( ESTIMASI PERHITUNGAN CADANGAN )

Down Bench Long Strike Cadangan Overburden Stripping


Thick Dip Luas
Seam Dip Slope Tereka BJ Tereka Tereka Ratio
( m ) ( m) ( o ) ( o ) ( m ) ( m2 ) ( MT ) ( BCM )
AA 0.8 50 43 50 382 1.31 1111.33 17,014.28 424,528.79 24.95
AB 1 50 42 50 461 1.31 1091.19 25,666.18 503,040.82 19.60
A 0.37 50 52 50 593 1.31 1257.74 12,215.65 745,842.76 61.06
B 0.39 50 56 50 637.2 1.31 1300.38 13,835.68 828,605.22 59.89
C 0.75 50 49 50 730.1 1.31 1216.34 30,486.24 888,051.57 29.13
D 1.06 50 45 50 521.4 1.31 1149.44 30,770.68 599,316.59 19.48
E 1.11 50 44 50 195.1 1.31 1130.75 12,057.03 220,610.09 18.30
F 0.35 50 45 50 310.6 1.31 1149.44 6,052.43 357,015.22 58.99
G 0.59 50 46 50 398 1.31 1167.36 13,073.60 464,608.93 35.54
H 0.49 50 46 50 343.3 1.31 1167.36 9,365.48 400,754.39 42.79
GRAND TOTAL 170,537.26 5,432,374.38
987,704.43 31.85

Keterangan : Overburden dihitung dalam keadaan datar

Cadangan Batubara = Tebal x Panjang Penyebaran x Down Dip x Berat Jenis


Overburden = Luas x Panjang Penyebaran ( Long Strike )
SR = Overburden : Cadangan Batubara