AGENDA

1. Safety Induction
2. Sejarah Pembangunan PLTGU Sengkang
3. Sistem Manajemen PT CEPA
4. Proses Combined Cycle Power Plant
5. Plant Tour Block I & II
6. Istirahat
STEAM TURBINE 18 GT12/HRSG 12 GT11/HRSG11

WTP

COOLING TOWER CCR BUILDING

PTP

SENGKANG CCPP BLOCK I


STEAM TURBINE 28 GT 22/HRSG 22
GT 21/HRSG 21

COOLING TOWER

PTP/WTP

SENGKANG CCPP BLOCK II


MUSTER POINT BLOCK I
(The Emergency Evacuation Assembly Area)

MUSTER POINT
MUSTER POINT BLOCK II
(The Emergency Evacuation Assembly Area) PT. ENERGI SENGKANG

MUSTER POINT 1
Near of CCR Building

CCR BUILDING
Beberapa Aturan Dasar
Selama Plant Tour

1. Selama Plant tour dilarang memotret di area


sekitar mesin

2. Selama Plant tour Handphone Wajib di


OFF atau di matikan (bukan di silent)

3. Dilarang makan dan minum di area sekitar


mesin

4. Dilarang berpisah dengan rombongan


Sejarah 01
Untuk mengantisipasi peningkatan kebutuhan tenaga
listrik, mulai tahun 1992 Pemerintah Indonesia
mengundang partisipasi pihak swasta dalam pengadaan
tenaga listrik. Proyek listrik swasta ini dikenal dengan
nama Independent Power Producer (IPP).

Energy World Corporation (EWC) menanamkan investasi


dengan membangun proyek pembangkit listrik melalui
subsidiary-nya yaitu PT. Energi Sengkang dan sekaligus
membangun proyek Kampung Baru Gas Field (Onshore)
sebagai penyuplai gas alam untuk bahan bakar
pembangkit listrik melalui subsidiary yang lain yaitu
Energy Equity EPIC Sengkang.

Gas alam yang diproduksi oleh Energy Equity EPIC yang


berlokasi di Kampung Baru Kec. Gilireng kemudian
disalurkan melalui pipa bawah tanah sepanjang 29 km ke
PT. Energi Sengkang yang berlokasi di Patila Kec.
Pammana.
Sejarah 02
Tanggal 23 April 1996, Penandatanganan Power Purchase
Agreement (PPA) antara PT. Energi Sengkang dengan PT. PLN.

Tanggal 27 September 1997, Commercial Operation of 85 MW


Open Cycle Power Plant (2 x 42.5 MW ALSTOM Gas Turbines).

Tanggal 12 September 1998, Commercial Operation of 135 MW


Combined Cycle Power Plant (Block I).
O & M Contractor : PT. ALSTOM Power Energy Systems
Indonesia Sampai 12 Maret 2012

O & M Contractor : PT. Consolidated Electric Power


Asia Mulai 13 Maret 2012.

Tanggal 19 September 2002, Penandatanganan Amandemen PPA


menjadi 195 MW. Additional 60 MW Simple Cycle (Block II).

Maret 2008, Konstruksi 60 MW Simple Cycle dan Commercial


Operation pada tanggal 17 November 2008, O&M di pegang
langsung oleh PT Energi Sengkang

12 November 2010, Penandatanganan Amandemen PPA menjadi


315 MW. Additional 120 MW untuk Block II menjadi 180 MW
Combined Cycle Power Plant.
About us PT. ENERGI SENGKANG
About us PT. ENERGI SENGKANG
About us PT. ENERGI SENGKANG
About us PT. ENERGI SENGKANG
DEVELOPMENT STATUS CAPACITY UNIT COD
COMBINED CYCLE IN OPERATION 135 MW 12 Sept 1998
GAS TURBINE 21 IN OPERATION 60 MW 17 Nov 2008
GAS TURBINE 22 IN OPERATION 60 MW 08 March 2013
STEAM TURBINE 28 IN OPERATION 60 MW 14 September 2013
TOTAL 315 MW

SENGKANG POWER PLANT CCPP


Sumber RUPTL 2016 2025
Sistem Pembangkit Eksisting Di Sulawesi Selatan

Kapasitas Terpasang: 1366.9 MW


Daya Mampu: 1102 MW
Beban Puncak: 949.8 MW

PLTGU Sengkang 315 MW atau


28.58 % dari total kebutuhan listrik
POWER Milik PLN Existing Rencana
GENERATION Milik IPP/Sewa
275 kV N/A

PLAN 2009 - 2018 D PLTA POSO


150 kV

3x65 MW/720 GWh A 70 kV

D PLTM RANTEBALLA
Gardu Induk
2 x 1,2 MW

PLTA BONTO BATU PLTA MALEA


2 x 50 MW 2 x 45 MW
PLTA POKO Wotu
3 x 78 MW Malili
Mamuju
PLTA BAKARU-2 145 km
2 x 63 MW
PLTA LALINDU PLTA KONAWE
Malea PLTU KOLAKA
PLTU SULSEL 2 x 50 MW 2 x 25 MW
A Palopo 2 x 10 MW
2 x 50 MW Poko
PLTU PROYEK 10RIBU
A B Batu Makale TAHAP2 - 2 x 15 MW
Polman 200 km Sewa PLTD
SUB SISTEM MAKASSAR Majene Bakaru A A MFO 4 MW
A PLTU SULTRA
Enrekang 2 x 10 MW
Pangkep
Sewa PLTD MFO A U U
Pinrang Keera / A
70 MW Tonasa Sidrap LNG Plant Kendari
D Unaaha D
D GU U
Maros Pare Sengkang Kolaka P P
Tallo Lama Bosowa
U
Mandai Soppeng Sewa PLTD
Barru PLTGU SENGKANG
Daya MFO 10 MW
Bontoala 315 MW
Tello
Panakukang Bone PLTP
Tanjung PLTM TANGKA/
D LAENIA 20 MW
Pangkep MANIPI - 6,5+3,5
Bunga Tonasa Raha
Sungguminasa Maros
PLTP
U D G Bosowa
MANGOLO 10 MW
ke PLTU Takalar Tello Sinjai D
3 x 100 MW
PLTU PROYEK 10RIBU Sungguminasa
TAHAP2 - 3 x 100 MW Borongloe PLTU BOSOWA
A Bili-Bili M 2 x 100 MW U
PLTU BAU-BAU Bau-Bau
PLTU PUNAGA TAKALAR U
2 x 10 MW
2 X 100 MW U Bulukumba
U U
Tallasa Jeneponto PLTU BAU-BAU
PLTU JENEPONTO PLN D 2 x 7 MW 18
2 x 100 MW
Vision & Mission

Vision
To be the most valued and respected Power Plant
Operator and Maintenance company in the
industry through outstanding performance.

Mission
To build an Operation and Maintenance Company
for sustainable electricity generation, which is
able to provide the highest profit to shareholders
and become a leader in occupational health and
safety, environmental protection and social
responsibility
Organization Chart PT CEPA
PT. ENERGI SENGKANG

President Director
Stewart Elliot

Managing Director
John Anderson

Power Station
Manager
Toby S Kusuma

QEHS DEpartment

Operation Maintenance
Administration Purchasing
Department Block Department Block
Department Department
I & II I & II
EMPLOYEES

101 PT. ENERGI SENGKANG

138
Operation Department
PT. ENERGI SENGKANG

Responsible for operation of Power station

Single Cycle

Combined Cycle

Coordinate directly with PLN/Government


for setting the amount of power that will be
supply to grid.

Maintain reliability and availability of power


station and operates the plant in safe
manner.
Maintenance Department
PT. ENERGI SENGKANG

Responsible to maintain all equipment


in power plant
Conduct routine maintenance
Example: A , B and C Inspection
Carry out routine maintenance on the
machine and also to solve the
problems occurred
Carry out Preventive Maintenance
Planned and Unplanned corrective
maintenance
Ware House
ADMINISTRATION AND
PURCHASING DEPARTEMENT
PT. ENERGI SENGKANG

Supporting the three other


Department

Purchasing/Procurement
Function

Accounting Function

Human Resources
Administration Function

General Administration Duties


QEHS Department
PT. ENERGI SENGKANG

Ensuring all activities are carried


out in all areas of power station in safe
way with no harm to people,
environment and equipment

Establish and develop Quality,


Environmental, Health and
Safety Management system

Ensuring integrated management


system is maintained and
implemented

Conduct and organize internal and


external audit
Kampung Baru Onshore Gas Field
Energy Equity EPIC (Sengkang) Pty Ltd
Patila Metering Station
Energy Equity EPIC (Sengkang) Pty Ltd
BRAYTON CYCLE

Proses 1 ke 2 (kompresi isentropik). Kerja yang dibutuhkan oleh kompresor

Proses 2 ke 3, pemasukan bahan bakar pada tekanan konstan

Proses 3 ke 4, ekspansi isentropik didalam turbin. Daya yang dibutuhkan turbin

Proses 4 ke 1, pembuangan panas pada tekanan konstan ke udara.


RANKINE CYCLE
SIEMENS GT SGT5 - 1000F PT. ENERGI SENGKANG
SIEMENS GT SGT5 - 1000F PT. ENERGI SENGKANG
SIEMENS GT SGT5 - 1000F PT. ENERGI SENGKANG
ALSTOM-GT8C PT. ENERGI SENGKANG
ALSTOM-GT8C PT. ENERGI SENGKANG

1. Gas Turbine
2. Combustor
3. Gear Block
4. Generator
5. Air Intake
6. Exhaust Stack
7. Gen. Bush Duct
8. Gen.Breaker
module
9. Auxiliary
Transformer
10. Main Transformer
11. Starting Module
12. Control Module
13. Auxiliary Block
14. Cooling Block
15. Fuel Oil Block
16. NOx water Block
17. Control Valve Block
ALSTOM-GT8C PT. ENERGI SENGKANG
COMBINED CYCLE POWER PLANT
PROCESS PT. ENERGI SENGKANG
WATER BALANCE 135 MW
WATER BALANCE 180 MW
Pretreatment Plant Overview

2
To WTP
1
17 6 10

18
3

13
11
8 12 15
7 16
14
9

1. Clarifier 7. Wash Water Tank 13. Clarifier Polimer Day Tank


2. Gravity Filter 8. Sludge Storage Tank 14. Clarifier Polimer Batching Tank
3. Filter Water Basin 9. Wash Water Recovery Tank 15. Sodium Hypoclorite Day Tank
4. Carbon Filter 10.Potable Water Tank 16. Sodium Hydroxide Day Tank
5. Thickener 11.Alum Day Tank 17. Sludge Polimer Day Tank
6. Beltpress 12.Alum Batching Tank 18. Sludge Polimer Batching Tank
Water Treatment Plant Overview

From
PTP 1
11 16 15

17 5 4 3 2
To
14
18 WWT

12

10

19
13 9 8 7 6
20

21

To
Hotwell
1. Break Tank 8. Anion Exchanger 2 15. Neutralisation Tank
2. Organic Scavenger 1 9. Mixed bed Polisher 2 16. Neutral. HCl Metering Tank
3. Cation Exchanger 1 10. Demin Water Tank 17. Mixbed HCl Metering Tank
4. Anion Exchanger 1 11. HCl Tank 18. Cation HCl Metering Tank
5. Mixed bed Polisher 1 12. Brine Tank 19. Anion NaOH Metering Tank
6. Organic Scavenger 2 13. NaOH Tank 20. Mixbed NaOH Metering Tank
7. Cation Exchanger 2 14. Neutralisation Sump 21. Neutral. NaOH Metering Tank
PHILANTROPIC
RESPONSIBILITY

ETHICAL
RESPONSIBILITIES

LEGAL
RESPONSIBILITY

ECONOMIC
RESPONSIBILITY
PROGRAM UKS
BIOGAS PROGRAM 2012

5 Ekor Sapi +Biodigister


COMMUNITY WELFARE
Integrated management System Certification
PT. ENERGI SENGKANG

PT CEPA Indonesia has been certified Integrated Management System by Lloyd Register Quality Assurance
(LRQA)

Quality Management System Standard ISO 9001:2008


Environmental Management System Standard ISO 14001:2004
Occupational Health and Safety Management System Standard OHSAS 18001:2007
Integrated Management system

CERTIFICATE ISO 9001, ISO 14O01 DAN OHSAS 18001 FOR


PT ENERGI SENGKANG
March 2013: Award from Government South Sulawesi for company in the South
Sulawesi who apply Principles of Occupational Health and Safety Management
System.

- - P 55
April 2013: Award from Ministry of Man Power and Transmigration
Indonesia for ZERO ACCIDENT AWARD

- - P 56
February 2014: Award from Government South Sulawesi for
Occupational Health and Safety Performance

- - P 57
February 2015: Award from Government South Sulawesi as the best
company in Occupational Health and Safety Performance

- - P 58
The Company's
Environmental Rating
Program (PROPER)

2008 - 2009 BLUE


2009 - 2010 GREEN
2010 - 2011 BLUE
2011 - 2012 BLUE
2012 - 2013 BLUE
2013 - 2014 BLUE
2014 - 2015 BLUE