+62 812 6247 5352 233/53 C, B.Katamso street, Medan TANGGAL : 16 AUG 2021 - 21 AUG 2021 PROYEK : RENOVASI RUMAH TINGGAL LOKASI : KOMP. HALTON PLACE NO. L-50, JL MENTENG VII, MEDAN DAFTAR ABSENSI ANGGOTA AUG 2021 JUMLAH UPAH KERJA UPAH JUMLAH JUMLAH JUMLAH LEMBUR / JUMLAH SENIN SELASA RABU KAMIS JUM'AT SABTU TOTAL NO NAMA ANGGOTA JABATAN PER HARI MINUM HARI UPAH KERJA MINUM KETERLAMBAT KERAJINAN (Rp) (Rp) (Rp) KERJA (Rp) (Rp) AN (Rp) 16/08/21 17/08/21 18/08/21 19/08/21 20/08/21 21/08/21 (Rp) 1 DIKA STAFF 100.000 4.000 H - - H H H H 5 500.000 20.000 35.000 555.000 2 ALDI KN 90.000 4.000 H - - H H H H 5 450.000 20.000 30.000 500.000 3 AGUS KN 100.000 4.000 X X - - H H H H 4 400.000 16.000 30.000 446.000 4 DEDI KN 100.000 4.000 H - - X X H X X X X 2 200.000 8.000 208.000 5 HERMAN TK. BATU 130.000 4.000 H - - H H H H 5 650.000 20.000 35.000 705.000 6 ENDEK KN 80.000 4.000 H - - H H H H 5 400.000 20.000 30.000 450.000 7 8 9 10 11 12 13 14 15 16 17 18 TOTAL KESELURUHAN 26 2.600.000 104.000 0 160.000 2.864.000