com MINGGU KE (: 24 ) KEDUAPULUH EMPAT


+62 812 6247 5352
233/53 C, B.Katamso street, Medan TANGGAL : 09 AUG 2021 - 14 AUG 2021
PROYEK : RENOVASI RUMAH TINGGAL ( PEMBONGKARAN )
LOKASI : KOMP. GRAND POLONIA, NO. 2 - Y , MEDAN - INDONESIA
DAFTAR ABSENSI ANGGOTA
AUG 2021 JUMLAH
UPAH KERJA UPAH SENIN SELASA RABU KAMIS JUM'AT SABTU JUMLAH JUMLAH JUMLAH LEMBUR / JUMLAH
TOTAL
NO NAMA ANGGOTA JABATAN PER HARI MINUM HARI UPAH KERJA MINUM KETERLAMBA KERAJINAN
TAN
(Rp)
(Rp) (Rp) KERJA (Rp) (Rp) (Rp)
09/08/21 10/08/21 11/08/21 12/08/21 13/08/21 14/08/21 (Rp)
1 SOFIYAN MNDR 150.000 4.000 H H - - H H H 5 750.000 20.000 770.000
2 MARWAN TK. BESI 130.000 4.000 H H - - 1/2 H H 4 1/2 585.000 18.000 603.000
3 ALIM TK. KAYU 130.000 4.000 H H - - H H H 5 650.000 20.000 35.000 705.000
4 IWAN TK. KAYU 130.000 4.000 H H - - H H H 5 650.000 20.000 35.000 705.000
5 WENDI KN 90.000 4.000 H X X - - H H H 4 360.000 16.000 376.000
6 HUSEN TK. KAYU 130.000 4.000 H H - - H H H 5 650.000 20.000 35.000 705.000
7 DIKA STAFF 100.000 4.000 H H - - H H H 5 500.000 20.000 35.000 555.000
8 RUDI KN 90.000 4.000 H H - - H H H 5 450.000 20.000 30.000 500.000
9 RIONAL KN 90.000 4.000 X X H - - H H H 4 360.000 16.000 376.000
10 IWAN KN 90.000 4.000 H H - - H H H 5 450.000 20.000 30.000 500.000
11 SUPIRAN TK. KAYU 130.000 4.000 H H - - H H H 5 650.000 20.000 35.000 705.000
12 ISMAIL TK. BESI 130.000 4.000 X X H - - 1/2 H H 3,5 455.000 14.000 469.000
13 LUKMAN KN 100.000 4.000 H H - - H H H 5 500.000 20.000 30.000 550.000
14 AGUS KN 100.000 4.000 H X X - - X X X X X X 1 100.000 4.000 104.000
15 DEDI KN 100.000 4.000 H X X - - X X X X X X 1 100.000 4.000 104.000
16
17
18
19
20
TOTAL KESELURUHAN 63 7.210.000 252.000 0 265.000 7.727.000

DISETUJUI STAFF (PARAF)

DISETUJUI & DITERIMA MANDOR (PARAF)