REPAIR RTG 12

VOLUME
NO URAIAN SATUAN HARGA
MANDOR WASPANG
1 PULLING KABEL Meter 2,500 7,367 7,364

500 8,986 4,493


2 BONGKAR KABEL Meter
3 PULLING KABEL LAMA Meter 2,500 1,000 1,000
4 TANAM TIANG Bh 125,000 55 55
5 BONGKAR TIANG Bh 30,000 54 54
6 REVISI CAT Bh - -
7 REVISI COR Bh - -
TOTAL
REPAIR RE
1 PULLING KABEL Meter - - -
2 BONGKAR KABEL Meter - - -
3 PULLING KABEL LAMA Meter - - -
4 TANAM TIANG Bh - - -
5 BONGKAR TIANG Bh - - -
6 REVISI CAT Bh 25,000 120 121
7 REVISI COR Bh - - -
TOTAL

1 KONTRAKAN BASECAMP MANGGARAI Lsm 800,000 1


2 KONTRAKAN BASECAMP MANGGARAI Lsm 400,000 1
3 BBM PULANG PERGI BAJO RUTENG Lsm 1,000,000 1
PEMBAYARAN ANGKUT MATERIAL
4 TIANG 20 BATANG Lsm 1,500,000 1
3 DESA NARANGDMT & RTG 068
JUMLAH
MANDOR ZAENAL WASPANG SPSI
18,417,500 18,410,000

4,493,000 2,246,500

2,500,000 2,500,000
6,875,000 6,875,000
1,620,000 1,620,000
- -
- -
33,905,500 31,651,500
JOTANJUNGHILIHINTIRDMT
- -
- -
- -
- -
- -
3,000,000 3,025,000
- -
3,000,000 3,025,000

800,000
400,000
1,000,000

1,500,000
KETERANGAN EVIDENT
DARI SPAN 3 SAMAPAI SPAN 6 OK
DARI SPAN 3 (4000M) + SPAN 4 (2000M) + SPAN 6 (1000M) , ARAHAN TEAM
WASPANG SAMPAI BC BARU TERHITUNG, DI BASECAMP BARU ADA 50% KABEL OK
LAMA NYA, SISANYA MASIH DI LAPANGAN
DI SPAN 5 OK
DI SPAN 2 ( 1 BTG ) , SPAN 3 ( 1 BTG ) , SPAN 5 ( 22 BTG ) , SPAN 6 ( 31 BTG ) OK
DI SPAN 3 ( 1 BTG ), SPAN 5 ( 22 BTG ) , SPAN 6 ( 31 BTG ) OK

SPAN 3 ( 87 BTG ) , SPAN 4 ( 34 BTG ) OK SPAN 5 ( 22

PEMBAYARAN SEWA RUMAH 1 BULAN ( 27/09/2023 ) ,ASEP TIDAK MENERIMA


UNTUK BAYAR MAKAN TEAM ZAENAL , ASEP MENGETAHUI NYA ( 26/09/2023 )
TIDAK ADA PEKERJAAN SPSI DI BAJO

REALISASI DI LAPANGAN HANYA 6 BATANG ( SISANYA BELUM DI AMBIL 16 BTG )


2 BTG ) , SPAN 6 ( 31 BTG )