Anda di halaman 1dari 2

BACK UP DATA JALAN USAHA TANI

( Lembar Perhitungan )

A. Pekerjaan Persiapan
167,400,000
1.A Galian Tanah
- Panjang = 199.95 m
- STA 00 = 0.100 m2
- STA 50 = 0.181 m2
- STA 100 = 0.655 m2
- STA 150 = 0.440 m2
Total Volume Galian Tanah = 68.78 M³

1.B Timbunan Tanah


- Panjang = 199.95 m
- STA 00 = 0.574 m2
- STA 50 = 0.000 m2
- STA 100 = 0.000 m2
- STA 150 = 0.055 m2
Total Volume Galian Tanah = 31.44 M³

B. Pekerjaan Pasangan Batu Kali

1 Dinding kiri
- Panjang = 200.0 m
- Lebar Atas = 0.2 m
- Lebar Bawah = 0.4 m
- Tinggi Pasangan = 0.8 m
Volume Dinding Kiri = 47.99 M³

2 Dinding kanan
- Panjang = 20.0 m
- Lebar Atas = 0.2 m
- Lebar Bawah = 0.3 m
- Tinggi Pasangan = 0.4 m
Volume Dinding Kanan = 2.00 M³

3 pondasi Kiri
- Panjang = 200.0 m
- Lebar = 0.4 m
- Tinggi Pas. = 0.2 m
Volume Pondasi kanan = 16.00 M³

4 pondasi Kanan
- Panjang = 20.0 m
- Lebar = 0.3 m
- Tinggi Pas. = 0.2 m
Volume Pondasi kanan = 1.20 M³
Total Volume Pasangan Batu Kali = 67.18 M³

C. Pekerjaan Plesteran

1 Plesteran Kiri
- Panjang = 200.0 m
- Lebar = 1 m
Volume Plasteran Kiri = 199.95 M²

2 Plesteran Kanan
- Panjang = 20.0 m
- Lebar = 0.6 m
Volume Plasteran Kanan = 11.97 M²
Total Volume Plasteran = 211.92 M²

D. Pekerjaan Perkerasan Jalan


1 Batu Koral
- Panjang = 200.0 m
- Lebar = 1.8 m
- Tinggi Pas. = 0.15 m
Volume Pondasi Sisi Kiri dan Kanan = 53.99 M³
2 Pasir Berbatu
- Panjang = 200.0 m
- Lebar = 1.8 m
- Tinggi Pas. = 0.05 m
Volume Pondasi Sisi Kiri dan Kanan = 18.00 M³

E Pekerjaan Gorong Gorong


E.1 Plat Beton
- Panjang = 2.0 m
- Lebar = 0.9 m
- Tinggi Pas. = 0.15 m
Volume Beton plat = 0.27 M³
E.2 Dinding Gorong gorong
- Panjang = 2.0 m
- Lebar = 0.2 m
- Tinggi Pas. = 0.85 m
Volume Dinding Gorong gorong = 0.68 M³

E.3 Lantai Gorong gorong


- Panjang = 2.0 m
- Lebar = 0.9 m
- Tinggi Pas. = 0.2 m
Volume Lantai Gorong gorong = 0.36 M³

E.4 Tulangan arah X


- Panjang = 2.0 m
- Jumlah = 6 m
- Berat = 0.617
7.398 kg
Tulangan arah Y
- Panjang = 0.85 m
- Jumlah = 13.333333 m
- Berat = 0.617
6.987 kg

SEI RAMPAH, OKTOBER 2023


DIBUAT OLEH :
TIM PERENCANA

RICKY IKHWAN, ST