I BIAYA PENGADAAN ALAT 1.1 Pipa Sanitary 1 1/2 " m 250 1.2 Elbow Sanitary 1 1/2 '' Pcs 30 1.3 Valve Sanitary 1 1/2 " Pcs 4 1.4 Tangki distribusi stainless Cap : 2000 L Unit 1 1.5 Ceramic Filter Unit 1 1.6 Hexane Filter Unit 1 1.7 Pompa Centrifugal Unit 2 1.8 Unit Ultraviolet Unit 1 II BIAYA OPERASIONAL 2.1 NA NA
III BIAYA MAINTENANCE
3.1 Penggantian Ceramic Filter Unit 3.2 Penggantian Hexane Filter Unit ESTIMASI KEBUTUHAN AIR MINUM Jumlah karyawan : 3000 orang Kebutuhan air minum : 2 L/orang/hari Kebutuhan Total : 6000 L/hari : 2000 L/shift ESTIMASI BIAYA PENYEDIAAN AIR MINUM KARYAWAN PRS PLAN A : Penyediaan Air Minum dari Vendor
NO ITEM UoM QUANTITY UNIT PRICE
I BIAYA PENGADAAN ALAT 1.1 Sand Filter tank Unit 2 1.2 Carbon Filter Unit 2 1.3 Cartridge Filter 5 Micron Unit 1 1.4 Cartridge Filter 10 Micron Unit 1 1.5 Unit Ultraviolet Unit 1 1.6 Unit Ozonisasi Unit 1 1.7 Tabung Oksigen Unit 1 1.8 Tangki distribusi Cap 2000 L Unit 2 1.9 Pompa distribusi Unit 4 1.10 Pipa Sanitary 1 1/2 " m 330 1.11 Elbow Sanitary 1 1/2 '' Pcs 30 1.12 Valve Sanitary 1 1/2 " Pcs 4
II BIAYA OPERASIONAL 2.1 Pembelian air M3 12 Perhari
III BIAYA MAINTENANCE
3.1 Penggantian Sand Filter Unit Pertahun 3.2 Penggantian Carbon Filter Unit Per 6 bulan 3.3 Penggantian Cartridge Filter Unit Perbulan 3.4 Penggantian Lampu UV Unit 3.5 Refill Tabung Oksigen Unit ESTIMASI KEBUTUHAN AIR MINUM Unit Air minum di Area Loker Jumlah karyawan : 3000 orang Kebutuhan air minum : 2 L/orang/hari Kebutuhan Total : 6000 L/hari : 2000 L/shift
Unit Air minum di Area PRS 2
Jumlah karyawan : 3000 orang
Kebutuhan air minum : 2 L/orang/hari Kebutuhan Total : 6000 L/hari : 2000 L/shift Untuk : PRS WRM WSM