Anda di halaman 1dari 30

KEGIATAN

PERENCANAAN TEMPAT PARKIR DAN GEDUNG FASILITAS PENUNJANG


KANTOR BANK INDONESIA
WILAYAH KALIMANTAN UTARA

PEKERJAAN
PERENCANAAN TEMPAT PARKIR DAN GEDUNG FASILITAS PENUNJANG
KANTOR BANK INDONESIA
WILAYAH KALIMANTAN UTARA

RENCANA ANGGARAN BIAYA

LOKASI
Kota Tarakan Provinsi Kalimantan Utara
TIME SCHEDULE

Kegiatan : 0
Pekerjaan : 0
Lokasi Kegiatan : 0

Bobot BULAN KE - I BULAN KE - II BULAN KE - III BULAN KE - IV


Uraian Pekerjaan
(%)
No. MGG. 1 MGG. 2 MGG. 3 MGG. 4 MGG. 5 MGG. 6 MGG. 7 MGG. 8 MGG. 9 MGG. 10 MGG. 11 MGG. 12 MGG. 13 MGG. 14 MGG. 15 MGG. 16

DARI TANGGAL 23-Aug 30-Aug 6-Sep 13-Sep 20-Sep 27-Sep 4-Oct 11-Oct 18-Oct 25-Oct 1-Nov 8-Nov 15-Nov 22-Nov 29-Nov 6-Dec
SAMPAI DENGAN TANGGAL 29-Aug 5-Sep 12-Sep 19-Sep 26-Sep 3-Oct 10-Oct 17-Oct 24-Oct 31-Oct 7-Nov 14-Nov 21-Nov 28-Nov 5-Dec 12-Dec

A PEKERJAAN PENDAHULUAN
1 Pembersihan dan Persiapan Pekerjaan 0.014% 0.01%
B PEKERJAAN TANAH
1 Urugan Pasir Bawah Lantai t= 5cm 0.048%

C PEKERJAAN BETON
1 Cor Beton Bertulang Sloof bantu 10/20 0.317% 0.13% 0.19%
2 Kolom beton bertulang 20/20 1.480% 0.59% 0.43% 0.46%
3 Kolom Praktis 10/10 0.143% 0.04%
4 Cor beton Bertulang Balok 20/30 0.847% 0.08% 0.04% 0.13%
5 Cor beton Bertulang Balok 20/25 1.009% 0.20% 0.10%
6 Cor beton Bertulang Balok 18/20 0.167% 0.03% 0.02%
7 Cor Beton Bertulang Ringbalk 18/20 1.436%
8 Cor Beton Bertulang Balok Kantilever BK 20/25 0.405% 0.08% 0.02%
9 Cor Beton Sunscreen 15/30 0.321%
10 Plat Dag beton k-225 2.969% 0.59% 0.74%
11 List plank beton 1.141%
12 Cor Lantai rabat Finishing Acian 0.252%

E PEKERJAAN PASANGAN DAN PLESTERAN


1 Pas. Dinding Bata Camp. 1:4 1.560%
2 Plesteran dan Acian 1 : 4 1.403%
3 Pas. Dinding Partisi Toilet PVC + Rangka 0.869%
4 Pas. Batu Alam 0.791%

F PEKERJAAN ATAP
1 Rangka Atap Baja Ringan 2.615%
2 Atap Multiroof 1.455%
3 Bubungan 0.418%
4 Jurai Dalam 0.046%
5 Listplank GRC 30 cm 0.151%

G PEKERJAAN KUSEN / P / J
1
Kusen Pintu & Jendela Aluminium 0.704%
2
Pintu Type P.1 0.654%
3
Pintu Type P.2 0.474%
4
Pintu Km/Wc (PVC) 0.208%
5
Bovenlicht BV 0.057%
6
Kunci Tanam 2 x Putar (Yale) 0.039%
7
Engsel pintu Kaca 0.015%
8
Kaca Polos / Bening 5mm 0.393%
H PEKERJAAN PLAFOND
1 Rangka Plafond Besi Holow 0.354%
2 Plafond Gypsum 0.119%

I PEKERJAAN LANTAI
1 Lantai Keramik toilet 30x30 0.216%

J PEKERJAAN CAT-CATAN
1 Cat dinding luar dalam 0.676%
2 Cat Plafound 0.068%

K PEKERJAAN FINISHING
1 Dinding keramik WC 30/30 0.398%
2 Pas. Pagar realing besi Holow 0.867%
3 Raling Tangga besi Holow 0.662%
4 Pas. Tangga besi dari lantai 1 kelantai 2 0.654% 0.00%
5 Pas. Exhouse Fan 0.077%

L PEKERJAAN JARINGAN SANITASI


1 Floor drain stainless steel Dia. 50 mm 0.023%
2 Kran dinding 0.003%
3 Closet Duduk 0.257%
4 Urinoir Toto 0.317%
5 Pas. Kran Shower 0.078%
6 Pas. Wastafel + Cermin 0.166%

M PEKERJAAN PLUMBING
1 Instalasi pipa air bersih
- Pipa PVC AW Dia. 2' 0.026%
- Fitting material bantu 0.004%
2 Instalasi pipa air kotor, limbah & ventilasi
- Pipa PVC Kelas AW Dia. 3' 0.102%
- Pipa PVC Kelas AW Dia. 4' 0.051%
- Fitting material bantu 0.007%

N PEKERJAAN JARINGAN LISTRIK


1 Lampu down light 15 Watt 0.601%
2 Saklar tunggal 0.003%
3 Saklar ganda 0.013%
4 Stop kontak 0.011%
5 Stop kontak AC 0.020%
6 Titik lampu + instalasi
C V . R AIH AN M A HAR AN I S EJA HT ER A
1.302%
7 Titik stop kontak + instalasi 0.133%
G E N E RA L C O N T R AC T O R & SU P P LIE R
J L. AGATHIS RT. 0 5 K ARANG H ARAPAN TAR AKAN
H p : 0 81 2 58 9 5 2 73

8 Box Sekring 0.006%


RENCANA MINGGUAN 0.048% 1.931% 7.082% 7.082% 11.037% 11.037% 7.496% 8.639% 4.684% 8.392% 2.147% 6.218% 4.899% 8.014% 8.782% 2.512%
KOMULATIF RENCANA MINGGUAN 0.048% 1.979% 9.061% 16.142% 27.179% 38.216% 45.713% 54.352% 59.036% 67.428% 69.575% 75.793% 80.692% 88.706% 97.488% 100.00%
%

PROGRESS REALISASI MINGGU INI 0.014% 0.719% 0.736% 1.414% 1.007% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
30

PROGGRES REALISASI S.D MINGGU INI 0.014% 0.733% 1.469% 2.884% 3.891% 3.891% 3.891% 3.891% 3.891% 3.891% 3.891% 3.891% 3.891% 3.891% 3.891% 3.891%
DEVIASI -0.034% -1.246% -7.591% -13.259% -23.289% -34.326% -41.822% -50.461% -55.145% -63.537% -65.684% -71.902% -76.801% -84.815% -93.597% -96.109%
REKAPITULASI RENCANA ANGGARAN BIAYA

Kegiatan :
Pekerjaan :
Lokasi Kegiatan :

NO URAIAN PEKERJAAN JUMLAH ( Rp.

A PEKERJAAN PENDAHULUAN
B PEKERJAAN TANAH
D PEKERJAAN BETON
E PEKERJAAN PASANGAN DAN PLESTERAN
F PEKERJAAN KAYU DAN ATAP
G PEKERJAAN KUSEN / P / J
H PEKERJAAN PLAFOND
I PEKERJAAN LANTAI
J PEKERJAAN CAT-CATAN
K PEKERJAAN FINISHING
L PEKERJAAN JARINGAN SANITASI
M PEKERJAAN PLUMBING
N PEKERJAAN JARINGAN LISTRIK

JUMLAH
PPN 10 %
TOTAL JUMLAH + PPN 10 %
DIBULATKAN

TERBILANG :

DUA MILYAR ENAM RATUS SEMBILAN PULUH SATU JUTA DELAPAN RATUS SEMBILAN PULUH

Mengetahui,
Konsultan Sipil

YAYAN WARDANA
KAPITULASI RENCANA ANGGARAN BIAYA

JUMLAH ( Rp. )

350,000.00
14,766,115.00
658,743,839.54
427,239,938.90
782,744,000.00
63,759,414.05
117,303,377.26
106,930,360.65
33,632,299.41
158,006,601.60
27,929,947.65
4,657,500.00
51,110,000.00

2,447,173,394.06
244,717,339.41
2,691,890,733.47
2,691,890,000.00

US SEMBILAN PULUH SATU JUTA DELAPAN RATUS SEMBILAN PULUH RIBU RUPIAH

Mengetahui,
Konsultan Sipil

YAYAN WARDANA
RENCANA ANGGARAN BIAYA PEKERJAAN

Kegiatan :
Pekerjaan :
Lokasi Kegiatan :

No. Uraian Pekerjaan Satuan Volume Harga Satuan (Rp.) Jumlah Harga (Rp.)

(1) (2) (3) (5) (6)

A PEKERJAAN PENDAHULUAN
1 Pembersihan dan Persiapan Pekerjaan Ls 1.00 350,000.00 350,000.00
Sub Jumlah A 350,000.00
B PEKERJAAN TANAH
1 Urugan Pasir Bawah Lantai t= 5cm M³ 83.00 177,905.00 14,766,115.00

Sub Jumlah B 14,766,115.00


C PEKERJAAN BETON
1 Pembuatan Pondasi ls 1 136574200 136,574,200.00
2 Cor Beton Bertulang Sloof bantu 20/30 M³ 7.00 7,101,751.04 49,712,257.26
3 Kolom beton bertulang 20/20 M³ 5.00 11,166,605.51 55,833,027.53
4 Kolom Praktis 10/10 M³ 5.00 12,032,318.91 60,161,594.57
5 Cor beton Brtulang Balok 20/30 M³ 7.50 7,677,621.77 57,582,163.29
6 Cor beton Brtulang Balok 20/25 M³ 6.50 8,339,054.91 54,203,856.91
7 Cor beton Brtulang Balok 18/20 M³ 5.80 9,192,507.19 53,316,541.68
8 Cor Beton Bertulang Ringbalk 18/20 M³ 4.58 10,467,477.02 47,941,044.75
9 Cor Beton Bertulang Balok Kantilever BK 20/25 M³ 4.40 8,339,054.91 36,691,841.60
10 Cor Beton Sunscreen 15/30 M³ 4.00 8,781,357.20 35,125,428.79
11 Plat Lantai Panggung beton k-225 M³ 5.00 5,939,150.75 29,695,753.74
12 List plank beton M³ 4.00 8,164,297.52 32,657,190.09
13 Cor Lantai rabat Finishing Acian M³ 124.00 1,175,993.06 145,823,139.33

Sub Jumlah D 658,743,839.54


E PEKERJAAN PASANGAN DAN PLESTERAN
1 Pas. Dinding Bata Camp. 1:4 M² 398.00 271,837.00 108,191,126.00
2 Plesteran dan Acian 1 : 4 M² 498.00 81,106.05 40,390,812.90
3 Pas. Dinding Partisi + Rangka M² 452.00 616,500.00 278,658,000.00

Sub Jumlah E 427,239,938.90


F PEKERJAAN ATAP
1 Rangka Atap Baja Ringan M² 467.00 272,724.80 127,362,481.60
2 Atap Gelombang M² 467.00 146,915.95 68,609,748.65
3 Bubungan M' 81.00 147,568.00 11,953,008.00
4 Jurai Dalam M' 230.00 63,888.25 14,694,297.50
5 Listplank GRC 30 cm M' 169.00 44,675.78 7,550,205.98

Sub Jumlah F 230,169,741.73


No. Uraian Pekerjaan Satuan Volume Harga Satuan (Rp.) Jumlah Harga (Rp.)

(1) (2) (3) (5) (6)


G PEKERJAAN KUSEN / P / J
1 Kusen Pintu & Jendela Aluminium M' 8.00 189,889.73 1,519,117.80
2 Pintu Type P.1 Buah 4.00 4,000,000.00 16,000,000.00
3 Pintu Type P.2 Buah 2.00 5,800,000.00 11,600,000.00
4 Pintu Km/Wc (PVC) Buah 6.00 850,000.00 5,100,000.00
5 Bovenlicht BV Buah 4.00 350,000.00 1,400,000.00
6 Kunci Tanam 2 x Putar (Yale) Buah 6.00 158,400.00 950,400.00
7 Engsel pintu Kaca Buah 12.00 29,700.00 356,400.00
8 Kaca Polos / Bening 5mm M² 55.00 487,881.75 26,833,496.25
Sub Jumlah G 63,759,414.05
H PEKERJAAN PLAFOND
1 Rangka Plafond Besi Holow M² 467.50 190,500.38 89,058,925.31
2 Plafond Gypsum M² 467.50 60,415.94 28,244,451.95

Sub Jumlah H 117,303,377.26


I PEKERJAAN LANTAI
1 Lantai Keramik 30x30 M² 467.00 228,972.94 106,930,360.65

Sub Jumlah I 106,930,360.65


J PEKERJAAN CAT-CATAN
1 Cat dinding luar dalam M² 498.00 34,834.08 17,347,369.35
2 Cat Plafound M² 467.50 34,834.08 16,284,930.06

Sub Jumlah J 33,632,299.41


K PEKERJAAN FINISHING
1 Dinding keramik Luar 30/30 M² 196.00 340,289.60 66,696,761.60
2 Pas. Pagar realing besi Holow M² 51.00 675,000.00 34,425,000.00
3 Raling Tangga besi Holow M² 55.00 675,000.00 37,125,000.00
4 Pas. Tangga dari lantai 1 kelantai 2 Unit 2.00 8,000,000.00 16,000,000.00
5 Pas. Exhouse Fan Bh 8.00 469,980.00 3,759,840.00

Sub Jumlah K 158,006,601.60


L PEKERJAAN JARINGAN SANITASI
1 Floor drain stainless steel Dia. 50 mm Bh 6.00 98,440.00 590,640.00
2 Kran dinding Bh 2.00 44,519.38 89,038.75
3 Closet Duduk Bh 4.00 3,289,034.50 13,156,138.00
4 Urinoir Toto Bh 2.00 3,947,639.50 7,895,279.00
5 Pas. Kran Shower Bh 4.00 484,394.38 1,937,577.50
6 Pas. Wastafel + Cermin Bh 2.00 2,130,637.20 4,261,274.40

Sub Jumlah L 27,929,947.65


M PEKERJAAN PLUMBING
1 Instalasi pipa air bersih
- Pipa PVC AW Dia. 2' M¹ 30.00 21,375.00 641,250.00
- Fitting material bantu Ls 1.00 90,000.00 90,000.00
2 Instalasi pipa air kotor, limbah & ventilasi
- Pipa PVC Kelas AW Dia. 3' M¹ 65.00 38,250.00 2,486,250.00
- Pipa PVC Kelas AW Dia. 4' M¹ 28.00 45,000.00 1,260,000.00
- Fitting material bantu Ls 1.00 180,000.00 180,000.00

Sub Jumlah M 4,657,500.00


No. Uraian Pekerjaan Satuan Volume Harga Satuan (Rp.) Jumlah Harga (Rp.)

(1) (2) (3) (5) (6)


N PEKERJAAN JARINGAN LISTRIK
1 Lampu down light 15 Watt Buah 98.00 150,000.00 14,700,000.00
2 Saklar tunggal Buah 2.00 40,000.00 80,000.00
3 Saklar ganda Buah 6.00 55,000.00 330,000.00
4 Stop kontak Buah 6.00 45,000.00 270,000.00
5 Stop kontak AC Buah 4.00 120,000.00 480,000.00
6 Titik lampu + instalasi Titik 98.00 325,000.00 31,850,000.00
7 Titik stop kontak + instalasi Titik 10.00 325,000.00 3,250,000.00
8 Box Sekring Buah 1.00 150,000.00 150,000.00
Sub Jumlah N 51,110,000.00
ANALISA HARGA SATUAN
UPAH, BAHAN DAN PERALATAN

I PEKERJAAN PERSIAPAN
1. 1 m' pengukuran dan pemasangan bowplank
Harga sat. Jumlah Harga
No Uraian Jenis Pekerjaan Kode Sat. Koeff.
(Rp. ) (Rp. )
A Tenaga Kerja :
Pekerja OH 0.100 110,000.00 11,000.00
Tukang Kayu OH 0.100 145,000.00 14,500.00
Kepala Tukang OH 0.010 165,000.00 1,650.00
Mandor OH 0.005 170,000.00 850.00
Jumlah Tenaga Kerja 28,000.00
B Bahan :
Kayu Balok 5/7 m3 0.0120 4,400,000.00 52,800.00
Paku biasa 2 inci - 3 inci kg 0.0200 18,000.00 360.00
Kayu papan 3/20 m3 0.0070 2,500,000.00 17,500.00
Jumlah Harga Bahan 70,660.00
C Peralatan :

Jumlah Harga Alat

D Jumlah (A+B+C) 98,660.00


E Overhead & Profit ( 15% x D ) 14,799.00
F Harga Satuan Pekerjaan ( D + E ) 113,459.00

II PEKERJAAN TANAH
1. Menggali 1 m3 tanah biasa sedalam 1 meter
Harga sat. Jumlah Harga
No Uraian Jenis Pekerjaan Kode Sat. Koeff.
(Rp. ) (Rp. )
A Tenaga kerja :
pekerja L.01 OH 0.7500 110,000.00 82,500.00
Mandor L.02 OH 0.0250 170,000.00 4,250.00
Jumlah Tenaga Kerja 86,750.00
B Bahan :
Jumlah Harga Bahan
C Peralatan :
Jumlah Harga Alat

D Jumlah (A+B+C) 86,750.00


E Overhead & Profit ( 15% x D ) 13,012.50
F Harga Satuan Pekerjaan ( D + E ) 99,762.50

2. Pengurugan Kembali 1 m3 Galian Tanah


Harga sat. Jumlah Harga
No Uraian Jenis Pekerjaan Kode Sat. Koeff.
(Rp. ) (Rp. )
A Tenaga kerja :
pekerja L.01 OH 0.5000 110,000.00 55,000.00
Mandor L.02 OH 0.0050 170,000.00 850.00
Jumlah Tenaga Kerja 55,850.00
B Bahan :
Jumlah Harga Bahan
C Peralatan :
Jumlah Harga Alat

D Jumlah (A+B+C) 55,850.00


E Overhead & Profit ( 15% x D ) 8,377.50
F Harga Satuan Pekerjaan ( D + E ) 64,227.50
3. Pengurugan 1 m3 dengan Pasir Urug
Harga sat. Jumlah Harga
No Uraian Jenis Pekerjaan Kode Sat. Koeff.
(Rp. ) (Rp. )
A Tenaga kerja :
pekerja L.01 OH 0.3000 110,000.00 33,000.00
Mandor L.02 OH 0.0100 170,000.00 1,700.00
Jumlah Tenaga Kerja 34,700.00
B Bahan :
Pasir Urug m3 1.2000 100,000.00 120,000.00
Jumlah Harga Bahan 120,000.00
C Peralatan :
Jumlah Harga Alat

D Jumlah (A+B+C) 154,700.00


E Overhead & Profit ( 15% x D ) 23,205.00
F Harga Satuan Pekerjaan ( D + E ) 177,905.00

4. Pengurugan 1 m3 urugan tanah


Harga sat. Jumlah Harga
No Uraian Jenis Pekerjaan Kode Sat. Koeff.
(Rp. ) (Rp. )
A Tenaga kerja :
pekerja L.01 OH 0.2500 110,000.00 27,500.00
Mandor L.02 OH 0.0250 170,000.00 4,250.00
Jumlah Tenaga Kerja 31,750.00
B Bahan :
Sirtu/Timbunan Pilihan 1.2000 57,600.00 69,120.00
Jumlah Harga Bahan 69,120.00
C Peralatan :
Jumlah Harga Alat

D Jumlah (A+B+C) 100,870.00


E Overhead & Profit ( 15% x D ) 15,130.50
F Harga Satuan Pekerjaan ( D + E ) 116,000.50

III PEKERJAAN PONDASI

1. Memasang 1 m3 pondasi batu Kali, campuran 1 PC : 4 PP


Harga sat. Jumlah Harga
No Uraian Jenis Pekerjaan Kode Sat. Koeff.
(Rp. ) (Rp. )
A Tenaga Kerja :
Pekerja L.01 OH 1.5000 110,000.00 165,000.00
Tukang batu L.02 OH 0.7500 145,000.00 108,750.00
Kepala tukang L.03 OH 0.0750 165,000.00 12,375.00
Mandor L.04 OH 0.0750 170,000.00 12,750.00
Jumlah Tenaga Kerja 298,875.00
B Bahan :
Batu belah 15 cm/20 cm m3 1.2000 560,000.00 672,000.00
Portland Cement kg 163.000 1,300.00 211,900.00
Pasir Pasang m3 0.5200 110,000.00 57,200.00
Jumlah Harga Bahan 941,100.00
C Peralatan :

Jumlah Harga Alat

D Jumlah (A+B+C) 1,239,975.00


E Overhead & Profit ( 15% x D ) 185,996.25
F Harga Satuan Pekerjaan ( D + E ) 1,425,971.25
2. Memasang 1 m3 Batu Kosong (Aanstamping)
Harga sat. Jumlah Harga
No Uraian Jenis Pekerjaan Kode Sat. Koeff.
(Rp. ) (Rp. )
A Tenaga Kerja :
Pekerja L.01 OH 0.7800 110,000.00 85,800.00
Tukang batu L.02 OH 0.3900 145,000.00 56,550.00
Kepala tukang L.03 OH 0.0390 165,000.00 6,435.00
Mandor L.04 OH 0.0390 170,000.00 6,630.00
Jumlah Tenaga Kerja 155,415.00
B Bahan :
Batu belah 15 cm/20 cm m3 1.2000 560,000.00 672,000.00
Pasir Urug m3 0.4320 100,000.00 43,200.00
Jumlah Harga Bahan 715,200.00
C Peralatan :

Jumlah Harga Alat

D Jumlah (A+B+C) 870,615.00


E Overhead & Profit ( 15% x D ) 130,592.25
F Harga Satuan Pekerjaan ( D + E ) 1,001,207.25

IV PEKERJAAN BETON

1. Membuat 1 m3 beton mutu f’c = 9,8 MPa (K 125), slump (12 ± 2) cm, w/c = 0,78
Harga sat. Jumlah Harga
No Uraian Jenis Pekerjaan Kode Sat. Koeff.
(Rp. ) (Rp. )
A Tenaga Kerja :
Pekerja L.01 OH 1.6500 110,000.00 181,500.00
Tukang batu L.02 OH 0.2750 145,000.00 39,875.00
Kepala tukang L.03 OH 0.0280 165,000.00 4,620.00
Mandor L.04 OH 0.0830 170,000.00 14,110.00
Jumlah Tenaga Kerja 240,105.00
B Bahan :
Portland Cement kg 276.0000 1,300.00 358,800.00
Pasir Beton kg 828.0000 78.57 65,057.14
Kerikil ( maksimum 30 mm ) kg 1,012.0000 344.83 348,965.52
Air Liter 215.0000 45.00 9,675.00
Jumlah Harga Bahan 782,497.66
C Peralatan :

Jumlah Harga Alat

D Jumlah (A+B+C) 1,022,602.66


E Overhead & Profit ( 15% x D ) 153,390.40
F Harga Satuan Pekerjaan ( D + E ) 1,175,993.06
2. Membuat 1 m3 beton Lantai Kerja mutu f’c = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0,87
Harga sat. Jumlah Harga
No Uraian Jenis Pekerjaan Kode Sat. Koeff.
(Rp. ) (Rp. )
A Tenaga Kerja :
Pekerja L.01 OH 1.2000 110,000.00 132,000.00
Tukang batu L.02 OH 0.2000 145,000.00 29,000.00
Kepala tukang L.03 OH 0.0200 165,000.00 3,300.00
Mandor L.04 OH 0.0600 170,000.00 10,200.00
Jumlah Tenaga Kerja 174,500.00
B Bahan :
Portland Cement kg 230.000 1,300.00 299,000.00
Pasir Beton kg 893.000 78.57 70,164.29
Kerikil ( maksimum 30 mm ) kg 1,027.000 344.83 354,137.93
Air Liter 200.000 45.00 9,000.00
Jumlah Harga Bahan 732,302.22
C Peralatan :

Jumlah Harga Alat

D Jumlah (A+B+C) 906,802.22


E Overhead & Profit ( 15% x D ) 136,020.33
F Harga Satuan Pekerjaan ( D + E ) 1,042,822.55

3. Membuat 1 m3 beton mutu f’c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,66
Harga sat. Jumlah Harga
No Uraian Jenis Pekerjaan Kode Sat. Koeff.
(Rp. ) (Rp. )
A Tenaga Kerja :
Pekerja L.01 OH 1.6500 110,000.00 181,500.00
Tukang batu L.02 OH 0.2750 145,000.00 39,875.00
Kepala tukang L.03 OH 0.0280 165,000.00 4,620.00
Mandor L.04 OH 0.0830 170,000.00 14,110.00
Jumlah Tenaga Kerja 240,105.00
B Bahan :
Portland Cement kg 326.000 1,300.00 423,800.00
Pasir Beton kg 760.000 78.57 59,714.29
Kerikil ( maksimum 30 mm ) kg 1,029.000 344.83 354,827.59
Air Liter 215.000 45.00 9,675.00
Jumlah Harga Bahan 848,016.87
C Peralatan :

Jumlah Harga Alat

D Jumlah (A+B+C) 1,088,121.87


E Overhead & Profit ( 15% x D ) 163,218.28
F Harga Satuan Pekerjaan ( D + E ) 1,251,340.15
4. Membuat 1 m3 beton mutu f’c = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = 0,58
Harga sat. Jumlah Harga
No Uraian Jenis Pekerjaan Kode Sat. Koeff.
(Rp. ) (Rp. )
A Tenaga Kerja :
Pekerja L.01 OH 1.6500 110,000.00 181,500.00
Tukang batu L.02 OH 0.2750 145,000.00 39,875.00
Kepala tukang L.03 OH 0.0280 165,000.00 4,620.00
Mandor L.04 OH 0.0830 170,000.00 14,110.00
Jumlah Tenaga Kerja 240,105.00
B Bahan :
Portland Cement kg 371.000 1,300.00 482,300.00
Pasir Beton kg 698.000 78.57 54,842.86
Kerikil ( maksimum 30 mm ) kg 1,047.000 344.83 361,034.48
Air Liter 215.000 45.00 9,675.00
Jumlah Harga Bahan 907,852.34
C Peralatan :

Jumlah Harga Alat

D Jumlah (A+B+C) 1,147,957.34


E Overhead & Profit ( 15% x D ) 172,193.60
F Harga Satuan Pekerjaan ( D + E ) 1,320,150.94

5. Membuat 1 m3 beton mutu f’c = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56
Harga sat. Jumlah Harga
No Uraian Jenis Pekerjaan Kode Sat. Koeff.
(Rp. ) (Rp. )
A Tenaga Kerja :
Pekerja L.01 OH 1.6500 110,000.00 181,500.00
Tukang batu L.02 OH 0.2750 145,000.00 39,875.00
Kepala tukang L.03 OH 0.0280 165,000.00 4,620.00
Mandor L.04 OH 0.0830 170,000.00 14,110.00
Jumlah Tenaga Kerja 240,105.00
B Bahan :
Portland Cement kg 384.000 1,300.00 499,200.00
Pasir Beton kg 692.000 78.57 54,371.43
Kerikil ( maksimum 30 mm ) kg 1,039.000 344.83 358,275.86
Air Liter 215.000 45.00 9,675.00
Jumlah Harga Bahan 921,522.29
C Peralatan :

Jumlah Harga Alat

D Jumlah (A+B+C) 1,161,627.29


E Overhead & Profit ( 15% x D ) 174,244.09
F Harga Satuan Pekerjaan ( D + E ) 1,335,871.38

6. Membuat 1 m3 beton mutu f’c = 26,4 MPa (K 300), slump (12 ± 2) cm, w/c = 0,52
Harga sat. Jumlah Harga
No Uraian Jenis Pekerjaan Kode Sat. Koeff.
(Rp. ) (Rp. )
A Tenaga Kerja :
Pekerja L.01 OH 1.6500 110,000.00 181,500.00
Tukang batu L.02 OH 0.2750 145,000.00 39,875.00
Kepala tukang L.03 OH 0.0280 165,000.00 4,620.00
Mandor L.04 OH 0.0830 170,000.00 14,110.00
Jumlah Tenaga Kerja 240,105.00
B Bahan :
Portland Cement kg 413.000 1,300.00 536,900.00
Pasir Beton kg 681.000 78.57 53,507.14
Kerikil ( maksimum 30 mm ) kg 1,021.000 344.83 352,068.97
Air Liter 215.000 45.00 9,675.00
Jumlah Harga Bahan 952,151.11
C Peralatan :

Jumlah Harga Alat

D Jumlah (A+B+C) 1,192,256.11


E Overhead & Profit ( 15% x D ) 178,838.42
F Harga Satuan Pekerjaan ( D + E ) 1,371,094.52
7. Pembesian 10 kg dengan besi polos atau besi ulir
Harga sat. Jumlah Harga
No Uraian Jenis Pekerjaan Kode Sat. Koeff.
(Rp. ) (Rp. )
A Tenaga Kerja :
Pekerja L.01 OH 0.0700 110,000.00 7,700.00
Tukang besi L.02 OH 0.0700 145,000.00 10,150.00
Kepala tukang L.03 OH 0.0070 165,000.00 1,155.00
Mandor L.04 OH 0.0040 170,000.00 680.00
Jumlah Tenaga Kerja 19,685.00
B Bahan :
Besi beton (polos/ulir) kg 10.5000 13,000.00 136,500.00
Kawat beton kg 0.1500 25,000.00 3,750.00
Jumlah Harga Bahan 140,250.00
C Peralatan :

Jumlah Harga Alat

D Jumlah (A+B+C) 159,935.00


E Overhead & Profit ( 15% x D ) 23,990.25
F Harga Satuan Pekerjaan ( D + E ) 183,925.25
1 Kg Pekerjaan Besi beton polos/ulir 18,392.53

8. Memasang 1 m2 bekisting untuk pondasi


Harga sat. Jumlah Harga
No Uraian Jenis Pekerjaan Kode Sat. Koeff.
(Rp. ) (Rp. )
A Tenaga Kerja :
Pekerja L.01 OH 0.5200 110,000.00 57,200.00
Tukang Kayu L.02 OH 0.2600 145,000.00 37,700.00
Kepala tukang L.03 OH 0.0260 165,000.00 4,290.00
Mandor L.04 OH 0.0260 170,000.00 4,420.00
Jumlah Tenaga Kerja 103,610.00
B Bahan :
Kayu kelas III m3 0.0400 2,500,000.00 100,000.00
Paku 5 cm – 10 cm kg 0.3000 18,000.00 5,400.00
Minyak bekisting Liter 0.1000 7,200.00 720.00
Jumlah Harga Bahan 106,120.00
C Peralatan :

Jumlah Harga Alat

D Jumlah (A+B+C) 209,730.00


E Overhead & Profit ( 15% x D ) 31,459.50
F Harga Satuan Pekerjaan ( D + E ) 241,189.50

9. Memasang 1 m2 bekisting untuk Sloof


Harga sat. Jumlah Harga
No Uraian Jenis Pekerjaan Kode Sat. Koeff.
(Rp. ) (Rp. )
A Tenaga Kerja :
Pekerja L.01 OH 0.5200 110,000.00 57,200.00
Tukang Kayu L.02 OH 0.2600 145,000.00 37,700.00
Kepala tukang L.03 OH 0.0260 165,000.00 4,290.00
Mandor L.04 OH 0.0260 170,000.00 4,420.00
Jumlah Tenaga Kerja 103,610.00
B Bahan :
Kayu kelas III m3 0.0450 2,500,000.00 112,500.00
Paku 5 cm – 10 cm kg 0.3000 18,000.00 5,400.00
Minyak bekisting Liter 0.1000 7,200.00 720.00
Jumlah Harga Bahan 118,620.00
C Peralatan :

Jumlah Harga Alat

D Jumlah (A+B+C) 222,230.00


E Overhead & Profit ( 15% x D ) 33,334.50
F Harga Satuan Pekerjaan ( D + E ) 255,564.50
10. Memasang 1 m2 bekisting untuk Kolom
Harga sat. Jumlah Harga
No Uraian Jenis Pekerjaan Kode Sat. Koeff.
(Rp. ) (Rp. )
A Tenaga Kerja :
Pekerja L.01 OH 0.6600 110,000.00 72,600.00
Tukang Kayu L.02 OH 0.3300 145,000.00 47,850.00
Kepala tukang L.03 OH 0.0330 165,000.00 5,445.00
Mandor L.04 OH 0.0030 170,000.00 510.00
Jumlah Tenaga Kerja 126,405.00
B Bahan :
Kayu kelas III m3 0.0400 2,500,000.00 100,000.00
Paku 5 cm – 10 cm kg 0.4000 18,000.00 7,200.00
Minyak bekisting Liter 0.2000 7,200.00 1,440.00
Balok Kayu Klas III m3 0.0150 2,500,000.00 37,500.00
Playwood tebal 9 mm Lbr 0.3500 135,000.00 47,250.00
Dolken Kayu Dia.8 - 10 cm panjang 4m Btg 2.0000 35,000.00 70,000.00
Jumlah Harga Bahan 263,390.00
C Peralatan :

Jumlah Harga Alat

D Jumlah (A+B+C) 389,795.00


E Overhead & Profit ( 15% x D ) 58,469.25
F Harga Satuan Pekerjaan ( D + E ) 448,264.25

11 Memasang 1 m2 bekisting untuk Balok


Harga sat. Jumlah Harga
No Uraian Jenis Pekerjaan Kode Sat. Koeff.
(Rp. ) (Rp. )
A Tenaga Kerja :
Pekerja L.01 OH 0.6600 110,000.00 72,600.00
Tukang Kayu L.02 OH 0.3300 145,000.00 47,850.00
Kepala tukang L.03 OH 0.0330 165,000.00 5,445.00
Mandor L.04 OH 0.0030 170,000.00 510.00
Jumlah Tenaga Kerja 126,405.00
B Bahan :
Kayu kelas III m3 0.0400 2,500,000.00 100,000.00
Paku 5 cm – 10 cm kg 0.4000 18,000.00 7,200.00
Minyak bekisting Liter 0.2000 7,200.00 1,440.00
Balok Kayu Klas III m3 0.0180 2,500,000.00 45,000.00
Playwood tebal 9 mm Lbr 0.3500 135,000.00 47,250.00
Dolken Kayu Dia.8 - 10 cm panjang 4m Btg 2.0000 35,000.00 70,000.00
Jumlah Harga Bahan 270,890.00
C Peralatan :

Jumlah Harga Alat

D Jumlah (A+B+C) 397,295.00


E Overhead & Profit ( 15% x D ) 59,594.25
F Harga Satuan Pekerjaan ( D + E ) 456,889.25

12. Memasang 1 m2 bekisting untuk Lantai


Harga sat. Jumlah Harga
No Uraian Jenis Pekerjaan Kode Sat. Koeff.
(Rp. ) (Rp. )
A Tenaga Kerja :
Pekerja L.01 OH 0.6600 110,000.00 72,600.00
Tukang Kayu L.02 OH 0.3300 145,000.00 47,850.00
Kepala tukang L.03 OH 0.0330 165,000.00 5,445.00
Mandor L.04 OH 0.0330 170,000.00 5,610.00
Jumlah Tenaga Kerja 131,505.00
B Bahan :
Kayu kelas III m3 0.0400 2,500,000.00 100,000.00
Paku 5 cm – 10 cm kg 0.4000 18,000.00 7,200.00
Minyak bekisting Liter 0.2000 7,200.00 1,440.00
Balok Kayu Klas III m3 0.0150 2,500,000.00 37,500.00
Playwood tebal 9 mm Lbr 0.3500 135,000.00 47,250.00
Dolken Kayu Dia.8 - 10 cm panjang 4m Btg 6.0000 35,000.00 210,000.00
Jumlah Harga Bahan 403,390.00
C Peralatan :

Jumlah Harga Alat

D Jumlah (A+B+C) 534,895.00


E Overhead & Profit ( 15% x D ) 80,234.25
F Harga Satuan Pekerjaan ( D + E ) 615,129.25
13. Memasang 1 m2 bekisting untuk Dinding
Harga sat. Jumlah Harga
No Uraian Jenis Pekerjaan Kode Sat. Koeff.
(Rp. ) (Rp. )
A Tenaga Kerja :
Pekerja L.01 OH 0.6600 110,000.00 72,600.00
Tukang Kayu L.02 OH 0.3300 145,000.00 47,850.00
Kepala tukang L.03 OH 0.0330 165,000.00 5,445.00
Mandor L.04 OH 0.0330 170,000.00 5,610.00
Jumlah Tenaga Kerja 131,505.00
B Bahan :
Kayu kelas III m3 0.0300 2,500,000.00 75,000.00
Paku 5 cm – 10 cm kg 0.4000 18,000.00 7,200.00
Minyak bekisting Liter 0.2000 7,200.00 1,440.00
Balok Kayu Klas III m3 0.0200 2,500,000.00 50,000.00
Playwood tebal 9 mm Lbr 0.3500 135,000.00 47,250.00
Dolken Kayu Dia.8 - 10 cm panjang 4m Btg 3.0000 35,000.00 105,000.00
Penjaga Jarak begisting / spacer Buah 4.0000 -
Jumlah Harga Bahan 285,890.00
C Peralatan :

Jumlah Harga Alat

D Jumlah (A+B+C) 417,395.00


E Overhead & Profit ( 15% x D ) 62,609.25
F Harga Satuan Pekerjaan ( D + E ) 480,004.25

14. 1 m3 Beton Sloof Bantu (10/20) K-225


Harga sat. Jumlah Harga
No Uraian Jenis Pekerjaan Kode Sat. Koeff.
(Rp. ) (Rp. )

A Beton K-225 m3 1.000 1,320,150.94 1,320,150.94


B Pembesian dg besi Polos Kg 244.870 18,392.53 4,503,777.60
C Begisting m2 5.000 255,564.50 1,277,822.50

D Harga Satuan Pekerjaan 7,101,751.04

14. 1 m3 Beton Kolom (20/20) K-225


Harga sat. Jumlah Harga
No Uraian Jenis Pekerjaan Kode Sat. Koeff.
(Rp. ) (Rp. )

A Beton K-225 m3 1.000 1,320,150.94 1,320,150.94


B Pembesian dg besi Polos Kg 291.630 18,392.53 5,363,812.07
C Begisting m2 10.000 448,264.25 4,482,642.50

D Harga Satuan Pekerjaan 11,166,605.51

15. 1 m3 Beton Kolom Praktis dan Balok Latai 10/10


Harga sat. Jumlah Harga
No Uraian Jenis Pekerjaan Kode Sat. Koeff.
(Rp. ) (Rp. )

A Beton K-175 m3 1.000 1,251,340.15 1,251,340.15


B Pembesian dg besi Polos Kg 342.440 18,392.53 6,298,336.26
C Begesting M2 10.000 448,264.25 4,482,642.50

D Harga Satuan Pekerjaan 12,032,318.91

34. 1 m3 Beton Balok (20/30) K-225


Harga sat. Jumlah Harga
No Uraian Jenis Pekerjaan Kode Sat. Koeff.
(Rp. ) (Rp. )

A Beton K-225 m3 1.000 1,320,150.94 1,320,150.94


B Pembesian dg besi Polos Kg 180.040 18,392.53 3,311,390.20
C Begesting M2 6.667 456,889.25 3,046,080.63

D Harga Satuan Pekerjaan 7,677,621.77

39. 1 m3 Beton balok (20/25 ) K-225


Harga sat. Jumlah Harga
No Uraian Jenis Pekerjaan Kode Sat. Koeff.
(Rp. ) (Rp. )

A Beton K-225 m3 1.000 1,320,150.94 1,320,150.94


B Pembesian dg besi Polos Kg 207.730 18,392.53 3,820,679.22
C Begesting M2 7.000 456,889.25 3,198,224.75

D Harga Satuan Pekerjaan 8,339,054.91


40. 1 m3 Beton balok (18/20 ) K-225
Harga sat. Jumlah Harga
No Uraian Jenis Pekerjaan Kode Sat. Koeff.
(Rp. ) (Rp. )

A Beton K-225 m3 1.000 1,320,150.94 1,320,150.94


B Pembesian dg besi Polos Kg 227.900 18,392.53 4,191,656.45
C Begesting M2 8.056 456,889.25 3,680,699.80

D Harga Satuan Pekerjaan 9,192,507.19

42. 1 m3 Beton Atap Dag


Harga sat. Jumlah Harga
No Uraian Jenis Pekerjaan Kode Sat. Koeff.
(Rp. ) (Rp. )

A Beton K-225 m3 1.000 1,320,150.94 1,320,150.94


B Pembesian dg besi Polos Kg 83.912 18,392.53 1,543,353.56
C Begesting M2 5.000 615,129.25 3,075,646.25

D Harga Satuan Pekerjaan 5,939,150.75

46. 1 m3 Beton Ring Blk (18/20) K-225


Harga sat. Jumlah Harga
No Uraian Jenis Pekerjaan Kode Sat. Koeff.
(Rp. ) (Rp. )

A Beton K-225 m3 1.000 1,320,150.94 1,320,150.94


B Pembesian dg besi Polos Kg 297.220 18,392.53 5,466,626.28
C Begesting M2 8.056 456,889.25 3,680,699.80

D Harga Satuan Pekerjaan 10,467,477.02

47. 1 m3 Beton Sunscreen (15/30) K-225


Harga sat. Jumlah Harga
No Uraian Jenis Pekerjaan Kode Sat. Koeff.
(Rp. ) (Rp. )

A Beton K-225 m3 1.000 1,320,150.94 1,320,150.94


B Pembesian dg besi Polos Kg 240.050 18,392.53 4,415,125.63
C Begesting M2 6.667 456,889.25 3,046,080.63

D Harga Satuan Pekerjaan 8,781,357.20

51. 1 m3 List plank beton


Harga sat. Jumlah Harga
No Uraian Jenis Pekerjaan Kode Sat. Koeff.
(Rp. ) (Rp. )

A Beton K-225 m3 1.000 1,320,150.94 1,320,150.94


B Pembesian dg besi Polos Kg 143.760 18,392.53 2,644,109.39
C Begesting M2 8.750 480,004.25 4,200,037.19

D Harga Satuan Pekerjaan 8,164,297.52

V PEKERJAAN PASANGAN DINDING DAN CONBLOCK

1. Memasang 1 m2 dinding bata merah ukuran (9 x 9 x 18) cm tebal 1/2 bata, Campuran Spesi 1 PC : 4 PP
Harga sat. Jumlah Harga
No Uraian Jenis Pekerjaan Kode Sat. Koeff.
(Rp. ) (Rp. )
A Tenaga Kerja :
Pekerja L.01 OH 0.3000 110,000.00 33,000.00
Tukang batu L.02 OH 0.1000 145,000.00 14,500.00
Kepala tukang L.03 OH 0.0100 165,000.00 1,650.00
Mandor L.04 OH 0.0150 170,000.00 2,550.00
Jumlah Tenaga Kerja 51,700.00
B Bahan :
Bata merah Bh 55.000 3,000.00 165,000.00
Portland Cement kg 11.500 1,300.00 14,950.00
Pasir Pasang m3 0.0430 110,000.00 4,730.00
Jumlah Harga Bahan 184,680.00
C Peralatan :

Jumlah Harga Alat

D Jumlah (A+B+C) 236,380.00


E Overhead & Profit ( 15% x D ) 35,457.00
F Harga Satuan Pekerjaan ( D + E ) 271,837.00
VI PEKERJAAN PLESTERAN

1. Memasang 1 m2 plesteran 1 PC : 4 PP, tebal 15 mm


Harga sat. Jumlah Harga
No Uraian Jenis Pekerjaan Kode Sat. Koeff.
(Rp. ) (Rp. )
A Tenaga Kerja :
Pekerja L.01 OH 0.3000 110,000.00 33,000.00
Tukang batu L.02 OH 0.1500 145,000.00 21,750.00
Kepala tukang L.03 OH 0.0150 165,000.00 2,475.00
Mandor L.04 OH 0.0150 170,000.00 2,550.00
Jumlah Tenaga Kerja 59,775.00
B Bahan :
Portland Cement kg 6.2400 1,300.00 8,112.00
Pasir Pasang m3 0.0240 110,000.00 2,640.00
Jumlah Harga Bahan 10,752.00
C Peralatan :
Jumlah Harga Alat

D Jumlah (A+B+C) 70,527.00


E Overhead & Profit ( 15% x D ) 10,579.05
F Harga Satuan Pekerjaan ( D + E ) 81,106.05

VI. PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING

1. Memasang 1 m2 Lantai Keramik ukuran 30 cm x 30 cm


Harga sat. Jumlah Harga
No Uraian Jenis Pekerjaan Kode Sat. Koeff.
(Rp. ) (Rp. )
A Tenaga Kerja :
Pekerja L.01 OH 0.2600 110,000.00 28,600.00
Tukang batu L.02 OH 0.1300 145,000.00 18,850.00
Kepala tukang L.03 OH 0.0130 165,000.00 2,145.00
Mandor L.04 OH 0.0130 170,000.00 2,210.00
Jumlah Tenaga Kerja 51,805.00
B Bahan :
Keramik 30/30 Bh 11.870 8,370.00 99,351.90
Portland Cement kg 10.000 1,300.00 13,000.00
Semen Warna kg 1.500 20,000.00 30,000.00
Pasir Pasang m3 0.045 110,000.00 4,950.00
Jumlah Harga Bahan 147,301.90
C Peralatan :
Jumlah Harga Alat

D Jumlah (A+B+C) 199,106.90


E Overhead & Profit ( 15% x D ) 29,866.04
F Harga Satuan Pekerjaan ( D + E ) 228,972.94

2. Memasang 1 m2 Lantai Keramik Granito ukuran 60 cm x 60 cm


Harga sat. Jumlah Harga
No Uraian Jenis Pekerjaan Kode Sat. Koeff.
(Rp. ) (Rp. )
A Tenaga Kerja :
Pekerja L.01 OH 0.2400 110,000.00 26,400.00
Tukang batu L.02 OH 0.1200 145,000.00 17,400.00
Kepala tukang L.03 OH 0.0120 165,000.00 1,980.00
Mandor L.04 OH 0.0120 170,000.00 2,040.00
Jumlah Tenaga Kerja 47,820.00
B Bahan :
Keramik granit 60/60 Bh 3.100 148,500.00 460,350.00
Portland Cement kg 9.600 1,300.00 12,480.00
Semen Warna kg 1.500 20,000.00 30,000.00
Pasir Pasang m3 0.045 110,000.00 4,950.00
Jumlah Harga Bahan 507,780.00
C Peralatan :
Jumlah Harga Alat

D Jumlah (A+B+C) 555,600.00


E Overhead & Profit ( 15% x D ) 83,340.00
F Harga Satuan Pekerjaan ( D + E ) 638,940.00
3. Memasang 1 m2 dinding keramik ukuran 20 cm x 25 cm
Harga sat. Jumlah Harga
No Uraian Jenis Pekerjaan Kode Sat. Koeff.
(Rp. ) (Rp. )
A Tenaga Kerja :
Pekerja L.01 OH 0.9000 110,000.00 99,000.00
Tukang batu L.02 OH 0.4500 145,000.00 65,250.00
Kepala tukang L.03 OH 0.0450 102,000.00 4,590.00
Mandor L.04 OH 0.0450 109,200.00 4,914.00
Jumlah Tenaga Kerja 173,754.00
B Bahan :
Keramik Bh 20.000 3,564.00 71,280.00
Portland Cement kg 10.400 1,300.00 13,520.00
Semen warna Kg 1.620 20,000.00 32,400.00
Pasir pasang m3 0.045 110,000.00 4,950.00
Jumlah Harga Bahan 122,150.00
C Peralatan :
Jumlah Harga Alat

D Jumlah (A+B+C) 295,904.00


E Overhead & Profit ( 15% x D ) 44,385.60
F Harga Satuan Pekerjaan ( D + E ) 340,289.60

4. Memasang 1 m2 Lantai Karpet


Harga sat. Jumlah Harga
No Uraian Jenis Pekerjaan Kode Sat. Koeff.
(Rp. ) (Rp. )
A Tenaga Kerja :
Pekerja L.01 OH 0.1700 110,000.00 18,700.00
Tukang batu L.02 OH 0.1700 145,000.00 24,650.00
Kepala tukang L.03 OH 0.0170 102,000.00 1,734.00
Mandor L.04 OH 0.0090 109,200.00 982.80
Jumlah Tenaga Kerja 46,066.80
B Bahan :
Karpet m2 1.050 11,250.00 11,812.50
Lem kg 0.350 36,000.00 12,600.00
Jumlah Harga Bahan 24,412.50
C Peralatan :
Jumlah Harga Alat

D Jumlah (A+B+C) 70,479.30


E Overhead & Profit ( 15% x D ) 10,571.90
F Harga Satuan Pekerjaan ( D + E ) 81,051.20

5. Memasang 1 m2 dinding Batu tempel hitam


Harga sat. Jumlah Harga
No Uraian Jenis Pekerjaan Kode Sat. Koeff.
(Rp. ) (Rp. )
A Tenaga Kerja :
Pekerja L.01 OH 0.7000 110,000.00 77,000.00
Tukang batu L.02 OH 0.3500 145,000.00 50,750.00
Kepala tukang L.03 OH 0.0350 165,000.00 5,775.00
Mandor L.04 OH 0.0350 170,000.00 5,950.00
Jumlah Tenaga Kerja 139,475.00
B Bahan :
Batu Tempel Hitam Bh 1.100 346,500.00 381,150.00
Portland Cement kg 11.750 1,300.00 15,275.00
Pasir Pasang m3 0.035 110,000.00 3,850.00
Jumlah Harga Bahan 400,275.00
C Peralatan :
Jumlah Harga Alat

D Jumlah (A+B+C) 539,750.00


E Overhead & Profit ( 15% x D ) 80,962.50
F Harga Satuan Pekerjaan ( D + E ) 620,712.50
VII. PEKERJAAN LANGIT-LANGIT (PLAFOND)

1. Memasang 1 m2 Langit-langit Gypsum board Ukuran (120x240x9)mm, tebal 9 mm


Harga sat. Jumlah Harga
No Uraian Jenis Pekerjaan Kode Sat. Koeff.
(Rp. ) (Rp. )
A Tenaga Kerja :
1 Pekerja L.01 OH 0.1000 110,000.00 11,000.00
2 Tukang Kayu L.02 OH 0.0500 145,000.00 7,250.00
3 Kepala tukang L.03 OH 0.0050 165,000.00 825.00
4 Mandor L.04 OH 0.0050 170,000.00 850.00
Jumlah Tenaga Kerja 19,925.00
B Bahan :
1 Gypsum board Lembar 0.364 84,150.00 30,630.60
2 Paku skrup Kg 0.110 18,000.00 1,980.00
Jumlah Harga Bahan 32,610.60
C Peralatan :
Jumlah Harga Alat

D Jumlah (A+B+C) 52,535.60


E Overhead & Profit ( 15% x D ) 7,880.34
F Harga Satuan Pekerjaan ( D + E ) 60,415.94

VIII. PEKERJAAN PENUTUP ATAP

1. Memasang 1 m2 Genteng Metal


Harga sat. Jumlah Harga
No Uraian Jenis Pekerjaan Kode Sat. Koeff.
(Rp. ) (Rp. )
A Tenaga Kerja :
Pekerja L.01 OH 0.2000 110,000.00 22,000.00
Tukang Kayu L.03 OH 0.1000 145,000.00 14,500.00
Kepala tukang L.11 OH 0.0100 165,000.00 1,650.00
Mandor L.15 OH 0.0010 170,000.00 170.00
Jumlah Tenaga Kerja 38,320.00
B Bahan :
Genteng Metal Bh 1.020 84,150.00 85,833.00
Paku Biasa 1/2 - 1" Kg 0.200 18,000.00 3,600.00
Jumlah Harga Bahan 89,433.00
C Peralatan :
Jumlah Harga Alat

D Jumlah (A+B+C) 127,753.00


E Overhead & Profit ( 15% x D ) 19,162.95
F Harga Satuan Pekerjaan ( D + E ) 146,915.95

2. Pemasangan 1 m' Bubungan Nok Genteng Metal


Harga sat. Jumlah Harga
No Uraian Jenis Pekerjaan Kode Sat. Koeff.
(Rp. ) (Rp. )
A Tenaga Kerja :
Pekerja L.01 OH 0.2500 110,000.00 27,500.00
Tukang Kayu L.03 OH 0.1500 145,000.00 21,750.00
Kepala tukang L.11 OH 0.0150 165,000.00 2,475.00
Mandor L.15 OH 0.0130 170,000.00 2,210.00
Jumlah Tenaga Kerja 53,935.00
B Bahan :
Nok Genteng Metal Bh 1.100 64,350.00 70,785.00
Paku Biasa 1/2 - 1" Kg 0.200 18,000.00 3,600.00
Jumlah Harga Bahan 74,385.00
C Peralatan :
Jumlah Harga Alat

D Jumlah (A+B+C) 128,320.00


E Overhead & Profit ( 15% x D ) 19,248.00
F Harga Satuan Pekerjaan ( D + E ) 147,568.00
3. Pemasangan 10 m' Jurai Dalam
Harga sat. Jumlah Harga
No Uraian Jenis Pekerjaan Kode Sat. Koeff.
(Rp. ) (Rp. )
A Tenaga Kerja :
Pekerja L.01 OH 0.0250 110,000.00 2,750.00
Mandor L.02 OH 0.2500 170,000.00 42,500.00
Jumlah Tenaga Kerja 45,250.00
B Bahan :
Seng Plat BJLS.30 Lbr 6.000 84,600.00 507,600.00
Paku Biasa 1/2 - 1" Kg 0.15 18,000.00 2,700.00
Jumlah Harga Bahan 510,300.00
C Peralatan :
Jumlah Harga Alat

D Jumlah (A+B+C) 555,550.00


E Overhead & Profit ( 15% x D ) 83,332.50
F Harga Satuan Pekerjaan ( D + E ) 638,882.50
Per 1 m' Pekerjaan Jurai Dalam 63,888.25

X PEKERJAAN BESI , KACA DAN ALUMINIUM

1. Pemasangan 1 m2 Kuda-kuda Baja Ringan + Reng


Harga sat. Jumlah Harga
No Uraian Jenis Pekerjaan Kode Sat. Koeff.
(Rp. ) (Rp. )
A Tenaga Kerja :
Pekerja L.01 OH 0.200 110,000.00 22,000.00
Tukang Besi L.02 OH 0.450 145,000.00 65,250.00
Kepala tukang L.03 OH 0.0100 165,000.00 1,650.00
Mandor L.04 OH 0.0500 170,000.00 8,500.00
Jumlah Tenaga Kerja 97,400.00
B Bahan :
C-75 , 0.8 m' 1.4880 16,500.00 24,552.00
C-75 , 0.6 m' 2.2320 15,000.00 33,480.00
Baut (screw driver) bh 38.000 315.00 11,970.00
Dynabolt bh 1.6000 15,750.00 25,200.00
Reng 0,43 m' 5.4000 8,250.00 44,550.00

Jumlah Harga Bahan 139,752.00


C Peralatan :
Jumlah Harga Alat

D Jumlah (A+B+C) 237,152.00


E Overhead & Profit ( 15% x D ) 35,572.80
F Harga Satuan Pekerjaan ( D + E ) 272,724.80

2. Pemasangan 1 m' Lisplank (GRC Board 30 cm)


Harga sat. Jumlah Harga
No Uraian Jenis Pekerjaan Kode Sat. Koeff.
(Rp. ) (Rp. )
A Tenaga Kerja :
Pekerja L.01 OH 0.050 110,000.00 5,500.00
Tukang Besi L.02 OH 0.050 145,000.00 7,250.00
Kepala tukang L.03 OH 0.0050 165,000.00 825.00
Mandor L.04 OH 0.0030 170,000.00 510.00
Jumlah Tenaga Kerja 14,085.00
B Bahan :
Listplank GRC 30 cm m' 1.100 22,500.00 24,750.00
Sekrup segala ukuran bh 0.050 270.00 13.50

Jumlah Harga Bahan 24,763.50


C Peralatan :
Jumlah Harga Alat

D Jumlah (A+B+C) 38,848.50


E Overhead & Profit ( 15% x D ) 5,827.28
F Harga Satuan Pekerjaan ( D + E ) 44,675.78
3. 1 m2 Pasang Kaca Bening t= 5 mm
Harga sat. Jumlah Harga
No Uraian Jenis Pekerjaan Kode Sat. Koeff.
(Rp. ) (Rp. )
Tenaga Kerja:
Pekerja L.01 OH 0.0150 110,000.00 1,650.00
Tukang Kayu L.02 OH 0.1500 145,000.00 21,750.00
Kepala Tukang L.03 OH 0.0150 165,000.00 2,475.00
Mandor L.04 OH 0.0010 170,000.00 170.00
Jumlah Tenaga Kerja 26,045.00
B Bahan :
Kaca Polos m2 1.1000 362,000.00 398,200.00
Jumlah Harga Bahan 398,200.00
C Peralatan :

Jumlah Harga Alat -

D Jumlah (A+B+C) 424,245.00


E Overhead & Profit ( 15% x D ) 63,636.75
F Harga Satuan Pekerjaan ( D + E ) 487,881.75

4. Pemasangan 1 m' Kusen Aluminium Coklat


Harga sat. Jumlah Harga
No Uraian Jenis Pekerjaan Kode Sat. Koeff.
(Rp. ) (Rp. )
A Tenaga Kerja :
Pekerja L.01 OH 0.043 110,000.00 4,730.00
Tukang Besi L.02 OH 0.043 145,000.00 6,235.00
Kepala tukang L.03 OH 0.0043 165,000.00 709.50
Mandor L.04 OH 0.0021 170,000.00 357.00
Jumlah Tenaga Kerja 12,031.50
B Bahan :
Profil Aluminium Coklat m' 1.100 135,000.00 148,500.00
Sekrup Segala Ukuran bh 2.000 270.00 540.00
Sealant tube 0.060 67,500.00 4,050.00

Jumlah Harga Bahan 153,090.00


C Peralatan :
Jumlah Harga Alat

D Jumlah (A+B+C) 165,121.50


E Overhead & Profit ( 15% x D ) 24,768.23
F Harga Satuan Pekerjaan ( D + E ) 189,889.73

5. Memasang 1 m2 Kerangka besi Holow 1x40.40.3 mm, Plafond


Harga sat. Jumlah Harga
No Uraian Jenis Pekerjaan Kode Sat. Koeff.
(Rp. ) (Rp. )
A Tenaga Kerja :
Pekerja L.01 OH 0.3500 110,000.00 38,500.00
Tukang batu L.02 OH 0.3500 145,000.00 50,750.00
Kepala tukang L.03 OH 0.0350 165,000.00 5,775.00
Mandor L.04 OH 0.0180 170,000.00 3,060.00
Jumlah Tenaga Kerja 98,085.00
B Bahan :
Rangka Metal Holow 40.40.3 mm m' 3.500 9,652.50 33,783.75
Aksesoris (perkuatan, Las dan lain-lain) Ls 100 % 33,783.75 33,783.75

Jumlah Harga Bahan 67,567.50


C Peralatan :
Jumlah Harga Alat

D Jumlah (A+B+C) 165,652.50


E Overhead & Profit ( 15% x D ) 24,847.88
F Harga Satuan Pekerjaan ( D + E ) 190,500.38
XI PEKERJAAN PIPA DAN SANITASI

1. Memasang 1 buah Kloset Duduk / Monoblock


Harga sat. Jumlah Harga
No Uraian Jenis Pekerjaan Kode Sat. Koeff.
(Rp. ) (Rp. )
Tenaga Kerja:
Pekerja L.01 OH 3.300 110,000.00 363,000.00
Tukang Batu L.02 OH 1.100 145,000.00 159,500.00
Kepala Tukang L.03 OH 0.010 165,000.00 1,650.00
Mandor L.04 OH 0.160 170,000.00 27,200.00
Jumlah Tenaga Kerja 551,350.00
B Bahan :
Kloset Duduk / Monoblok Unit 1.000 2,178,000.00 2,178,000.00
Perlengkapan Ls 6% x closed 130,680.00

Jumlah Harga Bahan 2,308,680.00


C Peralatan :

Jumlah Harga Alat -

D Jumlah (A+B+C) 2,860,030.00


E Overhead & Profit ( 15% x D ) 429,004.50
F Harga Satuan Pekerjaan ( D + E ) 3,289,034.50

2. Memasang 1 buah bak cuci piring stainlessteel


Harga sat. Jumlah Harga
No Uraian Jenis Pekerjaan Kode Sat. Koeff.
(Rp. ) (Rp. )
Tenaga Kerja:
Pekerja L.01 OH 0.030 110,000.00 3,300.00
Tukang Batu L.02 OH 0.300 145,000.00 43,500.00
Kepala Tukang L.03 OH 0.030 165,000.00 4,950.00
Mandor L.04 OH 0.015 170,000.00 2,550.00
Jumlah Tenaga Kerja 54,300.00
B Bahan :
Bak cuci piring Unit 1.000 495,000.00 495,000.00
Waterdrain Bh 1.000 50,000.00 50,000.00
Jumlah Harga Bahan 545,000.00
C Peralatan :

Jumlah Harga Alat -

D Jumlah (A+B+C) 599,300.00


E Overhead & Profit ( 15% x D ) 89,895.00
F Harga Satuan Pekerjaan ( D + E ) 689,195.00

3. Memasang 1 buah Floor drain


Harga sat. Jumlah Harga
No Uraian Jenis Pekerjaan Kode Sat. Koeff.
(Rp. ) (Rp. )
Tenaga Kerja:
Pekerja L.01 OH 0.010 110,000.00 1,100.00
Tukang Batu L.02 OH 0.100 145,000.00 14,500.00
Kepala Tukang L.03 OH 0.010 165,000.00 1,650.00
Mandor L.04 OH 0.005 170,000.00 850.00
Jumlah Tenaga Kerja 18,100.00
B Bahan :
Floor drain Unit 1.000 67,500.00 67,500.00

Jumlah Harga Bahan 67,500.00


C Peralatan :

Jumlah Harga Alat -

D Jumlah (A+B+C) 85,600.00


E Overhead & Profit ( 15% x D ) 12,840.00
F Harga Satuan Pekerjaan ( D + E ) 98,440.00
4. Memasang 1 buah Kran Dinding
Harga sat. Jumlah Harga
No Uraian Jenis Pekerjaan Kode Sat. Koeff.
(Rp. ) (Rp. )
A Tenaga Kerja:

Tukang Batu L.02 OH 0.100 145,000.00 14,500.00


Kepala Tukang L.03 OH 0.010 165,000.00 1,650.00

Jumlah Tenaga Kerja 16,150.00


B Bahan :
Kran Air Bh 1.000 22,500.00 22,500.00
Seal Tape Bh 0.025 2,500.00 62.50
Jumlah Harga Bahan 22,562.50
C Peralatan :

Jumlah Harga Alat -

D Jumlah (A+B+C) 38,712.50


E Overhead & Profit ( 15% x D ) 5,806.88
F Harga Satuan Pekerjaan ( D + E ) 44,519.38

5. Memasang 1 buah Kran Shower


Harga sat. Jumlah Harga
No Uraian Jenis Pekerjaan Kode Sat. Koeff.
(Rp. ) (Rp. )
A Tenaga Kerja:

Tukang Batu L.02 OH 0.100 145,000.00 14,500.00


Kepala Tukang L.03 OH 0.010 165,000.00 1,650.00

Jumlah Tenaga Kerja 16,150.00


B Bahan :
Jet Shower Bh 1.000 405,000.00 405,000.00
Seal Tape Bh 0.025 2,500.00 62.50
Jumlah Harga Bahan 405,062.50
C Peralatan :

Jumlah Harga Alat -

D Jumlah (A+B+C) 421,212.50


E Overhead & Profit ( 15% x D ) 63,181.88
F Harga Satuan Pekerjaan ( D + E ) 484,394.38
6. Memasang 1 buah Wastafel + Cermin
Harga sat. Jumlah Harga
No Uraian Jenis Pekerjaan Kode Sat. Koeff.
(Rp. ) (Rp. )
Tenaga Kerja:
1 Pekerja L.01 OH 1.200 110,000.00 132,000.00
2 Tukang Batu L.02 OH 1.450 145,000.00 210,250.00
3 Kepala Tukang L.03 OH 0.150 165,000.00 24,750.00
4 Mandor L.04 OH 0.060 170,000.00 10,200.00
Jumlah Tenaga Kerja 377,200.00
B Bahan :
1 Wastafel Unit 1.200 990,000.00 1,188,000.00
2 Sement portlan Kg 6.000 1,300.00 7,800.00
3 Pasir pasang m3 0.0100 110,000.00 1,100.00
4 Perlengkapan % 12.000 0.12 143,628.00
5 Cermin 30x50 cm Bh 1.000 135,000.00 135,000.00
Jumlah Harga Bahan 1,475,528.00
C Peralatan :

Jumlah Harga Alat -

D Jumlah (A+B+C) 1,852,728.00


E Overhead & Profit ( 15% x D ) 277,909.20
F Harga Satuan Pekerjaan ( D + E ) 2,130,637.20

7. Memasang 1 buah Urinoir


Harga sat. Jumlah Harga
No Uraian Jenis Pekerjaan Kode Sat. Koeff.
(Rp. ) (Rp. )
A Tenaga Kerja:
1 Pekerja L.01 OH 1.000 110,000.00 110,000.00
2 Tukang Batu L.02 OH 1.000 145,000.00 145,000.00
3 Kepala Tukang L.03 OH 0.010 165,000.00 1,650.00
4 Mandor L.04 OH 0.050 170,000.00 8,500.00
Jumlah Tenaga Kerja 265,150.00
B Bahan :
1 Urinoir Unit 1.000 2,425,500.00 2,425,500.00
2 Semen Portland Kg 6.000 1,300.00 7,800.00
3 Pasir Pasang M3 0.030 110,000.00 3,300.00
4 Perlengkapan % 30.00 0.30 730,980.00
Jumlah Harga Bahan 3,167,580.00
C Peralatan :

Jumlah Harga Alat -

D Jumlah (A+B+C) 3,432,730.00


E Overhead & Profit ( 15% x D ) 514,909.50
F Harga Satuan Pekerjaan ( D + E ) 3,947,639.50

XII PEKERJAAN PENGECATAN

1. 1 m2 Pengecatan Tembok baru ( 1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup )
Harga sat. Jumlah Harga
No Uraian Jenis Pekerjaan Kode Sat. Koeff.
(Rp. ) (Rp. )
Tenaga Kerja:
Pekerja L.01 OH 0.020 110,000.00 2,200.00
Tukang cat L.02 OH 0.063 145,000.00 9,135.00
Kepala Tukang L.03 OH 0.006 165,000.00 1,039.50
Mandor L.04 OH 0.003 170,000.00 510.00
Jumlah Tenaga Kerja 12,884.50
B Bahan :
Plamuur Kg 0.100 39,600.00 3,960.00
Cat dasar Kg 0.100 31,500.00 3,150.00
Cat penutup Kg 0.260 39,600.00 10,296.00
Jumlah Harga Bahan 17,406.00
C Peralatan :

Jumlah Harga Alat -

D Jumlah (A+B+C) 30,290.50


E Overhead & Profit ( 15% x D ) 4,543.58
F Harga Satuan Pekerjaan ( D + E ) 34,834.08
2. 1 m2 Pengecatan Bidang Kayu baru ( 1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup )
Harga sat. Jumlah Harga
No Uraian Jenis Pekerjaan Kode Sat. Koeff.
(Rp. ) (Rp. )
Tenaga Kerja:
Pekerja L.01 OH 0.070 110,000.00 7,700.00
Tukang cat L.02 OH 0.009 145,000.00 1,305.00
Kepala Tukang L.03 OH 0.006 165,000.00 990.00
Mandor L.04 OH 0.003 170,000.00 510.00
Jumlah Tenaga Kerja 10,505.00
B Bahan :
Cat meni Kg 0.200 29,700.00 5,940.00
Plamuur Kg 0.150 39,600.00 5,940.00
Cat dasar Kg 0.170 31,500.00 5,355.00
Cat penutup Kg 0.260 54,450.00 14,157.00
Kuas Bh 0.010 13,500.00 135.00
Pengencer cat Kg 0.030 24,750.00 742.50
Ampelas Lbr 0.200 59,400.00 11,880.00
Jumlah Harga Bahan 44,149.50
C Peralatan :

Jumlah Harga Alat -

D Jumlah (A+B+C) 54,654.50


E Overhead & Profit ( 15% x D ) 8,198.18
F Harga Satuan Pekerjaan ( D + E ) 62,852.68
DAFTAR HARGA UPAH DAN BAHAN

Kegiatan : 0
Pekerjaan : 0
Lokasi Kegiatan : 0

HARGA SATUAN DASAR


NO. URAIAN SATUAN
(Rp.)

1 2 3 4

A. UPAH
1 Pekerja Orang / Hari 110,000.00
2 Tukang Cat Orang / Hari 145,000.00
3 Tukang Kayu Orang / Hari 145,000.00
4 Tukang Batu Orang / Hari 145,000.00
5 Tukang Besi Orang / Hari 145,000.00
6 Kepala Tukang Cat Orang / Hari 165,000.00
7 Kepala Tukang Kayu Orang / Hari 165,000.00
8 Kepala Tukang Batu Orang / Hari 165,000.00
9 Kepala Tukang Besi Orang / Hari 165,000.00
10 Mandor Orang / Hari 170,000.00
11 Pekerja Orang / Jam Efektif 15,714.29
12 Mandor Orang / Jam Efektif 24,285.71

B. BAHAN
1 Semen PC 50 Kg Zak 65,000.00
kg 1,300.00
2 Semen Putih Zak 137,500.00
3 Semen warna kg 20,000.00
4 Semen Mortar Prime MU-380 Kg 2,250.00
5 Batu Gunung M3 560,000.00
6 Batu Batako Buah 3,000.00
7 Batu Bata Ringan Buah 20,481.93
8 Roster (B) Buah 33,000.00
9 Roster (K) Buah 22,000.00
10 Paving Block Segienam (K) Buah 3,520.00
11 Glass Box Buah 33,000.00
12 Batu Pecah 1/1 - 5/7 cm M3 500,000.00
kg 344.83
13 Batu Kerikil sungai M3 350,000.00
14 Pasir Urug M3 100,000.00
15 Pasir Pasangan / Beton M3 110,000.00
kg 78.57
16 Bahan Tanah Urug Biasa M3 50,400.00
17 Bahan Tanah Urug Pilihan M3 57,600.00
18 Besi Beton Polos Kg 13,000.00
19 Besi Beton Ulir Kg 15,000.00
19 Kawat Beton / Bendrat Kg 25,000.00
20 Besi Pelat 5 mm Kg 24,500.00
21 Kayu Perancah M 3
2,500,000.00
22 Kayu Meranti M3 2,500,000.00
HARGA SATUAN DASAR
NO. URAIAN SATUAN
(Rp.)

1 2 3 4
23 Kayu Bengkirai / Lembasung M 3
4,400,000.00
24 Kusen kayu Lembasung M3 4,400,000.00
25 Kayu ulin (balok) M3 7,000,000.00
26 Kayu Laut Dia. 8-10 cm Btg 35,000.00
27 Plywood 4 mm Lbr 85,800.00
28 Plywood 9 mm Lbr 135,000.00
29 Pipa PVC 2" M1 21,015.00
30 Seng Gelombang BJLS 30 Lembar 58,500.00
31 Seng Gelombang BJLS 20 Lembar 49,500.00
32 Seng Pelat BJLS 30 Lembar 84,600.00
33 Seng Pelat BJLS 20 Lembar 79,200.00
34 Closet Jongkok (toto) non polos Buah 315,000.00
35 Closet Duduk Buah 2,178,000.00
36 Tempat sabun Toto S11N Buah 81,000.00
37 Floor drain Toto Buah 67,500.00
38 Kran dinding Buah 22,500.00
39 Kran Shower Cabang euro Buah 405,000.00
40 Kitchen sink Royal 1 lubang Buah 495,000.00
41 Kran dapur Toto Buah 157,500.00
42 Washtafel Toto Buah 990,000.00
43 Urinoir Toto U57M Buah 2,425,500.00
44 Cermin Buah 135,000.00
45 Kaca polos 8 mm M2 362,000.00
46 Kunci Tanam 2 x Putar (Yale) Buah 158,400.00
47 Kunci Tanam 2 x putar (Union) Buah 272,250.00
48 Engsel pintu 4" (Axaxi) tiap daun pintu 3 bh Buah 29,700.00
49 Engsel jendela 4"(Axaxi) tiap daun 2 bh Buah 29,700.00
50 Grendel putar pintu dua daun Buah 24,750.00
51 Grendel jendela (lamskar) Buah 24,750.00
52 Handel jendela (lamskar) Buah 18,450.00
53 Hak angin jendela 10 " (lamskar) Buah 21,150.00
54 Gypsum Board Lembar 84,150.00
55 Gypsum BRC Boar 6 mm Lembar 121,500.00
56 Les Plafond 4/4 M1 16,200.00
57 Liastplank GRC Board 30 cm M' 22,500.00
58 Genteng Metal Multi Color Lembar 84,150.00
59 Bubungan Genteng Metal Multi Color Lembar 64,350.00
60 Paku Biasa Kg 18,000.00
61 Paku Ulin Kg 22,500.00
62 Paku Seng Kg 22,500.00
63 Paku Genteng Metal Multi Color Buah 217.80
64 Tegel Keramik (20/20) M 2
89,100.00
HARGA SATUAN DASAR
NO. URAIAN SATUAN
(Rp.)

1 2 3 4
Bh 3,564.00
65 Tegel Keramik (20/25) M2 89,100.00
Bh 4,455.00
66 Tegel Keramik (30/30) M2 92,070.00
Bh 8,370.00
67 Tegel Keramik (40/40) M 2
94,050.00
Bh 15,675.00
68 Tegel Granito (60/60) M2 297,000.00
Bh 148,500.00
69 Plint Keramik M2 94,050.00
3,617.31
70 Batu Alam M 2
346,500.00
71 Dempul/ Plamir Kg 39,600.00
72 Cat Minyak Avian Kg 54,450.00
73 Cat meni Kg 29,700.00
74 Cat dasar kg 31,500.00
75 cat air dulux Kg 39,600.00
76 Cat air Paragon Kg 29,700.00
77 Minyak Cat Thiner Ltr 24,750.00
78 Minyak Begisting Ltr 7,200.00
79 Amplas Lbr 59,400.00
80 Kuas cat Bh 13,500.00
81 Grass Block Bh 27,000.00
82 Air m3 45,000.00
kg 45.00
Besi Holow 40.40.3 mm m' 9,652.50
83 Galvalume C-75, 0,8 m' 16,500.00
84 Galvalume C-75, 0,6 m' 15,000.00
85 Baut ( Sre Driver) Bh 315.00
86 Dynabolt Bh 15,750.00
87 Reng 0,45 m' 8,250.00
88 Bak Air Fiber Bh 855,000.00
89 Lem perekat Kg 36,000.00
90 Sealent Tube 67,500.00
91 Profil Aluminium Coklat m' 135,000.00
92 Skrup fixer Bh 270.00
93 Karpet m2 11,250.00
94 Pagar besi holow + pengecatan m2 675,000.00
95 Pas. Pipa PVC Dia. 2" m' 21,375.00
96 Pas. Pipa PVC Dia. 3" m' 38,250.00
97 Pas. Pipa PVC Dia. 4" m' 45,000.00
98 Pas. Dinding Partisi PVC + Rangka m2 616,500.00
99 Exhouse Fan Bh 469,980.00
C V . R AIHAN M AHAR AN I S EJAHT ER A
G ENE RAL C O NTR AC TO R & SUPP LIER
J L. AGATH IS RT. 0 5 KAR ANG HAR APAN TARAKAN
H p : 0 8 12 5 8 95 2 73

RENCANA ANGGARAN BIAYA PEKERJAAN


PEMAKAIAN UANG MUKA
#REF! : #REF!
#REF! : #REF!

Harga Satuan Jumlah Harga


No. Uraian Pekerjaan Satuan Volume
(Rp.) (Rp.)

(1) (2) (3) (5) (6)

A PEKERJAAN PENDAHULUAN
1 Pembersihan dan Persiapan Pekerjaan Ls 1.00 350,000.00 350,000.00
Sub Jumlah A 350,000.00
B PEKERJAAN TANAH
1 Urugan Pasir Bawah Lantai t= 5cm M³ #REF! 177,905 #REF!

Sub Jumlah B #REF!


C PEKERJAAN BETON
1 Cor Beton Bertulang Sloof bantu 10/20 M³ 1.15 7,101,751.04 8,152,810.19
2 Kolom beton bertulang 20/20 M³ 3.42 11,166,605.51 38,145,124.41
3 Kolom Praktis 10/10 M³ 0.00 12,032,318.91 -
4 Cor beton Brtulang Balok 20/30 M³ 2.84 7,677,621.77 21,835,156.32
5 Cor beton Brtulang Balok 20/25 M³ 3.12 8,339,054.91 25,984,495.10
6 Cor beton Brtulang Balok 18/20 M³ 0.47 9,192,507.19 4,302,093.36
7 Cor Beton Bertulang Ringbalk 18/20 M³ 3.53 10,467,477.02 36,929,258.92
8 Cor Beton Bertulang Balok Kantilever BK 20/25 M³ 1.25 8,339,054.91 10,446,083.91
9 Cor Beton Sunscreen 15/30 M³ 0.59 8,781,357.20 5,167,263.34
10 Plat Dag beton k-225 M³ 0.00 5,939,150.75 -
11 List plank beton M³ 0.00 8,164,297.52 -
12 Cor Lantai rabat Finishing Acian M³ 0.00 1,175,993.06 -

Sub Jumlah D 150,962,285.56


E PEKERJAAN PASANGAN DAN PLESTERAN
1 Pas. Dinding Bata Camp. 1:4 M² #REF! #REF!
2 Plesteran dan Acian 1 : 4 M² #REF! #REF!
3 Pas. Dinding Partisi Toilet PVC + Rangka M² #REF! #REF!
4 Pas. Batu Alam M² #REF! #REF!

Sub Jumlah E #REF!


F PEKERJAAN ATAP
1 Rangka Atap Baja Ringan M³ #REF! #REF!
2 Atap Multiroof M² #REF! #REF!
3 Bubungan M' #REF! #REF!
4 Jurai Dalam M' #REF! #REF!
5 Listplank GRC 30 cm M' #REF! #REF!

Sub Jumlah F #REF!


G PEKERJAAN KUSEN / P / J
1 Kusen Pintu & Jendela Aluminium M' #REF! #REF!
2 Pintu Type P.1 Buah 4.00 -
3 Pintu Type P.2 Buah 2.00 -
4 Pintu Km/Wc (PVC) Buah 6.00 -
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Satuan Volume
(Rp.) (Rp.)

(1) (2) (3) (5) (6)


5 Bovenlicht BV Buah 4.00 -
6 Kunci Tanam 2 x Putar (Yale) Buah 6.00 -
7 Engsel pintu Kaca Buah 12.00 -
8 Kaca Polos / Bening 5mm M² #REF! #REF!
Sub Jumlah G #REF!
H PEKERJAAN PLAFOND
1 Rangka Plafond Besi Holow M² 53.12 -
2 Plafond Gypsum M² 53.12 -

Sub Jumlah H -
I PEKERJAAN LANTAI
1 Lantai Keramik toilet 30x30 M² #REF! #REF!

Sub Jumlah I #REF!


J PEKERJAAN CAT-CATAN
1 Cat dinding luar dalam M² #REF! #REF!
2 Cat Plafound M² 53.12 -

Sub Jumlah J #REF!


K PEKERJAAN FINISHING
1 Dinding keramik WC 30/30 M² #REF! #REF!
2 Pas. Pagar realing besi Holow M² #REF! #REF!
3 Raling Tangga besi Holow M² #REF! #REF!
4 Pas. Tangga besi dari lantai 1 kelantai 2 Unit 2.00 -
5 Pas. Exhouse Fan Bh 4.00 -

Sub Jumlah K #REF!


L PEKERJAAN JARINGAN SANITASI
1 Floor drain stainless steel Dia. 50 mm Bh 6.00 -
2 Kran dinding Bh 2.00 -
3 Closet Duduk Bh 2.00 -
4 Urinoir Toto Bh 2.00 -
5 Pas. Kran Shower Bh 4.00 -
6 Pas. Wastafel + Cermin Bh 2.00 -

Sub Jumlah L -
M PEKERJAAN PLUMBING
1 Instalasi pipa air bersih
- Pipa PVC AW Dia. 2' M¹ 30.00 -
- Fitting material bantu Ls 1.00 -
2 Instalasi pipa air kotor, limbah & ventilasi
- Pipa PVC Kelas AW Dia. 3' M¹ 65.00 -
- Pipa PVC Kelas AW Dia. 4' M¹ 28.00 -
- Fitting material bantu Ls 1.00 -

Sub Jumlah M -
N PEKERJAAN JARINGAN LISTRIK
1 Lampu down light 15 Watt Buah 98.00 -
2 Saklar tunggal Buah 2.00 -
3 Saklar ganda Buah 6.00 -
4 Stop kontak Buah 6.00 -
5 Stop kontak AC Buah 4.00 -
6 Titik lampu + instalasi Titik 98.00 -
7 Titik stop kontak + instalasi Titik 10.00 -
8 Box Sekring Buah 1.00 -
Sub Jumlah N -

Anda mungkin juga menyukai