Anda di halaman 1dari 5

LABORATORIUM PENGUJIAN BAHAN JALAN DAN STRUKTUR PT.

AKAM
Jl. A. M. Sangaji Gonof KM. 12 Masuk, Klasaman Sorong Timur Papua Barat

Paket : PEMELIHARAAN/REHABILITASI JALAN SELAT KARIMATA Material : HRS - BASE


Kontraktor : PT. AKAM Sumber : EX. AMP KM. 21
Konsultan : CV. DEWA KONSULTAN

KOMPOSISI MATERIAL HOT BIN HRS - BASE

Ukuran Ayakan Persen (%) Lolos


ASTM (mm) BIN I BIN II BIN III BIN IV BIN I BIN II BIN III BIN IV Total Spec.
50 20 23 7 100
1" 25.4 100.00 100.00 100.00 100.00 50.00 20.00 23.00 7.00 100.00
3/4 " 19.1 100.00 100.00 100.00 100.00 50.00 20.00 23.00 7.00 100.00 100
1/2 " 12.5 100.00 100.00 87.24 38.89 50.00 20.00 20.07 2.72 92.79 90 - 100
3/8 " 9.52 100.00 99.78 57.41 1.12 50.00 19.96 13.20 0.08 83.24 65 - 90
N0. 8 2,36 77.55 3.62 12.42 1.03 38.78 0.72 2.86 0.07 42.43 35 - 55
N0. 30 0,60 37.92 3.35 1.91 0.99 18.96 0.67 0.44 0.07 20.14 15 - 35
N0. 100 0,149 15.48 3.34 1.90 0.94 7.74 0.67 0.44 0.07 8.91
N0. 200 0.075 11.41 3.31 1.83 0.91 5.71 0.66 0.42 0.06 6.85 2 - 9

Jumlah Lolos (%)


100

90

80
Spesifikasi
70

60

50

40

30

Gradasi 20
Gabungan
10

0
0.01 0.10 1.00 10.00 100.00
S i z e ( mm )

Disetujui Oleh Diperiksa Oleh Dikerjakan Oleh


PEJABAT PEMBUAT KOMITMEN KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA

AGUSTINUS HOWAY, ST KOBA TAWANG, ST ERICK TIBLOLA, ST


NIP. 19730820 200801 1 009 Site Engineer Quality
LABORATORIUM PENGUJIAN BAHAN JALAN DAN STRUKTUR PT. AKAM
Jl. A. M. Sangaji Gonof KM. 12 Masuk, Klasaman Sorong Timur Papua Barat

Paket : PEMELIHARAAN/REHABILITASI JALAN SELAT KARIMATA Material : HOT BIN I


Kontraktor : PT. AKAM Sumber : EX. AMP KM. 21
Konsultan : CV. DEWA KONSULTAN

GRADASI MATERIAL HOT BIN I

Berat Sampel : 2,183.00 gram

Komulatif
Ukuran Ayakan Berat Spec.
Tertahan Brt. Tertahan Persen Thn Persen Lolos
ASTM (mm) (gr) (gr) (%) (%)
1" 25.4 - - 100.00
3/4 " 19.1 - - 100.00
1/2 " 12.50 - - 100.00
3/8 " 12.50 - - 100.00
N0. 8 2.36 490.0 22.45 77.55
N0. 30 0.60 1355.2 62.08 37.92
N0. 100 0.149 1845.0 84.52 15.48
N0. 200 0.075 1934.0 88.59 11.41

100

Jumlah Lolos (%)


90

80

70

60

50

40

30

20

10

0
0.01 0.1 1 10 100
Diameter Butir (mm)

Disetujui Oleh Diperiksa Oleh Dikerjakan Oleh


PEJABAT PEMBUAT KOMITMEN KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA

AGUSTINUS HOWAY, ST KOBA TAWANG, ST ERICK TIBLOLA, ST


NIP. 19730820 200801 1 009 Site Engineer Quality
LABORATORIUM PENGUJIAN BAHAN JALAN DAN STRUKTUR PT. AKAM
Jl. A. M. Sangaji Gonof KM. 12 Masuk, Klasaman Sorong Timur Papua Barat

Paket : PEMELIHARAAN/REHABILITASI JALAN SELAT KARIMATA Material : HOT BIN II


Kontraktor : PT. AKAM Sumber : EX. AMP KM. 21
Konsultan : CV. DEWA KONSULTAN

GRADASI MATERIAL HOT BIN II

Berat Sampel : 2,265.00 gram

Komulatif
Ukuran Ayakan Berat Spec.
Tertahan Brt. Tertahan Persen Thn Persen Lolos
ASTM (mm) (gr) (gr) (%) (%)
1" 25.4 - - 100.00
3/4 " 19.1 - - 100.00
1/2 " 12.50 - - 100.00
3/8 " 9.52 5 0.22 99.78
N0. 8 2.36 2183.0 96.38 3.62
N0. 30 0.60 2189.2 96.65 3.35
N0. 100 0.149 2189.4 96.66 3.34
N0. 200 0.075 2190.0 96.69 3.31

100

Jumlah Lolos (%)


90

80

70

60

50

40

30

20

10

0
0.01 0.1 1 10 100
Diameter Butir (mm)

Disetujui Oleh Diperiksa Oleh Dikerjakan Oleh


PEJABAT PEMBUAT KOMITMEN KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA

AGUSTINUS HOWAY, ST KOBA TAWANG, ST ERICK TIBLOLA, ST


NIP. 19730820 200801 1 009 Site Engineer Quality
LABORATORIUM PENGUJIAN BAHAN JALAN DAN STRUKTUR PT. AKAM
Jl. A. M. Sangaji Gonof KM. 12 Masuk, Klasaman Sorong Timur Papua Barat

Paket : PEMELIHARAAN/REHABILITASI JALAN SELAT KARIMATA Material : HOT BIN III


Kontraktor : PT. AKAM Sumber : EX. AMP KM. 21
Konsultan : CV. DEWA KONSULTAN

GRADASI MATERIAL HOT BIN III

Berat Sampel : 2,268.40 gram

Komulatif
Ukuran Ayakan Berat Spec.
Tertahan Brt. Tertahan Persen Thn Persen Lolos
ASTM (mm) (gr) (gr) (%) (%)
1" 25.4 - - 100.00
3/4 " 19.1 - - 100.00
1/2 " 12.50 289.5 12.76 87.24
3/8 " 9.52 966.2 42.59 57.41
N0. 8 2.36 1986.7 87.58 12.42
N0. 30 0.60 2225.0 98.09 1.91
N0. 100 0.149 2225.3 98.10 1.90
N0. 200 0.075 2227.0 98.17 1.83

100

Jumlah Lolos (%)


90

80

70

60

50

40

30

20

10

0
0.01 0.1 1 10 100
Diameter Butir (mm)

Disetujui Oleh Diperiksa Oleh Dikerjakan Oleh


PEJABAT PEMBUAT KOMITMEN KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA

AGUSTINUS HOWAY, ST KOBA TAWANG, ST ERICK TIBLOLA, ST


NIP. 19730820 200801 1 009 Site Engineer Quality
LABORATORIUM PENGUJIAN BAHAN JALAN DAN STRUKTUR PT. AKAM
Jl. A. M. Sangaji Gonof KM. 12 Masuk, Klasaman Sorong Timur Papua Barat

Paket : PEMELIHARAAN/REHABILITASI JALAN SELAT KARIMATA Material : HOT BIN IV


Kontraktor : PT. AKAM Sumber : EX. AMP KM. 21
Konsultan : CV. DEWA KONSULTAN

GRADASI MATERIAL HOT BIN IV

Berat Sampel : 2,162.30 gram

Komulatif
Ukuran Ayakan Berat Spec.
Tertahan Brt. Tertahan Persen Thn Persen Lolos
ASTM (mm) (gr) (gr) (%) (%)
1" 25.4 - - 100.00
3/4 " 19.1 - - 100.00
1/2 " 12.50 1321.4 61.11 38.89
3/8 " 9.52 2138.0 98.88 1.12
N0. 8 2.36 2140.0 98.97 1.03
N0. 30 0.60 2141.0 99.01 0.99
N0. 100 0.149 2142.0 99.06 0.94
N0. 200 0.075 2142.6 99.09 0.91
###

100

Jumlah Lolos (%)


90

80

70

60

50

40

30

20

10

0
0.01 0.1 1 10 100
Diameter Butir (mm)

Disetujui Oleh Diperiksa Oleh Dikerjakan Oleh


PEJABAT PEMBUAT KOMITMEN KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA

AGUSTINUS HOWAY, ST KOBA TAWANG, ST ERICK TIBLOLA, ST


NIP. 19730820 200801 1 009 Site Engineer Quality

Anda mungkin juga menyukai