HARGA UPAH
NO URAIAN SATUAN UPAH UPAH
ORANG/JAM ORANG/HARI
I BAHAN KACA
1 Kaca Polos 2 mm ( ASAHI ) m2 75,900.00
2 Kaca Polos 3 mm ( ASAHI ) m2 96,200.00
3 Kaca Polos 5 mm ( ASAHI ) m2 122,100.00
4 Kaca Polos 8 mm ( ASAHI ) m2 201,500.00
5 Kaca Rayband 5 mm ( ASAHI ) m2 163,600.00
6 Kaca Rayband 8 mm ( ASAHI ) m2 355,800.00
8 mm tempered m2 600,000.00
7 Kaca Rayband 12 mm ( ASAHI ) m2 689,700.00
8 Kaca cermin 5 mm m2 165,600.00
9 Kaca cermin 6 mm m2 205,100.00
10 Kaca cermin 8 mm m2 257,800.00
11 Kaca Patri Lokal Terpasang ( ASAHI ) m2 1,783,300.00
12 Kaca Patri Ex Luar Negeri Terpasang m2 3,768,300.00
13 Kaca 6 mm Gravver m2 1,390,300.00
14 Glass Block DN 20 x 20 ( Kedawung ) bh 24,200.00
15 Glass Block DN 20 x 20 Ex LN bh 138,300.00
16 Sealant kg 233,000.00
17 Jendela Nako bh 120,200.00
K BAHAN PERPIPAAN
1 Besi Pipa Untuk Hydrant BSP 1" bt 183,500.00
2 Besi Pipa Untuk Hydrant BSP 1.25" bt 231,300.00
3 Besi Pipa Untuk Hydrant BSP 1.5" bt 327,800.00
4 Besi Pipa Untuk Hydrant BSP 2" bt 387,000.00
5 Besi Pipa Untuk Hydrant BSP 2.5" bt 483,500.00
6 Besi Pipa Untuk Hydrant BSP 3" bt 654,500.00
7 Besi Pipa Untuk Hydrant BSP 4" bt 956,600.00
8 Besi Pipa Untuk Hydrant BSP 6" bt 1,565,800.00
9 Besi Pipa Hitam 1" t = 2 mm bt 189,600.00
10 Besi Pipa Hitam 2" t = 2 mm bt 250,700.00
11 Besi Pipa Hitam 3" t = 2mm bt 402,500.00
12 Besi Pipa Hitam 4" t = 2 mm bt 630,500.00
13 Besi Pipa Hitam 6" t = 2 mm bt 850,000.00
14 Pipa GIP Medium A 1/2" ( 6 m1 ) bt 120,500.00
15 Pipa GIP Medium A 3/4" ( 6 m1 ) bt 175,500.00
16 Pipa GIP Medium A 1" ( 6 m1 ) bt 199,700.00
17 Pipa GIP Medium A 1 1/4" ( 6 m1 ) bt 285,500.00
18 Pipa GIP Medium A 1 1/2" ( 6 m1 ) bt 308,600.00
19 Pipa GIP Medium A 1 3/4" ( 6 m1 ) bt 359,100.00
20 Pipa GIP Medium A 2" ( 6 m1 ) bt 514,200.00
21 Pipa GIP Medium A 2 1/2" ( 6 m1 ) bt 739,500.00
22 Pipa GIP Medium A 3" ( 6 m1 ) bt 934,900.00
23 Pipa GIP Medium A 4" ( 6 m1 ) bt 950,000.00
24 Macam2 Sambungan GIP 1/2" bh 7,000.00
25 Macam2 Sambungan GIP 3/4" bh 9,500.00
26 Macam2 Sambungan GIP 1" bh 18,500.00
27 Macam2 Sambungan GIP 1 1/4" bh 21,800.00
28 Macam2 Sambungan GIP 1 1/2" bh 23,000.00
29 Macam2 Sambungan GIP 1 3/4" bh 25,000.00
30 Macam2 Sambungan GIP 2" bh 56,500.00
31 Macam2 Sambungan GIP 2 1/2" bh 66,500.00
32 Macam2 Sambungan GIP 3" bh 83,500.00
33 Macam2 Sambungan GIP 4" bh 130,500.00
34 Pipa PVC RUCIKA type AW 1/2" bt 42,500.00
35 Pipa PVC RUCIKA type AW 3/4" bt 55,500.00
36 Pipa PVC RUCIKA type AW 1" bt 65,000.00
37 Pipa PVC RUCIKA type AW 1 1/4" bt 82,500.00
38 Pipa PVC RUCIKA type AW 1 1/2" bt 110,000.00
39 Pipa PVC RUCIKA type AW 2" bt 120,000.00
40 Pipa PVC RUCIKA type AW 2 1/2" bt 170,000.00
41 Pipa PVC RUCIKA type AW 3" bt 215,000.00
42 Pipa PVC RUCIKA type AW 4" bt 360,000.00
43 Pipa PVC RUCIKA type AW 6" bt 675,000.00
44 Pipa PVC RUCIKA type AW 8" bt 850,000.00
45 Pipa PVC MASPION ABU ( AW ) 1/2" bt 25,000.00
46 Pipa PVC MASPION ABU ( AW ) 3/4" bt 28,500.00
47 Pipa PVC MASPION ABU ( AW ) 1" bt 42,500.00
NO URAIAN SAT. HARGA
L BAHAN SANITAIR
1 Stop Kran 3/4" KIT bh 115,000.00
2 Stop Kran 1" KIT bh 137,500.00
3 Stop Kran 1 1/2" KIT bh 230,000.00
4 Stop Kran 2" KIT bh 295,000.00
5 Stop Kran 2 1/2" KIT bh 785,000.00
6 Stop Kran 3" KIT bh 915,000.00
7 Check Valve 1/2" bh 95,500.00
8 Double Neple 1/2" bh 36,000.00
9 Water Mur 1/2" bh 44,500.00
10 Gate walve 1/2" bh 61,500.00
11 Saringan Air Lt. KM Stainless Steel/Floor Drain TOTO bh 35,000.00
12 Apooer Bath Tube bh 295,000.00
13 Kran Stainless Lokal Kait bh 51,500.00
14 Shower Dengan Tiang bh 245,000.00
15 Shower ex TX402sn hand shower bh 450,000.00
16 Kran Tembok Sun Eui dia. 1/2" bh 20,000.00
17 Kran Tembok ITAP dia. 1/2" bh 25,000.00
18 Kran Bebek Sun Eui 1/2" bh 160,000.00
19 Kran Bebek ITAP 1/2" bh 57,500.00
20 Kran Panas Dingin San Eui Standard bh 252,000.00
Kran wastafel ex toto bh 300,000.00
Kran kitchen sink ex toto bh 650,000.00
21 Bath Cape Washteren unit 2,310,000.00
22 Tempat Sabun Poslin bh 51,500.00
23 Wastafel Lengkap TOTO LW 230 unit 1,115,000.00
24 Wastafel Lengkap INA unit 800,000.00
25 Closet Jongkok Poslin Warna TOTO unit 260,000.00
26 Closet Jongkok Standard Putih Poslin TOTO unit 230,000.00
27 Closet Jongkok Lengkap Sistem Jet TOTO unit 2,236,500.00
28 Closet Duduk Warna Standard TOTO C 240 Lengkap unit 1,897,500.00
NO URAIAN SAT. HARGA
N BAHAN MEKANIKAL
1 Jockey Pump kap. 80 gln/menit 100 m1 ( 18.6 kW ) unit 78,536,500.00
2 Electrical Pump kap. 750 gln/menit 120 m1 ( 90 kW ) unit 237,995,000.00
3 Diesel Pump kap. 750 gln/menit 120 m1 ( 105 kW ) unit 650,812,000.00
4 Presure Tank kap. 500 liter lengkap unit 40,698,000.00
5 Hydran Box dlm Gedung ( Lengkap ) unit 7,540,000.00
6 Fire House 1.5 x 30 m + nose unit 5,353,000.00
7 Exhose Fan H 360 W 60 x 60 cm unit 7,550,000.00
8 Exhose Fan H 380 W CFM 55 x 55 cm unit 6,040,500.00
9 Exhose Fan H 100 W 40 x 40 cm unit 1,212,500.00
10 AC Split 3 PK Setara TOSHIBA unit 33,871,500.00
11 AC Split 2 PK Setara TOSHIBA unit 24,119,500.00
12 AC Split 1 PK Setara TOSHIBA unit 5,692,000.00
13 Mesin AC Split DAIKIN ( Indoor / Outdoor Unit ) 1 BTU 5,000,000.00
O BAHAN ELEKTRIKAL
1 Kabel NYA 1 x 1.5 Prima ( 1 rol = 50 m' ) ROLL 105,000.00
2 Kabel NYA 1 x 2.5 Prima ( 1 rol = 50 m' ) ROLL 155,000.00
3 Kabel NYM 2 x 1.5 Prima ( 1 rol = 50 m' ) m' 7,000.00
4 Kabel NYM 3 x 1.5 Prima ( 1 rol = 50 m' ) m' 8,000.00
5 Kabel NYM 2 x 2.5 Prima ( 1 rol = 50 m' ) m' 5,000.00
6 Kabel NYM 3 x 2.5 Prima ( 1 rol = 50 m' ) m' 11,500.00
7 Kabel NYM 4 x 2.5 Prima ( 1 rol = 50 m' ) m' 8,000.00
8 Kabel NYM 2 x 4 Prima ( 1 rol = 50 m' ) m' 6,500.00
9 Kabel NYM 3 x 4 Prima ( 1 rol = 50 m' ) m' 16,000.00
10 Kabel NYM 4 x 4 Prima ( 1 rol = 50 m' ) m' 21,500.00
11 Kabel NYM 2 x 6 Supreme ( 1 rol = 50 m' ) m' 12,500.00
12 Kabel NYM 3 x 6 Supreme ( 1 rol = 50 m' ) m' 14,500.00
13 Kabel NYM 4 x 6 Supreme ( 1 rol = 50 m' ) m' 20,500.00
14 Kabel NYM 2 x 10 Supreme ( 1 rol = 50 m' ) m' 19,500.00
15 Kabel NYM 3 x 10 Supreme ( 1 rol = 50 m' ) m' 132,500.00
16 Kabel NYM 4 x 10 Supreme ( 1 rol = 50 m' ) m' 27,500.00
17 Kabel NYM 4 x 16 Supreme ( 1 rol = 50 m' ) m' 31,500.00
18 Kabel NYY 2 x 4 Supreme ( 1 rol = 50 m' ) m' 13,000.00
19 Kabel NYY 3 x 4 Supreme ( 1 rol = 50 m' ) m' 21,500.00
NO URAIAN SAT. HARGA
T ALAT TUKANG
1 Palu 0.5 kg bh 43,500.00
2 Cangkul bh 27,500.00
3 Singkup bh 46,000.00
4 Sekrop bh 55,500.00
5 Pengki bh 14,000.00
6 Linggis bh 46,000.00
7 Rool Meter 30 meter ( Bahan Plastik ) bh 111,100.00
8 Rool Meter 5 meter ( Bahan Besi ) bh 40,000.00
9 Selang Plastik untuk Water Pas dia. 0.5 cm m 1,700.00
10 Water Pas Alumunium 60 cm bh 92,500.00
V BAHAN PAGAR
1 Panel Beton Pracetak lbr 200,900.00
2 Kolom Beton Pracetak btg 290,500.00
B BIDANG PERTAMANAN
1 Aglomena batang 55,000.00
2 Bambu krisik/jepang batang 55,000.00
3 Furadan kg 26,500.00
4 Kompos/pupuk kandang batang 27,500.00
5 Matoa (2 m) batang 42,500.00
6 Palm (botol, ekor tupai, putri, dll) tinggi 2 m batang 110,500.00
7 Philo batang 83,000.00
8 Pohon pelindung (angsana, mahoni, kamboja dll) tinggi 2 m batang 27,500.00
9 Pohon perdu (kaca piring, puring, mawar, melati, dll) batang 10,500.00
10 Rumput gajah mini m2 16,500.00
Keterangan :
Harga material diatas sudah termasuk profit / keuntungan
ANALISA HARGA SATUAN PEKERJAAN
HARGA SAT. JUMLAH
NO URAIAN SAT VOLUME
Rp. Rp.
1 2 3 4 5 6=4x5
A PEKERJAAN PERSIAPAN SNI 03-2835-2002
A-01 1 M Pagar Sementara dari Kayu Setinggi 2 Meter
Dolken Kayu Ø 8-10/400 Cm Btg 1.2500 30,800.00 38,500.00
Semen Portland Kg 2.5000 1,540.00 3,850.00
Pasir Beton M3 0.0050 350,000.00 1,750.00
Koral Beton 2/3 M3 0.0090 218,260.00 1,964.34
Kayu balok terentang M3 0.0720 2,705,000.00 194,760.00
Paku Biasa 2 " - 5 " Kg 0.0600 24,000.00 1,440.00
Residu Lt 0.4000 9,000.00 3,600.00
Tukang Kayu Oh 0.2000 170,000.00 34,000.00
Pekerja Oh 0.4000 150,000.00 60,000.00
Kepala Tukang Oh 0.0200 180,000.00 3,600.00
Mandor Oh 0.0200 200,000.00 4,000.00
Jumlah 347,464.34
Dibulatkan 347,460.00
A-02 1 M Pagar Sementara dari Seng Gelombang Tinggi 2 Meter
Dolken Kayu Ø 8-10/400 Cm Btg 1.2500 30,800.00 38,500.00
Semen Portland Kg 2.5000 1,540.00 3,850.00
Seng Gelombang BJLS-30 Lbr 1.2000 69,500.00 83,400.00
Pasir Beton M3 0.0050 350,000.00 1,750.00
Koral Beton 2/3 M3 0.0090 218,260.00 1,964.34
Kayu balok terentang M3 0.0720 2,705,000.00 194,760.00
Paku Biasa 2 " - 5 " Kg 0.0600 24,000.00 1,440.00
Meni besi Kg 0.4500 33,500.00 15,075.00
Tukang Kayu Oh 0.2000 170,000.00 34,000.00
Pekerja Oh 0.4000 150,000.00 60,000.00
Kepala Tukang Oh 0.0200 180,000.00 3,600.00
Mandor Oh 0.0200 200,000.00 4,000.00
Jumlah 442,339.34
Dibulatkan 442,330.00
A-03 1 M Pagar Sementara dari Kawat Duri Tinggi 1,8 Meter
Dolken Kayu Ø 8-10/400 Cm Btg 1.0000 30,800.00 30,800.00
Semen Portland Kg 2.0000 1,540.00 3,080.00
Kawat Duri Kg 2.5000 70,000.00 175,000.00
Pasir Beton M3 0.0050 350,000.00 1,750.00
Koral Beton M3 0.0090 218,260.00 1,964.34
Paku Biasa 2 " - 5 " Kg 0.0600 24,000.00 1,440.00
Tukang Kayu Oh 0.2000 170,000.00 34,000.00
Pekerja Oh 0.3000 150,000.00 45,000.00
Kepala Tukang Oh 0.0200 180,000.00 3,600.00
Mandor Oh 0.0200 200,000.00 4,000.00
Jumlah 300,634.34
Dibulatkan 300,630.00
A-04 1 M¹ Pengukuran dan Pasang Bouwplank
Kayu kaso 5/7 Albasia M3 0.0120 2,058,000.00 24,696.00
Paku Biasa 2" - 5 " Kg 0.0200 24,000.00 480.00
Kayu Papan 3/20 Albasia M3 0.0070 2,279,000.00 15,953.00
Tukang Kayu Oh 0.1000 170,000.00 17,000.00
Pekerja Oh 0.1000 150,000.00 15,000.00
Kepala Tukang Oh 0.0100 180,000.00 1,800.00
Mandor Oh 0.0050 200,000.00 1,000.00
Jumlah 75,929.00
Dibulatkan 75,920.00
1 M¹ Pengukuran
Kayu kaso 5/7 Albasia M3 0.0040 2,058,000.00 8,232.00
Paku Biasa 2" - 5 " Kg 0.0080 24,000.00 192.00
Tukang Kayu Oh 0.1000 170,000.00 17,000.00
Pekerja Oh 0.1000 150,000.00 15,000.00
1 2 3 4 5 6=4x5
Kepala Tukang Oh 0.0100 180,000.00 1,800.00
Mandor Oh 0.0050 200,000.00 1,000.00
Jumlah 43,224.00
Dibulatkan 43,220.00
A-05 1 M2 Pembuatan Kantor Sementara, dengan Lantai Plesteran
Dolken Kayu Ø 8-10/400 Cm Btg 1.2500 30,800.00 38,500.00
Kayu terentang M3 0.1800 2,705,000.00 486,900.00
Paku Biasa Kg 0.8500 24,000.00 20,400.00
Besi Strip Kg 1.1000 29,500.00 32,450.00
Semen Portland Kg 35.0000 1,540.00 53,900.00
Pasir Pasang M3 0.1500 350,000.00 52,500.00
Pasir Beton M3 0.1000 350,000.00 35,000.00
Koral Beton 2/3 M3 0.1500 218,260.00 32,739.00
Bata Merah Bh 30.0000 850.00 25,500.00
Seng Plat Lbr 0.2500 17,400.00 4,350.00
Kawat harmonika 4 cm Bh 2.0000 37,000.00 74,000.00
Kaca Polos M2 0.0800 96,200.00 7,696.00
Kunci Tanam Bh 0.1500 104,000.00 15,600.00
Plywood 120 x 240 x 0,4 cm Lbr 0.0600 145,000.00 8,700.00
Tukang Kayu Oh 2.0000 170,000.00 340,000.00
Tukang Batu Oh 1.0000 170,000.00 170,000.00
Pekerja Oh 2.0000 150,000.00 300,000.00
Kepala Tukang Oh 0.3000 180,000.00 54,000.00
Mandor Oh 0.0500 200,000.00 10,000.00
Jumlah 1,762,235.00
Dibulatkan 1,762,230.00
A-06 1 M2 Pembuatan Gudang Semen dan alat - alat
Dolken Kayu Ø 8-10/400 Cm Btg 1.7000 30,800.00 52,360.00
Kayu balok terentang M3 0.2100 2,705,000.00 568,050.00
Paku Biasa Kg 0.3000 24,000.00 7,200.00
Semen Portland Kg 10.5000 1,540.00 16,170.00
Pasir Beton M3 0.0300 350,000.00 10,500.00
Koral Beton 2/3 M3 0.0500 218,260.00 10,913.00
Seng Gelombang Bjls 30 Lbr 1.5000 69,500.00 104,250.00
Tukang Kayu Oh 2.0000 170,000.00 340,000.00
Pekerja Oh 1.0000 150,000.00 150,000.00
Kepala Tukang Oh 0.2000 180,000.00 36,000.00
Mandor Oh 0.0500 200,000.00 10,000.00
Jumlah 1,305,443.00
Dibulatkan 1,305,440.00
A-07 1 M2 Pembuatan Bedeng Buruh
Dolken Kayu Ø 8-10/400 Cm Btg 1.2500 30,800.00 38,500.00
Kayu balok terentang M3 0.1860 2,705,000.00 503,130.00
Paku Biasa Kg 0.3000 24,000.00 7,200.00
Semen Portland Kg 18.0000 1,540.00 27,720.00
Pasir Beton M3 0.0300 350,000.00 10,500.00
Koral Beton 2/3 M3 0.0500 218,260.00 10,913.00
Seng Gelombang Bjls 32 Lbr 1.5000 69,500.00 104,250.00
Tukang Kayu Oh 2.0000 170,000.00 340,000.00
Pekerja Oh 1.0000 150,000.00 150,000.00
Kepala Tukang Oh 0.2000 180,000.00 36,000.00
Mandor Oh 0.0500 200,000.00 10,000.00
Jumlah 1,238,213.00
Dibulatkan 1,238,210.00
A-08 1 M2 Pembersihan Lokasi
Pekerja Oh 0.1000 150,000.00 15,000.00
Mandor Oh 0.0500 200,000.00 10,000.00
Jumlah 25,000.00
Dibulatkan 25,000.00
A-09 1 M2 Pembuatan Jalan Sementara
Batu Belah 15/20 M3 0.1500 212,530.00 31,879.50
Batu Pecah 5/7 M3 0.0900 202,660.00 18,239.40
Pasir Pasang M3 0.0100 350,000.00 3,500.00
1 2 3 4 5 6=4x5
Pekerja Oh 1.0000 150,000.00 150,000.00
Mandor Oh 0.0500 200,000.00 10,000.00
Jumlah 213,618.90
Dibulatkan 213,610.00
A-10 1 M3 Bongkaran Beton Bertulang
Pekerja Oh 6.6670 150,000.00 1,000,050.00
Mandor Oh 0.3330 200,000.00 66,600.00
Jumlah 1,066,650.00
Dibulatkan 1,066,650.00
A-11 1 M3 Bongkaran Dinding Tembok Bata Merah
Pekerja Oh 6.6670 150,000.00 1,000,050.00
Mandor Oh 0.0330 200,000.00 6,600.00
Jumlah 1,006,650.00
Dibulatkan 1,006,650.00
A-12 1 M Pagar Beton Pracetak (5x50x213) Cm
Panel Beton Pracetak Lbr 0.9860 200,900.00 198,087.40
Kolom Beton Pracetak Btg 0.5250 290,500.00 152,512.50
Pasir Beton M3 0.0740 350,000.00 25,900.00
Koral 2/3 M3 0.1460 218,260.00 31,865.96
Semen Portland Kg 45.0000 1,540.00 69,300.00
Tukang Batu Oh 0.1250 170,000.00 21,250.00
Pekerja Oh 0.3750 150,000.00 56,250.00
Kepala Tukang Oh 0.0120 180,000.00 2,160.00
Mandor Oh 0.0190 200,000.00 3,800.00
Jumlah 561,125.86
Dibulatkan 561,120.00
A-13 1 M¹ Pagar kawat ayam tiang besi L 50.50.5, tinggi 1 m¹
Kawat ram ayam Lbr 0.4340 15,500.00 6,727.00
Besi siku L 50.50.5 Kg 6.7860 20,200.00 137,077.20
Besi pelat (1,2 x 3) mm Kg 0.0424 20,200.00 856.48
Baut Kg 4.0000 700.00 2,800.00
Semen Portland Kg 2.5000 1,540.00 3,850.00
Pasir Beton M3 0.0050 350,000.00 1,750.00
Koral 2/3 M3 0.0090 218,260.00 1,964.34
Pekerja Oh 0.3750 150,000.00 56,250.00
Tukang Batu Oh 0.1250 170,000.00 21,250.00
Kepala Tukang Oh 0.0120 180,000.00 2,160.00
Mandor Oh 0.0190 200,000.00 3,800.00
Jumlah 238,485.02
Dibulatkan 238,480.00
A-14 1 M2 Pagar BRC lengkap dengan tiang
BRC lengkap dengan tiang Lbr 0.4340 188,500.00 81,809.00
Semen Portland Kg 2.0000 1,540.00 3,080.00
Kawat Duri Kg 2.5000 70,000.00 175,000.00
Pasir Beton M3 0.0050 350,000.00 1,750.00
Koral Beton 2/3 M3 0.0090 218,260.00 1,964.34
Pekerja Oh 0.3750 150,000.00 56,250.00
Tukang Batu Oh 0.1250 170,000.00 21,250.00
Kepala Tukang Oh 0.0120 180,000.00 2,160.00
Mandor Oh 0.0190 200,000.00 3,800.00
Jumlah 347,063.34
Dibulatkan 347,060.00
A-15 1 M2 Pembuatan Stegger dari Bambu, Ukuran (40x50x20) Cm
Bambu Ø 6 -10/600 Cm Btg 1.0000 27,500.00 27,500.00
Tali Ijuk Kg 0.2500 25,800.00 6,450.00
Tukang Kayu Oh 0.0170 170,000.00 2,890.00
Pekerja Oh 0.2000 150,000.00 30,000.00
Kepala Tukang Oh 0.0020 180,000.00 360.00
Mandor Oh 0.0130 200,000.00 2,600.00
Jumlah 69,800.00
Dibulatkan 69,800.00
A-16 1 M¹ Cerucuk Bambu
Bambu Ø 7 -10 ( 400 ) Cm Btg 1.2500 27,500.00 34,375.00
1 2 3 4 5 6=4x5
Pekerja Oh 0.5000 150,000.00 75,000.00
Mandor Oh 0.0250 200,000.00 5,000.00
Jumlah 114,375.00
Dibulatkan 114,370.00
17 1 M3 Bongkaran Kuda-kuda, Gording Balok
Pekerja Oh 2.5000 150,000.00 375,000.00
Tukang Kayu Oh 1.2000 170,000.00 204,000.00
Mandor Oh 0.1200 200,000.00 24,000.00
Jumlah 603,000.00
Dibulatkan 603,000.00
18 1 M3 Bongkaran Rangka Atap, Reng dan Kaso
Pekerja Oh 0.0700 150,000.00 10,500.00
Tukang Kayu Oh 0.0200 170,000.00 3,400.00
Mandor Oh 0.0050 200,000.00 1,000.00
Jumlah 14,900.00
Dibulatkan 14,900.00
19 1 M3 Bongkaran Genteng Lama
Pekerja Oh 0.0200 150,000.00 3,000.00
Mandor Oh 0.0100 200,000.00 2,000.00
Jumlah 5,000.00
Dibulatkan 5,000.00
D PEKERJAAN BETON
1 M2 Lantai kerja beton tumbuk, 1 Pc : 3 Ps : 5 Kr. tebal 5 cm
Semen Portland Kg 10.0000 1,540.00 15,400.00
Pasir Beton M3 0.0260 350,000.00 9,100.00
Koral Beton M3 0.0440 218,260.00 9,603.44
Pekerja Oh 1.1500 150,000.00 172,500.00
Tukang Batu Oh 0.0200 170,000.00 3,400.00
Kepala Tukang Oh 0.0020 180,000.00 360.00
Mandor Oh 0.0060 200,000.00 1,200.00
Jumlah 211,563.44
Dibulatkan 211,560.00
D-01 1 M3 Beton rabat beton , 1 Pc : 3 Ps : 5 Kr
Semen Portland Kg 218.0000 1,540.00 335,720.00
Pasir Beton M3 0.5200 350,000.00 182,000.00
Koral Beton M3 0.8700 218,260.00 189,886.20
Pekerja Oh 1.6500 150,000.00 247,500.00
Tukang Batu Oh 0.2500 170,000.00 42,500.00
Kepala Tukang Oh 0.0250 180,000.00 4,500.00
Mandor Oh 0.0800 200,000.00 16,000.00
Jumlah 1,018,106.20
Dibulatkan 1,019,000.00
D-02 1 M3 Beton Tumbuk, 1 Pc : 3 Ps : 6 Kr
Semen Portland Kg 197.0000 1,540.00 303,380.00
Pasir Beton M3 0.4700 350,000.00 164,500.00
Koral Beton M3 0.9400 218,260.00 205,164.40
Pekerja Oh 1.6500 150,000.00 247,500.00
Tukang Batu Oh 0.2500 170,000.00 42,500.00
Kepala Tukang Oh 0.0250 180,000.00 4,500.00
Mandor Oh 0.0800 200,000.00 16,000.00
Jumlah 983,544.40
Dibulatkan 983,540.00
D-03 1 M3 Beton Tumbuk, 1 Pc : 2 Ps : 3 Kr
Semen Portland Kg 336.0000 1,540.00 517,440.00
Pasir Beton M3 0.5400 350,000.00 189,000.00
Koral Beton M3 0.8100 218,260.00 176,790.60
Pekerja Oh 2.0000 150,000.00 300,000.00
Tukang Batu Oh 0.3500 170,000.00 59,500.00
Kepala Tukang Oh 0.0350 180,000.00 6,300.00
Mandor Oh 1.0000 200,000.00 200,000.00
Jumlah 1,449,030.60
Dibulatkan 1,449,030.00
D-04 1 M3 Tiang Pancang Prestressed Beton
Semen Portland Kg 440.0000 1,540.00 677,600.00
Pasir Beton M3 0.5000 350,000.00 175,000.00
Koral Beton M3 0.8000 218,260.00 174,608.00
1 2 3 4 5 6=4x5
Rapidrant Gln 2.4600 17,500.00 43,050.00
Pekerja Oh 1.6500 150,000.00 247,500.00
Tukang Batu Oh 0.2500 170,000.00 42,500.00
Kepala Tukang Oh 0.0250 180,000.00 4,500.00
Mandor Oh 0.0800 200,000.00 16,000.00
Jumlah 1,380,758.00
Dibulatkan 1,380,750.00
D-05 1 M3 Beton Tumbuk, 1 Pc : 2 Ps : 4 Kr
Semen Portland Kg 291.0000 1,540.00 448,140.00
Pasir Beton M3 0.4700 350,000.00 164,500.00
Koral Beton M3 0.9300 218,260.00 202,981.80
Pekerja Oh 2.0000 150,000.00 300,000.00
Tukang Batu Oh 0.3500 170,000.00 59,500.00
Kepala Tukang Oh 0.0350 180,000.00 6,300.00
Mandor Oh 1.0000 200,000.00 200,000.00
Jumlah 1,381,421.80
Dibulatkan 1,381,420.00
D-06 1 M' Memasang PVC Waterstop Lebar 200 mm
Waterstop Lebar 200 mm M1 1.0500 64,500.00 67,725.00
Pekerja Oh 0.0500 150,000.00 7,500.00
Tukang Batu Oh 0.0350 170,000.00 5,950.00
Kepala Tukang Oh 0.0035 180,000.00 630.00
Mandor Oh 0.0020 200,000.00 400.00
Jumlah 82,205.00
Dibulatkan 77,310.00
1 M' Memasang PVC Waterstop Lebar 150 mm
Waterstop Lebar 150 mm M1 1.0500 57,000.00 59,850.00
Pekerja Oh 0.0500 150,000.00 7,500.00
Tukang Batu Oh 0.0300 170,000.00 5,100.00
Kepala Tukang Oh 0.0030 180,000.00 540.00
Mandor Oh 0.0020 200,000.00 400.00
Jumlah 73,390.00
Dibulatkan 73,390.00
D-07 1 Kg Pembesian Dengan Besi Polos atau Besi Ulir
Besi Beton ( Polos/ Ulir ) Kg 1.0500 16,500.00 17,325.00
Kawat Beton Kg 0.0150 30,500.00 457.50
Pekerja Oh 0.0070 150,000.00 1,050.00
Tukang Besi Oh 0.0070 170,000.00 1,190.00
Kepala Tukang Oh 0.0007 180,000.00 126.00
Mandor Oh 0.0003 200,000.00 60.00
Jumlah 20,208.50
Dibulatkan 20,200.00
D-08 1 M2 Pasangan Bekisting untuk Pondasi
Kayu terentang M3 0.0400 2,950,000.00 118,000.00
Paku Biasa 2" - 5" Kg 0.3000 24,000.00 7,200.00
Pekerja Oh 0.3000 150,000.00 45,000.00
Tukang Kayu Oh 0.2600 170,000.00 44,200.00
Kepala Tukang Oh 0.0260 180,000.00 4,680.00
Mandor Oh 0.0050 200,000.00 1,000.00
Jumlah 220,080.00
Dibulatkan 220,080.00
D-09 1 M2 Pasangan Bekisting untuk Sloof
Kayu Terentang M3 0.0450 2,950,000.00 132,750.00
Paku Biasa 2" - 5" Kg 0.3000 24,000.00 7,200.00
Pekerja Oh 0.3000 150,000.00 45,000.00
Tukang Kayu Oh 0.2600 170,000.00 44,200.00
Kepala Tukang Oh 0.0260 180,000.00 4,680.00
Mandor Oh 0.0050 200,000.00 1,000.00
Jumlah 234,830.00
Dibulatkan 234,830.00
D-10 1 M2 Pasangan Bekisting untuk Kolom
Kayu Terentang M3 0.0400 2,950,000.00 118,000.00
Paku Biasa 2" - 5" Kg 0.4000 24,000.00 9,600.00
1 2 3 4 5 6=4x5
Kayu balok terentang M3 0.0150 2,705,000.00 40,575.00
Multiplek 9 mm 120 x 240 Lbr 0.3500 166,500.00 58,275.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 2.0000 30,800.00 61,600.00
Pekerja Oh 0.3300 150,000.00 49,500.00
Tukang Kayu Oh 0.3300 170,000.00 56,100.00
Kepala Tukang Oh 0.0330 180,000.00 5,940.00
Mandor Oh 0.0060 200,000.00 1,200.00
Jumlah 400,790.00
Dibulatkan 400,790.00
D-11 1 M2 Pasangan Bekisting untuk Balok
Kayu Terentang M3 0.0400 2,950,000.00 118,000.00
Paku Biasa 2" - 5" Kg 0.4000 24,000.00 9,600.00
Kayu balok terentang M3 0.0180 2,705,000.00 48,690.00
Multiplek 9 mm 120 x 240 Lbr 0.3500 166,500.00 58,275.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 2.0000 30,800.00 61,600.00
Pekerja Oh 0.3000 150,000.00 45,000.00
Tukang Kayu Oh 0.3300 170,000.00 56,100.00
Kepala Tukang Oh 0.0330 180,000.00 5,940.00
Mandor Oh 0.0060 200,000.00 1,200.00
Jumlah 404,405.00
Dibulatkan 404,400.00
D-12 1 M2 Pasangan Bekisting untuk Lantai
Kayu Terentang M3 0.0400 2,950,000.00 118,000.00
Paku Biasa 2" - 5" Kg 0.4000 24,000.00 9,600.00
Minyak Bekisting Ltr 0.2000 45,000.00 9,000.00
Kayu balok terentang M3 0.0150 2,705,000.00 40,575.00
Multiplek 9 mm 120 x 240 Lbr 0.3500 166,500.00 58,275.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 6.0000 30,800.00 184,800.00
Pekerja Oh 0.3000 150,000.00 45,000.00
Tukang Kayu Oh 0.3300 170,000.00 56,100.00
Kepala Tukang Oh 0.0330 180,000.00 5,940.00
Mandor Oh 0.0060 200,000.00 1,200.00
Jumlah 528,490.00
Dibulatkan 528,490.00
D-13 1 M2 Pasang Bekisting untuk Tangga
Kayu Terentang M3 0.0300 2,950,000.00 88,500.00
Paku Biasa 2" - 5" Kg 0.4000 24,000.00 9,600.00
Minyak Bekisting Ltr 0.1500 45,000.00 6,750.00
Kayu balok terentang M3 0.0150 2,705,000.00 40,575.00
Multiplek 9 mm 120 x 240 Lbr 0.3500 166,500.00 58,275.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 2.0000 30,800.00 61,600.00
Pekerja Oh 0.3200 150,000.00 48,000.00
Tukang Kayu Oh 0.3300 170,000.00 56,100.00
Kepala Tukang Oh 0.0330 180,000.00 5,940.00
Mandor Oh 0.0060 200,000.00 1,200.00
Jumlah 376,540.00
Dibulatkan 376,540.00
D-14 1 M3 Membuat Beton Cor Mutu K225
Semen Portland Kg 388.0000 1,540.00 597,520.00
Pasir Beton M3 0.6500 350,000.00 227,500.00
Koral Beton M3 0.6500 218,260.00 141,869.00
Air Ltr 215.0000 350.00 75,250.00
Pekerja Oh 6.0000 150,000.00 900,000.00
Tukang Batu Oh 1.0000 170,000.00 170,000.00
Kepala Tukang Oh 0.1000 180,000.00 18,000.00
Mandor Oh 0.3000 200,000.00 60,000.00
Jumlah 2,190,139.00
Dibulatkan 2,190,130.00
D-15 1 M3 Membuat Beton Cor Mutu K275
Semen Portland Kg 400.0000 1,540.00 616,000.00
Pasir Beton M3 0.4000 350,000.00 140,000.00
Koral Beton M3 0.8200 218,260.00 178,973.20
Air Ltr 215.0000 350.00 75,250.00
1 2 3 4 5 6=4x5
Pekerja Oh 6.0000 150,000.00 900,000.00
Tukang Batu Oh 1.0000 170,000.00 170,000.00
Kepala Tukang Oh 0.1000 180,000.00 18,000.00
Mandor Oh 0.3000 200,000.00 60,000.00
Jumlah 2,158,223.20
Dibulatkan 2,158,220.00
D-16 1 KG Besi Beton Polos
Besi Beton Polos U 24 Kg 1.1000 16,500.00 18,150.00
Kawat Beton Kg 0.0188 30,500.00 573.40
Pekerja Oh 0.0080 150,000.00 1,200.00
Tukang Besi Oh 0.0100 170,000.00 1,700.00
Kepala Tukang Oh 0.0029 180,000.00 522.00
Mandor Oh 0.0010 200,000.00 200.00
Jumlah 22,345.40
Dibulatkan 22,340.00
D-16 1 KG Besi Beton Ulir
Besi Beton Ulir 32 / 39 Kg 1.1000 22,800.00 25,080.00
Kawat Beton Kg 0.0188 30,500.00 573.40
Pekerja Oh 0.0080 150,000.00 1,200.00
Tukang Besi Oh 0.0100 170,000.00 1,700.00
Kepala Tukang Oh 0.0029 180,000.00 522.00
Mandor Oh 0.0010 200,000.00 200.00
Jumlah 29,275.40
Dibulatkan 29,270.00
D-16 1 M3 Pondasi Beton Tulang (150 kg besi+bekisting)
Kayu Terentang M3 0.2000 2,950,000.00 590,000.00
Paku Biasa 2" - 5" Kg 1.5000 24,000.00 36,000.00
Besi Beton Polos Kg 150.0000 16,500.00 2,475,000.00
Kawat Beton Kg 2.2500 30,500.00 68,625.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 350,000.00 182,000.00
Koral Beton M3 0.7800 218,260.00 170,242.80
Pekerja Oh 3.9000 150,000.00 585,000.00
Tukang Batu Oh 0.3500 170,000.00 59,500.00
Tukang Kayu Oh 1.0400 170,000.00 176,800.00
Tukang Besi Oh 1.0500 170,000.00 178,500.00
Kepala Tukang Oh 0.2450 180,000.00 44,100.00
Mandor Oh 0.1650 200,000.00 33,000.00
Jumlah 5,096,187.80
Dibulatkan 5,096,180.00
D-17 1 M3 Sloof Beton Tulang (200 kg besi+bekisting)
Kayu Terentang M3 0.2700 2,950,000.00 796,500.00
Paku Biasa 2" - 5" Kg 2.0000 24,000.00 48,000.00
Besi Beton Polos Kg 200.0000 16,500.00 3,300,000.00
Kawat Beton Kg 3.0000 30,500.00 91,500.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 350,000.00 182,000.00
Koral Beton M3 0.7800 218,260.00 170,242.80
Pekerja Oh 4.8500 150,000.00 727,500.00
Tukang Batu Oh 0.3500 170,000.00 59,500.00
Tukang Kayu Oh 1.5600 170,000.00 265,200.00
Tukang Besi Oh 1.4000 170,000.00 238,000.00
Kepala Tukang Oh 0.3310 180,000.00 59,580.00
Mandor Oh 0.1700 200,000.00 34,000.00
Jumlah 6,469,442.80
Dibulatkan 6,469,440.00
1 M3 Sloof Beton Tulang 15/20 cm (150 kg besi+bekisting)
Kayu Terentang M3 0.2700 2,950,000.00 796,500.00
Paku Biasa 2" - 5" Kg 2.0000 24,000.00 48,000.00
Minyak Bekisting Ltr 0.6000 45,000.00 27,000.00
Besi Beton Polos Kg 150.0000 16,500.00 2,475,000.00
Kawat Beton Kg 3.0000 30,500.00 91,500.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
1 2 3 4 5 6=4x5
Pasir Beton M3 0.5200 350,000.00 182,000.00
Koral Beton M3 0.7800 218,260.00 170,242.80
Pekerja Oh 4.8500 150,000.00 727,500.00
Tukang Batu Oh 0.3500 170,000.00 59,500.00
Tukang Kayu Oh 1.5600 170,000.00 265,200.00
Tukang Besi Oh 1.4000 170,000.00 238,000.00
Kepala Tukang Oh 0.3310 180,000.00 59,580.00
Mandor Oh 0.1700 200,000.00 34,000.00
Jumlah 5,671,442.80
Dibulatkan 5,671,440.00
1 M3 Sloof Beton Tulang 15/20 cm (180 kg besi+bekisting) 4 dia. 12 ring 8-15
Kayu Terentang M3 0.2700 2,950,000.00 796,500.00
Paku Biasa 2" - 5" Kg 2.0000 24,000.00 48,000.00
Besi Beton Polos Kg 180.0000 16,500.00 2,970,000.00
Kawat Beton Kg 3.0000 30,500.00 91,500.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 350,000.00 182,000.00
Koral Beton M3 0.7800 218,260.00 170,242.80
Pekerja Oh 4.8500 150,000.00 727,500.00
Tukang Batu Oh 0.3500 170,000.00 59,500.00
Tukang Kayu Oh 1.5600 170,000.00 265,200.00
Tukang Besi Oh 1.4000 170,000.00 238,000.00
Kepala Tukang Oh 0.3310 180,000.00 59,580.00
Mandor Oh 0.1700 200,000.00 34,000.00
Jumlah 6,139,442.80
Dibulatkan 6,139,440.00
1 M3 Sloof Beton Tulang 20/30 cm (150 kg besi+bekisting) 4 dia. 16 ring 8-15
Kayu Terentang M3 0.2700 2,950,000.00 796,500.00
Paku Biasa 2" - 5" Kg 2.0000 24,000.00 48,000.00
Besi Beton Polos Kg 150.0000 16,500.00 2,475,000.00
Kawat Beton Kg 3.0000 30,500.00 91,500.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 350,000.00 182,000.00
Koral Beton M3 0.7800 218,260.00 170,242.80
Pekerja Oh 4.8500 150,000.00 727,500.00
Tukang Batu Oh 0.3500 170,000.00 59,500.00
Tukang Kayu Oh 1.5600 170,000.00 265,200.00
Tukang Besi Oh 1.4000 170,000.00 238,000.00
Kepala Tukang Oh 0.3310 180,000.00 59,580.00
Mandor Oh 0.1700 200,000.00 34,000.00
Jumlah 5,644,442.80
Dibulatkan 5,644,440.00
1 M3 Sloof Beton Tulang 20/30 cm (200 kg besi+bekisting) Struktur bertingkat 6 dia. 16, 8-15
Kayu Terentang M3 0.2700 2,950,000.00 796,500.00
Paku Biasa 2" - 5" Kg 2.0000 24,000.00 48,000.00
Besi Beton Polos Kg 200.0000 16,500.00 3,300,000.00
Kawat Beton Kg 3.0000 30,500.00 91,500.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 350,000.00 182,000.00
Koral Beton M3 0.7800 218,260.00 170,242.80
Pekerja Oh 4.8500 150,000.00 727,500.00
Tukang Batu Oh 0.3500 170,000.00 59,500.00
Tukang Kayu Oh 1.5600 170,000.00 265,200.00
Tukang Besi Oh 1.4000 170,000.00 238,000.00
Kepala Tukang Oh 0.3310 180,000.00 59,580.00
Mandor Oh 0.1700 200,000.00 34,000.00
Jumlah 6,469,442.80
Dibulatkan 6,469,440.00
1 M3 Sloof Beton Bertulang 20/40 cm (240 kg besi+bekisting) Struktur bertingkat
Kayu Terentang M3 0.2700 2,950,000.00 796,500.00
Paku Biasa 2" - 5" Kg 2.0000 24,000.00 48,000.00
Minyak Bekisting Ltr 0.6000 45,000.00 27,000.00
Besi Beton Polos Kg 240.0000 16,500.00 3,960,000.00
1 2 3 4 5 6=4x5
Kawat Beton Kg 3.0000 30,500.00 91,500.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 350,000.00 182,000.00
Koral Beton M3 0.7800 218,260.00 170,242.80
Pekerja Oh 4.8500 150,000.00 727,500.00
Tukang Batu Oh 0.3500 170,000.00 59,500.00
Tukang Kayu Oh 1.5600 170,000.00 265,200.00
Tukang Besi Oh 1.4000 170,000.00 238,000.00
Kepala Tukang Oh 0.3310 180,000.00 59,580.00
Mandor Oh 0.1700 200,000.00 34,000.00
Jumlah 7,156,442.80
Dibulatkan 7,156,440.00
D-18 1 M3 Kolom Beton Tulang (120 kg besi+bekisting)
Kayu Terentang M3 0.4000 2,950,000.00 1,180,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Minyak Bekisting Ltr 2.0000 45,000.00 90,000.00
Besi Beton Polos Kg 120.0000 16,500.00 1,980,000.00
Kawat Beton Kg 1.8000 30,500.00 54,900.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 350,000.00 182,000.00
Koral Beton M3 0.7800 218,260.00 170,242.80
Kayu Balok Terentang M3 0.1500 2,705,000.00 405,750.00
Multiplek 9 mm 120 x 240 Lbr 3.5000 166,500.00 582,750.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 20.0000 30,800.00 616,000.00
Pekerja Oh 7.3000 150,000.00 1,095,000.00
Tukang Batu Oh 0.3500 170,000.00 59,500.00
Tukang Kayu Oh 3.3000 170,000.00 561,000.00
Tukang Besi Oh 2.1000 170,000.00 357,000.00
Kepala Tukang Oh 0.5700 180,000.00 102,600.00
Mandor Oh 0.2500 200,000.00 50,000.00
Jumlah 8,080,162.80
Dibulatkan 8,080,160.00
D-19 1 M3 Kolom Beton Tulang (140 kg besi+bekisting)
Kayu Terentang M3 0.4000 2,950,000.00 1,180,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Minyak Bekisting Ltr 2.0000 45,000.00 90,000.00
Besi Beton Polos Kg 140.0000 16,500.00 2,310,000.00
Kawat Beton Kg 1.8000 30,500.00 54,900.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 350,000.00 182,000.00
Koral Beton M3 0.7800 218,260.00 170,242.80
Kayu Balok Terentang M3 0.1500 2,705,000.00 405,750.00
Multiplek 9 mm 120 x 240 Lbr 3.5000 166,500.00 582,750.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 20.0000 30,800.00 616,000.00
Pekerja Oh 7.3000 150,000.00 1,095,000.00
Tukang Batu Oh 0.3500 170,000.00 59,500.00
Tukang Kayu Oh 3.3000 170,000.00 561,000.00
Tukang Besi Oh 2.1000 170,000.00 357,000.00
Kepala Tukang Oh 0.5700 180,000.00 102,600.00
Mandor Oh 0.2500 200,000.00 50,000.00
Jumlah 8,410,162.80
Dibulatkan 8,410,160.00
D-20 1 M3 Kolom Beton Tulang (150 kg besi+bekisting)
Kayu Terentang M3 0.2700 2,950,000.00 796,500.00
Paku Biasa 2" - 5" Kg 2.0000 24,000.00 48,000.00
Minyak Bekisting Ltr 0.6000 45,000.00 27,000.00
Besi Beton Polos Kg 150.0000 16,500.00 2,475,000.00
Kawat Beton Kg 1.8000 30,500.00 54,900.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 350,000.00 182,000.00
Koral Beton M3 0.7800 218,260.00 170,242.80
Kayu Balok Terentang M3 0.1500 2,705,000.00 405,750.00
Multiplek 9 mm 120 x 240 Lbr 3.5000 166,500.00 582,750.00
1 2 3 4 5 6=4x5
Dolken Kayu Galam Ø-8 Cm / 4m Btg 10.0000 30,800.00 308,000.00
Pekerja Oh 6.0000 150,000.00 900,000.00
Tukang Batu Oh 0.3500 170,000.00 59,500.00
Tukang Kayu Oh 3.3000 170,000.00 561,000.00
Tukang Besi Oh 2.1000 170,000.00 357,000.00
Kepala Tukang Oh 0.5700 180,000.00 102,600.00
Mandor Oh 0.2500 200,000.00 50,000.00
Jumlah 7,577,662.80
Dibulatkan 7,578,000.00
D-21 1 M3 Kolom Beton Tulang (180 kg besi+bekisting)
Kayu Terentang M3 0.4000 2,950,000.00 1,180,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Minyak Bekisting Ltr 2.0000 45,000.00 90,000.00
Besi Beton Polos Kg 180.0000 16,500.00 2,970,000.00
Kawat Beton Kg 1.8000 30,500.00 54,900.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 350,000.00 182,000.00
Koral Beton M3 0.7800 218,260.00 170,242.80
Kayu Balok Terentang M3 0.1500 2,705,000.00 405,750.00
Multiplek 9 mm 120 x 240 Lbr 3.5000 166,500.00 582,750.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 20.0000 30,800.00 616,000.00
Pekerja Oh 7.3000 150,000.00 1,095,000.00
Tukang Batu Oh 0.3500 170,000.00 59,500.00
Tukang Kayu Oh 3.3000 170,000.00 561,000.00
Tukang Besi Oh 2.1000 170,000.00 357,000.00
Kepala Tukang Oh 0.5700 180,000.00 102,600.00
Mandor Oh 0.2500 200,000.00 50,000.00
Jumlah 9,070,162.80
Dibulatkan 9,071,000.00
D-22 1 M3 Kolom Beton Tulang (200 kg besi+bekisting)
Kayu Terentang M3 0.4000 2,950,000.00 1,180,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Minyak Bekisting Ltr 2.0000 45,000.00 90,000.00
Besi Beton Polos Kg 200.0000 16,500.00 3,300,000.00
Kawat Beton Kg 1.8000 30,500.00 54,900.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 350,000.00 182,000.00
Koral Beton M3 0.7800 218,260.00 170,242.80
Kayu Balok Terentang M3 0.1500 2,705,000.00 405,750.00
Multiplek 9 mm 120 x 240 Lbr 3.5000 166,500.00 582,750.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 20.0000 30,800.00 616,000.00
Pekerja Oh 7.3000 150,000.00 1,095,000.00
Tukang Batu Oh 0.3500 170,000.00 59,500.00
Tukang Kayu Oh 3.3000 170,000.00 561,000.00
Tukang Besi Oh 2.1000 170,000.00 357,000.00
Kepala Tukang Oh 0.5700 180,000.00 102,600.00
Mandor Oh 0.2500 200,000.00 50,000.00
Jumlah 9,400,162.80
Dibulatkan 9,400,160.00
D-23 1 M3 Kolom Beton Tulang (250 kg besi+bekisting)
Kayu Terentang M3 0.4000 2,950,000.00 1,180,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Minyak Bekisting Ltr 2.0000 45,000.00 90,000.00
Besi Beton Polos Kg 250.0000 16,500.00 4,125,000.00
Kawat Beton Kg 1.8000 30,500.00 54,900.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 350,000.00 182,000.00
Koral Beton M3 0.7800 218,260.00 170,242.80
Kayu Balok Terentang M3 0.1500 2,705,000.00 405,750.00
Multiplek 9 mm 120 x 240 Lbr 3.5000 166,500.00 582,750.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 20.0000 30,800.00 616,000.00
Pekerja Oh 7.3000 150,000.00 1,095,000.00
Tukang Batu Oh 0.3500 170,000.00 59,500.00
1 2 3 4 5 6=4x5
Tukang Kayu Oh 3.3000 170,000.00 561,000.00
Tukang Besi Oh 2.1000 170,000.00 357,000.00
Kepala Tukang Oh 0.5700 180,000.00 102,600.00
Mandor Oh 0.2500 200,000.00 50,000.00
Jumlah 10,225,162.80
Dibulatkan 10,225,160.00
D-24 1 M3 Kolom Beton Tulang (300 kg besi+bekisting)
Kayu Terentang M3 0.4000 2,950,000.00 1,180,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Minyak Bekisting Ltr 2.0000 45,000.00 90,000.00
Besi Beton Polos Kg 300.0000 16,500.00 4,950,000.00
Kawat Beton Kg 1.8000 30,500.00 54,900.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 350,000.00 182,000.00
Koral Beton M3 0.7800 218,260.00 170,242.80
Kayu Balok Terentang M3 0.1500 2,705,000.00 405,750.00
Multiplek 9 mm 120 x 240 Lbr 3.5000 166,500.00 582,750.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 20.0000 30,800.00 616,000.00
Pekerja Oh 7.3000 150,000.00 1,095,000.00
Tukang Batu Oh 0.3500 170,000.00 59,500.00
Tukang Kayu Oh 3.3000 170,000.00 561,000.00
Tukang Besi Oh 2.1000 170,000.00 357,000.00
Kepala Tukang Oh 0.5700 180,000.00 102,600.00
Mandor Oh 0.2500 200,000.00 50,000.00
Jumlah 11,050,162.80
Dibulatkan 11,050,160.00
1 M3 Kolom Beton Tulang 20/20 cm (140 kg besi+bekisting) 4 dia. 12, 8-15
Kayu Terentang M3 0.4000 2,950,000.00 1,180,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Besi Beton Polos Kg 140.0000 16,500.00 2,310,000.00
Kawat Beton Kg 1.8000 30,500.00 54,900.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 350,000.00 182,000.00
Koral Beton M3 0.7800 218,260.00 170,242.80
Kayu Balok Terentang M3 0.1500 2,705,000.00 405,750.00
Multiplek 9 mm 120 x 240 Lbr 3.5000 166,500.00 582,750.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 20.0000 30,800.00 616,000.00
Pekerja Oh 7.3000 150,000.00 1,095,000.00
Tukang Batu Oh 0.3500 170,000.00 59,500.00
Tukang Kayu Oh 3.3000 170,000.00 561,000.00
Tukang Besi Oh 2.1000 170,000.00 357,000.00
Kepala Tukang Oh 0.5700 180,000.00 102,600.00
Mandor Oh 0.2500 200,000.00 50,000.00
Jumlah 8,320,162.80
Dibulatkan 8,320,160.00
1 M3 Kolom Beton Tulang 15/20 (180 kg besi+bekisting) 4 dia. 12, 8-15
Kayu Terentang M3 0.4000 2,950,000.00 1,180,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Besi Beton Polos Kg 180.0000 16,500.00 2,970,000.00
Kawat Beton Kg 1.8000 30,500.00 54,900.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 350,000.00 182,000.00
Koral Beton M3 0.7800 218,260.00 170,242.80
Kayu Balok Terentang M3 0.1500 2,705,000.00 405,750.00
Multiplek 9 mm 120 x 240 Lbr 3.5000 166,500.00 582,750.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 20.0000 30,800.00 616,000.00
Pekerja Oh 7.3000 150,000.00 1,095,000.00
Tukang Batu Oh 0.3500 170,000.00 59,500.00
Tukang Kayu Oh 3.3000 170,000.00 561,000.00
Tukang Besi Oh 2.1000 170,000.00 357,000.00
Kepala Tukang Oh 0.5700 180,000.00 102,600.00
Mandor Oh 0.2500 200,000.00 50,000.00
Jumlah 8,980,162.80
1 2 3 4 5 6=4x5
Dibulatkan 8,980,160.00
1 M3 Kolom Beton Tulang 20/20 cm (210 kg besi+bekisting) Struktur bertingkat 4 dia. 16, 8-15
Kayu Terentang M3 0.4000 2,950,000.00 1,180,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Besi Beton Polos Kg 210.0000 16,500.00 3,465,000.00
Kawat Beton Kg 1.8000 30,500.00 54,900.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 350,000.00 182,000.00
Koral Beton M3 0.7800 218,260.00 170,242.80
Kayu Balok Terentang M3 0.1500 2,705,000.00 405,750.00
Multiplek 9 mm 120 x 240 Lbr 3.5000 166,500.00 582,750.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 20.0000 30,800.00 616,000.00
Pekerja Oh 7.3000 150,000.00 1,095,000.00
Tukang Batu Oh 0.3500 170,000.00 59,500.00
Tukang Kayu Oh 3.3000 170,000.00 561,000.00
Tukang Besi Oh 2.1000 170,000.00 357,000.00
Kepala Tukang Oh 0.5700 180,000.00 102,600.00
Mandor Oh 0.2500 200,000.00 50,000.00
Jumlah 9,475,162.80
Dibulatkan 9,475,160.00
1 M3 Kolom Beton Tulang 20/30cm (230 kg besi+bekisting) Struktur bertingkat 6 dia.16+2 dia.12, 8-15
Kayu Terentang M3 0.4000 2,950,000.00 1,180,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Besi Beton Polos Kg 230.0000 16,500.00 3,795,000.00
Kawat Beton Kg 1.8000 30,500.00 54,900.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 350,000.00 182,000.00
Koral Beton M3 0.7800 218,260.00 170,242.80
Kayu Balok Terentang M3 0.1500 2,705,000.00 405,750.00
Multiplek 9 mm 120 x 240 Lbr 3.5000 166,500.00 582,750.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 20.0000 30,800.00 616,000.00
Pekerja Oh 7.3000 150,000.00 1,095,000.00
Tukang Batu Oh 0.3500 170,000.00 59,500.00
Tukang Kayu Oh 3.3000 170,000.00 561,000.00
Tukang Besi Oh 2.1000 170,000.00 357,000.00
Kepala Tukang Oh 0.5700 180,000.00 102,600.00
Mandor Oh 0.2500 200,000.00 50,000.00
Jumlah 9,805,162.80
Dibulatkan 9,805,160.00
1 M3 Kolom Beton Tulang 20/40 cm (250 kg besi+bekisting) Struktur bertingkat
Kayu Terentang M3 0.4000 2,950,000.00 1,180,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Minyak Bekisting Ltr 2.0000 45,000.00 90,000.00
Besi Beton Polos Kg 250.0000 16,500.00 4,125,000.00
Kawat Beton Kg 1.8000 30,500.00 54,900.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 350,000.00 182,000.00
Koral Beton M3 0.7800 218,260.00 170,242.80
Kayu Balok Terentang M3 0.1500 2,705,000.00 405,750.00
Multiplek 9 mm 120 x 240 Lbr 3.5000 166,500.00 582,750.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 20.0000 30,800.00 616,000.00
Pekerja Oh 7.3000 150,000.00 1,095,000.00
Tukang Batu Oh 0.3500 170,000.00 59,500.00
Tukang Kayu Oh 3.3000 170,000.00 561,000.00
Tukang Besi Oh 2.1000 170,000.00 357,000.00
Kepala Tukang Oh 0.5700 180,000.00 102,600.00
Mandor Oh 0.2500 200,000.00 50,000.00
Jumlah 10,225,162.80
Dibulatkan 10,225,160.00
1 M3 Kolom Beton Tulang 30/30 cm (175 kg besi+bekisting) Struktur bertingkat 8 dia. 16, 8-15
Kayu Terentang M3 0.4000 2,950,000.00 1,180,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Besi Beton Polos Kg 175.0000 16,500.00 2,887,500.00
1 2 3 4 5 6=4x5
Kawat Beton Kg 1.8000 30,500.00 54,900.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 350,000.00 182,000.00
Koral Beton M3 0.7800 218,260.00 170,242.80
Kayu Balok Terentang M3 0.1500 2,705,000.00 405,750.00
Multiplek 9 mm 120 x 240 Lbr 3.5000 166,500.00 582,750.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 20.0000 30,800.00 616,000.00
Pekerja Oh 7.3000 150,000.00 1,095,000.00
Tukang Batu Oh 0.3500 170,000.00 59,500.00
Tukang Kayu Oh 3.3000 170,000.00 561,000.00
Tukang Besi Oh 2.1000 170,000.00 357,000.00
Kepala Tukang Oh 0.5700 180,000.00 102,600.00
Mandor Oh 0.2500 200,000.00 50,000.00
Jumlah 8,897,662.80
Dibulatkan 8,897,660.00
1 M3 Kolom Beton Tulang 30/30 cm (210 kg besi bekisting) Struktur bertingkat 10 dia. 16, 8-15
Kayu Terentang M3 0.4000 2,950,000.00 1,180,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Besi Beton Polos Kg 210.0000 16,500.00 3,465,000.00
Kawat Beton Kg 1.8000 30,500.00 54,900.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 350,000.00 182,000.00
Koral Beton M3 0.7800 218,260.00 170,242.80
Kayu Balok Terentang M3 0.1500 2,705,000.00 405,750.00
Multiplek 9 mm 120 x 240 Lbr 3.5000 166,500.00 582,750.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 20.0000 30,800.00 616,000.00
Pekerja Oh 7.3000 150,000.00 1,095,000.00
Tukang Batu Oh 0.3500 170,000.00 59,500.00
Tukang Kayu Oh 3.3000 170,000.00 561,000.00
Tukang Besi Oh 2.1000 170,000.00 357,000.00
Kepala Tukang Oh 0.5700 180,000.00 102,600.00
Mandor Oh 0.2500 200,000.00 50,000.00
Jumlah 9,475,162.80
Dibulatkan 9,475,160.00
1 M3 Kolom Beton Tulang 30/40 cm (200 kg besi bekisting) Struktur bertingkat
Kayu Terentang M3 0.4000 2,950,000.00 1,180,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Minyak Bekisting Ltr 2.0000 45,000.00 90,000.00
Besi Beton Polos Kg 200.0000 16,500.00 3,300,000.00
Kawat Beton Kg 1.8000 30,500.00 54,900.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 350,000.00 182,000.00
Koral Beton M3 0.7800 218,260.00 170,242.80
Kayu Balok Terentang M3 0.1500 2,705,000.00 405,750.00
Multiplek 9 mm 120 x 240 Lbr 3.5000 166,500.00 582,750.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 20.0000 30,800.00 616,000.00
Pekerja Oh 7.3000 150,000.00 1,095,000.00
Tukang Batu Oh 0.3500 170,000.00 59,500.00
Tukang Kayu Oh 3.3000 170,000.00 561,000.00
Tukang Besi Oh 2.1000 170,000.00 357,000.00
Kepala Tukang Oh 0.5700 180,000.00 102,600.00
Mandor Oh 0.2500 200,000.00 50,000.00
Jumlah 9,400,162.80
Dibulatkan 9,400,160.00
1 M3 Kolom Beton Tulang Praktis 12/12 cm (175 kg besi+bekisting)
Kayu Terentang M3 0.4000 2,950,000.00 1,180,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Besi Beton Polos Kg 175.0000 16,500.00 2,887,500.00
Kawat Beton Kg 1.8000 30,500.00 54,900.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 350,000.00 182,000.00
Koral Beton M3 0.7800 218,260.00 170,242.80
Dolken Kayu Galam Ø-8 Cm / 4m Btg 20.0000 30,800.00 616,000.00
1 2 3 4 5 6=4x5
Pekerja Oh 7.3000 150,000.00 1,095,000.00
Tukang Batu Oh 0.3500 170,000.00 59,500.00
Tukang Kayu Oh 3.3000 170,000.00 561,000.00
Tukang Besi Oh 2.1000 170,000.00 357,000.00
Kepala Tukang Oh 0.5700 180,000.00 102,600.00
Mandor Oh 0.2500 200,000.00 50,000.00
Jumlah 7,909,162.80
Dibulatkan 7,909,160.00
1 M3 Kolom Beton Tulang Praktis 12/12 cm (260 kg besi+bekisting) 4 dia. 10, 8-15
Kayu Terentang M3 0.4000 2,950,000.00 1,180,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Besi Beton Polos Kg 260.0000 16,500.00 4,290,000.00
Kawat Beton Kg 1.8000 30,500.00 54,900.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 350,000.00 182,000.00
Koral Beton M3 0.7800 218,260.00 170,242.80
Dolken Kayu Galam Ø-8 Cm / 4m Btg 20.0000 30,800.00 616,000.00
Pekerja Oh 7.3000 150,000.00 1,095,000.00
Tukang Batu Oh 0.3500 170,000.00 59,500.00
Tukang Kayu Oh 3.3000 170,000.00 561,000.00
Tukang Besi Oh 2.1000 170,000.00 357,000.00
Kepala Tukang Oh 0.5700 180,000.00 102,600.00
Mandor Oh 0.2500 200,000.00 50,000.00
Jumlah 9,311,662.80
Dibulatkan 9,311,660.00
1 M3 Kolom Beton Tulang (200 kg besi+bekisting)
Kayu Terentang M3 0.4000 2,950,000.00 1,180,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Besi Beton Polos Kg 200.0000 16,500.00 3,300,000.00
Kawat Beton Kg 4.5000 30,500.00 137,250.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 350,000.00 182,000.00
Koral Beton M3 0.7800 218,260.00 170,242.80
Kayu Balok Terentang M3 0.1500 2,705,000.00 405,750.00
Multiplek 9 mm 120 x 240 Lbr 3.5000 166,500.00 582,750.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 20.0000 30,800.00 616,000.00
Pekerja Oh 7.3000 150,000.00 1,095,000.00
Tukang Batu Oh 0.3500 170,000.00 59,500.00
Tukang Kayu Oh 3.3000 170,000.00 561,000.00
Tukang Besi Oh 2.1000 170,000.00 357,000.00
Kepala Tukang Oh 0.5700 180,000.00 102,600.00
Mandor Oh 0.2500 200,000.00 50,000.00
Jumlah 9,392,512.80
Dibulatkan 9,392,510.00
1 M3 Kolom Beton Tulang (250 kg besi+bekisting)
Kayu Terentang M3 0.4000 2,950,000.00 1,180,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Besi Beton Polos Kg 250.0000 16,500.00 4,125,000.00
Kawat Beton Kg 4.5000 30,500.00 137,250.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 350,000.00 182,000.00
Koral Beton M3 0.7800 218,260.00 170,242.80
Kayu Balok Terentang M3 0.1500 2,705,000.00 405,750.00
Multiplek 9 mm 120 x 240 Lbr 3.5000 166,500.00 582,750.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 20.0000 30,800.00 616,000.00
Pekerja Oh 7.3000 150,000.00 1,095,000.00
Tukang Batu Oh 0.3500 170,000.00 59,500.00
Tukang Kayu Oh 3.3000 170,000.00 561,000.00
Tukang Besi Oh 2.1000 170,000.00 357,000.00
Kepala Tukang Oh 0.5700 180,000.00 102,600.00
Mandor Oh 0.2500 200,000.00 50,000.00
Jumlah 10,217,512.80
Dibulatkan 10,217,510.00
1 2 3 4 5 6=4x5
1 M3 Kolom Beton Tulang (300 kg besi+bekisting)
Kayu Terentang M3 0.4000 2,950,000.00 1,180,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Besi Beton Polos Kg 300.0000 16,500.00 4,950,000.00
Kawat Beton Kg 4.5000 30,500.00 137,250.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 350,000.00 182,000.00
Koral Beton M3 0.7800 218,260.00 170,242.80
Kayu Balok Terentang M3 0.1500 2,705,000.00 405,750.00
Multiplek 9 mm 120 x 240 Lbr 3.5000 166,500.00 582,750.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 20.0000 30,800.00 616,000.00
Pekerja Oh 7.3000 150,000.00 1,095,000.00
Tukang Batu Oh 0.3500 170,000.00 59,500.00
Tukang Kayu Oh 3.3000 170,000.00 561,000.00
Tukang Besi Oh 2.1000 170,000.00 357,000.00
Kepala Tukang Oh 0.5700 180,000.00 102,600.00
Mandor Oh 0.2500 200,000.00 50,000.00
Jumlah 11,042,512.80
Dibulatkan 11,042,510.00
D-25 1 M3 Balok Beton Tulang (120 kg besi+bekisting)
Kayu Terentang M3 0.3200 2,950,000.00 944,000.00
Paku Biasa 2" - 5" Kg 3.2000 24,000.00 76,800.00
Minyak Bekisting Ltr 1.6000 45,000.00 72,000.00
Besi Beton Polos Kg 120.0000 16,500.00 1,980,000.00
Kawat Beton Kg 1.8000 30,500.00 54,900.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 350,000.00 182,000.00
Koral Beton M3 0.7800 218,260.00 170,242.80
Kayu Balok Terentang M3 0.1400 2,705,000.00 378,700.00
Multiplek 9 mm 120 x 240 Lbr 2.8000 166,500.00 466,200.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 16.0000 30,800.00 492,800.00
Pekerja Oh 5.9600 150,000.00 894,000.00
Tukang Batu Oh 0.3500 170,000.00 59,500.00
Tukang Kayu Oh 2.8000 170,000.00 476,000.00
Tukang Besi Oh 1.4000 170,000.00 238,000.00
Kepala Tukang Oh 0.4550 180,000.00 81,900.00
Mandor Oh 0.2080 200,000.00 41,600.00
Jumlah 7,106,062.80
Dibulatkan 7,106,060.00
D-26 1 M3 Balok Beton Tulang (150 kg besi+bekisting)
Kayu Terentang M3 0.3500 2,950,000.00 1,032,500.00
Paku Biasa 2" - 5" Kg 3.2000 24,000.00 76,800.00
Minyak Bekisting Ltr 1.6000 45,000.00 72,000.00
Besi Beton Polos Kg 150.0000 16,500.00 2,475,000.00
Kawat Beton Kg 2.2500 30,500.00 68,625.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 350,000.00 182,000.00
Koral Beton M3 0.7800 218,260.00 170,242.80
Kayu Balok Terentang M3 0.1400 2,705,000.00 378,700.00
Multiplek 9 mm 120 x 240 Lbr 2.8000 166,500.00 466,200.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 16.0000 30,800.00 492,800.00
Pekerja Oh 5.9600 150,000.00 894,000.00
Tukang Batu Oh 0.3500 170,000.00 59,500.00
Tukang Kayu Oh 2.8000 170,000.00 476,000.00
Tukang Besi Oh 1.4000 170,000.00 238,000.00
Kepala Tukang Oh 0.4550 180,000.00 81,900.00
Mandor Oh 0.2080 200,000.00 41,600.00
Jumlah 7,703,287.80
Dibulatkan 7,703,280.00
D-27 1 M3 Balok Beton Tulang (200 kg besi+bekisting)
Kayu Terentang M3 0.3000 2,950,000.00 885,000.00
Paku Biasa 2" - 5" Kg 3.2000 24,000.00 76,800.00
Minyak Bekisting Ltr 1.6000 45,000.00 72,000.00
1 2 3 4 5 6=4x5
Besi Beton Polos Kg 200.0000 16,500.00 3,300,000.00
Kawat Beton Kg 3.0000 30,500.00 91,500.00
Semen Portland Kg 200.0000 1,540.00 308,000.00
Pasir Beton M3 0.5200 350,000.00 182,000.00
Koral Beton M3 0.7800 218,260.00 170,242.80
Kayu Balok Terentang M3 0.1400 2,705,000.00 378,700.00
Multiplek 9 mm 120 x 240 Lbr 1.5000 166,500.00 249,750.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 12.0000 30,800.00 369,600.00
Pekerja Oh 5.9600 150,000.00 894,000.00
Tukang Batu Oh 0.3500 170,000.00 59,500.00
Tukang Kayu Oh 2.8000 170,000.00 476,000.00
Tukang Besi Oh 1.4000 170,000.00 238,000.00
Kepala Tukang Oh 0.4550 180,000.00 81,900.00
Mandor Oh 0.2080 200,000.00 41,600.00
Jumlah 7,874,592.80
Dibulatkan 7,874,590.00
D-28 1 M3 Balok Beton Tulang (230 kg besi+bekisting)
Kayu Terentang M3 0.3200 2,950,000.00 944,000.00
Paku Biasa 2" - 5" Kg 3.2000 24,000.00 76,800.00
Minyak Bekisting Ltr 1.6000 45,000.00 72,000.00
Besi Beton Polos Kg 230.0000 16,500.00 3,795,000.00
Kawat Beton Kg 3.4500 30,500.00 105,225.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 350,000.00 182,000.00
Koral Beton M3 0.7800 218,260.00 170,242.80
Kayu Balok Terentang M3 0.1400 2,705,000.00 378,700.00
Multiplek 9 mm 120 x 240 Lbr 2.8000 166,500.00 466,200.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 16.0000 30,800.00 492,800.00
Pekerja Oh 5.9600 150,000.00 894,000.00
Tukang Batu Oh 0.3500 170,000.00 59,500.00
Tukang Kayu Oh 2.8000 170,000.00 476,000.00
Tukang Besi Oh 1.4000 170,000.00 238,000.00
Kepala Tukang Oh 0.4550 180,000.00 81,900.00
Mandor Oh 0.2080 200,000.00 41,600.00
Jumlah 8,971,387.80
Dibulatkan 8,971,380.00
1 M3 Balok Beton Tulang 15/20 cm (150 kg besi+bekisting)
Kayu Terentang M3 0.3200 2,950,000.00 944,000.00
Paku Biasa 2" - 5" Kg 3.2000 24,000.00 76,800.00
Minyak Bekisting Ltr 1.6000 45,000.00 72,000.00
Besi Beton Polos Kg 150.0000 16,500.00 2,475,000.00
Kawat Beton Kg 2.2500 30,500.00 68,625.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 350,000.00 182,000.00
Koral Beton M3 0.7800 218,260.00 170,242.80
Kayu Balok Terentang M3 0.1400 2,705,000.00 378,700.00
Multiplek 9 mm 120 x 240 Lbr 2.8000 166,500.00 466,200.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 16.0000 30,800.00 492,800.00
Pekerja Oh 5.9600 150,000.00 894,000.00
Tukang Batu Oh 0.3500 170,000.00 59,500.00
Tukang Kayu Oh 2.8000 170,000.00 476,000.00
Tukang Besi Oh 1.4000 170,000.00 238,000.00
Kepala Tukang Oh 0.4550 180,000.00 81,900.00
Mandor Oh 0.2080 200,000.00 41,600.00
Jumlah 7,614,787.80
Dibulatkan 7,614,780.00
1 M3 Balok Beton Tulang 15/20 (180 kg besi+bekisting) 4 dia. 12, 8-15
Kayu Terentang M3 0.3200 2,950,000.00 944,000.00
Paku Biasa 2" - 5" Kg 3.2000 24,000.00 76,800.00
Besi Beton Polos Kg 180.0000 16,500.00 2,970,000.00
Kawat Beton Kg 2.2500 30,500.00 68,625.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 350,000.00 182,000.00
1 2 3 4 5 6=4x5
Koral Beton M3 0.7800 218,260.00 170,242.80
Kayu Balok Terentang M3 0.1400 2,705,000.00 378,700.00
Multiplek 9 mm 120 x 240 Lbr 2.8000 166,500.00 466,200.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 16.0000 30,800.00 492,800.00
Pekerja Oh 5.9600 150,000.00 894,000.00
Tukang Batu Oh 0.3500 170,000.00 59,500.00
Tukang Kayu Oh 2.8000 170,000.00 476,000.00
Tukang Besi Oh 1.4000 170,000.00 238,000.00
Kepala Tukang Oh 0.4550 180,000.00 81,900.00
Mandor Oh 0.2080 200,000.00 41,600.00
Jumlah 8,037,787.80
Dibulatkan 8,037,780.00
1 M3 Balok Beton Lintel 11/11 (300 kg besi+bekisting) 4 dia. 10, 8-15
Kayu Terentang M3 0.4000 2,950,000.00 1,180,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Besi Beton Polos Kg 300.0000 16,500.00 4,950,000.00
Kawat Beton Kg 1.8000 30,500.00 54,900.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 350,000.00 182,000.00
Koral Beton M3 0.7800 218,260.00 170,242.80
Dolken Kayu Galam Ø-8 Cm / 4m Btg 20.0000 30,800.00 616,000.00
Pekerja Oh 7.3000 150,000.00 1,095,000.00
Tukang Batu Oh 0.3500 170,000.00 59,500.00
Tukang Kayu Oh 3.3000 170,000.00 561,000.00
Tukang Besi Oh 2.1000 170,000.00 357,000.00
Kepala Tukang Oh 0.5700 180,000.00 102,600.00
Mandor Oh 0.2500 200,000.00 50,000.00
Jumlah 9,971,662.80
Dibulatkan 9,971,660.00
1 M3 Balok Beton Tulang 15/20 sofi-sofi, ring balk+balok portal (180 kg besi+bekisting) 4 dia.12, 8-15
Kayu Terentang M3 0.3200 2,950,000.00 944,000.00
Paku Biasa 2" - 5" Kg 3.2000 24,000.00 76,800.00
Besi Beton Polos Kg 180.0000 16,500.00 2,970,000.00
Kawat Beton Kg 2.2500 30,500.00 68,625.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 350,000.00 182,000.00
Koral Beton M3 0.7800 218,260.00 170,242.80
Kayu Balok Terentang M3 0.1400 2,705,000.00 378,700.00
Multiplek 9 mm 120 x 240 Lbr 2.8000 166,500.00 466,200.00
Dolken o - 8 Cm/ 4 m Btg 16.0000 30,800.00 492,800.00
Pekerja Oh 5.9600 150,000.00 894,000.00
Tukang Batu Oh 0.3500 170,000.00 59,500.00
Tukang Kayu Oh 2.8000 170,000.00 476,000.00
Tukang Besi Oh 1.4000 170,000.00 238,000.00
Kepala Tukang Oh 0.4550 180,000.00 81,900.00
Mandor Oh 0.2080 200,000.00 41,600.00
Jumlah 8,037,787.80
Dibulatkan 8,037,780.00
1 M3 Balok Beton Tulang 15/30 (190 kg besi+bekisting) Struktur bertingkat 4 dia. 16, 8-15
Kayu Terentang M3 0.3200 2,950,000.00 944,000.00
Paku Biasa 2" - 5" Kg 3.2000 24,000.00 76,800.00
Besi Beton Polos Kg 190.0000 16,500.00 3,135,000.00
Kawat Beton Kg 2.2500 30,500.00 68,625.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 350,000.00 182,000.00
Koral Beton M3 0.7800 218,260.00 170,242.80
Kayu Balok Terentang M3 0.1400 2,705,000.00 378,700.00
Multiplek 9 mm 120 x 240 Lbr 2.8000 166,500.00 466,200.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 16.0000 30,800.00 492,800.00
Pekerja Oh 5.9600 150,000.00 894,000.00
Tukang Batu Oh 0.3500 170,000.00 59,500.00
Tukang Kayu Oh 2.8000 170,000.00 476,000.00
Tukang Besi Oh 1.4000 170,000.00 238,000.00
1 2 3 4 5 6=4x5
Kepala Tukang Oh 0.4550 180,000.00 81,900.00
Mandor Oh 0.2080 200,000.00 41,600.00
Jumlah 8,202,787.80
Dibulatkan 8,202,780.00
1 M3 Balok Beton Tulang 20/40 (200 kg besi+bekisting) Struktur bertingkat 7 dia. 16+2 dia. 12, 8-15
Kayu Terentang M3 0.3200 2,950,000.00 944,000.00
Paku Biasa 2" - 5" Kg 3.2000 24,000.00 76,800.00
Besi Beton Polos Kg 200.0000 16,500.00 3,300,000.00
Kawat Beton Kg 3.0000 30,500.00 91,500.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 350,000.00 182,000.00
Koral Beton M3 0.7800 218,260.00 170,242.80
Kayu Balok Terentang M3 0.1400 2,705,000.00 378,700.00
Multiplek 9 mm 120 x 240 Lbr 2.8000 166,500.00 466,200.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 16.0000 30,800.00 492,800.00
Pekerja Oh 5.9600 150,000.00 894,000.00
Tukang Batu Oh 0.3500 170,000.00 59,500.00
Tukang Kayu Oh 2.8000 170,000.00 476,000.00
Tukang Besi Oh 1.4000 170,000.00 238,000.00
Kepala Tukang Oh 0.4550 180,000.00 81,900.00
Mandor Oh 0.2080 200,000.00 41,600.00
Jumlah 8,390,662.80
Dibulatkan 8,390,660.00
1 M3 Balok Beton Tulang 20/30 (200 kg besi+bekisting) Struktur bertingkat 6 dia. 16, 8-15
Kayu Terentang M3 0.3200 2,950,000.00 944,000.00
Paku Biasa 2" - 5" Kg 3.2000 24,000.00 76,800.00
Besi Beton Polos Kg 200.0000 16,500.00 3,300,000.00
Kawat Beton Kg 3.0000 30,500.00 91,500.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 350,000.00 182,000.00
Koral Beton M3 0.7800 218,260.00 170,242.80
Kayu Balok Terentang M3 0.1400 2,705,000.00 378,700.00
Multiplek 9 mm 120 x 240 Lbr 2.8000 166,500.00 466,200.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 16.0000 30,800.00 492,800.00
Pekerja Oh 5.9600 150,000.00 894,000.00
Tukang Batu Oh 0.3500 170,000.00 59,500.00
Tukang Kayu Oh 2.8000 170,000.00 476,000.00
Tukang Besi Oh 1.4000 170,000.00 238,000.00
Kepala Tukang Oh 0.4550 180,000.00 81,900.00
Mandor Oh 0.2080 200,000.00 41,600.00
Jumlah 8,390,662.80
Dibulatkan 7,791,000.00
1 M3 Balok Beton Tulang 20/30 (175 kg besi+bekisting) Struktur bertingkat 5 dia. 16, 8-15
Kayu Terentang M3 0.3200 2,950,000.00 944,000.00
Paku Biasa 2" - 5" Kg 3.2000 24,000.00 76,800.00
Besi Beton Polos Kg 175.0000 16,500.00 2,887,500.00
Kawat Beton Kg 3.0000 30,500.00 91,500.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 350,000.00 182,000.00
Koral Beton M3 0.7800 218,260.00 170,242.80
Kayu Balok Terentang M3 0.1400 2,705,000.00 378,700.00
Multiplek 9 mm 120 x 240 Lbr 2.8000 166,500.00 466,200.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 16.0000 30,800.00 492,800.00
Pekerja Oh 5.9600 150,000.00 894,000.00
Tukang Batu Oh 0.3500 170,000.00 59,500.00
Tukang Kayu Oh 2.8000 170,000.00 476,000.00
Tukang Besi Oh 1.4000 170,000.00 238,000.00
Kepala Tukang Oh 0.4550 180,000.00 81,900.00
Mandor Oh 0.2080 200,000.00 41,600.00
Jumlah 7,978,162.80
Dibulatkan 7,978,160.00
1 M3 Balok Beton Tulang 25/55 (140 kg besi+bekisting) Struktur bertingkat 8 dia. 16+2 dia. 12, 8-15
Kayu Terentang M3 0.3200 2,950,000.00 944,000.00
1 2 3 4 5 6=4x5
Paku Biasa 2" - 5" Kg 3.2000 24,000.00 76,800.00
Besi Beton Polos Kg 140.0000 16,500.00 2,310,000.00
Kawat Beton Kg 3.0000 30,500.00 91,500.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 350,000.00 182,000.00
Koral Beton M3 0.7800 218,260.00 170,242.80
Kayu Balok Terentang M3 0.1400 2,705,000.00 378,700.00
Multiplek 9 mm 120 x 240 Lbr 2.8000 166,500.00 466,200.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 16.0000 30,800.00 492,800.00
Pekerja Oh 5.9600 150,000.00 894,000.00
Tukang Batu Oh 0.3500 170,000.00 59,500.00
Tukang Kayu Oh 2.8000 170,000.00 476,000.00
Tukang Besi Oh 1.4000 170,000.00 238,000.00
Kepala Tukang Oh 0.4550 180,000.00 81,900.00
Mandor Oh 0.2080 200,000.00 41,600.00
Jumlah 7,400,662.80
Dibulatkan 7,400,660.00
1 M3 Balok Beton Tulang 30/60 (110 kg besi+ bekisting) Struktur bertingkat 9 dia. 19+2 dia. 12, 8-15
Kayu Terentang M3 0.3200 2,950,000.00 944,000.00
Paku Biasa 2" - 5" Kg 3.2000 24,000.00 76,800.00
Besi Beton Polos Kg 110.0000 16,500.00 1,815,000.00
Kawat Beton Kg 3.0000 30,500.00 91,500.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 350,000.00 182,000.00
Koral Beton M3 0.7800 218,260.00 170,242.80
Kayu Balok Terentang M3 0.1400 2,705,000.00 378,700.00
Multiplek 9 mm 120 x 240 Lbr 2.8000 166,500.00 466,200.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 16.0000 30,800.00 492,800.00
Pekerja Oh 5.9600 150,000.00 894,000.00
Tukang Batu Oh 0.3500 170,000.00 59,500.00
Tukang Kayu Oh 2.8000 170,000.00 476,000.00
Tukang Besi Oh 1.4000 170,000.00 238,000.00
Kepala Tukang Oh 0.4550 180,000.00 81,900.00
Mandor Oh 0.2080 200,000.00 41,600.00
Jumlah 6,905,662.80
Dibulatkan 6,905,660.00
D-29 1 M3 Tangga Beton Tulang (200 kg besi+bekisting)
Kayu Terentang M3 0.2500 2,950,000.00 737,500.00
Paku Biasa 2" - 5" Kg 3.0000 24,000.00 72,000.00
Minyak Bekisting Ltr 1.2000 45,000.00 54,000.00
Besi Beton Polos Kg 200.0000 16,500.00 3,300,000.00
Kawat Beton Kg 3.0000 30,500.00 91,500.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 350,000.00 182,000.00
Koral Beton M3 0.7800 218,260.00 170,242.80
Kayu Balok Terentang M3 0.1050 2,705,000.00 284,025.00
Multiplek 9 mm 120 x 240 Lbr 2.5000 166,500.00 416,250.00
Dolken o - 8 Cm/ 4 m Btg 14.0000 30,800.00 431,200.00
Pekerja Oh 5.6000 150,000.00 840,000.00
Tukang Batu Oh 0.3500 170,000.00 59,500.00
Tukang Kayu Oh 2.3000 170,000.00 391,000.00
Tukang Besi Oh 1.4000 170,000.00 238,000.00
Kepala Tukang Oh 0.4050 180,000.00 72,900.00
Mandor Oh 0.2020 200,000.00 40,400.00
Jumlah 7,877,937.80
Dibulatkan 7,877,930.00
D-30 1 M3 Plat Lantai Tb. 10 Cm Beton Bertulang (90 kg besi+bekisting)
Beton bertulang ad. 1Pc : 2 Ps : 3 Kr M3 1.0000 1,449,030.00 1,449,030.00
Pasang Bekisting untuk lantai M2 10.0000 528,490.00 5,284,900.00
Besi Beton Polos Kg 90.0000 20,200.00 1,818,000.00
Jumlah 8,551,930.00
Dibulatkan 8,551,930.00
D-30.1 1 M3 Plat Lantai 1 lapis Tb. 10 Cm Beton Bertulang (50 kg besi+bekisting)
1 2 3 4 5 6=4x5
Beton bertulang ad. 1Pc : 2 Ps : 3 Kr M3 1.0000 1,449,030.00 1,449,030.00
Besi Beton Polos Kg 50.0000 20,200.00 1,010,000.00
Jumlah 2,459,030.00
Dibulatkan 2,459,030.00
D-31 1 M3 Plat Lantai Tb. 12 Cm Beton Bertulang (110 kg besi+bekisting)
Beton bertulang ad. 1Pc : 2 Ps : 3 Kr M3 1.0000 1,449,030.00 1,449,030.00
Pasang Bekisting untuk lantai M2 8.3300 528,490.00 4,402,321.70
Besi Beton Polos Kg 110.0000 20,200.00 2,222,000.00
Jumlah 8,073,351.70
Dibulatkan 8,073,350.00
D-32 1 M3 Plat Lantai Tb. 12 Cm Beton Bertulang (130 kg besi+bekisting)
Beton bertulang ad. 1Pc : 2 Ps : 3 Kr M3 1.0000 1,449,030.00 1,449,030.00
Pasang Bekisting untuk lantai M2 8.3300 528,490.00 4,402,321.70
Besi Beton Polos Kg 130.0000 20,200.00 2,626,000.00
Jumlah 8,477,351.70
Dibulatkan 8,477,350.00
D-33 1 M3 Plat Lantai Tb. 15 Cm Beton Bertulang (90 kg besi+bekisting)
Beton bertulang ad. 1Pc : 2 Ps : 3 Kr M3 1.0000 1,449,030.00 1,449,030.00
Pasang Bekisting untuk lantai M2 6.6700 528,490.00 3,525,028.30
Besi Beton Polos Kg 90.0000 20,200.00 1,818,000.00
Jumlah 6,792,058.30
Dibulatkan 6,792,050.00
D-34 1 M3 Plat Lantai Tb. 15 Cm Beton Bertulang (115 kg besi+bekisting)
Beton bertulang ad. 1Pc : 2 Ps : 3 Kr M3 1.0000 1,449,030.00 1,449,030.00
Pasang Bekisting untuk lantai M2 6.6700 528,490.00 3,525,028.30
Besi Beton Polos Kg 115.0000 20,200.00 2,323,000.00
Jumlah 7,297,058.30
Dibulatkan 7,297,050.00
1 M3 Listplang Beton Tulang T= 8 cm (77.5 kg besi+bekisting)
Beton bertulang ad. 1Pc : 2 Ps : 3 Kr M3 1.0000 1,449,030.00 1,449,030.00
Pasang Bekisting untuk lantai M2 8.3300 528,490.00 4,402,321.70
Besi Beton Polos Kg 77.5000 20,200.00 1,565,500.00
Jumlah 7,416,851.70
Dibulatkan 6,857,240.00
D-35 1 M' Kolom Praktis Beton Tulang ( 11 x 11 ) Cm
Kayu Terentang M3 0.0020 2,950,000.00 5,900.00
Paku Biasa 2" - 5" Kg 0.0100 24,000.00 240.00
Besi Beton Polos Kg 3.0000 16,500.00 49,500.00
Kawat Beton Kg 0.0450 30,500.00 1,372.50
Semen Portland Kg 4.0000 1,540.00 6,160.00
Pasir Beton M3 0.0060 350,000.00 2,100.00
Koral Beton M3 0.0090 218,260.00 1,964.34
Pekerja Oh 0.0600 150,000.00 9,000.00
Tukang Batu Oh 0.0200 170,000.00 3,400.00
Tukang Kayu Oh 0.0200 170,000.00 3,400.00
Tukang Besi Oh 0.0200 170,000.00 3,400.00
Kepala Tukang Oh 0.0060 180,000.00 1,080.00
Mandor Oh 0.0030 200,000.00 600.00
Jumlah 88,116.84
Dibulatkan 88,110.00
D-36 1 M' Ring Balok Beton Tulang ( 10 x 15 ) Cm
Kayu Terentang M3 0.0030 2,950,000.00 8,850.00
Paku Biasa 2" - 5" Kg 0.0200 24,000.00 480.00
Besi Beton Polos Kg 3.6000 16,500.00 59,400.00
Kawat Beton Kg 0.0500 30,500.00 1,525.00
Semen Portland Kg 5.5000 1,540.00 8,470.00
Pasir Beton M3 0.0090 350,000.00 3,150.00
Koral Beton M3 0.0150 218,260.00 3,273.90
Pekerja Oh 0.1000 150,000.00 15,000.00
Tukang Batu Oh 0.0330 170,000.00 5,610.00
Tukang Kayu Oh 0.0330 170,000.00 5,610.00
Tukang Besi Oh 0.0330 170,000.00 5,610.00
Kepala Tukang Oh 0.0100 180,000.00 1,800.00
1 2 3 4 5 6=4x5
Mandor Oh 0.0050 200,000.00 1,000.00
Jumlah 119,778.90
Dibulatkan 119,770.00
D-37 1 M2 Pasang Bekisting untuk Dinding
Kayu Terentang M3 0.0300 2,950,000.00 88,500.00
Paku Biasa 2" - 5" Kg 0.4000 24,000.00 9,600.00
Minyak Bekisting Ltr 0.2000 45,000.00 9,000.00
Kayu balok terentang M3 0.0200 2,705,000.00 54,100.00
Multiplek 9 mm 120 x 240 Lbr 0.3500 166,500.00 58,275.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 3.0000 30,800.00 92,400.00
Formtie/ Penjaga jarak Bekisting/ Spacer Bh 4.0000 2,800.00 11,200.00
Pekerja Oh 0.3200 150,000.00 48,000.00
Tukang Kayu Oh 0.3300 170,000.00 56,100.00
Kepala Tukang Oh 0.0330 180,000.00 5,940.00
Mandor Oh 0.0060 200,000.00 1,200.00
Jumlah 434,315.00
Dibulatkan 434,310.00
D-38 1 M3 Pelat Beton Tulang (150 kg besi+bekisting)
Kayu Terentang M3 0.3200 2,950,000.00 944,000.00
Paku Biasa 2" - 5" Kg 3.2000 24,000.00 76,800.00
Minyak Bekisting Ltr 1.6000 45,000.00 72,000.00
Besi Beton Polos Kg 150.0000 16,500.00 2,475,000.00
Kawat Beton Kg 2.2500 30,500.00 68,625.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 350,000.00 182,000.00
Koral Beton M3 0.7800 218,260.00 170,242.80
Kayu Balok Terentang M3 0.1200 2,705,000.00 324,600.00
Multiplek 9 mm 120 x 240 Lbr 2.8000 166,500.00 466,200.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 32.0000 30,800.00 985,600.00
Pekerja Oh 5.3000 150,000.00 795,000.00
Tukang Batu Oh 0.3500 170,000.00 59,500.00
Tukang Kayu Oh 1.3000 170,000.00 221,000.00
Tukang Besi Oh 1.0500 170,000.00 178,500.00
Kepala Tukang Oh 0.2650 180,000.00 47,700.00
Mandor Oh 0.2650 200,000.00 53,000.00
Jumlah 7,617,187.80
Dibulatkan 7,617,180.00
D-39 1 M3 Dinding Beton Tulang (150 kg besi+bekisting)
Kayu Terentang M3 0.2400 2,950,000.00 708,000.00
Paku Biasa 2" - 5" Kg 3.2000 24,000.00 76,800.00
Minyak Bekisting Ltr 1.6000 45,000.00 72,000.00
Besi Beton Polos Kg 150.0000 16,500.00 2,475,000.00
Kawat Beton Kg 2.2500 30,500.00 68,625.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 350,000.00 182,000.00
Koral Beton M3 0.7800 218,260.00 170,242.80
Kayu Balok Terentang M3 0.1600 2,705,000.00 432,800.00
Multiplek 9 mm 120 x 240 Lbr 2.8000 166,500.00 466,200.00
Dolken o - 8 Cm/ 4 m Btg 24.0000 30,800.00 739,200.00
Pekerja Oh 5.6000 150,000.00 840,000.00
Tukang Batu Oh 0.3500 170,000.00 59,500.00
Tukang Kayu Oh 2.6400 170,000.00 448,800.00
Tukang Besi Oh 1.0500 170,000.00 178,500.00
Kepala Tukang Oh 0.4000 180,000.00 72,000.00
Mandor Oh 0.1930 200,000.00 38,600.00
Jumlah 7,525,687.80
Dibulatkan 7,525,680.00
D-40 1 M3 Dinding Beton Tulang (200 kg besi+bekisting)
Kayu Terentang M3 0.2500 2,950,000.00 737,500.00
Paku Biasa 2" - 5" Kg 3.0000 24,000.00 72,000.00
Minyak Bekisting Ltr 1.2000 45,000.00 54,000.00
Besi Beton Polos Kg 200.0000 16,500.00 3,300,000.00
Kawat Beton Kg 3.0000 30,500.00 91,500.00
1 2 3 4 5 6=4x5
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 350,000.00 182,000.00
Koral Beton M3 0.7800 218,260.00 170,242.80
Kayu Balok Terentang M3 0.1050 2,705,000.00 284,025.00
Multiplek 9 mm 120 x 240 Lbr 2.8000 166,500.00 466,200.00
Dolken o - 8 Cm/ 4 m Btg 14.0000 30,800.00 431,200.00
Pekerja Oh 5.6000 150,000.00 840,000.00
Tukang Batu Oh 0.3500 170,000.00 59,500.00
Tukang Kayu Oh 1.5600 170,000.00 265,200.00
Tukang Besi Oh 1.4000 170,000.00 238,000.00
Kepala Tukang Oh 0.3230 180,000.00 58,140.00
Mandor Oh 0.2830 200,000.00 56,600.00
Jumlah 7,803,527.80
Dibulatkan 7,803,520.00
D-41 1 M3 Membuat Beton Cor Mutu K300
Semen Portland Kg 413.0000 1,540.00 636,020.00
Pasir Beton M3 0.4256 350,000.00 148,960.00
Koral Beton M3 0.6807 218,260.00 148,569.58
Pekerja Oh 1.6500 150,000.00 247,500.00
Tukang Batu Oh 0.2750 170,000.00 46,750.00
Kepala Tukang Oh 0.0280 180,000.00 5,040.00
Mandor Oh 0.0830 200,000.00 16,600.00
Jumlah 1,249,439.58
Dibulatkan 1,249,430.00
D-42 1 M3 Membuat Beton Cor Mutu K200
Semen Portland Kg 352.0000 1,540.00 542,080.00
Pasir Beton M3 0.4569 350,000.00 159,915.00
Koral Beton M3 0.6873 218,260.00 150,010.10
Pekerja Oh 1.6500 150,000.00 247,500.00
Tukang Batu Oh 0.2750 170,000.00 46,750.00
Kepala Tukang Oh 0.0280 180,000.00 5,040.00
Mandor Oh 0.0830 200,000.00 16,600.00
Jumlah 1,167,895.10
Dibulatkan 1,167,890.00
D-43 1 M3 Membuat Beton Cor Mutu K250
Semen Portland Kg 384.0000 1,540.00 591,360.00
Pasir Beton M3 0.4325 350,000.00 151,375.00
Koral Beton M3 0.6927 218,260.00 151,188.70
Pekerja Oh 1.6500 150,000.00 247,500.00
Tukang Batu Oh 0.2750 170,000.00 46,750.00
Kepala Tukang Oh 0.0280 180,000.00 5,040.00
Mandor Oh 0.0830 200,000.00 16,600.00
Jumlah 1,209,813.70
Dibulatkan 1,209,810.00
1 M3 Membuat Beton dengan Puzzdith - 100 XR
Semen Portland Kg 336.0000 1,540.00 517,440.00
Pasir Beton M3 0.5400 350,000.00 189,000.00
Koral Beton M3 0.8100 218,260.00 176,790.60
Puzzdith - 100 XR Ltr 1.0000 - 0.00
Pekerja Oh 1.6500 150,000.00 247,500.00
Tukang Batu Oh 0.2500 170,000.00 42,500.00
Kepala Tukang Oh 0.0250 180,000.00 4,500.00
Mandor Oh 0.0800 200,000.00 16,000.00
Jumlah 1,193,730.60
Dibulatkan 1,193,730.00
1 M3 Membuat Beton Kedap Air dengan AM - 100
Semen Portland Kg 400.0000 1,540.00 616,000.00
Pasir Beton M3 0.4800 350,000.00 168,000.00
Koral Beton M3 0.8000 218,260.00 174,608.00
AM - 100 Ltr 1.2000 41,500.00 49,800.00
Pekerja Oh 2.0000 150,000.00 300,000.00
Tukang Batu Oh 0.3500 170,000.00 59,500.00
Kepala Tukang Oh 0.0350 180,000.00 6,300.00
1 2 3 4 5 6=4x5
Mandor Oh 1.0000 200,000.00 200,000.00
Jumlah 1,574,208.00
Dibulatkan 1,574,200.00
1 Kg Kabel Presstressed Polos / Strands
Besi Presstressed Polos Kg 1.0500 16,500.00 17,325.00
Kawat Beton Kg 0.0100 30,500.00 305.00
Pekerja Oh 0.0050 150,000.00 750.00
Tukang Besi Oh 0.0050 170,000.00 850.00
Kepala Tukang Oh 0.0005 180,000.00 90.00
Mandor Oh 0.0003 200,000.00 60.00
Jumlah 19,380.00
Dibulatkan 19,380.00
1 Kg Jaring Kawat Baja
Besi Jaring Kawat Baja Kg 1.0200 31,800.00 32,436.00
Kawat Beton Kg 0.8050 30,500.00 24,552.50
Pekerja Oh 0.0250 150,000.00 3,750.00
Tukang Besi Oh 0.0250 170,000.00 4,250.00
Kepala Tukang Oh 0.0025 180,000.00 450.00
Mandor Oh 0.0015 200,000.00 300.00
Jumlah 65,738.50
Dibulatkan 65,730.00
1 M3 Membuat Beton Cor Mutu K175
Semen Portland Kg 326.0000 1,540.00 502,040.00
Pasir Beton M3 0.5429 350,000.00 190,015.00
Koral Beton M3 0.7622 218,260.00 166,357.77
Air Ltr 215.0000 350.00 75,250.00
Pekerja Oh 1.6500 150,000.00 247,500.00
Tukang Batu Oh 0.2750 170,000.00 46,750.00
Kepala Tukang Oh 0.0280 180,000.00 5,040.00
Mandor Oh 0.0830 200,000.00 16,600.00
Jumlah 1,249,552.77
Dibulatkan 1,249,550.00
1 M2 Pasangan Jembatan Cor
Kayu Albasia M3 0.0264 2,279,000.00 60,165.60
Paku Biasa 2" - 5" Kg 0.6000 24,000.00 14,400.00
Dolken Kayu Galam Ø-8 Cm / 4m Btg 0.5000 30,800.00 15,400.00
Pekerja Oh 0.1500 150,000.00 22,500.00
Tukang Kayu Oh 0.0500 170,000.00 8,500.00
Kepala Tukang Oh 0.0050 180,000.00 900.00
Mandor Oh 0.0070 200,000.00 1,400.00
Jumlah 123,265.60
Dibulatkan 123,260.00
1 M3 Listplank Beton Tulang T=8 cm ( 77,50 kg besi + bekisting )
Beton bertulang ad. 1Pc : 2 Ps : 3 Kr M3 1.0000 1,449,030.00 1,449,030.00
Pasang Bekisting untuk lantai M2 8.3300 528,490.00 4,402,321.70
Besi Beton Polos Kg 77.5000 20,200.00 1,565,500.00
Jumlah 7,416,851.70
Dibulatkan 7,416,850.00
E PEKERJAAN DINDING
E-01 1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 3Ps
Bata Merah Bh 140.0000 850.00 119,000.00
Semen Portland Kg 32.9500 1,540.00 50,743.00
Pasir Pasang M3 0.0910 350,000.00 31,850.00
Pekerja Oh 0.6500 150,000.00 97,500.00
Tukang Batu Oh 0.2000 170,000.00 34,000.00
Kepala Tukang Oh 0.0200 180,000.00 3,600.00
Mandor Oh 0.0300 200,000.00 6,000.00
Jumlah 342,693.00
Dibulatkan 342,690.00
E-02 1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 4Ps
Bata Merah Bh 140.0000 850.00 119,000.00
Semen Portland Kg 26.5500 1,540.00 40,887.00
1 2 3 4 5 6=4x5
Pasir Pasang M3 0.0930 350,000.00 32,550.00
Pekerja Oh 0.6500 150,000.00 97,500.00
Tukang Batu Oh 0.2000 170,000.00 34,000.00
Kepala Tukang Oh 0.0200 180,000.00 3,600.00
Mandor Oh 0.0300 200,000.00 6,000.00
Jumlah 333,537.00
Dibulatkan 333,530.00
E-03 1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 5Ps
Bata Merah Bh 140.0000 850.00 119,000.00
Semen Portland Kg 22.2000 1,540.00 34,188.00
Pasir Pasang M3 0.1020 350,000.00 35,700.00
Pekerja Oh 0.6500 150,000.00 97,500.00
Tukang Batu Oh 0.2000 170,000.00 34,000.00
Kepala Tukang Oh 0.0200 180,000.00 3,600.00
Mandor Oh 0.0300 200,000.00 6,000.00
Jumlah 329,988.00
Dibulatkan 329,980.00
E-04 1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 3Ps
Bata Merah Bh 70.0000 850.00 59,500.00
Semen Portland Kg 14.3700 1,540.00 22,129.80
Pasir Pasang M3 0.0400 350,000.00 14,000.00
Pekerja Oh 0.3200 150,000.00 48,000.00
Tukang Batu Oh 0.1000 170,000.00 17,000.00
Kepala Tukang Oh 0.0100 180,000.00 1,800.00
Mandor Oh 0.0150 200,000.00 3,000.00
Jumlah 165,429.80
Dibulatkan 165,420.00
E-05 1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 4Ps
Bata Merah Bh 70.0000 850.00 59,500.00
Semen Portland Kg 11.5000 1,540.00 17,710.00
Pasir Pasang M3 0.0430 350,000.00 15,050.00
Pekerja Oh 0.3200 150,000.00 48,000.00
Tukang Batu Oh 0.1000 170,000.00 17,000.00
Kepala Tukang Oh 0.0100 180,000.00 1,800.00
Mandor Oh 0.0150 200,000.00 3,000.00
Jumlah 162,060.00
Dibulatkan 162,060.00
E-06 1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 5Ps
Bata Merah Bh 70.0000 850.00 59,500.00
Semen Portland Kg 9.6800 1,540.00 14,907.20
Pasir Pasang M3 0.0450 350,000.00 15,750.00
Pekerja Oh 0.3200 150,000.00 48,000.00
Tukang Batu Oh 0.1000 170,000.00 17,000.00
Kepala Tukang Oh 0.0100 180,000.00 1,800.00
Mandor Oh 0.0150 200,000.00 3,000.00
Jumlah 159,957.20
Dibulatkan 159,950.00
E-07 1 M2 Pasang Dinding Roster Beton 20 x 20 ad.1pc : 3 ps
Roster Terawang Bh 36.0000 16,000.00 576,000.00
Semen Portland Kg 12.8000 1,540.00 19,712.00
Pasir Pasang M3 0.0350 350,000.00 12,250.00
Pekerja Oh 0.3000 150,000.00 45,000.00
Tukang Batu Oh 0.1000 170,000.00 17,000.00
Kepala Tukang Oh 0.0100 180,000.00 1,800.00
Mandor Oh 0.0150 200,000.00 3,000.00
Jumlah 674,762.00
Dibulatkan 674,760.00
E-08 1 M2 Pasang Dinding Roster Beton 20 x 20 ad.1pc : 4 ps
Roster Terawang Bh 36.0000 16,000.00 576,000.00
Semen Portland Kg 11.0000 1,540.00 16,940.00
Pasir Pasang M3 0.0350 350,000.00 12,250.00
Pekerja Oh 0.3000 150,000.00 45,000.00
Tukang Batu Oh 0.1000 170,000.00 17,000.00
1 2 3 4 5 6=4x5
Kepala Tukang Oh 0.0100 180,000.00 1,800.00
Mandor Oh 0.0150 200,000.00 3,000.00
Jumlah 671,990.00
Dibulatkan 671,990.00
E-09 1 M2 Pasang Dinding Roster/terawang (12 x 11 x 24) cm
Roster Terawang Bh 36.0000 16,000.00 576,000.00
Semen Portland Kg 12.8000 1,540.00 19,712.00
Pasir Pasang M3 0.0350 350,000.00 12,250.00
Pekerja Oh 0.3000 150,000.00 45,000.00
Tukang Batu Oh 0.1000 170,000.00 17,000.00
Kepala Tukang Oh 0.0100 180,000.00 1,800.00
Mandor Oh 0.0150 200,000.00 3,000.00
Jumlah 674,762.00
Dibulatkan 674,760.00
E-10 1 M2 Pasang Dinding Batako Besar Pres uk. 8 x 20 x 30 ad. 1pc : 4ps
Batako Bh 13.0000 2,700.00 35,100.00
Semen Portland Kg 12.0000 1,540.00 18,480.00
Pasir Pasang M3 0.0380 350,000.00 13,300.00
Pekerja Oh 0.3000 150,000.00 45,000.00
Tukang Batu Oh 0.1000 170,000.00 17,000.00
Kepala Tukang Oh 0.0100 180,000.00 1,800.00
Mandor Oh 0.0150 200,000.00 3,000.00
Jumlah 133,680.00
Dibulatkan 134,000.00
E-11 1 M2 Pasang Dinding Hollowblock (HB-20)
HB-20 Bh 12.5000 5,700.00 71,250.00
Semen Portland Kg 13.5000 1,540.00 20,790.00
Pasir Pasang M3 0.0480 350,000.00 16,800.00
Besi angkur Ø 8 mm Kg 1.9500 16,500.00 32,175.00
Pekerja Oh 0.3500 150,000.00 52,500.00
Tukang Batu Oh 0.1500 170,000.00 25,500.00
Kepala Tukang Oh 0.0150 180,000.00 2,700.00
Mandor Oh 0.0170 200,000.00 3,400.00
Jumlah 225,115.00
Dibulatkan 225,110.00
E-12 1 M2 Pasang Dinding Hollowblock (HB-15)
HB-15 Bh 12.5000 6,500.00 81,250.00
Semen Portland Kg 10.4500 1,540.00 16,093.00
Pasir Pasang M3 0.0380 350,000.00 13,300.00
Besi angkur Ø 8 mm Kg 1.9500 16,500.00 32,175.00
Pekerja Oh 0.3200 150,000.00 48,000.00
Tukang Batu Oh 0.1200 170,000.00 20,400.00
Kepala Tukang Oh 0.0120 180,000.00 2,160.00
Mandor Oh 0.0150 200,000.00 3,000.00
Jumlah 216,378.00
Dibulatkan 216,370.00
E-13 1 M2 Pasang Dinding Hollowblock (HB-10)
HB-10 Bh 12.5000 3,500.00 43,750.00
Semen Portland Kg 7.5000 1,540.00 11,550.00
Pasir Pasang M3 0.0270 350,000.00 9,450.00
Besi angkur Ø 8 mm Kg 1.9500 16,500.00 32,175.00
Pekerja Oh 0.3200 150,000.00 48,000.00
Tukang Batu Oh 0.1200 170,000.00 20,400.00
Kepala Tukang Oh 0.0120 180,000.00 2,160.00
Mandor Oh 0.0150 200,000.00 3,000.00
Jumlah 170,485.00
Dibulatkan 170,480.00
E-14 1 M2 Pasang Dinding Conblock (CB-20)
CB-20 Bh 12.5000 5,700.00 71,250.00
Semen Portland Kg 14.0500 1,540.00 21,637.00
Pasir Beton M3 0.0040 350,000.00 1,400.00
Pasir Pasang M3 0.0420 350,000.00 14,700.00
Besi angkur Ø 8 mm Kg 3.8700 16,500.00 63,855.00
1 2 3 4 5 6=4x5
Paku Biasa 2" - 5" Kg 0.0060 24,000.00 144.00
Kayu Terentang M3 0.0010 2,950,000.00 2,950.00
Kawat Beton Kg 0.0300 30,500.00 915.00
Koral Beton M3 0.0050 218,260.00 1,091.30
Pekerja Oh 0.3700 150,000.00 55,500.00
Tukang Batu Oh 0.1570 170,000.00 26,690.00
Tukang Besi Oh 0.0070 170,000.00 1,190.00
Kepala Tukang Oh 0.0164 180,000.00 2,952.00
Mandor Oh 0.0185 200,000.00 3,700.00
Jumlah 267,974.30
Dibulatkan 267,970.00
E-15 1 M2 Pasang Dinding Conblock (CB-15)
CB-15 Bh 12.5000 6,500.00 81,250.00
Semen Portland Kg 10.4600 1,540.00 16,108.40
Pasir Beton M3 0.0030 350,000.00 1,050.00
Pasir Pasang M3 0.0320 350,000.00 11,200.00
Besi angkur Ø 8 mm Kg 0.8700 16,500.00 14,355.00
Paku Biasa 2" - 5" Kg 0.0040 24,000.00 96.00
Kayu Terentang M3 0.0010 2,950,000.00 2,950.00
Kawat Beton Kg 0.0200 30,500.00 610.00
Koral Beton M3 0.0040 218,260.00 873.04
Pekerja Oh 0.3400 150,000.00 51,000.00
Tukang Batu Oh 0.1300 170,000.00 22,100.00
Tukang Besi Oh 0.0070 170,000.00 1,190.00
Kepala Tukang Oh 0.0137 180,000.00 2,466.00
Mandor Oh 0.0170 200,000.00 3,400.00
Jumlah 208,648.44
Dibulatkan 208,640.00
E-16 1 M2 Pasang Dinding Conblock (CB-10)
CB-10 Bh 12.5000 3,500.00 43,750.00
Semen Portland Kg 10.4600 1,540.00 16,108.40
Pasir Beton M3 0.0030 350,000.00 1,050.00
Pasir Pasang M3 0.0320 350,000.00 11,200.00
Besi angkur Ø 8 mm Kg 0.8700 16,500.00 14,355.00
Paku Biasa 2" - 5" Kg 0.0040 24,000.00 96.00
Kayu Terentang M3 0.0010 2,950,000.00 2,950.00
Kawat Beton Kg 0.0200 30,500.00 610.00
Koral Beton M3 0.0040 218,260.00 873.04
Pekerja Oh 0.3400 150,000.00 51,000.00
Tukang Batu Oh 0.1300 170,000.00 22,100.00
Tukang Besi Oh 0.0070 170,000.00 1,190.00
Kepala Tukang Oh 0.0137 180,000.00 2,466.00
Mandor Oh 0.0170 200,000.00 3,400.00
Jumlah 171,148.44
Dibulatkan 171,140.00
E-17 1 M2 Pasang Dinding Keramik mozaik mulia valino blue 25 x 40cm
Keramik mozaik mulia valino blue 25 x 40cm m2 1.0000 75,000.00 75,000.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 350,000.00 6,300.00
Semen Warna Kg 0.0130 15,000.00 195.00
Pekerja Oh 0.1875 150,000.00 28,125.00
Tukang Batu Oh 0.3750 170,000.00 63,750.00
Kepala Tukang Oh 0.0450 180,000.00 8,100.00
Mandor Oh 0.0188 200,000.00 3,760.00
Jumlah 197,550.00
Dibulatkan 198,000.00
E-17 1 M2 Pasang Dinding Keramik 10 x 20 Cm Corak setara Mulia
Keramik 10x20 Cm Corak m2 1.0000 62,500.00 62,500.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 350,000.00 6,300.00
Semen Warna Kg 0.0130 15,000.00 195.00
Pekerja Oh 0.1875 150,000.00 28,125.00
Tukang Batu Oh 0.3750 170,000.00 63,750.00
1 2 3 4 5 6=4x5
Kepala Tukang Oh 0.0450 180,000.00 8,100.00
Mandor Oh 0.0188 200,000.00 3,760.00
Jumlah 185,050.00
Dibulatkan 185,050.00
E-18 1 M2 Pasang Dinding Keramik 10 x 20 Cm Polos setara Mulia
Keramik 10x20 Cm Polos m2 1.0000 60,000.00 60,000.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 350,000.00 6,300.00
Semen Warna Kg 0.0130 15,000.00 195.00
Pekerja Oh 0.1875 150,000.00 28,125.00
Tukang Batu Oh 0.3750 170,000.00 63,750.00
Kepala Tukang Oh 0.0450 180,000.00 8,100.00
Mandor Oh 0.0188 200,000.00 3,760.00
Jumlah 182,550.00
Dibulatkan 182,550.00
E-19 1 M2 Pasang Dinding Keramik 20 x 20 Cm Corak setara Mulia
Keramik 20x20 Cm Corak m2 1.0000 65,000.00 65,000.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 350,000.00 6,300.00
Semen Warna Kg 0.0130 15,000.00 195.00
Pekerja Oh 0.1875 150,000.00 28,125.00
Tukang Batu Oh 0.3750 170,000.00 63,750.00
Kepala Tukang Oh 0.0450 180,000.00 8,100.00
Mandor Oh 0.0188 200,000.00 3,760.00
Jumlah 187,550.00
Dibulatkan 187,550.00
E-20 1 M2 Pasang Dinding Keramik 20 x 20 Cm polos setara Mulia
Keramik 20x20 Cm polos m2 1.0000 60,000.00 60,000.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 350,000.00 6,300.00
Semen Warna Kg 0.0130 15,000.00 195.00
Pekerja Oh 0.1875 150,000.00 28,125.00
Tukang Batu Oh 0.3750 170,000.00 63,750.00
Kepala Tukang Oh 0.0450 180,000.00 8,100.00
Mandor Oh 0.0188 200,000.00 3,760.00
Jumlah 182,550.00
Dibulatkan 182,550.00
E-21 1 M2 Pasang Dinding Keramik 20 x 25 Cm polos setara Mulia
Keramik 20x25 Cm Corak m2 1.0000 60,000.00 60,000.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 350,000.00 6,300.00
Semen Warna Kg 0.0130 15,000.00 195.00
Pekerja Oh 0.1875 150,000.00 28,125.00
Tukang Batu Oh 0.3750 170,000.00 63,750.00
Kepala Tukang Oh 0.0450 180,000.00 8,100.00
Mandor Oh 0.0188 200,000.00 3,760.00
Jumlah 182,550.00
Dibulatkan 182,550.00
E-22 1 M2 Pasang Dinding Keramik 20 x 25 Cm Corak setara Mulia
Keramik 20x25 Cm Corak m2 1.0000 65,000.00 65,000.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 350,000.00 6,300.00
Semen Warna Kg 0.0130 15,000.00 195.00
Pekerja Oh 0.1875 150,000.00 28,125.00
Tukang Batu Oh 0.3750 170,000.00 63,750.00
Kepala Tukang Oh 0.0450 180,000.00 8,100.00
Mandor Oh 0.0188 200,000.00 3,760.00
Jumlah 187,550.00
Dibulatkan 187,550.00
E-23 1 M2 Pasang Dinding Keramik 30 x 30 Cm polos setara Mulia
Keramik 30x30 Cm polos m2 1.0000 55,500.00 55,500.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 350,000.00 6,300.00
1 2 3 4 5 6=4x5
Semen Warna Kg 0.0130 15,000.00 195.00
Pekerja Oh 0.1875 150,000.00 28,125.00
Tukang Batu Oh 0.3750 170,000.00 63,750.00
Kepala Tukang Oh 0.0450 180,000.00 8,100.00
Mandor Oh 0.0188 200,000.00 3,760.00
Jumlah 178,050.00
Dibulatkan 178,050.00
E-24 1 M2 Pasang Dinding Keramik 30 x 30 Cm corak setara Mulia
Keramik 30x30 Cm corak m2 1.0000 60,500.00 60,500.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 350,000.00 6,300.00
Semen Warna Kg 0.0130 15,000.00 195.00
Pekerja Oh 0.1875 150,000.00 28,125.00
Tukang Batu Oh 0.3750 170,000.00 63,750.00
Kepala Tukang Oh 0.0450 180,000.00 8,100.00
Mandor Oh 0.0188 200,000.00 3,760.00
Jumlah 183,050.00
Dibulatkan 183,050.00
E-25 1 M2 Pasang Dinding Keramik 40 x 40 Cm polos setara Mulia
Keramik 40x40 Cm polos m2 1.0000 67,500.00 67,500.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 350,000.00 6,300.00
Semen Warna Kg 0.0130 15,000.00 195.00
Pekerja Oh 0.1875 150,000.00 28,125.00
Tukang Batu Oh 0.3750 170,000.00 63,750.00
Kepala Tukang Oh 0.0450 180,000.00 8,100.00
Mandor Oh 0.0188 200,000.00 3,760.00
Jumlah 190,050.00
Dibulatkan 190,050.00
E-26 1 M2 Pasang Dinding Keramik 40 x 40 Cm corak setara Mulia
Keramik 40x40 Cm corak m2 1.0000 66,000.00 66,000.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 350,000.00 6,300.00
Semen Warna Kg 0.0130 15,000.00 195.00
Pekerja Oh 0.1875 150,000.00 28,125.00
Tukang Batu Oh 0.3750 170,000.00 63,750.00
Kepala Tukang Oh 0.0450 180,000.00 8,100.00
Mandor Oh 0.0188 200,000.00 3,760.00
Jumlah 188,550.00
Dibulatkan 188,550.00
1 M2 Pasang Dinding Granito uk. 60 x 60 set. Essenza polis
Granito 60 x 60 essenza polis M2 1.0500 395,000.00 414,750.00
Paku Pancing 60x230 Bh 2.0000 1,000.00 2,000.00
Semen Abu - Abu Kg 10.4400 1,540.00 16,077.60
Pasir Pasang M3 0.0200 350,000.00 7,000.00
Semen Warna Kg 1.5000 15,000.00 22,500.00
Pekerja Oh 0.5000 150,000.00 75,000.00
Tukang Batu Oh 0.2500 170,000.00 42,500.00
Kepala Tukang Oh 0.0250 180,000.00 4,500.00
Mandor Oh 0.0250 200,000.00 5,000.00
Jumlah 589,327.60
Dibulatkan 589,320.00
E-27 1 M2 Pasang Dinding Keramik 10 x 20 Cm Corak setara Roman
Keramik 10x20 Cm Corak m2 1.0000 80,000.00 80,000.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 350,000.00 6,300.00
Semen Warna Kg 0.0130 15,000.00 195.00
Pekerja Oh 0.1875 150,000.00 28,125.00
Tukang Batu Oh 0.3750 170,000.00 63,750.00
Kepala Tukang Oh 0.0450 180,000.00 8,100.00
Mandor Oh 0.0188 200,000.00 3,760.00
Jumlah 202,550.00
Dibulatkan 202,550.00
1 2 3 4 5 6=4x5
E-28 1 M2 Pasang Dinding Keramik 10 x 20 Cm Polos setara Roman
Keramik 10x20 Cm Polos m2 1.0000 65,500.00 65,500.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 350,000.00 6,300.00
Semen Warna Kg 0.0130 15,000.00 195.00
Pekerja Oh 0.1875 150,000.00 28,125.00
Tukang Batu Oh 0.3750 170,000.00 63,750.00
Kepala Tukang Oh 0.0450 180,000.00 8,100.00
Mandor Oh 0.0188 200,000.00 3,760.00
Jumlah 188,050.00
Dibulatkan 188,050.00
E-29 1 M2 Pasang Dinding Keramik 20 x 20 Cm Corak setara Roman
Keramik 20x20 Cm Corak m2 1.0000 83,000.00 83,000.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 350,000.00 6,300.00
Semen Warna Kg 0.0130 15,000.00 195.00
Pekerja Oh 0.1875 150,000.00 28,125.00
Tukang Batu Oh 0.3750 170,000.00 63,750.00
Kepala Tukang Oh 0.0450 180,000.00 8,100.00
Mandor Oh 0.0188 200,000.00 3,760.00
Jumlah 205,550.00
Dibulatkan 205,550.00
E-30 1 M2 Pasang Dinding Keramik 20 x 20 Cm polos setara Roman
Keramik 20x20 Cm polos m2 1.0000 65,500.00 65,500.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 350,000.00 6,300.00
Semen Warna Kg 0.0130 15,000.00 195.00
Pekerja Oh 0.1875 150,000.00 28,125.00
Tukang Batu Oh 0.3750 170,000.00 63,750.00
Kepala Tukang Oh 0.0450 180,000.00 8,100.00
Mandor Oh 0.0188 200,000.00 3,760.00
Jumlah 188,050.00
Dibulatkan 188,050.00
E-31 1 M2 Pasang Dinding Keramik 20 x 25 Cm polos setara Roman
Keramik 20x25 Cm m2 1.0000 76,000.00 76,000.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 350,000.00 6,300.00
Semen Warna Kg 0.0130 15,000.00 195.00
Pekerja Oh 0.1875 150,000.00 28,125.00
Tukang Batu Oh 0.3750 170,000.00 63,750.00
Kepala Tukang Oh 0.0450 180,000.00 8,100.00
Mandor Oh 0.0188 200,000.00 3,760.00
Jumlah 198,550.00
Dibulatkan 198,550.00
E-32 1 M2 Pasang Dinding Keramik 20 x 25 Cm Corak setara Roman
Keramik 20x25 Cm Corak m2 1.0000 81,500.00 81,500.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 350,000.00 6,300.00
Semen Warna Kg 0.0130 15,000.00 195.00
Pekerja Oh 0.1875 150,000.00 28,125.00
Tukang Batu Oh 0.3750 170,000.00 63,750.00
Kepala Tukang Oh 0.0450 180,000.00 8,100.00
Mandor Oh 0.0188 200,000.00 3,760.00
Jumlah 204,050.00
Dibulatkan 204,050.00
E-33 1 M2 Pasang Dinding Keramik 30 x 30 Cm polos setara Roman
Keramik 30x30 Cm polos m2 1.0000 76,000.00 76,000.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 350,000.00 6,300.00
Semen Warna Kg 0.0130 15,000.00 195.00
Pekerja Oh 0.1875 150,000.00 28,125.00
Tukang Batu Oh 0.3750 170,000.00 63,750.00
Kepala Tukang Oh 0.0450 180,000.00 8,100.00
1 2 3 4 5 6=4x5
Mandor Oh 0.0188 200,000.00 3,760.00
Jumlah 198,550.00
Dibulatkan 198,550.00
E-34 1 M2 Pasang Dinding Keramik 30 x 30 Cm corak setara Roman
Keramik 30x30 Cm corak m2 1.0000 80,000.00 80,000.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 350,000.00 6,300.00
Semen Warna Kg 0.0130 15,000.00 195.00
Pekerja Oh 0.1875 150,000.00 28,125.00
Tukang Batu Oh 0.3750 170,000.00 63,750.00
Kepala Tukang Oh 0.0450 180,000.00 8,100.00
Mandor Oh 0.0188 200,000.00 3,760.00
Jumlah 202,550.00
Dibulatkan 202,550.00
E-35 1 M2 Pasang Dinding Keramik 40 x 40 Cm polos setara Roman
Keramik 40x40 Cm polos m2 1.0000 80,000.00 80,000.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 350,000.00 6,300.00
Semen Warna Kg 0.0130 15,000.00 195.00
Pekerja Oh 0.1875 150,000.00 28,125.00
Tukang Batu Oh 0.3750 170,000.00 63,750.00
Kepala Tukang Oh 0.0450 180,000.00 8,100.00
Mandor Oh 0.0188 200,000.00 3,760.00
Jumlah 202,550.00
Dibulatkan 202,550.00
E-36 1 M2 Pasang Dinding Keramik 40 x 40 Cm corak setara Roman
Keramik 40x40 Cm corak m2 1.0000 85,000.00 85,000.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 350,000.00 6,300.00
Semen Warna Kg 0.0130 15,000.00 195.00
Pekerja Oh 0.1875 150,000.00 28,125.00
Tukang Batu Oh 0.3750 170,000.00 63,750.00
Kepala Tukang Oh 0.0450 180,000.00 8,100.00
Mandor Oh 0.0188 200,000.00 3,760.00
Jumlah 207,550.00
Dibulatkan 207,550.00
E-36 1 M2 Pasang Dinding Keramik 20 x 40 Cm corak setara Roman
Keramik 20x40 Cm corak m2 1.0000 83,000.00 83,000.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 350,000.00 6,300.00
Semen Warna Kg 0.0130 15,000.00 195.00
Pekerja Oh 0.1875 150,000.00 28,125.00
Tukang Batu Oh 0.3750 170,000.00 63,750.00
Kepala Tukang Oh 0.0450 180,000.00 8,100.00
Mandor Oh 0.0188 200,000.00 3,760.00
Jumlah 205,550.00
Dibulatkan 205,550.00
E-37 1 M2 Pasang Dinding Marmer
Marmer M2 1.0500 605,000.00 635,250.00
Paku Pancing 60x230 Bh 2.0000 1,000.00 2,000.00
Semen Abu - Abu Kg 12.4400 1,540.00 19,157.60
Pasir Pasang M3 0.0250 350,000.00 8,750.00
Semen Warna Kg 1.5000 15,000.00 22,500.00
Pekerja Oh 0.9000 150,000.00 135,000.00
Tukang Batu Oh 0.6500 170,000.00 110,500.00
Kepala Tukang Oh 0.0650 180,000.00 11,700.00
Mandor Oh 0.0350 200,000.00 7,000.00
Jumlah 951,857.60
Dibulatkan 951,850.00
E-38 1 M2 Pasang Dinding Batu Tempel Hitam
Batu Tempel Hitam M2 0.0500 100,110.00 5,005.50
Semen Abu - Abu Kg 11.7500 1,540.00 18,095.00
Pasir Pasang M3 0.0350 350,000.00 12,250.00
1 2 3 4 5 6=4x5
Pekerja Oh 0.6200 150,000.00 93,000.00
Tukang Batu Oh 0.3500 170,000.00 59,500.00
Kepala Tukang Oh 0.0350 180,000.00 6,300.00
Mandor Oh 0.0300 200,000.00 6,000.00
Jumlah 200,150.50
Dibulatkan 200,150.00
E-39 1 M2 Pasang Dinding Poslin 11 x 11 Cm
Poslin m2 1.0000 70,000.00 70,000.00
Semen Portland Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 350,000.00 6,300.00
Semen Warna Kg 0.0130 15,000.00 195.00
Pekerja Oh 0.1875 150,000.00 28,125.00
Tukang Batu Oh 0.3750 170,000.00 63,750.00
Kepala Tukang Oh 0.0450 180,000.00 8,100.00
Mandor Oh 0.0188 200,000.00 3,760.00
Jumlah 192,550.00
Dibulatkan 192,550.00
E-40 1 M2 Wall paper
Wall paper m2 1.0500 61,500.00 64,575.00
Lem Kg 0.2500 39,300.00 9,825.00
Pekerja Oh 0.3500 150,000.00 52,500.00
Tukang Batu Oh 0.1750 170,000.00 29,750.00
Kepala Tukang Oh 0.0170 180,000.00 3,060.00
Mandor Oh 0.0020 200,000.00 400.00
Jumlah 160,110.00
Dibulatkan 160,110.00
E-41 1 M2 Dinding Pemisah Teakwood Rangkap, Rangka Kayu Kamper Medan
Kayu Balok Kamper Medan M3 0.0280 6,262,000.00 175,336.00
Paku Biasa 2" - 5" Kg 0.1500 24,000.00 3,600.00
Lem Kayu Lt 0.5600 26,300.00 14,728.00
Teak Wood 4 mm 120 x 240 Lbr 0.8600 145,000.00 124,700.00
Pekerja Oh 0.1500 150,000.00 22,500.00
Tukang Kayu Oh 0.4500 170,000.00 76,500.00
Kepala Tukang Oh 0.0450 180,000.00 8,100.00
Mandor Oh 0.0080 200,000.00 1,600.00
Jumlah 427,064.00
Dibulatkan 427,060.00
E-42 1 M2 Dinding Pemisah Plywood Rangkap, Rangka Kayu Kamper Medan
Kayu Balok Kamper Medan M3 0.0280 6,262,000.00 175,336.00
Paku Biasa 2" - 5" Kg 0.1500 24,000.00 3,600.00
Lem Kayu Lt 0.5600 26,300.00 14,728.00
Plywood 120 x 240 x 9 mm Lbr 0.8600 260,000.00 223,600.00
Pekerja Oh 0.2000 150,000.00 30,000.00
Tukang Kayu Oh 0.6000 170,000.00 102,000.00
Kepala Tukang Oh 0.0600 180,000.00 10,800.00
Mandor Oh 0.0100 200,000.00 2,000.00
Jumlah 562,064.00
Dibulatkan 562,060.00
E-43 1 M2 Dinding Pemisah Triplek Rangkap, Rangka Kayu Kamper Medan
Kayu Balok Kamper Medan M3 0.0280 6,262,000.00 175,336.00
Paku Biasa 2" - 5" Kg 0.1500 24,000.00 3,600.00
Lem Kayu Lt 0.5600 26,300.00 14,728.00
Triplek 120 x 240 x 4 mm Lbr 0.8600 68,500.00 58,910.00
Pekerja Oh 0.2000 150,000.00 30,000.00
Tukang Kayu Oh 0.6000 170,000.00 102,000.00
Kepala Tukang Oh 0.0600 180,000.00 10,800.00
Mandor Oh 0.0100 200,000.00 2,000.00
Jumlah 397,374.00
Dibulatkan 397,370.00
E-44 1 M2 Dinding Pemisah GRC tb. 4 mm + rangka besi hollow
Hollow 4/4 Zincromate Btg 0.4150 45,000.00 18,675.00
Hollow 2/4 Zincromate Btg 0.1500 28,000.00 4,200.00
GRC ( 120 x 240 x 4 ) mm Lbr 0.3640 74,500.00 27,118.00
1 2 3 4 5 6=4x5
Paku GRC kg 0.1100 38,500.00 4,235.00
Ramset / dina bolt Bh 4.0000 8,000.00 32,000.00
Cotton plaster Bh 0.0720 16,500.00 1,188.00
Compoun Zak 0.1250 83,000.00 10,375.00
Pekerja Oh 0.1000 150,000.00 15,000.00
Tukang besi Oh 0.0500 170,000.00 8,500.00
Kepala tukang Oh 0.0050 180,000.00 900.00
Mandor Oh 0.0050 200,000.00 1,000.00
Jumlah 123,191.00
Dibulatkan 123,190.00
E 45 A 1 M2 eco wood milan tb. 4 mm + rangka besi hollow
Hollow 4/4 Zincromate Btg 0.4150 45,000.00 18,675.00
Hollow 2/4 Zincromate Btg 0.1500 28,000.00 4,200.00
ECO WOOD milan M2 1.2000 1,500,000.00 1,800,000.00
Paku GRC kg 0.1100 38,500.00 4,235.00
Ramset / dina bolt Bh 4.0000 8,000.00 32,000.00
Cotton plaster Bh 0.0720 16,500.00 1,188.00
Compoun Zak 0.1250 83,000.00 10,375.00
Pekerja Oh 0.1000 150,000.00 15,000.00
Tukang besi Oh 0.0500 170,000.00 8,500.00
Kepala tukang Oh 0.0050 180,000.00 900.00
Mandor Oh 0.0050 200,000.00 1,000.00
Jumlah 1,896,073.00
Dibulatkan 1,896,070.00
1 m2 milan ecowood
Wall paper m2 1.0500 1,500,000.00 1,575,000.00
Lem Kg 0.2500 39,300.00 9,825.00
Pekerja Oh 0.3500 150,000.00 52,500.00
Tukang Batu Oh 0.1750 170,000.00 29,750.00
Kepala Tukang Oh 0.0170 180,000.00 3,060.00
Mandor Oh 0.0020 200,000.00 400.00
Jumlah 1,670,535.00
Dibulatkan 1,670,530.00
H-08 1 M2 Langit - Langit Gypsum Board, tb. 9 mm + Rangka Besi Hollow Galvalum 4/4, 2/4
Hollow 4/4 Zincromate Btg 0.4150 45,000.00 18,675.00
Hollow 2/4 Zincromate Btg 0.1500 28,000.00 4,200.00
Gypsum board ( 120 x 240 x 9 ) mm Lbr 0.3640 70,000.00 25,480.00
Paku gypsum Kg 0.1100 18,500.00 2,035.00
Ramset / dina bolt Bh 4.0000 8,000.00 32,000.00
Cotton plaster Bh 0.0720 16,500.00 1,188.00
Compoun Zak 0.1250 83,000.00 10,375.00
Pekerja Oh 0.1000 150,000.00 15,000.00
Tukang besi Oh 0.0500 170,000.00 8,500.00
Kepala tukang Oh 0.0050 180,000.00 900.00
Mandor Oh 0.0050 200,000.00 1,000.00
Jumlah 119,353.00
Dibulatkan 119,353.00
E-45A 1 M2 Dinding Pemisah Gypsum single tb. 9 mm + rangka besi hollow
Hollow 4/4 Zincromate Btg 0.8300 45,000.00 37,350.00
Hollow 2/4 Zincromate Btg 0.1500 28,000.00 4,200.00
Gypsum Lbr 0.3640 70,000.00 25,480.00
Paku Gypsum kg 0.1100 38,500.00 4,235.00
Ramset / dina bolt Bh 4.0000 8,000.00 32,000.00
Cotton plaster Bh 0.0720 16,500.00 1,188.00
Compoun Zak 0.1250 83,000.00 10,375.00
Pekerja Oh 0.1000 150,000.00 15,000.00
Tukang besi Oh 0.0500 170,000.00 8,500.00
Kepala tukang Oh 0.0050 180,000.00 900.00
1 2 3 4 5 6=4x5
Mandor Oh 0.0050 200,000.00 1,000.00
Jumlah 140,228.00
Dibulatkan 140,220.00
E-45 1 M2 Dinding Pemisah Gypsum dobel tb. 9 mm + rangka besi hollow
Hollow 4/4 Zincromate Btg 0.8300 45,000.00 37,350.00
Hollow 2/4 Zincromate Btg 0.8300 28,000.00 23,240.00
Gypsum Lbr 0.7280 70,000.00 50,960.00
Paku Gypsum kg 0.2200 38,500.00 8,470.00
Ramset / dina bolt Bh 8.0000 8,000.00 64,000.00
Cotton plaster Bh 0.1440 16,500.00 2,376.00
Compoun Zak 0.2500 83,000.00 20,750.00
Pekerja Oh 0.2000 150,000.00 30,000.00
Tukang besi Oh 0.1000 170,000.00 17,000.00
Kepala tukang Oh 0.0100 180,000.00 1,800.00
Mandor Oh 0.0100 200,000.00 2,000.00
Jumlah 257,946.00
Dibulatkan 257,940.00
E-46 1 M2 Dinding Plywood tb. 4 mm + rangka besi hollow
Hollow 4/4 Zincromate Btg 0.4150 45,000.00 18,675.00
Hollow 2/4 Zincromate Btg 0.1500 28,000.00 4,200.00
Plywood 120 x 240 x 9 mm Lbr 0.3640 166,500.00 60,606.00
Paku kg 0.1100 24,000.00 2,640.00
Ramset / dina bolt Bh 4.0000 8,000.00 32,000.00
Pekerja Oh 0.1000 150,000.00 15,000.00
Tukang besi Oh 0.0500 170,000.00 8,500.00
Kepala tukang Oh 0.0050 180,000.00 900.00
Mandor Oh 0.0050 200,000.00 1,000.00
Jumlah 143,521.00
Dibulatkan 143,520.00
E-47 1 M2 Dinding Teakwood tb. 4 mm + rangka besi hollow
Hollow 4/4 Zincromate Btg 0.4150 45,000.00 18,675.00
Hollow 2/4 Zincromate Btg 0.1500 28,000.00 4,200.00
Teakwood (120 x 240 x 4) mm Lbr 0.3640 145,000.00 52,780.00
Paku kg 0.1100 24,000.00 2,640.00
Ramset / dina bolt Bh 4.0000 8,000.00 32,000.00
Pekerja Oh 0.1000 150,000.00 15,000.00
Tukang besi Oh 0.0500 170,000.00 8,500.00
Kepala tukang Oh 0.0050 180,000.00 900.00
Mandor Oh 0.0050 200,000.00 1,000.00
Jumlah 135,695.00
Dibulatkan 135,690.00
E-48 1 M2 Pasang Dinding Glass Block 20 x 20 ad. 1pc : 4 ps
Glass block 20 x 20 bh 36.0000 24,200.00 871,200.00
Semen Abu - Abu Kg 11.0000 1,540.00 16,940.00
Pasir Pasang M3 0.0350 350,000.00 12,250.00
Pekerja Oh 0.3000 150,000.00 45,000.00
Tukang Batu Oh 0.1000 170,000.00 17,000.00
Kepala Tukang Oh 0.0100 180,000.00 1,800.00
Mandor Oh 0.0150 200,000.00 3,000.00
Jumlah 967,190.00
Dibulatkan 967,190.00
E-49 1 M2 Pasang Dinding Anyaman Bambu, rangka kayu
Bilik bambu M2 1.5000 25,000.00 37,500.00
Kayu kaso 5/7 M3 0.0140 3,692,500.00 51,695.00
Paku Kg 0.0112 24,000.00 268.80
List kayu 2/4 M3 0.0030 5,810,000.00 17,430.00
Pekerja Oh 0.1000 150,000.00 15,000.00
Tukang Kayu Oh 0.0500 170,000.00 8,500.00
Kepala Tukang Oh 0.0050 180,000.00 900.00
Mandor Oh 0.0020 200,000.00 400.00
Jumlah 131,693.80
Dibulatkan 131,690.00
1 2 3 4 5 6=4x5
F PEKERJAAN PLESTERAN
F-01 1 M2 Plesteran 1 Pc : 2 Ps, Tebal 15 mm
Semen Portland Kg 8.5200 1,540.00 13,120.80
Pasir Pasang M3 0.0170 350,000.00 5,950.00
Pekerja Oh 0.2000 150,000.00 30,000.00
Tukang Batu Oh 0.1500 170,000.00 25,500.00
Kepala Tukang Oh 0.0150 180,000.00 2,700.00
Mandor Oh 0.0100 200,000.00 2,000.00
Jumlah 79,270.80
Dibulatkan 80,000.00
F-02 1 M2 Plesteran 1 Pc : 3 Ps, Tebal 15 mm
Semen Portland Kg 6.4800 1,540.00 9,979.20
Pasir Pasang M3 0.0190 350,000.00 6,650.00
Pekerja Oh 0.2000 150,000.00 30,000.00
Tukang Batu Oh 0.1500 170,000.00 25,500.00
Kepala Tukang Oh 0.0150 180,000.00 2,700.00
Mandor Oh 0.0100 200,000.00 2,000.00
Jumlah 76,829.20
Dibulatkan 76,820.00
F-03 1 M2 Plesteran 1 Pc : 4 Ps, Tebal 15 mm
Semen Portland Kg 5.2000 1,540.00 8,008.00
Pasir Pasang M3 0.0200 350,000.00 7,000.00
Pekerja Oh 0.2000 150,000.00 30,000.00
Tukang Batu Oh 0.1500 170,000.00 25,500.00
Kepala Tukang Oh 0.0150 180,000.00 2,700.00
Mandor Oh 0.0100 200,000.00 2,000.00
Jumlah 75,208.00
Dibulatkan 75,200.00
1 M2 Plesteran 1 Pc : 5 Ps, Tebal 15 mm + Acian
Semen Portland Kg 4.3200 1,540.00 6,652.80
Pasir Pasang M3 0.0220 350,000.00 7,700.00
Pekerja Oh 0.2000 150,000.00 30,000.00
Tukang Batu Oh 0.1500 170,000.00 25,500.00
Kepala Tukang Oh 0.0150 180,000.00 2,700.00
Mandor Oh 0.0100 200,000.00 2,000.00
Jumlah 74,552.80
Dibulatkan 74,550.00
F-04 1 M2 Plesteran 1 Pc : 3 Ps, Tebal 20 mm
Semen Portland Kg 10.8000 1,540.00 16,632.00
Pasir Pasang M3 0.0260 350,000.00 9,100.00
Pekerja Oh 0.2500 150,000.00 37,500.00
Tukang Batu Oh 0.2000 170,000.00 34,000.00
Kepala Tukang Oh 0.0200 180,000.00 3,600.00
Mandor Oh 0.0125 200,000.00 2,500.00
Jumlah 103,332.00
Dibulatkan 103,330.00
F-05 1 M2 Plesteran 1 Pc : 4 Ps, Tebal 20 mm
Semen Portland Kg 8.6800 1,540.00 13,367.20
Pasir Pasang M3 0.0280 350,000.00 9,800.00
Pekerja Oh 0.2500 150,000.00 37,500.00
Tukang Batu Oh 0.2000 170,000.00 34,000.00
Kepala Tukang Oh 0.0200 180,000.00 3,600.00
Mandor Oh 0.0125 200,000.00 2,500.00
Jumlah 100,767.20
Dibulatkan 100,760.00
F-06 1 M2 Plesteran 1 Pc : 5 Ps, Tebal 20 mm
Semen Portland Kg 7.2900 1,540.00 11,226.60
Pasir Pasang M3 0.0260 350,000.00 9,100.00
Pekerja Oh 0.2500 150,000.00 37,500.00
Tukang Batu Oh 0.2000 170,000.00 34,000.00
Kepala Tukang Oh 0.0200 180,000.00 3,600.00
Mandor Oh 0.0125 200,000.00 2,500.00
Jumlah 97,926.60
1 2 3 4 5 6=4x5
Dibulatkan 97,920.00
F-07 1 M2 Barapen 1 Pc : 5 Ps, Tebal 15 mm
Semen Portland Kg 5.6700 1,540.00 8,731.80
Pasir Pasang M3 0.0230 350,000.00 8,050.00
Pekerja Oh 0.1500 150,000.00 22,500.00
Tukang Batu Oh 0.0700 170,000.00 11,900.00
Kepala Tukang Oh 0.0070 180,000.00 1,260.00
Mandor Oh 0.0080 200,000.00 1,600.00
Jumlah 54,041.80
Dibulatkan 54,040.00
F-08 1 M2 Plesteran Beton 1 Pc : 2 Ps, Tebal 15 mm
Semen Portland Kg 9.3000 1,540.00 14,322.00
Pasir Pasang M3 0.0180 350,000.00 6,300.00
Pekerja Oh 0.2600 150,000.00 39,000.00
Tukang Batu Oh 0.2000 170,000.00 34,000.00
Kepala Tukang Oh 0.0200 180,000.00 3,600.00
Mandor Oh 0.0130 200,000.00 2,600.00
Jumlah 99,822.00
Dibulatkan 99,820.00
F-09 1 M2 Plesteran Beton 1 Pc : 3 Ps, Tebal 15 mm
Semen Portland Kg 7.0700 1,540.00 10,887.80
Pasir Pasang M3 0.0210 350,000.00 7,350.00
Pekerja Oh 0.2600 150,000.00 39,000.00
Tukang Batu Oh 0.2000 170,000.00 34,000.00
Kepala Tukang Oh 0.0200 180,000.00 3,600.00
Mandor Oh 0.0130 200,000.00 2,600.00
Jumlah 97,437.80
Dibulatkan 97,430.00
F-10 1 M2 Plesteran Skoning 1 Pc : 2 Ps, Tebal 10 mm
Semen Portland Kg 0.5000 1,540.00 770.00
Pasir Pasang M3 0.0130 350,000.00 4,550.00
Pekerja Oh 0.0800 150,000.00 12,000.00
Tukang Batu Oh 0.4000 170,000.00 68,000.00
Kepala Tukang Oh 0.0400 180,000.00 7,200.00
Mandor Oh 0.0040 200,000.00 800.00
Jumlah 93,320.00
Dibulatkan 93,320.00
F-11 1 M2 Acian Plesteran
Semen Portland Kg 4.0000 1,540.00 6,160.00
Pekerja Oh 0.1430 150,000.00 21,450.00
Tukang Batu Oh 0.1070 170,000.00 18,190.00
Kepala Tukang Oh 0.0105 180,000.00 1,890.00
Mandor Oh 0.0105 200,000.00 2,100.00
Jumlah 49,790.00
Dibulatkan 49,790.00
F-12 1 M2 Plesteran Siar Adukan 1 Pc : 2 Ps batu belah
Semen Portland Kg 6.3400 1,540.00 9,763.60
Pasir Pasang M3 0.0120 350,000.00 4,200.00
Pekerja Oh 0.3000 150,000.00 45,000.00
Tukang Batu Oh 0.1500 170,000.00 25,500.00
Kepala Tukang Oh 0.0150 180,000.00 2,700.00
Mandor Oh 0.0150 200,000.00 3,000.00
Jumlah 90,163.60
Dibulatkan 90,160.00
F-13 1 M2 Plesteran Siar Adukan 1 Pc : 2 Ps dinding bata merah
Semen Portland Kg 4.3200 1,540.00 6,652.80
Pasir Pasang M3 0.0160 350,000.00 5,600.00
Pekerja Oh 0.1500 150,000.00 22,500.00
Tukang Batu Oh 0.0700 170,000.00 11,900.00
Kepala Tukang Oh 0.0070 180,000.00 1,260.00
Mandor Oh 0.0080 200,000.00 1,600.00
Jumlah 49,512.80
Dibulatkan 49,510.00
1 2 3 4 5 6=4x5
J PEKERJAAN KAYU
J-01 1 M3 Pasang Kusen Pintu dan Jendela Kayu Kamper Samarinda
Kayu Balok Kamper Samarinda M3 1.2000 10,500,000.00 12,600,000.00
Pekerja Oh 6.0000 150,000.00 900,000.00
Tukang Kayu Oh 18.0000 170,000.00 3,060,000.00
Kepala Tukang Oh 2.0000 180,000.00 360,000.00
Mandor Oh 0.3000 200,000.00 60,000.00
Jumlah 16,980,000.00
Dibulatkan 16,980,000.00
J-02 1 M3 Pasang Kusen Pintu dan Jendela Kayu Kamper Medan/Kruing
Kayu Balok Kamper Medan M3 1.2000 6,262,000.00 7,514,400.00
Pekerja Oh 6.0000 150,000.00 900,000.00
Tukang Kayu Oh 18.0000 170,000.00 3,060,000.00
Kepala Tukang Oh 2.0000 180,000.00 360,000.00
1 2 3 4 5 6=4x5
Mandor Oh 0.3000 200,000.00 60,000.00
Jumlah 11,894,400.00
Dibulatkan 11,894,400.00
J-03 1 M3 Pasang Kusen Pintu dan Jendela Kayu Borneo Super
Kayu Balok Borneo Super M3 1.2000 5,810,000.00 6,972,000.00
Pekerja Oh 6.0000 150,000.00 900,000.00
Tukang Kayu Oh 18.0000 170,000.00 3,060,000.00
Kepala Tukang Oh 2.0000 180,000.00 360,000.00
Mandor Oh 0.3000 200,000.00 60,000.00
Jumlah 11,352,000.00
Dibulatkan 11,352,000.00
J-04 1 M2 Pasang Pintu Panel Kayu Kamper Samarinda
Kayu Papan Kamper Samarinda M3 0.0400 9,600,000.00 384,000.00
Paku biasa 2" - 5" Kg 0.0500 24,000.00 1,200.00
Pekerja Oh 1.0000 150,000.00 150,000.00
Tukang Kayu Oh 2.5000 170,000.00 425,000.00
Kepala Tukang Oh 0.2500 180,000.00 45,000.00
Mandor Oh 0.0500 200,000.00 10,000.00
Jumlah 1,015,200.00
Dibulatkan 1,015,200.00
J-05 1 M2 Pasang Pintu Panel Kayu Kamper Medan/Kruing
Kayu Papan Kamper Medan M3 0.0400 6,405,800.00 256,232.00
Paku biasa 2" - 5" Kg 0.0500 24,000.00 1,200.00
Pekerja Oh 1.0000 150,000.00 150,000.00
Tukang Kayu Oh 2.5000 170,000.00 425,000.00
Kepala Tukang Oh 0.2500 180,000.00 45,000.00
Mandor Oh 0.0500 200,000.00 10,000.00
Jumlah 887,432.00
Dibulatkan 887,430.00
J-06 1 M2 Pasang Daun Jendela Kaca Kayu Kamper Medan
Kayu Papan Kamper Medan M3 0.0150 6,405,800.00 96,087.00
Pekerja Oh 0.8000 150,000.00 120,000.00
Tukang Kayu Oh 2.0000 170,000.00 340,000.00
Kepala Tukang Oh 0.2000 180,000.00 36,000.00
Mandor Oh 0.0400 200,000.00 8,000.00
Jumlah 600,087.00
Dibulatkan 600,080.00
J-07 1 M2 Pasang Pintu dan Jendela Kaca Kayu Borneo
Kayu Papan Borneo Super M3 0.0350 6,155,500.00 215,442.50
Pekerja Oh 0.8000 150,000.00 120,000.00
Tukang Kayu Oh 2.0000 170,000.00 340,000.00
Kepala Tukang Oh 0.2000 180,000.00 36,000.00
Mandor Oh 0.0400 200,000.00 8,000.00
Jumlah 719,442.50
Dibulatkan 719,440.00
J-08 1 M2 Pasang Pintu dan Jendela Jalusi Kayu Kamper Medan
Kayu Papan Kamper Medan M3 0.0640 6,405,800.00 409,971.20
Pekerja Oh 1.0000 150,000.00 150,000.00
Tukang Kayu Oh 3.0000 170,000.00 510,000.00
Kepala Tukang Oh 0.3000 180,000.00 54,000.00
Mandor Oh 0.5000 200,000.00 100,000.00
Jumlah 1,223,971.20
Dibulatkan 1,223,970.00
J-09 1 M2 Pasang Pintu Triplek Rangkap, Rangka Tertutup Kayu Kamper Medan/Kruing
Kayu Papan Kamper Medan M3 0.0196 6,405,800.00 125,553.68
Paku Biasa 1/2" - 1 " Kg 0.0300 24,000.00 720.00
Lem Kayu Lt 0.3000 26,300.00 7,890.00
Triplek 4 mm 120 x 240 Lbr 1.0000 68,500.00 68,500.00
Pekerja Oh 0.6000 150,000.00 90,000.00
Tukang Kayu Oh 2.0000 170,000.00 340,000.00
Kepala Tukang Oh 0.2000 180,000.00 36,000.00
Mandor Oh 0.0300 200,000.00 6,000.00
Jumlah 674,663.68
1 2 3 4 5 6=4x5
Dibulatkan 674,660.00
J-10 1 M2 Pasang Jalusi Mati Kusen kayu Kamper Medan
Kayu Papan Kamper Medan M3 0.0600 6,405,800.00 384,348.00
Paku Biasa 1/2" - 1" Kg 0.1500 24,000.00 3,600.00
Pekerja Oh 0.5000 150,000.00 75,000.00
Tukang Kayu Oh 2.0000 170,000.00 340,000.00
Kepala Tukang Oh 0.3000 180,000.00 54,000.00
Mandor Oh 0.0250 200,000.00 5,000.00
Jumlah 861,948.00
Dibulatkan 861,940.00
J-11 1 M2 Pasang Daun Pintu Triplek Rangkap, Rangka Kayu Kamper
Kayu Papan Kamper Medan M3 0.0196 6,405,800.00 125,553.68
Paku Biasa 1/2" - 1 " Kg 0.0300 24,000.00 720.00
Lem Kayu Lt 0.3000 26,300.00 7,890.00
Triplek 4 mm 120 x 240 Lbr 1.0000 68,500.00 68,500.00
Pekerja Oh 0.6000 150,000.00 90,000.00
Tukang Kayu Oh 2.0000 170,000.00 340,000.00
Kepala Tukang Oh 0.2000 180,000.00 36,000.00
Mandor Oh 0.0300 200,000.00 6,000.00
Jumlah 674,663.68
Dibulatkan 674,660.00
J-12 1 M2 Pasang Daun Pintu Teakwood Rangkap, Rangka Kayu Kamper Medan
Kayu Papan Kamper Medan M3 0.0196 6,405,800.00 125,553.68
Paku Biasa 1/2" - 1 " Kg 0.3000 24,000.00 7,200.00
Lem Kayu Lt 0.3000 26,300.00 7,890.00
Teak Wood 4 mm 120 x 240 Lbr 1.0000 145,000.00 145,000.00
Pekerja Oh 0.6000 150,000.00 90,000.00
Tukang Kayu Oh 2.0000 170,000.00 340,000.00
Kepala Tukang Oh 0.2000 180,000.00 36,000.00
Mandor Oh 0.0300 200,000.00 6,000.00
Jumlah 757,643.68
Dibulatkan 757,640.00
J-13 1 M2 Pasang Pintu dobel Plywood lapis HPL, Rangka Kayu Kamper Medan
Kayu Papan Kamper Medan M3 0.0196 6,405,800.00 125,553.68
Paku Biasa 1/2" - 1 " Kg 0.3000 24,000.00 7,200.00
Lem Kayu Ltr 0.8000 26,300.00 21,040.00
Triplek 4 mm 120 x 240 Lbr 1.0000 68,500.00 68,500.00
HPL Lbr 0.5000 175,000.00 87,500.00
Pekerja Oh 0.8000 150,000.00 120,000.00
Tukang Kayu Oh 2.5000 170,000.00 425,000.00
Kepala Tukang Oh 0.2500 180,000.00 45,000.00
Mandor Oh 0.0400 200,000.00 8,000.00
Jumlah 907,793.68
Dibulatkan 907,790.00
J-14 1 M2 Pasang Pintu Teakwood lapis HPL , Rangka Kayu Kamper Medan
Kayu Papan Kamper Medan M3 0.0196 6,405,800.00 125,553.68
Paku Biasa 1/2" - 1 " Kg 0.3000 24,000.00 7,200.00
Lem Kayu Ltr 0.8000 26,300.00 21,040.00
Teak Wood 4 mm 120 x 240 Lbr 1.0000 145,000.00 145,000.00
Politur Ltr 0.5000 55,000.00 27,500.00
Formika Warna 4" x 8" Lbr 0.5000 262,500.00 131,250.00
Pekerja Oh 0.8000 150,000.00 120,000.00
Tukang Kayu Oh 2.5000 170,000.00 425,000.00
Kepala Tukang Oh 0.2500 180,000.00 45,000.00
Mandor Oh 0.0400 200,000.00 8,000.00
Jumlah 1,055,543.68
Dibulatkan 1,055,540.00
J-15 1 M3 Pasang Konstruksi Kuda - Kuda Kayu Kamper Medan
Kayu Balok Kamper Medan M3 1.1000 6,262,000.00 6,888,200.00
Besi Strip Kg 15.0000 29,500.00 442,500.00
Paku Biasa 2" - 5" Kg 0.8000 24,000.00 19,200.00
Pekerja Oh 4.0000 150,000.00 600,000.00
Tukang Kayu Oh 12.0000 170,000.00 2,040,000.00
1 2 3 4 5 6=4x5
Kepala Tukang Oh 1.2000 180,000.00 216,000.00
Mandor Oh 0.2000 200,000.00 40,000.00
Jumlah 10,245,900.00
Dibulatkan 10,245,900.00
J-16 1 M3 Pasang Konstruksi Kuda - Kuda Kayu Borneo
Kayu Balok Borneo Super M3 1.1000 5,810,000.00 6,391,000.00
Besi Strip Kg 15.0000 29,500.00 442,500.00
Paku Biasa 2" - 5" Kg 0.8000 24,000.00 19,200.00
Pekerja Oh 4.0000 150,000.00 600,000.00
Tukang Kayu Oh 12.0000 170,000.00 2,040,000.00
Kepala Tukang Oh 1.2000 180,000.00 216,000.00
Mandor Oh 0.2000 200,000.00 40,000.00
Jumlah 9,748,700.00
Dibulatkan 9,748,700.00
J-17 1 M2 Pasang Kaso dan Reng Genteng Plentong kayu Kamper Medan
Kayu Balok Kamper medan M3 0.0120 6,262,000.00 75,144.00
Paku Biasa 2" - 5" Kg 0.1500 24,000.00 3,600.00
Pekerja Oh 0.1000 150,000.00 15,000.00
Tukang Kayu Oh 0.1000 170,000.00 17,000.00
Kepala Tukang Oh 0.0100 180,000.00 1,800.00
Mandor Oh 0.0050 200,000.00 1,000.00
Jumlah 113,544.00
Dibulatkan 113,540.00
J-18 1 M2 Pasang Kaso dan Reng Genteng Beton kayu Kamper
Kayu Balok Kamper Medan M3 0.0140 6,262,000.00 87,668.00
Paku Biasa 2" - 5" Kg 0.1500 24,000.00 3,600.00
Pekerja Oh 0.1000 150,000.00 15,000.00
Tukang Kayu Oh 0.1000 170,000.00 17,000.00
Kepala Tukang Oh 0.0100 180,000.00 1,800.00
Mandor Oh 0.0050 200,000.00 1,000.00
Jumlah 126,068.00
Dibulatkan 126,060.00
J-19 1 M' Pasang Lisplang (3x20) Cm, Kayu Kamper Medan
Kayu Papan Kamper Medan M3 0.0072 6,405,800.00 46,121.76
Paku Biasa 2" - 5" Kg 0.0500 24,000.00 1,200.00
Pekerja Oh 0.1000 150,000.00 15,000.00
Tukang Kayu Oh 0.2000 170,000.00 34,000.00
Kepala Tukang Oh 0.0200 180,000.00 3,600.00
Mandor Oh 0.0050 200,000.00 1,000.00
Jumlah 100,921.76
Dibulatkan 100,920.00
J-20 1 M' Pasang Lisplang (3x30) Cm, Kayu Kamper Medan
Kayu Papan Kamper Medan M3 0.0110 6,405,800.00 70,463.80
Paku Biasa 2" - 5" Kg 0.0500 24,000.00 1,200.00
Pekerja Oh 0.1100 150,000.00 16,500.00
Tukang Kayu Oh 0.2200 170,000.00 37,400.00
Kepala Tukang Oh 0.0220 180,000.00 3,960.00
Mandor Oh 0.0050 200,000.00 1,000.00
Jumlah 130,523.80
Dibulatkan 130,520.00
J-21 1 M' Pasang List Plafon - Kayu Profil 10 cm
Kayu Profil M' 1.0500 32,400.00 34,020.00
Pekerja Oh 0.0210 150,000.00 3,150.00
Tukang Kayu Oh 0.0210 170,000.00 3,570.00
Kepala Tukang Oh 0.0020 180,000.00 360.00
Mandor Oh 0.0010 200,000.00 200.00
Jumlah 41,300.00
Dibulatkan 41,300.00
J-22 7,26 M2 Kusen Partisi Dobel Triplek
Kayu Balok Borneo Super M3 0.1050 5,810,000.00 610,050.00
Triplek 4 mm 120 x 240 Lbr 5.0000 68,500.00 342,500.00
Paku Biasa 1 s/d 3 cm Kg 2.0000 24,000.00 48,000.00
Ampelas Lbr 2.0000 5,500.00 11,000.00
1 2 3 4 5 6=4x5
Engsel Bh 4.0000 23,100.00 92,400.00
Slot Bh 4.0000 35,000.00 140,000.00
Pekerja Oh 0.3000 150,000.00 45,000.00
Tukang Kayu Oh 1.3000 170,000.00 221,000.00
Kepala Tukang Oh 0.1300 180,000.00 23,400.00
Mandor Oh 0.0130 200,000.00 2,600.00
Jumlah 1,535,950.00
1 M2 Pekerjaan partisi 211,563.36
Dibulatkan 211,560.00
J-23 1 M2 Pasang Rangka Langit - langit (1.00x1.00) m, Kayu Kamper
Kayu Balok Kamper M3 0.0120 6,262,000.00 75,144.00
Paku Biasa 5" - 7" Kg 0.1000 24,000.00 2,400.00
Pekerja Oh 0.1500 150,000.00 22,500.00
Tukang Kayu Oh 0.2500 170,000.00 42,500.00
Kepala Tukang Oh 0.0250 180,000.00 4,500.00
Mandor Oh 0.0750 200,000.00 15,000.00
Jumlah 162,044.00
Dibulatkan 162,040.00
J-24 1 M2 Pasang Rangka Langit - langit (0.50 x 1.00) m, Kayu Borneo
Kayu Balok Borneo Super M3 0.0154 5,810,000.00 89,474.00
Paku Biasa 5" - 7" Kg 0.2000 24,000.00 4,800.00
Pekerja Oh 0.1500 150,000.00 22,500.00
Tukang Kayu Oh 0.3000 170,000.00 51,000.00
Kepala Tukang Oh 0.0300 180,000.00 5,400.00
Mandor Oh 0.0750 200,000.00 15,000.00
Jumlah 188,174.00
Dibulatkan 188,170.00
J-25 1 M1 Reuter Kayu Kamper Medan
Kayu Kamper Medan M3 0.0040 6,262,000.00 25,048.00
Pekerja Oh 0.1000 150,000.00 15,000.00
Tukang Kayu Oh 0.2000 170,000.00 34,000.00
Kepala Tukang Oh 0.0200 180,000.00 3,600.00
Mandor Oh 0.0050 200,000.00 1,000.00
Jumlah 78,648.00
Dibulatkan 78,640.00
J-26 1 M3 Gording kayu kelas II
Balok kayu M3 1.1000 6,262,000.00 6,888,200.00
Besi Strip Kg 15.0000 29,500.00 442,500.00
Paku Biasa 2" - 5" Kg 3.0000 24,000.00 72,000.00
Pekerja Oh 2.4000 150,000.00 360,000.00
Tukang Kayu Oh 7.2000 170,000.00 1,224,000.00
Kepala Tukang Oh 0.7200 180,000.00 129,600.00
Mandor Oh 0.1200 200,000.00 24,000.00
Jumlah 9,140,300.00
Dibulatkan 9,140,300.00
J-27 1 M2 Dinding bilik, rangka kayu borneo
Bilik bambu m2 1.1000 25,000.00 27,500.00
Kaso 5/7 m3 0.0140 2,705,000.00 37,870.00
Paku Biasa 2" - 5" Kg 0.0120 24,000.00 288.00
List kayu 2/4 m3 0.0030 10,500.00 31.50
Pekerja Oh 0.1000 150,000.00 15,000.00
Tukang Kayu Oh 0.0500 170,000.00 8,500.00
Kepala Tukang Oh 0.0050 180,000.00 900.00
Mandor Oh 0.0050 200,000.00 1,000.00
Jumlah 91,089.50
Dibulatkan 91,080.00
1 M2 Pasang Pintu Panel Multiplek 9 mm rangka kayu Kamper Medan / Kruing
Kayu Papan Kamper Medan/Kruing M3 0.0230 6,405,800.00 147,333.40
Multiplek 9 mm lbr 0.2300 166,500.00 38,295.00
List kayu profil 1 cm m' 3.6000 9,800.00 35,280.00
Paku biasa ½" - 1" kg 0.3000 24,000.00 7,200.00
Lem putih FOX kg 0.1500 26,300.00 3,945.00
Pekerja Oh 1.0000 150,000.00 150,000.00
1 2 3 4 5 6=4x5
Tukang Kayu Oh 2.5000 170,000.00 425,000.00
Kepala Tukang Oh 0.2500 180,000.00 45,000.00
Mandor Oh 0.0500 200,000.00 10,000.00
Jumlah 862,053.40
Dibulatkan 862,050.00
M PEKERJAAN SANITASI
M-01 1 Buah Closet Jongkok Proselen Standar
Kloset jongkok porselen Bh 1.0000 230,000.00 230,000.00
Semen PC Kg 6.0000 1,540.00 9,240.00
Pasir Pasang M3 0.0100 350,000.00 3,500.00
Pekerja Oh 1.0000 160,000.00 160,000.00
Tukang Batu Oh 1.5000 170,000.00 255,000.00
Kepala Tukang Oh 0.1500 180,000.00 27,000.00
Mandor Oh 0.1600 200,000.00 32,000.00
Jumlah 716,740.00
Dibulatkan 716,740.00
M-02 1 Buah Urinoir
Urinoir Bh 1.0000 1,952,500.00 1,952,500.00
Semen PC Kg 6.0000 1,540.00 9,240.00
Pasir Pasang M3 0.0100 350,000.00 3,500.00
Pekerja Oh 1.0000 160,000.00 160,000.00
Tukang Batu Oh 1.0000 170,000.00 170,000.00
Kepala Tukang Oh 0.1000 180,000.00 18,000.00
Mandor Oh 0.0010 200,000.00 200.00
Perlengkapan 30 % Ls 0.3000 1,952,500.00 585,750.00
Jumlah 2,899,190.00
Dibulatkan 2,899,190.00
M-03 1 Buah Wastafel
Wastafel Bh 1.0000 800,000.00 800,000.00
Semen PC Kg 6.0000 1,540.00 9,240.00
Pasir Pasang M3 0.0100 350,000.00 3,500.00
Pekerja Oh 1.2000 160,000.00 192,000.00
Tukang Batu Oh 1.4500 170,000.00 246,500.00
1 2 3 4 5 6=4x5
Kepala Tukang Oh 0.1500 180,000.00 27,000.00
Mandor Oh 0.1000 200,000.00 20,000.00
Perlengkapan 12 % Ls 0.1200 800,000.00 96,000.00
Jumlah 1,394,240.00
Dibulatkan 1,394,240.00
M-04 1 Buah Bak Mandi Fibreflass volume 0,30 M3
Bak Fibreglass Bh 1.0000 281,000.00 281,000.00
Pekerja Oh 1.8000 160,000.00 288,000.00
Tukang Batu Oh 2.7000 170,000.00 459,000.00
Kepala Tukang Oh 0.5400 180,000.00 97,200.00
Mandor Oh 0.1100 200,000.00 22,000.00
Perlengkapan 18 % Ls 0.1800 281,000.00 50,580.00
Jumlah 1,197,780.00
Dibulatkan 1,197,780.00
M-05 1 M' Saluran Air Limbah Buis beton d = 30 cm - 60 cm
Buis beton Ø 30 cm bh 1.1000 68,000.00 74,800.00
Bata merah bh 25.0000 850.00 21,250.00
P.C (50 gk) Kg 10.3000 1,540.00 15,862.00
Pasir pasang m3 0.0610 350,000.00 21,350.00
Pasir urug m3 0.0690 250,000.00 17,250.00
Pekerja org 0.3800 160,000.00 60,800.00
Tukang batu org 0.1900 170,000.00 32,300.00
Kepala Tukang org 0.0190 180,000.00 3,420.00
Mandor org 0.0190 200,000.00 3,800.00
Jumlah 250,832.00
Dibulatkan 250,830.00
M-06 1 Buah Bak kontrol Pas. Bata Merah Uk (60 x 60) cm
Bata Merah bh 186.0000 850.00 158,100.00
Semen PC Kg 114.0000 1,540.00 175,560.00
Pasir Pasang M3 0.1840 350,000.00 64,400.00
Batu pecah 2/3 M3 0.0330 218,260.00 7,202.58
Besi Beton Kg 4.8500 16,500.00 80,025.00
Pasir Beton M3 0.1200 350,000.00 42,000.00
Pekerja Oh 2.1600 160,000.00 345,600.00
Tukang Batu Oh 0.7200 170,000.00 122,400.00
Kepala Tukang Oh 0.0720 180,000.00 12,960.00
Tukang Gali Oh 0.1000 160,000.00 16,000.00
Mandor Oh 0.1080 200,000.00 21,600.00
Jumlah 1,045,847.58
Dibulatkan 1,045,840.00
M-07 1 Buah Bak kontrol Pas. Bata Merah Uk (30 x 30) cm
Bata Merah bh 53.0000 850.00 45,050.00
Semen PC Kg 44.0000 1,540.00 67,760.00
Pasir Pasang M3 0.0700 350,000.00 24,500.00
Batu pecah 2/3 M3 0.0700 218,260.00 15,278.20
Besi Beton Kg 1.6000 16,500.00 26,400.00
Pasir Beton M3 0.0600 350,000.00 21,000.00
Pekerja Oh 3.2000 160,000.00 512,000.00
Tukang Batu Oh 1.0150 170,000.00 172,550.00
Kepala Tukang Oh 0.0015 180,000.00 270.00
Mandor Oh 0.0160 200,000.00 3,200.00
Jumlah 888,008.20
Dibulatkan 888,000.00
M-08 1 M¹ Pipa PVC Type AW Ø ½"
Pipa PVC M1 1.2000 10,625.00 12,750.00
Pekerja Oh 0.0360 160,000.00 5,760.00
Tukang Batu Oh 0.0600 170,000.00 10,200.00
Kepala Tukang Oh 0.0060 180,000.00 1,080.00
Mandor Oh 0.0018 200,000.00 360.00
Perlengkapan 35% Ls 0.3500 12,750.00 4,462.50
Jumlah 34,612.50
Dibulatkan 34,610.00
M-09 1 M¹ Pipa PVC Type AW Ø 1"
1 2 3 4 5 6=4x5
Pipa PVC M1 1.2000 16,250.00 19,500.00
Pekerja Oh 0.0360 160,000.00 5,760.00
Tukang Batu Oh 0.0600 170,000.00 10,200.00
Kepala Tukang Oh 0.0060 180,000.00 1,080.00
Mandor Oh 0.0018 200,000.00 360.00
Perlengkapan 35% Ls 0.3500 19,500.00 6,825.00
Jumlah 43,725.00
Dibulatkan 43,720.00
M-10 1 M¹ Pipa PVC Type AW Ø 1½"
Pipa PVC M1 1.2000 27,500.00 33,000.00
Pekerja Oh 0.0360 160,000.00 5,760.00
Tukang Batu Oh 0.0600 170,000.00 10,200.00
Kepala Tukang Oh 0.0060 180,000.00 1,080.00
Mandor Oh 0.0018 200,000.00 360.00
Perlengkapan 35% Ls 0.3500 33,000.00 11,550.00
Jumlah 61,950.00
Dibulatkan 62,000.00
M-11 1 M¹ Pipa PVC Type AW Ø 2"
Pipa PVC M1 1.2000 30,000.00 36,000.00
Pekerja Oh 0.0360 160,000.00 5,760.00
Tukang Batu Oh 0.0600 170,000.00 10,200.00
Kepala Tukang Oh 0.0060 180,000.00 1,080.00
Mandor Oh 0.0018 200,000.00 360.00
Perlengkapan 35% Ls 0.3500 36,000.00 12,600.00
Jumlah 66,000.00
Dibulatkan 66,000.00
1 M¹ Pipa PVC Type AW Ø 2½"
Pipa PVC M1 1.2000 42,500.00 51,000.00
Perlengkapan 35% Ls 1.0000 17,850.00 17,850.00
Pekerja Oh 0.0540 160,000.00 8,640.00
Tukang Batu Oh 0.0900 170,000.00 15,300.00
Kepala Tukang Oh 0.0090 180,000.00 1,620.00
Mandor Oh 0.0027 200,000.00 540.00
Jumlah 94,950.00
Dibulatkan 94,950.00
1 M¹ Pipa PVC Type AW Ø 3"
Pipa PVC M1 1.2000 53,750.00 64,500.00
Perlengkapan 35% Ls 1.0000 22,575.00 22,575.00
Pekerja Oh 0.0810 160,000.00 12,960.00
Tukang Batu Oh 0.1350 170,000.00 22,950.00
Kepala Tukang Oh 0.0135 180,000.00 2,430.00
Mandor Oh 0.0041 200,000.00 820.00
Jumlah 126,235.00
Dibulatkan 126,230.00
M-12 1 M¹ Pipa PVC Type AW Ø 4"
Pipa PVC M1 1.2000 90,000.00 108,000.00
Pekerja Oh 0.0810 160,000.00 12,960.00
Tukang Batu Oh 0.1350 170,000.00 22,950.00
Kepala Tukang Oh 0.0135 180,000.00 2,430.00
Mandor Oh 0.0041 200,000.00 820.00
Perlengkapan 35% Ls 0.3500 108,000.00 37,800.00
Jumlah 184,960.00
Dibulatkan 184,960.00
M-13 1 M¹ Pipa PVC Type AW Ø ¾"
Pipa PVC M1 1.2000 13,875.00 16,650.00
Pekerja Oh 0.0360 160,000.00 5,760.00
Tukang Batu Oh 0.0600 170,000.00 10,200.00
Kepala Tukang Oh 0.0060 180,000.00 1,080.00
Mandor Oh 0.0018 200,000.00 360.00
Perlengkapan 35% Ls 0.3500 16,650.00 5,827.50
Jumlah 39,877.50
Dibulatkan 39,870.00
M-14 1 Buah Bak Cuci Piring Stainles Steel
1 2 3 4 5 6=4x5
Bak cuci stainles steel Bh 1.0000 438,500.00 438,500.00
Pekerja Oh 0.0300 160,000.00 4,800.00
Tukang Batu Oh 0.3000 170,000.00 51,000.00
Kepala Tukang Oh 0.0300 180,000.00 5,400.00
Mandor Oh 0.0015 200,000.00 300.00
Jumlah 500,000.00
Dibulatkan 500,000.00
M-15 1 Buah Kran Ø ½" atau ¾"
Kran Air Bh 1.0000 25,000.00 25,000.00
Seal Tape Bh 0.0250 4,500.00 112.50
Pekerja Oh 0.0100 160,000.00 1,600.00
Tukang Batu Oh 0.1000 170,000.00 17,000.00
Kepala Tukang Oh 0.0100 180,000.00 1,800.00
Mandor Oh 0.0050 200,000.00 1,000.00
Jumlah 46,512.50
Dibulatkan 46,510.00
1 Buah Kran sink toto
kran sink Bh 1.0000 650,000.00 650,000.00
Seal Tape Bh 0.0250 4,500.00 112.50
Pekerja Oh 0.0100 160,000.00 1,600.00
Tukang Batu Oh 0.1000 170,000.00 17,000.00
Kepala Tukang Oh 0.0100 180,000.00 1,800.00
Mandor Oh 0.0050 200,000.00 1,000.00
Jumlah 671,512.50
Dibulatkan 671,510.00
1 Buah Kran wastafel ex toto
kran wastafel Bh 1.0000 300,000.00 300,000.00
Seal Tape Bh 0.0250 4,500.00 112.50
Pekerja Oh 0.0100 160,000.00 1,600.00
Tukang Batu Oh 0.1000 170,000.00 17,000.00
Kepala Tukang Oh 0.0100 180,000.00 1,800.00
Mandor Oh 0.0050 200,000.00 1,000.00
Jumlah 321,512.50
Dibulatkan 321,510.00
M-16 1 Buah Floor Drain
Floor Drain Bh 1.0000 35,000.00 35,000.00
Pekerja Oh 0.0100 160,000.00 1,600.00
Tukang Batu Oh 0.1000 170,000.00 17,000.00
Kepala Tukang Oh 0.0100 180,000.00 1,800.00
Mandor Oh 0.0050 200,000.00 1,000.00
Jumlah 56,400.00
Dibulatkan 56,400.00
M-17 1 M' Grafel beton U 20 cm -60 cm
Pipa beton U bh 1.1000 48,000.00 52,800.00
Bata merah bh 12.0000 850.00 10,200.00
P.C (50 gk) zak 0.1030 1,540.00 158.62
Pasir pasang m3 0.0305 350,000.00 10,675.00
Pasir urug m3 0.0345 250,000.00 8,625.00
Pekerja org 0.0100 160,000.00 1,600.00
Tukang batu org 0.1000 170,000.00 17,000.00
Kepala Tukang org 0.0100 180,000.00 1,800.00
Mandor org 0.0050 200,000.00 1,000.00
Jumlah 103,858.62
Dibulatkan 103,850.00
M-18 1 M' Pasang Talang Plastik PVC U 15 cm (AW)
Talang plastik PVC m' 1.0500 66,000.00 69,300.00
Perlengkapan 35 % harga talang lot 0.3500 69,300.00 24,255.00
Pekerja org 0.1500 160,000.00 24,000.00
Tukang batu org 0.4000 170,000.00 68,000.00
Kepala Tukang org 0.0250 180,000.00 4,500.00
Mandor org 0.0013 200,000.00 250.00
Jumlah 190,305.00
Dibulatkan 190,300.00
1 2 3 4 5 6=4x5
M-19 1 M' Saluran Air Limbah Buis beton Ø 60 cm
Buis beton Ø 60 cm bh 1.1000 135,000.00 148,500.00
Bata merah bh 25.0000 850.00 21,250.00
P.C (50 gk) Kg 0.2060 1,540.00 317.24
Pasir pasang m3 0.0610 350,000.00 21,350.00
Pasir urug m3 0.0690 250,000.00 17,250.00
Pekerja org 0.3800 160,000.00 60,800.00
Tukang batu org 0.1900 170,000.00 32,300.00
Kepala Tukang org 0.0190 180,000.00 3,420.00
Mandor org 0.0190 200,000.00 3,800.00
Jumlah 308,987.24
Dibulatkan 308,980.00
M-20 1 M' Pasang Talang Seng Datar
Seng pelat 3" x 6" lbr 0.5000 17,400.00 8,700.00
Paku kg 0.0150 24,000.00 360.00
Kayu kelas II m3 0.0096 2,950,000.00 28,320.00
Meni besi kg 0.2500 33,500.00 8,375.00
Pekerja org 0.1500 160,000.00 24,000.00
Tukang batu org 0.4000 170,000.00 68,000.00
Kepala Tukang org 0.0250 180,000.00 4,500.00
Mandor org 0.0013 200,000.00 250.00
Jumlah 142,505.00
Dibulatkan 142,500.00
M-21 1 Buah Closet Duduk
Closet duduk Bh 1.0000 1,897,500.00 1,897,500.00
Pekerja Oh 3.3000 160,000.00 528,000.00
Tukang Batu Oh 1.1000 170,000.00 187,000.00
Kepala Tukang Oh 0.0100 180,000.00 1,800.00
Mandor Oh 0.1600 200,000.00 32,000.00
Perlengkapan 6 % Ls 0.0600 1,897,500.00 113,850.00
Jumlah 2,760,150.00
Dibulatkan 2,760,150.00
m21' 1 Buah jet shower
jet washer thx20nb/thx20/ shower spray ex toto Bh 1.0000 230,000.00 230,000.00
Pekerja Oh 0.0100 160,000.00 1,600.00
Tukang Batu Oh 0.1000 170,000.00 17,000.00
Kepala Tukang Oh 0.0100 180,000.00 1,800.00
Mandor Oh 0.0500 200,000.00 10,000.00
Perlengkapan 6 % Ls 0.0600 230,000.00 13,800.00
Jumlah 274,200.00
Dibulatkan 274,200.00
1 Buah shower
shower Bh 1.0000 450,000.00 450,000.00
Pekerja Oh 0.0100 160,000.00 1,600.00
Tukang Batu Oh 0.1000 170,000.00 17,000.00
Kepala Tukang Oh 0.0100 180,000.00 1,800.00
Mandor Oh 0.0500 200,000.00 10,000.00
Perlengkapan 6 % Ls 0.0600 450,000.00 27,000.00
Jumlah 507,400.00
Dibulatkan 507,400.00
M-22 1 Buah Tangki Air fibreglass Volume 1 m3
Bak fibreglass kapasitas 1 m3 bh 1.0000 1,448,500.00 1,448,500.00
Pekerja org 3.3000 160,000.00 528,000.00
Tukang batu org 1.1000 170,000.00 187,000.00
Kepala Tukang org 0.0010 180,000.00 180.00
Mandor org 0.1600 200,000.00 32,000.00
Perlengkapan 6 % harga bak lot 0.0600 1,448,500.00 86,910.00
Jumlah 2,282,590.00
Dibulatkan 2,282,590.00
m22' 1 Buah pompa
Pompa Zet Pump 250 W - Sanyo bh 1.0000 5,458,000.00 5,458,000.00
Pekerja org 0.2500 160,000.00 40,000.00
Mandor org 0.1245 200,000.00 24,900.00
1 2 3 4 5 6=4x5
Perlengkapan 6 % harga bak lot 0.0600 5,458,000.00 327,480.00
Jumlah 5,850,380.00
Dibulatkan 5,850,380.00
1 Unit Septictank 3 x 1 x 2 M + Rembesannya
Galian tanah M3 9.0000 89,420.00 804,780.00
Pasir urug M3 0.4200 250,000.00 105,000.00
Lantai kerja M3 4.5000 1,019,000.00 4,585,500.00
Pas bata 1pc : 3ps M2 30.0000 342,690.00 10,280,700.00
Plesteran M2 30.0000 80,000.00 2,400,000.00
Plat beton penutup & balok M3 0.6000 8,551,930.00 5,131,158.00
Pipa PVC 4" jenis AW + sambungan M1 10.8000 66,250.00 715,500.00
Pipa GIP 1 1/2" M1 10.0000 30,583.33 305,833.33
Galian tanah untuk rembesan M3 6.7400 89,420.00 602,690.80
Pas. Injuk KG 10.8000 25,800.00 278,640.00
Urugan kerikil 3.5 cm M3 2.1000 211,970.00 445,137.00
Pipa PVC 4" berlobang jenis AW M1 18.0000 40,500.00 729,000.00
Urugan kembali perataan tanah M3 2.2400 117,600.00 263,424.00
Jumlah 26,647,363.13
Dibulatkan 26,647,360.00
N PEKERJAAN PENGECATAN
N-01 1 M2 Mengikis / Mengerok Permukaan Cat Tembok Lama
Soda Api Kg 0.0500 39,500.00 1,975.00
Pekerja Oh 0.1500 150,000.00 22,500.00
Mandor Oh 0.0025 200,000.00 500.00
Jumlah 24,975.00
Dibulatkan 24,970.00
N-02 1 M2 Mendempul dan Menggosok Kayu
Dempul Jadi Kg 0.0800 40,000.00 3,200.00
Minyak Cat Kg 0.0200 42,300.00 846.00
Batu Apung Kg 0.0100 30,640.00 306.40
Pekerja Oh 0.0400 150,000.00 6,000.00
Tukang Cat Oh 0.0400 170,000.00 6,800.00
Kepala Tukang Oh 0.0040 180,000.00 720.00
Mandor Oh 0.0025 200,000.00 500.00
Jumlah 18,372.40
Dibulatkan 18,370.00
N-03 1 M2 Pengecatan Bidang Kayu dan Besi lama Setara Glotex
Plamir Kg 0.1500 27,500.00 4,125.00
Cat Dasar Kg 0.1700 35,000.00 5,950.00
Cat Penutup setara Glotex 2X Kg 0.1700 45,900.00 7,803.00
Pekerja Oh 0.0700 150,000.00 10,500.00
Tukang Cat Oh 0.0750 170,000.00 12,750.00
Kepala Tukang Oh 0.0075 180,000.00 1,350.00
Mandor Oh 0.0025 200,000.00 500.00
Jumlah 42,978.00
Dibulatkan 42,970.00
N-03 1 M2 Pengecatan Bidang Kayu lama Setara Pinotex
Plamir Kg 0.1500 27,500.00 4,125.00
Cat Dasar Kg 0.1700 35,000.00 5,950.00
Cat Penutup setara Pinotex 2X Kg 0.1700 52,500.00 8,925.00
Pekerja Oh 0.0700 150,000.00 10,500.00
Tukang Cat Oh 0.0750 170,000.00 12,750.00
Kepala Tukang Oh 0.0075 180,000.00 1,350.00
Mandor Oh 0.0025 200,000.00 500.00
Jumlah 44,100.00
Dibulatkan 44,100.00
N-04 1 M2 Pengecatan Bidang Kayu Baru Setara Glotex 3 X laburan
Cat Meni Kg 0.2000 33,500.00 6,700.00
Plamir Kg 0.1500 27,500.00 4,125.00
Cat Dasar Kg 0.1700 35,000.00 5,950.00
Cat Penutup setara Glotex 3X Kg 0.3500 45,900.00 16,065.00
Pekerja Oh 0.0700 150,000.00 10,500.00
Tukang Cat Oh 0.1050 170,000.00 17,850.00
Kepala Tukang Oh 0.0040 180,000.00 720.00
Mandor Oh 0.0025 200,000.00 500.00
Jumlah 62,410.00
Dibulatkan 62,410.00
1 M2 Pengecatan Bidang Kayu Baru Setara Sieve 2 X laburan
Cat Meni Kg 0.2000 33,500.00 6,700.00
Plamir Kg 0.1500 27,500.00 4,125.00
Cat Dasar Kg 0.1700 35,000.00 5,950.00
Cat Penutup setara Sieve 2X Kg 0.2600 45,900.00 11,934.00
Pekerja Oh 0.0700 150,000.00 10,500.00
1 2 3 4 5 6=4x5
Tukang Cat Oh 0.0090 170,000.00 1,530.00
Kepala Tukang Oh 0.0060 180,000.00 1,080.00
Mandor Oh 0.0025 200,000.00 500.00
Jumlah 42,319.00
Dibulatkan 42,310.00
N-05 1 M2 Pelaburan Bidang Kayu dengan Politur
Politur Ltr 0.1500 55,000.00 8,250.00
Politur Jadi Ltr 0.3720 125,000.00 46,500.00
Ampelas Lbr 2.0000 5,500.00 11,000.00
Tukang Cat Oh 0.0600 170,000.00 10,200.00
Kepala Tukang Oh 0.0160 180,000.00 2,880.00
Mandor Oh 0.0025 200,000.00 500.00
Jumlah 79,330.00
Dibulatkan 79,330.00
N-06 1 M2 Pelaburan Bidang Kayu dengan Cat Residu dan Ter
Residu atau Ter Ltr 0.3500 9,000.00 3,150.00
Pekerja Oh 0.1000 150,000.00 15,000.00
Mandor Oh 0.0060 200,000.00 1,200.00
Jumlah 19,350.00
Dibulatkan 19,350.00
N-07 1 M2 Pengecatan Tembok Setara ICI Exterior (weather shield)
Plamir Kg 0.1000 27,500.00 2,750.00
Cat Dasar Kg 0.1000 35,000.00 3,500.00
Cat Penutup setara ICI Exterior 2X Kg 0.2600 135,000.00 35,100.00
Pekerja Oh 0.0200 150,000.00 3,000.00
Tukang Cat Oh 0.0630 170,000.00 10,710.00
Kepala Tukang Oh 0.0063 180,000.00 1,134.00
Mandor Oh 0.0025 200,000.00 500.00
Jumlah 56,694.00
Dibulatkan 56,690.00
N-07 1 M2 Pengecatan Tembok Setara ICI Interior
Plamir Kg 0.1000 27,500.00 2,750.00
Cat Dasar Kg 0.1000 35,000.00 3,500.00
Cat Penutup setara ICI Interior 2X Kg 0.2600 92,500.00 24,050.00
Pekerja Oh 0.0200 150,000.00 3,000.00
Tukang Cat Oh 0.0630 170,000.00 10,710.00
Kepala Tukang Oh 0.0063 180,000.00 1,134.00
Mandor Oh 0.0025 200,000.00 500.00
Jumlah 45,644.00
Dibulatkan 45,640.00
N-08 1 M2 Pengecatan Tembok Lama Setara ICI Weather Shield
Cat Dasar Kg 0.1200 35,000.00 4,200.00
Cat Penutup setara ICI 2X Kg 0.1800 135,000.00 24,300.00
Pekerja Oh 0.0280 150,000.00 4,200.00
Tukang Cat Oh 0.0420 170,000.00 7,140.00
Kepala Tukang Oh 0.0042 180,000.00 756.00
Mandor Oh 0.0025 200,000.00 500.00
Jumlah 41,096.00
Dibulatkan 41,090.00
N-09 1 M2 Pengecatan Plafond ( 3x ) setara ICI
Cat tembok setara ICI Kg 0.2000 92,500.00 18,500.00
Plamir tembok Kg 0.1600 27,500.00 4,400.00
Rol cat Bh 0.0100 35,000.00 350.00
Steger werk Ls 1.0000 1,000.00 1,000.00
Ampelas Lbr 0.5000 5,500.00 2,750.00
Pekerja setengah trampil Oh 0.2000 160,000.00 32,000.00
Tukang cat Oh 0.3000 170,000.00 51,000.00
Kepala tukang Oh 0.0300 180,000.00 5,400.00
Mandor Oh 0.0100 200,000.00 2,000.00
Jumlah 117,400.00
Dibulatkan 117,400.00
N-10 1 M2 Pengecatan Plafond ( 3x ) setara Vinilex
Cat tembok setara Vinilex Kg 0.2000 27,500.00 5,500.00
1 2 3 4 5 6=4x5
Plamir tembok Kg 0.1600 27,500.00 4,400.00
Rol cat Bh 0.0100 35,000.00 350.00
Steger werk Ls 1.0000 1,000.00 1,000.00
Ampelas Lbr 0.5000 5,500.00 2,750.00
Pekerja setengah trampil Oh 0.2000 160,000.00 32,000.00
Tukang cat Oh 0.3000 170,000.00 51,000.00
Kepala tukang Oh 0.0300 180,000.00 5,400.00
Mandor Oh 0.0100 200,000.00 2,000.00
Jumlah 104,400.00
Dibulatkan 104,400.00
N-10r 1 M2 Pengecatan Plafond ( 2x ) setara Vinilex
Cat tembok setara Vinilex Kg 0.1300 27,500.00 3,575.00
Plamir tembok Kg 0.1100 27,500.00 3,025.00
Rol cat Bh 0.0100 35,000.00 350.00
Steger werk Ls 0.6700 1,000.00 670.00
Ampelas Lbr 0.3300 5,500.00 1,815.00
Pekerja setengah trampil Oh 0.1300 160,000.00 20,800.00
Tukang cat Oh 0.2000 170,000.00 34,000.00
Kepala tukang Oh 0.0200 180,000.00 3,600.00
Mandor Oh 0.0100 200,000.00 2,000.00
Jumlah 69,835.00
Dibulatkan 69,830.00
N-11 1 M2 Pemasangan Wall Paper
Wall Paper M3 1.2000 61,500.00 73,800.00
Perekat Kg 0.2500 39,300.00 9,825.00
Pekerja Oh 0.3500 160,000.00 56,000.00
Tukang Cat Oh 0.1750 170,000.00 29,750.00
Kepala Tukang Oh 0.0170 180,000.00 3,060.00
Mandor Oh 0.0017 200,000.00 340.00
Jumlah 172,775.00
Dibulatkan 172,770.00
N-12 1 M2 Pengecatan Permukaan Baja dengan Meni Besi
Meni Besi Kg 0.1000 33,500.00 3,350.00
Kuas Bh 0.0100 16,500.00 165.00
Pekerja Oh 0.0200 160,000.00 3,200.00
Tukang Cat Oh 0.2000 170,000.00 34,000.00
Kepala Tukang Oh 0.0200 180,000.00 3,600.00
Mandor Oh 0.0100 200,000.00 2,000.00
Jumlah 46,315.00
Dibulatkan 46,310.00
N-13 1 M2 Pengecatan Permukaan Baja dengan Meni Besi dan Perancah
Meni Besi Kg 0.1000 33,500.00 3,350.00
Kuas Bh 0.0100 16,500.00 165.00
Perancah Kayu M3 0.0020 2,276,800.00 4,553.60
Pekerja Oh 0.2500 160,000.00 40,000.00
Tukang Cat Oh 0.2250 170,000.00 38,250.00
Kepala Tukang Oh 0.0225 180,000.00 4,050.00
Mandor Oh 0.0075 200,000.00 1,500.00
Jumlah 91,868.60
Dibulatkan 91,860.00
N-14 1 M2 Pengecatan Permukaan Baja Lapis seng (galbani) secara manual 1 lps cat 2 um
Cat besi setara ICI Kg 0.3000 74,500.00 22,350.00
Pekerja Oh 0.0060 160,000.00 960.00
Tukang Cat Oh 0.0600 170,000.00 10,200.00
Kepala Tukang Oh 0.0120 180,000.00 2,160.00
Mandor Oh 0.0060 200,000.00 1,200.00
Jumlah 36,870.00
Dibulatkan 36,870.00
N-15 1 M2 Pengecatan Tembok Baru Setara Vinilex (3 x laburan)
Plamir Kg 0.1600 27,500.00 4,400.00
Cat Dasar Kg 0.1000 35,000.00 3,500.00
Cat Penutup setara Vinilex 3X Kg 0.3900 27,500.00 10,725.00
Pekerja Oh 0.0300 150,000.00 4,500.00
1 2 3 4 5 6=4x5
Tukang Cat Oh 0.1890 170,000.00 32,130.00
Kepala Tukang Oh 0.0189 180,000.00 3,402.00
Mandor Oh 0.0019 200,000.00 378.00
Jumlah 59,035.00
Dibulatkan 59,030.00
N-15r 1 M2 Pengecatan Tembok Setara Vinilex (2 x laburan)
Plamir Kg 0.1000 27,500.00 2,750.00
Cat Dasar Kg 0.1000 35,000.00 3,500.00
Cat Penutup setara Vinilex 2X Kg 0.3900 27,500.00 10,725.00
Pekerja Oh 0.0300 150,000.00 4,500.00
Tukang Cat Oh 0.0945 170,000.00 16,065.00
Kepala Tukang Oh 0.0095 180,000.00 1,710.00
Mandor Oh 0.0038 200,000.00 760.00
Jumlah 40,010.00
Dibulatkan 40,010.00
N-16 1 M2 Pengecatan Tembok Lama Setara Vinilex
Cat Dasar Kg 0.1200 35,000.00 4,200.00
Cat Penutup setara Vinilex 2X Kg 0.1800 27,500.00 4,950.00
Pekerja Oh 0.0280 150,000.00 4,200.00
Tukang Cat Oh 0.0420 170,000.00 7,140.00
Kepala Tukang Oh 0.0042 180,000.00 756.00
Mandor Oh 0.0025 200,000.00 500.00
Jumlah 21,746.00
Dibulatkan 21,740.00
N-16 1 M2 Waterproofing
waterproof kg 0.3500 80,000.00 28,000.00
serat fiber lbr 1.0000 27,500.00 27,500.00
Pekerja Oh 0.0505 150,000.00 7,572.00
Tukang Cat Oh 0.0750 170,000.00 12,750.00
Mandor Oh 0.0070 200,000.00 1,400.00
Jumlah 77,222.00
Dibulatkan 77,220.00
wina w600
rel atas 800,000.00
rel bawah 335,000.00
rel tikung 850,000.00
D PEKERJAAN BETON
1 M2 Lantai kerja beton tumbuk, 1 Pc : 3 Ps : 5 Kr. tebal 5 cm 211,560.00
1 1 M3 Beton rabat beton , 1 Pc : 3 Ps : 5 Kr D-01 1,019,000.00
2 1 M3 Beton Tumbuk, 1 Pc : 3 Ps : 6 Kr D-02 983,540.00
3 1 M3 Beton Tumbuk, 1 Pc : 2 Ps : 3 Kr D-03 1,449,030.00
4 1 M3 Tiang Pancang Prestressed Beton D-04 1,380,750.00
5 1 M3 Beton Tumbuk, 1 Pc : 2 Ps : 4 Kr D-05 1,381,420.00
6 1 M' Memasang PVC Waterstop Lebar 200 mm D-06 77,310.00
1 M' Memasang PVC Waterstop Lebar 150 mm 73,390.00
7 1 Kg Pembesian Dengan Besi Polos atau Besi Ulir D-07 20,200.00
8 1 M2 Pasangan Bekisting untuk Pondasi D-08 220,080.00
9 1 M2 Pasangan Bekisting untuk Sloof D-09 234,830.00
10 1 M2 Pasangan Bekisting untuk Kolom D-10 400,790.00
11 1 M2 Pasangan Bekisting untuk Balok D-11 404,400.00
KODE HARGA
No. URAIAN SATUAN
ANAL SATUAN
12 1 M2 Pasangan Bekisting untuk Lantai D-12 528,490.00
13 1 M2 Pasang Bekisting untuk Tangga D-13 376,540.00
14 1 M3 Membuat Beton Cor Mutu K225 D-14 2,190,130.00
15 1 M3 Membuat Beton Cor Mutu K275 D-15 2,158,220.00
16 1 M3 Pondasi Beton Tulang (150 kg besi+bekisting) D-16 5,096,180.00
17 1 M3 Sloof Beton Tulang (200 kg besi+bekisting) D-17 6,469,440.00
1 M3 Sloof Beton Tulang 15/20 cm (150 kg besi+bekisting) 5,671,440.00
1 M3 Sloof Beton Tulang 15/20 cm (180 kg besi+bekisting) 4 dia. 12 ring 8-15 6,139,440.00
1 M3 Sloof Beton Tulang 20/30 cm (150 kg besi+bekisting) 4 dia. 16 ring 8-15 5,644,440.00
1 M3 Sloof Beton Tulang 20/30 cm (200 kg besi+bekisting) Struktur bertingkat 6 dia. 16, 8-15 6,469,440.00
1 M3 Sloof Beton Bertulang 20/40 cm (240 kg besi+bekisting) Struktur bertingkat 7,156,440.00
18 1 M3 Kolom Beton Tulang (120 kg besi+bekisting) D-18 8,080,160.00
19 1 M3 Kolom Beton Tulang (140 kg besi+bekisting) D-19 8,410,160.00
20 1 M3 Kolom Beton Tulang (150 kg besi+bekisting) D-20 7,578,000.00
21 1 M3 Kolom Beton Tulang (180 kg besi+bekisting) D-21 9,071,000.00
22 1 M3 Kolom Beton Tulang (200 kg besi+bekisting) D-22 9,400,160.00
23 1 M3 Kolom Beton Tulang (250 kg besi+bekisting) D-23 10,225,160.00
24 1 M3 Kolom Beton Tulang (300 kg besi+bekisting) D-24 11,050,160.00
1 M3 Kolom Beton Tulang 20/20 cm (140 kg besi+bekisting) 4 dia. 12, 8-15 8,320,160.00
1 M3 Kolom Beton Tulang 15/20 (180 kg besi+bekisting) 4 dia. 12, 8-15 8,980,160.00
1 M3 Kolom Beton Tulang 20/20 cm (210 kg besi+bekisting) Struktur bertingkat 4 dia. 16, 8-15 9,475,160.00
1 M3 Kolom Beton Tulang 20/30cm (230 kg besi+bekisting) Struktur bertingkat 6 dia.16+2 dia.12, 8-15 9,805,160.00
1 M3 Kolom Beton Tulang 20/40 cm (250 kg besi+bekisting) Struktur bertingkat 10,225,160.00
1 M3 Kolom Beton Tulang 30/30 cm (175 kg besi+bekisting) Struktur bertingkat 8 dia. 16, 8-15 8,897,660.00
1 M3 Kolom Beton Tulang 30/30 cm (210 kg besi bekisting) Struktur bertingkat 10 dia. 16, 8-15 9,475,160.00
1 M3 Kolom Beton Tulang 30/40 cm (200 kg besi bekisting) Struktur bertingkat 9,400,160.00
1 M3 Kolom Beton Tulang Praktis 12/12 cm (175 kg besi+bekisting) 7,909,160.00
1 M3 Kolom Beton Tulang Praktis 12/12 cm (260 kg besi+bekisting) 4 dia. 10, 8-15 9,311,660.00
1 M3 Kolom Beton Tulang (200 kg besi+bekisting) 9,392,510.00
1 M3 Kolom Beton Tulang (250 kg besi+bekisting) 10,217,510.00
1 M3 Kolom Beton Tulang (300 kg besi+bekisting) 11,042,510.00
25 1 M3 Balok Beton Tulang (120 kg besi+bekisting) D-25 7,106,060.00
26 1 M3 Balok Beton Tulang (150 kg besi+bekisting) D-26 7,703,280.00
27 1 M3 Balok Beton Tulang (200 kg besi+bekisting) D-27 7,874,590.00
28 1 M3 Balok Beton Tulang (230 kg besi+bekisting) D-28 8,971,380.00
1 M3 Balok Beton Tulang 15/20 cm (150 kg besi+bekisting) 7,614,780.00
1 M3 Balok Beton Tulang 15/20 (180 kg besi+bekisting) 4 dia. 12, 8-15 8,037,780.00
1 M3 Balok Beton Lintel 11/11 (300 kg besi+bekisting) 4 dia. 10, 8-15 9,971,660.00
1 M3 Balok Beton Tulang 15/20 sofi-sofi, ring balk+balok portal (180 kg besi+bekisting) 4 dia.12, 8-15 8,037,780.00
1 M3 Balok Beton Tulang 15/30 (190 kg besi+bekisting) Struktur bertingkat 4 dia. 16, 8-15 8,202,780.00
1 M3 Balok Beton Tulang 20/40 (200 kg besi+bekisting) Struktur bertingkat 7 dia. 16+2 dia. 12, 8-15 8,390,660.00
1 M3 Balok Beton Tulang 20/30 (200 kg besi+bekisting) Struktur bertingkat 6 dia. 16, 8-15 7,791,000.00
1 M3 Balok Beton Tulang 20/30 (175 kg besi+bekisting) Struktur bertingkat 5 dia. 16, 8-15 7,978,160.00
1 M3 Balok Beton Tulang 25/55 (140 kg besi+bekisting) Struktur bertingkat 8 dia. 16+2 dia. 12, 8-15 7,400,660.00
1 M3 Balok Beton Tulang 30/60 (110 kg besi+ bekisting) Struktur bertingkat 9 dia. 19+2 dia. 12, 8-15 6,905,660.00
29 1 M3 Tangga Beton Tulang (200 kg besi+bekisting) D-29 7,877,930.00
30 1 M3 Plat Lantai Tb. 10 Cm Beton Bertulang (90 kg besi+bekisting) D-30 8,551,930.00
31 1 M3 Plat Lantai Tb. 12 Cm Beton Bertulang (110 kg besi+bekisting) D-31 8,073,350.00
32 1 M3 Plat Lantai Tb. 12 Cm Beton Bertulang (130 kg besi+bekisting) D-32 8,477,350.00
33 1 M3 Plat Lantai Tb. 15 Cm Beton Bertulang (90 kg besi+bekisting) D-33 6,792,050.00
34 1 M3 Plat Lantai Tb. 15 Cm Beton Bertulang (115 kg besi+bekisting) D-34 7,297,050.00
35 1 M' Kolom Praktis Beton Tulang ( 11 x 11 ) Cm D-35 88,110.00
36 1 M' Ring Balok Beton Tulang ( 10 x 15 ) Cm D-36 119,770.00
37 1 M2 Pasang Bekisting untuk Dinding D-37 434,310.00
38 1 M3 Pelat Beton Tulang (150 kg besi+bekisting) D-38 7,617,180.00
39 1 M3 Dinding Beton Tulang (150 kg besi+bekisting) D-39 7,525,680.00
40 1 M3 Dinding Beton Tulang (200 kg besi+bekisting) D-40 7,803,520.00
41 1 M3 Membuat Beton Cor Mutu K300 D-41 1,249,430.00
42 1 M3 Membuat Beton Cor Mutu K200 D-42 1,167,890.00
43 1 M3 Membuat Beton Cor Mutu K250 D-43 1,209,810.00
1 M3 Membuat Beton dengan Puzzdith - 100 XR 1,193,730.00
1 M3 Membuat Beton Kedap Air dengan AM - 100 1,574,200.00
1 Kg Kabel Presstressed Polos / Strands 19,380.00
1 Kg Jaring Kawat Baja 65,730.00
1 M3 Membuat Beton Cor Mutu K175 1,249,550.00
1 M2 Pasangan Jembatan Cor 123,260.00
1 M3 Listplank Beton Tulang T=8 cm ( 77,50 kg besi + bekisting ) 7,416,850.00
E PEKERJAAN DINDING
1 1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 3Ps E-01 342,690.00
2 1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 4Ps E-02 333,530.00
KODE HARGA
No. URAIAN SATUAN
ANAL SATUAN
3 1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 5Ps E-03 329,980.00
4 1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 3Ps E-04 165,420.00
5 1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 4Ps E-05 162,060.00
6 1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 5Ps E-06 159,950.00
7 1 M2 Pasang Dinding Roster Beton 20 x 20 ad.1pc : 3 ps E-07 674,760.00
8 1 M2 Pasang Dinding Roster Beton 20 x 20 ad.1pc : 4 ps E-08 671,990.00
9 1 M2 Pasang Dinding Roster/terawang (12 x 11 x 24) cm E-09 674,760.00
10 1 M2 Pasang Dinding Batako Besar Pres uk. 8 x 20 x 30 ad. 1pc : 4ps E-10 134,000.00
11 1 M2 Pasang Dinding Hollowblock (HB-20) E-11 225,110.00
12 1 M2 Pasang Dinding Hollowblock (HB-15) E-12 216,370.00
13 1 M2 Pasang Dinding Hollowblock (HB-10) E-13 170,480.00
14 1 M2 Pasang Dinding Conblock (CB-20) E-14 267,970.00
15 1 M2 Pasang Dinding Conblock (CB-15) E-15 208,640.00
16 1 M2 Pasang Dinding Conblock (CB-10) E-16 171,140.00
17 1 M2 Pasang Dinding Keramik 10 x 20 Cm Corak setara Mulia E-17 185,050.00
18 1 M2 Pasang Dinding Keramik 10 x 20 Cm Polos setara Mulia E-18 182,550.00
19 1 M2 Pasang Dinding Keramik 20 x 20 Cm Corak setara Mulia E-19 187,550.00
20 1 M2 Pasang Dinding Keramik 20 x 20 Cm polos setara Mulia E-20 182,550.00
21 1 M2 Pasang Dinding Keramik 20 x 25 Cm polos setara Mulia E-21 182,550.00
22 1 M2 Pasang Dinding Keramik 20 x 25 Cm Corak setara Mulia E-22 187,550.00
23 1 M2 Pasang Dinding Keramik 30 x 30 Cm corak setara Mulia E-23 178,050.00
24 1 M2 Pasang Dinding Keramik 30 x 30 Cm corak setara Mulia E-24 183,050.00
25 1 M2 Pasang Dinding Keramik 40 x 40 Cm polos setara Mulia E-25 190,050.00
26 1 M2 Pasang Dinding Keramik 40 x 40 Cm corak setara Mulia E-26 188,550.00
27 1 M2 Pasang Dinding Keramik 10 x 20 Cm Corak setara Roman E-27 202,550.00
28 1 M2 Pasang Dinding Keramik 10 x 20 Cm Polos setara Roman E-28 188,050.00
29 1 M2 Pasang Dinding Keramik 20 x 20 Cm Corak setara Roman E-29 205,550.00
30 1 M2 Pasang Dinding Keramik 20 x 20 Cm polos setara Roman E-30 188,050.00
31 1 M2 Pasang Dinding Keramik 20 x 25 Cm polos setara Roman E-31 198,550.00
32 1 M2 Pasang Dinding Keramik 20 x 25 Cm Corak setara Roman E-32 204,050.00
33 1 M2 Pasang Dinding Keramik 30 x 30 Cm polos setara Roman E-33 198,550.00
34 1 M2 Pasang Dinding Keramik 30 x 30 Cm corak setara Roman E-34 202,550.00
35 1 M2 Pasang Dinding Keramik 40 x 40 Cm polos setara Roman E-35 202,550.00
36 1 M2 Pasang Dinding Keramik 40 x 40 Cm corak setara Roman E-36 207,550.00
36 1 M2 Pasang Dinding Keramik 20 x 40 Cm corak setara Roman E-36 205,550.00
37 1 M2 Pasang Dinding Marmer E-37 951,850.00
38 1 M2 Pasang Dinding Batu Tempel Hitam E-38 200,150.00
39 1 M2 Pasang Dinding Poslin 11 x 11 Cm E-39 192,550.00
40 1 M2 Wall paper E-40 160,110.00
41 1 M2 Dinding Pemisah Teakwood Rangkap, Rangka Kayu Kamper Medan E-41 427,060.00
42 1 M2 Dinding Pemisah Plywood Rangkap, Rangka Kayu Kamper Medan E-42 562,060.00
43 1 M2 Dinding Pemisah Triplek Rangkap, Rangka Kayu Kamper Medan E-43 397,370.00
44 1 M2 Dinding Pemisah GRC tb. 4 mm + rangka besi hollow E-44 123,190.00
45 1 M2 Dinding Pemisah Gypsum dobel tb. 9 mm + rangka besi hollow E-45 257,940.00
46 1 M2 Dinding Plywood tb. 4 mm + rangka besi hollow E-46 143,520.00
47 1 M2 Dinding Teakwood tb. 4 mm + rangka besi hollow E-47 135,690.00
48 1 M2 Pasang Dinding Glass Block 20 x 20 ad. 1pc : 4 ps E-48 967,190.00
49 1 M2 Pasang Dinding Anyaman Bambu, rangka kayu E-49 131,690.00
F PEKERJAAN PLESTERAN
1 1 M2 Plesteran 1 Pc : 2 Ps, Tebal 15 mm F-01 80,000.00
2 1 M2 Plesteran 1 Pc : 3 Ps, Tebal 15 mm F-02 76,820.00
3 1 M2 Plesteran 1 Pc : 4 Ps, Tebal 15 mm F-03 75,200.00
1 M2 Plesteran 1 Pc : 5 Ps, Tebal 15 mm + Acian 74,550.00
4 1 M2 Plesteran 1 Pc : 3 Ps, Tebal 20 mm F-04 103,330.00
5 1 M2 Plesteran 1 Pc : 4 Ps, Tebal 20 mm F-05 100,760.00
6 1 M2 Plesteran 1 Pc : 5 Ps, Tebal 20 mm F-06 97,920.00
7 1 M2 Barapen 1 Pc : 5 Ps, Tebal 15 mm F-07 54,040.00
8 1 M2 Plesteran Beton 1 Pc : 2 Ps, Tebal 15 mm F-08 99,820.00
9 1 M2 Plesteran Beton 1 Pc : 3 Ps, Tebal 15 mm F-09 97,430.00
10 1 M2 Plesteran Skoning 1 Pc : 2 Ps, Tebal 10 mm F-10 93,320.00
11 1 M2 Acian Plesteran F-11 49,790.00
12 1 M2 Plesteran Siar Adukan 1 Pc : 2 Ps batu belah F-12 90,160.00
13 1 M2 Plesteran Siar Adukan 1 Pc : 2 Ps dinding bata merah F-13 49,510.00
J PEKERJAAN KAYU
1 1 M3 Pasang Kusen Pintu dan Jendela Kayu Kamper Samarinda J-01 16,980,000.00
2 1 M3 Pasang Kusen Pintu dan Jendela Kayu Kamper Medan/Kruing J-02 11,894,400.00
3 1 M3 Pasang Kusen Pintu dan Jendela Kayu Borneo Super J-03 11,352,000.00
4 1 M2 Pasang Pintu Panel Kayu Kamper Samarinda J-04 1,015,200.00
5 1 M2 Pasang Pintu Panel Kayu Kamper Medan/Kruing J-05 887,430.00
6 1 M2 Pasang Daun Jendela Kaca Kayu Kamper Medan J-06 600,080.00
7 1 M2 Pasang Pintu dan Jendela Kaca Kayu Borneo J-07 719,440.00
8 1 M2 Pasang Pintu dan Jendela Jalusi Kayu Kamper Medan J-08 1,223,970.00
9 1 M2 Pasang Pintu Triplek Rangkap, Rangka Tertutup Kayu Kamper Medan/Kruing J-09 674,660.00
10 1 M2 Pasang Jalusi Mati Kusen kayu Kamper Medan J-10 861,940.00
11 1 M2 Pasang Daun Pintu Triplek Rangkap, Rangka Kayu Kamper J-11 674,660.00
12 1 M2 Pasang Daun Pintu Teakwood Rangkap, Rangka Kayu Kamper Medan J-12 757,640.00
13 1 M2 Pasang Pintu dobel Plywood lapis HPL, Rangka Kayu Kamper Medan J-13 907,790.00
14 1 M2 Pasang Pintu Teakwood lapis HPL , Rangka Kayu Kamper Medan J-14 1,055,540.00
15 1 M3 Pasang Konstruksi Kuda - Kuda Kayu Kamper Medan J-15 10,245,900.00
16 1 M3 Pasang Konstruksi Kuda - Kuda Kayu Borneo J-16 9,748,700.00
17 1 M2 Pasang Kaso dan Reng Genteng Plentong kayu Kamper Medan J-17 113,540.00
18 1 M2 Pasang Kaso dan Reng Genteng Beton kayu Kamper J-18 126,060.00
19 1 M' Pasang Lisplang (3x20) Cm, Kayu Kamper Medan J-19 100,920.00
20 1 M' Pasang Lisplang (3x30) Cm, Kayu Kamper Medan J-20 130,520.00
21 1 M' Pasang List Plafon - Kayu Profil 10 cm J-21 41,300.00
22 7,26 M2 Kusen Partisi Dobel Triplek J-22 211,560.00
23 1 M2 Pasang Rangka Langit - langit (1.00x1.00) m, Kayu Kamper J-23 162,040.00
24 1 M2 Pasang Rangka Langit - langit (0.50 x 1.00) m, Kayu Borneo J-24 188,170.00
25 1 M1 Reuter Kayu Kamper Medan J-25 78,640.00
26 1 M3 Gording kayu kelas II J-26 9,140,300.00
27 1 M2 Dinding bilik, rangka kayu borneo J-27 91,080.00
1 M2 Pasang Pintu Panel Multiplek 9 mm rangka kayu Kamper Medan / Kruing 862,050.00
M PEKERJAAN SANITASI
1 1 Buah Closet Jongkok Proselen Standar M-01 716,740.00
2 1 Buah Urinoir M-02 2,899,190.00
3 1 Buah Wastafel M-03 1,394,240.00
4 1 Buah Bak Mandi Fibreflass volume 0,30 M3 M-04 1,197,780.00
5 1 M' Saluran Air Limbah Buis beton d = 30 cm - 60 cm M-05 250,830.00
6 1 Buah Bak kontrol Pas. Bata Merah Uk (60 x 60) cm M-06 1,045,840.00
7 1 Buah Bak kontrol Pas. Bata Merah Uk (30 x 30) cm M-07 888,000.00
8 1 M¹ Pipa PVC Type AW Ø ½" M-08 34,610.00
9 1 M¹ Pipa PVC Type AW Ø 1" M-09 43,720.00
10 1 M¹ Pipa PVC Type AW Ø 1½" M-10 62,000.00
11 1 M¹ Pipa PVC Type AW Ø 2" M-11 66,000.00
1 M¹ Pipa PVC Type AW Ø 2½" 94,950.00
1 M¹ Pipa PVC Type AW Ø 3" 126,230.00
12 1 M¹ Pipa PVC Type AW Ø 4" M-12 184,960.00
13 1 M¹ Pipa PVC Type AW Ø ¾" M-13 39,870.00
14 1 Buah Bak Cuci Piring Stainles Steel M-14 500,000.00
15 1 Buah Kran Ø ½" atau ¾" M-15 46,510.00
1 buah kran kitchen sink toto 671,510.00
1 buah kran wastefel toto 321,510.00
16 1 Buah Floor Drain M-16 56,400.00
17 1 M' Grafel beton U 20 cm -60 cm M-17 103,850.00
18 1 M' Pasang Talang Plastik PVC U 15 cm (AW) M-18 190,300.00
19 1 M' Saluran Air Limbah Buis beton Ø 60 cm M-19 308,980.00
20 1 M' Pasang Talang Seng Datar M-20 142,500.00
21 1 Buah Closet Duduk M-21 2,760,150.00
1 unit jet shower 274,200.00
22 1 Buah Tangki Air fibreglass Volume 1 m3 M-22 2,282,590.00
23 1 Unit Septictank 2 x 1,50 x 1,50 M + Rembesannya M-23 13,430,010.00
24 1 Unit Septictank 1 x 1,50 x 1,50 M + Rembesannya M-24 7,124,900.00
1 unit pompa sible Pompa Zet Pump 250 W - Sanyo 5,850,380.00
1 M¹ Pipa Galvanis Ø ½" 63,490.00
1 M¹ Pipa Galvanis Ø ¾" 78,340.00
1 M¹ Pipa Galvanis Ø 1" 84,870.00
1 M¹ Pipa Galvanis Ø 1½" 135,520.00
1 M¹ Pipa Galvanis Ø 3" 304,620.00
1 M¹ Pipa Galvanis Ø 4" 321,760.00
KODE HARGA
No. URAIAN SATUAN
ANAL SATUAN
1 Buah Bak kontrol Pas. Batu Bata (45 x 45) cm, Tinggi 50 cm 587,190.00
1 M' Saluran Air Hujan Lbr. 20 cm 129,010.00
1 M' Perbaikan Saluran Air Hujan Lbr. 20 cm 59,440.00
N PEKERJAAN PENGECATAN
1 1 M2 Mengikis / Mengerok Permukaan Cat Tembok Lama N-01 24,970.00
2 1 M2 Mendempul dan Menggosok Kayu N-02 18,370.00
3 1 M2 Pengecatan Bidang Kayu dan Besi lama Setara Glotex N-03 42,970.00
1 M2 Pengecatan Bidang Kayu lama Setara Pinotex 44,100.00
4 1 M2 Pengecatan Bidang Kayu Baru Setara Glotex 3 X laburan N-04 62,410.00
1 M2 Pengecatan Bidang Kayu Baru Setara Sieve 2 X laburan 42,310.00
5 1 M2 Pelaburan Bidang Kayu dengan Politur N-05 79,330.00
6 1 M2 Pelaburan Bidang Kayu dengan Cat Residu dan Ter N-06 19,350.00
7 1 M2 Pengecatan Tembok Setara ICI Exterior (weather shield) N-07 56,690.00
8 1 M2 Pengecatan Tembok Lama Setara ICI Weather Shield N-08 41,090.00
9 1 M2 Pengecatan Plafond ( 3x ) setara ICI N-09 117,400.00
10 1 M2 Pengecatan Plafond ( 3x ) setara Vinilex N-10 104,400.00
1 M2 Pengecatan Plafond ( 2x ) setara Vinilex N-10r 69,830.00
11 1 M2 Pemasangan Wall Paper N-11 172,770.00
12 1 M2 Pengecatan Permukaan Baja dengan Meni Besi N-12 46,310.00
13 1 M2 Pengecatan Permukaan Baja dengan Meni Besi dan Perancah N-13 91,860.00
14 1 M2 Pengecatan Permukaan Baja Lapis seng (galbani) secara manual 1 lps cat 2 um N-14 36,870.00
15 1 M2 Pengecatan Tembok Baru Setara Vinilex (3 x laburan) N-15 59,030.00
1 M2 Pengecatan Tembok Setara Vinilex (2 x laburan) N-15r 40,010.00
16 1 M2 Pengecatan Tembok Lama Setara Vinilex 16 21,740.00
1 #REF!
2 #REF!
3 #REF!
4 #REF!
5 #REF!
6 #REF!
7 #REF!
8 #REF!
9 #REF!
JUMLAH #REF!
PPN 11 % #REF!
TOTAL HARGA #REF!
PEMBULATAN #REF!
TERBILANG : Dua ratus lima puluh tujuh juta tiga ratus enam puluh enam
ribu rupiah