: WI-PRD-016
REVISION :0
DATE : 1-Nov-08
PAGE : 1 of 1
A
KAWAT LAS
120 90-120
A
20
18-20
I. PERSIAPAN KERJA
1. NYALAKAN MESIN DENGAN MENGGESER SWITCH POWER PADA POSISI " ON "
BIARKAN SELAMA 3 MENIT MESIN PANAS SEBELUM MESIN DIOPERASIKAN
2. BUKA TABUNG GAS CO2
KEMUDIAN SETTING TEKANAN GAS CO2 SESUAI DENGAN PART YANG DIPROSES. ( LIHAT SOP )
PERHATIKAN !
KETIKA MEMBUKA TABUNG GAS CO2 POSISI OPERATOR BERADA DISEBELAH KANAN /
BELAKANG REGULATOR DAN TABUNG GAS
3. SETTING AMPERE METER DAN VOLT METER YANG ADA DIREMOTE CONTROL SESUAI DENGAN
PART YANG DIPROSES. ( LIHAT SOP )
4. MESIN SIAP DIOPERASIKAN.