Tabel Olah Data dari Microsoft Excel :

JUMLAH PENGELUARAN         NILAI =


JUMLA
HARGA x GO-
H OBAT PER- KU- KE-
HARG JUMLAH LO-
MA AP JUL AG OK NO DALAM SEN- MU-LA- LOM
JAN FEB MEI JUN SEP DES A OBAT NGA
SATUA R R I T T P 12 TASE TIF -POK
DALAM 12 N
BULAN
NO NAMA OBAT N UNIT BULAN
Rp Rp
11
PREVENAR 11 11 13 13 10 12 15 11 13 11 10 649,09 948,323,41 27.550 27.550
5
73 13 (PFIZER) VIAL 3 4 0 6 9 5 3 4 0 3 9 2 1461 2 % % A V
Rp Rp
INFANRIX 92 11 11 11 646,86 636,516,14 18.492 46.041
89 HEXA (GSK) VIAL 85 5 5 85 95 2 95 5 5 85 95 6 984 4 % % A V
Rp Rp
16 20 510,65 162,897,66 50.774
1 VARIVAX VIAL 33 33 21 10 25 30 35 33 21 33 25 1 319 9 4.732% % A V
Rp Rp
DUROGESIC 71 125,40 114,490,20 54.100
94 12,5 MCG PATCH 72 58 76 97 83 90 77 58 76 72 83 0 913 0 3.326% % A V
UTROGESTA
83
N 100 MG TABLE 64 64 46 65 47 55 64 46 64 47 Rp Rp 61.690
2
13 CAPL T 2 4 1 8 8 0 2 4 1 2 8 13,200 6492 85,694,400 2.490% % A V
Rp
16 16 289,83 Rp 64.174
3 MMR II VIAL 30 20 25 30 20 30 29 20 25 30 20 8 295 85,502,210 2.484% % A V
EUVAX B
( VAKSIN 87 11 10 10 10 Rp Rp 70.147
87 HEPATITIS ) VIAL 77 75 78 9 1 4 85 75 78 77 1 58,443 1057 61,774,251 1.795% % A V
RL 500ML 36 35 33 36 51 43 41 36 35 36 36 43 Rp Rp 71.921
19 WIDATRA BOTOL 1 4 3 6 2 5 5 4 4 6 1 5 13,109 4656 61,035,504 1.773% % A V
Rp
17 ROTATEQ 16 244,83 Rp 73.670
2 (MSD) VIAL 21 16 23 21 18 25 28 16 23 21 18 8 246 60,230,148 1.750% % A V
kelompok 2 : menyusun EOQ, minimal stok, safety stok, maksimal stok untuk 5 obat yang Vital dan Mahal. Tambahan keterangan dari saya : RSIA Permata berada di Surabaya,
sehingga lead timenya hanya 2 hari, Biaya pemesanan untuk setiap kali melakukan transaksi sekitar Rp.50.000, sedangkan carrying cost sebesar 10 % dari nilai rata-rata
persediaan.
d=pemakain barang periode waktu 1 thn
p= biaya tiap kali pemesanan
C = biaya penyimpanan perunit /thn
Ket : 1 thn = 360 hari

PREVENAR 13 (PFIZER) INFANRIX HEXA (GSK) VARIVAX DUROGESIC 12,5 MCG UTROGESTAN 100 MG CAPL

EOQ =

( 2 xdxp )
C
EOQ =
√( 2 xdxp )
C
EOQ =
√( 2 xdxp )
C
EOQ =
√( 2 xdxp )
C
EOQ =
√( 2 xdxp )
C
EOQ =

(2 x 1.461 x 50.000)
10 % x 649 . 092
EOQ = 47,44 Vial
EOQ =

(2 x 984 x 50.000)
10 % x 646 . 86 6
EOQ = 39,00 Vial
EOQ =

(2 x 319 x 50.000)
10 % x 510 . 651
EOQ = 24,99 Vial
EOQ =

(2 x 913 x 50.000)
10 % x 125 . 400
EOQ = 85,33 Patch
EOQ =

(2 x 6 . 492 x 50.000)
10 % x 13.200
EOQ = 701,30 Kaplet

SS = Pemakaian Rata -rata SS = Pemakaian Rata -rata SS = Pemakaian Rata -rata SS = Pemakaian Rata -rata SS = Pemakaian Rata -rata
Harian x Lead time Harian x Lead time Harian x Lead time Harian x Lead time Harian x Lead time
SS = (1461/360) x 2 = 8,11 ~ 9 SS = (984/360) x 2 = 5,47 ~ 6 SS = (319/360) x 2 = 1,7 ~ 2 SS = (913/360) x 2 = 5,07 ~ 5 SS = (6492/360) x 2 = 36,06 ~
Vial Vial Vial Patch 30 Kaplet
Karena 1 box isi 5 Karena 1 box isi 30.
Minimal stok = 2 x SS Minimal stok = 2 x SS Minimal stok = 2 x SS Minimal stok = 2 x SS Minimal stok = 2 x SS
Minimal stok = 2 x 9 = 18 Vial Minimal stok = 2 x 6 = 12 Vial Minimal stok = 2 x 2 = 4 Vial Minimal stok = 2 x 5 = 10 Patch Minimal stok = 2 x 30 = 60
Kaplet
Maksimal stok = Pemakaian Maksimal stok = Pemakaian Maksimal stok = Pemakaian Maksimal stok = Pemakaian Maksimal stok = Pemakaian
Rata -rata Harian x Periode Rata -rata Harian x Periode Rata -rata Harian x Periode Rata -rata Harian x Periode Rata -rata Harian x Periode
Persediann + Minimal stok Persediann + Minimal stok Persediann + Minimal stok Persediann + Minimal stok Persediann + Minimal stok
Maksimal stok = (1461/360) x Maksimal stok = (984/360) x 30 Maksimal stok = (319/360) x 30 Maksimal stok = (913/360) x 30 Maksimal stok = (6492/360) x
30 +18 vial = 139,75 ~ 140 Vial + 12 Vial = 94 Vial + 4 Vial = 30,58 ~ 30 Vial + 10 Patch = 86,33 ~ 85 Patch 30 + 60 kaplet = 601 ~ 600
Kaplet
MMR II EUVAX B ( VAKSIN
HEPATITIS )

EOQ =
√( 2 xdxp )
C
EOQ =
√( 2 xdxp )
C
EOQ =

(2 x 295 x 50.000)
10 % x 289.838
EOQ = 31,9 ~ Vial
EOQ =

(2 x 1 057 x 50.000)
10 % x 58.443
EOQ = 134,5 ~ Vial

SS = Pemakaian Rata -rata SS = Pemakaian Rata -rata


Harian x Lead time Harian x Lead time
SS = (295/360) x 2 = 1,6 ~ 2 SS = (1057/360) x 2 = 5,87 ~ 6
Vial Vial
Minimal stok = 2 x SS Minimal stok = 2 x SS
Minimal stok = 2 x 2 = 4 Vial Minimal stok = 2 x 6 = 12 Vial
Maksimal stok = Pemakaian Maksimal stok = Pemakaian
Rata -rata Harian x Periode Rata -rata Harian x Periode
Persediann + Minimal stok Persediann + Minimal stok
Maksimal stok = (295/360) x 30 Maksimal stok = (1057/360) x
+ 4 vial = 28,5 ~ 29 Vial 30 + 12 Vial = 100,08 ~ 100
Vial