Anda di halaman 1dari 4

PERUMNAS x BANK BJB JAWA BARAT

DIVISI PEMASARAN KORPORASI & DIGITAL


Februarii 2023
REALISASI / BOOKING BANK BJB NASIONAL 2022
Realisasi Akad
No Proyek Nama Proyek
Jumlah Unit Rp
1 BANDUNG I Samesta Pasadana 64 8,636,500,000
2 DRAMAGA Samesta Dramaga 131 22,410,000,000
3 PURWAKARTA Samesta Royal Campaka 8 1,814,409,091
4 SUMATRA UTARA Samesta Griya Martubung 33 4,378,500,000
TOTAL 236 37,239,409,091

REALISASI KPR BJB DI CABANG :


• KC MAJALAYA Total : 236 Unit, Rp 37,2 M
• KC BOGOR
• KC PURWAKARTA
• KC MEDAN
Potensi unit, CABANG, SALES DEDICATED & PAYROLL KELOLAAN KANWIL JAWA BARAT
Jumlah Unit Rata-Rata Harga Jual Institusi Payroll Dominan
Kantor Cabang
No. Nama Proyek Kota PIC No Hp Sales Dedicated Nama Institusi / Jumlah Rata-Rata
Subsidi Non Subsidi Subsidi (Jt) Non Subsidi (Jt) BJB
Perusahaan Payroll Gaji
1 Samesta Pasadana Bandung 400 310 150 378
2 Samesta Griya Karangpawitan Garut 50 30 150 230
3 Samesta Pondok Indah Cianjur Cianjur 159 - 158 -
4 Samesta Bumi Cikal Asih Majalengka 96 - 130 -
5 Samesta Royal Campaka Purwakarta - 350 - 319
6 Samesta Dramaga Bogor - 155 - 310
705 845

Anda mungkin juga menyukai