Anda di halaman 1dari 8

PENAWARAN

1. BAHAN KIMIA PRO LAB


NO. NAMA BAHAN KIMIA

1 PH Strip
2 Fluoride test 0.10 - 20.0 mg/l
3 Nitrate Test 0.1 - 25.0 mg/l
4 Chloride test 2,5 - 250 mg/l
5 Sulfate Test 0.05 - 50.0 mg/L
6 Cyanide Test
7 Chromate Test 0.010-3.00 mg/L
8 Kimwipes Tissue
9 FerroVer Iron Reagent Powder Pillow
10 Ammonium Test 0.010 - 3.00 mg/L
11 Petrifilm E. coli
12 Petrifilm Coliform
13 Silicone solution SERVA in isopropanol
14 DPD Free Chlorine Reagent Powder Pillows

CATATAN : REAGEN PRO LAB INDENT ANTARA 4 - 6 BULAN (ANGKAS DISESUAIKAN DENGAN J

2. ALAT PELINDUNG DIRI / APD


NO. NAMA

1 Masker Hijab
2 Sarung tangan elastis (untuk lab)
3 Mantel pengaman (untuk pengaduk)
4 Sarung tangan latex (untuk pengaduk)
5 Filter masker

3. BELANJA MODAL
NO. NAMA

1 Turbiditimeter Lutron
2 Colorimeter
3 Ph Meter Digital
4 Hot Plate Magnetic Stirer
5 PC All In One Lenovo 330-20ASR (F0D8001HID)
6 Printer Epson L120
7 Kursi Lab
8 Meja Lab
9 Meja Kayu Jati
10 Kursi Kantor Aktiv
11 UPS untuk inkubator 230V, 50/60 Hz, power = 1400 watt
12 UPS untuk spektro 100-240 VAC, 50/60 Hz, power = 80 VA
13 UPS untuk komputer : 250 watt

4. ALAT DAN PERLENGKAPAN


NO. NAMA

1 Apar Local + tabung 3kg


2 Derigen 20 L Local
3 Cawan Timbang
4 Spatula
5 Sendok Sungu
6 Rak alat gelas
7 Termometer ruangan digital
8 Kuvet

5. ANGGARAN ANALISA LAB


NO NAMA SAMPEL HARGA VOLUME
1 AIR BAKU 940000 1
2 SEDIMEN 850000 2
3 CLEARWELL 850000 2
4 RESERVOAR GUWO 850000 1
5 RESERVOAR SIDOMULYO 850000 1
6 RESERVOAR KRONGGAHAN 850000 1
7 WARGA 850000 2
TOTAL ANALISA LAB / BULAN

NO NAMA SAMPEL PER BULAN 12 BULAN


1 Air Baku dan Air Minum 8590000 12
TOTAL ANALISA LAB/ TAHUN
Nb. Untuk analisa lab kalau bisa TIDAK DI RINCI menjadi kualiatas Air Baku dan Air Minum untuk A

5. PEMELIHARAAN ALAT LABORATORIUM


(Pemeliharaan alat Autoclave, Turbidity, Ph Meter, Hot Plate)
6. PENGOLAHAN LIMBAH B3
Pengolahan limbah tahun kemarin ikut anggaran Pengolahan Limbah IPAL, untuk tahun ini ....?
ARAN

BIAYA SATUAN JUMLAH BIAYA


VOLUME
(Rp) (Rp)

6 pack 410,000 2,460,000


5 pack 4,800,000 24,000,000
5 pack 5,500,000 27,500,000
5 pack 4,700,000 23,500,000
5 pack 3,800,000 19,000,000
5 pack 4,400,000 22,000,000
2 pack 5,520,000 11,040,000
30 Box 95,000 2,850,000
5 pack 910,000 4,550,000
1 pack 4,600,000 4,600,000
5 pack 2,250,000 11,250,000
5 pack 2,100,000 10,500,000
TIDAK JADI
15 pack 750,000 11,250,000

ISESUAIKAN DENGAN JANGKA WAKTU INDENT)

BIAYA SATUAN JUMLAH BIAYA


VOLUME
(Rp) (Rp)

70 pack 27,000 1,890,000


50 pack 75,000 3,750,000
10 buah 200,000 2,000,000
10 buah -
6 bh 350,000 2,100,000

BIAYA SATUAN JUMLAH BIAYA


VOLUME
(Rp) (Rp)

1 bh 6,750,000 6,750,000
1 bh 48,000,000 48,000,000
1 bh 18,000,000 18,000,000
1 bh 1,900,000 1,900,000
1 bh 7,500,000 7,500,000
1 bh 1,900,000 1,900,000
5 bh 500,000 2,500,000
1 bh -
5 bh 1,800,000 9,000,000
5 bh 650,000 3,250,000
1 unit 3,100,000 3,100,000
1 unit 2,500,000 2,500,000
1 unit 2,500,000 2,500,000

BIAYA SATUAN JUMLAH BIAYA


VOLUME
(Rp) (Rp)

3 tbg 650,000 1,950,000


5 bh 95,000 475,000
1 bh 75,000 75,000
1 bh 55,000 55,000
2 bh 36,000 72,000
1 bh 175,000 175,000
2 bh 350,000 700,000
2 bh 4,600,000 9,200,000

TOTAL
940000
1700000
1700000
850000
850000
850000
1700000
8590000

TOTAL
103080000

u dan Air Minum untuk ANTISIPASI KENAIKAN HARGA SEWAKTU-WAKTU


PAL, untuk tahun ini ....?????
Keterangan

Reagen Pro Lab


Reagen Pro Lab
Reagen Pro Lab
Reagen Pro Lab
Reagen Pro Lab
Reagen Pro Lab
Reagen Pro Lab
Reagen Pro Lab
Reagen Pro Lab
Reagen Pro Lab
Reagen Pro Lab
Reagen Pro Lab

Reagen Pro Lab T

Keterangan

APD
APD
APD
APD
APD

Keterangan

Belanja modal
Belanja modal
Belanja modal
Belanja modal
Belanja modal
Belanja modal
Belanja modal
Belanja modal
Belanja modal
Belanja modal
Belanja modal
Belanja modal
Belanja modal

Keterangan

Alat dan perlengkapan


Alat dan perlengkapan
Alat dan perlengkapan
Alat dan perlengkapan
Alat dan perlengkapan
Alat dan perlengkapan
Alat dan perlengkapan
Alat dan perlengkapan

KTU-WAKTU

Anda mungkin juga menyukai