4 Pengecatan Eksterior
5 Gali & Pasang Septitank (1.5x1.5x1) Biotank 1.00 lot 750,000.00 750,000.00
Total 8,852,500
No Uraian Qty Satuan HS Total Keterangan
1 PIPA PVC Ukuran 1/2 10.00 batang 38,000.00 380,000.00
5 Kabel Supreme / Setara 3 x 2.5 dari indor ke out door 30.00 M 23,000.00 690,000.00
Total 3,450,000
[11:02 AM, 10/28/2022] Taufik Ac: Baik pak nanti saya kirim
[2:26 PM, 10/28/2022] Taufik Ac: -Kamar utama Pipa + kabel 11x100 =1100
- kamar bawah pipa + kabel 8x100= 800
-ruang tamu 4x120 =480
-Jasa pasang pipa 3x125 =375
Diluar paralon pak
[2:27 PM, 10/28/2022] Taufik Ac: Paralon kurang lebih 6 batang pak
[2:35 PM, 10/28/2022] PRABU KONSTRUKSI: Paralon ukuran berapa
[2:36 PM, 10/28/2022] PRABU KONSTRUKSI: I7u sekalian bobok apa himana,coz 7ukan9 pada pade7
[2:48 PM, 10/28/2022] Taufik Ac: 1/2 in bisa pak kalo buat sendiri"
[2:48 PM, 10/28/2022] PRABU KONSTRUKSI: ok
[2:48 PM, 10/28/2022] PRABU KONSTRUKSI: taufik bisa sekalian bobok
[2:49 PM, 10/28/2022] PRABU KONSTRUKSI: coz tukang lagi pada ngejar plester pada ngk sempet katanya
[2:49 PM, 10/28/2022] Taufik Ac: Bisa pak cuma kena cas
[2:49 PM, 10/28/2022] Taufik Ac: Bisa sekalian sama pipa air atau pipa AC aja
[2:50 PM, 10/28/2022] PRABU KONSTRUKSI: ya coba dihitung keseluruhan aja pik
[2:53 PM, 10/28/2022] Taufik Ac: Paling bobok sama Pralon + keni nambah 500 lg pak
[2:54 PM, 10/28/2022] Taufik Ac: Jadi 3,255 ribu pak