RENCANA ALOKASI PENGADAAN MATERIAL

BULAN - NOVEMBER / DESEMBER 2022

1. SIMP. LAGAN - PELABI (ZONA V)

JUMLAH HARGA
KUBIKASI HARGA HARGA
NO JENIS MATERIAL STA LOKASI (M3) SATUAN HPS PENAWARAN HARGA NEGO (VOLUME X HARGA PPN 11%
NEGO)

1 KELAS B Tanjab Timur 280 637,653.42 633,500.00 630,000.00 176,400,000.00 19,404,000.00


2 KELAS B Tanjab Timur 277 637,653.42 633,500.00 629,000.00 174,233,000.00 19,165,630.00
3 KELAS B Tanjab Timur 273 637,653.42 633,500.00 628,500.00 171,580,500.00 18,873,855.00
830

2. TEMPINO - BTS KAB MA. JAMBI/BATANGHARI

KUBIKASI HARGA HARGA JUMLAH HARGA


NO JENIS MATERIAL STA LOKASI HARGA NEGO (VOLUME X HARGA PPN 11%
(M3) SATUAN HPS PENAWARAN NEGO)

1 KELAS B Ma. Jambi 322 559,348.91 555,000.00 552,000.00 177,744,000.00 19,551,840.00


2 KELAS B Ma. Jambi 320 559,348.91 555,000.00 552,000.00 176,640,000.00 19,430,400.00
3 KELAS B Ma. Jambi 318 559,348.91 555,000.00 552,000.00 175,536,000.00 19,308,960.00
4 KELAS B Ma. Jambi 320 559,348.91 555,000.00 552,000.00 176,640,000.00 19,430,400.00
5 KELAS B Ma. Jambi 315 559,348.91 555,000.00 552,000.00 173,880,000.00 19,126,800.00
6 KELAS B Ma. Jambi 310 559,348.91 555,000.00 552,000.00 171,120,000.00 18,823,200.00
1905

3. SIMP. AHOK - BUPER

JUMLAH HARGA
NO JENIS MATERIAL STA LOKASI KUBIKASI HARGA HARGA HARGA NEGO (VOLUME X HARGA PPN 11%
(M3) SATUAN HPS PENAWARAN
NEGO)

1 KELAS B Ma. Jambi 290 619,405.30 615,000.00 612,000.00 177,480,000.00 19,522,800.00


2 KELAS B Ma. Jambi 280 619,405.30 615,000.00 611,000.00 171,080,000.00 18,818,800.00
3 KELAS B Ma. Jambi 275 619,405.30 615,000.00 610,000.00 167,750,000.00 18,452,500.00
4 KELAS B Ma. Jambi 273 619,405.30 615,000.00 609,500.00 166,393,500.00 18,303,285.00
5 KELAS B Ma. Jambi 270 619,405.30 615,000.00 609,000.00 164,430,000.00 18,087,300.00
1388

4. PENEROKAN - SUNGAI BAHAR

JUMLAH HARGA
KUBIKASI HARGA HARGA
NO JENIS MATERIAL STA LOKASI (M3) SATUAN HPS PENAWARAN HARGA NEGO (VOLUME X HARGA PPN 11%
NEGO)

1 KELAS B STA 25 + 690 s/d 26 + 525 Ma. Jambi 320 559,348.91 555,000.00 552,000.00 176,640,000.00 19,430,400.00
2 KELAS B STA 25 + 690 s/d 26 + 525 Ma. Jambi 310 559,348.91 555,000.00 551,500.00 170,965,000.00 18,806,150.00
3 KELAS B STA 25 + 690 s/d 26 + 525 Ma. Jambi 305 559,348.91 555,000.00 551,000.00 168,055,000.00 18,486,050.00
4 KELAS B STA 25 + 690 s/d 26 + 525 Ma. Jambi 263 559,348.91 555,000.00 550,000.00 144,650,000.00 15,911,500.00
1198
5. JL SUDIRMAN

JUMLAH HARGA
NO JENIS MATERIAL STA LOKASI KUBIKASI HARGA HARGA HARGA NEGO PPN 11%
(M3) SATUAN HPS PENAWARAN (VOLUME X HARGA
NEGO)

1 KELAS B Batanghari 320 559,348.91 555,000.00 552,000.00 176,640,000.00 19,430,400.00


2 KELAS B Batanghari 300 559,348.91 555,000.00 552,000.00 165,600,000.00 18,216,000.00
3 KELAS B Batanghari 280 559,348.91 555,000.00 552,000.00 154,560,000.00 17,001,600.00
4 KELAS B Batanghari 258 559,348.91 555,000.00 552,000.00 142,416,000.00 15,665,760.00
1158

6. PAUH - AIR HITAM

KUBIKASI HARGA HARGA JUMLAH HARGA


NO JENIS MATERIAL STA LOKASI HARGA NEGO (VOLUME X HARGA PPN 11%
(M3) SATUAN HPS PENAWARAN NEGO)

1 KELAS B Sarolangun 260 669,961.50 665,000.00 663,000.00 172,380,000.00 18,961,800.00


2 KELAS B Sarolangun 250 669,961.50 665,000.00 662,000.00 165,500,000.00 18,205,000.00
3 KELAS B Sarolangun 240 669,961.50 665,000.00 661,000.00 158,640,000.00 17,450,400.00
750

7. MARGOYOSO - AIR HITAM


JUMLAH HARGA
KUBIKASI HARGA HARGA
NO JENIS MATERIAL STA LOKASI (M3) SATUAN HPS PENAWARAN HARGA NEGO (VOLUME X HARGA PPN 11%
NEGO)
1 KELAS B Sarolangun 260 669,961.50 665,000.00 662,000.00 172,120,000.00 18,933,200.00
2 KELAS B Sarolangun 250 669,961.50 665,000.00 660,000.00 165,000,000.00 18,150,000.00
3 KELAS B Sarolangun 244 669,961.50 665,000.00 659,000.00 160,796,000.00 17,687,560.00
4 KELAS B Sarolangun 230 669,961.50 665,000.00 659,000.00 151,570,000.00 16,672,700.00
5 KELAS B Sarolangun 200 669,961.50 665,000.00 658,000.00 131,600,000.00 14,476,000.00
1184

NILAI PAGU SISA


JUMLAH KAB. BATANGHARI 710,000,333 470,573.00
JUMLAH KAB. MA. JAMBI 2,841,029,292 535,407.00
JUMLAH KAB. TANJAB TIMUR 579,999,738 342,753.00
JUMLAH KAB. SAROLANGUN 1,418,568,886 426,226.00
JUMLAH 1,774,959.00
ANA ALOKASI PENGADAAN MATERIAL
AN - NOVEMBER / DESEMBER 2022

NILAI KONTRAK
TGL
(JUMLAH HARGA + KONTRAK NO SPK NAMA PERUSAHAAN
PPN)

195,804,000.00
193,398,630.00
190,454,355.00
579,656,985.00

NILAI KONTRAK TGL


(JUMLAH HARGA + NO SPK NAMA PERUSAHAAN
PPN) KONTRAK

197,295,840.00
196,070,400.00
194,844,960.00
196,070,400.00
193,006,800.00
189,943,200.00
1,167,231,600.00

NILAI KONTRAK
(JUMLAH HARGA + TGL NO SPK NAMA PERUSAHAAN
KONTRAK
PPN)

197,002,800.00
189,898,800.00
186,202,500.00
184,696,785.00
182,517,300.00
940,318,185.00

NILAI KONTRAK
TGL
(JUMLAH HARGA + KONTRAK NO SPK NAMA PERUSAHAAN
PPN)

196,070,400.00
189,771,150.00
186,541,050.00
160,561,500.00
732,944,100.00
NILAI KONTRAK
TGL NO SPK NAMA PERUSAHAAN
(JUMLAH HARGA + KONTRAK
PPN)

196,070,400.00
183,816,000.00
171,561,600.00
158,081,760.00
709,529,760.00

NILAI KONTRAK TGL


(JUMLAH HARGA + NO SPK NAMA PERUSAHAAN
PPN) KONTRAK

191,341,800.00
183,705,000.00
176,090,400.00
551,137,200.00

NILAI KONTRAK
TGL
(JUMLAH HARGA + KONTRAK NO SPK NAMA PERUSAHAAN
PPN)
191,053,200.00
183,150,000.00
178,483,560.00
168,242,700.00
146,076,000.00
867,005,460.00

709,529,760.00
2,840,493,885.00
579,656,985.00
1,418,142,660.00
5,547,823,290.00
RENCANA ALOKASI PENGADAAN MATERIAL
BULAN - JANUARI / FEBUARI 2022

1. SIMP. LAGAN - PELABI (ZONA V)

JUMLAH HARGA
KUBIKASI HARGA HARGA
NO JENIS MATERIAL STA LOKASI (M3) SATUAN HPS PENAWARAN HARGA NEGO (VOLUME X HARGA PPN 10%
NEGO)

1 KELAS B STA 18 + 850 s/d 31 + 230 Tanjab Timur 285 637,653.42 633,500.00 630,000.00 179,550,000.00 17,955,000.00
2 KELAS B STA 15 + 150 s/d 18 + 810 Tanjab Timur 285 637,653.42 633,500.00 630,000.00 179,550,000.00 17,955,000.00
570
2. SIMP. PUDAK - SUAK KANDIS

KUBIKASI HARGA HARGA JUMLAH HARGA


NO JENIS MATERIAL STA LOKASI HARGA NEGO (VOLUME X HARGA PPN 10%
(M3) SATUAN HPS PENAWARAN NEGO)

3 KELAS B STA 60 + 770 s/d 61 + 470 Ma. Jambi 270 619,405.30 614,000.00 610,000.00 164,700,000.00 16,470,000.00
4 KELAS B STA 61 + 550 s/d 62 + 180 Ma. Jambi 212 619,405.30 614,000.00 610,000.00 129,320,000.00 12,932,000.00
482

3. SIMP. AHOK - BUPER

JUMLAH HARGA
KUBIKASI HARGA HARGA
NO JENIS MATERIAL STA LOKASI (M3) SATUAN HPS PENAWARAN HARGA NEGO (VOLUME X HARGA PPN 10%
NEGO)

5 KELAS B STA 2 + 980 s/d 5 + 235 Ma. Jambi 290 619,405.30 615,000.00 610,000.00 176,900,000.00 17,690,000.00
6 KELAS B STA 5 + 382 s/d 7 + 295 Ma. Jambi 285 619,405.30 615,000.00 610,000.00 173,850,000.00 17,385,000.00
575

4. TEMPINO - MA. BULIAN

JUMLAH HARGA
NO JENIS MATERIAL STA LOKASI KUBIKASI HARGA HARGA HARGA NEGO (VOLUME X HARGA PPN 10%
(M3) SATUAN HPS PENAWARAN
NEGO)

7 KELAS B STA 23 + 590 s/d 25 + 600 Batanghari 320 559,348.91 555,000.00 552,000.00 176,640,000.00 17,664,000.00
8 KELAS B STA 25 + 601 s/d 26 + 330 Batanghari 256 559,348.91 555,000.00 552,000.00 141,312,000.00 14,131,200.00
576

5. PENEROKAN - SUNGAI BAHAR

KUBIKASI HARGA HARGA JUMLAH HARGA


NO JENIS MATERIAL STA LOKASI HARGA NEGO (VOLUME X HARGA PPN 10%
(M3) SATUAN HPS PENAWARAN NEGO)

9 KELAS B STA 25 + 690 s/d 26 + 525 Ma. Jambi 323 559,348.91 555,000.00 552,000.00 178,296,000.00 17,829,600.00
10 KELAS B STA 26 + 700 s/d 27 + 520 Ma. Jambi 320 559,348.91 555,000.00 552,000.00 176,640,000.00 17,664,000.00
643

6. SIMP. PELAWAN - SEI SALAK

JUMLAH HARGA
KUBIKASI HARGA HARGA
NO JENIS MATERIAL STA LOKASI (M3) SATUAN HPS PENAWARAN HARGA NEGO (VOLUME X HARGA PPN 10%
NEGO)

11 Agregat Pecah Kasar STA 42 + 460 s/d 43 + 020 Sarolangun 280 550,423.83 545,000.00 541,000.00 151,480,000.00 15,148,000.00
280
7. PAUH - AIR HITAM

KUBIKASI HARGA HARGA JUMLAH HARGA


NO JENIS MATERIAL STA LOKASI HARGA NEGO (VOLUME X HARGA PPN 10%
(M3) SATUAN HPS PENAWARAN NEGO)

12 KELAS B STA 10 + 160 s/d 12 + 370 Sarolangun 268 669,961.50 665,000.00 660,000.00 176,880,000.00 17,688,000.00
13 KELAS B STA 12 + 480 s/d 13 + 630 Sarolangun 250 669,961.50 665,000.00 660,000.00 165,000,000.00 16,500,000.00
14 KELAS B STA 13 + 705 s/d 15 + 122 Sarolangun 242 669,961.50 665,000.00 660,000.00 159,720,000.00 15,972,000.00
760

8. MARGOYOSO - AIR HITAM


JUMLAH HARGA
KUBIKASI HARGA HARGA
NO JENIS MATERIAL STA LOKASI (M3) SATUAN HPS PENAWARAN HARGA NEGO (VOLUME X HARGA PPN 10%
NEGO)
15 Agregat Pecah Kasar STA 40 + 010 s/d 41 + 040 Sarolangun 190 550,423.83 545,000.00 541,000.00 102,790,000.00 10,279,000.00
190

JUMLAH KAB. BATANGHARI


JUMLAH KAB. MA. JAMBI
JUMLAH KAB. TANJAB TIMUR
JUMLAH KAB. SAROLANGUN
JUMLAH
ANA ALOKASI PENGADAAN MATERIAL
BULAN - JANUARI / FEBUARI 2022

NILAI KONTRAK
TGL
(JUMLAH HARGA + KONTRAK NO SPK NAMA PERUSAHAAN
PPN)

197,505,000.00
197,505,000.00
395,010,000.00

NILAI KONTRAK TGL


(JUMLAH HARGA + NO SPK NAMA PERUSAHAAN
PPN) KONTRAK

181,170,000.00
142,252,000.00
323,422,000.00

NILAI KONTRAK
TGL
(JUMLAH HARGA + KONTRAK NO SPK NAMA PERUSAHAAN
PPN)

194,590,000.00
191,235,000.00
385,825,000.00

NILAI KONTRAK
(JUMLAH HARGA + TGL NO SPK NAMA PERUSAHAAN
KONTRAK
PPN)

194,304,000.00
155,443,200.00
349,747,200.00

NILAI KONTRAK TGL


(JUMLAH HARGA + NO SPK NAMA PERUSAHAAN
PPN) KONTRAK

196,125,600.00
194,304,000.00
390,429,600.00

NILAI KONTRAK
TGL
(JUMLAH HARGA + KONTRAK NO SPK NAMA PERUSAHAAN
PPN)

166,628,000.00
166,628,000.00
NILAI KONTRAK TGL
(JUMLAH HARGA + NO SPK NAMA PERUSAHAAN
PPN) KONTRAK

194,568,000.00
181,500,000.00
175,692,000.00
551,760,000.00

NILAI KONTRAK
TGL
(JUMLAH HARGA + KONTRAK NO SPK NAMA PERUSAHAAN
PPN)
113,069,000.00
113,069,000.00

349,747,200.00
1,099,676,600.00
395,010,000.00
718,388,000.00
2,562,821,800.00
RENCANA ALOKASI PENGADAAN MATERIAL
BULAN - NOVEMBER / DESEMBER 2022

1. SIMP. LAGAN - PELABI (ZONA V)

JUMLAH HARGA
KUBIKASI HARGA HARGA
NO JENIS MATERIAL STA LOKASI (M3) SATUAN HPS PENAWARAN HARGA NEGO (VOLUME X HARGA
NEGO)

1 KELAS B Sta 0 + 720 s/d 4 + 620 Tanjab Timur 236 637,653.42 633,500.00 631,000.00 148,916,000.00
2 KELAS B Sta 4 + 670 s/d 8 + 925 Tanjab Timur 200 637,653.42 633,500.00 630,000.00 126,000,000.00
3 KELAS B Sta 8 + 950 s/d 10 + 240 Tanjab Timur 150 637,653.42 633,500.00 629,000.00 94,350,000.00
586

2. TEMPINO - BTS KAB MA. JAMBI/BATANGHARI

KUBIKASI HARGA HARGA JUMLAH HARGA


NO JENIS MATERIAL STA LOKASI HARGA NEGO (VOLUME X HARGA
(M3) SATUAN HPS PENAWARAN NEGO)

1 KELAS B Sta 0 + 000 s/d 1 + 860 Ma. Jambi 322 559,348.91 555,000.00 553,000.00 178,066,000.00
2 KELAS B Sta 1 + 860 s/d 2 + 900 Ma. Jambi 320 559,348.91 555,000.00 552,000.00 176,640,000.00
3 KELAS B Sta 3 + 060 s/d 4 +200 Ma. Jambi 320 559,348.91 555,000.00 551,000.00 176,320,000.00
4 KELAS B Sta 4 + 305 s/d 5 + 060 Ma. Jambi 318 559,348.91 555,000.00 550,000.00 174,900,000.00
5 KELAS B Sta 5 + 065 s/d 6 + 175 Ma. Jambi 315 559,348.91 555,000.00 550,000.00 173,250,000.00
6 KELAS B Sta 6 + 295 s/d 6 + 575 Ma. Jambi 305 559,348.91 555,000.00 549,500.00 167,597,500.00
7 KELAS B Sta 6 + 830 s/d 7 + 870 Ma. Jambi 275 559,348.91 555,000.00 549,000.00 150,975,000.00
8 KELAS B Sta 7 + 940 s/d 12 + 550 Ma. Jambi 248 559,348.91 555,000.00 548,500.00 136,028,000.00
2423

3. SIMP. AHOK - BUPER

KUBIKASI HARGA HARGA JUMLAH HARGA


NO JENIS MATERIAL STA LOKASI (M3) SATUAN HPS PENAWARAN HARGA NEGO (VOLUME X HARGA
NEGO)

1 KELAS B Sta 7 + 435 s/d 8 + 075 Ma. Jambi 290 619,405.30 615,000.00 613,000.00 177,770,000.00
2 KELAS B Sta 8 + 230 s/d 9 + 090 Ma. Jambi 280 619,405.30 615,000.00 612,000.00 171,360,000.00
3 KELAS B Sta 9 + 195 s/d 9 + 525 Ma. Jambi 275 619,405.30 615,000.00 612,500.00 168,437,500.00
4 KELAS B Sta 9 + 740 s/d 10 + 570 Ma. Jambi 270 619,405.30 615,000.00 611,000.00 164,970,000.00
5 KELAS B Sta 10 + 660 s/d 11 + 230 Ma. Jambi 260 619,405.30 615,000.00 610,000.00 158,600,000.00
6 KELAS B Sta 1 + 150 s/d 4 + 630 Ma. Jambi 200 619,405.30 615,000.00 610,000.00 122,000,000.00
1575

4. PENEROKAN - SUNGAI BAHAR

KUBIKASI HARGA HARGA JUMLAH HARGA


NO JENIS MATERIAL STA LOKASI HARGA NEGO (VOLUME X HARGA
(M3) SATUAN HPS PENAWARAN
NEGO)

1 KELAS B Sta 12 + 225 s/d 14 + 410 Ma. Jambi 320 559,348.91 555,000.00 552,000.00 176,640,000.00
2 KELAS B Sta 14 + 500 s/d 17 + 950 Ma. Jambi 317 559,348.91 555,000.00 551,000.00 174,667,000.00
3 KELAS B Sta 18 + 160 s/d 25 + 330 Ma. Jambi 310 559,348.91 555,000.00 550,000.00 170,500,000.00
947
5. BTS BATANGHARI - BULIAN

KUBIKASI HARGA HARGA JUMLAH HARGA


NO JENIS MATERIAL STA LOKASI (M3) SATUAN HPS PENAWARAN HARGA NEGO (VOLUME X HARGA
NEGO)

1 KELAS B Sta 13 + 790 s/d 15 + 085 Batanghari 320 559,348.91 555,000.00 552,000.00 176,640,000.00
2 KELAS B Sta 23 + 640 s/d 24 + 655 Batanghari 285 559,348.91 555,000.00 551,000.00 157,035,000.00
605
6. JL SUDIRMAN

KUBIKASI HARGA HARGA JUMLAH HARGA


NO JENIS MATERIAL STA LOKASI (M3) SATUAN HPS PENAWARAN HARGA NEGO (VOLUME X HARGA
NEGO)

1 KELAS B Sta 0 + 050 s/d 1 + 760 Batanghari 320 559,348.91 555,000.00 552,000.00 176,640,000.00
2 KELAS B Sta 1 + 850 s/d 7 + 434 Batanghari 270 559,348.91 555,000.00 551,000.00 148,770,000.00
590

7. MARGOYOSO - AIR HITAM


JUMLAH HARGA
NO JENIS MATERIAL STA LOKASI KUBIKASI HARGA HARGA HARGA NEGO (VOLUME X HARGA
(M3) SATUAN HPS PENAWARAN NEGO)
1 KELAS B Sta 46 + 075 s/d 47 + 800 Sarolangun 260 669,961.50 665,000.00 663,000.00 172,380,000.00
2 KELAS B Sta 44 + 980 s/d 46 + 050 Sarolangun 245 669,961.50 665,000.00 662,000.00 162,190,000.00
3 KELAS B Sta 42 + 370 s/d 44 + 850 Sarolangun 235 669,961.50 665,000.00 661,000.00 155,335,000.00
4 KELAS B Sta 41 + 040 s/d 42 + 300 Sarolangun 230 669,961.50 665,000.00 660,000.00 151,800,000.00
5 KELAS B Sta 39 + 070 s/d 40 + 780 Sarolangun 214 669,961.50 665,000.00 659,000.00 141,026,000.00
6 KELAS B Sta 35 + 790 s/d 38 + 290 Sarolangun 175 669,961.50 665,000.00 658,000.00 115,150,000.00
1359

SISA
JUMLAH KAB. BATANGHARI 731,956,915 372,565.00
JUMLAH KAB. MA. JAMBI 3,129,035,000 254,690.00
JUMLAH KAB. TANJAB TIMUR 410,035,555 150,295.00
JUMLAH KAB. SAROLANGUN 997,123,482 475,572.00
JUMLAH
ALOKASI PENGADAAN MATERIAL
NOVEMBER / DESEMBER 2022

NILAI KONTRAK
TGL
PPN 11% (JUMLAH HARGA + KONTRAK NO SPK NAMA PERUSAHAAN
PPN)

16,380,760.00 165,296,760.00
13,860,000.00 139,860,000.00
10,378,500.00 104,728,500.00
409,885,260.00

NILAI KONTRAK TGL


PPN 11% (JUMLAH HARGA + NO SPK NAMA PERUSAHAAN
PPN) KONTRAK

19,587,260.00 197,653,260.00
19,430,400.00 196,070,400.00
19,395,200.00 195,715,200.00
19,239,000.00 194,139,000.00
19,057,500.00 192,307,500.00
18,435,725.00 186,033,225.00
16,607,250.00 167,582,250.00
14,963,080.00 150,991,080.00
1,480,491,915.00

NILAI KONTRAK TGL


PPN 11% (JUMLAH HARGA + KONTRAK NO SPK NAMA PERUSAHAAN
PPN)

19,554,700.00 197,324,700.00
18,849,600.00 190,209,600.00
18,528,125.00 186,965,625.00
18,146,700.00 183,116,700.00
17,446,000.00 176,046,000.00
13,420,000.00 135,420,000.00
1,069,082,625.00

NILAI KONTRAK TGL


PPN 11% (JUMLAH HARGA + NO SPK NAMA PERUSAHAAN
KONTRAK
PPN)

19,430,400.00 196,070,400.00
19,213,370.00 193,880,370.00
18,755,000.00 189,255,000.00
579,205,770.00
NILAI KONTRAK TGL
PPN 11% (JUMLAH HARGA + KONTRAK NO SPK NAMA PERUSAHAAN
PPN)

19,430,400.00 196,070,400.00
17,273,850.00 174,308,850.00
370,379,250.00

NILAI KONTRAK TGL


PPN 11% (JUMLAH HARGA + KONTRAK NO SPK NAMA PERUSAHAAN
PPN)

19,430,400.00 196,070,400.00
16,364,700.00 165,134,700.00
361,205,100.00

NILAI KONTRAK
PPN 11% (JUMLAH HARGA + TGL NO SPK NAMA PERUSAHAAN
PPN) KONTRAK

18,961,800.00 191,341,800.00
17,840,900.00 180,030,900.00
17,086,850.00 172,421,850.00
16,698,000.00 168,498,000.00
15,512,860.00 156,538,860.00
12,666,500.00 127,816,500.00
996,647,910.00

JUMLAH
731,584,350.00
3,128,780,310.00
409,885,260.00
996,647,910.00
5,266,897,830.00
ALOKASI PENGADAAN MATERIAL
BULAN - JANUARI DESEMBER 2022

1. SIMP. LAGAN - PELABI (ZONA V)

JUMLAH HARGA NILAI KONTRAK


KUBIKASI HARGA HARGA TGL
NO JENIS MATERIAL STA LOKASI (M3) SATUAN HPS PENAWARAN HARGA NEGO (VOLUME X HARGA PPN 10% (JUMLAH HARGA + KONTRAK NO SPK NAMA PERUSAHAAN
NEGO) PPN)

1 KELAS B STA 18 + 850 s/d 31 + 230 Tanjab Timur 285 637,653.42 633,500.00 630,000.00 179,550,000.00 17,955,000.00 197,505,000.00
2 KELAS B STA 15 + 150 s/d 18 + 810 Tanjab Timur 285 637,653.42 633,500.00 630,000.00 179,550,000.00 17,955,000.00 197,505,000.00
1 KELAS B Sta 0 + 720 s/d 4 + 620 Tanjab Timur 236 637,653.42 633,500.00 631,000.00 148,916,000.00 16,380,760.00 165,296,760.00
2 KELAS B Sta 4 + 670 s/d 8 + 925 Tanjab Timur 200 637,653.42 633,500.00 630,000.00 126,000,000.00 13,860,000.00 139,860,000.00
3 KELAS B Sta 8 + 950 s/d 10 + 240 Tanjab Timur 150 637,653.42 633,500.00 629,000.00 94,350,000.00 10,378,500.00 104,728,500.00
1156 804,895,260.00

2. SIMP. PUDAK - SUAK KANDIS

JUMLAH HARGA NILAI KONTRAK


KUBIKASI HARGA HARGA TGL
NO JENIS MATERIAL STA LOKASI (M3) SATUAN HPS PENAWARAN HARGA NEGO (VOLUME X HARGA PPN 10% (JUMLAH HARGA + KONTRAK NO SPK NAMA PERUSAHAAN
NEGO) PPN)

3 KELAS B STA 60 + 770 s/d 61 + 470 Ma. Jambi 270 619,405.30 614,000.00 610,000.00 164,700,000.00 16,470,000.00 181,170,000.00
4 KELAS B STA 61 + 550 s/d 62 + 180 Ma. Jambi 212 619,405.30 614,000.00 610,000.00 129,320,000.00 12,932,000.00 142,252,000.00
482 323,422,000.00

3. SIMP. AHOK - BUPER

JUMLAH HARGA NILAI KONTRAK


KUBIKASI HARGA HARGA TGL
NO JENIS MATERIAL STA LOKASI (M3) SATUAN HPS PENAWARAN HARGA NEGO (VOLUME X HARGA PPN 10% (JUMLAH HARGA +
KONTRAK NO SPK NAMA PERUSAHAAN
NEGO) PPN)

5 KELAS B STA 2 + 980 s/d 5 + 235 Ma. Jambi 290 619,405.30 615,000.00 610,000.00 176,900,000.00 17,690,000.00 194,590,000.00
6 KELAS B STA 5 + 382 s/d 7 + 295 Ma. Jambi 285 619,405.30 615,000.00 610,000.00 173,850,000.00 17,385,000.00 191,235,000.00
1 KELAS B Sta 7 + 435 s/d 8 + 075 Ma. Jambi 290 619,405.30 615,000.00 613,000.00 177,770,000.00 19,554,700.00 197,324,700.00
2 KELAS B Sta 8 + 230 s/d 9 + 090 Ma. Jambi 280 619,405.30 615,000.00 612,000.00 171,360,000.00 18,849,600.00 190,209,600.00
3 KELAS B Sta 9 + 195 s/d 9 + 525 Ma. Jambi 275 619,405.30 615,000.00 612,500.00 168,437,500.00 18,528,125.00 186,965,625.00
4 KELAS B Sta 9 + 740 s/d 10 + 570 Ma. Jambi 270 619,405.30 615,000.00 611,000.00 164,970,000.00 18,146,700.00 183,116,700.00
5 KELAS B Sta 10 + 660 s/d 11 + 230 Ma. Jambi 260 619,405.30 615,000.00 610,000.00 158,600,000.00 17,446,000.00 176,046,000.00
6 KELAS B Sta 1 + 150 s/d 4 + 630 Ma. Jambi 200 619,405.30 615,000.00 610,000.00 122,000,000.00 13,420,000.00 135,420,000.00
2150 1,454,907,625.00

4. TEMPINO - MA. BULIAN

JUMLAH HARGA NILAI KONTRAK


KUBIKASI HARGA HARGA TGL
NO JENIS MATERIAL STA LOKASI HARGA NEGO (VOLUME X HARGA PPN 10% (JUMLAH HARGA + NO SPK NAMA PERUSAHAAN
(M3) SATUAN HPS PENAWARAN KONTRAK
NEGO) PPN)

7 KELAS B STA 23 + 590 s/d 25 + 600 Batanghari 320 559,348.91 555,000.00 552,000.00 176,640,000.00 17,664,000.00 194,304,000.00
8 KELAS B STA 25 + 601 s/d 26 + 330 Batanghari 256 559,348.91 555,000.00 552,000.00 141,312,000.00 14,131,200.00 155,443,200.00
576 349,747,200.00
1 KELAS B Sta 0 + 000 s/d 1 + 860 Ma. Jambi 322 559,348.91 555,000.00 553,000.00 178,066,000.00 19,587,260.00 197,653,260.00
2 KELAS B Sta 1 + 860 s/d 2 + 900 Ma. Jambi 320 559,348.91 555,000.00 552,000.00 176,640,000.00 19,430,400.00 196,070,400.00
3 KELAS B Sta 3 + 060 s/d 4 +200 Ma. Jambi 320 559,348.91 555,000.00 551,000.00 176,320,000.00 19,395,200.00 195,715,200.00
4 KELAS B Sta 4 + 305 s/d 5 + 060 Ma. Jambi 318 559,348.91 555,000.00 550,000.00 174,900,000.00 19,239,000.00 194,139,000.00
5 KELAS B Sta 5 + 065 s/d 6 + 175 Ma. Jambi 315 559,348.91 555,000.00 550,000.00 173,250,000.00 19,057,500.00 192,307,500.00
6 KELAS B Sta 6 + 295 s/d 6 + 575 Ma. Jambi 305 559,348.91 555,000.00 549,500.00 167,597,500.00 18,435,725.00 186,033,225.00
7 KELAS B Sta 6 + 830 s/d 7 + 870 Ma. Jambi 275 559,348.91 555,000.00 549,000.00 150,975,000.00 16,607,250.00 167,582,250.00
8 KELAS B Sta 7 + 940 s/d 12 + 550 Ma. Jambi 248 559,348.91 555,000.00 548,500.00 136,028,000.00 14,963,080.00 150,991,080.00
2423 1,480,491,915.00
5. PENEROKAN - SUNGAI BAHAR

JUMLAH HARGA NILAI KONTRAK


KUBIKASI HARGA HARGA TGL
NO JENIS MATERIAL STA LOKASI HARGA NEGO (VOLUME X HARGA PPN 10% (JUMLAH HARGA + NO SPK NAMA PERUSAHAAN
(M3) SATUAN HPS PENAWARAN NEGO) PPN) KONTRAK

9 KELAS B STA 25 + 690 s/d 26 + 525 Ma. Jambi 323 559,348.91 555,000.00 552,000.00 178,296,000.00 17,829,600.00 196,125,600.00
10 KELAS B STA 26 + 700 s/d 27 + 520 Ma. Jambi 320 559,348.91 555,000.00 552,000.00 176,640,000.00 17,664,000.00 194,304,000.00
1 KELAS B Sta 12 + 225 s/d 14 + 410 Ma. Jambi 320 559,348.91 555,000.00 552,000.00 176,640,000.00 19,430,400.00 196,070,400.00
2 KELAS B Sta 14 + 500 s/d 17 + 950 Ma. Jambi 317 559,348.91 555,000.00 551,000.00 174,667,000.00 19,213,370.00 193,880,370.00
3 KELAS B Sta 18 + 160 s/d 25 + 330 Ma. Jambi 310 559,348.91 555,000.00 550,000.00 170,500,000.00 18,755,000.00 189,255,000.00
1590 969,635,370.00

6. SIMP. PELAWAN - SEI SALAK

JUMLAH HARGA NILAI KONTRAK


KUBIKASI HARGA HARGA TGL
NO JENIS MATERIAL STA LOKASI (M3) SATUAN HPS PENAWARAN HARGA NEGO (VOLUME X HARGA PPN 10% (JUMLAH HARGA +
KONTRAK NO SPK NAMA PERUSAHAAN
NEGO) PPN)

11 Agregat Pecah Kasar STA 42 + 460 s/d 43 + 020 Sarolangun 280 550,423.83 545,000.00 541,000.00 151,480,000.00 15,148,000.00 166,628,000.00
280 166,628,000.00

7. PAUH - AIR HITAM

JUMLAH HARGA NILAI KONTRAK


KUBIKASI HARGA HARGA TGL
NO JENIS MATERIAL STA LOKASI HARGA NEGO (VOLUME X HARGA PPN 10% (JUMLAH HARGA + NO SPK NAMA PERUSAHAAN
(M3) SATUAN HPS PENAWARAN NEGO) PPN) KONTRAK

12 KELAS B STA 10 + 160 s/d 12 + 370 Sarolangun 268 669,961.50 665,000.00 660,000.00 176,880,000.00 17,688,000.00 194,568,000.00
13 KELAS B STA 12 + 480 s/d 13 + 630 Sarolangun 250 669,961.50 665,000.00 660,000.00 165,000,000.00 16,500,000.00 181,500,000.00
14 KELAS B STA 13 + 705 s/d 15 + 122 Sarolangun 242 669,961.50 665,000.00 660,000.00 159,720,000.00 15,972,000.00 175,692,000.00
760 551,760,000.00

8. MARGOYOSO - AIR HITAM


JUMLAH HARGA NILAI KONTRAK
KUBIKASI HARGA HARGA TGL
NO JENIS MATERIAL STA LOKASI (M3) SATUAN HPS PENAWARAN HARGA NEGO (VOLUME X HARGA PPN 10% (JUMLAH HARGA + KONTRAK NO SPK NAMA PERUSAHAAN
NEGO) PPN)
15 Agregat Pecah Kasar STA 40 + 010 s/d 41 + 040 Sarolangun 190 550,423.83 545,000.00 541,000.00 102,790,000.00 10,279,000.00 113,069,000.00
1 KELAS B Sta 46 + 075 s/d 47 + 800 Sarolangun 260 669,961.50 665,000.00 663,000.00 172,380,000.00 18,961,800.00 191,341,800.00
2 KELAS B Sta 44 + 980 s/d 46 + 050 Sarolangun 245 669,961.50 665,000.00 662,000.00 162,190,000.00 17,840,900.00 180,030,900.00
3 KELAS B Sta 42 + 370 s/d 44 + 850 Sarolangun 235 669,961.50 665,000.00 661,000.00 155,335,000.00 17,086,850.00 172,421,850.00
4 KELAS B Sta 41 + 040 s/d 42 + 300 Sarolangun 230 669,961.50 665,000.00 660,000.00 151,800,000.00 16,698,000.00 168,498,000.00
5 KELAS B Sta 39 + 070 s/d 40 + 780 Sarolangun 214 669,961.50 665,000.00 659,000.00 141,026,000.00 15,512,860.00 156,538,860.00
6 KELAS B Sta 35 + 790 s/d 38 + 290 Sarolangun 175 669,961.50 665,000.00 658,000.00 115,150,000.00 12,666,500.00 127,816,500.00
1549 1,109,716,910.00

5. BTS BATANGHARI - BULIAN

JUMLAH HARGA NILAI KONTRAK


KUBIKASI HARGA HARGA TGL
NO JENIS MATERIAL STA LOKASI (M3) SATUAN HPS PENAWARAN HARGA NEGO (VOLUME X HARGA PPN 11% (JUMLAH HARGA + KONTRAK NO SPK NAMA PERUSAHAAN
NEGO) PPN)

1 KELAS B Sta 13 + 790 s/d 15 + 085 Batanghari 320 559,348.91 555,000.00 552,000.00 176,640,000.00 19,430,400.00 196,070,400.00
2 KELAS B Sta 23 + 640 s/d 24 + 655 Batanghari 285 559,348.91 555,000.00 551,000.00 157,035,000.00 17,273,850.00 174,308,850.00
605 370,379,250.00
6. JL SUDIRMAN

JUMLAH HARGA NILAI KONTRAK


KUBIKASI HARGA HARGA TGL
NO JENIS MATERIAL STA LOKASI HARGA NEGO (VOLUME X HARGA PPN 11% (JUMLAH HARGA + NO SPK NAMA PERUSAHAAN
(M3) SATUAN HPS PENAWARAN NEGO) PPN) KONTRAK

1 KELAS B Sta 0 + 050 s/d 1 + 760 Batanghari 320 559,348.91 555,000.00 552,000.00 176,640,000.00 19,430,400.00 196,070,400.00
2 KELAS B Sta 1 + 850 s/d 7 + 434 Batanghari 270 559,348.91 555,000.00 551,000.00 148,770,000.00 16,364,700.00 165,134,700.00
590 361,205,100.00

JUMLAH KAB. BATANGHARI 1,081,331,550.00


JUMLAH KAB. MA. JAMBI 4,228,456,910.00
JUMLAH KAB. TANJAB TIMUR 804,895,260.00
JUMLAH KAB. SAROLANGUN 1,828,104,910.00
JUMLAH 7,942,788,630.00 7,942,788,630.00
Ruas Jalan kontrak realisasi Selisih Keterangan
1. SIMP. LAGAN - PELABI (ZONA V) 1156 302 854 Kelas B
2. SIMP. PUDAK - SUAK KANDIS 482 328 154 Kelas B
3. SIMP. AHOK - BUPER 2150 1336.44 813.56 1821.56 1836.44 3658 (Suak Kandis-Simpang) Kelas B
4. TEMPINO - MA. BULIAN 2999 960.9 2038.1 201.66 (sisa dari 2038,1-1836,44) Kelas B
5. PENEROKAN - SUNGAI BAHAR 1590 862.8 727.2 Kelas B
6. SIMP. PELAWAN - SEI SALAK 280 464 2714.46 3398.7 (Ds. Simpang-Sabak) agregat pecah kasar
7. PAUH - AIR HITAM 760 587 684.24 Kelas B
8. MARGOYOSO - AIR HITAM 1549 708.4 840.6 Kelas B
5. BTS BATANGHARI - BULIAN 605 150 455 2865,8+201,66 Kelas B
6. JL SUDIRMAN 590 100 490 2512.8 Kelas B
7. SUAK KANDIS-SIMPANG 0 (3658-1836,44-1821,56) Kelas B
8. DS. SIMPANG-SABAK 684.24 (3398,7-3067,46) Kelas B
9. SAWMILL-LOGPON 160 Kelas B
10. LOGPON-TANJUNG 90 Kelas B
12161 5799.54 6372.46 934.24 (kelebihan material)