Berita Acara Inspection
Berita Acara Inspection
CHEKLIST
Project Pembangunan Talud PLTMG Alor 10Mw
Contractor PT.HYDRO TECHNO UTAMA Report No.
Location Alor , Nusa Tenggara Timur AFI No.
1 Pemasangan Gabion/Bronjong
2 Excavation Work/River
3 Volume Retaining Wall
4 Galian Gabion / Bronjong
5 Timbunan Gabion / Bronjong
6 Galian Retaining Wall
Result Rejected
Note :
VOLUME
NO. POINT DEVIATION REMARKS
DESIGN ACTUAL
1 210-220 11.050
2 220-240 18.850
3 240-260 16.340
4 260-280 17.720
5 280-300 18.980
6 300-320 19.770
7 320-340 20.390
8 340-360 20.940
9 360-380 25.610
10 380-400 31.320
11 400-420 34.560
12 420-440 35.320
13 440-460 38.510
14 460-480 47.720
15 480-500 52.700
16 500-510 26.550
TOTAL 436.330
SHOP DRAWING
LUAS AREA 9.52 m2 LUAS AREA 11.15 m2
LUAS AREA 1.09 m2 LUAS AREA 0.795 m2
KETERANGAN :
A A
CL CL
65.000 65.000
64.000 64.000 : PAGAR KAWAT DURI
63.000 63.000
62.000 62.000
2 2
1: 1:
61.000 61.000
60.000 60.000 : TIMBUNAN TANAH
B 59.000 59.000 B
58.000 58.000
57.000 5541.0000
5532.0000
5487.0000
5402.0000
5312.0000
57.000 5518.0000
5512.0000
5489.0000
5379.0000
5319.0000
: GALIAN BRONJONG
56.000 4000.0000
56.000 4196.0000
55.000 55.000
Bid. Persamaan +54.000 Bid. Persamaan +54.000
STATION +210 STATION +240 Ki
59.541
59.532
59.487
59.402
59.131
59.518
59.512
59.489
59.379
59.319
C Elevasi Tanah Asli Elevasi Tanah Asli C
20.000
20.000
15.000
10.000
15.000
10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00
5.000
0.000
5.000
0.000
59.487
58.000
58.000
58.196
58.196
59.489
Elevasi Rencana Elevasi Rencana
D D
5487.0000
5402.0000
5312.0000
57.000 5879.0000
5856.0000
5435.0000
5408.0000
5338.0000
56.000 56.000
4336.0000
4056.0000
G 55.000 55.000 G
Bid. Persamaan +54.000 Bid. Persamaan +54.000 PT. HYDRO TECHNO UTAMA
STATION +220 STATION +260
PROJECT :
59.541
59.532
59.487
59.402
59.312
59.879
59.856
59.435
59.408
59.338
Elevasi Tanah Asli Elevasi Tanah Asli
PEKERJAAN PEMBANGUNAN TALUD
PLTMG ALOR 10 MW
20.000
20.000
15.000
10.000
15.000
10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00
5.000
0.000
5.000
0.000
H H
58.056
58.056
58.336
58.336
59.487
59.435
Elevasi Rencana Elevasi Rencana
J
PENAMPANG POTONGAN BRONJONG J
SCALE 1:50
020 SD.ALORPLTMG/HTU/02-2023
PLN DRAWING NO :
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14
SHOP DRAWING
LUAS AREA 10.18 m2 LUAS AREA 7.75 m2
LUAS AREA 0.933 m2 LUAS AREA 1.012 m2
KETERANGAN :
A A
CL CL
65.000 65.000
64.000 64.000 : PAGAR KAWAT DURI
63.000 63.000
62.000 62.000
2 2
1: 1:
61.000 61.000
60.000 60.000 : TIMBUNAN TANAH
B 59.000 59.000 B
58.000 58.000
57.000 5732.0000
5674.0000
5617.0000
5532.0000
5482.0000
57.000 5985.0000 5978.0000
5965.0000
5876.0000
5841.0000
: GALIAN BRONJONG
56.000 56.000
4757.0000
4477.0000
55.000 55.000
Bid. Persamaan +54.000 Bid. Persamaan +54.000
STATION +280 Ki STATION +320 Ki
59.732
59.674
59.617
59.532
59.482
59.985
59.978
59.965
59.876
59.841
C Elevasi Tanah Asli Elevasi Tanah Asli C
20.000
20.000
15.000
10.000
15.000
10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00
5.000
0.000
5.000
0.000
58.477
58.477
58.757
58.757
59.617
59.965
Elevasi Rencana Elevasi Rencana
D D
E E
5953.0000
5905.0000
5760.0000
5844.0000
CONTRACTOR :
57.000 56.000
4898.0000
5745.0000
5642.0000
5558.0000
5509.0000
5487.0000
56.000 55.000
Bid. Persamaan +54.000
4617.0000
G 55.000 G
Bid. Persamaan +54.000 PT. HYDRO TECHNO UTAMA
STATION +340 Ki
STATION +300
59.998
59.953
59.905
59.760
59.844
Elevasi Tanah Asli PROJECT :
59.558
59.509
59.487
59.642
59.745
20.000
15.000
10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00
5.000
0.000
PLTMG ALOR 10 MW
20.000
15.000
10.000
0.000
H H
58.898
58.898
59.905
Elevasi Rencana
58.617
58.617
59.487
Elevasi Rencana
SYAIKHAN.A DEDEN. H
DATE DATE DATE DATE
SHEET NO : CONTRACTOR DRAWING NO: REVISION:
J
PENAMPANG POTONGAN BRONJONG J
SCALE 1:50
021 SD.ALORPLTMG/HTU/02-2023
PLN DRAWING NO :
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14
SHOP DRAWING
LUAS AREA 4.00 m2 LUAS AREA 3.60 m2
LUAS AREA 1.494 m2 LUAS AREA 1.638 m2
KETERANGAN :
A A
CL CL
65.000 65.000
64.000 64.000 : PAGAR KAWAT DURI
63.000 63.000
62.000 2
62.000 2
1: 1:
61.000 61.000
60.000 60.000 : TIMBUNAN TANAH
B 59.000 59.000 B
58.000 58.000
57.000 57.000
6742.0000 6722.0000
6674.0000
6665.0000
6643.0000
6602.0000
6588.0000
: GALIAN BRONJONG
6493.0000
6452.0000
6387.0000
5318.0000
5178.0000
56.000 56.000
55.000 55.000
Bid. Persamaan +54.000 Bid. Persamaan +54.000
STATION +380 Ki STATION +400 Ki
60.665
60.643
60.588
60.493
60.387
60.742
60.722
60.674
60.602
60.452
C Elevasi Tanah Asli
20.000
Elevasi Tanah Asli C
20.000
15.000
10.000
15.000
10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00
5.000
0.000
5.000
0.000
59.178
59.178
59.318
59.318
60.588
60.674
Elevasi Rencana Elevasi Rencana
D D
E E
6816.0000
6789.0000
6662.0000
6523.0000
6432.0000
6395.0000
6305.0000
6285.0000
5884.0000
5459.0000
5038.0000
56.000 56.000
G 55.000 55.000 G
Bid. Persamaan +54.000 Bid. Persamaan +54.000 PT. HYDRO TECHNO UTAMA
STATION +360 Ki STATION +420 Ki
PROJECT :
60.432
60.395
60.285
60.305
59.884
60.876
60.816
60.789
60.662
60.523
Elevasi Tanah Asli Elevasi Tanah Asli
PEKERJAAN PEMBANGUNAN TALUD
PLTMG ALOR 10 MW
20.000
20.000
15.000
10.000
15.000
10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00
5.000
0.000
5.000
0.000
H H
59.038
59.038
59.884
60.789
59.459
59.459
Elevasi Rencana Elevasi Rencana
SYAIKHAN.A DEDEN. H
DATE DATE DATE DATE
J
SCALE 1:50 J
022 SD.ALORPLTMG/HTU/02-2023
PLN DRAWING NO :
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14
SHOP DRAWING
LUAS AREA 3.77 m2 LUAS AREA 0.94 m2
LUAS AREA 1.714m2 LUAS AREA 2.635 m2 KETERANGAN :
A A
CL CL
65.000 65.000
64.000 64.000
: PAGAR KAWAT DURI
63.000 63.000
62.000 62.000 2
1:
2 1:
61.000 61.000
60.000 60.000
: TIMBUNAN TANAH
59.000 59.000
B B
58.000 58.000 7368.0000
7423.0000
7476.0000
7495.0000
57.000 57.000
6764.0000
6739.0000
6673.0000
6592.0000
6554.0000
6231.0000
: GALIAN BRONJONG
5879.0000
5599.0000
56.000 56.000
55.000 55.000
Bid. Persamaan +54.000 Bid. Persamaan +54.000
STATION +440 STATION +480 Ki
60.554
60.592
60.673
60.739
60.764
60.231
61.368
61.423
61.476
61.495
C Elevasi Tanah Asli 20.000 Elevasi Tanah Asli C
20.000
15.000
10.000
15.000
10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00
5.000
0.000
5.000
0.000
59.599
59.599
59.879
59.879
60.673
61.423
Elevasi Rencana Elevasi Rencana
D D
7721.0000
7652.0000
7548.0000
6448.0000
6019.0000
5739.0000
56.000 56.000
55.000 55.000
G Bid. Persamaan +54.000 Bid. Persamaan +54.000 PT. HYDRO TECHNO UTAMA G
61.132
61.163
61.197
61.202
60.448
62.032
61.721
61.652
61.548
Elevasi Tanah Asli Elevasi Tanah Asli
PEKERJAAN PEMBANGUNAN TALUD
20.000
20.000
15.000
10.000
15.000
10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 PLTMG ALOR 10 MW
5.000
0.000
5.000
0.000
H H
59.739
59.739
61.721
60.019
60.019
61.163
J
PENAMPANG POTONGAN BRONJONG J
SCALE 1:50
023 SD.ALORPLTMG/HTU/02-2023
PLN DRAWING NO :
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14
SHOP DRAWING
LUAS AREA 0.289 m2
LUAS AREA 3.302m2 KETERANGAN :
A A
CL
65.000
64.000
63.000 : PAGAR KAWAT DURI
62.000
61.000
60.000
59.000 : TIMBUNAN TANAH
B 58.000 8032.0000
7721.0000
7652.0000
7548.0000
B
57.000
6448.0000
6019.0000
: GALIAN BRONJONG
56.000
55.000
Bid. Persamaan +54.000
STATION +510
60.448
62.032
61.721
61.652
61.548
C Elevasi Tanah Asli C
20.000
15.000
10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00
5.000
0.000
60.019
60.019
61.721
Elevasi Rencana
D D
CONTRACT NO :
F F
0028.Pj/DAN.01.03/F46000000/2022
CONTRACTOR :
G G
PT. HYDRO TECHNO UTAMA
PROJECT :
SYAIKHAN.A DEDEN. H
DATE DATE DATE DATE
SHEET NO : CONTRACTOR DRAWING NO: REVISION:
J
PENAMPANG POTONGAN BRONJONG J
SCALE 1:50
024 SD.ALORPLTMG/HTU/02-2023
PLN DRAWING NO :
1 2 3 4 5 6 7 8 9 10 11 12 13 14
INSPECTION REPORT GALIAN RETAINING WALL
VOLUME
NO. POINT DEVIATION REMARKS
DESIGN ACTUAL
1 510-520 134.57
2 520-540 273.31
3 540-550 187.645
4 0-10 221.865
5 10-20 165.37
6 20-30 157.945
7 30-40 188.745
8 40-50 223.2
9 50-60 230.545
10 60-70 208.865
11 70-80 192.98
12 80-90 179.65
13 90-100 172.885
14 100-110 164.475
15 110-120 156.11
16 120-130 162.16
17 130-140 173.39
18 140-150 202.19
19 150-160 247.61
20 160-165 132.6525
21 165-175 145.47
22 175-185 30.985
23 185-195 32.385
24 195-205 27.93
25 205-215 12.8975
TOTAL 4025.830
SHOP DRAWING
LUAS AREA GALIAN 15.321 m2 LUAS AREA GALIAN 25.519 m2
A
KETERANGAN : A
CL CL
65.000 65.000
: DRAINAGE 100X100
64.000 64.000
63.000 63.000
62.000 62.000
61.000 61.000 : PAGAR KAWAT DURI
60.000 60.000
59.000 59.000
B 58.000 8032.0000
7721.0000
7652.0000
7548.0000
58.000
8450.0000
8342.0000
7985.0000
7921.0000
7853.0000
B
57.000 57.000 : RETAINING WALL TYPE 1
6448.0000
6300.0000
6019.0000
56.000 56.000
55.000 55.000
Bid. Persamaan +54.000 Bid. Persamaan +54.000
STATION +20 Ki STATION +60 Ki
: GALIAN RETAINING WALL
60.448
62.032
61.721
61.652
61.548
62.450
62.342
61.985
61.921
61.853
C Elevasi Tanah Asli Elevasi Tanah Asli C
20.000
20.000
15.000
10.000
15.000
10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00
5.000
0.000
5.000
0.000
60.019
60.019
61.985
60.300
60.300
61.721
Elevasi Rencana Elevasi Rencana
D D
E E
LUAS AREA GALIAN 25.519 m2
LUAS AREA GALIAN 12.010 m2 PT. PLN (Persero)
CL CL UNIT INDUK PEMBANGUNAN NUSRA
65.000 65.000
UNIT PELAKSANA PROYEK NUSRA
64.000 64.000
63.000 63.000
62.000 62.000
61.000 61.000
CONTRACT NO :
F F
60.000 60.000
59.000 59.000
0028.Pj/DAN.01.03/F46000000/2022
58.000 58.000
8450.0000
8342.0000
7985.0000 8000.0000
7921.0000
7668.0000
7623.0000
7609.0000
57.000 57.000
6925.0000
6873.0000
6370.2024
6159.0000
56.000 56.000
55.000 55.000
Bid. Persamaan +54.000 Bid. Persamaan +54.000 CONTRACTOR :
60.873
61.609
61.623
61.668
62.450
62.342
61.985
61.921
62.000
Elevasi Tanah Asli Elevasi Tanah Asli
PROJECT :
20.000
20.000
15.000
10.000
15.000
10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00
5.000
0.000
5.000
0.000
PEKERJAAN PEMBANGUNAN TALUD
PLTMG ALOR 10 MW
60.159
60.159
60.300
60.370
61.609
61.985
H Elevasi Rencana Elevasi Rencana H
SYAIKHAN.A DEDEN. H
DATE DATE DATE DATE
SHEET NO :
PENAMPANG POTONGAN RETAINING WALL TYPE 1
CONTRACTOR DRAWING NO: REVISION:
J 032 SD.ALORPLTMG/HTU/02-2023 J
SCALE 1:50
PLN DRAWING NO :
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14
SHOP DRAWING
A
KETERANGAN : A
: DRAINAGE 100X100
LUAS AREA GALIAN 25.309 m2
LUAS AREA GALIAN 14.010 m2
Bts Bts
65.000 65.000
64.000 64.000 : PAGAR KAWAT DURI
63.000 63.000
62.000 62.000
B B
:1
1
:1
61.000 61.000
:1
1
1
60.000 60.000
:1
: RETAINING WALL TYPE 1
59.000 59.000
58.000 58.000
8444.0000
8371.0000 8381.0000
8342.0000
8172.0000
7702.5299
7589.5462
7523.0000
7342.0000
6953.0000
57.000 57.000
6926.0000
6903.0000
10087.8536
9706.8536
56.000 56.000
55.000 55.000
Bid. Persamaan +54.000 Bid. Persamaan +54.000 : GALIAN RETAINING WALL
61.342
61.523
61.795
62.381
62.172
62.176
60.953
62.444
62.371
62.342
60.903
60.926
Elevasi Tanah Asli Elevasi Tanah Asli
20.000
20.000
15.000
10.000
10.000
15.000
10.000
10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 5.00 5.00
5.000
0.000
5.000
5.000
0.000
5.000
58.900
58.900
58.900
58.900
Elevasi Rencana Elevasi Rencana
D D
61.000 61.000
0028.Pj/DAN.01.03/F46000000/2022
1
1
:1
1
:1
:1
60.000 60.000
1
59.000 59.000
58.000 7373.0000 7382.0000
7997.0000
7646.3120
8234.0000
58.000 7638.0000
7567.0000
7523.0000
7612.0000
7762.9457
7656.0000
57.000 57.000
6825.0000
10228.8536
9619.8536
56.000 56.000
CONTRACTOR :
55.000 55.000
Bid. Persamaan +54.000 Bid. Persamaan +54.000
G G
STATION +10 Dalam Luar STATION +30 Dalam Luar
PT. HYDRO TECHNO UTAMA
61.708
61.523
61.612
61.656
61.638
61.567
62.234
62.317
61.997
60.825
61.373
61.382
20.000
15.000
10.000
10.000
15.000
10.000
10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 5.00 5.00
5.000
0.000
5.000
5.000
0.000
5.000
PEKERJAAN PEMBANGUNAN TALUD
PLTMG ALOR 10 MW
58.900
58.900
58.900
58.900
H Elevasi Rencana Elevasi Rencana H
SYAIKHAN.A DEDEN. H
DATE DATE DATE DATE
SHEET NO :
PENAMPANG POTONGAN RETAINING WALL TYPE 1
CONTRACTOR DRAWING NO: REVISION:
J 033 SD.ALORPLTMG/HTU/02-2023 J
SCALE 1:50
PLN DRAWING NO :
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14
SHOP DRAWING
A
KETERANGAN : A
: DRAINAGE 100X100
LUAS AREA GALIAN 20.174 m2 LUAS AREA GALIAN 21.639 m2
Bts Bts
65.000 65.000
64.000 64.000 : PAGAR KAWAT DURI
63.000 63.000
62.000 62.000
B B
:1
1
1
:1
:1
:1
61.000 61.000
1
1
60.000 60.000
: RETAINING WALL TYPE 1
59.000 59.000
58.000 58.000
8304.0000
8104.0000
7942.1607
7905.0000
7823.6685
7682.0000
57.000 57.000
10295.8536
9625.8536
56.000 56.000
55.000 55.000
Bid. Persamaan +54.000 Bid. Persamaan +54.000 : GALIAN RETAINING WALL
62.384
61.714
62.304
61.852
61.682
61.867
61.852
61.834
62.104
61.905
61.867
61.864
Elevasi Tanah Asli Elevasi Tanah Asli
20.000
20.000
15.000
10.000
10.000
15.000
10.000
10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 5.00 5.00
5.000
0.000
5.000
5.000
0.000
5.000
58.900
58.900
58.900
58.900
Elevasi Rencana Elevasi Rencana
D D
:1
1
1
0028.Pj/DAN.01.03/F46000000/2022
:1
61.000 61.000
1
1
:1
60.000 60.000
59.000 59.000
58.000 58.000
8295.0000
8287.0000
8243.0000
8209.0000
8143.0000
8084.0000
7999.5269
7914.0000
7882.8826
7739.0000
7721.0000 7711.0000
57.000 57.000
10187.8536
10050.8536
56.000 56.000
CONTRACTOR :
55.000 55.000
Bid. Persamaan +54.000 Bid. Persamaan +54.000
G G
STATION +50 Dalam Luar STATION +70 Dalam Luar
PT. HYDRO TECHNO UTAMA
62.084
62.139
62.276
62.295
62.287
61.721
61.711
61.739
61.914
62.243
62.143
62.209
20.000
15.000
10.000
10.000
15.000
10.000
10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 5.00 5.00
5.000
0.000
5.000
5.000
0.000
5.000
PEKERJAAN PEMBANGUNAN TALUD
PLTMG ALOR 10 MW
58.900
58.900
58.900
58.900
H Elevasi Rencana Elevasi Rencana H
SYAIKHAN.A DEDEN. H
DATE DATE DATE DATE
SHEET NO :
PENAMPANG POTONGAN RETAINING WALL TYPE 1
CONTRACTOR DRAWING NO: REVISION:
J 034 SD.ALORPLTMG/HTU/02-2023 J
SCALE 1:50
PLN DRAWING NO :
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14
SHOP DRAWING
A
KETERANGAN : A
: DRAINAGE 100X100
LUAS AREA GALIAN 18.462 m2 LUAS AREA GALIAN 17.109 m2
Bts Bts
65.000 65.000
64.000 64.000
: PAGAR KAWAT DURI
63.000 63.000
62.000 62.000
B 61.000 61.000 B
:1
1
1
:1
:1
:1
1
60.000 60.000
1
59.000 59.000 : RETAINING WALL TYPE 1
58.000 7623.0000 7616.0000
7594.0000
7714.0000
8058.1893
7874.0000
7444.0000
8176.3590
8144.0000
57.000 9935.8536
57.000 10015.8536
56.000 56.000
55.000 55.000
Bid. Persamaan +54.000 Bid. Persamaan +54.000 : GALIAN RETAINING WALL
61.444
62.144
62.104
61.623
61.616
61.594
61.714
61.874
62.024
61.502
61.515
61.519
Elevasi Tanah Asli Elevasi Tanah Asli
20.000
20.000
15.000
10.000
10.000
15.000
10.000
10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 5.00 5.00
5.000
0.000
5.000
5.000
0.000
5.000
58.900
58.900
58.900
58.900
Elevasi Rencana Elevasi Rencana
D D
:1
:1
1
1
:1
1
:1
60.000 60.000
59.000 59.000
58.000 7524.0000
7513.0000 7499.0000
7579.0000
8117.2728
7904.0000
7304.0000
8235.4602
7914.0000
57.000 9895.8536
57.000 10025.8536
61.304
61.914
62.114
61.524
61.904
61.984
61.398
61.391
61.384
61.579
61.513
61.499
20.000
15.000
10.000
10.000
15.000
10.000
10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 5.00 5.00
5.000
0.000
5.000
5.000
0.000
5.000
PEKERJAAN PEMBANGUNAN TALUD
PLTMG ALOR 10 MW
58.900
58.900
58.900
58.900
H Elevasi Rencana Elevasi Rencana H
SYAIKHAN.A DEDEN. H
DATE DATE DATE DATE
SHEET NO :
PENAMPANG POTONGAN RETAINING WALL TYPE 1
CONTRACTOR DRAWING NO: REVISION:
J 035 SD.ALORPLTMG/HTU/02-2023 J
SCALE 1:50
PLN DRAWING NO :
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14
SHOP DRAWING
A
KETERANGAN : A
: DRAINAGE 100X100
Bts Bts
65.000 65.000
64.000 64.000
: PAGAR KAWAT DURI
63.000 63.000
62.000 62.000
B 61.000 61.000 B
1
:1
1
:1
:1
:1
1
60.000 60.000
1
59.000 59.000 : RETAINING WALL TYPE 1
58.000 58.000
8412.0925
8296.7664
8124.0000
8098.0000
7618.0000
7486.0000
7418.0000
7198.0000
57.000 57.000
10235.8536
10124.8536
56.000 56.000
55.000 55.000
Bid. Persamaan +54.000 Bid. Persamaan +54.000 : GALIAN RETAINING WALL
61.486
61.618
62.098
62.124
62.324
61.299
61.198
61.418
62.213
61.291
61.287
61.279
Elevasi Tanah Asli Elevasi Tanah Asli
20.000
20.000
15.000
10.000
10.000
15.000
10.000
10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 5.00 5.00
5.000
0.000
5.000
5.000
0.000
5.000
58.900
58.900
58.900
58.900
Elevasi Rencana Elevasi Rencana
D D
:1
61.000 61.000
1
0028.Pj/DAN.01.03/F46000000/2022
:1
1
1
:1
:1
60.000 60.000
59.000 59.000
58.000 58.000
8471.9990
8353.3171
8343.0000
8318.0000
7873.0000
7764.0000
7488.0000 7496.0000
7378.0000
7283.0000 7264.0000
7257.0000
57.000 57.000
10194.8536
9734.8536
62.318
61.764
61.823
61.488
61.378
61.496
61.873
62.343
62.283
61.257
61.283
61.264
20.000
15.000
10.000
10.000
15.000
10.000
10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 5.00 5.00
5.000
0.000
5.000
5.000
0.000
5.000
PEKERJAAN PEMBANGUNAN TALUD
PLTMG ALOR 10 MW
58.900
58.900
58.900
58.900
H Elevasi Rencana Elevasi Rencana H
SYAIKHAN.A DEDEN. H
DATE DATE DATE DATE
SHEET NO :
PENAMPANG POTONGAN RETAINING WALL TYPE 1
CONTRACTOR DRAWING NO: REVISION:
J 036 SD.ALORPLTMG/HTU/02-2023 J
SCALE 1:50
PLN DRAWING NO :
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14
SHOP DRAWING
A
KETERANGAN : A
Mesjid Bts
65.000
64.000
: PAGAR KAWAT DURI
63.000
62.000
:1
1
B B
:1
61.000
1
60.000
59.000
58.000
8703.0000 8708.0000
8226.0000
57.000
10613.8536
56.000
55.000
Bid. Persamaan +54.000 : GALIAN RETAINING WALL
STATION +160 Dalam Luar
C C
62.703
62.708
62.226
62.702
Elevasi Tanah Asli
20.000
15.000
10.000
10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 5.00 5.00
5.000
0.000
5.000
58.900
58.900
Elevasi Rencana
D D
61.000
1
60.000 0028.Pj/DAN.01.03/F46000000/2022
59.000
58.000
8688.0000
8553.0000 8553.0000
8278.0000
57.000
10734.8536
56.000 CONTRACTOR :
55.000
Bid. Persamaan +54.000
G STATION G
+165 Dalam Luar PT. HYDRO TECHNO UTAMA
62.688
62.278
62.553
62.823
15.000
10.000
10.000
0.000
5.000
58.900
H Elevasi Rencana H
SYAIKHAN.A DEDEN. H
DATE DATE DATE DATE
SHEET NO :
PENAMPANG POTONGAN RETAINING WALL TYPE 1
CONTRACTOR DRAWING NO: REVISION:
J 037 SD.ALORPLTMG/HTU/02-2023 J
SCALE 1:50
PLN DRAWING NO :
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14
SHOP DRAWING
A
KETERANGAN : A
LUAS AREA GALIAN 26.295 m2 LUAS AREA GALIAN 3.398 m2 : DRAINAGE 80X80
:1
1
B B
:1
61.000 61.000
1
60.000 60.000
59.000 59.000 9040.0000
: RETAINING WALL TYPE 2
58.000 58.000
8800.0000
8688.0000
8553.0000
8278.0000
8275.0000
57.000 57.000
10734.8536 10721.8536
56.000 56.000
55.000 55.000
Bid. Persamaan +54.000 Bid. Persamaan +54.000 : GALIAN RETAINING WALL
62.823
62.553
62.688
63.040
62.800
62.278
62.275
62.810
Elevasi Tanah Asli Elevasi Tanah Asli
20.000
15.000
10.000
10.000
10.000
10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00
5.000
0.000
5.000
5.000
0.000
5.000
58.900
58.900
60.850
60.850
Elevasi Rencana Elevasi Rencana
D D
58.000 58.000
8795.0000
8545.0000
8490.0000
8350.0000
8260.0000
11031.8536
57.000 57.000
10366.8536
62.455
62.945
62.350
62.545
62.260
62.795
63.120
Elevasi Tanah Asli Elevasi Tanah Asli
PROJECT :
10.000
10.000
10.000
10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00
5.000
0.000
5.000
5.000
0.000
5.000
PEKERJAAN PEMBANGUNAN TALUD
PLTMG ALOR 10 MW
60.850
60.850
60.850
60.850
H Elevasi Rencana Elevasi Rencana H
SYAIKHAN.A DEDEN. H
DATE DATE DATE DATE
SHEET NO :
PENAMPANG POTONGAN RETAINING WALL TYPE 2
CONTRACTOR DRAWING NO: REVISION:
J 040 SD.ALORPLTMG/HTU/02-2023 J
SCALE 1:50
PLN DRAWING NO :
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14
SHOP DRAWING
A
KETERANGAN : A
: DRAINAGE 80X80
LUAS AREA GALIAN 2.507 m2
Bts
65.000
64.000
: PAGAR KAWAT DURI
63.000
62.000
B 61.000 B
60.000
59.000 : RETAINING WALL TYPE 2
58.000
8710.0000
8430.0000
8010.0000
7990.0000
57.000
10651.8536
56.000
55.000
Bid. Persamaan +54.000 : GALIAN RETAINING WALL
62.740
62.430
62.710
61.990
62.010
Elevasi Tanah Asli
10.000
10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00
5.000
0.000
5.000
60.850
60.850
Elevasi Rencana
D D
8420.0000
8380.0000
8370.0000
57.000
10671.8536
56.000 CONTRACTOR :
55.000
Bid. Persamaan +54.000
G STATION G
+215 Dalam Luar PT. HYDRO TECHNO UTAMA
62.740
62.760
62.370
62.380
62.420
10.000
0.000
5.000
60.850
H Elevasi Rencana H
SYAIKHAN.A DEDEN. H
DATE DATE DATE DATE
SHEET NO :
PENAMPANG POTONGAN RETAINING WALL TYPE 2
CONTRACTOR DRAWING NO: REVISION:
J 041 SD.ALORPLTMG/HTU/02-2023 J
SCALE 1:50
PLN DRAWING NO :
1 2 3 4 5 6 7 8 9 10 11 12 13 14
INSPECTION REPORT EXCAVATION WORK
VOLUME
NO. POINT DEVIATION REMARKS
DESIGN ACTUAL
1 0-20 161.4
2 20-40 161.7
3 40-60 153.1
4 60-80 146.9
5 80-100 186.2
6 100-120 217.75
7 120-140 232.25
8 140-160 268.11
9 160-180 289.56
10 180-200 304.2
11 200-220 354.7
12 220-240 365.5
13 240-260 319.85
14 260-280 302.3
15 280-300 312.75
16 300-320 327.4
17 320-340 304.85
18 340-360 324.1
19 360-380 365.3
20 380-400 361.15
21 400-420 350.05
22 420-440 346.3
23 440-460 410.95
24 460-480 476.8
25 480-500 479.95
26 500-520 465.65
27 520-540 464.6
28 540-560 499.75
29 560-580 539.4
30 580-600 553.6
31 600-620 568.29
32 620-640 574.79
33 649-660 557.4
34 660-680 517.85
35 680-700 496.25
36 700-720 500.5
37 720-740 538.05
38 740-760 568.75
39 760-780 575
40 780-800 632.5
41 800-820 635.8
42 820-840 596.55
TOTAL 16807.85
Pada hari ini kamis , Tanggal Enam Belas , Bulan Februari , Tahun Dua Ribu Dua Puluh Tiga, telah
dilakukan pengukuran bersama antara PT, Hydro Techno Utama dan PT. PLN (Persero) UPP NUSA
TENGGARA 3 untuk pekerjaan Talud PLTMG alor 10mw yang beralamat di desa fanating kecamatan
teluk mutiara kabupaten alor provinsi Nusa Tenggara Timur dan untuk selanjutnya dibuatkan Gambar
Denah Talud,
Demikian Berita Acara ini kami buat dengan sebenarnya dan untuk dipergunakan semestinya
.ry
SOLIHIN EDHO TORSESA JAROSIVIAN
1 2 3 4 5 6 7 8 9 10 11 12 13 14
SHOP DRAWING
LUAS AREA 8.395 m2
LUAS AREA 8.365 m2
A A
60.000
CL 60.000
CL
59.000 59.000
58.000 58.000
57.000 57.000
56.000 56.000 3386.0000
3403.0000 3391.0000
3264.0000
3303.0000
55.000 55.000
2793.0000
B B
STATION +0 Ki Ka STATION +40 Ki Ka
57.165
57.173
57.013
57.026
57.008
57.386
57.586
57.403
57.391
57.264
57.303
Elevasi Tanah Asli Elevasi Tanah Asli
10.000
10.000
10.000
10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00
5.000
0.000
5.000
5.000
0.000
5.000
C C
56.513
57.008
56.793
56.793
57.303
56.513
56.513
57.165
57.386
56.793
Elevasi Rencana Elevasi Rencana
D D
E E
60.000
CL 60.000
CL CONTRACT NO :
F F
59.000 59.000
58.000 58.000 0028.Pj/DAN.01.03/F46000000/2022
57.000 57.000
56.000 56.000 3597.0000
3546.0000
3341.0000
3298.0000
3426.0000
55.000 55.000
2934.0000
CONTRACTOR :
57.165
57.187
57.162
57.176
57.597
57.546
57.341
57.298
57.426
Elevasi Tanah Asli Elevasi Tanah Asli
PROJECT :
10.000
10.000
10.000
10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00
5.000
0.000
5.000
5.000
0.000
5.000
PEKERJAAN PEMBANGUNAN TALUD
PLTMG ALOR 10 MW
H H
57.176
56.653
56.653
56.653
56.934
57.426
57.209
57.597
56.934
56.934
Elevasi Rencana Elevasi Rencana
PENAMPANG POTONGAN
DAN GALIAN SUNGAI
SYAIKHAN.A DEDEN. H
DATE DATE DATE DATE
SHEET NO : CONTRACTOR DRAWING NO: REVISION:
J
PENAMPANG POTONGAN SUNGAI J
SCALE 1:50
005 SD.ALORPLTMG/HTU/02-2023
PLN DRAWING NO :
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14
SHOP DRAWING
LUAS AREA 10.930 m2
LUAS AREA 7.770 m2
A A
60.000 CL 60.000 CL
59.000 59.000
58.000 58.000
57.000 57.000
56.000 56.000
55.000 55.000
B B
STATION +80 Ki Ka STATION +120 Ki Ka
57.702
57.614
57.574
57.588
57.598
58.213
58.122
58.066
58.063
58.062
Elevasi Tanah Asli Elevasi Tanah Asli
10.000
10.000
10.000
10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00
5.000
0.000
5.000
5.000
0.000
5.000
C C
57.074
57.074
57.598
57.355
57.355
58.062
57.702
57.074
58.213
57.355
Elevasi Rencana Elevasi Rencana
D D
E E
57.998
57.875
57.938
58.011
58.357
58.344
58.313
58.287
58.158
Elevasi Tanah Asli Elevasi Tanah Asli
PROJECT :
10.000
10.000
10.000
10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00
5.000
0.000
5.000
5.000
0.000
5.000
PEKERJAAN PEMBANGUNAN TALUD
PLTMG ALOR 10 MW
H H
58.011
57.214
57.214
57.214
57.495
57.495
58.158
58.121
58.357
57.495
Elevasi Rencana Elevasi Rencana
PENAMPANG POTONGAN
DAN GALIAN SUNGAI
SYAIKHAN.A DEDEN. H
DATE DATE DATE DATE
SHEET NO : CONTRACTOR DRAWING NO: REVISION:
J
PENAMPANG POTONGAN SUNGAI J
SCALE 1:50
006 SD.ALORPLTMG/HTU/02-2023
PLN DRAWING NO :
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14
SHOP DRAWING
LUAS AREA 14.516 m2 LUAS AREA 15.980 m2
A A
60.000 CL 60.000 CL
59.000 59.000
58.000 58.000
57.000 57.000
56.000 56.000
55.000 55.000
B
Bid. Persamaan +54.000 B
STATION +160 Ki Ka STATION +200 Ki Ka
58.684
58.638
58.541
58.628
58.663
58.921
58.933
58.953
59.058
59.146
Elevasi Tanah Asli Elevasi Tanah Asli
10.000
10.000
10.000
10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00
5.000
0.000
5.000
5.000
0.000
5.000
C C
57.635
57.635
58.663
57.916
57.916
59.146
58.684
57.635
58.921
57.916
Elevasi Rencana Elevasi Rencana
D D
E E
60.000 CL 60.000 CL
59.000 59.000
CONTRACT NO :
F F
58.000 58.000
57.000 57.000 0028.Pj/DAN.01.03/F46000000/2022
56.000 56.000
55.000 55.000
CONTRACTOR :
STATION +180 Ki Ka STATION +210 Ki Ka
G G
PT. HYDRO TECHNO UTAMA
58.733
58.719
58.745
58.749
58.753
59.487
59.402
59.131
59.352
59.368
Elevasi Tanah Asli Elevasi Tanah Asli
PROJECT :
10.000
10.000
10.000
10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00
5.000
0.000
5.000
5.000
0.000
5.000
PEKERJAAN PEMBANGUNAN TALUD
PLTMG ALOR 10 MW
58.753
57.775
57.775
57.775
58.000
58.000
58.056
59.368
58.733
59.487
H
Elevasi Rencana Elevasi Rencana H
PENAMPANG POTONGAN
DAN GALIAN SUNGAI
I PENAMPANG POTONGAN Station +180 PENAMPANG POTONGAN Station +210 SCALE DRAWN SURVEYOR CHECKED APPROVED I
SYAIKHAN.A DEDEN. H
DATE DATE DATE DATE
SHEET NO : CONTRACTOR DRAWING NO: REVISION:
J
PENAMPANG POTONGAN SUNGAI J
SCALE 1:50
007 SD.ALORPLTMG/HTU/02-2023
PLN DRAWING NO :
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14
SHOP DRAWING
LUAS AREA 19.490 m2
LUAS AREA 14.925 m2
A A
60.000 CL 60.000 CL
59.000 59.000
58.000 58.000
57.000 57.000
56.000 56.000
55.000 55.000
B B
STATION +220 Ki Ka STATION +260 Ki Ka
59.487
59.402
59.312
59.352
59.368
59.435
59.408
59.338
59.247
59.017
Elevasi Tanah Asli Elevasi Tanah Asli
10.000
10.000
10.000
10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00
5.000
0.000
5.000
5.000
0.000
5.000
C C
58.056
58.056
59.368
58.336
58.336
58.336
59.017
59.487
58.056
59.435
Elevasi Rencana Elevasi Rencana
D D
E E
60.000
CL 60.000 CL
59.000 59.000
CONTRACT NO :
F F
58.000 58.000
57.000 57.000 0028.Pj/DAN.01.03/F46000000/2022
56.000 56.000
55.000 55.000
CONTRACTOR :
STATION +240 Ki Ka STATION +280 Ki Ka
G G
PT. HYDRO TECHNO UTAMA
59.489
59.379
59.319
59.302
59.298
59.617
59.532
59.482
59.478
59.443
Elevasi Tanah Asli Elevasi Tanah Asli
PROJECT :
10.000
10.000
10.000
10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00
5.000
0.000
5.000
5.000
0.000
5.000
PEKERJAAN PEMBANGUNAN TALUD
PLTMG ALOR 10 MW
58.196
58.196
58.196
59.298
58.477
58.477
58.477
59.443
59.489
59.617
H
Elevasi Rencana Elevasi Rencana H
PENAMPANG POTONGAN
DAN GALIAN SUNGAI
I PENAMPANG POTONGAN Station +240 PENAMPANG POTONGAN Station +280 SCALE DRAWN SURVEYOR CHECKED APPROVED I
SYAIKHAN.A DEDEN. H
DATE DATE DATE DATE
SHEET NO : CONTRACTOR DRAWING NO: REVISION:
J
PENAMPANG POTONGAN SUNGAI J
SCALE 1:50
008 SD.ALORPLTMG/HTU/02-2023
PLN DRAWING NO :
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14
SHOP DRAWING
A LUAS AREA 13.715 m2 A
59.487
59.642
59.745
59.658
59.372
59.905
59.760
59.844
59.833
59.827
Elevasi Tanah Asli Elevasi Tanah Asli
10.000
10.000
10.000
10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00
5.000
0.000
5.000
5.000
0.000
5.000
C C
58.617
59.372
58.898
58.898
59.827
59.487
58.617
58.617
59.905
58.898
Elevasi Rencana Elevasi Rencana
D D
E E
CL 61.000 CL CONTRACT NO :
61.000
F F
60.000
60.000
59.000
59.000 0028.Pj/DAN.01.03/F46000000/2022
58.000
58.000
57.000
57.000
59.884
60.285
60.305
60.263
59.992
Elevasi Tanah Asli PT. HYDRO TECHNO UTAMA
59.965
59.876
59.841
59.908
59.943
10.000
10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 PROJECT :
5.000
0.000
5.000
10.000
10.000
0.000
5.000
59.038
59.038
59.038
59.992
59.884
Elevasi Rencana PLTMG ALOR 10 MW
58.757
58.757
59.943
59.965
58.757
H
Elevasi Rencana H
PENAMPANG POTONGAN
DAN GALIAN SUNGAI
I PENAMPANG POTONGAN Station +320 PENAMPANG POTONGAN Station +360 SCALE DRAWN SURVEYOR CHECKED APPROVED I
SYAIKHAN.A DEDEN. H
DATE DATE DATE DATE
SHEET NO : CONTRACTOR DRAWING NO: REVISION:
J
PENAMPANG POTONGAN SUNGAI J
SCALE 1:50
009 SD.ALORPLTMG/HTU/02-2023
PLN DRAWING NO :
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14
SHOP DRAWING
A A
LUAS AREA 17.835 m2 LUAS AREA 16.725 m2
62.000 62.000 CL
61.000 CL 61.000
60.000 60.000
59.000 59.000
58.000 58.000
B B
STATION +380 Ki Ka STATION +420 Ki Ka
60.588
60.493
60.387
60.221
60.789
60.662
60.523
60.537
60.876
59.875
Elevasi Tanah Asli Elevasi Tanah Asli
10.000
10.000
10.000
10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00
5.000
0.000
5.000
5.000
0.000
5.000
C C
59.178
59.875
59.459
60.876
60.588
59.178
59.178
60.789
59.459
59.459
Elevasi Rencana Elevasi Rencana
D D
E E
62.000
CL 62.000 CL
61.000 61.000 CONTRACT NO :
F 60.000 60.000 F
59.000 59.000
58.000 58.000 0028.Pj/DAN.01.03/F46000000/2022
60.602
60.452
60.556
60.698
60.673
60.739
60.764
60.875
61.096
Elevasi Tanah Asli Elevasi Tanah Asli
G G
PT. HYDRO TECHNO UTAMA
10.000
10.000
10.000
10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00
5.000
0.000
5.000
5.000
0.000
5.000
PROJECT :
59.318
59.318
60.698
59.599
59.599
59.599
61.096
60.674
59.318
60.673
Elevasi Rencana Elevasi Rencana PEKERJAAN PEMBANGUNAN TALUD
PLTMG ALOR 10 MW
H H
PENAMPANG POTONGAN
PENAMPANG POTONGAN Station +400 PENAMPANG POTONGAN Station +440 DAN GALIAN SUNGAI
I SCALE DRAWN SURVEYOR CHECKED APPROVED I
SYAIKHAN.A DEDEN. H
DATE DATE DATE DATE
SHEET NO : CONTRACTOR DRAWING NO: REVISION:
J
PENAMPANG POTONGAN SUNGAI J
SCALE 1:50
010 SD.ALORPLTMG/HTU/02-2023
PLN DRAWING NO :
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14
SHOP DRAWING
LUAS AREA 23.505 m2
LUAS AREA 23.190 m2
A A
63.000 CL 63.000 CL
62.000 62.000
61.000 61.000
60.000 60.000
59.000 59.000
58.000 58.000
B B
STATION +460 Ki Ka STATION +500 Ki Ka
61.163
61.197
61.202
61.456
61.608
61.721
61.652
61.548
61.558
61.586
Elevasi Tanah Asli Elevasi Tanah Asli
10.000
10.000
10.000
10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00
5.000
0.000
5.000
5.000
0.000
5.000
C C
59.739
61.608
60.019
60.019
61.586
61.163
59.739
59.739
61.721
60.019
Elevasi Rencana Elevasi Rencana
D D
E E
63.000
CL 63.000
CL UNIT PELAKSANA PROYEK NUSRA
62.000 62.000
61.000 61.000 CONTRACT NO :
F 60.000 60.000 F
59.000 59.000
58.000 58.000 0028.Pj/DAN.01.03/F46000000/2022
61.476
61.495
61.564
61.608
61.721
61.652
61.548
61.558
61.586
Elevasi Tanah Asli Elevasi Tanah Asli
G G
PT. HYDRO TECHNO UTAMA
20.000
10.000
10.000
10.000
10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00
5.000
0.000
5.000
5.000
0.000
5.000
PROJECT :
59.879
59.879
59.879
61.608
60.019
60.019
61.586
61.423
61.721
60.019
Elevasi Rencana Elevasi Rencana PEKERJAAN PEMBANGUNAN TALUD
PLTMG ALOR 10 MW
H H
PENAMPANG POTONGAN
PENAMPANG POTONGAN Station +480 PENAMPANG POTONGAN Station +510 DAN GALIAN SUNGAI
I SCALE DRAWN SURVEYOR CHECKED APPROVED I
SYAIKHAN.A DEDEN. H
DATE DATE DATE DATE
SHEET NO : CONTRACTOR DRAWING NO: REVISION:
J
PENAMPANG POTONGAN SUNGAI J
SCALE 1:50
011 SD.ALORPLTMG/HTU/02-2023
PLN DRAWING NO :
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14
SHOP DRAWING
LUAS AREA 23.400 m2
A LUAS AREA 23.060 m2 A
63.000 CL 63.000 CL
62.000 62.000
61.000 61.000
60.000 60.000
59.000 59.000
B B
STATION +520 Ki Ka STATION +550 Ki Ka
61.609
61.623
61.668
61.798
61.603
61.985
61.921
62.000
61.806
61.769
Elevasi Tanah Asli Elevasi Tanah Asli
10.000
10.000
10.000
10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00
5.000
0.000
5.000
5.000
0.000
5.000
C C
60.159
61.603
60.159
60.159
60.370
60.300
61.769
61.609
61.985
60.300
Elevasi Rencana Elevasi Rencana
D D
E E
62.183
62.176
62.131
62.328
62.227
Elevasi Tanah Asli
61.985
61.921
61.853
61.806
61.769
10.000
10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00
5.000
0.000
5.000
10.000
10.000
0.000
5.000
PROJECT :
62.183
60.440
60.440
60.440
62.227
Elevasi Rencana
60.300
60.300
61.769
61.985
60.300
PENAMPANG POTONGAN Station +540 PENAMPANG POTONGAN Station +560 PENAMPANG POTONGAN
DAN GALIAN SUNGAI
I SCALE DRAWN SURVEYOR CHECKED APPROVED I
SYAIKHAN.A DEDEN. H
DATE DATE DATE DATE
SHEET NO : CONTRACTOR DRAWING NO: REVISION:
J
PENAMPANG POTONGAN SUNGAI J
SCALE 1:50
012 SD.ALORPLTMG/HTU/02-2023
PLN DRAWING NO :
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14
SHOP DRAWING
LUAS AREA 28.834 m2
A LUAS AREA 27.365 m2 A
64.000 CL 64.000 CL
63.000 63.000
62.000 62.000
61.000 61.000
60.000 60.000
B B
STATION +580 Ki Ka STATION +620 Ki Ka
62.231
62.394
62.416
62.432
62.368
62.265
62.542
62.704
62.796
62.809
62.843
Elevasi Tanah Asli Elevasi Tanah Asli
20.000
20.000
10.000
10.000
10.000
10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00
5.000
0.000
5.000
5.000
0.000
5.000
C C
60.581
60.581
62.265
60.861
60.861
62.843
62.394
60.581
62.542
60.861
Elevasi Rencana Elevasi Rencana
D D
E E
64.000
CL 64.000 CL
UNIT PELAKSANA PROYEK NUSRA
63.000 63.000
62.000 62.000 CONTRACT NO :
F 61.000 61.000 F
60.000 60.000
0028.Pj/DAN.01.03/F46000000/2022
STATION +600 Ki Ka STATION +640 Ki Ka
CONTRACTOR :
62.455
62.583
62.631
62.548
62.698
62.673
62.842
62.983
62.904
62.862
Elevasi Tanah Asli Elevasi Tanah Asli
G G
PT. HYDRO TECHNO UTAMA
10.000
10.000
10.000
10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00
5.000
0.000
5.000
5.000
0.000
5.000
PROJECT :
60.721
60.721
62.698
61.001
61.001
62.862
62.455
60.721
62.673
61.001
Elevasi Rencana Elevasi Rencana
PEKERJAAN PEMBANGUNAN TALUD
PLTMG ALOR 10 MW
H H
PENAMPANG POTONGAN Station +600 PENAMPANG POTONGAN Station +640 PENAMPANG POTONGAN
DAN GALIAN SUNGAI
I SCALE DRAWN SURVEYOR CHECKED APPROVED I
SYAIKHAN.A DEDEN. H
DATE DATE DATE DATE
SHEET NO : CONTRACTOR DRAWING NO: REVISION:
J
PENAMPANG POTONGAN SUNGAI J
SCALE 1:50
013 SD.ALORPLTMG/HTU/02-2023
PLN DRAWING NO :
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14
SHOP DRAWING
LUAS AREA 27.095 m2 LUAS AREA 24.935m2
A A
CL CL
65.000 65.000
64.000 64.000
63.000 63.000
62.000 62.000
61.000 61.000
60.000 60.000
B B
STATION +660 Ki Ka STATION +700 Ki Ka
62.871
62.923
62.967
62.955
62.921
62.654
62.943
63.122
63.219
63.254
Elevasi Tanah Asli Elevasi Tanah Asli
10.000
10.000
10.000
10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00
5.000
0.000
5.000
5.000
0.000
5.000
C C
61.142
61.142
62.921
61.422
61.422
61.422
63.254
62.871
61.142
62.654
Elevasi Rencana Elevasi Rencana
D D
E E
60.000 60.000
0028.Pj/DAN.01.03/F46000000/2022
STATION Ki Ka STATION +720 Ki Ka
CONTRACTOR :
62.553
62.802
62.984
62.998
63.118
63.309
63.285
63.185
63.239
63.347
Elevasi Tanah Asli Elevasi Tanah Asli
G G
PT. HYDRO TECHNO UTAMA
10.000
10.000
10.000
10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00
5.000
0.000
5.000
5.000
0.000
5.000
PROJECT :
63.118
62.553
61.282
61.282
61.562
61.562
61.562
63.347
61.282
63.309
Elevasi Rencana Elevasi Rencana
PEKERJAAN PEMBANGUNAN TALUD
PLTMG ALOR 10 MW
H H
PENAMPANG POTONGAN Station +680 PENAMPANG POTONGAN Station +720 PENAMPANG POTONGAN
DAN GALIAN SUNGAI
I SCALE DRAWN SURVEYOR CHECKED APPROVED I
SYAIKHAN.A DEDEN. H
DATE DATE DATE DATE
SHEET NO : CONTRACTOR DRAWING NO: REVISION:
J
PENAMPANG POTONGAN SUNGAI J
SCALE 1:50
014 SD.ALORPLTMG/HTU/02-2023
PLN DRAWING NO :
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14
SHOP DRAWING
LUAS AREA 28.690 m2
A LUAS AREA 29.315 m2 A
CL
65.000 CL
64.000 65.000
63.000 64.000
62.000 63.000
61.000 62.000
60.000 61.000
B B
STATION +740 Ki Ka STATION +780 Ki Ka
63.731
63.594
63.621
63.632
63.665
63.915
63.874
63.952
63.986
63.894
Elevasi Tanah Asli Elevasi Tanah Asli
10.000
10.000
10.000
10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00
5.000
0.000
5.000
5.000
0.000
5.000
C C
63.665
61.703
61.703
61.703
61.983
61.983
63.894
63.731
63.915
61.983
Elevasi Rencana Elevasi Rencana
D D
E E
61.000 61.000
0028.Pj/DAN.01.03/F46000000/2022
STATION +760 Ki Ka STATION Ki Ka
CONTRACTOR :
63.873
63.799
63.689
63.678
63.664
64.668
64.546
64.311
64.302
64.287
Elevasi Tanah Asli Elevasi Tanah Asli
G G
PT. HYDRO TECHNO UTAMA
10.000
10.000
10.000
10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00
5.000
0.000
5.000
5.000
0.000
5.000
PROJECT :
61.843
61.843
61.843
63.664
63.873
62.124
62.124
62.124
64.287
64.668
Elevasi Rencana Elevasi Rencana
PEKERJAAN PEMBANGUNAN TALUD
PLTMG ALOR 10 MW
H H
SYAIKHAN.A DEDEN. H
DATE DATE DATE DATE
SHEET NO : CONTRACTOR DRAWING NO: REVISION:
J
PENAMPANG POTONGAN SUNGAI J
SCALE 1:50
015 SD.ALORPLTMG/HTU/02-2023
PLN DRAWING NO :
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14
SHOP DRAWING
A LUAS AREA 29.645 m2 A
CL
65.000
64.000
63.000
62.000
61.000
B B
STATION +820 Ki Ka
64.085
64.216
64.392
64.113
64.201
Elevasi Tanah Asli
10.000
10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00
5.000
0.000
5.000
C C
62.264
64.201
64.085
62.264
62.264
Elevasi Rencana
D D
E E
61.000
0028.Pj/DAN.01.03/F46000000/2022
STATION +840 Ki Ka
CONTRACTOR :
65.046
64.542
64.404
64.268
64.302
10.000
0.000
5.000
PROJECT :
62.404
62.404
64.302
65.046
62.404
Elevasi Rencana
PEKERJAAN PEMBANGUNAN TALUD
PLTMG ALOR 10 MW
H H
SYAIKHAN.A DEDEN. H
DATE DATE DATE DATE
SHEET NO : CONTRACTOR DRAWING NO: REVISION:
J
PENAMPANG POTONGAN SUNGAI J
SCALE 1:50
016 SD.ALORPLTMG/HTU/02-2023
PLN DRAWING NO :
1 2 3 4 5 6 7 8 9 10 11 12 13 14
INSPECTION REPORT GABION / BRONJONG
VOLUME
NO. POINT DEVIATION REMARKS
DESIGN ACTUAL
STA.210-
1 135
STA.240
STA.240-
2 240
STA.300
STA.300-
3 210
STA.360
STA.360-
4 300
STA.460
STA.460-
5 50
STA.480
STA.480-
6 75
STA.510
TOTAL 1010
SHOP DRAWING
LUAS AREA 9.52 m2 LUAS AREA 11.15 m2
LUAS AREA 1.09 m2 LUAS AREA 0.795 m2
KETERANGAN :
A A
CL CL
65.000 65.000
64.000 64.000 : PAGAR KAWAT DURI
63.000 63.000
62.000 62.000
2 2
1: 1:
61.000 61.000
60.000 60.000 : TIMBUNAN TANAH
B 59.000 59.000 B
58.000 58.000
57.000 5541.0000
5532.0000
5487.0000
5402.0000
5312.0000
57.000 5518.0000
5512.0000
5489.0000
5379.0000
5319.0000
: GALIAN BRONJONG
56.000 4000.0000
56.000 4196.0000
55.000 55.000
Bid. Persamaan +54.000 Bid. Persamaan +54.000
STATION +210 STATION +240 Ki
59.541
59.532
59.487
59.402
59.131
59.518
59.512
59.489
59.379
59.319
C Elevasi Tanah Asli Elevasi Tanah Asli C
20.000
20.000
15.000
10.000
15.000
10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00
5.000
0.000
5.000
0.000
59.487
58.000
58.000
58.196
58.196
59.489
Elevasi Rencana Elevasi Rencana
D D
5487.0000
5402.0000
5312.0000
57.000 5879.0000
5856.0000
5435.0000
5408.0000
5338.0000
56.000 56.000
4336.0000
4056.0000
G 55.000 55.000 G
Bid. Persamaan +54.000 Bid. Persamaan +54.000 PT. HYDRO TECHNO UTAMA
STATION +220 STATION +260
PROJECT :
59.541
59.532
59.487
59.402
59.312
59.879
59.856
59.435
59.408
59.338
Elevasi Tanah Asli Elevasi Tanah Asli
PEKERJAAN PEMBANGUNAN TALUD
PLTMG ALOR 10 MW
20.000
20.000
15.000
10.000
15.000
10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00
5.000
0.000
5.000
0.000
H H
58.056
58.056
58.336
58.336
59.487
59.435
Elevasi Rencana Elevasi Rencana
J
PENAMPANG POTONGAN BRONJONG J
SCALE 1:50
020 SD.ALORPLTMG/HTU/02-2023
PLN DRAWING NO :
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14
SHOP DRAWING
LUAS AREA 10.18 m2 LUAS AREA 7.75 m2
LUAS AREA 0.933 m2 LUAS AREA 1.012 m2
KETERANGAN :
A A
CL CL
65.000 65.000
64.000 64.000 : PAGAR KAWAT DURI
63.000 63.000
62.000 62.000
2 2
1: 1:
61.000 61.000
60.000 60.000 : TIMBUNAN TANAH
B 59.000 59.000 B
58.000 58.000
57.000 5732.0000
5674.0000
5617.0000
5532.0000
5482.0000
57.000 5985.0000 5978.0000
5965.0000
5876.0000
5841.0000
: GALIAN BRONJONG
56.000 56.000
4757.0000
4477.0000
55.000 55.000
Bid. Persamaan +54.000 Bid. Persamaan +54.000
STATION +280 Ki STATION +320 Ki
59.732
59.674
59.617
59.532
59.482
59.985
59.978
59.965
59.876
59.841
C Elevasi Tanah Asli Elevasi Tanah Asli C
20.000
20.000
15.000
10.000
15.000
10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00
5.000
0.000
5.000
0.000
58.477
58.477
58.757
58.757
59.617
59.965
Elevasi Rencana Elevasi Rencana
D D
E E
5953.0000
5905.0000
5760.0000
5844.0000
CONTRACTOR :
57.000 56.000
4898.0000
5745.0000
5642.0000
5558.0000
5509.0000
5487.0000
56.000 55.000
Bid. Persamaan +54.000
4617.0000
G 55.000 G
Bid. Persamaan +54.000 PT. HYDRO TECHNO UTAMA
STATION +340 Ki
STATION +300
59.998
59.953
59.905
59.760
59.844
Elevasi Tanah Asli PROJECT :
59.558
59.509
59.487
59.642
59.745
20.000
15.000
10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00
5.000
0.000
PLTMG ALOR 10 MW
20.000
15.000
10.000
0.000
H H
58.898
58.898
59.905
Elevasi Rencana
58.617
58.617
59.487
Elevasi Rencana
SYAIKHAN.A DEDEN. H
DATE DATE DATE DATE
SHEET NO : CONTRACTOR DRAWING NO: REVISION:
J
PENAMPANG POTONGAN BRONJONG J
SCALE 1:50
021 SD.ALORPLTMG/HTU/02-2023
PLN DRAWING NO :
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14
SHOP DRAWING
LUAS AREA 4.00 m2 LUAS AREA 3.60 m2
LUAS AREA 1.494 m2 LUAS AREA 1.638 m2
KETERANGAN :
A A
CL CL
65.000 65.000
64.000 64.000 : PAGAR KAWAT DURI
63.000 63.000
62.000 2
62.000 2
1: 1:
61.000 61.000
60.000 60.000 : TIMBUNAN TANAH
B 59.000 59.000 B
58.000 58.000
57.000 57.000
6742.0000 6722.0000
6674.0000
6665.0000
6643.0000
6602.0000
6588.0000
: GALIAN BRONJONG
6493.0000
6452.0000
6387.0000
5318.0000
5178.0000
56.000 56.000
55.000 55.000
Bid. Persamaan +54.000 Bid. Persamaan +54.000
STATION +380 Ki STATION +400 Ki
60.665
60.643
60.588
60.493
60.387
60.742
60.722
60.674
60.602
60.452
C Elevasi Tanah Asli
20.000
Elevasi Tanah Asli C
20.000
15.000
10.000
15.000
10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00
5.000
0.000
5.000
0.000
59.178
59.178
59.318
59.318
60.588
60.674
Elevasi Rencana Elevasi Rencana
D D
E E
6816.0000
6789.0000
6662.0000
6523.0000
6432.0000
6395.0000
6305.0000
6285.0000
5884.0000
5459.0000
5038.0000
56.000 56.000
G 55.000 55.000 G
Bid. Persamaan +54.000 Bid. Persamaan +54.000 PT. HYDRO TECHNO UTAMA
STATION +360 Ki STATION +420 Ki
PROJECT :
60.432
60.395
60.285
60.305
59.884
60.876
60.816
60.789
60.662
60.523
Elevasi Tanah Asli Elevasi Tanah Asli
PEKERJAAN PEMBANGUNAN TALUD
PLTMG ALOR 10 MW
20.000
20.000
15.000
10.000
15.000
10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00
5.000
0.000
5.000
0.000
H H
59.038
59.038
59.884
60.789
59.459
59.459
Elevasi Rencana Elevasi Rencana
SYAIKHAN.A DEDEN. H
DATE DATE DATE DATE
J
SCALE 1:50 J
022 SD.ALORPLTMG/HTU/02-2023
PLN DRAWING NO :
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14
SHOP DRAWING
LUAS AREA 3.77 m2 LUAS AREA 0.94 m2
LUAS AREA 1.714m2 LUAS AREA 2.635 m2 KETERANGAN :
A A
CL CL
65.000 65.000
64.000 64.000
: PAGAR KAWAT DURI
63.000 63.000
62.000 62.000 2
1:
2 1:
61.000 61.000
60.000 60.000
: TIMBUNAN TANAH
59.000 59.000
B B
58.000 58.000 7368.0000
7423.0000
7476.0000
7495.0000
57.000 57.000
6764.0000
6739.0000
6673.0000
6592.0000
6554.0000
6231.0000
: GALIAN BRONJONG
5879.0000
5599.0000
56.000 56.000
55.000 55.000
Bid. Persamaan +54.000 Bid. Persamaan +54.000
STATION +440 STATION +480 Ki
60.554
60.592
60.673
60.739
60.764
60.231
61.368
61.423
61.476
61.495
C Elevasi Tanah Asli 20.000 Elevasi Tanah Asli C
20.000
15.000
10.000
15.000
10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00
5.000
0.000
5.000
0.000
59.599
59.599
59.879
59.879
60.673
61.423
Elevasi Rencana Elevasi Rencana
D D
7721.0000
7652.0000
7548.0000
6448.0000
6019.0000
5739.0000
56.000 56.000
55.000 55.000
G Bid. Persamaan +54.000 Bid. Persamaan +54.000 PT. HYDRO TECHNO UTAMA G
61.132
61.163
61.197
61.202
60.448
62.032
61.721
61.652
61.548
Elevasi Tanah Asli Elevasi Tanah Asli
PEKERJAAN PEMBANGUNAN TALUD
20.000
20.000
15.000
10.000
15.000
10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 PLTMG ALOR 10 MW
5.000
0.000
5.000
0.000
H H
59.739
59.739
61.721
60.019
60.019
61.163
J
PENAMPANG POTONGAN BRONJONG J
SCALE 1:50
023 SD.ALORPLTMG/HTU/02-2023
PLN DRAWING NO :
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14
SHOP DRAWING
LUAS AREA 0.289 m2
LUAS AREA 3.302m2 KETERANGAN :
A A
CL
65.000
64.000
63.000 : PAGAR KAWAT DURI
62.000
61.000
60.000
59.000 : TIMBUNAN TANAH
B 58.000 8032.0000
7721.0000
7652.0000
7548.0000
B
57.000
6448.0000
6019.0000
: GALIAN BRONJONG
56.000
55.000
Bid. Persamaan +54.000
STATION +510
60.448
62.032
61.721
61.652
61.548
C Elevasi Tanah Asli C
20.000
15.000
10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00
5.000
0.000
60.019
60.019
61.721
Elevasi Rencana
D D
CONTRACT NO :
F F
0028.Pj/DAN.01.03/F46000000/2022
CONTRACTOR :
G G
PT. HYDRO TECHNO UTAMA
PROJECT :
SYAIKHAN.A DEDEN. H
DATE DATE DATE DATE
SHEET NO : CONTRACTOR DRAWING NO: REVISION:
J
PENAMPANG POTONGAN BRONJONG J
SCALE 1:50
024 SD.ALORPLTMG/HTU/02-2023
PLN DRAWING NO :
1 2 3 4 5 6 7 8 9 10 11 12 13 14
INSPECTION REPORT RETAINING WALL
VOLUME
NO. POINT DEVIATION REMARKS
DESIGN ACTUAL
1 TYPE 1 582.20
2 TYPE 2 70.00
TOTAL 652.20
SHOP DRAWING
KETERANGAN :
A A
1. BJTS-420B
PVC 2"
100
Drainage 100x100
C 35 C
D16-150
D D
360
D16-200
400
E E
0028.Pj/DAN.01.03/F46000000/2022
40
SYAIKHAN.A DEDEN. H
DATE DATE DATE DATE
SHEET NO : CONTRACTOR DRAWING NO: REVISION:
J 038 SD.ALORPLTMG/HTU/02-2023 J
PLN DRAWING NO :
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14
SHOP DRAWING
KETERANGAN :
A A
1. BJTS-420B
PVC 2" 2. LANTAI KERJA K-100
D16-150 D16-150
B 100 100 100 100 B
D16-200
100
C C
360
D D
400
400
E E
CONTRACT NO :
F F
0028.Pj/DAN.01.03/F46000000/2022
40
40
CONTRACTOR :
SYAIKHAN.A DEDEN. H
DATE DATE DATE DATE
SHEET NO : CONTRACTOR DRAWING NO: REVISION:
J 039 SD.ALORPLTMG/HTU/02-2023 J
PLN DRAWING NO :
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14
SHOP DRAWING
KETERANGAN :
A A
1. BJTS-420B
B B
50
Drainage 80x80
35
D16-200
D D
200 D16-200
240
E E
CONTRACT NO :
F F
0028.Pj/DAN.01.03/F46000000/2022
D13-200
40 Lantai kerja 5cm
PROJECT :
SYAIKHAN.A DEDEN. H
DATE DATE DATE DATE
SHEET NO : CONTRACTOR DRAWING NO: REVISION:
J 042 SD.ALORPLTMG/HTU/02-2023 J
PLN DRAWING NO :
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14
SHOP DRAWING
KETERANGAN :
A A
1. BJTS-420B
B B
PVC 2"
D13-200
200
D D
240
200
E E
40
CONTRACT NO :
F F
0028.Pj/DAN.01.03/F46000000/2022
Pasir Urug 10cm
G G
PT. HYDRO TECHNO UTAMA
PROJECT :
SYAIKHAN.A DEDEN. H
DATE DATE DATE DATE
SHEET NO : CONTRACTOR DRAWING NO: REVISION:
J 043 SD.ALORPLTMG/HTU/02-2023 J
PLN DRAWING NO :
1 2 3 4 5 6 7 8 9 10 11 12 13 14
INSPECTION REPORT TIMBUNAN BRONJONG
VOLUME
NO. POINT DEVIATION REMARKS
DESIGN ACTUAL
1 210-220 93.850
2 220-240 206.700
3 240-260 212.800
4 260-280 213.260
5 280-300 213.860
6 300-320 189.590
7 320-340 158.540
8 340-360 151.210
9 360-380 110.140
10 380-400 76.030
11 400-420 67.250
12 420-440 68.900
13 440-460 54.980
14 460-480 26.640
15 480-500 18.720
16 500-520 18.720
17 520-540 18.720
18 540-550 9.360
SHOP DRAWING
LUAS AREA 9.52 m2 LUAS AREA 11.15 m2
LUAS AREA 1.09 m2 LUAS AREA 0.795 m2
KETERANGAN :
A A
CL CL
65.000 65.000
64.000 64.000 : PAGAR KAWAT DURI
63.000 63.000
62.000 62.000
2 2
1: 1:
61.000 61.000
60.000 60.000 : TIMBUNAN TANAH
B 59.000 59.000 B
58.000 58.000
57.000 5541.0000
5532.0000
5487.0000
5402.0000
5312.0000
57.000 5518.0000
5512.0000
5489.0000
5379.0000
5319.0000
: GALIAN BRONJONG
56.000 4000.0000
56.000 4196.0000
55.000 55.000
Bid. Persamaan +54.000 Bid. Persamaan +54.000
STATION +210 STATION +240 Ki
59.541
59.532
59.487
59.402
59.131
59.518
59.512
59.489
59.379
59.319
C Elevasi Tanah Asli Elevasi Tanah Asli C
20.000
20.000
15.000
10.000
15.000
10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00
5.000
0.000
5.000
0.000
59.487
58.000
58.000
58.196
58.196
59.489
Elevasi Rencana Elevasi Rencana
D D
5487.0000
5402.0000
5312.0000
57.000 5879.0000
5856.0000
5435.0000
5408.0000
5338.0000
56.000 56.000
4336.0000
4056.0000
G 55.000 55.000 G
Bid. Persamaan +54.000 Bid. Persamaan +54.000 PT. HYDRO TECHNO UTAMA
STATION +220 STATION +260
PROJECT :
59.541
59.532
59.487
59.402
59.312
59.879
59.856
59.435
59.408
59.338
Elevasi Tanah Asli Elevasi Tanah Asli
PEKERJAAN PEMBANGUNAN TALUD
PLTMG ALOR 10 MW
20.000
20.000
15.000
10.000
15.000
10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00
5.000
0.000
5.000
0.000
H H
58.056
58.056
58.336
58.336
59.487
59.435
Elevasi Rencana Elevasi Rencana
J
PENAMPANG POTONGAN BRONJONG J
SCALE 1:50
020 SD.ALORPLTMG/HTU/02-2023
PLN DRAWING NO :
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14
SHOP DRAWING
LUAS AREA 10.18 m2 LUAS AREA 7.75 m2
LUAS AREA 0.933 m2 LUAS AREA 1.012 m2
KETERANGAN :
A A
CL CL
65.000 65.000
64.000 64.000 : PAGAR KAWAT DURI
63.000 63.000
62.000 62.000
2 2
1: 1:
61.000 61.000
60.000 60.000 : TIMBUNAN TANAH
B 59.000 59.000 B
58.000 58.000
57.000 5732.0000
5674.0000
5617.0000
5532.0000
5482.0000
57.000 5985.0000 5978.0000
5965.0000
5876.0000
5841.0000
: GALIAN BRONJONG
56.000 56.000
4757.0000
4477.0000
55.000 55.000
Bid. Persamaan +54.000 Bid. Persamaan +54.000
STATION +280 Ki STATION +320 Ki
59.732
59.674
59.617
59.532
59.482
59.985
59.978
59.965
59.876
59.841
C Elevasi Tanah Asli Elevasi Tanah Asli C
20.000
20.000
15.000
10.000
15.000
10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00
5.000
0.000
5.000
0.000
58.477
58.477
58.757
58.757
59.617
59.965
Elevasi Rencana Elevasi Rencana
D D
E E
5953.0000
5905.0000
5760.0000
5844.0000
CONTRACTOR :
57.000 56.000
4898.0000
5745.0000
5642.0000
5558.0000
5509.0000
5487.0000
56.000 55.000
Bid. Persamaan +54.000
4617.0000
G 55.000 G
Bid. Persamaan +54.000 PT. HYDRO TECHNO UTAMA
STATION +340 Ki
STATION +300
59.998
59.953
59.905
59.760
59.844
Elevasi Tanah Asli PROJECT :
59.558
59.509
59.487
59.642
59.745
20.000
15.000
10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00
5.000
0.000
PLTMG ALOR 10 MW
20.000
15.000
10.000
0.000
H H
58.898
58.898
59.905
Elevasi Rencana
58.617
58.617
59.487
Elevasi Rencana
SYAIKHAN.A DEDEN. H
DATE DATE DATE DATE
SHEET NO : CONTRACTOR DRAWING NO: REVISION:
J
PENAMPANG POTONGAN BRONJONG J
SCALE 1:50
021 SD.ALORPLTMG/HTU/02-2023
PLN DRAWING NO :
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14
SHOP DRAWING
LUAS AREA 4.00 m2 LUAS AREA 3.60 m2
LUAS AREA 1.494 m2 LUAS AREA 1.638 m2
KETERANGAN :
A A
CL CL
65.000 65.000
64.000 64.000 : PAGAR KAWAT DURI
63.000 63.000
62.000 2
62.000 2
1: 1:
61.000 61.000
60.000 60.000 : TIMBUNAN TANAH
B 59.000 59.000 B
58.000 58.000
57.000 57.000
6742.0000 6722.0000
6674.0000
6665.0000
6643.0000
6602.0000
6588.0000
: GALIAN BRONJONG
6493.0000
6452.0000
6387.0000
5318.0000
5178.0000
56.000 56.000
55.000 55.000
Bid. Persamaan +54.000 Bid. Persamaan +54.000
STATION +380 Ki STATION +400 Ki
60.665
60.643
60.588
60.493
60.387
60.742
60.722
60.674
60.602
60.452
C Elevasi Tanah Asli
20.000
Elevasi Tanah Asli C
20.000
15.000
10.000
15.000
10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00
5.000
0.000
5.000
0.000
59.178
59.178
59.318
59.318
60.588
60.674
Elevasi Rencana Elevasi Rencana
D D
E E
6816.0000
6789.0000
6662.0000
6523.0000
6432.0000
6395.0000
6305.0000
6285.0000
5884.0000
5459.0000
5038.0000
56.000 56.000
G 55.000 55.000 G
Bid. Persamaan +54.000 Bid. Persamaan +54.000 PT. HYDRO TECHNO UTAMA
STATION +360 Ki STATION +420 Ki
PROJECT :
60.432
60.395
60.285
60.305
59.884
60.876
60.816
60.789
60.662
60.523
Elevasi Tanah Asli Elevasi Tanah Asli
PEKERJAAN PEMBANGUNAN TALUD
PLTMG ALOR 10 MW
20.000
20.000
15.000
10.000
15.000
10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00
5.000
0.000
5.000
0.000
H H
59.038
59.038
59.884
60.789
59.459
59.459
Elevasi Rencana Elevasi Rencana
SYAIKHAN.A DEDEN. H
DATE DATE DATE DATE
J
SCALE 1:50 J
022 SD.ALORPLTMG/HTU/02-2023
PLN DRAWING NO :
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14
SHOP DRAWING
LUAS AREA 3.77 m2 LUAS AREA 0.94 m2
LUAS AREA 1.714m2 LUAS AREA 2.635 m2 KETERANGAN :
A A
CL CL
65.000 65.000
64.000 64.000
: PAGAR KAWAT DURI
63.000 63.000
62.000 62.000 2
1:
2 1:
61.000 61.000
60.000 60.000
: TIMBUNAN TANAH
59.000 59.000
B B
58.000 58.000 7368.0000
7423.0000
7476.0000
7495.0000
57.000 57.000
6764.0000
6739.0000
6673.0000
6592.0000
6554.0000
6231.0000
: GALIAN BRONJONG
5879.0000
5599.0000
56.000 56.000
55.000 55.000
Bid. Persamaan +54.000 Bid. Persamaan +54.000
STATION +440 STATION +480 Ki
60.554
60.592
60.673
60.739
60.764
60.231
61.368
61.423
61.476
61.495
C Elevasi Tanah Asli 20.000 Elevasi Tanah Asli C
20.000
15.000
10.000
15.000
10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00
5.000
0.000
5.000
0.000
59.599
59.599
59.879
59.879
60.673
61.423
Elevasi Rencana Elevasi Rencana
D D
7721.0000
7652.0000
7548.0000
6448.0000
6019.0000
5739.0000
56.000 56.000
55.000 55.000
G Bid. Persamaan +54.000 Bid. Persamaan +54.000 PT. HYDRO TECHNO UTAMA G
61.132
61.163
61.197
61.202
60.448
62.032
61.721
61.652
61.548
Elevasi Tanah Asli Elevasi Tanah Asli
PEKERJAAN PEMBANGUNAN TALUD
20.000
20.000
15.000
10.000
15.000
10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 PLTMG ALOR 10 MW
5.000
0.000
5.000
0.000
H H
59.739
59.739
61.721
60.019
60.019
61.163
J
PENAMPANG POTONGAN BRONJONG J
SCALE 1:50
023 SD.ALORPLTMG/HTU/02-2023
PLN DRAWING NO :
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14
SHOP DRAWING
LUAS AREA 0.289 m2
LUAS AREA 3.302m2 KETERANGAN :
A A
CL
65.000
64.000
63.000 : PAGAR KAWAT DURI
62.000
61.000
60.000
59.000 : TIMBUNAN TANAH
B 58.000 8032.0000
7721.0000
7652.0000
7548.0000
B
57.000
6448.0000
6019.0000
: GALIAN BRONJONG
56.000
55.000
Bid. Persamaan +54.000
STATION +510
60.448
62.032
61.721
61.652
61.548
C Elevasi Tanah Asli C
20.000
15.000
10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00
5.000
0.000
60.019
60.019
61.721
Elevasi Rencana
D D
CONTRACT NO :
F F
0028.Pj/DAN.01.03/F46000000/2022
CONTRACTOR :
G G
PT. HYDRO TECHNO UTAMA
PROJECT :
SYAIKHAN.A DEDEN. H
DATE DATE DATE DATE
SHEET NO : CONTRACTOR DRAWING NO: REVISION:
J
PENAMPANG POTONGAN BRONJONG J
SCALE 1:50
024 SD.ALORPLTMG/HTU/02-2023
PLN DRAWING NO :
1 2 3 4 5 6 7 8 9 10 11 12 13 14