Anda di halaman 1dari 5

TAMPAK LUAR TAMPAK DALAM 34 1 RELAY kWh RL8

33 1 POWER SUPLAI 220 VAC KE 24 VDC BC1


32 1 MODUL BATERAI MB
31 1 SURGE ARRESTER 40kA Q1
30 1 RCBO 1 PHASE PROTEKSI LOAD 220 VAC Q2
29 1 MCB 2 PHASE PROTEKSI LOAD 24 VDC Q3
28 1 MCB 1 PHASE PROTEKSI BATERAI Q4
27 1 NH FUSE PROTEKSI MOTORIZED VCB Q5
L10 L1 L2 L3 L7 L8 L9 26 1 NH FUSE PROTEKSI CLOSING COIL VCB Q6
25 1 NH FUSE PROTEKSI COIL VCB Q7
24 1 RELAY TRIP OCR RL1
23 1 RELAY TRIP OCR (INST) RL2
22 1 RELAY TRIP GFR RL3
T1 21 1 RELAY INDIKATOR TRIP (Interlock Relay) RL4
BC1 MB 20 1 RELAY KONTROL OPEN RL5

P1 19 1 RELAY KONTROL CLOSE RL6


18 1 RELAY KONTROL TEMPERATUR RL7
17 1 STOP KONTAK KK
16 1 INDIKATOR HEATER L10
15 1 INDIKATOR GANGGUAN GFR L9
kWh 14 1 INDIKATOR GANGGUAN OCR INSTANT L8

Meter 13 1 INDIKATOR GANGGUAN OCR


INDIKATOR PHASE T
L7
L3
12 1
11 1 INDIKATOR PHASE S L2
Q1 Q2 Q3 Q4 Q5 Q6 Q7 RL1 RL2 RL3 RL4 RL5 RL6 RL7 RL8 KK 10 1 INDIKATOR PHASE R L1
9 1 TEMPERATUR KONTROL T1
8 1 RELAY PROTEKSI P1
7 1 kWh METER
6 3 TEST BLOCK CT TB2
5 1 TEST BLOCK VT TB1
4 1 TOMBOL RESET PB3
3 1 TOMBOL CLOSE + INDIKATOR CLOSE PB2
2 1 TOMBOL OPEN + INDIKATOR OPEN PB1
1 1 SELECTOR SWITCH(LOCAL/REMOTE) S1

No Jumlah Nama Komponen Kode


TB1 TB2
PT PLN (PERSERO)
PUSAT PEMELIHARAAN KETENAGALISTRIKAN
PB3 PB2 PB1 S1
Pekerjaan :
Pembuatan 15 Unit PMCB 4.0 PT PLN UIW NTB

NO Penugasan PK :

NO Penugasan KI :

NO Gambar :

JUDUL :

PANEL KONTROL PMCB

SUB JUDUL :

LAYOUT PANEL KONTROL PMCB

DISETUJUI DIPERIKSA DIGAMBAR


tgl : tgl : tgl :

Basic Design Inspection

Shop Drawing As - Built

2
PUSHARLIS-F-7.1-1-06

1
SIZE : A3

0
SEMUA UKURAN DALAM
DIREVISI DIPERIKSA DISETUJUI
SATUAN CENTIMETER REV. TANGGAL KETERANGAN OLEH OLEH OLEH

JENIS PROYEKSI

PT PLN (PERSERO)
PUSAT PEMELIHARAAN KETENAGALISTRIKAN
HALAMAN:
SKALA: 1 dari 5
RL5

9 5

10 6
RL5
209 208
TC
9 5
X2.4 X3.4 208
9 10
208
37

204 35 X3.5 X2.5


005.4E
33 WD
1 2 36 005.5E 005.6E
304 Q8
005.5E
34 303
303
208
6 CC
X2.4 X3.3 207
4 7 8
RL1
209 207
2

2
S1
75 208 Local

1
12

10
76 RL2
207.1
209
8 004.3C
67 304
207 211
16 207

BS 68 RL3 210 9 1 209 RL1 24 1 Mini Sekring 1A Q8


14
INCOMING
RL6 004.4C 23 1 Tombol Reset PB3
49 RL4 207
20kV 20 212
304 22 1 Relay Indikasi Gangguan GFR RL3
210 9 5
RL4
18 21 1 Relay Indikasi Gangguan OCR Instan RL2
R S T 50 RL2
211
20 1 Relay Indikasi Gangguan OCR Rl1
1 004.4C
51 19 1 Indikator CB Open L6
RL5 204
213 304
3
18 1 Indikator CB Close L5
52 RL3
5 212 17 1 VCB 52

53 RL6 204
16 1 Relay Proteksi P1
7
15 1 Box Switching BS
213
54 9 SE1 14 4 Ground GND
RL7 X3.6 X2.6 304
11 204 216 216 13 1 Kontak Bantu VCB SE1
55 14 13
207.1 207.1 L6 12 1 Tripping Coil TC
13 005.4F
SE1 11 1 Closing Coil CC
56 RL8 215 X3.7 X2.7 215 304
209
15 10 1 Current Test Block TB1
TB1 18 17
2S1 -T1 10 10 10 41 204 L5 9 1 Voltage Test Block TB2
+
2S2
2S1 -T2 20 20 N1 Input L1 22 8 1 Selector Switch Local/Auto S1
42 24
- 7 1 Tombol Open PB2
2S2
2S1 -T3 30 30
20 + 204 6 1 Tombol Close PB1
43
2S2 N1 N1 26
Input L2 5 2 Terminal Kontak X1, X3
N1 28
44 - 4 1 Terminal Kontak Heavy Duty Connector X2
1S1 -T4 40 204
003.2D + SE1 3 3 VT Metering T7, T8, T9
1S2
30 45 17
50 Input L3 217
1S1 -T5

1S2
003.2D
kWh Meter N1 P1 19
-
217
217
X3.8 X3.8

20 19
304 2 3
3
CT Metering
CT Proteksi
T4, T5, T6
T1, T2, T3
1S1 -T6 60 46
1
003.2E + 204
005.4F
SE1 No Jumlah Nama Komponen Kode
1S2 N2 Input L4 21 X3.9 X3.9 218
218
003.2E N1 47 23 218 304
- 16 15
-GND
TB2
70 70 N1
48
+
25
204
PT PLN (PERSERO)
Input L5 304
80 80 27
219
3 4 PUSAT PEMELIHARAAN KETENAGALISTRIKAN
70 69
-
-T7
90 90 + 204 -PB3
N3
N3 N3 70 Input L6 58 Pekerjaan :
60
-T8 - Pembuatan 15 Unit PMCB 4.0 PT PLN UIW NTB
R 80 71 + 304

N3 Input L7 57
-T9 59
72 -
S

90 + NO Penugasan PK :
73 61
Input L8
T N3 NO Penugasan KI :
74
+ NO Gambar :
Input L9 64 204 304
-GND
JUDUL :
003.5F
52 +
63
WIRING PANEL KONTROL PMCB

005.4E

005.5E
003.5G
Input L10
lampu
003.5G
indikator +
Input L11 66
003.5H
SUB JUDUL :
+
OUTGOING
Input 12 65 WIRING DIAGRAM RELAY MICOM P127
62
-

DISETUJUI DIPERIKSA DIGAMBAR


29
tgl : tgl : tgl :

30
- Available
RS 485 31 for
+
32 Modem

77 Basic Design Inspection

78 Shop Drawing As - Built

-
RS 485-2 79
80 3
+
2
PUSHARLIS-F-7.1-1-06

-
IRIG B 81 1
SIZE : A3

Modul 82 0
+
SEMUA UKURAN DALAM
- DIREVISI DIPERIKSA DISETUJUI
IRIG B SATUAN MILIMETER REV. TANGGAL KETERANGAN OLEH OLEH OLEH
83
Modul 84 JENIS PROYEKSI
+
PT PLN (PERSERO)
PUSAT PEMELIHARAAN KETENAGALISTRIKAN
HALAMAN:
SKALA: 2 dari 5
kWh Meter L1 L2 L3

1 2 3 4 5 6 7 8 9 10 11 12 13 C OP3

40 004.2B
002.2D

50
002.2D

Current 4 1 kWh Meter


3 1 Indikator Tegangan R L1
Transformer
60 2 1 Indikator Tegangan S L2

002.2D 1 1 Indikator Tegangan T L3


No Jumlah Nama Komponen Kode

N2 PT PLN (PERSERO)
PUSAT PEMELIHARAAN KETENAGALISTRIKAN
002.2D

Pekerjaan :
Pembuatan 15 Unit PMCB 4.0 PT PLN UIW NTB

70 NO Penugasan PK :

002.2F NO Penugasan KI :

NO Gambar :

JUDUL :

80 WIRING PANEL KONTROL PMCB


002.2F
SUB JUDUL :
Voltage WIRING DIAGRAM KWH METER
Transformer
90
002.2F DISETUJUI DIPERIKSA DIGAMBAR
tgl : tgl : tgl :

N3
Basic Design Inspection
002.2F
Shop Drawing As - Built

201 2
PUSHARLIS-F-7.1-1-06

1
005.4B
SIZE : A3

0
SEMUA UKURAN DALAM
301 SATUAN MILIMETER REV. TANGGAL KETERANGAN
DIREVISI
OLEH
DIPERIKSA
OLEH
DISETUJUI
OLEH
005.4B JENIS PROYEKSI

PT PLN (PERSERO)
PUSAT PEMELIHARAAN KETENAGALISTRIKAN
HALAMAN:
SKALA: 3 dari 5
204 204
204 204

005.4F 204

204
204

2
C
kWh

PB 3

3
S1
Local

4
OP3
204 204
001.4F

1
204

X2-19 230
222 223 T1

204 204 204 222 222 222


204
204 223 223 4 5 6 9 10 11 12
X3-19

Close
Open
LS BK

LS BS

-PB2
5

8
-PB1
3

3
52

RL1

RL2

RL3

RL1

RL2

RL3

RL7
26

4
12

12

12

12
9

GR7

GR8

GR9
X3-12
27

221 221 221 221 221


X3-18

X2-12
211 212 213

204

204
308

307

306

226

227
221

18 1 Relay Shunt Trip RL8


X2-18

224 225
002.6B 002.6C 002.6C
231 17 1 ACB 52
16 1 Push Button Reset PB3
15 1 Relay Kontrol Open RL5
RL8 L4 RL4 L7 L8 L9 RL5 RL6 RL7 L10 14 1 Relay Kontrol Close RL6
13 1 Relay Kontrol Temperatur RL7
304 304 304 304 304 12 1 Temperatur Kontrol T1
304 304 304 304 304 304
005.4F 11 1 Limit Switch Box Switching LS BS
304 10 1 Limit Switch Box Control LS BK
9 1 Indikator Heater ON L10
8 1 Push Button Close PB2
7 1 Push Button Open PB1

308

307

306
6 1 Selector Switch Remote/Local S1
5 1 Relay Indikasi Trip (Interlock Relay) RL4

X2-13

X2-14

X2-15
4 1 Indikator Gangguan GFR L9
3 1 Indikator Gangguan OCR Instan L8
2 1 Indikator Gangguan OCR L7
1 1 Indikator Trip (Rotary Lamp) L4
No Jumlah Nama Komponen Kode

PT PLN (PERSERO)
PUSAT PEMELIHARAAN KETENAGALISTRIKAN

Pekerjaan :
Pembuatan 15 Unit PMCB 4.0 PT PLN UIW NTB

308

307

306
BS

X3-13

X3-14

X3-15
NO Penugasan PK :

NO Penugasan KI :

NO Gambar :

JUDUL :

WIRING PANEL KONTROL PMCB

PT 100
SUB JUDUL :

WIRING DIAGRAM KONTROL VCB

DISETUJUI DIPERIKSA DIGAMBAR


tgl : tgl : tgl :

Basic Design Inspection

Shop Drawing As - Built

2
PUSHARLIS-F-7.1-1-06

1
SIZE : A3

0
SEMUA UKURAN DALAM
DIREVISI DIPERIKSA DISETUJUI
SATUAN MILIMETER REV. TANGGAL KETERANGAN OLEH OLEH OLEH

JENIS PROYEKSI

PT PLN (PERSERO)
PUSAT PEMELIHARAAN KETENAGALISTRIKAN
HALAMAN:
SKALA: 4 dari 5
PS1

L1 200

Suplai tegangan 220 VAC


N 300
dari VT Outdoor atau SR

1
N

3
1
PE PE
Q1 Q2
2 N

4
201

201
003.2G

301 003.2G

301
201 301

L N

MB
BC1

KK PS Load Batt
+ - L N + - + - + - G 15 1 Modul Baterai MB
201 301 202 302 203 303 +24 -24
14 1 Power Suplai 220 VAC ke 24 VDC BC1

1
201

301
13 1 Plug Socket 1 phase PS1
Q4
202 Baterai 12 Vdc Batt
201 12 2

2
302 11 1 Stop Kontak KK
301
10 2 Heater H4
9 1 Motorized Charged VCB M
8 1 Terminal Kontak X1
Batt 7 1 Terminal Kontak Heavy Duty Connector X2
203
6 1 NH FUSE DC 6 A Q7
303 5 1 NH FUSE DC 12 A Q5, Q6
201

301

203 303 203 303 4 1 MCB DC 1 Phase 16 A Q4


3 1 MCB DC 2 Phase 20 A Q3

1
3
1

1
RL7 Q3 Q5 Q6 Q7 2 1 RCBO 10 A Q2
301
206

2
2
1 1 Surge Arrester 40 kA Q1
X1.1,2 X1.1,2 X2.1 X2.2 303
209 No Jumlah Nama Komponen Kode
204 304

X1.4,5,6 X1.1,2,3 205 305


BS PT PLN (PERSERO)
301
206

X1.1,2 X1.1,2
PUSAT PEMELIHARAAN KETENAGALISTRIKAN

002.5F & 002.2A

002.5F & 002.2B

002.5A

002.7A
H4 H4 Pekerjaan :
304
204
Pembuatan 15 Unit PMCB 4.0 PT PLN UIW NTB
X3.1 X3.1

205 305

X2.10 X2.11
1 2
NO Penugasan PK :
M
204 304 NO Penugasan KI :
X3.10 X3.11
NO Gambar :

JUDUL :

002.5C & 004.1B

002.5D & 004.1D


WIRING PANEL KONTROL PMCB

SUB JUDUL :

POWER SUPPLY PANEL KONTROL

DISETUJUI DIPERIKSA DIGAMBAR


tgl : tgl : tgl :

Basic Design Inspection

Shop Drawing As - Built

2
PUSHARLIS-F-7.1-1-06

1
SIZE : A3

0
SEMUA UKURAN DALAM
DIREVISI DIPERIKSA DISETUJUI
SATUAN MILIMETER REV. TANGGAL KETERANGAN OLEH OLEH OLEH

JENIS PROYEKSI

PT PLN (PERSERO)
PUSAT PEMELIHARAAN KETENAGALISTRIKAN
HALAMAN:
SKALA: 5 dari 5