I PEKERJAAN PLUMBING
A Peralatan Utama
A.1 AIR BERSIH
1 Clean Water Tank (FRP Panel) Kap. 43 m3 Efektif Unit 1
2 TN. 101 TANKI CHEMICAL TREATHMENT Type PE TANK Kap. 350 Liter Unit 3
3 TN. 102 TANKI KOAGULEN Type PE TANK Kap. 350 Liter Unit 3
4 RF. 101 RESIN FILTER TYPE PRESSURIZED RESIN FILTER, Unit 3
PRESSURIZED RESIN FILTER, Kap. 350 Liter
5 STP BIO SYSTEM 5 M3/Hari Unit 1
6 STP BIO SYSTEM 30 M3/Hari Unit 1
7 Bak Netralisir Uk. 1000 x 1000 x 1500 (2 sekat) Unit 4
SUB TOTAL
PPN 10%
GRAND TOTAL
HARGA SATUAN JUMLAH HARGA
Rp 315,000,000 Rp 315,000,000
Rp 4,000,000 Rp 12,000,000
Rp 6,000,000 Rp 18,000,000
Rp 6,500,000 Rp 19,500,000
Rp 17,500,000 Rp 17,500,000
Rp 65,000,000 Rp 65,000,000
Rp 5,000,000 Rp 20,000,000
Rp 467,000,000
Rp 46,700,000
Rp 513,700,000