E (TYPE=40;P=41M), JL
FORMAT ISIAN VOLUME DRAINASE
Kabupaten/Kota : Palu
Kecamatan : Palu Barat
Kelurahan : Kamonji
Recana Panjang Drain: 40 meter
Type Drainase : 40
Volume Drainase a1 a2 a3 a4 b1
0.62 0.05 0.51 0.08 0.4
Volume Galian a b
0.67 0.6
Pasangan Batu a1 a3 a4 c1 c2
0.62 0.51 0.08 0.1 0.2
Lapisan Pasir a2 b3
0.05 0.60
Cor Beton a4 b2
0.08 0.2
Type A
Recana Panjang Drainase : 41 meter
Plesteran
Panjang Lebar
41 1.42
Acian
Sama dengan Plesteran
OLUME DRAINASE
b2 b3 c1 c2
0.2 0.60 0.1 0.2
c1
a1
c2
a2
Volume
41.00 m'
Volume
3.81 m3
Volume
16.48 m3
Volume
4.12 m3
Volume
12.36 m3
Volume
1.23 m3
Volume
1.31 m3
Volume
3.81 m3
Volume
58.22 m2
Volume
58.22 m2
a a
b1 c1
a3 a3 a1
b2
a4 a4
c2
a2
b3
RENCANA ANGGARAN BIAYA
REKAPITULASI
NO URAIAN PEKERJAAN
Palu,
KSM, PPTK,
LURAN DRAINASE
AN PRASARANA KELURAHAN
ATAN KELEMBAGAAN
###
TOTAL
JUMLAH
BIAYA
(RP.)
17,574,054
17,574,054
2,013,694 18,306,306.31
732,252 0.11 0.04
20,320,000 2,013,693.69 732,252.25
20,320,000
2,745,945.95
17,574,054.05
2022
PPTK,
HARGA
NO. URAIAN PEKERJAAN SAT VOLUME
SATUAN (RP.)
JUMLAH HARGA
(RP.)
HARGA
NO. URAIAN PEKERJAAN VOLUME SAT
SATUAN (RP.)
A. PEKERJAAN PENDAHULUAN
1 Pekerjaan Pengukuran dan Pemasangan Bouwplank
1. Pekerja 4.10 OH 114,000
2. Tukang Kayu 4.10 OH 135,000
3. Kepala Tukang 0.41 OH 145,000
4. Mandor 0.21 OH 130,000
5. Kayu Balok 5/7 0.49 m³ 2,309,900
6. Paku 2''-3" 0.82 kg 27,700
7. Kayu Papan 3/20 0.29 m³ 2,309,900
JUMLAH - A
B. PEKERJAAN TANAH
1 Pekerjaan Galian Tanah
1. Pekerja 12.36 OH 114,000
2. Mandor 0.41 OH 130,000
2 Pekerjaan Pembuangan Tanah
1. Pekerja 2.92 OH 114,000
2. Mandor 0.15 OH 130,000
3 Pekerjaan Urugan Kembali
1. Pekerja 2.06 OH 114,000
2. Mandor 0.21 OH 130,000
4 Pekerjaan Urugan Pasir
1. Pekerja 0.37 OH 114,000
2. Mandor 0.01 OH 130,000
3. Pasir Urug 1.48 m³ 289,000
JUMLAH - B
C. PEKERJAAN PASANGAN
1 Pekerjaan Pasangan Pondasi
1. Pekerja 1.90 OH 114,000
2. Tukang Batu 2.85 OH 135,000
3. Kepala Tukang 0.29 OH 145,000
4. Mandor 0.29 OH 130,000
5. Batu Belah 4.57 m³ 316,600
6. Semen Portland (SP) 10.35 zak 85,300
7. Pasir Pasang (PP) 2.07 m³ 289,000
2 Pekerjaan Cor Lantai K-125
1. Pekerja 2.16 OH 114,000
2. Tukang Batu 0.36 OH 135,000
3. Kepala Tukang 0.04 OH 145,000
4. Mandor 0.11 OH 130,000
5. Semen Portland (SP) 7.23 zak 85,300
6. Pasir Beton 0.77 m³ 289,000
7. Kerikil 0.74 m³ 402,000
3 Pekerjaan Plesteran Trasram
1. Pekerja 7.57 OH 114,000
2. Tukang Batu 7.57 OH 135,000
3. Kepala Tukang 0.76 OH 145,000
4. Mandor 0.76 OH 130,000
5. Pasir Pasang 1.16 m³ 289,000
6. Semen Portland (SP) 11.90 zak 85,300
4 Pekerjaan Acian
1. Pekerja 11.64 OH 114,000
2. Tukang Batu 5.82 OH 135,000
3. Kepala Tukang 0.58 OH 145,000
4. Mandor 0.58 OH 130,000
5. Semen Portland (SP) 3.78 zak 85,300
JUMLAH - C
D PEKERJAAN FINISHING
1 Pekerjaan Pembersihan
1. Pekerja 5.0 OH 114,000
2. Tukang 3.1 OH 140,000
JUMLAH - D
JUMLAH A - D
TOTAL JUMLAH
Palu,
PPTK,
KSM,
1/RW.04 (TYPE=40;P=41M)
JUMLAH
HARGA (RP.)
467,400
553,500
59,450
26,650
1,136,471
22,714
662,941
2,929,126 2,929,126
1,409,211
53,567
332,997
18,963
234,869
26,783
42,066
1,599
426,564
2,546,617 2,546,617
216,885
385,256
41,379
37,099
1,445,596
882,821
598,207 3,607,243
246,200
48,592
5,314
14,123
616,294
223,718
295,824 1,450,065
862,820
1,021,761
109,745
98,392
336,512
1,015,482 3,444,711
1,327,416
785,970
84,419
75,686
322,801 2,596,292
11,098,311 11,098,311
570,000
430,000
1,000,000 1,000,000
17,574,054
17,574,054 17,574,054
2022
PPTK,
=40;P=41M)
m³ 289,000.00 Rp 289,000.00
Pasir Urug Pasir Urug
Pasir Kali m³ 289,000.00 Pasir Kali Rp 289,000.00
kg Batu Kali Rp 316,600.00
Batu Kali m³ 316,600.00 Kerikil Sun Rp 402,000.00
Kerikil Kali m³ 402,000.00
kg Semen
Air m³ Err:509 Semen Ton Rp 85,300.00
liter
Bahan Kayu
Kayu Kelas ###
Balok 5/7 Rp 75,000.00
Semen
85,300.00
Semen Tonasa zak Paku
kg Paku 2'' Rp 27,700.00
Bahan Kayu
Kayu Kelas III m³ 2,309,900.00
Balok 5/7 btg 2,309,900.00
55,000.00
Linggis buah
Berat Jenis
Semen 50
Pasir beton 1400
Kerikil 1800
Air 1000
DAFTAR HARGA SATUAN BAHAN BANGUNAN
HARGA SATUAN
No. NAMA BARANG SPESIFIKASI SATUAN
(Rp)
1 Pasir, Batu dan Kerikil
1 Pasir Urug m³ Rp 289,000.00
2 Pasir Kali m³ Rp 289,000.00
3 Batu Kali m³ Rp 316,600.00
4 Kerikil Sungai m³ Rp 402,000.00
2 Semen
1 Semen Tonasa 50 kg/zak zak Rp 85,300.00
3 Bahan Kayu
1 Kayu Kelas III Daerah m³ Rp 2,309,900.00
2 Balok 5/7 Daerah m³ Rp 2,309,900.00
4 Paku
1 Paku 2'' 2'' - 3'' kg Rp 27,700.00
DAFTAR HARGA SATUAN UPAH
HARGA SATUAN
No. URAIAN SATUAN
(Rp)
1 Pekerja/Buruh Org/Hari Rp 114,000.00
2 Tukang Org/Hari Rp 135,000.00
3 Tukang Batu Org/Hari Rp 135,000.00
4 Tukang Kayu Org/Hari Rp 135,000.00
5 Tukang Besi Org/Hari Rp 135,000.00
6 Tukang Las Org/Hari Rp 135,000.00
7 Tukang Aluminium Org/Hari Rp 135,000.00
8 Tukang Cat Org/Hari Rp 135,000.00
9 Tukanng Pipa Org/Hari Rp 135,000.00
10 Tukang Listrik Org/Hari Rp 135,000.00
11 Kepala Tukang Org/Hari Rp 145,000.00
12 Mandor Org/Hari Rp 130,000.00
REKAPITULASI
LAPORAN KEMAJUAN PELAKSANA
: JL. BANTILAN, RT.01/RW.04 (TY
RENCANA
No. URAIAN PEKERJAAN HARGA
VOL. SAT.
SATUAN (Rp)
1 Pengukuran & Pemasangan Bouwplank 41.00 m' 71,442
2 Pekerjaan Galian Tanah 16.48 m³ 88,750
3 Pekerjaan Buangan Tanah 12.36 m³ 28,472
4 Pekerjaan Urugan Tanah Kembali 4.12 m³ 63,500
5 Pekerjaan Urugan Pasir 1.23 m³ 382,300
6 Pekerjaan Pondasi Campuran 1SP : 4PP 3.81 m³ 948,027
7 Pekerjaan Cor Lantai K-125 1.31 m³ 1,107,867
8 Pekerjaan Plesteran Trasraam 1PC : 2PP 58.22 m² 59,167
9 Pekrjaan Acian 58.22 m² 44,595
10 Pekerjaan Finishing 1.00 ls 1,000,000
TOTAL RAB
SISA - -
Palu, 2022
JUMLAH UPAH
NO. NAMA PEKERJA SPESIFIKASI PEKERJAAN JUMLAH DITERIMA
HARI HARIAN
1 Mandor 2.71 130,000 352,861
TOTAL 9,188,168
Mandor 1
Kepala Tuka 1
Tukang Batu 1
Tukang Kay 1
Pekerja 3
16.695508
Mandor
Kepala Tukang
50
USALIM, SH.
KETUA
DAFTAR HADIR PEKERJA
PEKERJAAN : PEMBANGUNAN/REHAB SALURAN DRAINASE
PELAKSANA : KSM KEL. LERE
LOKASI : JL. BANTILAN, RT.01/RW.04 (TYPE=40;P=41M)
TAHUN ANGGARAN : 2022
Hari
HARI KERJA
NO. NAMA PEKERJA SPESIFIKASI PEKERJAAN
1 2 3 4 5 6 7
1 Mandor
2 Kepala Tukang
3 Tukang Batu
4 Tukang Batu
5 Tukang Kayu
6 Pekerja/Buruh
7 Pekerja/Buruh
8 Pekerja/Buruh
9 Pekerja/Buruh
10 Pekerja/Buruh
buat Oleh :
M KEL. LERE
USALIM, SH.
KETUA
USALIM, SH.
KETUA
LAPORAN MINGGUAN
PEKERJAAN : PEMBANGUNAN/REHAB SALURAN DRAINASE
PELAKSANA : KSM KEL. LERE
LOKASI : JL. BANTILAN, RT.01/RW.04 (TYPE=40;P=41M)
TAHUN ANGGARAN : 2022
Hari
1 2 3 4 5 6 7
1 Mandor 1 Org 1 Semen 33.26 zak 1
2 Kepala Tukang 1 Org 2 Batu Kali 4.57 m³ 2
3 Tukang Batu 2 Org 3 Pasir Pasang 4.01 m³ 3
4 Tukang Kayu 1 Org 4 Pasir Urug 1.48 m³ 4
5 Pekerja 5 Org 5 Kerikil 0.74 m³ 5
6 Papan 3/20 0.29 m³ 6
7 Balok 5/7 0.49 m³ 7
8 Paku 2" 0.82 kg 8
9
1 2 3 4
1 Pengukuran & Pemasangan Bouwplank 41.00 m'
2 Pekerjaan Galian Tanah 16.48 m³
3 Pekerjaan Buangan Tanah 12.36 m³
4 Pekerjaan Urugan Tanah Kembali 4.12 m³
5 Pekerjaan Urugan Pasir 1.23 m³
6 Pekerjaan Pondasi Campuran 1SP : 4PP 3.81 m³
7 Pekerjaan Cor Lantai K-125 1.31 m³
8 Pekerjaan Plesteran Trasraam 1PC : 2PP 58.22 m²
9 Pekrjaan Acian 58.22 m²
10 Pekerjaan Finishing 1.00 ls
8 9
Pacul 2
Sekop 2
Linggis 1
Artco 2
Ember 2
Waterpass 1
Tali Ukur 1 roll
Hammer 1
Sendok Semen 2
Keterangan
5
Dibuat Oleh :
KSM KEL. LERE
AGUSALIM, SH.
KETUA