Anda di halaman 1dari 54

INSPECTION & TEST REPORT

CHEKLIST
Project Pembangunan Talud PLTMG Alor 10Mw
Contractor PT.HYDRO TECHNO UTAMA Report No.
Location Alor , Nusa Tenggara Timur AFI No.

Structure Drawing No.

No. Item YES N/A REMARK

1 Pemasangan Gabion/Bronjong

2 Excavation Work/River
3 Volume Retaining Wall
4 Galian Gabion / Bronjong
5 Timbunan Gabion / Bronjong
6 Galian Retaining Wall
Result Rejected

Note :

Dibuat Oleh : Diperiksa Oleh : Disetujui Oleh :


PT.HYDRO TECHNO UTAMA PUSMANPRO UPP NUSRA 3

SOLIHIN MARGARETA NEWA MINA EDHO TORSESA JAROSMAN


INSPECTION REPORT GALIAN BRONJONG

PROJECT : PEMBANGUNAN TALUD PLTMG ALOR 10 MW Report No


Contractor : PT.HYDRO TECHNO UTAMA AFI No.
Location / Area : ALOR , NUSA TENGGARA TIMUR Drawing No 0480-KIT.03.01-F46000000-2023
Inspected Item : Pekerjaan Galian Bronjong
Reference :

VOLUME
NO. POINT DEVIATION REMARKS
DESIGN ACTUAL

1 210-220 11.050

2 220-240 18.850

3 240-260 16.340

4 260-280 17.720

5 280-300 18.980

6 300-320 19.770

7 320-340 20.390

8 340-360 20.940

9 360-380 25.610

10 380-400 31.320

11 400-420 34.560

12 420-440 35.320

13 440-460 38.510

14 460-480 47.720

15 480-500 52.700

16 500-510 26.550

TOTAL 436.330

Result Accepted Rejected

Dibuat Oleh : Diperiksa Oleh : Disetujui Oleh :


PT. HYDRO TECHNO UTAMA PLN PUSMANPRO PLN UPP NUSRA 3

SOLIHIN MARGARETA NEWA MINA EDHO TORSESA JAROSMAN


VOLUME GALIAN GABION / BRONJONG

NO LUAS PENAMPANG JARAK


VOLUME
STA A B rata-rata A B rata-rata

210-220 1.120 1.090 1.105 10.000 10.000 10.000 11.050


220-240 1.090 0.795 0.943 20.000 20.000 20.000 18.850
240-260 0.795 0.839 0.817 20.000 20.000 20.000 16.340
260-280 0.839 0.933 0.886 20.000 20.000 20.000 17.720
280-300 0.933 0.965 0.949 20.000 20.000 20.000 18.980
300-320 0.965 1.012 0.989 20.000 20.000 20.000 19.770
320-340 1.012 1.027 1.020 20.000 20.000 20.000 20.390
340-360 1.027 1.067 1.047 20.000 20.000 20.000 20.940
360-380 1.067 1.494 1.281 20.000 20.000 20.000 25.610
380-400 1.494 1.638 1.566 20.000 20.000 20.000 31.320
400-420 1.638 1.818 1.728 20.000 20.000 20.000 34.560
420-440 1.818 1.714 1.766 20.000 20.000 20.000 35.320
440-460 1.714 2.137 1.926 20.000 20.000 20.000 38.510
460-480 2.137 2.635 2.386 20.000 20.000 20.000 47.720
480-500 2.635 2.635 2.635 20.000 20.000 20.000 52.700
500-510 2.635 2.675 2.655 10.000 10.000 10.000 26.550

TOTAL VOLUME GALIAN 436.330

Dibuat Oleh Diperiksa Disetujui


PT.HYDRO TECHNO UTAMA PUSMANPRO UPP NUSRA 3

Solihin Margareta Newa Mina Edho Torsesa Jarosman


1 2 3 4 5 6 7 8 9 10 11 12 13 14

SHOP DRAWING
LUAS AREA 9.52 m2 LUAS AREA 11.15 m2
LUAS AREA 1.09 m2 LUAS AREA 0.795 m2
KETERANGAN :
A A
CL CL
65.000 65.000
64.000 64.000 : PAGAR KAWAT DURI
63.000 63.000
62.000 62.000
2 2
1: 1:
61.000 61.000
60.000 60.000 : TIMBUNAN TANAH

B 59.000 59.000 B
58.000 58.000
57.000 5541.0000

5532.0000

5487.0000

5402.0000

5312.0000
57.000 5518.0000

5512.0000

5489.0000

5379.0000

5319.0000
: GALIAN BRONJONG
56.000 4000.0000

56.000 4196.0000

55.000 55.000
Bid. Persamaan +54.000 Bid. Persamaan +54.000
STATION +210 STATION +240 Ki

59.541

59.532

59.487

59.402

59.131

59.518

59.512

59.489

59.379

59.319
C Elevasi Tanah Asli Elevasi Tanah Asli C
20.000

20.000
15.000

10.000

15.000

10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00

5.000

0.000

5.000

0.000
59.487

58.000

58.000

58.196

58.196
59.489
Elevasi Rencana Elevasi Rencana
D D

PENAMPANG POTONGAN Station +210 PENAMPANG POTONGAN Station +240


E E

PT. PLN (Persero)


LUAS AREA 9.52 m2 LUAS AREA 10.13 m2 UNIT INDUK PEMBANGUNAN NUSRA
LUAS AREA 1.09 m2 LUAS AREA 0.839 m2 UNIT PELAKSANA PROYEK NUSRA
CL CL
65.000 65.000
64.000 64.000 CONTRACT NO :
F 63.000 63.000 F
62.000 62.000
0028.Pj/DAN.01.03/F46000000/2022
2
1: 1:
2
61.000 61.000
60.000 60.000
59.000 59.000
58.000 58.000
CONTRACTOR :
57.000 5541.0000 5532.0000

5487.0000

5402.0000

5312.0000
57.000 5879.0000

5856.0000

5435.0000

5408.0000

5338.0000

56.000 56.000
4336.0000

4056.0000

G 55.000 55.000 G
Bid. Persamaan +54.000 Bid. Persamaan +54.000 PT. HYDRO TECHNO UTAMA
STATION +220 STATION +260
PROJECT :
59.541

59.532

59.487

59.402

59.312

59.879

59.856

59.435

59.408

59.338
Elevasi Tanah Asli Elevasi Tanah Asli
PEKERJAAN PEMBANGUNAN TALUD
PLTMG ALOR 10 MW
20.000

20.000
15.000

10.000

15.000

10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00
5.000

0.000

5.000

0.000
H H
58.056

58.056

58.336

58.336
59.487

59.435
Elevasi Rencana Elevasi Rencana

PENAMPANG POTONGAN GALIAN


DAN URUGAN BRONJONG
I SCALE DRAWN SURVEYOR CHECKED APPROVED I

PENAMPANG POTONGAN Station +220 PENAMPANG POTONGAN Station +260


SYAIKHAN.A DEDEN. H
DATE DATE DATE DATE
SHEET NO : CONTRACTOR DRAWING NO: REVISION:

J
PENAMPANG POTONGAN BRONJONG J
SCALE 1:50
020 SD.ALORPLTMG/HTU/02-2023

PLN DRAWING NO :

1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14

SHOP DRAWING
LUAS AREA 10.18 m2 LUAS AREA 7.75 m2
LUAS AREA 0.933 m2 LUAS AREA 1.012 m2
KETERANGAN :
A A
CL CL
65.000 65.000
64.000 64.000 : PAGAR KAWAT DURI
63.000 63.000
62.000 62.000
2 2
1: 1:
61.000 61.000
60.000 60.000 : TIMBUNAN TANAH

B 59.000 59.000 B
58.000 58.000
57.000 5732.0000

5674.0000

5617.0000

5532.0000

5482.0000
57.000 5985.0000 5978.0000

5965.0000

5876.0000

5841.0000

: GALIAN BRONJONG
56.000 56.000
4757.0000

4477.0000

55.000 55.000
Bid. Persamaan +54.000 Bid. Persamaan +54.000
STATION +280 Ki STATION +320 Ki

59.732

59.674

59.617

59.532

59.482

59.985

59.978

59.965

59.876

59.841
C Elevasi Tanah Asli Elevasi Tanah Asli C
20.000

20.000
15.000

10.000

15.000

10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00

5.000

0.000

5.000

0.000
58.477

58.477

58.757

58.757
59.617

59.965
Elevasi Rencana Elevasi Rencana
D D

PENAMPANG POTONGAN Station +280 PENAMPANG POTONGAN Station +320

E E

LUAS AREA 8.11 m2 PT. PLN (Persero)


LUAS AREA 11.21 m2 LUAS AREA 1.027 m2 UNIT INDUK PEMBANGUNAN NUSRA
LUAS AREA 0.965 m2 CL UNIT PELAKSANA PROYEK NUSRA
CL 65.000
65.000 64.000
64.000 63.000 CONTRACT NO :
F 63.000 62.000 F
2
1:
62.000 61.000
61.000 1:
2
60.000 0028.Pj/DAN.01.03/F46000000/2022
60.000 59.000
59.000 58.000
58.000 57.000 5998.0000

5953.0000

5905.0000

5760.0000
5844.0000

CONTRACTOR :
57.000 56.000
4898.0000

5745.0000

5642.0000

5558.0000

5509.0000

5487.0000

56.000 55.000
Bid. Persamaan +54.000
4617.0000

G 55.000 G
Bid. Persamaan +54.000 PT. HYDRO TECHNO UTAMA
STATION +340 Ki
STATION +300

59.998

59.953

59.905

59.760

59.844
Elevasi Tanah Asli PROJECT :
59.558

59.509

59.487

59.642

59.745

Elevasi Tanah Asli


PEKERJAAN PEMBANGUNAN TALUD

20.000

15.000

10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00

5.000

0.000
PLTMG ALOR 10 MW
20.000

15.000

10.000

Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00


5.000

0.000

H H

58.898

58.898
59.905
Elevasi Rencana
58.617

58.617
59.487

Elevasi Rencana

PENAMPANG POTONGAN GALIAN


DAN URUGAN BRONJONG
I
PENAMPANG POTONGAN Station +300 PENAMPANG POTONGAN Station +340 SCALE DRAWN SURVEYOR CHECKED APPROVED I

SYAIKHAN.A DEDEN. H
DATE DATE DATE DATE
SHEET NO : CONTRACTOR DRAWING NO: REVISION:

J
PENAMPANG POTONGAN BRONJONG J
SCALE 1:50
021 SD.ALORPLTMG/HTU/02-2023

PLN DRAWING NO :

1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14

SHOP DRAWING
LUAS AREA 4.00 m2 LUAS AREA 3.60 m2
LUAS AREA 1.494 m2 LUAS AREA 1.638 m2
KETERANGAN :
A A
CL CL
65.000 65.000
64.000 64.000 : PAGAR KAWAT DURI
63.000 63.000
62.000 2
62.000 2
1: 1:
61.000 61.000
60.000 60.000 : TIMBUNAN TANAH

B 59.000 59.000 B
58.000 58.000
57.000 57.000
6742.0000 6722.0000

6674.0000

6665.0000

6643.0000

6602.0000

6588.0000

: GALIAN BRONJONG
6493.0000

6452.0000

6387.0000

5318.0000

5178.0000

56.000 56.000
55.000 55.000
Bid. Persamaan +54.000 Bid. Persamaan +54.000
STATION +380 Ki STATION +400 Ki
60.665

60.643

60.588

60.493

60.387

60.742

60.722

60.674

60.602

60.452
C Elevasi Tanah Asli
20.000
Elevasi Tanah Asli C

20.000
15.000

10.000

15.000

10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00

5.000

0.000

5.000

0.000
59.178

59.178

59.318

59.318
60.588

60.674
Elevasi Rencana Elevasi Rencana
D D

PENAMPANG POTONGAN Station +380 PENAMPANG POTONGAN Station +400

E E

PT. PLN (Persero)


LUAS AREA 7.02 m2 LUAS AREA 3.12 m2 UNIT INDUK PEMBANGUNAN NUSRA
LUAS AREA 1.067 m2 LUAS AREA 1.818 m2 UNIT PELAKSANA PROYEK NUSRA
CL CL
65.000 65.000
64.000 64.000 CONTRACT NO :
F 63.000 63.000 F
62.000 62.000
0028.Pj/DAN.01.03/F46000000/2022
2
2 1:
1:
61.000 61.000
60.000 60.000
59.000 59.000
58.000 58.000
CONTRACTOR :
57.000 57.000
6876.0000

6816.0000

6789.0000

6662.0000

6523.0000

6432.0000

6395.0000

6305.0000

6285.0000

5884.0000

5459.0000

5038.0000

56.000 56.000
G 55.000 55.000 G
Bid. Persamaan +54.000 Bid. Persamaan +54.000 PT. HYDRO TECHNO UTAMA
STATION +360 Ki STATION +420 Ki
PROJECT :
60.432

60.395

60.285

60.305
59.884

60.876

60.816

60.789

60.662

60.523
Elevasi Tanah Asli Elevasi Tanah Asli
PEKERJAAN PEMBANGUNAN TALUD
PLTMG ALOR 10 MW
20.000

20.000
15.000

10.000

15.000

10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00
5.000

0.000

5.000

0.000
H H
59.038

59.038
59.884

60.789

59.459

59.459
Elevasi Rencana Elevasi Rencana

PENAMPANG POTONGAN GALIAN


DAN URUGAN BRONJONG
I
PENAMPANG POTONGAN Station +360 PENAMPANG POTONGAN Station +420 SCALE DRAWN SURVEYOR CHECKED APPROVED I

SYAIKHAN.A DEDEN. H
DATE DATE DATE DATE

PENAMPANG POTONGAN BRONJONG SHEET NO : CONTRACTOR DRAWING NO: REVISION:

J
SCALE 1:50 J
022 SD.ALORPLTMG/HTU/02-2023

PLN DRAWING NO :

1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14

SHOP DRAWING
LUAS AREA 3.77 m2 LUAS AREA 0.94 m2
LUAS AREA 1.714m2 LUAS AREA 2.635 m2 KETERANGAN :
A A
CL CL
65.000 65.000
64.000 64.000
: PAGAR KAWAT DURI
63.000 63.000
62.000 62.000 2
1:
2 1:
61.000 61.000
60.000 60.000
: TIMBUNAN TANAH
59.000 59.000
B B
58.000 58.000 7368.0000
7423.0000
7476.0000
7495.0000

57.000 57.000
6764.0000

6739.0000

6673.0000

6592.0000

6554.0000

6231.0000

: GALIAN BRONJONG
5879.0000

5599.0000

56.000 56.000
55.000 55.000
Bid. Persamaan +54.000 Bid. Persamaan +54.000
STATION +440 STATION +480 Ki

60.554

60.592

60.673

60.739

60.764

60.231

61.368

61.423

61.476

61.495
C Elevasi Tanah Asli 20.000 Elevasi Tanah Asli C

20.000
15.000

10.000

15.000

10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00

5.000

0.000

5.000

0.000
59.599

59.599

59.879

59.879
60.673

61.423
Elevasi Rencana Elevasi Rencana

D D

PENAMPANG POTONGAN Station +440 PENAMPANG POTONGAN Station +480


E E

LUAS AREA 1.73 m2 LUAS AREA 0.289 m2


PT. PLN (Persero)
UNIT INDUK PEMBANGUNAN NUSRA
LUAS AREA 2.137 m2 LUAS AREA 3.302m2
UNIT PELAKSANA PROYEK NUSRA
CL CL
65.000 65.000
64.000 64.000
CONTRACT NO :
F 63.000 63.000 F
62.000 2
62.000
1:
61.000 61.000
0028.Pj/DAN.01.03/F46000000/2022
60.000 60.000
59.000 59.000
58.000 7132.0000
7163.0000
7197.0000 7202.0000
58.000 8032.0000

7721.0000

7652.0000

7548.0000

57.000 57.000 CONTRACTOR :


6864.0000

6448.0000

6019.0000

5739.0000

56.000 56.000
55.000 55.000
G Bid. Persamaan +54.000 Bid. Persamaan +54.000 PT. HYDRO TECHNO UTAMA G

STATION +460 Ki STATION +500


PROJECT :
60.864

61.132

61.163

61.197

61.202

60.448

62.032

61.721

61.652

61.548
Elevasi Tanah Asli Elevasi Tanah Asli
PEKERJAAN PEMBANGUNAN TALUD
20.000

20.000
15.000

10.000

15.000

10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 PLTMG ALOR 10 MW
5.000

0.000

5.000

0.000
H H
59.739

59.739

61.721

60.019

60.019
61.163

Elevasi Rencana Elevasi Rencana

PENAMPANG POTONGAN GALIAN


DAN URUGAN BRONJONG
I SCALE DRAWN SURVEYOR CHECKED APPROVED I

PENAMPANG POTONGAN Station +460 PENAMPANG POTONGAN Station +500


SYAIKHAN.A DEDEN. H
DATE DATE DATE DATE
SHEET NO : CONTRACTOR DRAWING NO: REVISION:

J
PENAMPANG POTONGAN BRONJONG J
SCALE 1:50
023 SD.ALORPLTMG/HTU/02-2023

PLN DRAWING NO :

1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14

SHOP DRAWING
LUAS AREA 0.289 m2
LUAS AREA 3.302m2 KETERANGAN :
A A
CL
65.000
64.000
63.000 : PAGAR KAWAT DURI
62.000
61.000
60.000
59.000 : TIMBUNAN TANAH

B 58.000 8032.0000

7721.0000

7652.0000

7548.0000
B
57.000
6448.0000

6019.0000

: GALIAN BRONJONG
56.000
55.000
Bid. Persamaan +54.000
STATION +510

60.448

62.032

61.721

61.652

61.548
C Elevasi Tanah Asli C

20.000

15.000

10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00

5.000

0.000
60.019

60.019
61.721
Elevasi Rencana

D D

PENAMPANG POTONGAN Station +510


E E

PT. PLN (Persero)


UNIT INDUK PEMBANGUNAN NUSRA
UNIT PELAKSANA PROYEK NUSRA

CONTRACT NO :
F F

0028.Pj/DAN.01.03/F46000000/2022

CONTRACTOR :

G G
PT. HYDRO TECHNO UTAMA

PROJECT :

PEKERJAAN PEMBANGUNAN TALUD


PLTMG ALOR 10 MW
H H

PENAMPANG POTONGAN GALIAN


DAN URUGAN BRONJONG
I SCALE DRAWN SURVEYOR CHECKED APPROVED I

SYAIKHAN.A DEDEN. H
DATE DATE DATE DATE
SHEET NO : CONTRACTOR DRAWING NO: REVISION:

J
PENAMPANG POTONGAN BRONJONG J
SCALE 1:50
024 SD.ALORPLTMG/HTU/02-2023

PLN DRAWING NO :

1 2 3 4 5 6 7 8 9 10 11 12 13 14
INSPECTION REPORT GALIAN RETAINING WALL

PROJECT : PEMBANGUNAN TALUD PLTMG ALOR 10 MW Report No


Contractor : PT.HYDRO TECHNO UTAMA AFI No.
Location / Area : ALOR , NUSA TENGGARA TIMUR Drawing No 0509-KIT.03.01-F46000000-2023
Inspected Item : Pekerjaan Galian Retaining Wall
Reference :

VOLUME
NO. POINT DEVIATION REMARKS
DESIGN ACTUAL

1 510-520 134.57

2 520-540 273.31

3 540-550 187.645

4 0-10 221.865

5 10-20 165.37

6 20-30 157.945

7 30-40 188.745

8 40-50 223.2

9 50-60 230.545

10 60-70 208.865

11 70-80 192.98

12 80-90 179.65

13 90-100 172.885

14 100-110 164.475

15 110-120 156.11

16 120-130 162.16

17 130-140 173.39

18 140-150 202.19

19 150-160 247.61

20 160-165 132.6525

21 165-175 145.47

22 175-185 30.985

23 185-195 32.385

24 195-205 27.93

25 205-215 12.8975

TOTAL 4025.830

Result Accepted Rejected

Dibuat Oleh : Diperiksa Oleh : Disetujui Oleh :


PT. HYDRO TECHNO UTAMA PLN PUSMANPRO PLN UPP NUSRA 3

SOLIHIN MARGARETA NEWA MINA EDHO TORSESA JAROSMAN


VOLUME GALIAN RETAINING WALL

NO LUAS PENAMPANG JARAK VOLUME


STA A B rata-rata A B rata-rata

510-520 11.593 15.321 13.457 10.000 10.000 10.000 134.570


520-540 15.321 12.010 13.666 20.000 20.000 20.000 273.310
540-550 12.010 25.519 18.765 10.000 10.000 10.000 187.645

0-10 25.309 19.064 22.187 10.000 10.000 10.000 221.865


10-20 19.064 14.010 16.537 10.000 10.000 10.000 165.370
20-30 14.010 17.579 15.795 10.000 10.000 10.000 157.945
30-40 17.579 20.170 18.875 10.000 10.000 10.000 188.745
40-50 20.170 24.470 22.320 10.000 10.000 10.000 223.200
50-60 24.470 21.639 23.055 10.000 10.000 10.000 230.545
60-70 21.639 20.134 20.887 10.000 10.000 10.000 208.865
70-80 20.134 18.462 19.298 10.000 10.000 10.000 192.980
80-90 18.462 17.468 17.965 10.000 10.000 10.000 179.650
90-100 17.468 17.109 17.289 10.000 10.000 10.000 172.885
100-110 17.109 15.786 16.448 10.000 10.000 10.000 164.475
110-120 15.786 15.436 15.611 10.000 10.000 10.000 156.110
120-130 15.436 16.996 16.216 10.000 10.000 10.000 162.160
130-140 16.996 17.682 17.339 10.000 10.000 10.000 173.390
140-150 17.682 22.756 20.219 10.000 10.000 10.000 202.190
150-160 22.756 26.766 24.761 10.000 10.000 10.000 247.610
160-165 26.766 26.295 26.531 5.000 5.000 5.000 132.653
165-175 26.295 2.799 14.547 10.000 10.000 10.000 145.470
175-185 2.799 3.398 3.099 10.000 10.000 10.000 30.985
185-195 3.398 3.079 3.239 10.000 10.000 10.000 32.385
195-205 3.079 2.507 2.793 10.000 10.000 10.000 27.930
205-215 2.507 2.652 2.580 5.000 5.000 5.000 12.898

TOTAL VOLUME GALIAN 4,025.830

Dibuat Oleh Diperiksa Disetujui


PT.HYDRO TECHNO UTAMA PUSMANPRO UPP NUSRA 3

Solihin Margareta Newa Mina Edho Torsesa Jarosman


1 2 3 4 5 6 7 8 9 10 11 12 13 14

SHOP DRAWING
LUAS AREA GALIAN 15.321 m2 LUAS AREA GALIAN 25.519 m2

A
KETERANGAN : A
CL CL
65.000 65.000
: DRAINAGE 100X100
64.000 64.000
63.000 63.000
62.000 62.000
61.000 61.000 : PAGAR KAWAT DURI
60.000 60.000
59.000 59.000
B 58.000 8032.0000

7721.0000

7652.0000

7548.0000
58.000
8450.0000

8342.0000

7985.0000

7921.0000

7853.0000
B
57.000 57.000 : RETAINING WALL TYPE 1
6448.0000

6300.0000

6019.0000

56.000 56.000
55.000 55.000
Bid. Persamaan +54.000 Bid. Persamaan +54.000
STATION +20 Ki STATION +60 Ki
: GALIAN RETAINING WALL

60.448

62.032

61.721

61.652

61.548

62.450

62.342

61.985

61.921

61.853
C Elevasi Tanah Asli Elevasi Tanah Asli C
20.000

20.000
15.000

10.000

15.000

10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00

5.000

0.000

5.000

0.000
60.019

60.019

61.985

60.300

60.300
61.721
Elevasi Rencana Elevasi Rencana

D D

PENAMPANG POTONGAN Station +510 PENAMPANG POTONGAN Station +540

E E
LUAS AREA GALIAN 25.519 m2
LUAS AREA GALIAN 12.010 m2 PT. PLN (Persero)
CL CL UNIT INDUK PEMBANGUNAN NUSRA
65.000 65.000
UNIT PELAKSANA PROYEK NUSRA
64.000 64.000
63.000 63.000
62.000 62.000
61.000 61.000
CONTRACT NO :
F F
60.000 60.000
59.000 59.000
0028.Pj/DAN.01.03/F46000000/2022
58.000 58.000
8450.0000

8342.0000

7985.0000 8000.0000

7921.0000

7668.0000

7623.0000

7609.0000

57.000 57.000
6925.0000

6873.0000

6370.2024

6159.0000

56.000 56.000
55.000 55.000
Bid. Persamaan +54.000 Bid. Persamaan +54.000 CONTRACTOR :

G STATION +40 Ki STATION +60 Ki G


PT. HYDRO TECHNO UTAMA
60.925

60.873

61.609

61.623

61.668

62.450

62.342

61.985

61.921

62.000
Elevasi Tanah Asli Elevasi Tanah Asli
PROJECT :
20.000

20.000
15.000

10.000

15.000

10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00
5.000

0.000

5.000

0.000
PEKERJAAN PEMBANGUNAN TALUD
PLTMG ALOR 10 MW
60.159

60.159

60.300

60.370
61.609

61.985
H Elevasi Rencana Elevasi Rencana H

PENAMPANG POTONGAN DAN GALIAN


PENAMPANG POTONGAN Station +550
RETAINING WALL TYPE 1
PENAMPANG POTONGAN Station +520 SCALE
I DRAWN SURVEYOR CHECKED APPROVED I

SYAIKHAN.A DEDEN. H
DATE DATE DATE DATE
SHEET NO :
PENAMPANG POTONGAN RETAINING WALL TYPE 1
CONTRACTOR DRAWING NO: REVISION:

J 032 SD.ALORPLTMG/HTU/02-2023 J
SCALE 1:50

PLN DRAWING NO :

1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14

SHOP DRAWING
A
KETERANGAN : A

: DRAINAGE 100X100
LUAS AREA GALIAN 25.309 m2
LUAS AREA GALIAN 14.010 m2
Bts Bts
65.000 65.000
64.000 64.000 : PAGAR KAWAT DURI
63.000 63.000
62.000 62.000
B B

:1
1
:1
61.000 61.000

:1
1

1
60.000 60.000

:1
: RETAINING WALL TYPE 1
59.000 59.000
58.000 58.000
8444.0000

8371.0000 8381.0000

8342.0000

8172.0000

7702.5299

7589.5462

7523.0000

7342.0000

6953.0000

57.000 57.000
6926.0000

6903.0000

10087.8536

9706.8536

56.000 56.000
55.000 55.000
Bid. Persamaan +54.000 Bid. Persamaan +54.000 : GALIAN RETAINING WALL

STATION +0 Dalam Luar STATION +20 Dalam Luar


C C

61.342

61.523

61.795
62.381

62.172

62.176

60.953
62.444

62.371

62.342

60.903

60.926
Elevasi Tanah Asli Elevasi Tanah Asli
20.000

20.000
15.000

10.000

10.000

15.000

10.000

10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 5.00 5.00

5.000

0.000

5.000

5.000

0.000

5.000
58.900

58.900

58.900

58.900
Elevasi Rencana Elevasi Rencana
D D

PENAMPANG POTONGAN Station +0 PENAMPANG POTONGAN Station +20


E E

PT. PLN (Persero)


UNIT INDUK PEMBANGUNAN NUSRA
LUAS AREA GALIAN 19.064 m2 LUAS AREA GALIAN 17.579 m2 UNIT PELAKSANA PROYEK NUSRA
Bts Bts
65.000 65.000
64.000 64.000 CONTRACT NO :
F 63.000 63.000 F
62.000 62.000
:1

61.000 61.000
0028.Pj/DAN.01.03/F46000000/2022
1
1

:1
1
:1

:1
60.000 60.000

1
59.000 59.000
58.000 7373.0000 7382.0000
7997.0000

7646.3120
8234.0000

58.000 7638.0000

7567.0000

7523.0000
7612.0000
7762.9457

7656.0000

57.000 57.000
6825.0000

10228.8536

9619.8536

56.000 56.000
CONTRACTOR :
55.000 55.000
Bid. Persamaan +54.000 Bid. Persamaan +54.000
G G
STATION +10 Dalam Luar STATION +30 Dalam Luar
PT. HYDRO TECHNO UTAMA

61.708
61.523

61.612

61.656
61.638

61.567
62.234

62.317
61.997
60.825

61.373

61.382

Elevasi Tanah Asli Elevasi Tanah Asli


PROJECT :
20.000

20.000
15.000

10.000

10.000

15.000

10.000

10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 5.00 5.00
5.000

0.000

5.000

5.000

0.000

5.000
PEKERJAAN PEMBANGUNAN TALUD
PLTMG ALOR 10 MW
58.900

58.900

58.900

58.900
H Elevasi Rencana Elevasi Rencana H

PENAMPANG POTONGAN DAN GALIAN


RETAINING WALL TYPE 1
PENAMPANG POTONGAN Station +10 PENAMPANG POTONGAN Station +30
I SCALE DRAWN SURVEYOR CHECKED APPROVED I

SYAIKHAN.A DEDEN. H
DATE DATE DATE DATE
SHEET NO :
PENAMPANG POTONGAN RETAINING WALL TYPE 1
CONTRACTOR DRAWING NO: REVISION:

J 033 SD.ALORPLTMG/HTU/02-2023 J
SCALE 1:50

PLN DRAWING NO :

1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14

SHOP DRAWING
A
KETERANGAN : A

: DRAINAGE 100X100
LUAS AREA GALIAN 20.174 m2 LUAS AREA GALIAN 21.639 m2

Bts Bts
65.000 65.000
64.000 64.000 : PAGAR KAWAT DURI
63.000 63.000
62.000 62.000
B B

:1
1

1
:1
:1

:1
61.000 61.000

1
1
60.000 60.000
: RETAINING WALL TYPE 1
59.000 59.000
58.000 58.000
8304.0000

8104.0000

7942.1607

7905.0000

7867.0000 7864.0000 7867.0000

7852.0000 7852.0000 7834.0000

7823.6685

7682.0000

57.000 57.000
10295.8536

9625.8536

56.000 56.000
55.000 55.000
Bid. Persamaan +54.000 Bid. Persamaan +54.000 : GALIAN RETAINING WALL

STATION +40 Dalam Luar STATION +60 Dalam Luar


C C

62.384
61.714

62.304
61.852

61.682

61.867

61.852

61.834

62.104
61.905

61.867

61.864
Elevasi Tanah Asli Elevasi Tanah Asli
20.000

20.000
15.000

10.000

10.000

15.000

10.000

10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 5.00 5.00

5.000

0.000

5.000

5.000

0.000

5.000
58.900

58.900

58.900

58.900
Elevasi Rencana Elevasi Rencana
D D

PENAMPANG POTONGAN Station +40 PENAMPANG POTONGAN Station +60


E E

PT. PLN (Persero)


LUAS AREA GALIAN 24.470 m2
UNIT INDUK PEMBANGUNAN NUSRA
LUAS AREA GALIAN 20.134 m2
UNIT PELAKSANA PROYEK NUSRA
Bts Bts
65.000 65.000
64.000 64.000 CONTRACT NO :
F 63.000 63.000 F
62.000 62.000
:1

:1
1

1
0028.Pj/DAN.01.03/F46000000/2022
:1

61.000 61.000
1

1
:1
60.000 60.000
59.000 59.000
58.000 58.000
8295.0000

8287.0000

8243.0000

8209.0000

8143.0000

8084.0000

7999.5269

7914.0000

7882.8826

7739.0000

7721.0000 7711.0000

57.000 57.000
10187.8536

10050.8536

56.000 56.000
CONTRACTOR :
55.000 55.000
Bid. Persamaan +54.000 Bid. Persamaan +54.000
G G
STATION +50 Dalam Luar STATION +70 Dalam Luar
PT. HYDRO TECHNO UTAMA

62.084

62.139
62.276
62.295

62.287

61.721

61.711

61.739

61.914
62.243
62.143

62.209

Elevasi Tanah Asli Elevasi Tanah Asli


PROJECT :
20.000

20.000
15.000

10.000

10.000

15.000

10.000

10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 5.00 5.00
5.000

0.000

5.000

5.000

0.000

5.000
PEKERJAAN PEMBANGUNAN TALUD
PLTMG ALOR 10 MW
58.900

58.900

58.900

58.900
H Elevasi Rencana Elevasi Rencana H

PENAMPANG POTONGAN DAN GALIAN


RETAINING WALL TYPE 1
PENAMPANG POTONGAN Station +50 PENAMPANG POTONGAN Station +70
I SCALE DRAWN SURVEYOR CHECKED APPROVED I

SYAIKHAN.A DEDEN. H
DATE DATE DATE DATE
SHEET NO :
PENAMPANG POTONGAN RETAINING WALL TYPE 1
CONTRACTOR DRAWING NO: REVISION:

J 034 SD.ALORPLTMG/HTU/02-2023 J
SCALE 1:50

PLN DRAWING NO :

1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14

SHOP DRAWING
A
KETERANGAN : A

: DRAINAGE 100X100
LUAS AREA GALIAN 18.462 m2 LUAS AREA GALIAN 17.109 m2
Bts Bts
65.000 65.000
64.000 64.000
: PAGAR KAWAT DURI
63.000 63.000
62.000 62.000
B 61.000 61.000 B

:1
1

1
:1
:1

:1

1
60.000 60.000

1
59.000 59.000 : RETAINING WALL TYPE 1
58.000 7623.0000 7616.0000

7594.0000
7714.0000
8058.1893

7874.0000

58.000 7502.0000 7515.0000 7519.0000

7444.0000
8176.3590

8144.0000

57.000 9935.8536

57.000 10015.8536

56.000 56.000
55.000 55.000
Bid. Persamaan +54.000 Bid. Persamaan +54.000 : GALIAN RETAINING WALL

STATION +80 Dalam Luar STATION +100 Dalam Luar


C C

61.444

62.144

62.104
61.623

61.616

61.594

61.714

61.874

62.024

61.502

61.515

61.519
Elevasi Tanah Asli Elevasi Tanah Asli
20.000

20.000
15.000

10.000

10.000

15.000

10.000

10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 5.00 5.00

5.000

0.000

5.000

5.000

0.000

5.000
58.900

58.900

58.900

58.900
Elevasi Rencana Elevasi Rencana
D D

PENAMPANG POTONGAN Station +80 PENAMPANG POTONGAN Station +100


E E

PT. PLN (Persero)


UNIT INDUK PEMBANGUNAN NUSRA
LUAS AREA GALIAN 17.468 m2 LUAS AREA GALIAN 15.786 m2 UNIT PELAKSANA PROYEK NUSRA
Bts Bts
65.000 65.000
64.000 64.000
63.000 63.000
CONTRACT NO :
F F
62.000 62.000
61.000 61.000
0028.Pj/DAN.01.03/F46000000/2022

:1
:1

1
1

:1

1
:1

60.000 60.000
59.000 59.000
58.000 7524.0000

7513.0000 7499.0000
7579.0000
8117.2728

7904.0000

58.000 7398.0000 7391.0000 7384.0000

7304.0000
8235.4602

7914.0000

57.000 9895.8536

57.000 10025.8536

56.000 56.000 CONTRACTOR :


55.000 55.000
Bid. Persamaan +54.000 Bid. Persamaan +54.000
G STATION STATION G
+90 Dalam Luar +110 Dalam Luar PT. HYDRO TECHNO UTAMA

61.304

61.914

62.114
61.524

61.904

61.984

61.398

61.391

61.384
61.579
61.513

61.499

Elevasi Tanah Asli Elevasi Tanah Asli


PROJECT :
20.000

20.000
15.000

10.000

10.000

15.000

10.000

10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 5.00 5.00
5.000

0.000

5.000

5.000

0.000

5.000
PEKERJAAN PEMBANGUNAN TALUD
PLTMG ALOR 10 MW
58.900

58.900

58.900

58.900
H Elevasi Rencana Elevasi Rencana H

PENAMPANG POTONGAN DAN GALIAN


PENAMPANG POTONGAN Station +90 PENAMPANG POTONGAN Station +110 RETAINING WALL TYPE 1
I SCALE DRAWN SURVEYOR CHECKED APPROVED I

SYAIKHAN.A DEDEN. H
DATE DATE DATE DATE
SHEET NO :
PENAMPANG POTONGAN RETAINING WALL TYPE 1
CONTRACTOR DRAWING NO: REVISION:

J 035 SD.ALORPLTMG/HTU/02-2023 J
SCALE 1:50

PLN DRAWING NO :

1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14

SHOP DRAWING
A
KETERANGAN : A

: DRAINAGE 100X100

LUAS AREA GALIAN 15.436 m2 LUAS AREA GALIAN 17.682 m2

Bts Bts
65.000 65.000
64.000 64.000
: PAGAR KAWAT DURI
63.000 63.000
62.000 62.000
B 61.000 61.000 B

1
:1
1

:1
:1
:1

1
60.000 60.000

1
59.000 59.000 : RETAINING WALL TYPE 1
58.000 58.000
8412.0925

8296.7664

8124.0000

8098.0000

7618.0000

7486.0000

7418.0000

7291.0000 7287.0000 7299.0000 7279.0000

7198.0000

57.000 57.000
10235.8536

10124.8536

56.000 56.000
55.000 55.000
Bid. Persamaan +54.000 Bid. Persamaan +54.000 : GALIAN RETAINING WALL

STATION +120 Dalam Luar STATION +140 Dalam Luar


C C

61.486

61.618

62.098
62.124

62.324
61.299

61.198

61.418

62.213
61.291

61.287

61.279
Elevasi Tanah Asli Elevasi Tanah Asli
20.000

20.000
15.000

10.000

10.000

15.000

10.000

10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 5.00 5.00

5.000

0.000

5.000

5.000

0.000

5.000
58.900

58.900

58.900

58.900
Elevasi Rencana Elevasi Rencana
D D

PENAMPANG POTONGAN Station +120 PENAMPANG POTONGAN Station +140


E E

PT. PLN (Persero)


LUAS AREA GALIAN 22.756 m2 UNIT INDUK PEMBANGUNAN NUSRA
LUAS AREA GALIAN 15.996 m2 UNIT PELAKSANA PROYEK NUSRA
Bts Bts
65.000 65.000
64.000 64.000
63.000 63.000
CONTRACT NO :
F F
62.000 62.000

:1
61.000 61.000

1
0028.Pj/DAN.01.03/F46000000/2022
:1

1
1

:1
:1

60.000 60.000
59.000 59.000
58.000 58.000
8471.9990

8353.3171

8343.0000

8318.0000

7873.0000

7764.0000

7488.0000 7496.0000

7378.0000

7283.0000 7264.0000

7257.0000

57.000 57.000
10194.8536

9734.8536

56.000 56.000 CONTRACTOR :


55.000 55.000
Bid. Persamaan +54.000 Bid. Persamaan +54.000
G STATION STATION G
+130 Dalam Luar +150 Dalam Luar PT. HYDRO TECHNO UTAMA

62.318
61.764

61.823
61.488

61.378

61.496

61.873

62.343

62.283
61.257

61.283

61.264

Elevasi Tanah Asli Elevasi Tanah Asli


PROJECT :
20.000

20.000
15.000

10.000

10.000

15.000

10.000

10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 5.00 5.00
5.000

0.000

5.000

5.000

0.000

5.000
PEKERJAAN PEMBANGUNAN TALUD
PLTMG ALOR 10 MW
58.900

58.900

58.900

58.900
H Elevasi Rencana Elevasi Rencana H

PENAMPANG POTONGAN DAN GALIAN


PENAMPANG POTONGAN Station +130 PENAMPANG POTONGAN Station +150 RETAINING WALL TYPE 1
I SCALE DRAWN SURVEYOR CHECKED APPROVED I

SYAIKHAN.A DEDEN. H
DATE DATE DATE DATE
SHEET NO :
PENAMPANG POTONGAN RETAINING WALL TYPE 1
CONTRACTOR DRAWING NO: REVISION:

J 036 SD.ALORPLTMG/HTU/02-2023 J
SCALE 1:50

PLN DRAWING NO :

1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14

SHOP DRAWING
A
KETERANGAN : A

LUAS AREA GALIAN 26.766 m2 : DRAINAGE 100X100

Mesjid Bts
65.000
64.000
: PAGAR KAWAT DURI
63.000
62.000

:1
1
B B

:1
61.000

1
60.000
59.000
58.000
8703.0000 8708.0000

: RETAINING WALL TYPE 1


8530.2839

8226.0000

57.000
10613.8536

56.000
55.000
Bid. Persamaan +54.000 : GALIAN RETAINING WALL
STATION +160 Dalam Luar
C C

62.703

62.708
62.226

62.702
Elevasi Tanah Asli
20.000

15.000

10.000

10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 5.00 5.00

5.000

0.000

5.000
58.900

58.900
Elevasi Rencana
D D

PENAMPANG POTONGAN Station +160


E E

PT. PLN (Persero)


LUAS AREA GALIAN 26.295 m2 UNIT INDUK PEMBANGUNAN NUSRA
UNIT PELAKSANA PROYEK NUSRA
Mesjid Bts
65.000
64.000
63.000
CONTRACT NO :
F F
62.000
:1
1
:1

61.000
1

60.000 0028.Pj/DAN.01.03/F46000000/2022
59.000
58.000
8688.0000

8553.0000 8553.0000

8278.0000

57.000
10734.8536

56.000 CONTRACTOR :
55.000
Bid. Persamaan +54.000
G STATION G
+165 Dalam Luar PT. HYDRO TECHNO UTAMA
62.688
62.278

62.553

62.823

Elevasi Tanah Asli


PROJECT :
20.000

15.000

10.000

10.000

Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 5.00 5.00


5.000

0.000

5.000

PEKERJAAN PEMBANGUNAN TALUD


PLTMG ALOR 10 MW
58.900

58.900

H Elevasi Rencana H

PENAMPANG POTONGAN DAN GALIAN


PENAMPANG POTONGAN Station +165 RETAINING WALL TYPE 1
I SCALE DRAWN SURVEYOR CHECKED APPROVED I

SYAIKHAN.A DEDEN. H
DATE DATE DATE DATE
SHEET NO :
PENAMPANG POTONGAN RETAINING WALL TYPE 1
CONTRACTOR DRAWING NO: REVISION:

J 037 SD.ALORPLTMG/HTU/02-2023 J
SCALE 1:50

PLN DRAWING NO :

1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14

SHOP DRAWING
A
KETERANGAN : A

LUAS AREA GALIAN 26.295 m2 LUAS AREA GALIAN 3.398 m2 : DRAINAGE 80X80

Mesjid Bts Gudang Bts


65.000 65.000
64.000 64.000
: PAGAR KAWAT DURI
63.000 63.000
62.000 62.000

:1
1
B B

:1
61.000 61.000

1
60.000 60.000
59.000 59.000 9040.0000
: RETAINING WALL TYPE 2
58.000 58.000
8800.0000

8688.0000

8553.0000

8278.0000

8275.0000

57.000 57.000
10734.8536 10721.8536

56.000 56.000
55.000 55.000
Bid. Persamaan +54.000 Bid. Persamaan +54.000 : GALIAN RETAINING WALL

STATION +165 Dalam Luar STATION +185 Dalam Luar


C C

62.823
62.553

62.688

63.040

62.800
62.278

62.275

62.810
Elevasi Tanah Asli Elevasi Tanah Asli
20.000

15.000

10.000

10.000

10.000

10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00

5.000

0.000

5.000

5.000

0.000

5.000
58.900

58.900

60.850

60.850
Elevasi Rencana Elevasi Rencana
D D

PENAMPANG POTONGAN Station +165 PENAMPANG POTONGAN Station +185


E E

PT. PLN (Persero)


LUAS AREA GALIAN 2.799 m2 LUAS AREA GALIAN 3.079 m2 UNIT INDUK PEMBANGUNAN NUSRA
UNIT PELAKSANA PROYEK NUSRA
Gudang Bts Gudang Bts
65.000 65.000
64.000 64.000
63.000 63.000
CONTRACT NO :
F F
62.000 62.000
61.000 61.000
60.000 60.000 0028.Pj/DAN.01.03/F46000000/2022
59.000 59.000
8945.0000

58.000 58.000
8795.0000

8545.0000

8490.0000

8350.0000

8260.0000

11031.8536

57.000 57.000
10366.8536

56.000 56.000 CONTRACTOR :


55.000 55.000
Bid. Persamaan +54.000 Bid. Persamaan +54.000
G STATION STATION G
+175 Dalam Luar +195 Dalam Luar PT. HYDRO TECHNO UTAMA
62.490

62.455

62.945
62.350

62.545

62.260

62.795

63.120
Elevasi Tanah Asli Elevasi Tanah Asli
PROJECT :
10.000

10.000

10.000

10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00
5.000

0.000

5.000

5.000

0.000

5.000
PEKERJAAN PEMBANGUNAN TALUD
PLTMG ALOR 10 MW
60.850

60.850

60.850

60.850
H Elevasi Rencana Elevasi Rencana H

PENAMPANG POTONGAN DAN GALIAN


PENAMPANG POTONGAN Station +175 PENAMPANG POTONGAN Station +195 RETAINING WALL TYPE 2
I SCALE DRAWN SURVEYOR CHECKED APPROVED I

SYAIKHAN.A DEDEN. H
DATE DATE DATE DATE
SHEET NO :
PENAMPANG POTONGAN RETAINING WALL TYPE 2
CONTRACTOR DRAWING NO: REVISION:

J 040 SD.ALORPLTMG/HTU/02-2023 J
SCALE 1:50

PLN DRAWING NO :

1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14

SHOP DRAWING
A
KETERANGAN : A

: DRAINAGE 80X80
LUAS AREA GALIAN 2.507 m2

Bts
65.000
64.000
: PAGAR KAWAT DURI
63.000
62.000
B 61.000 B
60.000
59.000 : RETAINING WALL TYPE 2
58.000
8710.0000

8430.0000

8010.0000

7990.0000

57.000
10651.8536

56.000
55.000
Bid. Persamaan +54.000 : GALIAN RETAINING WALL

STATION +205 Dalam Luar


C C

62.740
62.430

62.710
61.990

62.010
Elevasi Tanah Asli

10.000

10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00

5.000

0.000

5.000
60.850

60.850
Elevasi Rencana
D D

PENAMPANG POTONGAN Station +205


E E

PT. PLN (Persero)


LUAS AREA GALIAN 2.652 m2 UNIT INDUK PEMBANGUNAN NUSRA
UNIT PELAKSANA PROYEK NUSRA
Bts
65.000
64.000
63.000
CONTRACT NO :
F F
62.000
61.000
60.000 0028.Pj/DAN.01.03/F46000000/2022
59.000
58.000
8740.0000

8420.0000

8380.0000

8370.0000

57.000
10671.8536

56.000 CONTRACTOR :
55.000
Bid. Persamaan +54.000
G STATION G
+215 Dalam Luar PT. HYDRO TECHNO UTAMA
62.740

62.760
62.370

62.380

62.420

Elevasi Tanah Asli


PROJECT :
10.000

10.000

Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00


5.000

0.000

5.000

PEKERJAAN PEMBANGUNAN TALUD


PLTMG ALOR 10 MW
60.850

60.850

H Elevasi Rencana H

PENAMPANG POTONGAN DAN GALIAN


PENAMPANG POTONGAN Station +215 RETAINING WALL TYPE 2
I SCALE DRAWN SURVEYOR CHECKED APPROVED I

SYAIKHAN.A DEDEN. H
DATE DATE DATE DATE
SHEET NO :
PENAMPANG POTONGAN RETAINING WALL TYPE 2
CONTRACTOR DRAWING NO: REVISION:

J 041 SD.ALORPLTMG/HTU/02-2023 J
SCALE 1:50

PLN DRAWING NO :

1 2 3 4 5 6 7 8 9 10 11 12 13 14
INSPECTION REPORT EXCAVATION WORK

PROJECT : PEMBANGUNAN TALUD PLTMG ALOR 10 MW Report No


Contractor : PT.HYDRO TECHNO UTAMA AFI No.
Location / Area : ALOR , NUSA TENGGARA TIMUR Drawing No 0410-KIT.03.01-F46000000-2023
Inspected Item : Pekerjaan EXCAVATION WORK (RIVER)
Reference :

VOLUME
NO. POINT DEVIATION REMARKS
DESIGN ACTUAL

1 0-20 161.4

2 20-40 161.7

3 40-60 153.1

4 60-80 146.9

5 80-100 186.2

6 100-120 217.75

7 120-140 232.25

8 140-160 268.11

9 160-180 289.56

10 180-200 304.2

11 200-220 354.7

12 220-240 365.5

13 240-260 319.85

14 260-280 302.3

15 280-300 312.75

16 300-320 327.4

17 320-340 304.85

18 340-360 324.1

19 360-380 365.3

20 380-400 361.15

21 400-420 350.05

22 420-440 346.3

23 440-460 410.95
24 460-480 476.8

25 480-500 479.95

26 500-520 465.65

27 520-540 464.6

28 540-560 499.75

29 560-580 539.4

30 580-600 553.6

31 600-620 568.29

32 620-640 574.79

33 649-660 557.4

34 660-680 517.85

35 680-700 496.25

36 700-720 500.5

37 720-740 538.05

38 740-760 568.75

39 760-780 575

40 780-800 632.5

41 800-820 635.8

42 820-840 596.55

TOTAL 16807.85

Result Accepted Rejected

Dibuat Oleh : Diperiksa Oleh : Disetujui Oleh :


PT. HYDRO TECHNO UTAMA PLN PUSMANPRO PLN UPP NUSRA 3

SOLIHIN MARGARETA NEWA MINA EDHO TORSESA JAROSMAN


VOLUME GALIAN NORMALISASI SUNGAI

NO LUAS PENAMPANG JARAK


VOLUME
STA A B rata-rata A B rata-rata

0-20 8.365 7.775 8.070 20.000 20.000 20.000 161.400


20-40 7.775 8.395 8.085 20.000 20.000 20.000 161.700
40-60 8.395 6.915 7.655 20.000 20.000 20.000 153.100
60-80 6.915 7.775 7.345 20.000 20.000 20.000 146.900
80-100 7.775 10.845 9.310 20.000 20.000 20.000 186.200
100-120 10.845 10.930 10.888 20.000 20.000 20.000 217.750
120-140 10.930 12.295 11.613 20.000 20.000 20.000 232.250
140-160 12.295 14.516 13.406 20.000 20.000 20.000 268.110
160-180 14.516 14.440 14.478 20.000 20.000 20.000 289.560
180-200 14.440 15.980 15.210 20.000 20.000 20.000 304.200
200-220 15.980 19.490 17.735 20.000 20.000 20.000 354.700
220-240 19.490 17.060 18.275 20.000 20.000 20.000 365.500
240-260 17.060 14.925 15.993 20.000 20.000 20.000 319.850
260-280 14.925 15.305 15.115 20.000 20.000 20.000 302.300
280-300 15.305 15.970 15.638 20.000 20.000 20.000 312.750
300-320 15.970 16.770 16.370 20.000 20.000 20.000 327.400
320-340 16.770 13.715 15.243 20.000 20.000 20.000 304.850
340-360 13.715 18.695 16.205 20.000 20.000 20.000 324.100
360-380 18.695 17.835 18.265 20.000 20.000 20.000 365.300
380-400 17.835 18.280 18.058 20.000 20.000 20.000 361.150
400-420 18.280 16.725 17.503 20.000 20.000 20.000 350.050
420-440 16.725 17.905 17.315 20.000 20.000 20.000 346.300
440-460 17.905 23.190 20.548 20.000 20.000 20.000 410.950
460-480 23.190 24.490 23.840 20.000 20.000 20.000 476.800
480-500 24.490 23.505 23.998 20.000 20.000 20.000 479.950
500-520 23.505 23.060 23.283 20.000 20.000 20.000 465.650
520-540 23.060 23.400 23.230 20.000 20.000 20.000 464.600
540-560 23.400 26.575 24.988 20.000 20.000 20.000 499.750
560-580 26.575 27.365 26.970 20.000 20.000 20.000 539.400
580-600 27.365 27.995 27.680 20.000 20.000 20.000 553.600
600-620 27.995 28.834 28.415 20.000 20.000 20.000 568.290
620-640 28.834 28.645 28.740 20.000 20.000 20.000 574.790
649-660 28.645 27.095 27.870 20.000 20.000 20.000 557.400
660-680 27.095 24.690 25.893 20.000 20.000 20.000 517.850
680-700 24.690 24.935 24.813 20.000 20.000 20.000 496.250
700-720 24.935 25.115 25.025 20.000 20.000 20.000 500.500
720-740 25.115 28.690 26.903 20.000 20.000 20.000 538.050
740-760 28.690 28.185 28.438 20.000 20.000 20.000 568.750
760-780 28.185 29.315 28.750 20.000 20.000 20.000 575.000
780-800 29.315 33.935 31.625 20.000 20.000 20.000 632.500
800-820 33.935 29.645 31.790 20.000 20.000 20.000 635.800
820-840 29.645 30.010 29.828 20.000 20.000 20.000 596.550
TOTAL VOLUME GALIAN 16,807.850

Dibuat Oleh Diperiksa Disetujui


PT.HYDRO TECHNO UTAMA PUSMANPRO UPP NUSRA 3

Solihin Margareta Newa Mina Edho Torsesa Jarosman


BERITA ACARA
PENGUKURAN TALUD PLTMG ALOR 10 MW

Pada hari ini kamis , Tanggal Enam Belas , Bulan Februari , Tahun Dua Ribu Dua Puluh Tiga, telah
dilakukan pengukuran bersama antara PT, Hydro Techno Utama dan PT. PLN (Persero) UPP NUSA
TENGGARA 3 untuk pekerjaan Talud PLTMG alor 10mw yang beralamat di desa fanating kecamatan
teluk mutiara kabupaten alor provinsi Nusa Tenggara Timur dan untuk selanjutnya dibuatkan Gambar
Denah Talud,

Demikian Berita Acara ini kami buat dengan sebenarnya dan untuk dipergunakan semestinya

PT. HYDRO TECHNO UTAMA PT. PLN (Persero)


UPP NUSRA 3

.ry
SOLIHIN EDHO TORSESA JAROSIVIAN
1 2 3 4 5 6 7 8 9 10 11 12 13 14

SHOP DRAWING
LUAS AREA 8.395 m2
LUAS AREA 8.365 m2
A A

60.000
CL 60.000
CL
59.000 59.000
58.000 58.000
57.000 57.000
56.000 56.000 3386.0000
3403.0000 3391.0000

3264.0000
3303.0000

55.000 55.000
2793.0000

B B
STATION +0 Ki Ka STATION +40 Ki Ka

57.165

57.173

57.013

57.026

57.008

57.386
57.586

57.403

57.391

57.264

57.303
Elevasi Tanah Asli Elevasi Tanah Asli

10.000

10.000

10.000

10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00

5.000

0.000

5.000

5.000

0.000

5.000
C C

56.513

57.008

56.793

56.793

57.303
56.513

56.513
57.165

57.386

56.793
Elevasi Rencana Elevasi Rencana

D D

PENAMPANG POTONGAN Station +0 PENAMPANG POTONGAN Station +40

E E

PT. PLN (Persero)


UNIT INDUK PEMBANGUNAN NUSRA
UNIT PELAKSANA PROYEK NUSRA
LUAS AREA 7.775 m2 LUAS AREA 6.915 m2

60.000
CL 60.000
CL CONTRACT NO :
F F
59.000 59.000
58.000 58.000 0028.Pj/DAN.01.03/F46000000/2022
57.000 57.000
56.000 56.000 3597.0000

3546.0000

3341.0000

3298.0000
3426.0000

55.000 55.000
2934.0000

CONTRACTOR :

STATION +20 Ki Ka STATION +60 Ki Ka


G G
PT. HYDRO TECHNO UTAMA
57.209

57.165

57.187

57.162

57.176

57.597

57.546

57.341

57.298

57.426
Elevasi Tanah Asli Elevasi Tanah Asli
PROJECT :
10.000

10.000

10.000

10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00
5.000

0.000

5.000

5.000

0.000

5.000
PEKERJAAN PEMBANGUNAN TALUD
PLTMG ALOR 10 MW
H H
57.176
56.653

56.653

56.653

56.934

57.426
57.209

57.597

56.934

56.934
Elevasi Rencana Elevasi Rencana

PENAMPANG POTONGAN
DAN GALIAN SUNGAI

PENAMPANG POTONGAN Station +20 PENAMPANG POTONGAN Station +60


I SCALE DRAWN SURVEYOR CHECKED APPROVED I

SYAIKHAN.A DEDEN. H
DATE DATE DATE DATE
SHEET NO : CONTRACTOR DRAWING NO: REVISION:

J
PENAMPANG POTONGAN SUNGAI J
SCALE 1:50
005 SD.ALORPLTMG/HTU/02-2023

PLN DRAWING NO :

1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14

SHOP DRAWING
LUAS AREA 10.930 m2
LUAS AREA 7.770 m2
A A

60.000 CL 60.000 CL
59.000 59.000
58.000 58.000
57.000 57.000
56.000 56.000
55.000 55.000
B B
STATION +80 Ki Ka STATION +120 Ki Ka

57.702

57.614

57.574

57.588

57.598

58.213

58.122

58.066

58.063

58.062
Elevasi Tanah Asli Elevasi Tanah Asli

10.000

10.000

10.000

10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00

5.000

0.000

5.000

5.000

0.000

5.000
C C

57.074

57.074

57.598

57.355

57.355

58.062
57.702

57.074

58.213

57.355
Elevasi Rencana Elevasi Rencana

D D

PENAMPANG POTONGAN Station +80 PENAMPANG POTONGAN Station +120

E E

PT. PLN (Persero)


UNIT INDUK PEMBANGUNAN NUSRA
LUAS AREA 10.845 m2 LUAS AREA 12.295 m2 UNIT PELAKSANA PROYEK NUSRA

60.000 CL 60.000 CL CONTRACT NO :


F F
59.000 59.000
58.000 58.000 0028.Pj/DAN.01.03/F46000000/2022
57.000 57.000
56.000 56.000
55.000 55.000
CONTRACTOR :

STATION +100 Ki Ka STATION +140 Ki Ka


G G
PT. HYDRO TECHNO UTAMA
58.121

57.998

57.875

57.938

58.011

58.357

58.344

58.313

58.287

58.158
Elevasi Tanah Asli Elevasi Tanah Asli
PROJECT :
10.000

10.000

10.000

10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00
5.000

0.000

5.000

5.000

0.000

5.000
PEKERJAAN PEMBANGUNAN TALUD
PLTMG ALOR 10 MW
H H
58.011
57.214

57.214

57.214

57.495

57.495

58.158
58.121

58.357

57.495
Elevasi Rencana Elevasi Rencana

PENAMPANG POTONGAN
DAN GALIAN SUNGAI

PENAMPANG POTONGAN Station +100 PENAMPANG POTONGAN Station +140


I SCALE DRAWN SURVEYOR CHECKED APPROVED I

SYAIKHAN.A DEDEN. H
DATE DATE DATE DATE
SHEET NO : CONTRACTOR DRAWING NO: REVISION:

J
PENAMPANG POTONGAN SUNGAI J
SCALE 1:50
006 SD.ALORPLTMG/HTU/02-2023

PLN DRAWING NO :

1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14

SHOP DRAWING
LUAS AREA 14.516 m2 LUAS AREA 15.980 m2
A A

60.000 CL 60.000 CL
59.000 59.000
58.000 58.000
57.000 57.000
56.000 56.000
55.000 55.000
B
Bid. Persamaan +54.000 B
STATION +160 Ki Ka STATION +200 Ki Ka

58.684

58.638

58.541

58.628

58.663

58.921

58.933

58.953

59.058

59.146
Elevasi Tanah Asli Elevasi Tanah Asli

10.000

10.000

10.000

10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00

5.000

0.000

5.000

5.000

0.000

5.000
C C

57.635

57.635

58.663

57.916

57.916

59.146
58.684

57.635

58.921

57.916
Elevasi Rencana Elevasi Rencana

D D

PENAMPANG POTONGAN Station +160 PENAMPANG POTONGAN Station +200

E E

PT. PLN (Persero)


UNIT INDUK PEMBANGUNAN NUSRA
LUAS AREA 14.440 m2 LUAS AREA 19.490 m2 UNIT PELAKSANA PROYEK NUSRA

60.000 CL 60.000 CL
59.000 59.000
CONTRACT NO :
F F
58.000 58.000
57.000 57.000 0028.Pj/DAN.01.03/F46000000/2022
56.000 56.000
55.000 55.000

CONTRACTOR :
STATION +180 Ki Ka STATION +210 Ki Ka
G G
PT. HYDRO TECHNO UTAMA
58.733

58.719

58.745

58.749

58.753

59.487

59.402

59.131

59.352

59.368
Elevasi Tanah Asli Elevasi Tanah Asli

PROJECT :
10.000

10.000

10.000

10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00
5.000

0.000

5.000

5.000

0.000

5.000
PEKERJAAN PEMBANGUNAN TALUD
PLTMG ALOR 10 MW
58.753
57.775

57.775

57.775

58.000

58.000

58.056

59.368
58.733

59.487
H
Elevasi Rencana Elevasi Rencana H

PENAMPANG POTONGAN
DAN GALIAN SUNGAI
I PENAMPANG POTONGAN Station +180 PENAMPANG POTONGAN Station +210 SCALE DRAWN SURVEYOR CHECKED APPROVED I

SYAIKHAN.A DEDEN. H
DATE DATE DATE DATE
SHEET NO : CONTRACTOR DRAWING NO: REVISION:

J
PENAMPANG POTONGAN SUNGAI J
SCALE 1:50
007 SD.ALORPLTMG/HTU/02-2023

PLN DRAWING NO :

1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14

SHOP DRAWING
LUAS AREA 19.490 m2
LUAS AREA 14.925 m2
A A

60.000 CL 60.000 CL
59.000 59.000
58.000 58.000
57.000 57.000
56.000 56.000
55.000 55.000
B B
STATION +220 Ki Ka STATION +260 Ki Ka

59.487

59.402

59.312

59.352

59.368

59.435

59.408

59.338

59.247

59.017
Elevasi Tanah Asli Elevasi Tanah Asli

10.000

10.000

10.000

10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00

5.000

0.000

5.000

5.000

0.000

5.000
C C

58.056

58.056

59.368

58.336

58.336

58.336

59.017
59.487

58.056

59.435
Elevasi Rencana Elevasi Rencana

D D

PENAMPANG POTONGAN Station +220 PENAMPANG POTONGAN Station +260

E E

LUAS AREA 15.305 m2 PT. PLN (Persero)


UNIT INDUK PEMBANGUNAN NUSRA
LUAS AREA 17.060 m2
UNIT PELAKSANA PROYEK NUSRA

60.000
CL 60.000 CL
59.000 59.000
CONTRACT NO :
F F
58.000 58.000
57.000 57.000 0028.Pj/DAN.01.03/F46000000/2022
56.000 56.000
55.000 55.000

CONTRACTOR :
STATION +240 Ki Ka STATION +280 Ki Ka
G G
PT. HYDRO TECHNO UTAMA
59.489

59.379

59.319

59.302

59.298

59.617

59.532

59.482

59.478

59.443
Elevasi Tanah Asli Elevasi Tanah Asli

PROJECT :
10.000

10.000

10.000

10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00
5.000

0.000

5.000

5.000

0.000

5.000
PEKERJAAN PEMBANGUNAN TALUD
PLTMG ALOR 10 MW
58.196

58.196

58.196

59.298

58.477

58.477

58.477

59.443
59.489

59.617
H
Elevasi Rencana Elevasi Rencana H

PENAMPANG POTONGAN
DAN GALIAN SUNGAI
I PENAMPANG POTONGAN Station +240 PENAMPANG POTONGAN Station +280 SCALE DRAWN SURVEYOR CHECKED APPROVED I

SYAIKHAN.A DEDEN. H
DATE DATE DATE DATE
SHEET NO : CONTRACTOR DRAWING NO: REVISION:

J
PENAMPANG POTONGAN SUNGAI J
SCALE 1:50
008 SD.ALORPLTMG/HTU/02-2023

PLN DRAWING NO :

1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14

SHOP DRAWING
A LUAS AREA 13.715 m2 A

LUAS AREA 15.970 m2


61.000 CL 61.000 CL
60.000 60.000
59.000 59.000
58.000 58.000
57.000 57.000
B B
STATION +300 Ki Ka STATION +340 Ki Ka

59.487

59.642

59.745

59.658

59.372

59.905

59.760

59.844

59.833

59.827
Elevasi Tanah Asli Elevasi Tanah Asli

10.000

10.000

10.000

10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00

5.000

0.000

5.000

5.000

0.000

5.000
C C

58.617

59.372

58.898

58.898

59.827
59.487

58.617

58.617

59.905

58.898
Elevasi Rencana Elevasi Rencana

D D

PENAMPANG POTONGAN Station +300 PENAMPANG POTONGAN Station +340

E E

PT. PLN (Persero)


UNIT INDUK PEMBANGUNAN NUSRA
LUAS AREA 16.770 m2 LUAS AREA 18.695 m2
UNIT PELAKSANA PROYEK NUSRA

CL 61.000 CL CONTRACT NO :
61.000
F F
60.000
60.000
59.000
59.000 0028.Pj/DAN.01.03/F46000000/2022
58.000
58.000
57.000
57.000

STATION STATION +360 Ki Ka


CONTRACTOR :
+320 Ki Ka
G G

59.884

60.285

60.305

60.263

59.992
Elevasi Tanah Asli PT. HYDRO TECHNO UTAMA
59.965

59.876

59.841

59.908

59.943

Elevasi Tanah Asli

10.000

10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 PROJECT :

5.000

0.000

5.000
10.000

10.000

Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00


5.000

0.000

5.000

PEKERJAAN PEMBANGUNAN TALUD

59.038

59.038

59.038

59.992
59.884
Elevasi Rencana PLTMG ALOR 10 MW
58.757

58.757

59.943
59.965

58.757

H
Elevasi Rencana H

PENAMPANG POTONGAN
DAN GALIAN SUNGAI
I PENAMPANG POTONGAN Station +320 PENAMPANG POTONGAN Station +360 SCALE DRAWN SURVEYOR CHECKED APPROVED I

SYAIKHAN.A DEDEN. H
DATE DATE DATE DATE
SHEET NO : CONTRACTOR DRAWING NO: REVISION:

J
PENAMPANG POTONGAN SUNGAI J
SCALE 1:50
009 SD.ALORPLTMG/HTU/02-2023

PLN DRAWING NO :

1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14

SHOP DRAWING
A A
LUAS AREA 17.835 m2 LUAS AREA 16.725 m2

62.000 62.000 CL
61.000 CL 61.000
60.000 60.000
59.000 59.000
58.000 58.000
B B
STATION +380 Ki Ka STATION +420 Ki Ka

60.588

60.493

60.387

60.221

60.789

60.662

60.523

60.537

60.876
59.875
Elevasi Tanah Asli Elevasi Tanah Asli

10.000

10.000

10.000

10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00

5.000

0.000

5.000

5.000

0.000

5.000
C C

59.178

59.875

59.459

60.876
60.588

59.178

59.178

60.789

59.459

59.459
Elevasi Rencana Elevasi Rencana

D D

PENAMPANG POTONGAN Station +380 PENAMPANG POTONGAN Station +420

E E

PT. PLN (Persero)


UNIT INDUK PEMBANGUNAN NUSRA
LUAS AREA 17.905 m2
LUAS AREA 18.280 m2 UNIT PELAKSANA PROYEK NUSRA

62.000
CL 62.000 CL
61.000 61.000 CONTRACT NO :
F 60.000 60.000 F
59.000 59.000
58.000 58.000 0028.Pj/DAN.01.03/F46000000/2022

STATION +400 Ki Ka STATION +440 Ki Ka


CONTRACTOR :
60.674

60.602

60.452

60.556

60.698

60.673

60.739

60.764

60.875

61.096
Elevasi Tanah Asli Elevasi Tanah Asli
G G
PT. HYDRO TECHNO UTAMA
10.000

10.000

10.000

10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00
5.000

0.000

5.000

5.000

0.000

5.000
PROJECT :
59.318

59.318

60.698

59.599

59.599

59.599

61.096
60.674

59.318

60.673
Elevasi Rencana Elevasi Rencana PEKERJAAN PEMBANGUNAN TALUD
PLTMG ALOR 10 MW
H H

PENAMPANG POTONGAN
PENAMPANG POTONGAN Station +400 PENAMPANG POTONGAN Station +440 DAN GALIAN SUNGAI
I SCALE DRAWN SURVEYOR CHECKED APPROVED I

SYAIKHAN.A DEDEN. H
DATE DATE DATE DATE
SHEET NO : CONTRACTOR DRAWING NO: REVISION:

J
PENAMPANG POTONGAN SUNGAI J
SCALE 1:50
010 SD.ALORPLTMG/HTU/02-2023

PLN DRAWING NO :

1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14

SHOP DRAWING
LUAS AREA 23.505 m2
LUAS AREA 23.190 m2
A A

63.000 CL 63.000 CL
62.000 62.000
61.000 61.000
60.000 60.000
59.000 59.000
58.000 58.000
B B
STATION +460 Ki Ka STATION +500 Ki Ka

61.163

61.197

61.202

61.456

61.608

61.721

61.652

61.548

61.558

61.586
Elevasi Tanah Asli Elevasi Tanah Asli

10.000

10.000

10.000

10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00

5.000

0.000

5.000

5.000

0.000

5.000
C C

59.739

61.608

60.019

60.019

61.586
61.163

59.739

59.739

61.721

60.019
Elevasi Rencana Elevasi Rencana

D D

PENAMPANG POTONGAN Station +460 PENAMPANG POTONGAN Station +500

E E

LUAS AREA 23.505 m2 PT. PLN (Persero)


LUAS AREA 24.490 m2 UNIT INDUK PEMBANGUNAN NUSRA

63.000
CL 63.000
CL UNIT PELAKSANA PROYEK NUSRA

62.000 62.000
61.000 61.000 CONTRACT NO :
F 60.000 60.000 F
59.000 59.000
58.000 58.000 0028.Pj/DAN.01.03/F46000000/2022

STATION +480 Ki Ka STATION Ki Ka


CONTRACTOR :
60.231
61.423

61.476

61.495

61.564

61.608

61.721

61.652

61.548

61.558

61.586
Elevasi Tanah Asli Elevasi Tanah Asli
G G
PT. HYDRO TECHNO UTAMA
20.000
10.000

10.000

10.000

10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00
5.000

0.000

5.000

5.000

0.000

5.000
PROJECT :
59.879

59.879

59.879

61.608

60.019

60.019

61.586
61.423

61.721

60.019
Elevasi Rencana Elevasi Rencana PEKERJAAN PEMBANGUNAN TALUD
PLTMG ALOR 10 MW
H H

PENAMPANG POTONGAN
PENAMPANG POTONGAN Station +480 PENAMPANG POTONGAN Station +510 DAN GALIAN SUNGAI
I SCALE DRAWN SURVEYOR CHECKED APPROVED I

SYAIKHAN.A DEDEN. H
DATE DATE DATE DATE
SHEET NO : CONTRACTOR DRAWING NO: REVISION:

J
PENAMPANG POTONGAN SUNGAI J
SCALE 1:50
011 SD.ALORPLTMG/HTU/02-2023

PLN DRAWING NO :

1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14

SHOP DRAWING
LUAS AREA 23.400 m2
A LUAS AREA 23.060 m2 A

63.000 CL 63.000 CL
62.000 62.000
61.000 61.000
60.000 60.000
59.000 59.000
B B
STATION +520 Ki Ka STATION +550 Ki Ka

61.609

61.623

61.668

61.798

61.603

61.985

61.921

62.000

61.806

61.769
Elevasi Tanah Asli Elevasi Tanah Asli

10.000

10.000

10.000

10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00

5.000

0.000

5.000

5.000

0.000

5.000
C C

60.159

61.603
60.159

60.159

60.370

60.300

61.769
61.609

61.985

60.300
Elevasi Rencana Elevasi Rencana

D D

PENAMPANG POTONGAN Station +520 PENAMPANG POTONGAN Station +550

E E

LUAS AREA 26.575 m2 PT. PLN (Persero)


LUAS AREA 23.400 m2
UNIT INDUK PEMBANGUNAN NUSRA
UNIT PELAKSANA PROYEK NUSRA
63.000 CL
63.000 CL
62.000
62.000 61.000 CONTRACT NO :
F 61.000 60.000 F
60.000 59.000
59.000 0028.Pj/DAN.01.03/F46000000/2022
STATION +560 Ki Ka
STATION +540 Ki Ka
CONTRACTOR :

62.183

62.176

62.131

62.328

62.227
Elevasi Tanah Asli
61.985

61.921

61.853

61.806

61.769

Elevasi Tanah Asli


G G
PT. HYDRO TECHNO UTAMA

10.000

10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00

5.000

0.000

5.000
10.000

10.000

Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00


5.000

0.000

5.000

PROJECT :

62.183

60.440

60.440

60.440

62.227
Elevasi Rencana
60.300

60.300

61.769
61.985

60.300

Elevasi Rencana PEKERJAAN PEMBANGUNAN TALUD


PLTMG ALOR 10 MW
H H

PENAMPANG POTONGAN Station +540 PENAMPANG POTONGAN Station +560 PENAMPANG POTONGAN
DAN GALIAN SUNGAI
I SCALE DRAWN SURVEYOR CHECKED APPROVED I

SYAIKHAN.A DEDEN. H
DATE DATE DATE DATE
SHEET NO : CONTRACTOR DRAWING NO: REVISION:

J
PENAMPANG POTONGAN SUNGAI J
SCALE 1:50
012 SD.ALORPLTMG/HTU/02-2023

PLN DRAWING NO :

1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14

SHOP DRAWING
LUAS AREA 28.834 m2
A LUAS AREA 27.365 m2 A

64.000 CL 64.000 CL
63.000 63.000
62.000 62.000
61.000 61.000
60.000 60.000
B B
STATION +580 Ki Ka STATION +620 Ki Ka

62.231
62.394

62.416

62.432

62.368

62.265

62.542

62.704

62.796

62.809

62.843
Elevasi Tanah Asli Elevasi Tanah Asli

20.000

20.000
10.000

10.000

10.000

10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00

5.000

0.000

5.000

5.000

0.000

5.000
C C

60.581

60.581

62.265

60.861

60.861

62.843
62.394

60.581

62.542

60.861
Elevasi Rencana Elevasi Rencana

D D

PENAMPANG POTONGAN Station +580 PENAMPANG POTONGAN Station +620

E E

LUAS AREA 27.995 m2 LUAS AREA 28.645 m2


PT. PLN (Persero)
UNIT INDUK PEMBANGUNAN NUSRA

64.000
CL 64.000 CL
UNIT PELAKSANA PROYEK NUSRA

63.000 63.000
62.000 62.000 CONTRACT NO :
F 61.000 61.000 F

60.000 60.000
0028.Pj/DAN.01.03/F46000000/2022
STATION +600 Ki Ka STATION +640 Ki Ka
CONTRACTOR :
62.455

62.583

62.631

62.548

62.698

62.673

62.842

62.983

62.904

62.862
Elevasi Tanah Asli Elevasi Tanah Asli
G G
PT. HYDRO TECHNO UTAMA
10.000

10.000

10.000

10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00
5.000

0.000

5.000

5.000

0.000

5.000
PROJECT :
60.721

60.721

62.698

61.001

61.001

62.862
62.455

60.721

62.673

61.001
Elevasi Rencana Elevasi Rencana
PEKERJAAN PEMBANGUNAN TALUD
PLTMG ALOR 10 MW
H H

PENAMPANG POTONGAN Station +600 PENAMPANG POTONGAN Station +640 PENAMPANG POTONGAN
DAN GALIAN SUNGAI
I SCALE DRAWN SURVEYOR CHECKED APPROVED I

SYAIKHAN.A DEDEN. H
DATE DATE DATE DATE
SHEET NO : CONTRACTOR DRAWING NO: REVISION:

J
PENAMPANG POTONGAN SUNGAI J
SCALE 1:50
013 SD.ALORPLTMG/HTU/02-2023

PLN DRAWING NO :

1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14

SHOP DRAWING
LUAS AREA 27.095 m2 LUAS AREA 24.935m2
A A
CL CL
65.000 65.000
64.000 64.000
63.000 63.000
62.000 62.000
61.000 61.000
60.000 60.000
B B
STATION +660 Ki Ka STATION +700 Ki Ka

62.871

62.923

62.967

62.955

62.921

62.654

62.943

63.122

63.219

63.254
Elevasi Tanah Asli Elevasi Tanah Asli

10.000

10.000

10.000

10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00

5.000

0.000

5.000

5.000

0.000

5.000
C C

61.142

61.142

62.921

61.422

61.422

61.422

63.254
62.871

61.142

62.654
Elevasi Rencana Elevasi Rencana

D D

PENAMPANG POTONGAN Station +660 PENAMPANG POTONGAN Station +700

E E

LUAS AREA 24.690 m2 LUAS AREA 25.115 m2


PT. PLN (Persero)
CL CL UNIT INDUK PEMBANGUNAN NUSRA
65.000 65.000 UNIT PELAKSANA PROYEK NUSRA
64.000 64.000
63.000 63.000
62.000 62.000 CONTRACT NO :
F 61.000 61.000 F

60.000 60.000
0028.Pj/DAN.01.03/F46000000/2022
STATION Ki Ka STATION +720 Ki Ka
CONTRACTOR :
62.553

62.802

62.984

62.998

63.118

63.309

63.285

63.185

63.239

63.347
Elevasi Tanah Asli Elevasi Tanah Asli
G G
PT. HYDRO TECHNO UTAMA
10.000

10.000

10.000

10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00
5.000

0.000

5.000

5.000

0.000

5.000
PROJECT :
63.118
62.553

61.282

61.282

61.562

61.562

61.562

63.347
61.282

63.309
Elevasi Rencana Elevasi Rencana
PEKERJAAN PEMBANGUNAN TALUD
PLTMG ALOR 10 MW
H H

PENAMPANG POTONGAN Station +680 PENAMPANG POTONGAN Station +720 PENAMPANG POTONGAN
DAN GALIAN SUNGAI
I SCALE DRAWN SURVEYOR CHECKED APPROVED I

SYAIKHAN.A DEDEN. H
DATE DATE DATE DATE
SHEET NO : CONTRACTOR DRAWING NO: REVISION:

J
PENAMPANG POTONGAN SUNGAI J
SCALE 1:50
014 SD.ALORPLTMG/HTU/02-2023

PLN DRAWING NO :

1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14

SHOP DRAWING
LUAS AREA 28.690 m2
A LUAS AREA 29.315 m2 A
CL
65.000 CL
64.000 65.000
63.000 64.000
62.000 63.000
61.000 62.000
60.000 61.000
B B
STATION +740 Ki Ka STATION +780 Ki Ka

63.731

63.594

63.621

63.632

63.665

63.915

63.874

63.952

63.986

63.894
Elevasi Tanah Asli Elevasi Tanah Asli

10.000

10.000

10.000

10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00

5.000

0.000

5.000

5.000

0.000

5.000
C C

63.665
61.703

61.703

61.703

61.983

61.983

63.894
63.731

63.915

61.983
Elevasi Rencana Elevasi Rencana

D D

PENAMPANG POTONGAN Station +740 PENAMPANG POTONGAN Station +780

E E

LUAS AREA 28.185 m2 PT. PLN (Persero)


LUAS AREA 33.935 m2
UNIT INDUK PEMBANGUNAN NUSRA
CL CL UNIT PELAKSANA PROYEK NUSRA
65.000 65.000
64.000 64.000
63.000 63.000 CONTRACT NO :
F 62.000 62.000 F

61.000 61.000
0028.Pj/DAN.01.03/F46000000/2022
STATION +760 Ki Ka STATION Ki Ka
CONTRACTOR :
63.873

63.799

63.689

63.678

63.664

64.668

64.546

64.311

64.302

64.287
Elevasi Tanah Asli Elevasi Tanah Asli
G G
PT. HYDRO TECHNO UTAMA
10.000

10.000

10.000

10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00
5.000

0.000

5.000

5.000

0.000

5.000
PROJECT :
61.843

61.843

61.843

63.664
63.873

62.124

62.124

62.124

64.287
64.668
Elevasi Rencana Elevasi Rencana
PEKERJAAN PEMBANGUNAN TALUD
PLTMG ALOR 10 MW
H H

PENAMPANG POTONGAN Station +800


PENAMPANG POTONGAN Station +760 PENAMPANG POTONGAN
DAN GALIAN SUNGAI
I SCALE DRAWN SURVEYOR CHECKED APPROVED I

SYAIKHAN.A DEDEN. H
DATE DATE DATE DATE
SHEET NO : CONTRACTOR DRAWING NO: REVISION:

J
PENAMPANG POTONGAN SUNGAI J
SCALE 1:50
015 SD.ALORPLTMG/HTU/02-2023

PLN DRAWING NO :

1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14

SHOP DRAWING
A LUAS AREA 29.645 m2 A

CL
65.000
64.000
63.000
62.000
61.000
B B
STATION +820 Ki Ka

64.085

64.216

64.392

64.113

64.201
Elevasi Tanah Asli

10.000

10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00

5.000

0.000

5.000
C C

62.264

64.201
64.085

62.264

62.264
Elevasi Rencana

D D

PENAMPANG POTONGAN Station +820

E E

LUAS AREA 30.010 m2


PT. PLN (Persero)
CL UNIT INDUK PEMBANGUNAN NUSRA
66.000 UNIT PELAKSANA PROYEK NUSRA
65.000
64.000
63.000 CONTRACT NO :
F 62.000 F

61.000
0028.Pj/DAN.01.03/F46000000/2022
STATION +840 Ki Ka
CONTRACTOR :
65.046

64.542

64.404

64.268

64.302

Elevasi Tanah Asli


G G
PT. HYDRO TECHNO UTAMA
10.000

10.000

Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00


5.000

0.000

5.000

PROJECT :
62.404

62.404

64.302
65.046

62.404

Elevasi Rencana
PEKERJAAN PEMBANGUNAN TALUD
PLTMG ALOR 10 MW
H H

PENAMPANG POTONGAN Station +840 PENAMPANG POTONGAN


DAN GALIAN SUNGAI
I SCALE DRAWN SURVEYOR CHECKED APPROVED I

SYAIKHAN.A DEDEN. H
DATE DATE DATE DATE
SHEET NO : CONTRACTOR DRAWING NO: REVISION:

J
PENAMPANG POTONGAN SUNGAI J
SCALE 1:50
016 SD.ALORPLTMG/HTU/02-2023

PLN DRAWING NO :

1 2 3 4 5 6 7 8 9 10 11 12 13 14
INSPECTION REPORT GABION / BRONJONG

PROJECT : PEMBANGUNAN TALUD PLTMG ALOR 10 MW Report No


Contractor : PT.HYDRO TECHNO UTAMA AFI No.
Location / Area : ALOR , NUSA TENGGARA TIMUR Drawing No 0480-KIT.03.01-F46000000-2023
Inspected Item : Pekerjaan Pemasangan Gabion / Bronjong
Reference :

VOLUME
NO. POINT DEVIATION REMARKS
DESIGN ACTUAL

STA.210-
1 135
STA.240
STA.240-
2 240
STA.300
STA.300-
3 210
STA.360
STA.360-
4 300
STA.460
STA.460-
5 50
STA.480
STA.480-
6 75
STA.510

TOTAL 1010

Result Accepted Rejected

Dibuat Oleh : Diperiksa Oleh : Disetujui Oleh :


PT. HYDRO TECHNO UTAMA PLN PUSMANPRO PLN UPP NUSRA 3

SOLIHIN MARGARETA NEWA MINA EDHO TORSESA JAROSMAN


VOLUME PEMASANGAN BRONJONG

Gabion / Bronjong (2,0 m x 1,0 m x 0,5 m Dia 4 mm)


Qty Per Jumlah
STA Trap
STA.210-STA.240 30.00 X 15.00 X 9.00 135.0
STA.240-STA.300 60.00 X 30.00 X 8.00 240.0
STA.300-STA.360 60.00 X 30.00 X 7.00 210.0
STA.360-STA.460 100.00 X 50.00 X 6.00 300.0
STA.460-STA.480 20.00 X 10.00 X 5.00 50.0
STA.480-STA.510 30.00 X 15.00 X 5.00 75.0
300.00
TOTAL VOLUME 1,010.0 M³

Dibuat Oleh Diperiksa Disetujui


PT.HYDRO TECHNO UTAMA PUSMANPRO UPP NUSRA 3

Solihin Margareta Newa Mina Edho Torsesa Jarosman


1 2 3 4 5 6 7 8 9 10 11 12 13 14

SHOP DRAWING
LUAS AREA 9.52 m2 LUAS AREA 11.15 m2
LUAS AREA 1.09 m2 LUAS AREA 0.795 m2
KETERANGAN :
A A
CL CL
65.000 65.000
64.000 64.000 : PAGAR KAWAT DURI
63.000 63.000
62.000 62.000
2 2
1: 1:
61.000 61.000
60.000 60.000 : TIMBUNAN TANAH

B 59.000 59.000 B
58.000 58.000
57.000 5541.0000

5532.0000

5487.0000

5402.0000

5312.0000
57.000 5518.0000

5512.0000

5489.0000

5379.0000

5319.0000
: GALIAN BRONJONG
56.000 4000.0000

56.000 4196.0000

55.000 55.000
Bid. Persamaan +54.000 Bid. Persamaan +54.000
STATION +210 STATION +240 Ki

59.541

59.532

59.487

59.402

59.131

59.518

59.512

59.489

59.379

59.319
C Elevasi Tanah Asli Elevasi Tanah Asli C
20.000

20.000
15.000

10.000

15.000

10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00

5.000

0.000

5.000

0.000
59.487

58.000

58.000

58.196

58.196
59.489
Elevasi Rencana Elevasi Rencana
D D

PENAMPANG POTONGAN Station +210 PENAMPANG POTONGAN Station +240


E E

PT. PLN (Persero)


LUAS AREA 9.52 m2 LUAS AREA 10.13 m2 UNIT INDUK PEMBANGUNAN NUSRA
LUAS AREA 1.09 m2 LUAS AREA 0.839 m2 UNIT PELAKSANA PROYEK NUSRA
CL CL
65.000 65.000
64.000 64.000 CONTRACT NO :
F 63.000 63.000 F
62.000 62.000
0028.Pj/DAN.01.03/F46000000/2022
2
1: 1:
2
61.000 61.000
60.000 60.000
59.000 59.000
58.000 58.000
CONTRACTOR :
57.000 5541.0000 5532.0000

5487.0000

5402.0000

5312.0000
57.000 5879.0000

5856.0000

5435.0000

5408.0000

5338.0000

56.000 56.000
4336.0000

4056.0000

G 55.000 55.000 G
Bid. Persamaan +54.000 Bid. Persamaan +54.000 PT. HYDRO TECHNO UTAMA
STATION +220 STATION +260
PROJECT :
59.541

59.532

59.487

59.402

59.312

59.879

59.856

59.435

59.408

59.338
Elevasi Tanah Asli Elevasi Tanah Asli
PEKERJAAN PEMBANGUNAN TALUD
PLTMG ALOR 10 MW
20.000

20.000
15.000

10.000

15.000

10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00
5.000

0.000

5.000

0.000
H H
58.056

58.056

58.336

58.336
59.487

59.435
Elevasi Rencana Elevasi Rencana

PENAMPANG POTONGAN GALIAN


DAN URUGAN BRONJONG
I SCALE DRAWN SURVEYOR CHECKED APPROVED I

PENAMPANG POTONGAN Station +220 PENAMPANG POTONGAN Station +260


SYAIKHAN.A DEDEN. H
DATE DATE DATE DATE
SHEET NO : CONTRACTOR DRAWING NO: REVISION:

J
PENAMPANG POTONGAN BRONJONG J
SCALE 1:50
020 SD.ALORPLTMG/HTU/02-2023

PLN DRAWING NO :

1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14

SHOP DRAWING
LUAS AREA 10.18 m2 LUAS AREA 7.75 m2
LUAS AREA 0.933 m2 LUAS AREA 1.012 m2
KETERANGAN :
A A
CL CL
65.000 65.000
64.000 64.000 : PAGAR KAWAT DURI
63.000 63.000
62.000 62.000
2 2
1: 1:
61.000 61.000
60.000 60.000 : TIMBUNAN TANAH

B 59.000 59.000 B
58.000 58.000
57.000 5732.0000

5674.0000

5617.0000

5532.0000

5482.0000
57.000 5985.0000 5978.0000

5965.0000

5876.0000

5841.0000

: GALIAN BRONJONG
56.000 56.000
4757.0000

4477.0000

55.000 55.000
Bid. Persamaan +54.000 Bid. Persamaan +54.000
STATION +280 Ki STATION +320 Ki

59.732

59.674

59.617

59.532

59.482

59.985

59.978

59.965

59.876

59.841
C Elevasi Tanah Asli Elevasi Tanah Asli C
20.000

20.000
15.000

10.000

15.000

10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00

5.000

0.000

5.000

0.000
58.477

58.477

58.757

58.757
59.617

59.965
Elevasi Rencana Elevasi Rencana
D D

PENAMPANG POTONGAN Station +280 PENAMPANG POTONGAN Station +320

E E

LUAS AREA 8.11 m2 PT. PLN (Persero)


LUAS AREA 11.21 m2 LUAS AREA 1.027 m2 UNIT INDUK PEMBANGUNAN NUSRA
LUAS AREA 0.965 m2 CL UNIT PELAKSANA PROYEK NUSRA
CL 65.000
65.000 64.000
64.000 63.000 CONTRACT NO :
F 63.000 62.000 F
2
1:
62.000 61.000
61.000 1:
2
60.000 0028.Pj/DAN.01.03/F46000000/2022
60.000 59.000
59.000 58.000
58.000 57.000 5998.0000

5953.0000

5905.0000

5760.0000
5844.0000

CONTRACTOR :
57.000 56.000
4898.0000

5745.0000

5642.0000

5558.0000

5509.0000

5487.0000

56.000 55.000
Bid. Persamaan +54.000
4617.0000

G 55.000 G
Bid. Persamaan +54.000 PT. HYDRO TECHNO UTAMA
STATION +340 Ki
STATION +300

59.998

59.953

59.905

59.760

59.844
Elevasi Tanah Asli PROJECT :
59.558

59.509

59.487

59.642

59.745

Elevasi Tanah Asli


PEKERJAAN PEMBANGUNAN TALUD

20.000

15.000

10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00

5.000

0.000
PLTMG ALOR 10 MW
20.000

15.000

10.000

Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00


5.000

0.000

H H

58.898

58.898
59.905
Elevasi Rencana
58.617

58.617
59.487

Elevasi Rencana

PENAMPANG POTONGAN GALIAN


DAN URUGAN BRONJONG
I
PENAMPANG POTONGAN Station +300 PENAMPANG POTONGAN Station +340 SCALE DRAWN SURVEYOR CHECKED APPROVED I

SYAIKHAN.A DEDEN. H
DATE DATE DATE DATE
SHEET NO : CONTRACTOR DRAWING NO: REVISION:

J
PENAMPANG POTONGAN BRONJONG J
SCALE 1:50
021 SD.ALORPLTMG/HTU/02-2023

PLN DRAWING NO :

1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14

SHOP DRAWING
LUAS AREA 4.00 m2 LUAS AREA 3.60 m2
LUAS AREA 1.494 m2 LUAS AREA 1.638 m2
KETERANGAN :
A A
CL CL
65.000 65.000
64.000 64.000 : PAGAR KAWAT DURI
63.000 63.000
62.000 2
62.000 2
1: 1:
61.000 61.000
60.000 60.000 : TIMBUNAN TANAH

B 59.000 59.000 B
58.000 58.000
57.000 57.000
6742.0000 6722.0000

6674.0000

6665.0000

6643.0000

6602.0000

6588.0000

: GALIAN BRONJONG
6493.0000

6452.0000

6387.0000

5318.0000

5178.0000

56.000 56.000
55.000 55.000
Bid. Persamaan +54.000 Bid. Persamaan +54.000
STATION +380 Ki STATION +400 Ki
60.665

60.643

60.588

60.493

60.387

60.742

60.722

60.674

60.602

60.452
C Elevasi Tanah Asli
20.000
Elevasi Tanah Asli C

20.000
15.000

10.000

15.000

10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00

5.000

0.000

5.000

0.000
59.178

59.178

59.318

59.318
60.588

60.674
Elevasi Rencana Elevasi Rencana
D D

PENAMPANG POTONGAN Station +380 PENAMPANG POTONGAN Station +400

E E

PT. PLN (Persero)


LUAS AREA 7.02 m2 LUAS AREA 3.12 m2 UNIT INDUK PEMBANGUNAN NUSRA
LUAS AREA 1.067 m2 LUAS AREA 1.818 m2 UNIT PELAKSANA PROYEK NUSRA
CL CL
65.000 65.000
64.000 64.000 CONTRACT NO :
F 63.000 63.000 F
62.000 62.000
0028.Pj/DAN.01.03/F46000000/2022
2
2 1:
1:
61.000 61.000
60.000 60.000
59.000 59.000
58.000 58.000
CONTRACTOR :
57.000 57.000
6876.0000

6816.0000

6789.0000

6662.0000

6523.0000

6432.0000

6395.0000

6305.0000

6285.0000

5884.0000

5459.0000

5038.0000

56.000 56.000
G 55.000 55.000 G
Bid. Persamaan +54.000 Bid. Persamaan +54.000 PT. HYDRO TECHNO UTAMA
STATION +360 Ki STATION +420 Ki
PROJECT :
60.432

60.395

60.285

60.305
59.884

60.876

60.816

60.789

60.662

60.523
Elevasi Tanah Asli Elevasi Tanah Asli
PEKERJAAN PEMBANGUNAN TALUD
PLTMG ALOR 10 MW
20.000

20.000
15.000

10.000

15.000

10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00
5.000

0.000

5.000

0.000
H H
59.038

59.038
59.884

60.789

59.459

59.459
Elevasi Rencana Elevasi Rencana

PENAMPANG POTONGAN GALIAN


DAN URUGAN BRONJONG
I
PENAMPANG POTONGAN Station +360 PENAMPANG POTONGAN Station +420 SCALE DRAWN SURVEYOR CHECKED APPROVED I

SYAIKHAN.A DEDEN. H
DATE DATE DATE DATE

PENAMPANG POTONGAN BRONJONG SHEET NO : CONTRACTOR DRAWING NO: REVISION:

J
SCALE 1:50 J
022 SD.ALORPLTMG/HTU/02-2023

PLN DRAWING NO :

1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14

SHOP DRAWING
LUAS AREA 3.77 m2 LUAS AREA 0.94 m2
LUAS AREA 1.714m2 LUAS AREA 2.635 m2 KETERANGAN :
A A
CL CL
65.000 65.000
64.000 64.000
: PAGAR KAWAT DURI
63.000 63.000
62.000 62.000 2
1:
2 1:
61.000 61.000
60.000 60.000
: TIMBUNAN TANAH
59.000 59.000
B B
58.000 58.000 7368.0000
7423.0000
7476.0000
7495.0000

57.000 57.000
6764.0000

6739.0000

6673.0000

6592.0000

6554.0000

6231.0000

: GALIAN BRONJONG
5879.0000

5599.0000

56.000 56.000
55.000 55.000
Bid. Persamaan +54.000 Bid. Persamaan +54.000
STATION +440 STATION +480 Ki

60.554

60.592

60.673

60.739

60.764

60.231

61.368

61.423

61.476

61.495
C Elevasi Tanah Asli 20.000 Elevasi Tanah Asli C

20.000
15.000

10.000

15.000

10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00

5.000

0.000

5.000

0.000
59.599

59.599

59.879

59.879
60.673

61.423
Elevasi Rencana Elevasi Rencana

D D

PENAMPANG POTONGAN Station +440 PENAMPANG POTONGAN Station +480


E E

LUAS AREA 1.73 m2 LUAS AREA 0.289 m2


PT. PLN (Persero)
UNIT INDUK PEMBANGUNAN NUSRA
LUAS AREA 2.137 m2 LUAS AREA 3.302m2
UNIT PELAKSANA PROYEK NUSRA
CL CL
65.000 65.000
64.000 64.000
CONTRACT NO :
F 63.000 63.000 F
62.000 2
62.000
1:
61.000 61.000
0028.Pj/DAN.01.03/F46000000/2022
60.000 60.000
59.000 59.000
58.000 7132.0000
7163.0000
7197.0000 7202.0000
58.000 8032.0000

7721.0000

7652.0000

7548.0000

57.000 57.000 CONTRACTOR :


6864.0000

6448.0000

6019.0000

5739.0000

56.000 56.000
55.000 55.000
G Bid. Persamaan +54.000 Bid. Persamaan +54.000 PT. HYDRO TECHNO UTAMA G

STATION +460 Ki STATION +500


PROJECT :
60.864

61.132

61.163

61.197

61.202

60.448

62.032

61.721

61.652

61.548
Elevasi Tanah Asli Elevasi Tanah Asli
PEKERJAAN PEMBANGUNAN TALUD
20.000

20.000
15.000

10.000

15.000

10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 PLTMG ALOR 10 MW
5.000

0.000

5.000

0.000
H H
59.739

59.739

61.721

60.019

60.019
61.163

Elevasi Rencana Elevasi Rencana

PENAMPANG POTONGAN GALIAN


DAN URUGAN BRONJONG
I SCALE DRAWN SURVEYOR CHECKED APPROVED I

PENAMPANG POTONGAN Station +460 PENAMPANG POTONGAN Station +500


SYAIKHAN.A DEDEN. H
DATE DATE DATE DATE
SHEET NO : CONTRACTOR DRAWING NO: REVISION:

J
PENAMPANG POTONGAN BRONJONG J
SCALE 1:50
023 SD.ALORPLTMG/HTU/02-2023

PLN DRAWING NO :

1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14

SHOP DRAWING
LUAS AREA 0.289 m2
LUAS AREA 3.302m2 KETERANGAN :
A A
CL
65.000
64.000
63.000 : PAGAR KAWAT DURI
62.000
61.000
60.000
59.000 : TIMBUNAN TANAH

B 58.000 8032.0000

7721.0000

7652.0000

7548.0000
B
57.000
6448.0000

6019.0000

: GALIAN BRONJONG
56.000
55.000
Bid. Persamaan +54.000
STATION +510

60.448

62.032

61.721

61.652

61.548
C Elevasi Tanah Asli C

20.000

15.000

10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00

5.000

0.000
60.019

60.019
61.721
Elevasi Rencana

D D

PENAMPANG POTONGAN Station +510


E E

PT. PLN (Persero)


UNIT INDUK PEMBANGUNAN NUSRA
UNIT PELAKSANA PROYEK NUSRA

CONTRACT NO :
F F

0028.Pj/DAN.01.03/F46000000/2022

CONTRACTOR :

G G
PT. HYDRO TECHNO UTAMA

PROJECT :

PEKERJAAN PEMBANGUNAN TALUD


PLTMG ALOR 10 MW
H H

PENAMPANG POTONGAN GALIAN


DAN URUGAN BRONJONG
I SCALE DRAWN SURVEYOR CHECKED APPROVED I

SYAIKHAN.A DEDEN. H
DATE DATE DATE DATE
SHEET NO : CONTRACTOR DRAWING NO: REVISION:

J
PENAMPANG POTONGAN BRONJONG J
SCALE 1:50
024 SD.ALORPLTMG/HTU/02-2023

PLN DRAWING NO :

1 2 3 4 5 6 7 8 9 10 11 12 13 14
INSPECTION REPORT RETAINING WALL

PROJECT : PEMBANGUNAN TALUD PLTMG ALOR 10 MW Report No


Contractor : PT.HYDRO TECHNO UTAMA AFI No.
Location / Area : ALOR , NUSA TENGGARA TIMUR Drawing No 0509-KIT.03.01-F46000000-2023
Inspected Item : Pekerjaan Volume Beton Retaining Wall
Reference :

VOLUME
NO. POINT DEVIATION REMARKS
DESIGN ACTUAL

1 TYPE 1 582.20

2 TYPE 2 70.00

TOTAL 652.20

Result Accepted Rejected

Dibuat Oleh : Diperiksa Oleh : Disetujui Oleh :


PT. HYDRO TECHNO UTAMA PLN PUSMANPRO PLN UPP NUSRA 3

SOLIHIN MARGARETA NEWA MINA EDHO TORSESA JAROSMAN


VOLUME RETAINING WALL

Retaining Wall K-225, Formwork (BJTS 420 B), Fe = 100 kg/m3


Type i
Telapak 205.0 X 3.5 X 0.4 287.00
Dinding 205.0 X 0.4 X 3.6 295.20
Type II
Telapak 50.0 X 1.5 X 0.4 30.00
Dinding 50.0 X 0.4 X 2 40.00
TOTAL VOLUME 652.20 M³

Dibuat Oleh Diperiksa Disetujui


PT.HYDRO TECHNO UTAMA PUSMANPRO UPP NUSRA 3

Solihin Margareta Newa Mina Edho Torsesa Jarosman


1 2 3 4 5 6 7 8 9 10 11 12 13 14

SHOP DRAWING
KETERANGAN :
A A

1. BJTS-420B

2. LANTAI KERJA K-100


30 Beton Bertulang k-225
B B

PVC 2"

100

Drainage 100x100
C 35 C

D16-150

D D
360

D16-200

400
E E

PT. PLN (Persero)


UNIT INDUK PEMBANGUNAN NUSRA
UNIT PELAKSANA PROYEK NUSRA

100 200 D16-200


CONTRACT NO :
F F

0028.Pj/DAN.01.03/F46000000/2022
40

Lantai Kerja 5cm


D16-200 CONTRACTOR :

50 Pasir Urug 10cm


G G
PT. HYDRO TECHNO UTAMA
350
PROJECT :

PEKERJAAN PEMBANGUNAN TALUD


PLTMG ALOR 10 MW
H H

DETAIL RETAINING WALL TYPE 1 DETAIL PEMBESIAN TYPE 1


SCALE 1:50 SCALE 1:50
DETAIL RETAINING WALL TYPE 1

I SCALE DRAWN SURVEYOR CHECKED APPROVED I

SYAIKHAN.A DEDEN. H
DATE DATE DATE DATE
SHEET NO : CONTRACTOR DRAWING NO: REVISION:

J 038 SD.ALORPLTMG/HTU/02-2023 J

PLN DRAWING NO :

1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14

SHOP DRAWING
KETERANGAN :
A A

1. BJTS-420B
PVC 2" 2. LANTAI KERJA K-100

D16-150 D16-150
B 100 100 100 100 B

D16-200
100

C C
360

D D

400
400

E E

PT. PLN (Persero)


UNIT INDUK PEMBANGUNAN NUSRA
D16-200 UNIT PELAKSANA PROYEK NUSRA

CONTRACT NO :
F F

0028.Pj/DAN.01.03/F46000000/2022
40

40
CONTRACTOR :

Pasir Urug 10cm


G D16-200 D16-200 PT. HYDRO TECHNO UTAMA G

Lantai kerja 5cm


PROJECT :

PEKERJAAN PEMBANGUNAN TALUD


PLTMG ALOR 10 MW
H H

DETAIL RETAINING WALL TYPE 1 DETAIL PEMBESIAN TYPE 1


SCALE 1:50 SCALE 1:50
DETAIL RETAINING WALL TYPE 1

I SCALE DRAWN SURVEYOR CHECKED APPROVED I

SYAIKHAN.A DEDEN. H
DATE DATE DATE DATE
SHEET NO : CONTRACTOR DRAWING NO: REVISION:

J 039 SD.ALORPLTMG/HTU/02-2023 J

PLN DRAWING NO :

1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14

SHOP DRAWING
KETERANGAN :
A A

1. BJTS-420B

2. LANTAI KERJA K-100

B B

Beton Bertulang K-225


30
C C
PVC 2"

50
Drainage 80x80
35
D16-200
D D

200 D16-200

240
E E

50 60 D13-200 PT. PLN (Persero)


UNIT INDUK PEMBANGUNAN NUSRA
UNIT PELAKSANA PROYEK NUSRA
40

CONTRACT NO :
F F

0028.Pj/DAN.01.03/F46000000/2022
D13-200
40 Lantai kerja 5cm

Pasir urug 10cm CONTRACTOR :


150
G G
PT. HYDRO TECHNO UTAMA

PROJECT :

PEKERJAAN PEMBANGUNAN TALUD


PLTMG ALOR 10 MW
H H

DETAIL RETAINING WALL TYPE 2

DETAIL RETAINING WALL TYPE 2 DETAIL PEMBESIAN TYPE 2 SCALE


I SCALE 1:50 SCALE 1:50
DRAWN SURVEYOR CHECKED APPROVED I

SYAIKHAN.A DEDEN. H
DATE DATE DATE DATE
SHEET NO : CONTRACTOR DRAWING NO: REVISION:

J 042 SD.ALORPLTMG/HTU/02-2023 J

PLN DRAWING NO :

1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14

SHOP DRAWING
KETERANGAN :
A A

1. BJTS-420B

2. LANTAI KERJA K-100

B B

PVC 2"

100 100 100 D16-200 D16-200


C C
50

D13-200
200

D D
240

200
E E

PT. PLN (Persero)


UNIT INDUK PEMBANGUNAN NUSRA
UNIT PELAKSANA PROYEK NUSRA
40

40
CONTRACT NO :
F F

0028.Pj/DAN.01.03/F46000000/2022
Pasir Urug 10cm

Lantai kerja 5cm


D13-200
CONTRACTOR :

G G
PT. HYDRO TECHNO UTAMA

PROJECT :

PEKERJAAN PEMBANGUNAN TALUD


PLTMG ALOR 10 MW
H H

DETAIL RETAINING WALL TYPE 2

DETAIL RETAINING WALL TYPE 2 DETAIL PEMBESIAN TYPE 2 SCALE


I SCALE 1:50 SCALE 1:50
DRAWN SURVEYOR CHECKED APPROVED I

SYAIKHAN.A DEDEN. H
DATE DATE DATE DATE
SHEET NO : CONTRACTOR DRAWING NO: REVISION:

J 043 SD.ALORPLTMG/HTU/02-2023 J

PLN DRAWING NO :

1 2 3 4 5 6 7 8 9 10 11 12 13 14
INSPECTION REPORT TIMBUNAN BRONJONG

PROJECT : PEMBANGUNAN TALUD PLTMG ALOR 10 MW Report No


Contractor : PT.HYDRO TECHNO UTAMA AFI No.
Location / Area : ALOR , NUSA TENGGARA TIMUR Drawing No 0480-KIT.03.01-F46000000-2023
Inspected Item : Pekerjaan Timbunan Bronjong
Reference :

VOLUME
NO. POINT DEVIATION REMARKS
DESIGN ACTUAL

1 210-220 93.850

2 220-240 206.700

3 240-260 212.800

4 260-280 213.260

5 280-300 213.860

6 300-320 189.590

7 320-340 158.540

8 340-360 151.210

9 360-380 110.140

10 380-400 76.030

11 400-420 67.250

12 420-440 68.900

13 440-460 54.980

14 460-480 26.640

15 480-500 18.720

16 500-520 18.720

17 520-540 18.720

18 540-550 9.360

Result Accepted Rejected

Dibuat Oleh : Diperiksa Oleh : Disetujui Oleh :


PT. HYDRO TECHNO UTAMA PLN PUSMANPRO PLN UPP NUSRA 3

SOLIHIN MARGARETA NEWA MINA EDHO TORSESA JAROSMAN


VOLUME TIMBUNAN TANAH BRONJONG

NO LUAS PENAMPANG JARAK


VOLUME
STA A B rata-rata (i) A B rata-rata

210-220 9.520 9.250 9.385 10.000 10.000 10.000 93.850


220-240 9.520 11.150 10.335 20.000 20.000 20.000 206.700
240-260 11.150 10.130 10.640 20.000 20.000 20.000 212.800
260-280 11.150 10.176 10.663 20.000 20.000 20.000 213.260
280-300 10.176 11.210 10.693 20.000 20.000 20.000 213.860
300-320 11.210 7.749 9.480 20.000 20.000 20.000 189.590
320-340 7.749 8.105 7.927 20.000 20.000 20.000 158.540
340-360 8.105 7.016 7.561 20.000 20.000 20.000 151.210
360-380 7.016 3.998 5.507 20.000 20.000 20.000 110.140
380-400 3.998 3.605 3.802 20.000 20.000 20.000 76.030
400-420 3.605 3.120 3.363 20.000 20.000 20.000 67.250
420-440 3.120 3.770 3.445 20.000 20.000 20.000 68.900
440-460 3.770 1.728 2.749 20.000 20.000 20.000 54.980
460-480 1.728 0.936 1.332 20.000 20.000 20.000 26.640
480-500 0.936 0.936 0.936 20.000 20.000 20.000 18.720
500-520 0.936 0.936 0.936 20.000 20.000 20.000 18.720
520-540 0.936 0.936 0.936 20.000 20.000 20.000 18.720
540-550 0.936 0.936 0.936 10.000 10.000 10.000 9.360

TOTAL VOLUME URUGAN 1,909.270

Dibuat Oleh Diperiksa Disetujui


PT.HYDRO TECHNO UTAMA PUSMANPRO UPP NUSRA 3

Solihin Margareta Newa Mina Edho Torsesa Jarosman


1 2 3 4 5 6 7 8 9 10 11 12 13 14

SHOP DRAWING
LUAS AREA 9.52 m2 LUAS AREA 11.15 m2
LUAS AREA 1.09 m2 LUAS AREA 0.795 m2
KETERANGAN :
A A
CL CL
65.000 65.000
64.000 64.000 : PAGAR KAWAT DURI
63.000 63.000
62.000 62.000
2 2
1: 1:
61.000 61.000
60.000 60.000 : TIMBUNAN TANAH

B 59.000 59.000 B
58.000 58.000
57.000 5541.0000

5532.0000

5487.0000

5402.0000

5312.0000
57.000 5518.0000

5512.0000

5489.0000

5379.0000

5319.0000
: GALIAN BRONJONG
56.000 4000.0000

56.000 4196.0000

55.000 55.000
Bid. Persamaan +54.000 Bid. Persamaan +54.000
STATION +210 STATION +240 Ki

59.541

59.532

59.487

59.402

59.131

59.518

59.512

59.489

59.379

59.319
C Elevasi Tanah Asli Elevasi Tanah Asli C
20.000

20.000
15.000

10.000

15.000

10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00

5.000

0.000

5.000

0.000
59.487

58.000

58.000

58.196

58.196
59.489
Elevasi Rencana Elevasi Rencana
D D

PENAMPANG POTONGAN Station +210 PENAMPANG POTONGAN Station +240


E E

PT. PLN (Persero)


LUAS AREA 9.52 m2 LUAS AREA 10.13 m2 UNIT INDUK PEMBANGUNAN NUSRA
LUAS AREA 1.09 m2 LUAS AREA 0.839 m2 UNIT PELAKSANA PROYEK NUSRA
CL CL
65.000 65.000
64.000 64.000 CONTRACT NO :
F 63.000 63.000 F
62.000 62.000
0028.Pj/DAN.01.03/F46000000/2022
2
1: 1:
2
61.000 61.000
60.000 60.000
59.000 59.000
58.000 58.000
CONTRACTOR :
57.000 5541.0000 5532.0000

5487.0000

5402.0000

5312.0000
57.000 5879.0000

5856.0000

5435.0000

5408.0000

5338.0000

56.000 56.000
4336.0000

4056.0000

G 55.000 55.000 G
Bid. Persamaan +54.000 Bid. Persamaan +54.000 PT. HYDRO TECHNO UTAMA
STATION +220 STATION +260
PROJECT :
59.541

59.532

59.487

59.402

59.312

59.879

59.856

59.435

59.408

59.338
Elevasi Tanah Asli Elevasi Tanah Asli
PEKERJAAN PEMBANGUNAN TALUD
PLTMG ALOR 10 MW
20.000

20.000
15.000

10.000

15.000

10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00
5.000

0.000

5.000

0.000
H H
58.056

58.056

58.336

58.336
59.487

59.435
Elevasi Rencana Elevasi Rencana

PENAMPANG POTONGAN GALIAN


DAN URUGAN BRONJONG
I SCALE DRAWN SURVEYOR CHECKED APPROVED I

PENAMPANG POTONGAN Station +220 PENAMPANG POTONGAN Station +260


SYAIKHAN.A DEDEN. H
DATE DATE DATE DATE
SHEET NO : CONTRACTOR DRAWING NO: REVISION:

J
PENAMPANG POTONGAN BRONJONG J
SCALE 1:50
020 SD.ALORPLTMG/HTU/02-2023

PLN DRAWING NO :

1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14

SHOP DRAWING
LUAS AREA 10.18 m2 LUAS AREA 7.75 m2
LUAS AREA 0.933 m2 LUAS AREA 1.012 m2
KETERANGAN :
A A
CL CL
65.000 65.000
64.000 64.000 : PAGAR KAWAT DURI
63.000 63.000
62.000 62.000
2 2
1: 1:
61.000 61.000
60.000 60.000 : TIMBUNAN TANAH

B 59.000 59.000 B
58.000 58.000
57.000 5732.0000

5674.0000

5617.0000

5532.0000

5482.0000
57.000 5985.0000 5978.0000

5965.0000

5876.0000

5841.0000

: GALIAN BRONJONG
56.000 56.000
4757.0000

4477.0000

55.000 55.000
Bid. Persamaan +54.000 Bid. Persamaan +54.000
STATION +280 Ki STATION +320 Ki

59.732

59.674

59.617

59.532

59.482

59.985

59.978

59.965

59.876

59.841
C Elevasi Tanah Asli Elevasi Tanah Asli C
20.000

20.000
15.000

10.000

15.000

10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00

5.000

0.000

5.000

0.000
58.477

58.477

58.757

58.757
59.617

59.965
Elevasi Rencana Elevasi Rencana
D D

PENAMPANG POTONGAN Station +280 PENAMPANG POTONGAN Station +320

E E

LUAS AREA 8.11 m2 PT. PLN (Persero)


LUAS AREA 11.21 m2 LUAS AREA 1.027 m2 UNIT INDUK PEMBANGUNAN NUSRA
LUAS AREA 0.965 m2 CL UNIT PELAKSANA PROYEK NUSRA
CL 65.000
65.000 64.000
64.000 63.000 CONTRACT NO :
F 63.000 62.000 F
2
1:
62.000 61.000
61.000 1:
2
60.000 0028.Pj/DAN.01.03/F46000000/2022
60.000 59.000
59.000 58.000
58.000 57.000 5998.0000

5953.0000

5905.0000

5760.0000
5844.0000

CONTRACTOR :
57.000 56.000
4898.0000

5745.0000

5642.0000

5558.0000

5509.0000

5487.0000

56.000 55.000
Bid. Persamaan +54.000
4617.0000

G 55.000 G
Bid. Persamaan +54.000 PT. HYDRO TECHNO UTAMA
STATION +340 Ki
STATION +300

59.998

59.953

59.905

59.760

59.844
Elevasi Tanah Asli PROJECT :
59.558

59.509

59.487

59.642

59.745

Elevasi Tanah Asli


PEKERJAAN PEMBANGUNAN TALUD

20.000

15.000

10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00

5.000

0.000
PLTMG ALOR 10 MW
20.000

15.000

10.000

Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00


5.000

0.000

H H

58.898

58.898
59.905
Elevasi Rencana
58.617

58.617
59.487

Elevasi Rencana

PENAMPANG POTONGAN GALIAN


DAN URUGAN BRONJONG
I
PENAMPANG POTONGAN Station +300 PENAMPANG POTONGAN Station +340 SCALE DRAWN SURVEYOR CHECKED APPROVED I

SYAIKHAN.A DEDEN. H
DATE DATE DATE DATE
SHEET NO : CONTRACTOR DRAWING NO: REVISION:

J
PENAMPANG POTONGAN BRONJONG J
SCALE 1:50
021 SD.ALORPLTMG/HTU/02-2023

PLN DRAWING NO :

1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14

SHOP DRAWING
LUAS AREA 4.00 m2 LUAS AREA 3.60 m2
LUAS AREA 1.494 m2 LUAS AREA 1.638 m2
KETERANGAN :
A A
CL CL
65.000 65.000
64.000 64.000 : PAGAR KAWAT DURI
63.000 63.000
62.000 2
62.000 2
1: 1:
61.000 61.000
60.000 60.000 : TIMBUNAN TANAH

B 59.000 59.000 B
58.000 58.000
57.000 57.000
6742.0000 6722.0000

6674.0000

6665.0000

6643.0000

6602.0000

6588.0000

: GALIAN BRONJONG
6493.0000

6452.0000

6387.0000

5318.0000

5178.0000

56.000 56.000
55.000 55.000
Bid. Persamaan +54.000 Bid. Persamaan +54.000
STATION +380 Ki STATION +400 Ki
60.665

60.643

60.588

60.493

60.387

60.742

60.722

60.674

60.602

60.452
C Elevasi Tanah Asli
20.000
Elevasi Tanah Asli C

20.000
15.000

10.000

15.000

10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00

5.000

0.000

5.000

0.000
59.178

59.178

59.318

59.318
60.588

60.674
Elevasi Rencana Elevasi Rencana
D D

PENAMPANG POTONGAN Station +380 PENAMPANG POTONGAN Station +400

E E

PT. PLN (Persero)


LUAS AREA 7.02 m2 LUAS AREA 3.12 m2 UNIT INDUK PEMBANGUNAN NUSRA
LUAS AREA 1.067 m2 LUAS AREA 1.818 m2 UNIT PELAKSANA PROYEK NUSRA
CL CL
65.000 65.000
64.000 64.000 CONTRACT NO :
F 63.000 63.000 F
62.000 62.000
0028.Pj/DAN.01.03/F46000000/2022
2
2 1:
1:
61.000 61.000
60.000 60.000
59.000 59.000
58.000 58.000
CONTRACTOR :
57.000 57.000
6876.0000

6816.0000

6789.0000

6662.0000

6523.0000

6432.0000

6395.0000

6305.0000

6285.0000

5884.0000

5459.0000

5038.0000

56.000 56.000
G 55.000 55.000 G
Bid. Persamaan +54.000 Bid. Persamaan +54.000 PT. HYDRO TECHNO UTAMA
STATION +360 Ki STATION +420 Ki
PROJECT :
60.432

60.395

60.285

60.305
59.884

60.876

60.816

60.789

60.662

60.523
Elevasi Tanah Asli Elevasi Tanah Asli
PEKERJAAN PEMBANGUNAN TALUD
PLTMG ALOR 10 MW
20.000

20.000
15.000

10.000

15.000

10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00
5.000

0.000

5.000

0.000
H H
59.038

59.038
59.884

60.789

59.459

59.459
Elevasi Rencana Elevasi Rencana

PENAMPANG POTONGAN GALIAN


DAN URUGAN BRONJONG
I
PENAMPANG POTONGAN Station +360 PENAMPANG POTONGAN Station +420 SCALE DRAWN SURVEYOR CHECKED APPROVED I

SYAIKHAN.A DEDEN. H
DATE DATE DATE DATE

PENAMPANG POTONGAN BRONJONG SHEET NO : CONTRACTOR DRAWING NO: REVISION:

J
SCALE 1:50 J
022 SD.ALORPLTMG/HTU/02-2023

PLN DRAWING NO :

1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14

SHOP DRAWING
LUAS AREA 3.77 m2 LUAS AREA 0.94 m2
LUAS AREA 1.714m2 LUAS AREA 2.635 m2 KETERANGAN :
A A
CL CL
65.000 65.000
64.000 64.000
: PAGAR KAWAT DURI
63.000 63.000
62.000 62.000 2
1:
2 1:
61.000 61.000
60.000 60.000
: TIMBUNAN TANAH
59.000 59.000
B B
58.000 58.000 7368.0000
7423.0000
7476.0000
7495.0000

57.000 57.000
6764.0000

6739.0000

6673.0000

6592.0000

6554.0000

6231.0000

: GALIAN BRONJONG
5879.0000

5599.0000

56.000 56.000
55.000 55.000
Bid. Persamaan +54.000 Bid. Persamaan +54.000
STATION +440 STATION +480 Ki

60.554

60.592

60.673

60.739

60.764

60.231

61.368

61.423

61.476

61.495
C Elevasi Tanah Asli 20.000 Elevasi Tanah Asli C

20.000
15.000

10.000

15.000

10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00

5.000

0.000

5.000

0.000
59.599

59.599

59.879

59.879
60.673

61.423
Elevasi Rencana Elevasi Rencana

D D

PENAMPANG POTONGAN Station +440 PENAMPANG POTONGAN Station +480


E E

LUAS AREA 1.73 m2 LUAS AREA 0.289 m2


PT. PLN (Persero)
UNIT INDUK PEMBANGUNAN NUSRA
LUAS AREA 2.137 m2 LUAS AREA 3.302m2
UNIT PELAKSANA PROYEK NUSRA
CL CL
65.000 65.000
64.000 64.000
CONTRACT NO :
F 63.000 63.000 F
62.000 2
62.000
1:
61.000 61.000
0028.Pj/DAN.01.03/F46000000/2022
60.000 60.000
59.000 59.000
58.000 7132.0000
7163.0000
7197.0000 7202.0000
58.000 8032.0000

7721.0000

7652.0000

7548.0000

57.000 57.000 CONTRACTOR :


6864.0000

6448.0000

6019.0000

5739.0000

56.000 56.000
55.000 55.000
G Bid. Persamaan +54.000 Bid. Persamaan +54.000 PT. HYDRO TECHNO UTAMA G

STATION +460 Ki STATION +500


PROJECT :
60.864

61.132

61.163

61.197

61.202

60.448

62.032

61.721

61.652

61.548
Elevasi Tanah Asli Elevasi Tanah Asli
PEKERJAAN PEMBANGUNAN TALUD
20.000

20.000
15.000

10.000

15.000

10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00 PLTMG ALOR 10 MW
5.000

0.000

5.000

0.000
H H
59.739

59.739

61.721

60.019

60.019
61.163

Elevasi Rencana Elevasi Rencana

PENAMPANG POTONGAN GALIAN


DAN URUGAN BRONJONG
I SCALE DRAWN SURVEYOR CHECKED APPROVED I

PENAMPANG POTONGAN Station +460 PENAMPANG POTONGAN Station +500


SYAIKHAN.A DEDEN. H
DATE DATE DATE DATE
SHEET NO : CONTRACTOR DRAWING NO: REVISION:

J
PENAMPANG POTONGAN BRONJONG J
SCALE 1:50
023 SD.ALORPLTMG/HTU/02-2023

PLN DRAWING NO :

1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14

SHOP DRAWING
LUAS AREA 0.289 m2
LUAS AREA 3.302m2 KETERANGAN :
A A
CL
65.000
64.000
63.000 : PAGAR KAWAT DURI
62.000
61.000
60.000
59.000 : TIMBUNAN TANAH

B 58.000 8032.0000

7721.0000

7652.0000

7548.0000
B
57.000
6448.0000

6019.0000

: GALIAN BRONJONG
56.000
55.000
Bid. Persamaan +54.000
STATION +510

60.448

62.032

61.721

61.652

61.548
C Elevasi Tanah Asli C

20.000

15.000

10.000
Jrk Datar/Jrk Langsung 5.00 5.00 5.00 5.00

5.000

0.000
60.019

60.019
61.721
Elevasi Rencana

D D

PENAMPANG POTONGAN Station +510


E E

PT. PLN (Persero)


UNIT INDUK PEMBANGUNAN NUSRA
UNIT PELAKSANA PROYEK NUSRA

CONTRACT NO :
F F

0028.Pj/DAN.01.03/F46000000/2022

CONTRACTOR :

G G
PT. HYDRO TECHNO UTAMA

PROJECT :

PEKERJAAN PEMBANGUNAN TALUD


PLTMG ALOR 10 MW
H H

PENAMPANG POTONGAN GALIAN


DAN URUGAN BRONJONG
I SCALE DRAWN SURVEYOR CHECKED APPROVED I

SYAIKHAN.A DEDEN. H
DATE DATE DATE DATE
SHEET NO : CONTRACTOR DRAWING NO: REVISION:

J
PENAMPANG POTONGAN BRONJONG J
SCALE 1:50
024 SD.ALORPLTMG/HTU/02-2023

PLN DRAWING NO :

1 2 3 4 5 6 7 8 9 10 11 12 13 14

Anda mungkin juga menyukai