RAB PAGAR PRECAST

1 Galian Pondasi m3 1 79,000 79,000


2 Urugan Kembali m3 1 58,500 58,500
3 Pasangan Batu Belah m3 0.5 729,673 364,837
4 Corsloof m3 0.12 2,300,000 276,000
5 Kolom Precast - t . 2,4 m m1 1 395,000 395,000
6 Panel Precast -t . 2,4 m m1 1 420,000 420,000
7 Cor siku penguat m3 0.01 2,300,000 23,000
8 Besi siku bh 1 95,000 95,000
9 Kawat duri m1 5 19,000 95,000
1,806,337

Vol Harga Jumlah


Jumlah RAB 1033.2 1,806,337 1,866,307,044
PPN + PPH (11%+2,5%) 251,951,451
2,118,258,495