Rab JLN Tilombok Lanjutan PPP
Rab JLN Tilombok Lanjutan PPP
TENAGA KERJA
HARGA
NO URAIAN SATUAN SATUAN HARGA SATUAN KETERANGAN
SATUAN
1 2 3 4 5
1 Pekerja Hok 65,000 JAM 8,125
2 Tukang Hok 80,000 JAM 10,000
3 Kep Tukang Hok 80,000 JAM 10,000
4 Mandor Hok 85,000 JAM 10,625
ALAT
HARGA
NO URAIAN SATUAN KETERANGAN
SATUAN
1 2 3 4 5
1 Motor Grader jam 200,000
2 Vibro Roller jam 150,000
3 Alat Bantu jam 1,500
4 Tandem Roller jam 175,000
5 Water Tanker jam 220,000
6 Asphalt Distributor jam 310,000
7 Compresor jam 100,000
8 Aspal Sprayer hari 350,000
9 Pen. Tyre Roller jam 320,000
10 Dump Truck 3 - 5 T jam 75,000
11 Three Wheel Roller 6 - 8 T hari 600,000
12 gerobak dorong hari
13 Mobilisasi alat ls 1,500,000
BAHAN
HARGA
NO URAIAN SATUAN PPn 10% PPh 1.5% HARGA DIPAKAI
SATUAN
1 2 3 4 5 6 7
1 Agregat Klas A m3
2 Batu Belah 10-15 m3 225,000 22,500 235,000
3 Batu Pecah 5-7 cm m3 240,000 24,000 250,000
4 Batu Pecah 3-5 cm m3 250,000 25,000 275,000
5 Batu Pecah 2-3 cm m3 280,000 28,000 315,000
6 Batu Pecah 1-2 cm m3 300,000 30,000 330,000
7 Batu Pecah 0,5-1 cm m3 300,000 30,000 330,000
8 Batu Pecah 02-0.5 cm m3 275,000 27,500 290,000
9 Abu batu m3 250,000 25,000 275,000
10 Aspal Drum 1,200,000 120,000 2,325,000
12 Karosene liter 15,000 1,500 15,500
13 Kayu bakar m3 100,000 10,000 115,000
14 Pasir sirtu m3 150,000 15,000 150,000
15 Pasir Pasang m3 130,000 13,000 -
……………………. ………………………..
KETERANGAN
NGAN
534000
277000
400000
305000
414000
200000
49000
497000
309000
247000
KETERANGAN SSH
8
235000
252000
277000
319000
336000
336000
294000
277000
tidak tercantum
18000
116000
168000
157000
Dibuat oleh
TPK Desa Karangasem
………………………..
TOS ( TAKE OF SHEET )
DASAR PERHITUNGAN
PENINGKATAN JALAN CEMPAKA 1 TAHUN ANGGARAN 2022
I. Pekerjaan Persiapan
1.1 Pembersihan Lokasi M2 370 4.00 1,480.00
P = ...M
L = ...M
LEBAR
POT. MELINTANG
Jumlah
No. Uraian Satuan Volume
Kebutuhan
I. Pekerjaan Persiapan
1.1 Pembersihan Lokasi M2 1480.00
Upah
0.0500 Mandor HOK 74.00
0.1000 Pekerja HOK 148.00
Alat
0.0134 3-wheel roller jam 7.93
II BAHAN
Agregat A m3 148 148.000 148
Batu belah 2-3 cm m3 26.217 26.217 26
Batu belah 1-2 cm m3 13.109 13.109 13
Batu belah 0,5-1 cm m3 8.880 8.880 9
Abu Batu m3 14.800 14.800 15
Aspal Penetrasi 60/70 m3 1004.92 9884.920 10889.840 10890
Kayu Bakar m3 74.000 74.000 74
III ALAT
Asphalt Sprayer hari 56.240 7.030 7
Three Wheel Roller 6 - 8 T hari 7.9328 7.992 15.925 16
Alat Bantu set
Mobilisasi ls 1 1.000 1
Mengetahui TPK
Kepala Desa TPK Desa Maos Kidul
VOLUME BIAYA
No. URAIAN Dari Dari dana Satuan Harga Satuan Swadaya
TOTAL TOTAL (Rp)
Swadaya ban keu (Rp)
I BAHAN MATERIAL
1 Agregat A 148.00 148.00 m3 250,000 37,000,000 -
2
3
4 Batu belah 2-3 cm 26.00 26.00 m3 315,000 8,190,000 -
5 Batu belah 1-2 cm 13.00 13.00 m3 330,000 4,290,000 -
Batu belah 0,5-1 cm 9.00
6 Abu Batu 15.00 15.00 m3 275,000 4,125,000 -
7 Aspal Penetrasi 60/70 10890.00 10,890.00 m3 275,000 2,994,750,000 -
8 Kayu Bakar 74.00 74.00 m3 115,000 8,510,000 -
9 0 0.00 - - 2,325,000 - -
10 0 0.00 - - 15,500 -
11
12
-
Sub Total I 3,056,865,000 -
II ALAT
1 3-whell roller 16 16 / Hari 600,000 9,600,000 -
2 asp sprayer 7 7 / Hari 350,000 2,450,000 -
3 Gerobak dorong Bh - -
Karangasem, 2019
Dibuat Oleh
Mengetahui PK
Kepala Desa Desa Karangasem
( Slamet, S.H )
Peningkatan Jalan Cempaka 1
BIAYA
37,000,000
8,190,000
4,290,000
4,125,000
2,994,750,000
8,510,000
-
-
-
3,056,865,000
9,600,000
2,450,000
-
12,050,000
6,560,000
22,425,000
28,985,000
9,600,000
-
2,450,000
-
-
1,500,000
-
50,000
50,000
-
-
60,000
60,000
140,000
-
200,000
100,000
30,000
100,000
200,000
150,000
100,000
-
-
-
14,790,000
###
Karangasem, 2019
Dibuat Oleh
PK
Desa Karangasem
BANTUAN KEUANGAN KHUSUS KABUPATEN 2019
REKAPITULASI RENCANA ANGGARAN BIAYA
Bobot Bobot
RENCANA REALISASI JUMLAH TOTAL
NO URAIAN
% %
BAN KEU SWADAYA BAN KEU SWADAYA BAN KEU Swadaya
HARGA
NO URAIAN KEGIATAN VOLUME SATUAN JUMLAH (Rp)
SATUAN
1 2 3 4 5 6
I Bahan
Agregat A 148 m3 275,000 40,700,000
Batu belah 2-3 cm 26 m3 280,000 7,280,000
Batu belah 1-2 cm 13 m3 288,000 3,744,000
Batu belah 0,5-1 cm 9 m3 340,000 3,060,000
Abu Batu 15 m3 275,000 4,125,000
Aspal Penetrasi 60/70 53 m3 2,200,000 116,600,000
Kayu Bakar 74 m3 110,000 8,140,000
Sub Total I Rp183,649,000
II Upah Tenaga
Pekerja Terampil 15 HOK 100,000 1,500,000
Pekerja 90 HOK 90,000 8,100,000
Sub Total II Rp9,600,000
III Alat
Sewa 3-whell roller 5 hari 600,000 3,000,000
Sewa Aspal Sprayer 4 hari 250,000 1,000,000
Mobilisasi alat 1 ls 2,000,000 2,000,000
Sub Total III Rp6,000,000
IV Operasional
Prasati 1 Ls 350,000 350,000
Papan nama kegiatan 1 Ls 200,000 200,000
Kertas HVS 1 Rim 60,000 60,000
Fotokopi 282 Lbr 500 141,000
Sub Total IV Rp751,000
Jumlah Total ( I + II + III + IV) Rp200,000,000
HARGA
NO URAIAN KEGIATAN VOLUME SATUAN JUMLAH (Rp)
SATUAN
1 2 3 4 5 6
I Bahan
Pekerja Terampil 110 hok 100,000 11,000,000
Pekerja 100 hok 90,000 9,000,000
Total Rp20,000,000
L= 4 m
CILACAP
KECAMATAN
SAMPANG
POT. A - A
LEBAR
POT. MELINTANG