Data Kapal
LWL 107.40 m
L 103.20 m
B 18.00 m
T 6.90 m
CB 0.79
rair laut 1.025 ton/m3
h (L/40) 2.69 m
t.b.BKT =
(DWT x t.b.DWT) + (BA x t.b.BA) + (KM x t.b.KM) + (PR x t.b.PR) + (OFT x t.b.OFT) + (WHL x t.b.WHL) + (WHT x t.b. WHT)
BKT
t.b.WHT =
(BKT x t.b.BKT) - [(DWT x t.b.DWT) + (BA x t.b.BA) + (KM x t.b.KM) + (PR x t.b.PR) + (OFTx t.b.OFT) + (WHL x t.b.WHL)]
WHT
t.b.WHT = -7.67 m
ma = 6.49 ton/m
mf = 2.59 ton/m
PERHITUNGAN GAYA ANGKAT Momen
No St Area [m2] FS Hasil Kali Lengan [m] luasan
0 0 1 0.00 [m^3]
1 0.2386 4 0.95 -47.15 -45.00
2 1.9874 2 3.97 -44.46 -176.72
3 10.5376 4 42.15 -41.78 -1760.87
4 30.4664 2 60.93 -39.09 -2381.91
5 50.9312 4 203.72 -36.41 -7416.76
6 70.068 2 140.14 -33.72 -4725.50
7 87.6844 4 350.74 -31.04 -10885.42
8 103.378 2 206.76 -28.35 -5861.70
9 115.3086 4 461.23 -25.67 -11837.95
10 122.0904 2 244.18 -22.98 -5611.47
11 123.4146 4 493.66 -20.30 -10019.19
12 123.4146 2 246.83 -17.61 -4346.86
13 123.4146 4 493.66 -14.93 -7368.25
14 123.4146 2 246.83 -12.24 -3021.39
15 123.4146 4 493.66 -9.56 -4717.30
16 123.4146 2 246.83 -6.87 -1695.91
17 123.4146 4 493.66 -4.19 -2066.36
18 123.4146 2 246.83 -1.50 -370.44
19 123.4146 4 493.66 1.18 584.59
20 123.4146 2 246.83 3.87 955.03
21 123.4146 4 493.66 6.55 3235.54
22 123.4146 2 246.83 9.24 2280.50
23 123.4146 4 493.66 11.92 5886.48
24 123.4146 2 246.83 14.61 3605.98
25 123.4146 4 493.66 17.29 8537.43
26 123.4146 2 246.83 19.98 4931.45
27 123.4146 4 493.66 22.66 11188.37
28 123.4146 2 246.83 25.35 6256.92
29 123.4146 4 493.66 28.03 13839.32
30 123.4146 2 246.83 30.72 7582.40
31 123.3618 4 493.45 33.40 16483.21
32 122.6698 2 245.34 36.09 8854.11
33 120.5326 4 482.13 38.77 18694.22
34 115.238 2 230.48 41.46 9555.35
35 104.804 4 419.22 44.14 18505.95
36 90.5568 2 181.11 46.83 8481.40
37 72.1578 4 288.63 49.51 14291.34
38 49.45 2 98.90 52.20 5162.50
39 24.8644 4 99.46 54.88 5458.65
40 0 1 0.00 57.57 0.00
Jumlah 11658.37 Jumlah 90061.76
LCB dr
displ.
10434.24 midship 7.73
[ton]
(m)
PERHITUNGAN BERAT BADAN KAPAL
Distribusi hull weight [ ton/m]
Station lengkung traplesiu lengan momen
total rata2
CSA m
0 0.00 6.49 6.49
1 0.02 6.39 6.41 6.449 -47.15 -304.030
2 0.19 6.29 6.48 6.447 -44.46 -286.620
3 1.01 6.19 7.20 6.843 -41.78 -285.852
4 2.92 6.10 9.01 8.109 -39.09 -316.994
5 4.88 6.00 10.88 9.946 -36.41 -362.110
6 6.71 5.90 12.61 11.746 -33.72 -396.079
7 8.40 5.80 14.20 13.409 -31.04 -416.152
8 9.90 5.71 15.61 14.907 -28.35 -422.620
9 11.05 5.61 16.66 16.133 -25.67 -414.055
10 11.69 5.51 17.21 16.931 -22.98 -389.098
11 11.82 5.42 17.24 17.222 -20.30 -349.541
12 11.82 5.32 17.14 17.188 -17.61 -302.702
13 11.82 5.22 17.04 17.091 -14.93 -255.099
14 11.82 5.12 16.95 16.994 -12.24 -208.018
15 11.82 5.03 16.85 16.896 -9.56 -161.460
16 11.82 4.93 16.75 16.799 -6.87 -115.424
17 11.82 4.83 16.65 16.702 -4.19 -69.911
18 11.82 4.73 16.56 16.605 -1.50 -24.920
19 11.82 4.64 16.46 16.507 1.18 19.548
20 11.82 4.54 16.36 16.410 3.87 63.493
21 11.82 4.44 16.26 16.313 6.55 106.916
22 11.82 4.34 16.17 16.215 9.24 149.816
23 11.82 4.25 16.07 16.118 11.92 192.194
24 11.82 4.15 15.97 16.021 14.61 234.049
25 11.82 4.05 15.87 15.923 17.29 275.381
26 11.82 3.96 15.78 15.826 19.98 316.191
27 11.82 3.86 15.68 15.729 22.66 356.478
28 11.82 3.76 15.58 15.631 25.35 396.242
29 11.82 3.66 15.49 15.534 28.03 435.484
30 11.82 3.57 15.39 15.437 30.72 474.204
31 11.82 3.47 15.29 15.337 33.40 512.316
32 11.75 3.37 15.12 15.204 36.09 548.696
33 11.55 3.27 14.82 14.971 38.77 580.491
34 11.04 3.18 14.22 14.518 41.46 601.897
35 10.04 3.08 13.12 13.667 44.14 603.327
36 8.67 2.98 11.66 12.388 46.83 580.110
37 6.91 2.89 9.80 10.727 49.51 531.134
38 4.74 2.79 7.52 8.661 52.20 452.087
39 2.38 2.69 5.07 6.298 54.88 345.683
40 0.00 2.59 2.59 3.833 57.57 220.647
jumlah 553.68 Jumlah 2915.70
berat 1486.64 titik berat 5.27
Dari Tugas Desain Kapal 1 (H Schneekluth; Ship Design Efficiency and Economy)
1 Total Berat Permesinan = 131.18965 ton (SDEE hal 182)
Berat Permesinan di KM : 207.36 ton
Berat Permesinan di Pump Room : 64.872 ton
2 Berat Perlengkapan Terdiri dari (SDEE hal 172)
Berat Poop : 53.447576 ton
Berat Layer 2 : 29.71485 ton
Berat Layer 3 : 13.068 ton
Berat Layer 4 : 5.6133 ton
Berat Forcastle : 20.952541 ton
Berat dll : 119.05951 ton
Total Berat Perlengkapan = 241.85578 ton
3 D (Tinggi Kapal) = 9.1 m
4 DA = 9.4542412 m (SDEE hal 173)
5 Steel Weight = 1519.5881 ton
Keterangan :
Berat Permesinan di Kamar Mesin terdiri dari Mesin Induk, Unit Propulsi, Genset
Berat Permesinan di Pump Room terdiri dari Pompa, Pipa, dll
Berat dll adalah berat jangkar, pipa-pipa diatas ruang muat, fairlead, bollard, dll.
DA adalah Tinggi kapal setelah dikoreksi dengan deck house
Hull Weight (ton/m)
Station
Hull Weight (ton/m)
Grafik Lengkung CSA
18.00
16.00
14.00
12.00
10.00
8.00
6.00
4.00
2.00
0.00
Station
Hull Weight (ton/m)
Grafik Trapesium
18.00
15.47
12.94
10.41
7.88
5.35
2.82
0.29
Station
-2.24
Hull Weight (ton/m)
Station
GRAFIK CSA
100
90
80
Area St (m2)
70
60
50
40
30
20
10
0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
STATION
0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
STATION
PENYEBARAN BERAT KAPAL KOSONG
Dari perhitungan sebelumnya telah diperoleh berat kapal kosong tiap station (40 station)
sehingga penyebaran berat kapal kosong dapat dihitung sebagai berikut
q(x) = W(x)/hs ton/m
dimana:
W(x) = Berat kapal kosong tiap station [ton]
hs = jarak station [m]
= Lwl/40 ; Lwl = 107.40 m
= 2.6850 m
berat
konstruksi q
panjang tinggi luas dek volume konstruk
[m2] dan
(m) (m) (m3) si
r
prlgkpn [ton/m]
[ton] konstruks
i [ton/m3]
poop 25.2 2.4 353.48 848.36 167.860 6.661 0.198 Nb :
forecast 13.1 2.5 90.58 226.46 44.808 3.414 0.198 vol = luas * tinggi
layer 2 19.2 2.4 184.42 442.62 87.578 4.56 0.198 berat = vol/totvol*HW
layer 3 15.0 2.4 109.92 263.81 52.199 3.480 0.198 q =berat kon/panjang
layer 4 13.2 2.4 67.78 162.67 32.186 2.438 0.198 ρ = berat / vol
layer 5 7.8 2.4 43.26 103.83 20.545 2.634 0.198
total 2047.75 405.176
II. Berat Mesin
Termasuk berat mesin dan berat konstruksi pendukungnya, funnel, dsb.
dimana
Lpp = 103.20 m
le = 15.0 m (panjang kamar mesin)
Wm = Berat Instalasi Permesinan
= 207.36 ton; (dari Tugas Merancang I )
Penyebaran beban 0 4 9
W = q * le le
q = W / le
= 207.36 / 15.0
= 13.82 ton / m
Beban di belakang st. 4
W' = q * x'
dimana
x' = 0.54 m (panjang kamar mesin dibelakang st. 4)
maka
W' = 7.46 ton
Beban didistribusikan ke dalam st.3 s/d st. 5.
W' = W1' + W2'
W' (-a) = W1' ( -1/2 ) b + W2' ( 1/2 ) b
W1' = W' ( 2a + b ) / ( 2b )
- 2 W' a = - W1' * b + W2' * b
W' * b = W1' * b + W2' * b +
W' ( -2a + b ) = 2 W2' * b
W2' = W' ( b - 2a ) / ( 2b ) 3 5
W1' W' 4
W2'
a
dimana
a = letak titik berat segi empat = 1/2 x' x' b
= 0.270 m
b = Lwl/40
= 2.69 m
ehingga
W2' = 2.98 ton q (st. 4 s/d 5) = 1.11 ton / m
W1' = 4.48 ton q (st. 3 s/d 4) = 1.67 ton / m
S = 77.23 -1896.05
W = S x h = 207.36 ton
titik berat kamar mesin = -1896.05 / 77.23
= -24.55152 m
III. Konstruksi Bangunan Atas
Layer 1
Poop
l = panjang kons. = 25.2 m
h = tinggi konstruksi = 2.4 m
a = luas poop deck = 353.48 m2
v =olume konstruksi = 848.36064 m3
W = Berat konstruksi = 167.86 ton
q = 6.66 ton/m
b = panjang station = 2.69 m
Beban di belakang st. 0
W' = q * x'
dimana
x' = 0.00 m (panjang kons. dibelakang st. 0)
y' = 11.99 m (lebar kons. dibelakang st. 0)
Luas Deck' = 1.65 m2
v' = 3.96 m3 (volume kons. dibelakang st. 0) 0 W' 1 W1' 2
maka W2'
a
W' = 0.00 ton
b b
Beban didistribusikan ke dalam st. 0 s/d st. 2.
W' = W1' + W2'
W' (-a) = W1' ( 1/2 ) b + W2' ( 3/2 ) b
Forecastle
W = Berat konstruksi = 44.81 ton r= 0.198 ton/m3
l = panjang kons. = 13.1 m b= panjang station = 2.69
Beban di depan st. 40
W'' = q * x''
dimana
x'' = 2.03 m (panjang konstruksi di depan st. 40)
l'' = 4.66 m (lebar konstruksi pada station 40)
h = 2.50 m (tinggi fore castle)
W'' = 6.92 ton
W= W1 + W2
W*a= -W1 ( 1/2 ) b - W2 ( 3/2 ) b
2W*a= -W1 * b - 3 W2 * b 38 39 40
W*b= W1 * b + W2 * b +
W ( 2a +b ) = - 2 W2 * b W'2 W'1 W'
W2 = - W ( b + 2a ) / 2b b a
a = letak titik berat segi tiga = 1/3 x''
= 0.68 m
b = Lwl/40
= 2.69 m
sehingga
W2' = -5.20 ton q (st. 38 s/d 39) = -1.936 ton / m
W1' = 12.11 ton q (st. 39 s/d 40) = 4.51 ton / m
Layer 2
W = Berat konstruksi = 87.58 ton
l = panjang kons. = 19.20 m
q = 4.56 ton/m
b = panjang station = 2.685 m
Beban di belakang st. 3
W' = q * x'
dimana
x' = 2.06 m (panjang kons. dibelakang st. 3)
maka
W' = 9.37 ton
Beban didistribusikan ke dalam st 2s/d st. 4.
W' = W1' + W2'
W' (-a) = W1' ( -1/2 ) b + W2' ( 1/2 ) b
W1' = W' ( 2a + b ) / ( 2b ) a
W2'' = W'' -W1'' x' b
dimana
a = letak titik berat segi empat = 1/2 x'
= 1.03 m
b = Lwl/40
= 2.685 m
sehingga
W2' = 1.10 ton q (st. 3 s/d 4) = 0.41 ton / m
W1' = 8.27 ton q (st. 2 s/d 3) = 3.08 ton / m
Beban di depan st. 9
W'' = q * x''
dimana
x'' = 1.04 m (panjang kons. di depan st. 9)
maka
W'' = 4.72 ton
Didistribusikan kedalam st. 8 s/d st. 10
W'' = W1'' + W2''
W'' (a) = W1'' ( 1/2 ) b + W2'' ( -1/2 ) b
W1' = W' ( 2a + b ) / ( 2b ) a
W2'' = W'' -W1'' x'' b
dimana
a = letak titik berat segi empat = 1/2 x'
= 0.27 m
b = Lwl/40
= 2.69 m
sehingga
W2' = 0.75 ton q (st. 4 s/d 5) = 0.28 ton / m
W1' = 1.13 ton q (st. 3 s/d 4) = 0.42 ton / m
Layer 4
W = Berat konstruksi = 32.19 ton
l = panjang kons. = 13.20 m
q = 2.44 ton/m
b = panjang station = 2.69 m
Beban di belakang st. 5
W' = q * x'
dimana
x' = 1.43 m (panjang kons. dibelakang st. 5)
maka
W' = 3.47 ton
Beban didistribusikan ke dalam st. 4 s/d st. 6
W' = W1' + W2'
W' (-a) = W1' ( -1/2 ) b + W2' ( 1/2 ) b
Layer 5
W = Berat konstruksi = 20.55 ton
l = panjang kons. = 7.80 m
q = 2.63 ton/m
b = panjang station = 2.69 m
Beban di belakang st. 7
W' = q * x'
dimana
x' = 1.40 m (panjang kons. dibelakang st. 7)
maka
W' = 3.67 ton
Beban didistribusikan ke dalam st. 6 s/d st. 8.
W' = W1' + W2' 6 7 8
W' (-a) = W1' ( -1/2 ) b + W2' ( 1/2 ) b W1' W' W2'
W1' = W' ( 2a + b ) / ( 2b )
W2' = W' -W1'
dimana
a = letak titik berat segi empat = 1/2 x'
= 0.70 m
b = Lwl/40
= 2.69 m
sehingga
W2' = 2.79 ton q (st. 7 s/d 8) = 1.04 ton / m
W1' = 0.88 ton q (st. 6 s/d 7) = 0.33 ton / m
layer 1
layer 2
layer 3
layer 4
layer 5
No station lengan momen
[ton/m]
Penyebaran beban
W = q * le
q = W / le
= 64.87 / 2.4
= 27.03 ton / m 8 9 10
Beban di belakang st. 9 W1' W' W2'
W' = q * x' a
dimana x' b
x' = 0.87 m (panjang pump room dibelakang st. 9)
maka
W' = 23.47 ton
Beban didistribusikan ke dalam st.8 s/d st. 10.
W' = W1' + W2'
W' (-a) = W1' ( -1/2 ) b + W2' ( 1/2 ) b
W1' = W' ( 2a + b ) / ( 2b )
W2' = W' -W1'
dimana
a = letak titik berat segi empat = 1/2 x'
= 0.43 m
b = Lwl/40
= 2.69 m
sehingga
W2' = 7.94 ton q (st. 9 s/d 10) = 2.96 ton / m
W1' = 15.53 ton q (st. 8 s/d 9) = 5.78 ton / m
Penyebaran beban
W = q * le 74.72
q = W / le 20
= 119.06 / 107.4
= 1.11 ton / m 18.59675
h= 2.69 m
12.64908
q qx h
Station Lengan Momen
(ton/m)
1 1.11 1.1085616 -52.36 -58.04151
2 1.11 1.1085616 -49.67 -55.06503
3 1.11 1.1085616 -46.99 -52.08854
4 1.11 1.1085616 -44.30 -49.11205
5 1.11 1.1085616 -41.62 -46.13556
6 1.11 1.1085616 -38.93 -43.15907
7 1.11 1.1085616 -36.25 -40.18259
8 1.11 1.1085616 -33.56 -37.2061
9 1.11 1.1085616 -30.88 -34.22961
10 1.11 1.1085616 -28.19 -31.25312
11 1.11 1.1085616 -25.51 -28.27663
12 1.11 1.1085616 -22.82 -25.30015
13 1.11 1.1085616 -20.14 -22.32366
14 1.11 1.1085616 -17.45 -19.34717
15 1.11 1.1085616 -14.77 -16.37068
16 1.11 1.1085616 -12.08 -13.3942
17 1.11 1.1085616 -9.40 -10.41771
18 1.11 1.1085616 -6.71 -7.44122
19 1.11 1.1085616 -4.03 -4.464732
20 1.11 1.1085616 -1.34 -1.488244
21 1.11 1.1085616 1.34 1.4882439
22 1.11 1.1085616 4.03 4.4647318
23 1.11 1.1085616 6.71 7.4412196
24 1.11 1.1085616 9.40 10.417707
25 1.11 1.1085616 12.08 13.394195
26 1.11 1.1085616 14.77 16.370683
27 1.11 1.1085616 17.45 19.347171
28 1.11 1.1085616 20.14 22.323659
29 1.11 1.1085616 22.82 25.300147 Berat Perlengkapan
30 1.11 1.1085616 25.51 28.276635 W = S x h = 134.26 ton
31 1.11 1.1085616 28.19 31.253122
32 1.11 1.1085616 30.88 34.22961 Titik berat perlengkapan
33 1.11 1.1085616 33.56 37.206098 = S3 /S1
34 1.11 1.1085616 36.25 40.182586 = 6.57E-15 m
35 1.11 1.1085616 38.93 43.159074
36 1.11 1.1085616 41.62 46.135562
37 1.11 1.1085616 44.30 49.112049 31.12504
38 1.11 1.1085616 46.99 52.088537 32.15
39 1.11 1.1085616 49.67 55.065025
40 1.11 1.1085616 52.36 58.041513
S1 44.34 44.34 S3 0
119.06
GRAFIK PENYEBARAN LWT
100
90
80
80
q(x) Ton/m
70
60
60
50
46
43 44
40
30
26
20 18 18 18 18 18 18 18 18 18 18 18 18 17 17 17 17
17 17 17 17 17 17 16 16
16 16
14 15
13
12 11
11 10
10 8
0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
Station
12 11
11 10
10 8
0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
Station
PERHITUNGAN PENYEBARAN DWT KAPAL
dimana
a = letak titik berat segi empat = 1/2 x'
= 0.000 m
b = Lwl/40
= 2.69 m
sehingga
W2' = 0.00 ton q (st. 1 s/d 2) = 0.00 ton / m
W1' = 0.00 ton q (st. 0 s/d 2) = 0.00 ton / m
dimana
a = letak titik berat segi empat = 1/2 x''
= 0.32 m
b = Lwl/40
= 2.69 m
sehingga
W2' = 0.97 ton q (st. 2 s/d 3) = 0.36 ton / m
W1' = 0.60 ton q (st. 3 s/d 4) = 0.22 ton / m
dimana
a = letak titik berat segi empat = 1/2 x''
= 0.52 m
b = Lpp/40
= 2.69 m
sehingga
W2' = 3.620 ton q (st. 9 s/d 10) = 1.35 ton / m
W1' = 8.162 ton q (st. 8 s/d 9) = 3.04 ton / m
S= 17.81
W'
-2 W' a = W1' * b + 3 W2' * b
a
W' * b = W1' * b + W2' * b -
b b
W' ( -2a -b ) = 2 W2' * b
W2' = W' (- 2a -b ) / ( 2b )
W1' = W' -W2'
dimana
a = letak titik berat segi empat = 1/2 x'
= 0.000 m
b = Lwl/40
= 2.69 m
sehingga
W2' = 0.00 ton q (st. 1 s/d 2) = 0.000 ton / m
W1' = 0.00 ton q (st. 0 s/d 1) = 0.000 ton / m
maka
W'' = 0.20 ton
Didistribusikan kedalam st. 7 s/d st. 9
W'' = W1'' + W2''
W'' (a) = W1'' ( 1/2 ) b + W2'' ( -1/2 ) b
q rata2 qx h
Station Area (m2) q (ton/m)
(ton/m)
6
7
8
9
10 133.370521 117.37 58.68 157.56
11 135.038721 118.83 118.10 317.10
12 135.012521 118.81 118.82 319.04
13 135.396321 119.15 118.98 319.46
14 135.396321 119.15 119.15 319.91
15 135.396321 119.15 119.15 319.91
16 135.396321 119.15 119.15 319.91
17 135.396321 119.15 119.15 319.91
18 135.396321 115.09 117.12 314.46
19 135.396321 115.09 115.09 309.01
20 135.396321 115.09 115.09 309.01
21 135.396321 115.09 115.09 309.01
22 135.396321 115.09 115.09 309.01
23 135.396321 115.09 115.09 309.01
24 135.396321 108.32 111.70 299.92
25 135.396321 108.32 108.32 290.83
26 135.396321 108.32 108.32 290.83
27 135.396321 108.32 108.32 290.83
28 135.396321 108.32 108.32 290.83
29 134.437321 107.55 107.93 289.80
30 134.128321 107.30 107.43 288.44
31 132.795321 103.58 105.44 283.11
32 132.702321 103.51 103.54 278.02
33 131.534321 102.60 103.05 276.70
34 128.665321 100.36 101.48 272.47
35 109.645321 85.52 92.94 249.55
36 106.811321 83.31 84.42 226.66
37 84.1953214 65.67 74.49 200.01
Berat [ton] 8080.32
q(x) [ton/m]
q(x) total
b. b. mesin
b. b. mesin
[ton/m]
momen
station
tangki air
lengan
provision
muatan
minyak
bagasi,
lumas
bantu
induk
tawar
ABK,
0-1 2.50 0.097 2.598 -52.36 -136.04
1-2 2.86 0.200 3.064 -44.46 -136.24
2-3 0.22 0.214 0.438 -41.78 -18.30
3-4 0.224 0.224 -39.09 -8.76
4-5 0.229 0.229 -36.41 -8.35
5-6 0.230 0.230 -33.72 -7.76
6-7 0.71 0.230 0.941 -31.04 -29.20
7-8 1.20 4.4670 0.230 5.897 -28.35 -167.18
8-9 15.26 1.79 2.2712 0.138 19.462 -25.67 -499.51
9-10 1.35 0.88 58.683 60.909 -22.98 -1399.74
10-11 118.100 118.100 -20.30 -2396.94
11-12 118.823 118.823 -17.61 -2092.56
12-13 118.980 118.980 -14.93 -1775.87
13-14 119.149 119.149 -12.24 -1458.48
14-15 119.149 119.149 -9.56 -1138.56
15-16 119.149 119.149 -6.87 -818.65
16-17 119.149 119.149 -4.19 -498.73
17-18 117.118 117.118 -1.50 -175.77
18-19 115.087 115.087 1.18 136.29
19-20 115.087 115.087 3.87 445.29
20-21 115.087 115.087 6.55 754.30
21-22 115.087 115.087 9.24 1063.31
22-23 115.087 115.087 11.92 1372.32
23-24 111.702 111.702 14.61 1631.88
24-25 108.317 108.317 17.29 1873.26
25-26 108.317 108.317 19.98 2164.09
26-27 108.317 108.317 22.66 2454.92
27-28 108.317 108.317 25.35 2745.75
28-29 107.933 107.933 28.03 3025.83
29-30 107.426 107.426 30.72 3300.05
30-31 105.442 105.442 33.40 3522.19
31-32 103.544 103.544 36.09 3736.82
32-33 103.052 103.052 38.77 3995.77
33-34 101.478 101.478 41.46 4207.19
34-35 92.941 92.941 44.14 4102.81
35-36 84.418 84.418 46.83 3953.23
36-37 74.493 74.493 49.51 3688.44
37-38 52.20 0.00
38-39 54.88 0.00
39-40 57.57 0.00
Jumlah
5.59 17.81 2.67 7.45 1.79 3009.43 3044.740 35407.11
[m3]
LCG dr midship (m) 11.629
berat DWT [ton] 8175.13
Muatan Bersih
Payload = 7800 ton
P. Ruang muat = 72 m
ro muatan = 0.77 ton/m3
h = 2.69 m
W1' = W' ( 2a + b ) / ( 2b )
Beban di depan ST 37
W'' = q * x''
dimana
x'' = 0.86 m (panjang tangki di depan ST 37)
maka
W'' = 73.12 ton
Beban didistribusikan ke dalam st. 36 s/d st. 38
W'' = W1'' + W2''
W'' (a) = W1'' ( 1/2 ) b + W2'' ( -1/2 ) b
36
W1'' = W'' ( 2a + b ) / ( 2b ) W2'' 37 38
' W'' W1''
2 W'' a = W1'' * b - W2'' * b a
W'' * b = W1'' * b + W2'' * b - b x''
W'' ( 2a - b ) = -2 W2'' * b
W2'' = W'' ( 2a - b ) / ( -2b )
dimana
a = letak titik berat segi empat = 1/2 x''
= 0.42750 m
b= Lwl/40
= 2.69 m
sehingga
W2' = 24.92 ton q (ST 15 s/d ST 16) = 9.28 ton / m
W1' = 48.20 ton q (ST 14 s/d ST 15) = 17.95 ton / m
Station q dist (ton/m) q(dist) (q) total Station (q) total
30 8-9 31.46
31.46 31.46 9-10 117.50
31 10-11 103.05
103.54 13.95 117.50 11-12 101.48
32 12-13 92.94
103.05 103.05 13-14 84.42
33 14-15 83.77
101.48 101.48 15-16 17.95
34
92.94 92.94
35
84.42 84.42
36
74.49 9.28 83.77
37
17.95 17.95
38
S= 632.5713
W1' = W' ( 2a + b ) / ( 2b )
-130
SUPERPOSISI ( Sk a l a 1 ~ 1 to n /m)
GAYA L INTANG ( Sk a la 1 ~ 5 to n )
Station
-150
-90
-100
-110
GAYA BERAT ( Sk a la 1 ~ 1 to n /m )
-130
SUPERPOSISI ( Sk a l a 1 ~ 1 to n /m)
GAYA L INTANG ( Sk a la 1 ~ 5 to n )
Station
-150
PENYEBARAN GAYA LINTANG DAN MOMEN PADA AIR TENANG
140
130
120
110
q(x) Ton/m
100
90
80
70
60
50
40
30
20
10
0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
STATION
Tabel Penyebaran Berat Bagian LWT
q(x) [ton/m]
Konstruksi Hull
Bangunan Atas
+ Peralatannya
dan Peralatan
Perlengkapan
Mesin+Pump
q(x) total
Kamar
Room
No station
[ton/m]
= 10389.3 ton
LCG = S5/S4
= 83696.11 / 10389.3386
= 8.06 m , di depan midship
Koreksi Dispalcement Kapal
Berat DWT Kapal = S2 x h
= 3041.74 x 2.69
= 8167.1 ton
Berat LWT Kapal = S1 x h
= 767.88 x 2.69
= 2061.75 ton
150.00
140.00 136.11
135.42 136.24
136.17 136.14 136.30
136.15
134.33
132.30
132.21
132.11
132.01
131.92
128.44
130.00 124.97
124.88
124.78
124.68
124.20
123.60
121.52
119.50
118.77
120.00 116.75
q(x) Ton/m
110.00 107.39
98.79
100.00 97.62
90.00
82.58
78.71
80.00
70.00 66.15
60.00
50.00 46.61
43.5343.92
40.00
30.00 26.42
20.00 17.2818.08
13.49
10.0010.99
8.33
10.00
0.00
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
Station
20.00 17.28
13.49
10.0010.99
8.33
10.00
0.00
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
Station
Data untuk pembuatan grafik Air Tenang
Station qx ax px Station Q'x M'x Skala Q'x
0 0.000 0.000 0.000 0 0.000 0.000 1:
0 -13.486 0.245 -13.241 1 -8.62 -2.67 Skala M'x
1 -13.486 0.245 -13.241 2 -18.31 -7.80 1:
1 -17.280 2.037 -15.243 3 -23.73 -14.95
2 -17.280 2.037 -15.243 4 -22.66 -22.69
2 -18.077 10.801 -7.276 5 -19.51 -29.86
3 -18.077 10.801 -7.276 6 -6.03 -34.80
3 -26.423 31.228 4.805 7 15.69 -35.02
4 -26.423 31.228 4.805 8 35.57 -29.65
4 -43.532 52.204 8.673 9 44.48 -20.41
5 -43.532 52.204 8.673 10 67.90 -6.84
5 -43.917 71.820 27.903 11 61.60 9.03
6 -43.917 71.820 27.903 12 54.93 23.17
6 -46.611 89.877 43.265 13 48.23 35.51
7 -46.611 89.877 43.265 14 41.49 46.04
7 -66.148 105.962 39.815 15 34.81 54.77
8 -66.148 105.962 39.815 16 28.12 61.71
8 -98.789 118.191 19.403 17 21.35 66.84
9 -98.789 118.191 19.403 18 15.64 70.29
9 -78.712 125.143 46.430 19 11.01 72.36
10 -78.712 125.143 46.430 20 6.44 73.19
10 -135.423 126.500 -8.924 21 1.92 72.80
11 -135.423 126.500 -8.924 22 -2.55 71.20
11 -136.110 126.500 -9.610 23 -6.97 68.41
12 -136.110 126.500 -9.610 24 -9.52 64.69
12 -136.170 126.500 -9.670 25 -10.21 60.52
13 -136.170 126.500 -9.670 26 -10.84 56.19
13 -136.241 126.500 -9.741 27 -11.43 51.69
14 -136.241 126.500 -9.741 28 -11.96 47.03
14 -136.144 126.500 -9.644 29 -12.23 42.27
15 -136.144 126.500 -9.644 30 -12.18 37.48
15 -136.147 126.500 -9.647 31 -11.05 32.85
16 -136.147 126.500 -9.647 32 -9.20 28.62
16 -136.299 126.500 -9.799 33 -8.15 24.78
17 -136.299 126.500 -9.799 34 -8.93 20.98
17 -134.327 126.500 -7.827 35 -10.42 16.87
18 -134.327 126.500 -7.827 36 -14.50 12.01
18 -132.305 126.500 -5.805 37 -20.64 5.78
19 -132.305 126.500 -5.805 38 -0.30 1.46
19 -132.208 126.500 -5.708 39 5.98 0.71
20 -132.208 126.500 -5.708 40 0.00 0.00
20 -132.208 126.500 -5.708
21 -132.013 126.500 -5.514
21 -132.013 126.500 -5.514
22 -131.916 126.500 -5.416
22 -131.916 126.500 -5.416
23 -124.973 126.500 1.527
23 -128.445 126.500 -1.945
24 -128.445 126.500 -1.945
24 -124.973 126.500 1.527
25 -124.973 126.500 1.527
25 -124.876 126.500 1.624
26 -124.876 126.500 1.624
26 -124.779 126.500 1.721
27 -124.779 126.500 1.721
27 -124.682 126.500 1.818
28 -124.682 126.500 1.818
28 -124.202 126.500 2.298
29 -124.202 126.500 2.298
29 -123.600 126.500 2.900
30 -123.600 126.500 2.900
30 -121.521 126.446 4.925
31 -121.521 126.446 4.925
31 -119.497 125.737 6.240
32 -119.497 125.737 6.240
32 -118.775 123.546 4.771
33 -118.775 123.546 4.771
33 -116.753 118.119 1.366
34 -116.753 118.119 1.366
34 -107.394 107.424 0.030
35 -107.394 107.424 0.030
35 -97.621 92.821 -4.800
36 -97.621 92.821 -4.800
36 -82.580 73.962 -8.618
37 -82.580 73.962 -8.618
37 -9.999 50.686 40.687
38 -9.999 50.686 40.687
38 -10.986 25.486 14.500
39 -10.986 25.486 14.500
39 -8.330 0.000 -8.330
40 -8.330 0.000 -8.330
40 0 0 0
Skala Q'x
5
Skala M'x
50
PERHITUNGAN GAYA LINTANG DAN MOMEN
PADA AIR BERGELOMBANG
Gelombang Hogging
MT = MSW + MWV [ kNm ]
MWV = L2 . B . c0 . c1 . cL . cM [ kNm ]
Keterangan :
MT = total bending moment in the seaway
MSW = still water bending moment of the actual loading or ballast condition considered
( positif sign for hogging, negativ sign for sagging )
MWV = vertical wave bending moment ( positif sign for hogging, negativ sign for sagging )
Data Kapal :
L = 107.40 m T = 6.90 m
B= 18.00 m H = 9.10 m
Cb = 0.785 Vo = 12 knot
CM = Distribution factor
Hogging condition
CMH = 2.5 . x/L untuk x/L <0.4
CMH = 1 untuk 0.4 ≤ x/L ≤ 0.65
CMH = [1-x/L]/0.35 untuk x/L > 0.65
Sagging condition
CMS = cv . 2.5 . x/L untuk x/L <0.4
CMS = cv untuk 0.4 ≤ x/L ≤ 0.65
CMS = cv . [(x/L-0.65 cv )/ 1-0.65 cv] untuk x/L > 0.65
Hasil Perhitungan :
c0 = 8.08
c1H = 0.149
cv = 1
Tabel Kondisi Hogging
St. x/L cMH MWV MSW MT Range
(kNm) (kNm) (kNm) x/L
0 0.000 0.000 0.000 0.000 0.000
1 0.025 0.063 15632.889 -133.450 15499.438
2 0.050 0.125 31265.777 -389.823 30875.954
3 0.075 0.188 46898.666 -747.617 46151.049
4 0.100 0.250 62531.555 -1134.567 61396.988
5 0.125 0.313 78164.443 -1493.182 76671.261
0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41
Momen [kN.m]
-100
-200
-300
-400
Station
-600
Mwv ( Skala 1 : 500 kNm)
-500
Msw ( Skala 1 : 50 kNm )
Station
-600
600
GRAFIK KONDISI HOGGING
500
Momen [kN.m]
400
300
200
100
Station
-100
Mwv ( Skala 1 : 500 kNm)
0
1 2 3 4 5 6 7 8 91011121314151617181920212223242526272829303132333435363738394041
Msw ( Skala 1 : 50 kNm )
Station
-100
PERHITUNGAN GAYA LINTANG DAN MOMEN PADA AIR BERGELOMBANG
3
Gelombang Hogging dan Sagging
2.5
1.5
0.5
0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
-0.5
-1
-1.5
-2
-2.5 G el o mb an g Saggi n g
G el o mb an g H o ggi n g
-3
V.2. Penyebaran Gaya tekan ke atas pada Kondisi Hogging
a(x) = 1.025 x 1.004 x Area [ton/m]
b = jarak station
= Lwl / 40 = 103.20/40 = 2.58 [m]
1. Tabel Penyebaran Gaya Tekan keatas pada Kondisi Hogging
Station Area a (x) a(x)rata a(x)rataxb Lengan Momen
[m2] [ton/m] [ton/m] [ton] [m] [ton.m]
0 0.000 0.00
1 3.123 3.21 0.00 0.00 #REF! #REF!
2 6.245 6.43 4.82 12.44 #REF! #REF!
3 20.299 20.89 13.66 35.24 #REF! #REF!
4 34.352 35.35 28.12 72.55 #REF! #REF!
5 55.885 57.51 46.43 119.79 #REF! #REF!
6 77.418 79.67 68.59 176.96 #REF! #REF!
7 97.719 100.56 90.12 232.50 #REF! #REF!
8 118.019 121.45 111.01 286.40 #REF! #REF!
9 134.392 138.30 129.88 335.08 #REF! #REF!
10 150.764 155.15 146.73 378.56 #REF! #REF!
11 162.019 166.73 160.94 415.23 #REF! #REF!
12 173.274 178.32 172.53 445.11 #REF! #REF!
13 180.991 186.26 182.29 470.30 #REF! #REF!
14 188.707 194.20 190.23 490.79 #REF! #REF!
15 193.387 199.01 196.61 507.24 #REF! #REF!
16 198.066 203.83 201.42 519.67 #REF! #REF!
17 198.445 204.22 204.02 526.38 #REF! #REF!
18 198.823 204.61 204.41 527.39 #REF! #REF!
19 196.596 202.32 203.46 524.93 #REF! #REF!
20 194.369 200.03 201.17 519.02 #REF! #REF!
21 189.770 195.29 197.66 509.96 #REF! #REF!
22 185.170 190.56 192.93 497.75 #REF! #REF!
23 178.508 183.70 187.13 482.80 #REF! #REF!
24 171.846 176.85 180.27 465.11 #REF! #REF!
25 162.587 167.32 172.08 443.97 #REF! #REF!
26 153.327 157.79 162.55 419.39 #REF! #REF!
27 143.802 147.99 152.89 394.45 #REF! #REF!
28 134.277 138.18 143.09 369.16 #REF! #REF!
29 123.405 127.00 132.59 342.08 #REF! #REF!
30 112.533 115.81 121.40 313.22 #REF! #REF!
31 99.481 102.38 109.09 281.46 #REF! #REF!
32 86.428 88.94 95.66 246.80 #REF! #REF!
33 74.162 76.32 82.63 213.19 #REF! #REF!
34 61.896 63.70 70.01 180.62 #REF! #REF!
35 50.140 51.60 57.65 148.73 #REF! #REF!
36 38.384 39.50 45.55 117.52 #REF! #REF!
37 26.497 27.27 33.38 86.13 #REF! #REF!
38 14.609 15.03 21.15 54.57 #REF! #REF!
39 7.305 7.52 11.28 29.09 #REF! #REF!
40 0.000 0.00 0.00 0.00 #REF! #REF!
S1 = 12191.59 S2 = #REF!
2. Koreksi Perbedaan Displacement
Buoyancy (B) = S1
= 12191.59 [ton]
Titik berat (XB) = S2 / S1
= #REF!
= #REF! m
2. Tabel Penyebaran Gaya Tekan keatas pada Kondisi Hogging Setelah Koreksi Displacement
Station Area a (x) a(x)rata a(x)rataxb Lengan Momen
[m2] [ton/m] [ton/m] [ton] [m] [ton.m]
0 0.000 0.00
1 2.297 2.36 0.00 0.00 #REF! #REF!
2 5.546 5.71 4.04 10.41 #REF! #REF!
3 9.155 9.42 7.56 19.52 #REF! #REF!
4 12.764 13.14 11.28 29.10 #REF! #REF!
5 24.391 25.10 19.12 49.32 #REF! #REF!
6 42.685 43.93 34.51 89.05 #REF! #REF!
7 72.214 74.32 59.12 152.53 #REF! #REF!
8 98.886 101.76 88.04 227.14 #REF! #REF!
9 118.438 121.88 111.82 288.51 #REF! #REF!
10 141.085 145.19 133.54 344.53 #REF! #REF!
11 164.976 169.78 157.48 406.31 #REF! #REF!
12 178.391 183.58 176.68 455.83 #REF! #REF!
13 187.555 193.01 188.30 485.81 #REF! #REF!
14 190.148 195.68 194.35 501.42 #REF! #REF!
15 192.748 198.36 197.02 508.31 #REF! #REF!
16 194.395 200.05 199.20 513.95 #REF! #REF!
17 195.756 201.45 200.75 517.94 #REF! #REF!
18 197.116 202.85 202.15 521.55 #REF! #REF!
19 198.000 203.76 203.31 524.53 #REF! #REF!
20 198.732 204.51 204.14 526.68 #REF! #REF!
21 198.208 203.98 204.25 526.95 #REF! #REF!
22 196.685 202.41 203.19 524.24 #REF! #REF!
23 193.102 198.72 200.57 517.46 #REF! #REF!
24 190.520 196.06 197.39 509.27 #REF! #REF!
25 189.319 194.83 195.45 504.25 #REF! #REF!
26 187.165 192.61 193.72 499.80 #REF! #REF!
27 183.743 189.09 190.85 492.39 #REF! #REF!
28 180.417 185.67 187.38 483.44 #REF! #REF!
29 177.700 182.87 184.27 475.41 #REF! #REF!
30 172.031 177.04 179.95 464.28 #REF! #REF!
31 156.059 160.60 168.82 435.55 #REF! #REF!
32 124.659 128.29 144.44 372.66 #REF! #REF!
33 84.340 86.79 107.54 277.45 #REF! #REF!
34 57.735 59.42 73.10 188.61 #REF! #REF!
35 34.236 35.23 47.32 122.10 #REF! #REF!
36 15.498 15.95 25.59 66.02 #REF! #REF!
37 7.686 7.91 11.93 30.78 #REF! #REF!
38 5.588 5.75 6.83 17.62 #REF! #REF!
39 2.318 2.39 4.07 10.49 #REF! #REF!
40 0.000 0.00 0.00 0.00 #REF! #REF!
S1 = 12945.04 S2 = #REF!
3. Koreksi Berat dan Titik Berat
Berdasarkan perhitungan penyebaran gaya tekan ke atas pada kondisi air tenang:
Buoyancy (B) = S1
= 12945.04 [ton]
Titik berat (XB) = S2 / S1
= #REF!
= #REF! m
Berdasarkan perhitungan LWT dan DWT:
Berat (W) = 10228.8 [ton]
Titik berat (XW) = 8.056 [m]
Koreksi moment
M(x)max = M(x)max x b2/2
6% M(x)max = 6 % x 20621.92
= 1237.315 ton.m
Mr = M(x)(FP) x b /2
2
= |4877.543 x (2.58^2)/2|
= 16233.439 ton.m
200
150
100
50
-50
-100
-150
-200
-250
-300
-350
-400
GAYA BERAT ( Sk a la 1 ~ 1 to n /m ) GAYA ANGKAT ( Sk a l a 1 ~ 1 to n /m)
-450
-600
-650