1. Safety Induction
2. Sejarah Pembangunan PLTGU Sengkang
3. Sistem Manajemen PT CEPA
4. Proses Combined Cycle Power Plant
5. Plant Tour Block I & II
6. Istirahat
STEAM TURBINE 18 GT12/HRSG 12 GT11/HRSG11
WTP
PTP
COOLING TOWER
PTP/WTP
MUSTER POINT
MUSTER POINT BLOCK II
(The Emergency Evacuation Assembly Area) PT. ENERGI SENGKANG
MUSTER POINT 1
Near of CCR Building
CCR BUILDING
Beberapa Aturan Dasar
Selama Plant Tour
D PLTM RANTEBALLA
Gardu Induk
2 x 1,2 MW
Vision
To be the most valued and respected Power Plant
Operator and Maintenance company in the
industry through outstanding performance.
Mission
To build an Operation and Maintenance Company
for sustainable electricity generation, which is
able to provide the highest profit to shareholders
and become a leader in occupational health and
safety, environmental protection and social
responsibility
Organization Chart PT CEPA
PT. ENERGI SENGKANG
President Director
Stewart Elliot
Managing Director
John Anderson
Power Station
Manager
Toby S Kusuma
QEHS DEpartment
Operation Maintenance
Administration Purchasing
Department Block Department Block
Department Department
I & II I & II
EMPLOYEES
138
Operation Department
PT. ENERGI SENGKANG
Single Cycle
Combined Cycle
Purchasing/Procurement
Function
Accounting Function
Human Resources
Administration Function
1. Gas Turbine
2. Combustor
3. Gear Block
4. Generator
5. Air Intake
6. Exhaust Stack
7. Gen. Bush Duct
8. Gen.Breaker
module
9. Auxiliary
Transformer
10. Main Transformer
11. Starting Module
12. Control Module
13. Auxiliary Block
14. Cooling Block
15. Fuel Oil Block
16. NOx water Block
17. Control Valve Block
ALSTOM-GT8C PT. ENERGI SENGKANG
COMBINED CYCLE POWER PLANT
PROCESS PT. ENERGI SENGKANG
WATER BALANCE 135 MW
WATER BALANCE 180 MW
Pretreatment Plant Overview
2
To WTP
1
17 6 10
18
3
13
11
8 12 15
7 16
14
9
From
PTP 1
11 16 15
17 5 4 3 2
To
14
18 WWT
12
10
19
13 9 8 7 6
20
21
To
Hotwell
1. Break Tank 8. Anion Exchanger 2 15. Neutralisation Tank
2. Organic Scavenger 1 9. Mixed bed Polisher 2 16. Neutral. HCl Metering Tank
3. Cation Exchanger 1 10. Demin Water Tank 17. Mixbed HCl Metering Tank
4. Anion Exchanger 1 11. HCl Tank 18. Cation HCl Metering Tank
5. Mixed bed Polisher 1 12. Brine Tank 19. Anion NaOH Metering Tank
6. Organic Scavenger 2 13. NaOH Tank 20. Mixbed NaOH Metering Tank
7. Cation Exchanger 2 14. Neutralisation Sump 21. Neutral. NaOH Metering Tank
PHILANTROPIC
RESPONSIBILITY
ETHICAL
RESPONSIBILITIES
LEGAL
RESPONSIBILITY
ECONOMIC
RESPONSIBILITY
PROGRAM UKS
BIOGAS PROGRAM 2012
PT CEPA Indonesia has been certified Integrated Management System by Lloyd Register Quality Assurance
(LRQA)
- - P 55
April 2013: Award from Ministry of Man Power and Transmigration
Indonesia for ZERO ACCIDENT AWARD
- - P 56
February 2014: Award from Government South Sulawesi for
Occupational Health and Safety Performance
- - P 57
February 2015: Award from Government South Sulawesi as the best
company in Occupational Health and Safety Performance
- - P 58
The Company's
Environmental Rating
Program (PROPER)