DRAWING STANDARD (DS) C 1 LEAF SPRING 0101 INES DS C 0101 55% Prosess pengerjaan
2 COIL SPRING HOT COIL
0201 INES DS C 0102 Prosess pengerjaan Activity Plan
COLD COIL
MANUFACTURING (MN) D 1 LEAF SPRING SHEARING PROCESS 0101 INES MN D 0101 70% Tinggal Presentasi dan Approval
PUNCHING PROCESS 0102 INES MN D 0102 70% Tinggal Presentasi dan Approval
TRIMMING PROCESS 0103 INES MN D 0103 70% Tinggal Presentasi dan Approval
TAPER PROCESS 0105 INES MN D 0105 70% Tinggal Presentasi dan Approval
EYE FORMING PROCESS 0106 INES MN D 0106 60% Prosess pengerjaan Activity Plan
WRAPPER FORMING PROCESS 0107 INES MN D 0107 60% Prosess pengerjaan Activity Plan
2 COIL SPRING HOT COIL 0201 INES MN D 0201
COLD COIL
TECHNICAL REQUIREMENT (TR) 1 LEAF SPRING METALURGI, Grain Size & Residual Stress 1101 INES TR E 1101 70% Tinggal Presentasi dan Approval
1. MATERIAL EVALUATION
2 COIL SPRING METALURGI 1201 INES TR E 1201
HOT AND
COLD
1202 INES TR E 1202
RESIDUAL STRESS
3 STABILIZER METALURGI 1301 INES TR E 1301
BAR
RESIDUAL STRESS 1302 INES TR E 1302
2. PRODUCT EVALUATION 1 LEAF SPRING DURABILITY TEST 2101 INES TR E 2101 70% Tinggal Presentasi dan Approval
E SURFACE TREATMENT 2102 INES TR E 2102 60% Prosess pengerjaan Activity Plan
STRAIN GAUGE 2103 INES TR E 2103
PAINTING 2105 INES TR E 2105 60% Tinggal Presentasi dan Approval
2 COIL SPRING DURABILITY TEST 2201 INES TR E 2201
HOT AND
SURFACE TREATMENT 2202 INES TR E 2202 60% Prosess pengerjaan Activity Plan
COLD
STRAIN GAUGE 2203 INES TR E 2203
3 STABILIZER DURABILITY TEST 2301 INES TR E 2301
BAR
SURFACE TREATMENT 2302 INES TR E 2302 60% Prosess pengerjaan Activity Plan
STRAIN GAUGE 2303 INES TR E 2303
MATERIAL REQUIREMENT F 3 MATERIAL COLD DRAWN BAR 3201 INES MR F 3201 40% Prosess pengerjaan ( INES Baru belum masuk Activity Plant)