Anda di halaman 1dari 20

PEMERINTAH KABUPATEN BOJONEGORO

DINAS PERUMAHAN , KAWASAN PERMUKIMAN DAN CIPTA KARYA

JL.LETTU SUYETNO NO. 39 B

BOJONEGORO

DATA PENDUKUNG
MUTUALING CONTROL AWAL ( MC 0% )

NAMA PROGRAM : PROGRAM PENATAAN BANGUNAN GEDUNG

NAMA KEGIATAN : PENYELENGGARAAN BANGUNAN GEDUNG DI WILAYAH DAERAH KABUPATEN/KOTA PEMBERIAN IZIN MENDIRIKAN BANGUNAN (IMB) DAN
SERTIFIKAT LAIN FUNGSI BANGUNAN GEDUNG

JENIS PEKERJAAN : REHABILITASI GEDUNG KANTOR KELURAHAN LEDOK KULON (P-APBD)

SUMBER DANA : P - APBD TAHUN 2022

LOKASI : DESA LEDOK KULON KECAMATAN BOJONEGORO

KONTRAKTOR PELAKSANA

CV. DWI JAYA KENCANA


PEMERINTAH KABUPATEN BOJONEGORO
DINAS PERUMAHAN , KAWASAN PERMUKIMAN DAN CIPTA KARYA

JL.LETTU SUYETNO NO. 39 B

BOJONEGORO

DATA PENDUKUNG
MUTUALING CONTROL AKHIR ( MC100% )

NAMA PROGRAM : PROGRAM PENATAAN BANGUNAN GEDUNG

NAMA KEGIATAN : PENYELENGGARAAN BANGUNAN GEDUNG DI WILAYAH DAERAH KABUPATEN/KOTA PEMBERIAN IZIN MENDIRIKAN BANGUNAN (IMB) DAN
SERTIFIKAT LAIN FUNGSI BANGUNAN GEDUNG

JENIS PEKERJAAN : REHABILITASI GEDUNG KANTOR KELURAHAN LEDOK KULON (P-APBD)

SUMBER DANA : P - APBD TAHUN 2022

LOKASI : DESA LEDOK KULON KECAMATAN BOJONEGORO

KONTRAKTOR PELAKSANA

CV. DWI JAYA KENCANA


BERITA ACARA MUTUAL CHECK 0% (MC 0%)

PROGRAM : PROGRAM PENATAAN BANGUNAN GEDUNG


KEGIATAN : PENYELENGGARAAN BANGUNAN GEDUNG DI WILAYAH DAERAH KABUPATEN/KOTA PEMBERIAN IZIN MENDIRIKAN BANGUNAN (IMB) DAN SERTIFIKAT LAIN FUNGSI BANGUNAN GEDUNG

PEKERJAAN : REHABILITASI GEDUNG KANTOR KELURAHAN LEDOK KULON (P-APBD)


LOKASI : DESA LEDOK KULON KECAMATAN BOJONEGORO
NOMOR KONTRAK : 640/554/FPL.BTB/412.205/2022
TANGGAL : 24 November 2022

"Pada hari ini Kamis Tanggal 24 November Tahun 2022 , Telah diadakan perhitungan bersama di lokasi pekerjaan Mutual Check 0 % ( MC 0 %), yang dilaksanankan Oleh Kontraktor Pelaksana CV. DWI JAYA KENCANA , Konsultan Pengawas
CV. ERZA PUTRA CONSULTAN serta Direksi Kegiatan penyelenggaraan bangunan gedung di wilayah daerah Kabupaten/Kota pemberian izin mendirikan bangunan (IMB) dan sertifikat lain fungsi bangunan gedung Dinas Perumahan ,kawasan
permukiman dan cipta karya Kab.Bojonegoro.
Nomor SPK : 640/554/FPL.BTB/412.205/2022
Tanggal : 24 November 2022
Dengan Hasil Sebagai Berikut :
1. Dari hasil pengukuran dan pengecekan dilapangan Tidak perlu adanya penyesuaian pekerjaan sesuai kondisi di lapangan
2. Berdasarkan butir 1 (Satu) diatas setelah diadakan perhitungan ulang maka tidak perlu diadakan pekerjaan tambah kurang
3. Dari Butir 2 (Dua) Tidak perlu perhitungan ulang terhadap kwalitas maka tidak terjadi perubahan pekerjaan
dan secara keseluruhan besarnya nilai kontrak tetap.
4. Apabila perhitungan ulang terjadi selisih nilai kelebihan dari nilai kontrak, maka yang dibayarkan adalah nilai kontrak, dan rekanan tidak boleh
meminta nilai kelebihan tersebut.

Demikian berita acara Mutual Check 0 % ( MC 0 % ) ini dibuat untuk dapat digunakan sebagaimana perlunya.

Mengetahui : Mengetahui : Diperiksa Oleh : Dibuat Oleh :


PEJABAT PEMBUAT KOMITMEN (PPK) TIM MONITORING KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
DINAS PERUMAHAN , KAWASAN DINAS PERUMAHAN , KAWASAN CV. ERZA PUTRA CONSULTAN CV. DWI JAYA KENCANA
PERMUKIMAN DAN CIPTA KAYA PERMUKIMAN DAN CIPTA KAYA
KABUPATEN BOJONEGORO KABUPATEN BOJONEGORO

BENY KURNIAWAN, ST …........................... ANGGA ARDIANTO, ST ANDY ZULKARNAIN


Nip. 19840526 201101 1 012 NIP. …............................. Direktur Direktur
BERITA ACARA MUTUAL CHECK 100% (MC 100%)

PROGRAM : PROGRAM PENATAAN BANGUNAN GEDUNG


KEGIATAN : PENYELENGGARAAN BANGUNAN GEDUNG DI WILAYAH DAERAH KABUPATEN/KOTA PEMBERIAN IZIN MENDIRIKAN BANGUNAN (IMB) DAN SERTIFIKAT LAIN FUNGSI BANGUNAN GEDUNG

PEKERJAAN : REHABILITASI GEDUNG KANTOR KELURAHAN LEDOK KULON (P-APBD)


LOKASI : DESA LEDOK KULON KECAMATAN BOJONEGORO
NOMOR KONTRAK : 640/554/FPL.BTB/412.205/2022
TANGGAL : 24 November 2022

"Pada hari ini ........... Tanggal ...... Desember Tahun 2022 , Telah diadakan perhitungan bersama di lokasi pekerjaan Mutual Check 100 % ( MC 100 %), yang dilaksanankan Oleh Kontraktor Pelaksana CV. DWI JAYA KENCANA , Konsultan
Pengawas CV. ERZA PUTRA CONSULTAN serta Direksi Kegiatan penyelenggaraan bangunan gedung di wilayah daerah Kabupaten/Kota pemberian izin mendirikan bangunan (IMB) dan sertifikat lain fungsi bangunan gedung Dinas Perumahan
,kawasan permukiman dan cipta karya Kab.Bojonegoro.
Nomor SPK : 640/554/FPL.BTB/412.205/2022
Tanggal : 24 November 2022
Dengan Hasil Sebagai Berikut :
1. Dari hasil pengukuran dan pengecekan dilapangan tidak perlu adanya perubahan pada pekerjaan
2. Berdasarkan butir 1 (Satu) diatas setelah diadakan perhitungan ulang maka tidak perlu diadakan pekerjaan tambah kurang
3. Dari Butir 2 (Dua) diatas setelah diadakan perhitungan ulang terhadap kwalitas maka tidak terjadi perubahan pekerjaan
dan secara keseluruhan besarnya nilai kontrak tetap.
4. Apabila perhitungan ulang terjadi selisih nilai kelebihan dari nilai kontrak, maka yang dibayarkan adalah nilai kontrak, dan rekanan tidak boleh
meminta nilai kelebihan tersebut.

Demikian berita acara Mutual Check 100 % ( MC 100 % ) ini dibuat untuk dapat digunakan sebagaimana perlunya.

Mengetahui : Mengetahui : Diperiksa Oleh : Dibuat Oleh :


PEJABAT PEMBUAT KOMITMEN (PPK) TIM MONITORING KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
DINAS PERUMAHAN , KAWASAN DINAS PERUMAHAN , KAWASAN CV. ERZA PUTRA CONSULTAN CV. DWI JAYA KENCANA
PERMUKIMAN DAN CIPTA KAYA PERMUKIMAN DAN CIPTA KAYA
KABUPATEN BOJONEGORO KABUPATEN BOJONEGORO

BENY KURNIAWAN, ST …........................... ANGGA ARDIANTO, ST ANDY ZULKARNAIN


Nip. 19840526 201101 1 012 NIP. …............................. Direktur Direktur
DAFTAR HADIR MUTUAL CHECK 0% ( MC 0%)
ACARA : SITE MEETING
HARI/TANGGAL : 24 November 2022
TEMPAT : DESA LEDOK KULON KECAMATAN BOJONEGORO
KEGIATAN : PENYELENGGARAAN BANGUNAN GEDUNG DI WILAYAH DAERAH KABUPATEN/KOTA PEMBERIAN IZIN MENDIRIKAN BANGUNAN (IMB) DAN SERTIFIKAT LAIN FUNGSI BANGUNAN GEDUNG
PEKERJAAN : REHABILITASI GEDUNG KANTOR KELURAHAN LEDOK KULON (P-APBD)
LOKASI : DESA LEDOK KULON KECAMATAN BOJONEGORO
NOMOR KONTRAK 640/554/FPL.BTB/412.205/2022
TANGGAL : 24 November 2022

NO NAMA INSTANSI TANDA TANGAN KETERANGAN


1 2 3 4 5

1. IWAN MAULANA , ST.MM SELAKU PEJABAT PEMBUAT KOMITMEN (PPK) 1.


Nip. 19840526 201101 1 012 DINAS PERUMAHAN , KAWASAN PERMUKIMAN DAN CIPTA KARYA

2 …............................. SELAKU TIM MONITORING 2


NIP ….......................... DINAS PERUMAHAN , KAWASAN PERMUKIMAN DAN CIPTA KARYA

3 ANGGA ARDIANTO, ST DIREKTUR KONSULTAN PENGAWAS 3


CV. ERZA PUTRA CONSULTAN

4 ANDY ZULKARNAIN DIREKTUR KONTRAKTOR PELAKSANA 4


CV. DWI JAYA KENCANA

5 ….......................... PENGAWAS LAPANGAN 5


CV. ERZA PUTRA CONSULTAN

6 …...................... PELAKSANA LAPANGAN 6


CV. DWI JAYA KENCANA

Dibuat Oleh :
Kontraktor Pelaksana
CV. DWI JAYA KENCANA

ANDY ZULKARNAIN
Direktur
DAFTAR HADIR MUTUAL CHECK 100% ( MC 100%)

ACARA : SITE MEETING


HARI/TANGGAL : …..... Desember 2022
TEMPAT : DESA LEDOK KULON KECAMATAN BOJONEGORO
KEGIATAN : PENYELENGGARAAN BANGUNAN GEDUNG DI WILAYAH DAERAH KABUPATEN/KOTA PEMBERIAN IZIN MENDIRIKAN BANGUNAN (IMB) DAN SERTIFIKAT LAIN FUNGSI BANGUNAN GEDUNG
PEKERJAAN : REHABILITASI GEDUNG KANTOR KELURAHAN LEDOK KULON (P-APBD)
LOKASI : DESA LEDOK KULON KECAMATAN BOJONEGORO
NOMOR KONTRAK 640/554/FPL.BTB/412.205/2022
TANGGAL : 24 November 2022

NO NAMA INSTANSI TANDA TANGAN KETERANGAN


1 2 3 4 5

1. IWAN MAULANA , ST.MM SELAKU PEJABAT PEMBUAT KOMITMEN (PPK) 1.


Nip. 19840526 201101 1 012 DINAS PERUMAHAN , KAWASAN PERMUKIMAN DAN CIPTA KARYA

2 …............................. SELAKU TIM MONITORING 2.


NIP ….......................... DINAS PERUMAHAN , KAWASAN PERMUKIMAN DAN CIPTA KARYA

3 ANGGA ARDIANTO, ST DIREKTUR KONSULTAN PENGAWAS 3.


CV. ERZA PUTRA CONSULTAN

4 ANDY ZULKARNAIN DIREKTUR KONTRAKTOR PELAKSANA 4.


CV. DWI JAYA KENCANA

5 ….......................... PENGAWAS LAPANGAN 5.


CV. ERZA PUTRA CONSULTAN

6 …...................... PELAKSANA LAPANGAN 6.


CV. DWI JAYA KENCANA

Di buat oleh :
Kontraktor Pelaksana
CV. DWI JAYA KENCANA

ANDY ZULKARNAIN
Direktur
MUTUAL CONTROL 0% ( MC 0%)
PROGRAM : PROGRAM PENATAAN BANGUNAN GEDUNG
KEGIATAN : PENYELENGGARAAN BANGUNAN GEDUNG DI WILAYAH DAERAH KABUPATEN/KOTA PEMBERIAN IZIN MENDIRIKAN BANGUNAN (IMB) DAN SERTIFIKAT LAIN FUNGSI
BANGUNAN GEDUNG
PEKERJAAN : REHABILITASI GEDUNG KANTOR KELURAHAN LEDOK KULON (P-APBD)
LOKASI : DESA LEDOK KULON KECAMATAN BOJONEGORO
TAHUN ANGGARAN : P-APBD TAHUN 2022

SESUAI KONTRAK ( SPK ) SESUAI MC NOL ( MC 0% ) PEKERJAAN TAMBAH PEKERJAAN KURANG

NO URAIAN PEKERJAAN SAT. BOBOT ( BOBOT ( %


VOL. HARGA SATUAN JUMLAH HARGA VOL. HARGA SATUAN JUMLAH HARGA VOL. HARGA SATUAN JUMLAH HARGA VOL. HARGA SATUAN JUMLAH HARGA
%) )

I PEKERJAAN PERSIAPAN
1 Pekerjaan Persiapan & Pembongkaran Pagar Lama Paket 1,00 Rp 2.215.000,00 Rp 2.215.000,00 1,231 1,00 Rp 2.215.000,000 Rp 2.215.000,000 1,231
2 Pengukuran dan Pasang Bouwplank Paket 1,00 Rp 500.000,00 Rp 500.000,00 0,278 1,00 Rp 500.000,000 Rp 500.000,000 0,278
3 Baya Penerapan SMK3
- Alat Pelindung Kerja (APK) dan Alat Pelindung Diri (APD) Paket 1,00 Rp 820.000,00 Rp 820.000,00 0,456 1,00 Rp 820.000,000 Rp 820.000,000 0,456
- Rambu dan Perlengkapan lalu lintas Paket 1,00 Rp 200.000,00 Rp 200.000,00 0,111 1,00 Rp 200.000,000 Rp 200.000,000 0,111
- Fasilitas sarana, prasarana, dan alat kesehatan Paket 1,00 Rp 671.800,00 Rp 671.800,00 0,373 1,00 Rp 671.800,000 Rp 671.800,000 0,373
TOTAL BIAYA PEKERJAAN PERSIAPAN Rp 4.406.800,00 2,449 Rp 4.406.800,000 2,449
II PEKERJAAN TANAH
1 Bor stroust Ø25cm - 300cm m1 34,00 Rp 32.900,00 Rp 1.118.600,00 0,622 34,00 Rp 32.900,000 Rp 1.118.600,000 0,622
2 Galian Tanah m3 21,56 Rp 71.600,00 Rp 1.543.696,00 0,858 21,56 Rp 71.600,000 Rp 1.543.696,000 0,858
3 Urugan Tanah Kembali m3 12,94 Rp 47.000,00 Rp 608.180,00 0,338 12,94 Rp 47.000,000 Rp 608.180,000 0,338
4 Urugan Pudel m3 25,65 Rp 172.000,00 Rp 4.411.800,00 2,452 25,65 Rp 172.000,000 Rp 4.411.800,000 2,452
5 Urugan Pasir m3 7,91 Rp 284.900,00 Rp 2.253.559,00 1,252 7,91 Rp 284.900,000 Rp 2.253.559,000 1,252
TOTAL BIAYA PEKERJAAN TANAH Rp 9.935.835,00 5,522 Rp 9.935.835,000 5,522
III PEKERJAAN BETON
1 Stroust Ø25-200 cm K150 m3 1,67 Rp 1.151.500,00 Rp 1.923.005,00 1,069 1,67 Rp 1.151.500,000 Rp 1.923.005,000 1,069
2 Poer 25/70/70 (P1) K225 m3 2,09 Rp 1.248.200,00 Rp 2.608.738,00 1,450 2,09 Rp 1.248.200,000 Rp 2.608.738,000 1,450
3 Sloof 20/30 (S1) K225 m3 2,94 Rp 1.248.200,00 Rp 3.669.708,00 2,039 2,94 Rp 1.248.200,000 Rp 3.669.708,000 2,039
4 Sloof 15/20 (S2) K225 m3 0,52 Rp 1.248.200,00 Rp 649.064,00 0,361 0,52 Rp 1.248.200,000 Rp 649.064,000 0,361
5 Kolom 15/25 (K1) K.225 m3 2,12 Rp 1.248.200,00 Rp 2.646.184,00 1,471 2,12 Rp 1.248.200,000 Rp 2.646.184,000 1,471
6 Kolom 20/20 (K2) K.225 m3 0,94 Rp 1.248.200,00 Rp 1.173.308,00 0,652 0,94 Rp 1.248.200,000 Rp 1.173.308,000 0,652
7 Ring Balk 15/20 (RB1) K.225 m3 1,10 Rp 1.248.200,00 Rp 1.373.020,00 0,763 1,10 Rp 1.248.200,000 Rp 1.373.020,000 0,763
8 Balok Latei 15/15 (BL1) K.225 m3 0,82 Rp 1.248.200,00 Rp 1.023.524,00 0,569 0,82 Rp 1.248.200,000 Rp 1.023.524,000 0,569
9 Balok Gantung 15/25 (BG1) K.225 m3 0,74 Rp 1.248.200,00 Rp 923.668,00 0,513 0,74 Rp 1.248.200,000 Rp 923.668,000 0,513
10 Kuda - Kuda 15/25 K.225 m3 1,06 Rp 1.248.200,00 Rp 1.323.092,00 0,735 1,06 Rp 1.248.200,000 Rp 1.323.092,000 0,735
11 Kuda - Kuda 15/20 K.225 m3 0,30 Rp 1.248.200,00 Rp 374.460,00 0,208 0,30 Rp 1.248.200,000 Rp 374.460,000 0,208
12 Gewel 15/25 K.225 m3 0,71 Rp 1.248.200,00 Rp 886.222,00 0,493 0,71 Rp 1.248.200,000 Rp 886.222,000 0,493
13 Gewel 15/20 K.225 m3 0,20 Rp 1.248.200,00 Rp 249.640,00 0,139 0,20 Rp 1.248.200,000 Rp 249.640,000 0,139
14 Lantai Kerja K100 m3 1,60 Rp 1.078.100,00 Rp 1.724.960,00 0,959 1,60 Rp 1.078.100,000 Rp 1.724.960,000 0,959
TOTAL BIAYA PEKERJAAN BETON Rp 20.548.593,00 11,420 Rp 20.548.593,00 11,420
IV PEKERJAAN PEMBESIAN
1 Stroust Ø25-200 cm K150 kg 128,53 Rp 15.900,00 Rp 2.043.627,00 1,136 128,53 Rp 15.900,000 Rp 2.043.627,000 1,136
2 Poer 25/70/70 (P1) K225 kg 154,55 Rp 15.900,00 Rp 2.457.345,00 1,366 154,55 Rp 15.900,000 Rp 2.457.345,000 1,366
3 Sloof 20/30 (S1) K225 kg 220,44 Rp 15.900,00 Rp 3.504.996,00 1,948 220,44 Rp 15.900,000 Rp 3.504.996,000 1,948
4 Sloof 15/20 (S2) K225 kg 102,19 Rp 15.900,00 Rp 1.624.821,00 0,903 102,19 Rp 15.900,000 Rp 1.624.821,000 0,903
5 Kolom 15/25 (K1) K.225 kg 369,61 Rp 15.900,00 Rp 5.876.799,00 3,266 369,61 Rp 15.900,000 Rp 5.876.799,000 3,266
6 Kolom 20/20 (K2) K.225 kg 115,02 Rp 15.900,00 Rp 1.828.818,00 1,016 115,02 Rp 15.900,000 Rp 1.828.818,000 1,016
7 Ring Balk 15/20 (RB1) K.225 kg 168,38 Rp 15.900,00 Rp 2.677.242,00 1,488 168,38 Rp 15.900,000 Rp 2.677.242,000 1,488
8 Balok Latei 15/15 (BL1) K.225 kg 141,93 Rp 15.900,00 Rp 2.256.687,00 1,254 141,93 Rp 15.900,000 Rp 2.256.687,000 1,254
9 Balok Gantung 15/25 (BG1) K.225 kg 180,34 Rp 15.900,00 Rp 2.867.406,00 1,594 180,34 Rp 15.900,000 Rp 2.867.406,000 1,594
10 Kuda - Kuda 15/25 K.225 kg 183,81 Rp 15.900,00 Rp 2.922.579,00 1,624 183,81 Rp 15.900,000 Rp 2.922.579,000 1,624
11 Kuda - Kuda 15/20 K.225 kg 46,37 Rp 15.900,00 Rp 737.283,00 0,410 46,37 Rp 15.900,000 Rp 737.283,000 0,410
12 Gewel 15/25 K.225 kg 140,89 Rp 15.900,00 Rp 2.240.151,00 1,245 140,89 Rp 15.900,000 Rp 2.240.151,000 1,245
13 Gewel 15/20 K.225 kg 39,10 Rp 15.900,00 Rp 621.690,00 0,346 39,10 Rp 15.900,000 Rp 621.690,000 0,346
TOTAL BIAYA PEKERJAAN PEMBESIAN Rp 31.659.444,00 17,595 Rp 31.659.444,00 17,595
V PEKERJAAN BEGESTING
1 Poer 25/70/70 (P1) K225 m2 11,90 Rp 73.700,00 Rp 877.030,00 0,487 11,90 Rp 73.700,000 Rp 877.030,000 0,487
2 Sloof 20/30 (S1) K225 m2 29,34 Rp 79.600,00 Rp 2.335.464,00 1,298 29,34 Rp 79.600,000 Rp 2.335.464,000 1,298
3 Sloof 15/20 (S2) K225 m2 6,84 Rp 79.600,00 Rp 544.464,00 0,303 6,84 Rp 79.600,000 Rp 544.464,000 0,303
4 Kolom 15/25 (K1) K.225 m2 45,12 Rp 87.500,00 Rp 3.948.000,00 2,194 45,12 Rp 87.500,000 Rp 3.948.000,000 2,194
5 Kolom 20/20 (K2) K.225 m2 18,80 Rp 87.500,00 Rp 1.645.000,00 0,914 18,80 Rp 87.500,000 Rp 1.645.000,000 0,914
6 Ring Balk 15/20 (RB1) K.225 m2 14,56 Rp 79.600,00 Rp 1.158.976,00 0,644 14,56 Rp 79.600,000 Rp 1.158.976,000 0,644
7 Balok Latei 15/15 (BL1) K.225 m2 10,92 Rp 79.600,00 Rp 869.232,00 0,483 10,92 Rp 79.600,000 Rp 869.232,000 0,483
8 Balok Gantung 15/25 (BG1) K.225 m2 23,66 Rp 93.000,00 Rp 2.200.380,00 1,223 23,66 Rp 93.000,000 Rp 2.200.380,000 1,223
9 Kuda - Kuda 15/25 K.225 m2 18,30 Rp 93.000,00 Rp 1.701.900,00 0,946 18,30 Rp 93.000,000 Rp 1.701.900,000 0,946
10 Kuda - Kuda 15/20 K.225 m2 6,44 Rp 93.000,00 Rp 598.920,00 0,333 6,44 Rp 93.000,000 Rp 598.920,000 0,333
11 Gewel 15/25 K.225 m2 12,20 Rp 93.000,00 Rp 1.134.600,00 0,631 12,20 Rp 93.000,000 Rp 1.134.600,000 0,631
12 Gewel 15/20 K.225 m2 4,29 Rp 93.000,00 Rp 398.970,00 0,222 4,29 Rp 93.000,000 Rp 398.970,000 0,222
TOTAL BIAYA PEKERJAAN PERSIAPAN Rp 17.412.936,00 9,677 Rp 17.412.936,000 9,677
VI PEKERJAAN PASANGAN
1 Pasangan Pondasi Batu Belah m2 14,19 Rp 979.000,00 Rp 13.892.010,00 7,720 14,19 Rp 979.000,000 Rp 13.892.010,000 7,720
2 Pasangan Dinding Bata Merah ½ Batu Bata (Campuran 1SP : 3PP). m2 14,45 Rp 137.200,00 Rp 1.982.540,00 1,102 14,45 Rp 137.200,000 Rp 1.982.540,000 1,102
3 Pasangan Dinding Bata Merah ½ Batu Bata (Campuran 1SP : 5PP). m2 47,49 Rp 130.800,00 Rp 6.211.692,00 3,452 47,49 Rp 130.800,000 Rp 6.211.692,000 3,452
4 Plesteran 1SP : 3PP tebal 15 mm m2 28,90 Rp 62.600,00 Rp 1.809.140,00 1,005 28,90 Rp 62.600,000 Rp 1.809.140,000 1,005
5 Plesteran 1SP : 5PP tebal 15 mm m2 87,08 Rp 59.100,00 Rp 5.146.428,00 2,860 87,08 Rp 59.100,000 Rp 5.146.428,000 2,860
6 Acian + Benangan Semen Instan m2 115,97 Rp 33.400,00 Rp 3.873.398,00 2,153 115,97 Rp 33.400,000 Rp 3.873.398,000 2,153
TOTAL BIAYA PEKERJAAN PASANGAN Rp 32.915.208,00 18,293 Rp 32.915.208,000 18,293
VII PEKERJAAN PASANGAN LANTAI
1 Pekerjaan Rabat Lantai t.5cm m3 3,69 Rp 1.078.100,00 Rp 3.978.189,00 2,211 3,69 Rp 1.078.100,000 Rp 3.978.189,000 2,211
TOTAL BIAYA PEKERJAAN PASANGAN LANTAI Rp 3.978.189,00 2,211 Rp 3.978.189,000 2,211
VIII PEKERJAAN ATAP
1 Pasangan Gording Kanal C 125.50.20.2,3 kg 400,00 Rp 29.655,00 Rp 11.862.000,00 6,592 400,00 Rp 29.655,000 Rp 11.862.000,000 6,592
2 Pasang Trekstang Ø 7,6 - 125 cm kg 41,76 Rp 15.900,00 Rp 663.984,00 0,369 41,76 Rp 15.900,000 Rp 663.984,000 0,369
3 Pasangan Rangka Atap Reng dan Usuk Galvalum m2 117,25 Rp 92.923,00 Rp 10.895.221,75 6,055 117,25 Rp 92.923,000 Rp 10.895.221,750 6,055
4 Pasangan Genteng Kodok m2 70,76 Rp 83.967,00 Rp 5.941.504,92 3,302 70,76 Rp 83.967,000 Rp 5.941.504,920 3,302
5 Pasangan kembali Genteng Kodok Lama m2 46,50 Rp 21.467,00 Rp 998.215,50 0,555 46,50 Rp 21.467,000 Rp 998.215,500 0,555
6 Pasangan Bubung Genteng Kodok m1 12,50 Rp 116.513,00 Rp 1.456.412,50 0,809 12,50 Rp 116.513,000 Rp 1.456.412,500 0,809
7 Pasang Kalsiplank+Papan kompres lebar 30cm m1 25,00 Rp 54.839,00 Rp 1.370.975,00 0,762 25,00 Rp 54.839,000 Rp 1.370.975,000 0,762
TOTAL BIAYA PEKERJAAN ATAP Rp 33.188.313,67 18,444 Rp 33.188.313,670 18,444
IX PEKERJAAN PLAFOND
1 Pasangan Plafond Kalsiboard 3,5mm m2 53,68 Rp 38.100,00 Rp 2.045.208,00 1,137 53,68 Rp 38.100,000 Rp 2.045.208,000 1,137
2 Pasangan Rangka Besi Hollow Galvanis 40.40 mm, Modul 60 x 60 cm, untuk Plafon m2 53,68 Rp 161.100,00 Rp 8.647.848,00 4,806 53,68 Rp 161.100,000 Rp 8.647.848,000 4,806
3 Pasangan List Plafond m1 33,20 Rp 15.400,00 Rp 511.280,00 0,284 33,20 Rp 15.400,000 Rp 511.280,000 0,284
TOTAL BIAYA PEKERJAAN PLAFOND Rp 11.204.336,00 6,227 Rp 11.204.336,000 6,227
X PEKERJAAN PINTU DAN JENDELA
1 Perbaikan Pintu PJ1 (Lama) bh 1,00 Rp 400.000,00 Rp 400.000,00 0,222 1,00 Rp 400.000,000 Rp 400.000,000 0,222
2 Perbaikan Pintu P1 (Lama) bh 1,00 Rp 100.000,00 Rp 100.000,00 0,056 1,00 Rp 100.000,000 Rp 100.000,000 0,056
3 Perbaikan Jendela J1 (Lama) bh 1,00 Rp 100.000,00 Rp 100.000,00 0,056 1,00 Rp 100.000,000 Rp 100.000,000 0,056
4 Pasangan Jendela J2 (Baru) bh 2,00 Rp 1.500.000,00 Rp 3.000.000,00 1,667 2,00 Rp 1.500.000,000 Rp 3.000.000,000 1,667
5 Pasangan BV (baru) bh 4,00 Rp 800.000,00 Rp 3.200.000,00 1,778 4,00 Rp 800.000,000 Rp 3.200.000,000 1,778
TOTAL BIAYAPEKERJAAN PINTU DAN JENDELA Rp 6.800.000,00 3,779 Rp 6.800.000,000 3,779
XI PEKERJAAN LISTRIK
1 Pemasangan 1 buah MCCB set 1,00 Rp 419.800,00 Rp 419.800,00 0,233 1,00 Rp 419.800,000 Rp 419.800,000 0,233
2 Pemasangan 1 Buah Titik Lampu titik 6,00 Rp 385.600,00 Rp 2.313.600,00 1,286 6,00 Rp 385.600,000 Rp 2.313.600,000 1,286
3 Stop Kontak bh 4,00 Rp 30.000,00 Rp 120.000,00 0,067 4,00 Rp 30.000,000 Rp 120.000,000 0,067
4 Lampu LED 18 Watt bh 6,00 Rp 100.000,00 Rp 600.000,00 0,333 6,00 Rp 100.000,000 Rp 600.000,000 0,333
TOTAL BIAYA PEKERJAAN LISTRIK Rp 3.453.400,00 1,919 Rp 3.453.400,000 1,919
XII PEKERJAAN PENGECATAN
1 Pekerjaan Pengecatan Interior m2 52,89 Rp 24.367,00 Rp 1.288.770,63 0,716 52,89 Rp 24.367,000 Rp 1.288.770,630 0,716
2 Pekerjaan Pengecatan exterior m2 57,99 Rp 54.247,00 Rp 3.145.783,53 1,748 57,99 Rp 54.247,000 Rp 3.145.783,530 1,748
TOTAL BIAYA PEKERJAAN PENGECATAN Rp 4.434.554,16 2,464 Rp 4.434.554,16 2,464
JUMLAH HARGA Rp 179.937.608,83 JUMLAH HARGA Rp 179.937.608,83 JUMLAH HARGA 0,00 JUMLAH HARGA 0,00
PPn 11% Rp 19.793.136,97 100,00 PPn 11% Rp 19.793.136,97 100,00 PPn 11% 0,00 PPn 11% 0,00
TOTAL Rp 199.730.745,80 TOTAL Rp 199.730.745,80 TOTAL 0,00 TOTAL 0,00
DIBULATKAN Rp 199.730.000,00 DIBULATKAN Rp 199.730.000,00 DIBULATKAN 0,00 DIBULATKAN 0,00
# SELISIH MUTUAL CONTROL AWAL ( MC 0 % ) DENGAN KONTRAK AWAL ( SPK ) = TERBILANG :

Mengetahui, Diperiksa / Disetujui, Dibuat oleh :


PEJABAT PEMBUAT KOMITMEN (PPK) KONSULTAN KOTRAKTOR
DINAS PERUMAHAN ,KAWASAN PERMUKIMAN PENGAWAS PELAKSANA
DAN CIPTA KARYA CV. ERZA PUTRA CONSULTAN CV. DWI JAYA KENCANA

BENY KURNIAWAN, ST ANGGA ARDIANTO, ST ANDY ZULKARNAIN


Nip. 19840526 201101 1 012 Direktur Direktur
BACK UP MC 0%

NAMA PEKERJAAN : REHABILITASI GEDUNG KANTOR KELURAHAN LEDOK KULON (P-APBD)


LOKASI : DESA LEDOK KULON KECAMATAN BOJONEGORO

DATA PERHITUNGAN VOLUME


NO JENIS PEKERJAAN
A Pjg Lbr Tinggi Jml ls Volume 1 Volume 2 Sat
I PEKERJAAN PENDAHULUAN
1 Pengukuran dan pembersihan lokasi pekerjaan 6,000 6,000 m1
2 Pasang Bouwplank 6,000 2,000 12,000 m1

II PEKERJAAN TANAH DAN URUGAN A/ Luasan Pjg Lbr Tinggi Jml Volume 1 Volume 2 Sat
1 Galian Stroust Stroust 2,000 17,000 1,000 34,000 34,000 m1

2 Galian Tanah Pondasi 35,200 0,650 0,447 1,000 10,223 16,470 m3


Poer 0,700 0,700 0,750 17,000 6,248

3 Urugan Pudel Pondasi 6,300 12,500 0,670 1,000 52,763 39,123 m3


Kurang Pondasi 13,640

4 Urugan Pasir Bawah pondasi Poer 0,700 0,700 0,100 17,000 0,833 7,909 m3
Lantai 1 12,200 4,500 0,100 5,490
Lantai 2 12,200 1,300 0,100 1,586

III PEKERJAAN BETON A Pjg Lbr Tinggi/ h Jml Volume 1 Volume 2 Sat
1 Stroust Ø25-200 cm K150 0,049 2,000 17,000 1,668 m3
2 Poer 25/70/70 (P1) K225 0,700 0,700 0,250 17,000 2,083 2,083 m3
3 Sloof 20/30 (S1) K225 48,900 0,200 0,300 2,934 2,154 m3
Berkurang 13,000 0,200 0,300 0,780

4 Sloof 15/20 (S2) K225 17,100 0,150 0,200 1,000 0,513 0,513 m3

5 Kolom 15/25 (K1) K.225 0,150 0,250 4,700 12,000 2,115 2,115 m3

6 Kolom 20/20 (K2) K.225 0,200 0,200 4,700 5,000 0,940 0,940 m3

7 Ring Balk 15/20 (RB1) K.225 36,400 0,150 0,200 1,092 m3

8 Balok Latei 15/15 (BL1) K.225 36,400 0,150 0,150 0,819 m3

9 Balok Gantung 15/25 (BG1) K.225 19,700 0,150 0,250 0,739 m3

10 Kuda - Kuda 15/25 K.225 9,380 0,150 0,250 3,000 1,055 m3

11 Kuda - Kuda 15/20 K.225 3,300 0,150 0,200 3,000 0,297 m3

12 Gewel 15/25 K.225 9,380 0,150 0,250 2,000 0,704 m3

13 Gewel 15/20 K.225 3,300 0,150 0,200 2,000 0,198 m3

10 Lantai Kerja K100 Poer 0,700 0,700 0,050 17,000 0,417 1,297 m3
Pondasi 35,200 0,500 0,050 0,880

IV PEKERJAAN PEMBESIAN A Pjg bgl/tul Tinggi Jm Tul/ Bgl kg/m1 Jml Volume 1 Volume 2 Sat

Keterangan Besi / Koefisien Besi


6 = 5.7 5,6 = 0,193 kg/m'
8 = 7.6 7,6 = 0,356 kg/m'
10 = 9.6 9,6 = 0,568 kg/m'
12 = 11.6 11,6 = 0,830 kg/m'

1 Stroust Ø25-200 cm K150 Tulangan 5 Ø 9,6 2,000 5,000 0,568 17,000 96,588
Begel Ø 5.7-150 0,678 14,333 0,193 17,000 31,940 128,528 kg

2 Poer 25/70/70 (P1) K225 Tulangan 5 Ø 9,6 1,600 5,000 0,568 17,000 77,271
Tulangan 5 Ø 9,6 1,600 5,000 0,568 17,000 77,271 154,541 kg

3 Sloof 20/30 (S1) K225 Tulangan 4 Ø 9,6 35,900 6,000 0,568 122,383
Begel Ø 5.7-150 0,850 240,333 0,193 39,495 161,878 kg

4 Sloof 15/20 (S2) K225 Tulangan 4 Ø 9,6 17,100 4,000 0,568 2,000 77,725
Begel Ø 5.7-150 0,550 115,000 0,193 2,000 24,457 102,182 kg

5 Kolom 15/25 (K1) K.225 Tulangan 4 Ø 11,6 4,700 6,000 0,830 12,000 280,724
Begel Ø 7.6-150 0,650 32,000 0,356 12,000 88,880 369,604 kg

6 Kolom 20/20 (K2) K.225 Tulangan 4 Ø 11,6 4,700 4,000 0,830 5,000 77,979
Begel Ø 7.6-150 0,650 32,000 0,356 5,000 37,033 115,012 kg

7 Ring Balk 15/20 (RB1) K.225 Tulangan 4 Ø 11,6 36,400 4,000 0,830 120,784
Begel Ø 7.6-150 0,550 243,000 0,356 47,591 168,376 kg
DATA PERHITUNGAN VOLUME
NO JENIS PEKERJAAN
A Pjg Lbr Tinggi Jml ls Volume 1 Volume 2 Sat
8 Balok Latei 15/15 (BL1) K.225 Tulangan 4 Ø 9,6 36,400 4,000 0,830 120,784
Begel Ø 5.6-150 0,450 243,000 0,193 21,141 141,925 kg

9 Balok Gantung 15/25 (BG1) K.225 Tulangan 4 Ø 11,6 19,700 6,000 0,568 67,157
Begel Ø 7,6-150 0,650 132,000 0,356 30,553 97,710 kg

10 Kuda - Kuda 15/25 K.225 Tulangan 4 Ø 11,6 9,380 6,000 0,830 3,000 140,063
Begel Ø 7.6-150 0,650 63,000 0,356 3,000 43,746 183,809 kg

11 Kuda - Kuda 15/20 K.225 Tulangan 4 Ø 11,6 3,300 4,000 0,830 3,000 32,851
Begel Ø 7.6-150 0,550 23,000 0,356 3,000 13,514 46,364 kg

12 Gewel 15/25 K.225 Tulangan 4 Ø 11,6 9,380 6,000 0,830 2,000 93,376
Begel Ø 7.6-150 1,050 63,533 0,356 2,000 47,510 140,885 kg

13 Gewel 15/20 K.225 Tulangan 4 Ø 11,6 3,300 4,000 0,830 2,000 21,900
Begel Ø 7.6-150 1,050 23,000 0,356 2,000 17,199 39,100 kg

V PEKERJAAN BEGESTING A Pjg Lbr Tinggi Jml sisi jml titik Volume Sat

1 Poer 25/70/70 (P1) K225 0,700 0,250 4,000 17,000 11,900 m2

2 Sloof 20/30 (S1) K225 35,900 0,300 2,000 21,540 m2

3 Sloof 15/20 (S2) K225 17,100 0,200 2,000 6,840 m2

4 Kolom 15/25 (K1) K.225 0,150 0,250 4,700 2,000 12,000 45,120 m2

5 Kolom 20/20 (K2) K.225 0,200 0,200 4,700 2,000 5,000 18,800 m2

6 Ring Balk 15/20 (RB1) K.225 36,400 0,200 2,000 14,560 m2

7 Balok Latei 15/15 (BL1) K.225 36,400 0,150 2,000 10,920 m2

8 Balok Gantung 15/25 (BG1) K.225 19,700 0,650 1,000 12,805 m2

9 Kuda - Kuda 15/25 K.225 9,380 0,650 3,000 18,291 m2

10 Kuda - Kuda 15/20 K.225 3,300 0,650 3,000 6,435 m2

11 Gewel 15/25 K.225 9,380 0,650 2,000 12,194 m2

12 Gewel 15/20 K.225 3,300 0,650 2,000 4,290 m2

VI PEKERJAAN PASANGAN DAN PLESTERAN A Pjg Lbr Tinggi Jml titik ls Volume 1 Volume 2 Sat

1 Pondasi Batu Belah Bagian 1 35,200 0,500 0,350 1,000 6,160 13,640 m3
Bagian 2 35,200 0,350 0,500 1,000 6,160
Bagian 3 35,200 0,075 0,500 1,000 1,320

2 Pasang Bata 1 dinding 19,040 0,700 1,000 13,328 11,648 m2


Kurang P1 1,500 0,700 1,000 1,050
P2 0,900 0,700 1,000 0,630

3 Pasang Bata 2 dinding 19,040 2,450 1,000 46,648 37,687 m2


dinding 1,500 9,000 0,950 1,000 8,550
Gewel 3,950 2,000 7,900
Kurang P1 pintu 1,500 1,970 1,000 2,955
jendela 0,600 1,950 2,000 2,340
P2 0,900 1,970 1,000 1,773
J1 1,250 1,950 1,000 2,438
J2 2,500 1,950 2,000 9,750
bv 1 2,700 0,570 4,000 6,156

2 Pasang Bata 1 dinding 23,040 0,700 1,000 2,000 32,256 28,896 m2


Kurang P1 1,500 0,700 1,000 2,000 2,100
P2 0,900 0,700 1,000 2,000 1,260

3 Pasang Bata 2 dinding 23,040 2,450 1,000 2,000 112,896 94,973 m2


dinding 1,500 9,000 0,950 1,000 2,000 17,100
Gewel 3,950 2,000 2,000 15,800
Kurang P1 pintu 1,500 1,970 1,000 2,000 5,910
jendela 0,600 1,950 2,000 2,000 4,680
P2 0,900 1,970 1,000 2,000 3,546
J1 1,250 1,950 1,000 2,000 4,875
J2 2,500 1,950 2,000 2,000 19,500
bv 1 2,700 0,570 4,000 2,000 12,312

VI PEKERJAAN LANTAI A Pjg Lbr Tinggi Jml titik ls Volume 1 Volume 2 Sat

1 Pekerjaan Rabat Lantai t.5cm Bagian 1 4,500 12,200 0,050 2,745 3,683 m2
DATA PERHITUNGAN VOLUME
NO JENIS PEKERJAAN
A Pjg Lbr Tinggi Jml ls Volume 1 Volume 2 Sat
Bagian 2 1,500 12,500 0,050 0,938
DATA PERHITUNGAN VOLUME
NO JENIS PEKERJAAN
A Pjg Lbr Tinggi Jml ls Volume 1 Volume 2 Sat
VI PEKERJAAN ATAP A Pjg Lbr Tinggi Jml titik ls Volume 1 Volume 2 Sat

1 Pasangan Gording Kanal C 125.50.20.2,3 12,500 10,000 3,200 400,000 400,000 kg

2 Pasang Trekstang Ø 7,6 - 125 cm 12,500 9,380 0,356 41,752 41,752 kg

3 Pasangan Rangka Atap Reng dan Usuk Galvalum 9,380 12,500 117,250 117,250 m2

4 Pasangan Genteng Kodok 9,380 12,500 1,000 117,250 70,756 m2


genteng lama 70% 7,380 9,000 0,700 46,494

5 Pasangan Bubung Genteng Kodok 12,500 1,000 12,500 12,500 m1

6 Pasang Kalsiplank+Papan kompres lebar 30cm 12,500 2,000 25,000 25,000 m1

VI PEKERJAAN PLAFOND A Pjg Lbr Tinggi Jml titik ls Volume 1 Volume 2 Sat

1 Pasangan Plafond Kalsiboard 3,5mm dalam 4,000 12,700 50,800 82,550 m2


luar 2,500 12,700 31,750

2 Pasangan Rangka Besi Hollow Galvanis 40.40 mm, Modul 60 x 60 cm, untuk Plafon 4,000 12,700 50,800 82,550 m2
2,500 12,700 31,750

3 Pasangan List Plafond dalam 4,000 12,700 33,400 115,800 m1


luar 1 1,500 12,700 28,400
luar 2 0,800 12,700 2,000 54,000
JADWAL PELAKSANAAN MC 0 %
PROGRAM : PROGRAM
: PENATAAN BANGUNAN GEDUNG
KEGIATAN : PENYELENGGARAAN
: BANGUNAN GEDUNG DI WILAYAH DAERAH KABUPATEN/KOTA PEMBERIAN IZIN MENDIRIKAN BANGUNAN (IMB) DAN SERTIFIKAT LAIN FUNGSI BANGUNAN GEDUNG
PEKERJAAN : REHABILITASI
: GEDUNG KANTOR KELURAHAN LEDOK KULON (P-APBD)
LOKASI : DESA
: LEDOK KULON KECAMATAN BOJONEGORO

JANGKA WAKTU PELAKSANAAN 35 HARI KERJA

NO URAIAN PEKERJAAN BOBOT% B0B0T%


MINGGU/PERIODE KE -

1 2 3 4 5

I PEKERJAAN PERSIAPAN 2,449 0,490 0,490 0,490 0,490 0,490 100%


II PEKERJAAN TANAH 5,522 1,841 1,841 1,841
III PEKERJAAN BETON 11,420 3,807 3,807 3,807
IV PEKERJAAN PEMBESIAN 17,595 4,399 4,399 4,399 4,399
V PEKERJAAN BEGESTING 9,677 2,419 2,419 2,419 2,419
VI PEKERJAAN PEKERJAAN BEGESTING 18,293 4,573 4,573 4,573 4,573
VII PEKERJAAN PASANGAN LANTAI 2,211 2,211 50%
VIII PEKERJAAN ATAP 18,444 9,222 9,222
IX PEKERJAAN PLAFOND 6,227 6,227
X PEKERJAAN PINTU DAN JENDELA 3,779 3,779
XI PEKERJAAN LISTRIK 1,919 1,919
XII PEKERJAAN PENGECATAN 2,464 2,464 0%

TOTAL : 100,000
RENCANA 13,722 17,528 30,529 31,137 7,084
RENCANA KOMULATIF - 13,722 31,250 61,779 92,916 100,000
REALISASI -
CEPAT -
LAMBAT -

Mengetahui, Diperiksa / Disetujui, Dibuat oleh :


PEJABAT PEMBUAT KOMITMEN (PPK) KONSULTAN KOTRAKTOR
DINAS PERUMAHAN ,KAWASAN PERMUKIMAN PENGAWAS PELAKSANA
DAN CIPTA KARYA CV. ERZA PUTRA CONSULTAN CV. DWI JAYA KENCANA

BENY KURNIAWAN, ST ANGGA ARDIANTO, ST ANDY ZULKARNAIN


Nip. 19840526 201101 1 012 Direktur Direktur
MUTUAL CONTROL 100 % ( M C 100 % )
PROGRAM : PROGRAM PENATAAN BANGUNAN GEDUNG
KEGIATAN : PENYELENGGARAAN BANGUNAN GEDUNG DI WILAYAH DAERAH KABUPATEN/KOTA PEMBERIAN IZIN MENDIRIKAN BANGUNAN (IMB) DAN SERTIFIKAT LAIN FUNGSI
BANGUNAN GEDUNG
PEKERJAAN : REHABILITASI GEDUNG KANTOR KELURAHAN LEDOK KULON (P-APBD)
LOKASI : DESA LEDOK KULON KECAMATAN BOJONEGORO
TAHUN ANGGARAN : P-APBD TAHUN 2022

SESUAI MC NOL ( MC 0% ) SESUAI MC NOL ( MC 100% ) PEKERJAAN TAMBAH PEKERJAAN KURANG

NO URAIAN PEKERJAAN SAT. BOBOT ( BOBOT ( %


VOL. HARGA SATUAN JUMLAH HARGA VOL. HARGA SATUAN JUMLAH HARGA VOL. HARGA SATUAN JUMLAH HARGA VOL. HARGA SATUAN JUMLAH HARGA
%) )

I PEKERJAAN PERSIAPAN
1 Pekerjaan Persiapan & Pembongkaran Pagar Lama Paket 1,00 Rp 2.215.000,00 Rp 2.215.000,00 1,231 1,00 Rp 2.215.000,000 Rp 2.215.000,000 1,231
2 Pengukuran dan Pasang Bouwplank Paket 1,00 Rp 500.000,00 Rp 500.000,00 0,278 1,00 Rp 500.000,000 Rp 500.000,000 0,278
3 Baya Penerapan SMK3
- Alat Pelindung Kerja (APK) dan Alat Pelindung Diri (APD) Paket 1,00 Rp 820.000,00 Rp 820.000,00 0,456 1,00 Rp 820.000,000 Rp 820.000,000 0,456
- Rambu dan Perlengkapan lalu lintas Paket 1,00 Rp 200.000,00 Rp 200.000,00 0,111 1,00 Rp 200.000,000 Rp 200.000,000 0,111
- Fasilitas sarana, prasarana, dan alat kesehatan Paket 1,00 Rp 671.800,00 Rp 671.800,00 0,373 1,00 Rp 671.800,000 Rp 671.800,000 0,373
TOTAL BIAYA PEKERJAAN PERSIAPAN Rp 4.406.800,00 2,449 Rp 4.406.800,000 2,449
II PEKERJAAN TANAH
1 Bor stroust Ø25cm - 300cm m1 34,00 Rp 32.900,00 Rp 1.118.600,00 0,622 34,00 Rp 32.900,000 Rp 1.118.600,000 0,622
2 Galian Tanah m3 21,56 Rp 71.600,00 Rp 1.543.696,00 0,858 21,56 Rp 71.600,000 Rp 1.543.696,000 0,858
3 Urugan Tanah Kembali m3 12,94 Rp 47.000,00 Rp 608.180,00 0,338 12,94 Rp 47.000,000 Rp 608.180,000 0,338
4 Urugan Pudel m3 25,65 Rp 172.000,00 Rp 4.411.800,00 2,452 25,65 Rp 172.000,000 Rp 4.411.800,000 2,452
5 Urugan Pasir m3 7,91 Rp 284.900,00 Rp 2.253.559,00 1,252 7,91 Rp 284.900,000 Rp 2.253.559,000 1,252
TOTAL BIAYA PEKERJAAN TANAH Rp 9.935.835,00 5,522 Rp 9.935.835,000 5,522
III PEKERJAAN BETON
1 Stroust Ø25-200 cm K150 m3 1,67 Rp 1.151.500,00 Rp 1.923.005,00 1,069 1,67 Rp 1.151.500,000 Rp 1.923.005,000 1,069
2 Poer 25/70/70 (P1) K225 m3 2,09 Rp 1.248.200,00 Rp 2.608.738,00 1,450 2,09 Rp 1.248.200,000 Rp 2.608.738,000 1,450
3 Sloof 20/30 (S1) K225 m3 2,94 Rp 1.248.200,00 Rp 3.669.708,00 2,039 2,94 Rp 1.248.200,000 Rp 3.669.708,000 2,039
4 Sloof 15/20 (S2) K225 m3 0,52 Rp 1.248.200,00 Rp 649.064,00 0,361 0,52 Rp 1.248.200,000 Rp 649.064,000 0,361
5 Kolom 15/25 (K1) K.225 m3 2,12 Rp 1.248.200,00 Rp 2.646.184,00 1,471 2,12 Rp 1.248.200,000 Rp 2.646.184,000 1,471
6 Kolom 20/20 (K2) K.225 m3 0,94 Rp 1.248.200,00 Rp 1.173.308,00 0,652 0,94 Rp 1.248.200,000 Rp 1.173.308,000 0,652
7 Ring Balk 15/20 (RB1) K.225 m3 1,10 Rp 1.248.200,00 Rp 1.373.020,00 0,763 1,10 Rp 1.248.200,000 Rp 1.373.020,000 0,763
8 Balok Latei 15/15 (BL1) K.225 m3 0,82 Rp 1.248.200,00 Rp 1.023.524,00 0,569 0,82 Rp 1.248.200,000 Rp 1.023.524,000 0,569
9 Balok Gantung 15/25 (BG1) K.225 m3 0,74 Rp 1.248.200,00 Rp 923.668,00 0,513 0,74 Rp 1.248.200,000 Rp 923.668,000 0,513
10 Kuda - Kuda 15/25 K.225 m3 1,06 Rp 1.248.200,00 Rp 1.323.092,00 0,735 1,06 Rp 1.248.200,000 Rp 1.323.092,000 0,735
11 Kuda - Kuda 15/20 K.225 m3 0,30 Rp 1.248.200,00 Rp 374.460,00 0,208 0,30 Rp 1.248.200,000 Rp 374.460,000 0,208
12 Gewel 15/25 K.225 m3 0,71 Rp 1.248.200,00 Rp 886.222,00 0,493 0,71 Rp 1.248.200,000 Rp 886.222,000 0,493
13 Gewel 15/20 K.225 m3 0,20 Rp 1.248.200,00 Rp 249.640,00 0,139 0,20 Rp 1.248.200,000 Rp 249.640,000 0,139
14 Lantai Kerja K100 m3 1,60 Rp 1.078.100,00 Rp 1.724.960,00 0,959 1,60 Rp 1.078.100,000 Rp 1.724.960,000 0,959
TOTAL BIAYA PEKERJAAN BETON Rp 20.548.593,00 11,420 Rp 20.548.593,00 11,420
IV PEKERJAAN PEMBESIAN
1 Stroust Ø25-200 cm K150 kg 128,53 Rp 15.900,00 Rp 2.043.627,00 1,136 128,53 Rp 15.900,000 Rp 2.043.627,000 1,136
2 Poer 25/70/70 (P1) K225 kg 154,55 Rp 15.900,00 Rp 2.457.345,00 1,366 154,55 Rp 15.900,000 Rp 2.457.345,000 1,366
3 Sloof 20/30 (S1) K225 kg 220,44 Rp 15.900,00 Rp 3.504.996,00 1,948 220,44 Rp 15.900,000 Rp 3.504.996,000 1,948
4 Sloof 15/20 (S2) K225 kg 102,19 Rp 15.900,00 Rp 1.624.821,00 0,903 102,19 Rp 15.900,000 Rp 1.624.821,000 0,903
5 Kolom 15/25 (K1) K.225 kg 369,61 Rp 15.900,00 Rp 5.876.799,00 3,266 369,61 Rp 15.900,000 Rp 5.876.799,000 3,266
6 Kolom 20/20 (K2) K.225 kg 115,02 Rp 15.900,00 Rp 1.828.818,00 1,016 115,02 Rp 15.900,000 Rp 1.828.818,000 1,016
7 Ring Balk 15/20 (RB1) K.225 kg 168,38 Rp 15.900,00 Rp 2.677.242,00 1,488 168,38 Rp 15.900,000 Rp 2.677.242,000 1,488
8 Balok Latei 15/15 (BL1) K.225 kg 141,93 Rp 15.900,00 Rp 2.256.687,00 1,254 141,93 Rp 15.900,000 Rp 2.256.687,000 1,254
9 Balok Gantung 15/25 (BG1) K.225 kg 180,34 Rp 15.900,00 Rp 2.867.406,00 1,594 180,34 Rp 15.900,000 Rp 2.867.406,000 1,594
10 Kuda - Kuda 15/25 K.225 kg 183,81 Rp 15.900,00 Rp 2.922.579,00 1,624 183,81 Rp 15.900,000 Rp 2.922.579,000 1,624
11 Kuda - Kuda 15/20 K.225 kg 46,37 Rp 15.900,00 Rp 737.283,00 0,410 46,37 Rp 15.900,000 Rp 737.283,000 0,410
12 Gewel 15/25 K.225 kg 140,89 Rp 15.900,00 Rp 2.240.151,00 1,245 140,89 Rp 15.900,000 Rp 2.240.151,000 1,245
13 Gewel 15/20 K.225 kg 39,10 Rp 15.900,00 Rp 621.690,00 0,346 39,10 Rp 15.900,000 Rp 621.690,000 0,346
TOTAL BIAYA PEKERJAAN PEMBESIAN Rp 31.659.444,00 17,595 Rp 31.659.444,00 17,595
V PEKERJAAN BEGESTING
1 Poer 25/70/70 (P1) K225 m2 11,90 Rp 73.700,00 Rp 877.030,00 0,487 11,90 Rp 73.700,000 Rp 877.030,000 0,487
2 Sloof 20/30 (S1) K225 m2 29,34 Rp 79.600,00 Rp 2.335.464,00 1,298 29,34 Rp 79.600,000 Rp 2.335.464,000 1,298
3 Sloof 15/20 (S2) K225 m2 6,84 Rp 79.600,00 Rp 544.464,00 0,303 6,84 Rp 79.600,000 Rp 544.464,000 0,303
4 Kolom 15/25 (K1) K.225 m2 45,12 Rp 87.500,00 Rp 3.948.000,00 2,194 45,12 Rp 87.500,000 Rp 3.948.000,000 2,194
5 Kolom 20/20 (K2) K.225 m2 18,80 Rp 87.500,00 Rp 1.645.000,00 0,914 18,80 Rp 87.500,000 Rp 1.645.000,000 0,914
6 Ring Balk 15/20 (RB1) K.225 m2 14,56 Rp 79.600,00 Rp 1.158.976,00 0,644 14,56 Rp 79.600,000 Rp 1.158.976,000 0,644
7 Balok Latei 15/15 (BL1) K.225 m2 10,92 Rp 79.600,00 Rp 869.232,00 0,483 10,92 Rp 79.600,000 Rp 869.232,000 0,483
8 Balok Gantung 15/25 (BG1) K.225 m2 23,66 Rp 93.000,00 Rp 2.200.380,00 1,223 23,66 Rp 93.000,000 Rp 2.200.380,000 1,223
9 Kuda - Kuda 15/25 K.225 m2 18,30 Rp 93.000,00 Rp 1.701.900,00 0,946 18,30 Rp 93.000,000 Rp 1.701.900,000 0,946
10 Kuda - Kuda 15/20 K.225 m2 6,44 Rp 93.000,00 Rp 598.920,00 0,333 6,44 Rp 93.000,000 Rp 598.920,000 0,333
11 Gewel 15/25 K.225 m2 12,20 Rp 93.000,00 Rp 1.134.600,00 0,631 12,20 Rp 93.000,000 Rp 1.134.600,000 0,631
12 Gewel 15/20 K.225 m2 4,29 Rp 93.000,00 Rp 398.970,00 0,222 4,29 Rp 93.000,000 Rp 398.970,000 0,222
TOTAL BIAYA PEKERJAAN PERSIAPAN Rp 17.412.936,00 9,677 Rp 17.412.936,000 9,677
VI PEKERJAAN PEKERJAAN BEGESTING
1 Pasangan Pondasi Batu Belah m2 14,19 Rp 979.000,00 Rp 13.892.010,00 7,720 14,19 Rp 979.000,000 Rp 13.892.010,000 7,720
2 Pasangan Dinding Bata Merah ½ Batu Bata (Campuran 1SP : 3PP). m2 14,45 Rp 137.200,00 Rp 1.982.540,00 1,102 14,45 Rp 137.200,000 Rp 1.982.540,000 1,102
3 Pasangan Dinding Bata Merah ½ Batu Bata (Campuran 1SP : 5PP). m2 47,49 Rp 130.800,00 Rp 6.211.692,00 3,452 47,49 Rp 130.800,000 Rp 6.211.692,000 3,452
4 Plesteran 1SP : 3PP tebal 15 mm m2 28,90 Rp 62.600,00 Rp 1.809.140,00 1,005 28,90 Rp 62.600,000 Rp 1.809.140,000 1,005
5 Plesteran 1SP : 5PP tebal 15 mm m2 87,08 Rp 59.100,00 Rp 5.146.428,00 2,860 87,08 Rp 59.100,000 Rp 5.146.428,000 2,860
6 Acian + Benangan Semen Instan m2 115,97 Rp 33.400,00 Rp 3.873.398,00 2,153 115,97 Rp 33.400,000 Rp 3.873.398,000 2,153
TOTAL BIAYA PEKERJAAN PERSIAPAN Rp 32.915.208,00 18,293 Rp 32.915.208,000 18,293
VII PEKERJAAN PASANGAN LANTAI
1 Pekerjaan Rabat Lantai t.5cm m3 3,69 Rp 1.078.100,00 Rp 3.978.189,00 2,211 3,69 Rp 1.078.100,000 Rp 3.978.189,000 2,211
TOTAL BIAYA PEKERJAAN PASANGAN LANTAI Rp 3.978.189,00 2,211 Rp 3.978.189,000 2,211
VIII PEKERJAAN ATAP
1 Pasangan Gording Kanal C 125.50.20.2,3 kg 400,00 Rp 29.655,00 Rp 11.862.000,00 6,592 400,00 Rp 29.655,000 Rp 11.862.000,000 6,592
2 Pasang Trekstang Ø 7,6 - 125 cm kg 41,76 Rp 15.900,00 Rp 663.984,00 0,369 41,76 Rp 15.900,000 Rp 663.984,000 0,369
3 Pasangan Rangka Atap Reng dan Usuk Galvalum m2 117,25 Rp 92.923,00 Rp 10.895.221,75 6,055 117,25 Rp 92.923,000 Rp 10.895.221,750 6,055
4 Pasangan Genteng Kodok m2 70,76 Rp 83.967,00 Rp 5.941.504,92 3,302 70,76 Rp 83.967,000 Rp 5.941.504,920 3,302
5 Pasangan kembali Genteng Kodok Lama m2 46,50 Rp 21.467,00 Rp 998.215,50 0,555 46,50 Rp 21.467,000 Rp 998.215,500 0,555
6 Pasangan Bubung Genteng Kodok m1 12,50 Rp 116.513,00 Rp 1.456.412,50 0,809 12,50 Rp 116.513,000 Rp 1.456.412,500 0,809
7 Pasang Kalsiplank+Papan kompres lebar 30cm m1 25,00 Rp 54.839,00 Rp 1.370.975,00 0,762 25,00 Rp 54.839,000 Rp 1.370.975,000 0,762
TOTAL BIAYA PEKERJAAN ATAP Rp 33.188.313,67 18,444 Rp 33.188.313,670 18,444
IX PEKERJAAN PLAFOND
1 Pasangan Plafond Kalsiboard 3,5mm m2 53,68 Rp 38.100,00 Rp 2.045.208,00 1,137 53,68 Rp 38.100,000 Rp 2.045.208,000 1,137
2 Pasangan Rangka Besi Hollow Galvanis 40.40 mm, Modul 60 x 60 cm, untuk Plafon m2 53,68 Rp 161.100,00 Rp 8.647.848,00 4,806 53,68 Rp 161.100,000 Rp 8.647.848,000 4,806
3 Pasangan List Plafond m1 33,20 Rp 15.400,00 Rp 511.280,00 0,284 33,20 Rp 15.400,000 Rp 511.280,000 0,284
TOTAL BIAYA PEKERJAAN PLAFOND Rp 11.204.336,00 6,227 Rp 11.204.336,000 6,227
X PEKERJAAN PINTU DAN JENDELA
1 Perbaikan Pintu PJ1 (Lama) bh 1,00 Rp 400.000,00 Rp 400.000,00 0,222 1,00 Rp 400.000,000 Rp 400.000,000 0,222
2 Perbaikan Pintu P1 (Lama) bh 1,00 Rp 100.000,00 Rp 100.000,00 0,056 1,00 Rp 100.000,000 Rp 100.000,000 0,056
3 Perbaikan Jendela J1 (Lama) bh 1,00 Rp 100.000,00 Rp 100.000,00 0,056 1,00 Rp 100.000,000 Rp 100.000,000 0,056
4 Pasangan Jendela J2 (Baru) bh 2,00 Rp 1.500.000,00 Rp 3.000.000,00 1,667 2,00 Rp 1.500.000,000 Rp 3.000.000,000 1,667
5 Pasangan BV (baru) bh 4,00 Rp 800.000,00 Rp 3.200.000,00 1,778 4,00 Rp 800.000,000 Rp 3.200.000,000 1,778
TOTAL BIAYAPEKERJAAN PINTU DAN JENDELA Rp 6.800.000,00 3,779 Rp 6.800.000,000 3,779
XI PEKERJAAN LISTRIK
1 Pemasangan 1 buah MCCB set 1,00 Rp 419.800,00 Rp 419.800,00 0,233 1,00 Rp 419.800,000 Rp 419.800,000 0,233
2 Pemasangan 1 Buah Titik Lampu titik 6,00 Rp 385.600,00 Rp 2.313.600,00 1,286 6,00 Rp 385.600,000 Rp 2.313.600,000 1,286
3 Stop Kontak bh 4,00 Rp 30.000,00 Rp 120.000,00 0,067 4,00 Rp 30.000,000 Rp 120.000,000 0,067
4 Lampu LED 18 Watt bh 6,00 Rp 100.000,00 Rp 600.000,00 0,333 6,00 Rp 100.000,000 Rp 600.000,000 0,333
TOTAL BIAYA PEKERJAAN PERSIAPAN Rp 3.453.400,00 1,919 Rp 3.453.400,000 1,919
XII PEKERJAAN PENGECATAN
1 Pekerjaan Pengecatan Interior m2 52,89 Rp 24.367,00 Rp 1.288.770,63 0,716 52,89 Rp 24.367,000 Rp 1.288.770,630 0,716
2 Pekerjaan Pengecatan exterior m2 57,99 Rp 54.247,00 Rp 3.145.783,53 1,748 57,99 Rp 54.247,000 Rp 3.145.783,530 1,748
TOTAL BIAYA PEKERJAAN PENGECATAN Rp 4.434.554,16 2,464 Rp 4.434.554,16 2,464
JUMLAH HARGA Rp 179.937.608,83 JUMLAH HARGA Rp 179.937.608,83 JUMLAH HARGA 0,00 JUMLAH HARGA 0,00
PPn 11% Rp 19.793.136,97 100,00 PPn 11% Rp 19.793.136,97 100,00 PPn 11% 0,00 PPn 11% 0,00
TOTAL Rp 199.730.745,80 TOTAL Rp 199.730.745,80 TOTAL 0,00 TOTAL 0,00
DIBULATKAN Rp 199.730.000,00 DIBULATKAN Rp 199.730.000,00 DIBULATKAN 0,00 DIBULATKAN 0,00
# SELISIH MUTUAL CONTROL AWAL ( MC 0 % ) DENGAN KONTRAK AWAL ( SPK ) = TERBILANG :

Mengetahui, Diperiksa / Disetujui, Dibuat oleh :


PEJABAT PEMBUAT KOMITMEN (PPK) KONSULTAN KOTRAKTOR
DINAS PERUMAHAN ,KAWASAN PERMUKIMAN PENGAWAS PELAKSANA
DAN CIPTA KARYA CV. ERZA PUTRA CONSULTAN CV. DWI JAYA KENCANA

BENY KURNIAWAN, ST ANGGA ARDIANTO, ST ANDY ZULKARNAIN


Nip. 19840526 201101 1 012 Direktur Direktur
BACK UP MC 0%

NAMA PEKERJAAN : REHABILITASI GEDUNG KANTOR KELURAHAN LEDOK KULON (P-APBD)


LOKASI : DESA LEDOK KULON KECAMATAN BOJONEGORO

DATA PERHITUNGAN VOLUME


NO JENIS PEKERJAAN
A Pjg Lbr Tinggi Jml ls Volume 1 Volume 2 Sat
I PEKERJAAN PENDAHULUAN
1 Pengukuran dan pembersihan lokasi pekerjaan 6,000 6,000 m1
2 Pasang Bouwplank 6,000 2,000 12,000 m1

II PEKERJAAN TANAH DAN URUGAN A/ Luasan Pjg Lbr Tinggi Jml Volume 1 Volume 2 Sat
1 Galian Stroust Stroust 2,000 17,000 1,000 34,000 34,000 m1

2 Galian Tanah Pondasi 35,200 0,650 0,447 1,000 10,223 16,470 m3


Poer 0,700 0,700 0,750 17,000 6,248

3 Urugan Pudel Pondasi 6,300 12,500 0,670 1,000 52,763 39,123 m3


Kurang Pondasi 13,640

4 Urugan Pasir Bawah pondasi Poer 0,700 0,700 0,100 17,000 0,833 7,909 m3
Lantai 1 12,200 4,500 0,100 5,490
Lantai 2 12,200 1,300 0,100 1,586

III PEKERJAAN BETON A Pjg Lbr Tinggi/ h Jml Volume 1 Volume 2 Sat
1 Stroust Ø25-200 cm K150 0,049 2,000 17,000 1,668 m3
2 Poer 25/70/70 (P1) K225 0,700 0,700 0,250 17,000 2,083 2,083 m3
3 Sloof 20/30 (S1) K225 48,900 0,200 0,300 2,934 2,154 m3
Berkurang 13,000 0,200 0,300 0,780

4 Sloof 15/20 (S2) K225 17,100 0,150 0,200 1,000 0,513 0,513 m3

5 Kolom 15/25 (K1) K.225 0,150 0,250 4,700 12,000 2,115 2,115 m3

6 Kolom 20/20 (K2) K.225 0,200 0,200 4,700 5,000 0,940 0,940 m3

7 Ring Balk 15/20 (RB1) K.225 36,400 0,150 0,200 1,092 m3

8 Balok Latei 15/15 (BL1) K.225 36,400 0,150 0,150 0,819 m3

9 Balok Gantung 15/25 (BG1) K.225 19,700 0,150 0,250 0,739 m3

10 Kuda - Kuda 15/25 K.225 9,380 0,150 0,250 3,000 1,055 m3

11 Kuda - Kuda 15/20 K.225 3,300 0,150 0,200 3,000 0,297 m3

12 Gewel 15/25 K.225 9,380 0,150 0,250 2,000 0,704 m3

13 Gewel 15/20 K.225 3,300 0,150 0,200 2,000 0,198 m3

10 Lantai Kerja K100 Poer 0,700 0,700 0,050 17,000 0,417 1,297 m3
Pondasi 35,200 0,500 0,050 0,880

IV PEKERJAAN PEMBESIAN A Pjg bgl/tul Tinggi Jm Tul/ Bgl kg/m1 Jml Volume 1 Volume 2 Sat

Keterangan Besi / Koefisien Besi


6 = 5.7 5,6 = 0,193 kg/m'
8 = 7.6 7,6 = 0,356 kg/m'
10 = 9.6 9,6 = 0,568 kg/m'
12 = 11.6 11,6 = 0,830 kg/m'

1 Stroust Ø25-200 cm K150 Tulangan 5 Ø 9,6 2,000 5,000 0,568 17,000 96,588
Begel Ø 5.7-150 0,678 14,333 0,193 17,000 31,940 128,528 kg

2 Poer 25/70/70 (P1) K225 Tulangan 5 Ø 9,6 1,600 5,000 0,568 17,000 77,271
Tulangan 5 Ø 9,6 1,600 5,000 0,568 17,000 77,271 154,541 kg

3 Sloof 20/30 (S1) K225 Tulangan 4 Ø 9,6 35,900 6,000 0,568 122,383
Begel Ø 5.7-150 0,850 240,333 0,193 39,495 161,878 kg

4 Sloof 15/20 (S2) K225 Tulangan 4 Ø 9,6 17,100 4,000 0,568 2,000 77,725
Begel Ø 5.7-150 0,550 115,000 0,193 2,000 24,457 102,182 kg

5 Kolom 15/25 (K1) K.225 Tulangan 4 Ø 11,6 4,700 6,000 0,830 12,000 280,724
Begel Ø 7.6-150 0,650 32,000 0,356 12,000 88,880 369,604 kg

6 Kolom 20/20 (K2) K.225 Tulangan 4 Ø 11,6 4,700 4,000 0,830 5,000 77,979
Begel Ø 7.6-150 0,650 32,000 0,356 5,000 37,033 115,012 kg

7 Ring Balk 15/20 (RB1) K.225 Tulangan 4 Ø 11,6 36,400 4,000 0,830 120,784
Begel Ø 7.6-150 0,550 243,000 0,356 47,591 168,376 kg
DATA PERHITUNGAN VOLUME
NO JENIS PEKERJAAN
A Pjg Lbr Tinggi Jml ls Volume 1 Volume 2 Sat
8 Balok Latei 15/15 (BL1) K.225 Tulangan 4 Ø 9,6 36,400 4,000 0,830 120,784
Begel Ø 5.6-150 0,450 243,000 0,193 21,141 141,925 kg

9 Balok Gantung 15/25 (BG1) K.225 Tulangan 4 Ø 11,6 19,700 6,000 0,568 67,157
Begel Ø 7,6-150 0,650 132,000 0,356 30,553 97,710 kg

10 Kuda - Kuda 15/25 K.225 Tulangan 4 Ø 11,6 9,380 6,000 0,830 3,000 140,063
Begel Ø 7.6-150 0,650 63,000 0,356 3,000 43,746 183,809 kg

11 Kuda - Kuda 15/20 K.225 Tulangan 4 Ø 11,6 3,300 4,000 0,830 3,000 32,851
Begel Ø 7.6-150 0,550 23,000 0,356 3,000 13,514 46,364 kg

12 Gewel 15/25 K.225 Tulangan 4 Ø 11,6 9,380 6,000 0,830 2,000 93,376
Begel Ø 7.6-150 1,050 63,533 0,356 2,000 47,510 140,885 kg

13 Gewel 15/20 K.225 Tulangan 4 Ø 11,6 3,300 4,000 0,830 2,000 21,900
Begel Ø 7.6-150 1,050 23,000 0,356 2,000 17,199 39,100 kg

V PEKERJAAN BEGESTING A Pjg Lbr Tinggi Jml sisi jml titik Volume Sat

1 Poer 25/70/70 (P1) K225 0,700 0,250 4,000 17,000 11,900 m2

2 Sloof 20/30 (S1) K225 35,900 0,300 2,000 21,540 m2

3 Sloof 15/20 (S2) K225 17,100 0,200 2,000 6,840 m2

4 Kolom 15/25 (K1) K.225 0,150 0,250 4,700 2,000 12,000 45,120 m2

5 Kolom 20/20 (K2) K.225 0,200 0,200 4,700 2,000 5,000 18,800 m2

6 Ring Balk 15/20 (RB1) K.225 36,400 0,200 2,000 14,560 m2

7 Balok Latei 15/15 (BL1) K.225 36,400 0,150 2,000 10,920 m2

8 Balok Gantung 15/25 (BG1) K.225 19,700 0,650 1,000 12,805 m2

9 Kuda - Kuda 15/25 K.225 9,380 0,650 3,000 18,291 m2

10 Kuda - Kuda 15/20 K.225 3,300 0,650 3,000 6,435 m2

11 Gewel 15/25 K.225 9,380 0,650 2,000 12,194 m2

12 Gewel 15/20 K.225 3,300 0,650 2,000 4,290 m2

VI PEKERJAAN PASANGAN DAN PLESTERAN A Pjg Lbr Tinggi Jml titik ls Volume 1 Volume 2 Sat

1 Pondasi Batu Belah Bagian 1 35,200 0,500 0,350 1,000 6,160 13,640 m3
Bagian 2 35,200 0,350 0,500 1,000 6,160
Bagian 3 35,200 0,075 0,500 1,000 1,320

2 Pasang Bata 1 dinding 19,040 0,700 1,000 13,328 11,648 m2


Kurang P1 1,500 0,700 1,000 1,050
P2 0,900 0,700 1,000 0,630

3 Pasang Bata 2 dinding 19,040 2,450 1,000 46,648 37,687 m2


dinding 1,500 9,000 0,950 1,000 8,550
Gewel 3,950 2,000 7,900
Kurang P1 pintu 1,500 1,970 1,000 2,955
jendela 0,600 1,950 2,000 2,340
P2 0,900 1,970 1,000 1,773
J1 1,250 1,950 1,000 2,438
J2 2,500 1,950 2,000 9,750
bv 1 2,700 0,570 4,000 6,156

2 Pasang Bata 1 dinding 23,040 0,700 1,000 2,000 32,256 28,896 m2


Kurang P1 1,500 0,700 1,000 2,000 2,100
P2 0,900 0,700 1,000 2,000 1,260

3 Pasang Bata 2 dinding 23,040 2,450 1,000 2,000 112,896 94,973 m2


dinding 1,500 9,000 0,950 1,000 2,000 17,100
Gewel 3,950 2,000 2,000 15,800
Kurang P1 pintu 1,500 1,970 1,000 2,000 5,910
jendela 0,600 1,950 2,000 2,000 4,680
P2 0,900 1,970 1,000 2,000 3,546
J1 1,250 1,950 1,000 2,000 4,875
J2 2,500 1,950 2,000 2,000 19,500
bv 1 2,700 0,570 4,000 2,000 12,312

VI PEKERJAAN LANTAI A Pjg Lbr Tinggi Jml titik ls Volume 1 Volume 2 Sat

1 Pekerjaan Rabat Lantai t.5cm Bagian 1 4,500 12,200 0,050 2,745 3,683 m2
DATA PERHITUNGAN VOLUME
NO JENIS PEKERJAAN
A Pjg Lbr Tinggi Jml ls Volume 1 Volume 2 Sat
Bagian 2 1,500 12,500 0,050 0,938
DATA PERHITUNGAN VOLUME
NO JENIS PEKERJAAN
A Pjg Lbr Tinggi Jml ls Volume 1 Volume 2 Sat
VI PEKERJAAN ATAP A Pjg Lbr Tinggi Jml titik ls Volume 1 Volume 2 Sat

1 Pasangan Gording Kanal C 125.50.20.2,3 12,500 10,000 3,200 400,000 400,000 kg

2 Pasang Trekstang Ø 7,6 - 125 cm 12,500 9,380 0,356 41,752 41,752 kg

3 Pasangan Rangka Atap Reng dan Usuk Galvalum 9,380 12,500 117,250 117,250 m2

4 Pasangan Genteng Kodok 9,380 12,500 1,000 117,250 70,756 m2


genteng lama 70% 7,380 9,000 0,700 46,494

5 Pasangan Bubung Genteng Kodok 12,500 1,000 12,500 12,500 m1

6 Pasang Kalsiplank+Papan kompres lebar 30cm 12,500 2,000 25,000 25,000 m1

VI PEKERJAAN PLAFOND A Pjg Lbr Tinggi Jml titik ls Volume 1 Volume 2 Sat

1 Pasangan Plafond Kalsiboard 3,5mm dalam 4,000 12,700 50,800 82,550 m2


luar 2,500 12,700 31,750

2 Pasangan Rangka Besi Hollow Galvanis 40.40 mm, Modul 60 x 60 cm, untuk Plafon 4,000 12,700 50,800 82,550 m2
2,500 12,700 31,750

3 Pasangan List Plafond dalam 4,000 12,700 33,400 115,800 m1


luar 1 1,500 12,700 28,400
luar 2 0,800 12,700 2,000 54,000
JADWAL PELAKSANAAN MC 100 %
PROGRAM : PROGRAM
: PENATAAN BANGUNAN GEDUNG
KEGIATAN : PENYELENGGARAAN
: BANGUNAN GEDUNG DI WILAYAH DAERAH KABUPATEN/KOTA PEMBERIAN IZIN MENDIRIKAN BANGUNAN (IMB) DAN SERTIFIKAT LAIN FUNGSI BANGUNAN GEDUNG
PEKERJAAN : REHABILITASI
: GEDUNG KANTOR KELURAHAN LEDOK KULON (P-APBD)
LOKASI : DESA
: LEDOK KULON KECAMATAN BOJONEGORO

JANGKA WAKTU PELAKSANAAN 35 HARI KERJA

NO URAIAN PEKERJAAN BOBOT% B0B0T%


MINGGU/PERIODE KE -

1 2 3 4 5

I PEKERJAAN PERSIAPAN 2,449 0,490 0,490 0,490 0,490 0,490 100%


II PEKERJAAN TANAH 5,522 1,841 1,841 1,841
III PEKERJAAN BETON 11,420 3,807 3,807 3,807
IV PEKERJAAN PEMBESIAN 17,595 4,399 4,399 4,399 4,399
V PEKERJAAN BEGESTING 9,677 2,419 2,419 2,419 2,419
VI PEKERJAAN PEKERJAAN BEGESTING 18,293 4,573 4,573 4,573 4,573
VII PEKERJAAN PASANGAN LANTAI 2,211 2,211 50%
VIII PEKERJAAN ATAP 18,444 9,222 9,222
IX PEKERJAAN PLAFOND 6,227 6,227
X PEKERJAAN PINTU DAN JENDELA 3,779 3,779
XI PEKERJAAN LISTRIK 1,919 1,919
XII PEKERJAAN PENGECATAN 2,464 2,464 0%

TOTAL : 100,000
RENCANA 13,722 17,528 30,529 31,137 7,084
RENCANA KOMULATIF - 13,722 31,250 61,779 92,916 100,000
REALISASI -
CEPAT -
LAMBAT -

Mengetahui, Diperiksa / Disetujui, Dibuat oleh :


PEJABAT PEMBUAT KOMITMEN (PPK) KONSULTAN KOTRAKTOR
DINAS PERUMAHAN ,KAWASAN PERMUKIMAN PENGAWAS PELAKSANA
DAN CIPTA KARYA CV. ERZA PUTRA CONSULTAN CV. DWI JAYA KENCANA

BENY KURNIAWAN, ST ANGGA ARDIANTO, ST ANDY ZULKARNAIN


Nip. 19840526 201101 1 012 Direktur Direktur

Anda mungkin juga menyukai