5 GI Semen Baru Bay Trafo 3 150/20 kV 60 MVA Switch Tap Changer Trafo 3 tidak bisa auto
6 GI Cileungsi Bay 70 kV Cibinong 1 - Hotspot Pisau PMS Line Fasa T (87 0C)
- Hotspot T Clamp Crossbar arah PMT Fasa R (80 0C)
- Isolator PMS Rel 1 pecah 1 piring Fasa R dan S
- Hotspot clamp CT PT Combine arah PMS Line Fasa S (77 0C)
Bay 70 kV Cibinong 2 - Hotspot Clamp PMS Line Arah LA Fasa R (62,1 0C)
- Hotspot Clamp PMS Line Arah Isolator tumpu Fasa S (61,7 0C)
- Counter LA Rusak fasa R,S,T
Bay 70 kV Aspek 2 - Counter LA Rusak fasa T
- Tidak ada Counter PMT
Trafo 2 150/20 kV 60 MVA - PMS Rel 1 Penggerak mekaniknya rusak
- Klem di LA Fasa S pecah 1 klem
- Siklus top up gas SF6 PMT 4-5 bulan 1x
Battere unit 1 110 VDC - Tegangan sel battere no.63 Drop ( 0,19 V )
7 GI Kedung Badak Bay Trafo 1 150/20 kV 60 MVA Hotspot Fleksibel Trafo 1 (500C)
Bay Kopel 150 kV Hotspot Klem CT arah PMT Fasa R (500C)
Inc.Trf.2 Indikasi di HMI invalid
8 GI Ciawi Trafo 1 150/20 kV 60 MVA - Rembesan minyak pada valve radiator no.10 dan 5
- Rembesan minyak pada Fire Protection
Bay 150 kV Cibadak Baru 2 Pisau PMS Line keluar tidak sempurna
Trafo 2 150/20 kV 60 MVA WTI HV Rusak
9 GI Bogor Baru Trafo 5 150/20 kV 60 MVA -Hotspot clamp CT Fasa R arah LA (90 0C) 1300 Amp.
-Pondasi retak bay trafo 5 ada 5 titik
HMI - Inverter untuk HMI rusak
- Manuver di Control HMI hanya bisa untuk Bay Trafo 6, Ciawi 1 -2
Bay 150 kV Cianjur 2 TCS bay Cianjur 2 mati 1
Battere Unit 3 Batere unit 3 110Vdc tegangan drop no 39 (0.14), 40 (0.2) 42 (0.17) ,63
(0.17) 300AH
Bay 150 kV Ciawi 2 Tekanan gas SF6 0,60 Mpa ( turun )
Bay 150 kV Cianjur KwH meter bay Cianjur tidak terbaca jelas
Bay 150 kV Sentul 1 Hotspot O Clamp Rel 1Fasa R arah PMT (120 0C) beban 750 Amp
Bay 150 kV Sentul 2 - Hotspot Clamp DS Line Fasa R (86 0C) beban 710 Amp
- Hotspot Clamp DS Line Fasa R (108°C) beban 710 A
10 GITET Cibinong Meter Control Unit Winding IBT 2 Rusak merk XIAN
IBT 2 Kebocoran radiator IBT 2 fasa R
Hotspot clamp CT Netral arah sekunder Netral Fasa R (92°c)
Jarum Penunjukan WTI IBT 1 Rusak merk ABB
IBT 1
Tutup Center tap Bushing primer Fasa T tidak bisa dibuka
PMS 7AB2.2 Stang penggerak PMS 7AB2.2 fasa S bengkok
PMT 7AB1 PMT 7AB1 Keluar masuk PMT lokal dari box PMT
PMS 7B1.3 Hotspot Pisau PMS øR 680C
PMS 7AB4.1 Hotspot Pisau PMS Fasa R (83°C)
IBT 3 Hotspot T Clamp Neutral sekunder Fasa R (60 0C)
Genset Tidak berfungsi secara otomatis
PMS 7AB4.2 Hotspot pisau PMS Fasa S (64°c)
Bay 500 kV Muara Tawar Hotspot klem line dropper arah wavetrap Fasa S (72°c)
PMS 7B4.3 Hotspot pisau PMS Fasa S (64°c)
PMS 7AB2.1 Hotspot pisau Fasa S (74°c)
11 GI Cibinong Bay Trafo 6 150/20 kV 60 MVA - Metering Trafo 6 Eror
HMI - SLD Trafo4, Gandaria2, Cileungsi 2,kopel 70kv,kopel 150kv invalid
IBT4 150/70 kV 100 MVA - Rembesan pada bushing primer & sekunder atas fasa RST
- Rembesan maintank ke Radiator
- Rembesan pada packing OLTC
- Hotspot Pisau PMS Rel 2 Fasa S sisi 70kV *(91°c)
- Hotspot Stut Bushing Sekunder phasa R *(50°c)
Bay Pht. 70 kV Gandaria 2 - Konduktor rantas pada busbar 1 fasa S
Bay Trafo 2 150/20 kV 60 MVA - Rembesan bushing netral primer
- Hotspot Klem PMT arah CT Fasa R (59°c)
- Hospot PMS Rel 1 Fasa R (53°c)
- Hotspot PMS Rel 1 Fasa S (62°c)
Bay Pht. 150 kV Semen Baru 2 - PMS Rel & PMS Line Box Mekanik Gear Aus, Pengoperasian Manual Per
Fasa
Bay Pht. 70Kv Cileungsi 1 - Hotspot Klem CT Arah PMS Line Fasa T *(110°c)
- Hotspot Klem CT Arah PMT Fasa R (65°c)
- Hotspot Klem CT Arah PMT Fasa T (65°c)
- Hotspot PMS Line arah CT fasa S (99°C)
- Hotspot Klem PMS Rel 2 arah Busbar Fasa T (58°c)
- Hotspot Pisau PMS Rel 2 arah Busbar Fasa S (62°c)
- Hotspot Pisau PMS Rel 2 arah Busbar Fasa R (59°c)
Bay IBT 1 500/150 kV 500 MVA - Hotspot Klem PMT arah PMS rel 1 Fasa R sisi 150kV *(58°c)
Bay IBT 2 500/150 kV 500 MVA - Hotspot Klem PMT arah CT Fasa S sisi 150kV (54°c)
- Hotspot Pisau PMS Rel 2 Fasa S sisi 150kV (60°c)
Bay Pht. 150 Kv Sentul 2 - Hotspot Pisau PMS rel 2 Fasa T Bay (91°C)
Bay Pht. 150 Kv Sentul 1 - Hotspot Clamp PMS rel 1 arah busbar Fasa S (67°C)
- Hotspot Pisau PMS rel 1 Fasa R (73°C)
Bay 150 kV Jatirangon 2 - Hotspot Pisau PMS rel 2 Fasa T (62°C)
Bay 150 kV Jatirangon 1 - Hotspot Klem pms line arah CT fasa S (75,5 °c)
Bay Trafo 3 - Hotspot Klem Outgoing Trafo 3 Fasa R (70°c)
- Hotspot Klem Outgoing Trafo 3 Fasa S (60°c)
- Hotspot Klem Outgoing Trafo 3 Fasa R (77°c)
Bay Seksi A - Hotspot Pisau PMS Rel 1 Fasa R (57°c)
Bay Trafo 4 - Hotspot Klem PMS Rel 2 arah Rel 1 Fasa R (79°c)
Bay Trafo 5 150/20 kV 60 MVA - Hotspot Klem CT arah PMT Fasa S (59°c)
- Hotspot Klem CT arah PMT Fasa T (54°c)
12 GI Bunar Bay Trafo 1 70/20 kV 30 MVA - Tap mentok di 16 dan banyak rembesan
Bay 70 kV Kopel - ct rembes
Bay 70 kV Kracak 2 - PMT harus diengkol ( tidak bisa elektrik )
N ANOMALI 2018
Mitigasi Keterangan
Terjadi 08 Des 2014
Terjadi 06 Des 2017, TL : 08 Des 2014
sudah di silicon rubber blm berhasil
Di jadwalkan
Di jadwalkan
Di jadwalkan
Di jadwalkan
Di jadwalkan
Di jadwalkan
Di ganti
Di ganti
Di jadwalkan
Di jadwalkan
Di monitoring
Diganti
Investigasi
Reseting 2/21/2018
Thermo kopel patah
Material sudah ada, MAPP akan koordinasi dengan pak Handy XIAN
Investigasi
Material sudah ada, MAPP akan koordinasi dengan pihak ABB 20-21/10/2018
Investigasi
Koordinasi dengan PDKB Enjinering
Investigasi
Investigasi
Buat Surat ke APB Enjinering
DATA LANJUTAN ANOM
T.6
T.7
T.9
T.10
T.11
T.12
T.13
T.16
T.19
T.20
T.24
T.25
T.26
T.27
3 GIS Katulampa Cianjur-Bogor Baru
10 GITET Cibinong
11 GI Cibinong
12 GI Bunar Kracak-Bunar
DATA LANJUTAN ANOMALI 2018
Masalah Anomali
Isolator Flash Fasa R pada Tower 14
Area sekitar tower longsor
Melengkung
Berkarat
Pentanahan jelek
Pentanahan jelek
Dumper pht 2 tidak ada
Papan nama karat
- Tangga panjat hanya 1 kaki
- Papan nama berkarat
- Braching bengkok
- ACD tidak ada
Chemney patah
- Chemney patah
- ACD tidak ada
Grounding paralel hilang 2 buah
Braching karat
Braching karat
Papan nama hilang
- Chemney patah
- Papan nama hilang
Papan nama hilang
Papan nama hilang
Grounding yang baru hilang
Grounding yang baru hilang
Grounding yang baru hilang
Dumper pht 1 tidak ada
- Tower 33 Pondasi tertimbun tanah
- Tower 85 Tanah amblas
Isolator Flash Fasa R
- Pentanahan lebih dari 10 pada Tower 8, 12, 20, 21, 27, 41, 42, 56
- Pentanahan lebih dari 5 pada Tower 4, 5, 10, 11, 13, 39, 43, 44, 55, 58
- Tiang sisipan berkarat 1-60
- Halaman twr 1 longsong, twr 2,55,58 terkikis, twr 21,33 tanah tebing rawan longsor
- Andongan rendah twr 14-15,37-38,47-48
- Tower 16 penghantar 1 fasa S isolator flash
- Tower 18 penghantar 1 fasa T isolator flash
Mitigasi