stops 1 In Progress

P15-CO180-40Stops
8 HuaShi (Malaysia) Sdn Bhd P10-CO180-38Stops 27 Completed
P15-CO60-3Stops

5 Pengerang Memorial Sdn Bhd P15-CO60-4Stops 2 In Progress

6 KK Teo Holdings Sdn Bhd P10-CO60-4Stops 1 In Progress

7 ACG Mediacorp Sdn Bhd P9-C060-7Stops 1 In Progress

Total unit of lift per project : 43

KEDAH
Total unit of lift per
No Project Name / Client Name Specification Status
project
1 Suzhan Resources Sdn Bhd DB300KG-3Stops 2 Completed

Total unit of lift per project : 2

Page 5 of 13
UPDATED ON 10/12/2020
LIST FOR PROJECT OF NEW SALES (NEW INSTALLATION)

PENANG
Total unit of lift per
No Project Name / Client Name Specification Status
project
1 Bestwell Engineering SB DB150KG-2Stops 1 Completed

Total unit of lift per project : 1

PERAK
Total unit of lift per
No Project Name / Client Name Specification Status
project
Hin Ying Properties Sdn Bhd,
1 Ipoh Budget Hotel P8-CO60-4Stops 1 Completed

2 Hotel Axis P8-CO60-4Stops 2 Completed

3 Hotel Axilite P8-CO60-5Stops 1 In Progress

Total unit of lift per project : 4

Total of Projects : 131 Total unit of Lift per project : 271 units

Page 6 of 13
UPDATED ON 10/12/2020
LIST OF MAINTENANCE
KUALA LUMPUR
NO Project Name Location of Equipment Qty Stop
1 Americ Corporation Kuala Lumpur 1 5 Stops
2 Agensy Remote Sensing ARSM (JKR) Kuala Lumpur 1 4 Stops
3 Beef Innovations Sdn Bhd Kuala Lumpur 1 2 Stops
4 Cafelink Kuala Lumpur 1 4 Stops
5 Casa Desa Condominium Kuala Lumpur 10 17-19 Stops
6 Central Market Sdn Bhd Kuala Lumpur 4 3 Stops
7 Danau Pandan Kuala Lumpur 2 11 Stops
8 Dato Saravanan Kuala Lumpur 1 3 Stops
9 Dato's Mat Shah Kuala Lumpur 1 2 Stops
10 Euroland - Dato Sri Choong Kuala Lumpur 1 5 Stops
11 Fomema Kg. Pandan Kuala Lumpur 1 4 Stops
12 GBC (Pavillion Ceylon Hill) Kuala Lumpur 1 3 Stops
13 Ms. Carman Kuala Lumpur 1 3 Stops
14 Help Universiti Kuala Lumpur 5 11 Stops
15 iO Hotel Kuala Lumpur 1 3 Stops
16 KL Hopo Kuala Lumpur 1 6 Stops
17 Kok Lai Yien (Jalil Link) Kuala Lumpur 1 3 Stops
18 Laksamana (Gombak) Kuala Lumpur 1 11 Stops
19 Madam Karen (Damai Gayana) Kuala Lumpur 1 3 Stops
20 Megan Avenue 1 Kuala Lumpur 38 11-14 Stops
21 Menara Uncang Emas Kuala Lumpur 16 12-15 Stops
22 Pantai HillPark 3 Kuala Lumpur 17 4-18 Stops
23 Public Bank (PBB) Kuala Lumpur 1 3 Stops
24 Pudu Impian Kuala Lumpur 3 20 Stops
25 Regency Hotel Kuala Lumpur 6 26 Stops
26 Suria Damansara Kuala Lumpur 16 19 Stops
27 Uthant - Istana sultan pahang Kuala Lumpur 2 5 Stops
28 Ysk.- Bungalow (Yulek) Kuala Lumpur 1 4 Stops
29 Angkara Setia Development Kuala Lumpur 1 4 Stops
30 Wisma MCA Kuala Lumpur 1 3 Stops
31 Euroland & Development Sdn Bhd Kuala Lumpur 5 6-25-25 Stops
32 MS City Hotel Kuala Lumpur 1 3 Stops
33 Embroider Sdn Bhd Kuala Lumpur 1
34 LT Sdn Bhd Kuala Lumpur 1
35 Winner Heights Condominium Kuala Lumpur 6 19 Stops
36 Sun Inns Hotel - Kepong Kuala Lumpur 1 4 Stops
37 99 Speed Mart Selangor 4 14 Stops
Total Unit : 157

Page 7 of 13
UPDATED ON 30.09.2019
LIST OF MAINTENANCE
SELANGOR
NO Project Name Location of Equipment Qty Stop
1 Ampang Mewah Selangor 6 15 Stops
2 Apartment Mawar, Bukit Beruntung Selangor 6 15 Stops
3 Apps Hotel, Kuala Selangor Selangor 2 5 Stops
4 Archtron Research (One Puchong) Selangor 1 5 Stops
5 Az-Zahrah Selangor 1 4 Stops
6 Bizz Hotel Selangor 1 4 Stops
7 Dato Lim (The Mines) Selangor 1 3 Stops
8 Dato Hiew Selangor 1 4 Stops
9 Eco Group Selangor 1 4 Stops
10 Elivest Sdn Bhd (Dr.Ko) Selangor 1 6 Stops
11 Fair View Int. School - Subang Jaya Selangor 1 6 Stops
12 Fawina Court Selangor 7 6 Stops
13 Ferida, Hassan Selangor 1 3 Stops

14 Foodlink Kitchen Planner - King Hery Collage Selangor 1 Dumbwaiter

15 Go Hotel Selangor 1 4 Stops


16 Good Shoppe Selangor 1 4 Stops
17 Hong Tiang Selangor 1 3 Stops
18 Hotel Lisa De Inn Selangor 2 8 Stops
19 Hotel PJ De Inn Selangor 1 3 Stops
20 Wong Chin Choy - Jet Yang Selangor 4 7 Stops
21 JMB Pangsapuri Spring Court Blok G & J Selangor 2 13 Stops
22 Kampung Aman Satu Selangor 2 12 Stops
23 KK Lee - Kajang Selangor 1 5 Stops
24 Ko Skin Laser Centre Sdn Bhd Selangor 1 6 Stops
25 KPKT - Desa Perangsang Selangor 2 14 Stops
26 KPKT - Golden Villa Selangor 1 9 Stops
27 LC Timberland - Factory Selangor 1 3 Stops
28 Selangor 24 16Stops
LCS Management Corporation
29 Selangor 1 Bubble Lift
30 Lee Chong Fatt - Bungalow Selangor 1 3 Stops
31 RZ Auto Works Sdn Bhd Selangor 1 3 Stops
32 Great Promotions Sdn Bhd
Selangor 1 4 Stops
33 Madam Nha Hooy Geoh
34 Iste Marketing Sdn Bhd Selangor 1 3 Stops
35 Kenep Resources (Asia) Sdn Bhd Selangor 1 3 Stops
36 Tiara Kelana Condominium Selangor 10 19 Stops
37 Pangsapuri Kota Pendamar Selangor 2 10 Stops
38 Tiara Duta Condominium Selangor 10 19 Stops

Page 8 of 13
UPDATED ON 30.09.2019
LIST OF MAINTENANCE
SELANGOR
NO Project Name Location of Equipment Qty Stop
39 KPKT - Permai Indah Selangor 8 12 Stops
40 Lim Kee Ann - Jenjarom Selangor 1 4 Stops
41 Lim Kim Hong (Nissan - Mahkota Cheras) Selangor 1 3 Stops
42 Lim Yok Koon (Mahkota Cheras) Selangor 1 2 Stops
43 Menara Jade Selangor 4 14 Stops
45 Ming Qu Selangor 1 5 Stops
46 Mr Jackson Kee (BK9) Selangor 1 3 Stops
47 Mr Lim (Puncak Perdana) Selangor 1 2 Stops
48 Mr. D.I.Y Selangor 1 2 Stops
49 Mr. Gary Lot.118 Selangor 1 3 Stops
50 Dato Zainudin Selangor 1 3 Stops
52 Pangsapuri Impian Meru Selangor 4 8 Stops
54 Persatuan Taiwan Selangor 1 6 Stops
55 Peter Wong Selangor 1 3 Stops
56 PPEC (YB Sri Edmund) Selangor 3 3-5 Stops
57 KPKT - Puchong Permai Selangor 3 17 Stops
58 Puregen Selangor 1 6 Stops
59 Puteri Rosmawini - No 28 Selangor 1 3 Stops
60 Restoran Jaring Selangor 1 4 Stops
61 Rukun Bina (Jalan Ampang - Starbucks) Selangor 1 2 Stops
62 Saga Suria Selangor 3 14 Stops
63 Saujana Puchong Selangor 2 11 Stops
64 Sim See Hua (Lot 187) Selangor 1 3 Stops
65 Sin Huat Hin Selangor 1 3 Stops
66 Steven Koo (Lot 79) Selangor 1 4 Stops
67 Stoneace Selangor 2 4 Stops
68 Sri Bayu Selangor 4 7 Stops
69 Sri Sithi Temple (PJ Hindu Association) Selangor 1 2 Stops
70 Sun Inns Hotel - Balakong Selangor 1 4 Stops
71 Sun Inns Hotel - Bandar Sunway Selangor 1 4 Stops
72 Sun Inns Hotel - IOI Puchong Selangor 2 7 Stops
74 Sun Inns Hotel - Kuala Selangor Selangor 1 4 Stops
75 Sun Inns Hotel - Kota Damansara Selangor 1 5 Stops
76 Sun Inns Hotel - D'Mind 2 Selangor 1 4 Stops
77 KPKT - Buginvilla Selangor 4 14 Stops
77 Sun Inns Hotel - Taman Sg Besi Indah Selangor 1 4 Stops
78 Surialand Selangor 1 6 Stops
79 Taner Industrial Selangor 1 4 Stops

Page 9 of 13
UPDATED ON 30.09.2019
LIST OF MAINTENANCE
SELANGOR
NO Project Name Location of Equipment Qty Stop
80 Time DotCom Berhad - No. 14 Selangor 3 7 Stops
81 Time DotCom Berhad - No. 12 Selangor 1 4 Stops
82 Time DotCom Berhad - No. 9 Selangor 1 7 Stops
83 Top Home Selangor 1 4 Stops
84 Usj Tang Lin Yau Selangor 1 3 Stops
85 Vista Panorama Selangor 4 15 Stops
86 Wei Hung Selangor 1 3 Stops
2 7 Stops
87 Worldland Selangor
8 Escalator
Total Unit : 191

PAHANG
NO Project Name Location of Equipment Qty Stop
1 Kempas Apartment - Genting Highland Pahang 8 24 Stops
2 Sekolah Triang Pahang 1 2 Stops
3 Golden Peak Inn Sdn Bhd Bentong 1 3 Stops
4 Indigo Hotel Bentong, Raub 1 5 Stops
5 Syarikat Boon Sin Bentong, Raub 1 3 Stops
6 Tumike Hotel Sdn Bhd Bentong 1 3 Stops
7 U Boutique Bentong, Mentakap 1 4 Stops
8 Citilite Hotel Kuantan 1 4 Stops
9 CKJ Engineering Kuantan 1 2 Stops
10 Exact Development Kuantan 2 7 Stops
11 MPK, Kuantan Kuantan 4 9 Stops
12 Paw Kong Kuantan 1 4 Stops
13 Rawson Enterprise Kuantan 1 3 stops
14 Kuantan Centre Point Kuantan 1 6 Stops
15 TT Dotcom Sdn Bhd Kuantan 1 2 Stops
16 CJ Bio Malaysia Sdn Bhd Kuantan 1 4 Stops
Total Unit : 27

KELANTAN
NO Project Name Location of Equipment Qty Stop
1 Darson Electronics Kelantan 1 4 Stops
2 Baza Tuan Kelantan 1 4 Stops
3 LKIM Kelantan 1 5 Stops
4 Kasjaria Kim Huat Kelantan 1 3 Stops
5 Setia Hartamas Sdn Bhd Kelantan 10 4 Stops
6 MSO Corporation Sdn Bhd Kelantan 1 6 Stops
Total Unit 15
Page 10 of 13
UPDATED ON 30.09.2019
LIST OF MAINTENANCE
TERENGGANU
NO Project Name Location of Equipment Qty Stop
1 Pasifik Idaman Terengganu 4 4 Stops
Total Unit : 4

MELAKA
NO Project Name Location of Equipment Qty Stop
1 A'Famosa Resort Hotel Melaka 2 5 Stops
2 EL Sanctuary - Vincent Melaka 1 3 Stops
4 Hotel Sri Impian Melaka 2 5 Stops
5 Hotel Super Cowboy Melaka 1 9 Stops
6 Hotel Zac Melaka 1 3 Stops
2 5 Stops
7 Keluargaku Melaka
4 Escalator
8 Kesidang Indah Melaka 2 4 Stops
9 Lim Meng Poh - Taman Ozana Melaka 1 3 Stops
10 Mr. Terk Yew Tee - Melacca Melaka 1 4 Stops
11 Pangsapuri Malinja, Melaka Melaka 3 5 Stops
13 Time Hotel Melaka 2 4 Stops
WFT Teknologi S/B - RNC Repair Specialist
14 Melaka 1 3 Stops
Sdn Bhd
Total Unit : 23

PERAK
NO Project Name Location of Equipment Qty Stop
1 Hotel Axis Taiping Taiping 1 4 Stops
Total Unit : 1

PENANG
NO Project Name Location of Equipment Qty Stop
1 Pu Tien Penang 1 2 Stops
2 Hotel Palm Inn Bukit Mertajam 1
3 Hotel Palm Inn Butterworth 2
4 Golden Nasmir Hotel Seberang Jaya 1
5 Gurney Condominium Penang 12
6 Queencity Hotel Penang 1
7 Jade View Condominium Penang 13
8 Jelutong Jaya Penang 6
9 Taman Serina Pangsapuri Penang 4
10 Hillcity Condo Penang 3
11 Taman York Condo Penang 11
12 Gurney Villa Penang 2
Page 11 of 13
UPDATED ON 30.09.2019
LIST OF MAINTENANCE
PENANG
13 Indah Condo Penang 4
14 Permai Indah Penang 4
15 Gembira Parade Penang 1
Total Unit : 66
JOHOR
NO Project Name Location of Equipment Qty Stop
1 Anika Hotel Johor Bahru 2 13 Stops
2 ATA Industrial (m) Sdn Bhd Johor Bahru 6 7 Stops
3 Bayu Tasek (The Lakefront Shop) Johor Bahru 5 3 Stops
4 D'Carlton Services Resindence Johor Bahru 10 33 Stops
5 Dwi Mahkota Johor Bahru 6 12 Stops
6 Fair View Int. School - Nusajaya Johor Bahru 3 4 Stops
7 8 23 Stops
Holiday Plaza Johor Bahru
8 22 Escalator
9 Jabatan Bomba Johor Bahru 2 5 Stops
10 Kaki - Kaki Master Johor Bahru 1 3 Stops
11 Khairi Consult S/B Johor Bahru 1 3 Stops
12 KK Teo Johor Bahru 2 5 Stops
13 Lee Kien Min (Sheng Yu) Johor Bahru 1 3 Stops
14 Lotte Chemical Titan Johor Bahru 1 4 Stops
15 Mahkamah Johor Johor Bahru 6 7 Stops
16 Matang Holding Berhad Johor Bahru 2 6 Stops
17 Norlan Johor Bahru 1 5 Stops
18 Nusa Perdana Johor Bahru 8 16 Stops
19 One Central Johor Bahru 10 22 Stops
20 1 6 Stops
Ottotree Assets Johor Bahru
21 1 Dumbwaiter
22 Pangsapuri Persiaran Tanjung Johor Bahru 8 17 Stops
23 Pangsapuri Sutera Ph 1 & 2 (The Seed) Johor Bahru 16 6,8 Stops
24 Rotary Club Johor Bahru 1 4 Stops
25 Rpo Media Johor Bahru 2 3 Stops
26 Sky Gardens Johor Bahru 7 22 Stops
27 Suria Mas Johor Bahru 5 12 Stops
28 Super One Restaurant Johor Bahru 1 2 Stops
29 Vivian Tan Johor Bahru 1 4 Stops
30 Yelico Engineering Johor Bahru 1 3 Stops
31 GMax Industrial (Senibong 88) Johor Bahru 1 3 Stops
32 Dato Goh Khai Beng Johor Bahru 2 3 Stops
33 Pusat Komersial Bayu Tasek (A-1-2) Johor Bahru 1 4 Stops
34 Pro Vision Printing Sdn Bhd Johor Bahru 2 3 Stops
35 118 Kopitiam Johor Bahru 1 3 Stops
Page 12 of 13
UPDATED ON 30.09.2019
LIST OF MAINTENANCE

JOHOR

36 Defred Properties Sdn Bhd - Permas Mall Johor Bahru 1 3 Stops


37 Capital Extension (Marina View) Johor Bahru 4
38 Cape EMS Johor Bahru 2 5 Stops

39 Changhuat Plastic Industries (Senai) Sdn Bhd Johor Bahru 2 4 Stops

40 Shobi Hotel Johor Bahru 1 4 Stops


41 MBSB Berhad Johor Bahru 5 4 Stops
42 Menara Larkin Utama Johor Bahru 7 20 Stops
43 Microtronics Technology Sdn Bhd Johor Bahru 2 3 Stops
Total Unit : 172

GOVERNMENT SITE

1 JKR - ARSM Kuala Lumpur 1 3 Stops


2 JKR - Kompleks Sri Bintang Kuala Lumpur 6 6 Stops
3 JKR - Sri Bintang Kuala Lumpur 2 7 Stops
4 JKR - Desa Perwira, Taman Maluri Kuala Lumpur 2 10 Stops
5 JKR - SMK Maxwell Kuala Lumpur 1 6 Stops
6 JKR - Akademi Pencegahan Rasuah(MACA) Kuala Lumpur 6 4 Stops
7 JKR - SMK Petaling, Klang Lama Kuala Lumpur 3 7 Stops
Total Unit : 21

Block A - 3 Stops
1 MPSJ - Kompleks 3C, Subang Jaya Selangor 3 Block B - 3 Stops
Block C - 1 Stops
2 MPSJ - Kompleks 3K, SS13 Subang Jaya Selangor 2 2 Stops

3 MPSJ - Perpustakaan Bandar Puteri Puchong Selangor 1 1 Stops

4 MPSJ - Kompleks 3K, Serdang Raya Selangor 1 2 Stops


5 MPSJ - Ibu Pejabat Selangor 1 3 Stops
Total Unit : 8

Total of Project = 232 Total unit : 685 units

Page 13 of 13
UPDATED ON 30.09.2019