Anda di halaman 1dari 1

RENOVASI MUSHOLLA

NO NAMA KEBUTUHAN VOLUME SATUAN HARGA VOLUME


KEBUTUHAN
1 PENGGANTIAN ATAP (DENGAN ATAP SPANDEK) 529 M2 245000/6M 21,600,833.33
2 PERABUNG SPANDEK 51 M1 34,000.00 1,734,000.00
3 SISIPAN KAYU 1 M3 2,500,000.00 2,500,000.00
4 TRIPLEK PLAFOND 441 M2 90000/LBR 13,333,109.38
5 CAT PLAFOND 441 M2 22,700.00 10,010,700.00
6 RANGKA BAJA 3X6 18 M2 217,000.00 3,906,000.00
7 TOWER AIR +TANKI 1 UNIT 5,000,000.00 5,000,000.00
TOTAL 58,084,642.71

Anda mungkin juga menyukai