ON GOING PROJECT
PT PLN (PERSERO)
UNIT INDUK PEMBANGUNAN XIII
ON GOING PROJECT
SULAWESI UTARA
ON GOING PROJECT
GI 150 kV PANIKI
4 LB, 1 TB, Tr 30 MVA APLN 39.1 M 100% 2015
Energized
Energized
ST-1
Konstruksi Konstruksi
PT PLN (PERSERO)
UNIT INDUK PEMBANGUNAN XIII
PROJECT
2015
SULAWESI UTARA
PROJECT 2015
GI 150 kV PANIKI (EXT) GI 70 kV BITUNG(EXT)
2LB, 1 TB, 60 MVA APBN 46 M -
GI 150 kV LIKUPANG IBT (NEW)
2018 & GI 70 kV LIKUPANG (EXT)
4 LB, 1 ITB, 60 MVA, 1 CB APLN 75 M - 2016
Disain & Persiapan Dokumen 2 LB APLN 7M - 2015
Disain & Persiapan Dokumen Konstruksi
GIS 150 kV TELING (EXT)
1 TB, 60 MVA APBN 34 M - 2016
GI 70 kV TASIKRIA (EXT)
1 TB, 30 MVA APBN 30.5 M - 2016
GI 70 kV TOMOHON (EXT)
1 TB, 30 MVA APLN 60 M - 2016
GI 150 kV KAWANGKOAN (EXT)
Disain & Persiapan Dokumen T/L 70 kV PLTP LAHENDONG V & VI –
2 LB, 1 TB, 60 MVA APBN 47 M - 2016
KAWANGKOAN
GI 150 kV OTAM (EXT) Disain & Persiapan Dokumen 5 km – 2 x 1 hawk IPP 15 M - 2017
2 LB, 1 TB, 30 MVA APLN 60 M - 2016
Disain & Persiapan Dokumen
Proses Lelang
GI 70 kV TONSEALAMA (EXT)
T/L 150 kV OTAM - MOLIBAGU 1 TB, 30 MVA APLN 50 M - 2016
66 km - 2 x 1 hawk APLN 138 M - 2016 Disain & Persiapan Dokumen
Survey, Disain & Persiapan Dokumen
Disain & Persiapan Dokumen Survey, Disain & Persiapan Dokumen Proses Lelang
PT PLN (PERSERO)
UNIT INDUK PEMBANGUNAN XIII
D. SULAWESI BARAT
PT PLN (PERSERO)
UNIT INDUK PEMBANGUNAN XIII
PROYEK TERKAIT
PROGRAM PEMBANGKIT
35.000 MW
35.000 MW
2 PLTG/MG MINAHASA PEAKER 150 MW 2017 UIP XII UIP XII UIP XII UIP XII UIP XII UIP XII
- T/L 150 kV PLTG/MG Minahasa Peaker - GI Likupang - GI 35 kmr Belum Sudah Sudah APLN Belum
Paniki ( WSUTG) (Izin Prinsip)
- GI 150 kV Paniki (Extension) 2LB, 1TB + Trafo 2017 Belum N/A Sudah APBN Ada
150/20; 60MVA ( WSUTG) Juni 2015
- GI 150/70 kV Likupang (Extnsion) 2 LB,1TB+IBT 2017 Belum N/A Apr-15 APLN Tidak
150/70;60MVA ( WSUTG) mencukupi
4 PLTU SULUT 3 50 MW 2019 UIP XII UIP XII UIP XII UIP XII UIP XII UIP XII Lokasi belum ada
- T/L 150 kV PLTU SULUT 3 - GI Tanjung Merah (KEMA) 10 kmr 2019 Belum Belum Belum Belum APLN Belum
( WSUTG) (Prasarana)
- GI 150 kV Tanjung Merah (Extension) 2 LB 2019 Belum Belum Belum Belum APLN Belum
( WSUTG) (Prasarana)
5 PLTU Talaud 2 x 3 MW 2017 UIP XII UIP XII UIP XII UIP XII UIP XII Terhubung JTM 20 kV
6 PLTU Amurang 0 MW UIP XII UIP XII UIP XII UIP XII UIP XII UIP XII DIVSIS 2 x 25 MW
8 PLTU Tahuna 10 MW 2018 UIP XII UIP XII UIP XII UIP XII UIP XII UIP XII Terhubung JTM 20 kV
TERIMA KASIH