Perhitungan Dimensi Saluran Pembawa b + 2mh


1.) Saluran Primer
Data saluran Primer Konohagakure (RKO1) :
Q = 4.9887 m³/dt
1 h
m
Tabel Debit Aliran Irigasi Di Setiap Saluran
b

Berdasarkan tabel didapatkan data :


b Q - Q1
= 4 V = V1 + . V2 - V1 (Interpolasi Linier)
h Q2 - Q1

m = 1.5 4.99 - 4.5


V = 0.65 + . 0.7 - 0.65
6 - 4.5
k = 42.5
V = 0.67 m/det
a. Menentukan Tinggi Air (h)
b
= 4
h
b = 4 h
2
A = b . h + m . h
2
= 4 h . h + 1.5 . h
2 2
= 4 h + 1.5 h
2
= 5.5 h
Q = A . V
Q
A =
V
2
5.5 h = 4.989
0.67
= 7.49
h2 = 1.36
h = 1.17 m
b. Menentukan Lebar Rencana
b
= 4
h
b = 4 h
= 4 . 1.17
= 4.67 m

c. Menentukan Luasan Melintang Saluran (A)


2
A = b . h + m . h
2
= 4.67 h . h + 1.5 . h
2 2
= 4.67 h + 1.5 h
2
= 6.17 h
= 6.17 . 1.36
2
= 8.4 m

d. Menentukan Keliling Penampang Basah (P)

2
P = b + 2 . h . 1 + m
= 4.67 + 2.33 . 1.8
= 8.87 m

e. Menentukan Jari-Jari Hidrolis (R)


A
R =
P
8.4
=
8.87
= 0.95 m

f. Menentukan Lebar Mulut Saluran (T)


T = b + 2 . m . h
= 4.67 + 2 . 1.5 . 1.17
= 8.17 m

g. Menentukan Tinggi Jagaan Air (W)


W = ℎ . 0.5
= 1.17 . 0.5
= 0.54 m

h. Menentukan Kemiringan Saluran (I)


V 2
I =
k . R2/3
0.666291343 2
=
42.5 . 0.96
= 0.0003

i. Menentukan Bilangan Froude (F)


𝑉
f = 𝑚+𝑛
𝑔. ℎ.
2𝑚 + 𝑛
0.67
=
3.03
= 0.22 < 0.55 (OK)

Keterangan : Untuk perhitungan dimensi saluran pembawa lainnya dapat dilihat pada rekapitulasi perhitungan
Tabel.1 Dimensi Saluran Primer

b + 2mh
2.) Saluran Sekunder b + 2mh
Data Saluran Sekunder Iwagakure (RIW 3) :
Q = 0.8004 m³/dt
1 h
Tabel Debit Aliran Irigasi Di Setiap Saluran m
b

Berdasarkan tabel didapatkan data :


b
= 2
h

Q - Q1
V = V1 + . V2 - V1 (Interpolasi Linier)
Q2 - Q1

0.80 - 0.75
V = 0.5 + . 0.55 - 0.5
1.5 - 0.75

V = 0.5 m/det
m = 1
k = 40

a. Menentukan Tinggi Air (h)


b
= 2
h
b = 2 h
2
A = b . h + m . h
2
= 2 h . h + 1 . h
2 2
= 2 h + 1 h
2
= 3 h
Q = A . V
Q
A =
V
2
3 h = 0.80
0.5
= 1.59
h2 = 0.53
h = 0.73 m

b. Menentukan Lebar Rencana


b
= 2
h
b = 2 h
= 2 . 0.73
= 1.46 m
c. Menentukan Luasan Melintang Saluran (A)
2
A = b . h + m . h
2
= 1.46 h . h + 1 . h
2 2
= 1.46 h + 1 h
2
= 2.46 h
= 2.46 . 0.53
2
= 1.3 m

d. Menentukan Keliling Penampang Basah (P)

2
P = b + 2 . h . 1 + m
= 1.46 + 1.46 . 1.41
= 3.52 m

e. Menentukan Jari-Jari Hidrolis (R)


A
R =
P
1.3
=
3.52
= 0.37 m

f. Menentukan Lebar Mulut Saluran (T)


T = b + 2 . m . h
= 1.46 + 2 . 1 . 0.73
= 2.91 m

g. Menentukan Tinggi Jagaan Air (W)


W = ℎ . 0.5
= 0.73 . 0.5
= 0.43 m

h. Menentukan Kemiringan Saluran (I)


V 2
I =
k . R2/3
0.50 2
=
40 . 0.52
= 0.0006

i. Menentukan Bilangan Froude (F)


𝑉
f = 𝑚+𝑛
𝑔. ℎ.
2𝑚 + 𝑛
0.5
=
2.34
= 0.22 < 0.55 (OK)

Keterangan : Untuk perhitungan dimensi saluran pembawa lainnya dapat dilihat pada rekapitulasi perhitungan
Tabel.2 Dimensi Saluran Sekunder

3.) Saluran Tersier


Data Saluran Tersier Kirigakure (KI 2.Ki) :
Q = 0.1845 m³/dt
Tabel Debit Aliran Irigasi Di Setiap Saluran
b+
2mh

1 h
m
b

Berdasarkan tabel didapatkan data :


b
= 1
h

Q - Q1
V = V1 + . V2 - V1 (Interpolasi Linier)
Q2 - Q1

0.185 - 0.15
V = 0.3 + . 0.35 - 0.3
0.3 - 0.15

V = 0.31 m/det
m = 1
k = 35

a. Menentukan Tinggi Air (h)


b
= 1
h
b = 1 h
2
A = b . h + m . h
2
= 1 h . h + 1 . h
2 2
= 1 h + 1 h
2
= 2 h
Q = A . V
Q
A =
V
2
2 h = 0.185
0.31
= 0.59
h2 = 0.30
h = 0.54 m

b. Menentukan Lebar Rencana


b
= 1
h
b = 1 h
= 1 . 0.54
= 0.54 m

c. Menentukan Luasan Melintang Saluran (A)


2
A = b . h + m . h
2
= 0.54 h . h + 1 . h
2 2
= 0.54 h + 1 h
2
= 1.54 h
= 1.54 . 0.3
2
= 0.46 m
d. Menentukan Keliling Penampang Basah (P)

2
P = b + 2 . h . 1 + m
= 0.54 + 1.09 . 1.41
= 2.08 m

e. Menentukan Jari-Jari Hidrolis (R)


A
R =
P
0.46
=
2.08
= 0.22 m

f. Menentukan Lebar Mulut Saluran (T)


T = b + 2 . m . h
= 0.54 + 2 . 1 . 0.54
= 1.63 m

g. Menentukan Tinggi Jagaan Air (W)


W = ℎ . 0.5
= 0.54 . 0.5
= 0.37 m

h. Menentukan Kemiringan Saluran (I)


V 2
I =
k . R2/3
0.31 2
=
35 . 0.36
= 0.0006

i. Menentukan Bilangan Froude (F)


𝑉
f = 𝑚+𝑛
𝑔. ℎ.
2𝑚 + 𝑛
0.31
=
1.9
= 0.16 < 0.55 (OK)

Keterangan : Untuk perhitungan dimensi saluran pembawa lainnya dapat dilihat pada rekapitulasi perhitungan
Tabel.2 Dimensi Saluran Sekunder

4.) Tabel Rekapitulasi Dimensi Saluran

Tabel 1. Dimensi Saluran Primer


Nama Q V
No. b/h m k h (m) b (m) A (m²) P (m) R (m) T (m) W (m) I F Ket.
Saluran (m³/dt) (m/s)
1 RKO1 1.38 2.5 0.55 1.5 40 0.8 1.99 2.21 4.9 0.45 4.38 0.45 0.0005 0.23 OK
2 RKO2 4.99 4 0.7 1.5 42.5 1.14 4.55 7.8 8.7 0.91 7.97 0.53 0.0003 0.23 OK
3 RKO3 1.96 2.5 0.57 1.5 40 0.93 2.33 3.31 5.7 0.58 5.12 0.48 0.0004 0.22 OK
4 RKO4 1.41 2.5 0.55 1.5 40 0.8 2.01 2.27 4.9 0.46 4.42 0.45 0.0005 0.23 OK
Tabel 2. Dimensi Saluran Sekunder
Nama Q V
No. (m³/dt)
b/h m k h (m) b (m) A (m²) P (m) R (m) T (m) W (m) I F Ket.
Saluran (m/s)
1 RSU1 1.06 2 0.52 1 40 0.82 1.65 1.79 4.0 0.45 3.29 0.45 0.0005 0.21 OK
2 RSU2 0.87 2 0.51 1 40 0.75 1.51 1.4 3.6 0.39 3.02 0.43 0.0006 0.21 OK
3 RSU3 0.71 2 0.5 1 40 0.69 1.38 1.13 3.3 0.34 2.76 0.41 0.0007 0.22 OK
4 RSU4 0.55 2 0.49 1 40 0.61 1.22 0.83 3.0 0.28 2.45 0.39 0.0008 0.23 OK
5 RSU5 0.33 2 0.46 1 40 0.49 0.97 0.47 2.3 0.20 1.95 0.35 0.0011 0.24 OK
6 RSU6 0.17 1.5 0.28 1 35 0.49 0.73 0.41 2.1 0.19 1.70 0.35 0.0006 0.15 OK
7 RKI1 2.34 1 1.03 1 35 1.07 1.07 2.35 4.1 0.58 3.20 0.52 0.0018 0.39 OK
8 RKI2 1.93 2.5 0.56 1.5 40 0.92 2.31 3.26 5.6 0.58 5.09 0.48 0.0004 0.22 OK
9 RKI3 1.52 2.5 0.55 1.5 40 0.83 2.07 2.46 5.1 0.49 4.56 0.46 0.0005 0.22 OK
10 RKI4 1.13 2.5 0.54 1.5 40 0.73 1.81 1.75 4.4 0.39 3.99 0.43 0.0006 0.23 OK
11 RKI5 0.72 2 0.5 1 40 0.69 1.38 1.14 3.3 0.34 2.77 0.42 0.0006 0.22 OK
12 RKI6 0.38 2 0.48 1 40 0.52 1.03 0.54 2.5 0.22 2.06 0.36 0.0011 0.24 OK
13 RKU1 0.23 2 0.4 1 40 0.44 0.89 0.37 2.1 0.17 1.77 0.33 0.0010 0.22 OK
14 RIW1 1.16 1 0.64 1 35 0.95 0.95 1.78 3.7 0.49 2.86 0.49 0.0009 0.25 OK
15 RIW2 0.99 1 0.58 1 35 0.92 0.92 1.64 3.5 0.46 2.77 0.48 0.0008 0.23 OK
16 RIW3 0.80 2 0.5 1 40 0.73 1.46 1.30 3.5 0.37 2.91 0.43 0.0006 0.22 OK
17 RIW4 0.58 2 0.49 1 40 0.63 1.26 0.90 3.0 0.29 2.52 0.4 0.0008 0.22 OK
18 RIW5 0.37 2 0.47 1 40 0.51 1.03 0.53 2.5 0.22 2.05 0.36 0.0011 0.24 OK
19 RIW6 0.17 2 0.38 1 40 0.38 0.77 0.26 1.8 0.14 1.53 0.31 0.0013 0.23 OK

Tabel 3. Dimensi Saluran Tersier


Nama Q V
No. (m³/dt)
b/h m k h (m) b (m) A (m²) P (m) R (m) T (m) W (m) I F Ket.
Saluran (m/s)
1 SU1.Ki 0.17 1 0.31 1 35 0.53 0.53 0.42 2.0 0.21 1.58 0.36 0.0006 0.16 OK
2 SU2.Ki 0.17 1 0.31 1 35 0.53 0.53 0.4 2.0 0.21 1.59 0.36 0.0006 0.16 OK
3 SU3.Ki 0.14 1 0.3 1 35 0.49 0.49 0.36 1.9 0.19 1.47 0.35 0.0007 0.16 OK
4 SU4.Ki 0.14 1 0.3 1 35 0.49 0.49 0.36 1.9 0.19 1.48 0.35 0.0007 0.16 OK
5 SU5.Ki 0.20 1 0.32 1 35 0.56 0.56 0.49 2.1 0.23 1.68 0.37 0.0006 0.16 OK
6 SU6.Ki 0.14 1 0.3 1 35 0.49 0.49 0.36 1.9 0.19 1.48 0.35 0.0007 0.16 OK
7 SU7.Ki 0.15 1 0.3 1 35 0.5 0.50 0.38 1.9 0.20 1.50 0.35 0.0006 0.16 OK
8 KI1.Ka 0.18 1 0.31 1 35 0.54 0.54 0.45 2.1 0.22 1.62 0.37 0.0006 0.16 OK
9 KI2.Ka 0.18 1 0.31 1 35 0.54 0.54 0.46 2.1 0.22 1.63 0.37 0.0006 0.16 OK
10 KI3.Ka 0.20 1 0.32 1 35 0.56 0.56 0.48 2.1 0.23 1.67 0.37 0.0006 0.16 OK
11 KI4.Ka 0.19 1 0.31 1 35 0.55 0.55 0.48 2.1 0.23 1.66 0.37 0.0006 0.16 OK
12 KI5.Ka 0.20 1 0.32 1 35 0.56 0.56 0.48 2.1 0.23 1.67 0.37 0.0006 0.16 OK
13 KI6.Ka 0.19 1 0.31 1 35 0.55 0.55 0.46 2.1 0.22 1.64 0.37 0.0006 0.16 OK
14 KI7.Ka 0.20 1 0.32 1 35 0.56 0.56 0.49 2.1 0.23 1.67 0.37 0.0006 0.16 OK
15 KI1.Ki 0.17 1 0.31 1 35 0.52 0.52 0.42 2.0 0.21 1.57 0.36 0.0006 0.16 OK
16 KI2.Ki 0.18 1 0.31 1 35 0.54 0.54 0.46 2.1 0.22 1.63 0.37 0.0006 0.16 OK
17 KI3.Ki 0.18 1 0.31 1 35 0.53 0.53 0.44 2.0 0.21 1.60 0.37 0.0006 0.16 OK
18 KI4.Ki 0.15 1 0.3 1 35 0.5 0.50 0.38 1.9 0.20 1.51 0.35 0.0006 0.16 OK
19 KI5.Ki 0.18 1 0.32 1 35 0.53 0.53 0.44 2.0 0.21 1.60 0.37 0.0006 0.17 OK
20 KI6.Ki 0.12 1 0.29 1 35 0.45 0.45 0.29 1.7 0.17 1.35 0.34 0.0007 0.17 OK
21 KI7.Ki 0.14 1 0.3 1 35 0.49 0.49 0.36 1.9 0.19 1.48 0.35 0.0007 0.16 OK
22 KU1.Ka 0.11 1 0.28 1 35 0.44 0.44 0.27 1.7 0.16 1.31 0.33 0.0007 0.16 OK
23 KU2.Ka 0.10 1 0.28 1 35 0.43 0.43 0.26 1.6 0.16 1.28 0.33 0.0008 0.17 OK
24 KU1.Ki 0.12 1 0.29 1 35 0.46 0.46 0.31 1.8 0.18 1.38 0.34 0.0007 0.17 OK
25 KU2.Ki 0.11 1 0.29 1 35 0.43 0.43 0.27 1.7 0.16 1.29 0.33 0.0008 0.17 OK
26 IW1.Ka 0.10 1 0.28 1 35 0.43 0.43 0.26 1.6 0.16 1.28 0.33 0.0008 0.17 OK
27 IW2.Ka 0.15 1 0.3 1 35 0.5 0.50 0.37 1.9 0.19 1.49 0.35 0.0006 0.16 OK
28 IW3.Ka 0.17 1 0.31 1 35 0.53 0.53 0.43 2.0 0.21 1.59 0.36 0.0006 0.16 OK
29 IW4.Ka 0.20 1 0.32 1 35 0.56 0.56 0.49 2.1 0.23 1.68 0.37 0.0006 0.16 OK
30 IW5.Ka 0.19 1 0.31 1 35 0.55 0.55 0.46 2.1 0.22 1.64 0.37 0.0006 0.16 OK
31 IW6.Ka 0.19 1 0.31 1 35 0.54 0.54 0.46 2.1 0.22 1.63 0.37 0.0006 0.16 OK
32 IW7.Ka 0.15 1 0.3 1 35 0.5 0.50 0.38 1.9 0.20 1.51 0.35 0.0006 0.16 OK