I. PEKERJAAN ………………………………. Rp -
II. PEKERJAAN ………………………………. Rp -
III. PEKERJAAN ………………………………. Rp -
IV. PEKERJAAN ………………………………. Rp -
V. PEKERJAAN ………………………………. Rp -
VI. PEKERJAAN ………………………………. Rp -
VII. PEKERJAAN ………………………………. Rp -
VIII. PEKERJAAN ………………………………. Rp -
IX. PEKERJAAN ………………………………. Rp -
X. PEKERJAAN ………………………………. Rp -
XI. PEKERJAAN ………………………………. Rp -
Jumlah Rp -
PPN 10% Rp -
Jumlah Total Rp -
Dibulatkan Rp -
Terbilang : ..........................
NIHIL
-
NIHIL - 1 0 0 0 0
0 0 0 0 0 0 0 0
( Rupiah ) ( Rupiah ) ( Rupiah ) ( Rupiah ( Rupiah( Rupi ( Rup
( R ( ( ( ( Rupiah )
Contoh
Kegiatan : ……………………………………………
Pekerjaan : ……………………………………………
Lokasi : ……………………………………………
TA : ……………………………………………
I. PEKERJAAN PERSIAPAN
1 ……………………….. A. 2.2.1.1. ……. …. Rp - Rp -
2 ……………………….. ……. …. Rp - Rp -
3 ……………………….. ……. …. Rp - Rp -
Rp -
V. PEKERJAAN Dst……………………..
1 ……………………….. ……. …. Rp - Rp -
2 ……………………….. ……. …. Rp - Rp -
3 ……………………….. ……. …. Rp - Rp -
4 ……………………….. ……. …. Rp - Rp -
5 dst………………………. ……. …. Rp - Rp -
Rp -
RANGKUMAN
ANALISA HARGA SATUAN PEKERJAAN (AHSP)
BIDANG CIPTA KARYA
TAHUN 2014
KELOMPOK PEKERJAAN JENIS PEKERJAAN HARGA SATUAN
LEVEL 1 KET.
(LEVEL 2) (SUB LEVEL 2) (Rp)
2.2.1
Divisi 2
Pekerjaan Persiapan 1 . A. 2.2.1.1. Pembuatan 1 m2 Pagar sementara dari kayu tinggi 2 meter 421,208.54
2 . A. 2.2.1.2. Pembuatan 1 m2 Pagar sementara dari seng gelombang tinggi 2 meter 503,088.58
3 . A. 2.2.1.3. Pembuatan 1 m2 Pagar sementara dari kawat duri tinggi 1,8 meter 432,684.45
4 . A. 2.2.1.4. Pengukuran dan pemasangan 1 m' bouwplank 71,654.00
5 . A. 2.2.1.5. Pembuatan 1 m2 kantor sementara lantai plesteran 1,316,642.25
6 . A. 2.2.1.6. Pembuatan 1 m2 rumah jaga (konstruksi kayu) 1,575,915.00
7 . A. 2.2.1.7. Pembuatan 1 m2 gudang semen dan peralatan 1,280,571.33
8 . A. 2.2.1.8. Pembuatan 1 m2 bedeng pekerja 1,258,413.20
9 . A. 2.2.1.9. Pembersihan 1 m2 lapangan dan perataan 8,250.00
10 . A. 2.2.1.10. Pembuatan 1 m2 steger/perancah dari bambu 207,477.60
11 . A. 2.2.1.11. Pembuatan 1 buah kotak adukan ukuran 40 cm x 50 cm x 25 cm 71,511.00
12 . A. 2.2.1.12. Pembuatan 1 m2 jalan sementara 96,897.90
13 . A. 2.2.1.13. Pembongkaran 1 m3 beton bertulang 703,989.00
14 . A. 2.2.1.14. Pembongkaran 1 m3 dinding tembok bata 351,994.50
15 . A. 2.2.1.15. Pemasangan 1 m2 pagar kawat jaring galvanis panjang 240 cm 14,683.90
16 . A. 2.2.1.16. Pembuatan 1 m2 panel beton pracetak 5x50x213 cm 390,458.31
2.3.1
Pekerjaan Tanah 1 . A. 2.3.1.1. Penggalian 1 m3 tanah biasa sedalam 1 m 38,775.00
2 . A. 2.3.1.2. Penggalian 1 m3 tanah biasa sedalam 2 m 47,520.00
3 . A. 2.3.1.3. Penggalian 1 m3 tanah biasa sedalam 3 m 56,397.00
4 . A. 2.3.1.4. Penggalian 1 m3 tanah keras sedalam 1 m 51,612.00
5 . A. 2.3.1.5. Penggalian 1 m3 tanah cadas sedalam 1 m 78,210.00
6 . A. 2.3.1.6. Penggalian 1 m3 tanah lumpur sedalam 1 m 62,370.00
7 . A. 2.3.1.7. Pengerjaan stripping 1 m2 tanah tebing setinggi 1 m 2,805.00
8 . A. 2.3.1.8. Pembuangan 1 m3 tanah sejauh 30 m 16,995.00
9 . A. 2.3.1.9. Pengurugan kembali 1 m3 galian tanah
1 m3 Urugan kembali galian tanah biasa sedalam 1 meter 12,925.00
1 m3 Urugan kembali galian tanah biasa sedalam 2 meter 15,840.00
1 m3 Urugan kembali galian tanah biasa sedalam 3 meter 18,799.00
1 m3 Urugan kembali galian tanah keras sedalam 1 meter 17,204.00
1 m3 Urugan kembali galian tanah cadas sedalam 1 meter 26,070.00
1 m3 Urugan kembali galian tanah lumpur sedalam 1 meter 20,790.00
10 . A. 2.3.1.10. Pemadatan tanah 1 m3 tanah ( per 20 cm) 28,050.00
11 . A. 2.3.1.11. Pengurugan 1 m3 dengan pasir urug 172,590.00
12 . A. 2.3.1.12. Pemasangan 1 m3 lapisan pudel 1KP : 3PP : 7TL 216,155.50
13 . A. 2.3.1.13. Pemasangan 1 m2 lapisan ijuk tebal 10 cm untuk bidang resapan 48,015.00
14 . A. 2.3.1.14. Pemasangan 1 m3 sirtu padat 182,985.00
3.2.1
Divisi 3
Pekerjaan Pondasi 1 . A. 3.2.1.1. Pemasangan 1 m3 Pondasi batu belah (hitam) campuran 1SP : 3PP 667,803.40
2 . A. 3.2.1.1. Pemasangan 1 m3 Pondasi batu belah (putih) campuran 1SP : 3PP 633,351.40
3 . A. 3.2.1.2. Pemasangan 1 m3 Pondasi batu belah (hitam) campuran 1SP : 4PP 617,686.30
4 . A. 3.2.1.2. Pemasangan 1 m3 Pondasi batu belah (putih) campuran 1SP : 4PP 583,234.30
5 . A. 3.2.1.3. Pemasangan 1 m3 Pondasi batu belah (hitam) campuran 1SP : 5PP 582,956.11
6 . A. 3.2.1.3. Pemasangan 1 m3 Pondasi batu belah (putih) campuran 1SP : 5PP 548,504.11
7 . A. 3.2.1.4. Pemasangan 1 m3 Pondasi batu belah (hitam) campuran 1SP : 6PP 558,532.59
8 . A. 3.2.1.4. Pemasangan 1 m3 Pondasi batu belah (putih) campuran 1SP : 6PP 524,080.59
9 . A. 3.2.1.5. Pemasangan 1 m3 Pondasi batu belah (hitam) campuran 1SP : 8PP 525,072.46
10 . A. 3.2.1.5. Pemasangan 1 m3 Pondasi batu belah (putih) campuran 1SP : 8PP 490,620.46
11 . A. 3.2.1.6. Pemasangan 1 m3 Pondasi batu belah (hitam) campuran 1SP : 1KP : 2PP 678,166.23
12 . A. 3.2.1.6. Pemasangan 1 m3 Pondasi batu belah (putih) campuran 1SP : 1KP : 2PP 643,714.23
13 . A. 3.2.1.7. Pemasangan 1 m3 Pondasi batu belah (hitam) campuran 1SP : 3KP : 10PP 487,730.98
14 . A. 3.2.1.7. Pemasangan 1 m3 Pondasi batu belah (putih) campuran 1SP : 3KP : 10PP 453,278.98
15 . A. 3.2.1.8. Pemasangan 1 m3 Pondasi batu belah (hitam) campuran 1/4SP : 1KP : 4PP 461,913.87
16 . A. 3.2.1.8. Pemasangan 1 m3 Pondasi batu belah (putih) campuran 1/4SP : 1KP : 4PP 427,461.87
17 . A. 3.2.1.9. Pemasangan 1 m3 batu hitam kosong (anstamping) 303,156.15
18 . A. 3.2.1.9. Pemasangan 1 m3 batu putih kosong (anstamping) 268,704.15
KELOMPOK PEKERJAAN JENIS PEKERJAAN HARGA SATUAN
LEVEL 1 KET.
(LEVEL 2) (SUB LEVEL 2) (Rp)
19 . A. 3.2.1.10. Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1SP : 2PB : 3 Kr dan 40% batu
1,966,775.03
belah (hitam).
20 . A. 3.2.1.10. Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1SP : 2PB : 3 Kr dan 40% batu
1,952,994.23
belah (putih).
21 . A. 3.2.1.11. Pemasangan 1 m3 pondasi sumuran batu belah (hitam), diameter 100 cm. 645,760.28
22 . A. 3.2.1.11. Pemasangan 1 m3 pondasi sumuran batu belah (putih), diameter 100 cm. 632,840.78
4.1.1
Divisi 4
Pekerjaan Beton 1 . A. 4.1.1.1. Membuat 1 m3 beton mutu f'c = 7,4 Mpa (K100), slump (12 ± 2) cm, w/c = 0,87 676,494.97
2 . A. 4.1.1.2. Membuat 1 m3 beton mutu f'c = 9,8 Mpa (K125), slump (12 ± 2) cm, w/c = 0,78 714,873.83
3 . A. 4.1.1.3. Membuat 1 m3 beton mutu f'c = 12,2 Mpa (K150), slump (12 ± 2) cm, w/c = 0,72 745,030.47
4 . A. 4.1.1.4. Membuat 1 m3 lantai kerja beton mutu f'c = 7,4 Mpa (K100), slump (3-6) cm, w/c = 0,97 628,933.06
5 . A. 4.1.1.5. Membuat 1 m3 beton mutu f'c = 14,5 Mpa (K175), slump (12 ± 2) cm, w/c = 0,66 780,663.45
6 . A. 4.1.1.6. Membuat 1 m3 beton mutu f'c = 16,9 Mpa (K200), slump (12 ± 2) cm, w/c = 0,61 814,702.18
7 . A. 4.1.1.7. Membuat 1 m3 beton mutu f'c = 19,3 Mpa (K225), slump (12 ± 2) cm, w/c = 0,58 840,120.57
8 . A. 4.1.1.8. Membuat 1 m3 beton mutu f'c = 21,7 Mpa (K250), slump (12 ± 2) cm, w/c = 0,56 856,927.52
9 . A. 4.1.1.9. Membuat 1 m3 beton mutu f'c = 24,0 Mpa (K275), slump (12 ± 2) cm, w/c = 0,53 885,660.76
10 . A. 4.1.1.10. Membuat 1 m3 beton mutu f'c = 26,4 Mpa (K300), slump (12 ± 2) cm, w/c = 0,52 894,650.13
11 . A. 4.1.1.11. Membuat 1 m3 beton mutu f'c = 28,8 Mpa (K325), slump (12 ± 2) cm, w/c = 0,49 957,197.91
12 . A. 4.1.1.12. Membuat 1 m3 beton mutu f'c = 31,2 Mpa (K350), slump (12 ± 2) cm, w/c = 0,48 968,897.57
13 . A. 4.1.1.13. Membuat 1 m3 beton kedap air dengan storox - 100 737,876.65
14 . A. 4.1.1.14. Membuat 1 m' PVC waterstop lebar 150 mm 210,762.75
15 . A. 4.1.1.15. Membuat 1 m' PVC waterstop lebar 200 mm 315,837.50
16 . A. 4.1.1.16. Membuat 1 m' PVC waterstop lebar 230 mm - 320 mm 1,016,367.00
17 . A. 4.1.1.17. Pembesian 10 kg dengan besi polos atau besi ulir 113,429.25
18 . A. 4.1.1.18. Pembesian 10 kg kabel presstressed polos/strands 110,294.25
19 . A. 4.1.1.19. Pemasangan 10 kg jaring kawat (wiremesh) 110,607.75
20 . A. 4.1.1.20. Membuat 1 m2 bekisting untuk pondasi 105,897.00
21 . A. 4.1.1.21. Membuat 1 m2 bekisting untuk sloof 112,772.00
22 . A. 4.1.1.22. Membuat 1 m2 bekisting untuk kolom 367,493.50
23 . A. 4.1.1.23. Membuat 1 m2 bekisting untuk balok 381,518.50
24 . A. 4.1.1.24. Membuat 1 m2 bekisting untuk lantai 605,093.50
25 . A. 4.1.1.25. Membuat 1 m2 bekisting untuk dinding 456,318.50
26 . A. 4.1.1.26. Membuat 1 m2 bekisting untuk tangga 353,083.50
27 . A. 4.1.1.27. Pemasangan 1 m2 jembatan untuk pengecoran beton 85,365.50
28 . A. 4.1.1.28. Membuat 1 m3 pondasi beton bertulang (150 kg besi + bekisting) 3,023,389.60
29 . A. 4.1.1.29. Membuat 1 m3 Sloof beton bertulang (200 kg besi + bekisting) 3,714,151.10
30 . A. 4.1.1.30. Membuat 1 m3 Kolom beton bertulang (300 kg besi + bekisting) 7,581,998.60
31 . A. 4.1.1.31. Membuat 1 m3 Balok beton bertulang (200 kg besi + bekisting) 5,922,153.60
32 . A. 4.1.1.32. Membuat 1 m3 Kolom beton bertulang (150 kg besi + bekisting) 6,150,667.60
33 . A. 4.1.1.33. Membuat 1 m3 Dinding beton bertulang (150 kg besi + bekisting) 5,158,269.60
34 . A. 4.1.1.34. Membuat 1 m3 Dinding beton bertulang (200 kg besi + bekisting) 5,442,746.10
35 . A. 4.1.1.35. Membuat 1 m1 Kolom praktis beton bertulang (11 x 11) cm 60,546.64
36 . A. 4.1.1.36. Membuat 1 m1 Ring balok beton bertulang (10 x 15) cm 74,387.34
4.1.2
Pekerjaan Beton Pracetak 1 . A. 4.1.2.1. Pembuatan 1 m2 lahan produksi tebal 8 cm beton f'c = 14,5 Mpa (K175), slump (12 ± 2) cm 62,461.66
2 . A. 4.1.2.2. Pembuatan 1 m2 lahan produksi tebal 10 cm beton f'c = 14,5 Mpa (K175), slump (12 ± 2) cm 78,089.45
3 . A. 4.1.2.3. Pembuatan 1 m2 lahan produksi tebal 12 cm beton f'c = 14,5 Mpa (K175), slump (12 ± 2) cm 83,745.73
4 . A. 4.1.2.4. Pembuatan 1 m2 lahan produksi tebal 15 cm beton f'c = 14,5 Mpa (K175), slump (12 ± 2) cm 117,132.79
5 . A. 4.1.2.5. Pembuatan 1 m2 bekisting untuk plat beton pracetak ( 5 kali pakai ) 204,839.96
6 . A. 4.1.2.6. Pembuatan 1 m2 bekisting untuk balok beton pracetak ( 10 - 12 kali pakai ) 41,608.88
7 . A. 4.1.2.7. Pembuatan 1 m2 bekisting untuk kolom beton pracetak ( 10 - 12 kali pakai ) 38,916.08
8 . A. 4.1.2.8. Pemasangan dan membuka 1 buah komponen plat beton pracetak 4,092.00
9 . A. 4.1.2.9. Pemasangan dan membuka 1 buah komponen balok beton pracetak 6,633.00
10 . A. 4.1.2.10. Pemasangan dan membuka 1 buah komponen kolom beton pracetak 5,362.50
11 . A. 4.1.2.11. Penuangan/menebar beton untuk 1 buah komponen plat pracetak 32,642.50
12 . A. 4.1.2.12. Penuangan/menebar beton untuk 1 buah komponen balok pracetak 33,563.75
13 . A. 4.1.2.13. Penuangan/menebar beton untuk 1 buah komponen kolom pracetak 30,192.25
14 . A. 4.1.2.14. Mendirikan 1 buah komponen plat pracetak 593,243.75
15 . A. 4.1.2.15. Mendirikan 1 buah komponen balok pracetak 195,890.75
16 . A. 4.1.2.16. Mendirikan 1 buah komponen kolom pracetak 300,026.10
17 . A. 4.1.2.17. Melangsir 1 buah komponen plat pracetak ( ± 20 m ) 48,469.85
18 . A. 4.1.2.18. Melangsir 1 buah komponen balok pracetak ( ± 20 m ) 48,469.85
19 . A. 4.1.2.19. Melangsir 1 buah komponen kolom pracetak ( ± 20 m ) 48,469.85
20 . A. 4.1.2.20. Bahan 1 m3 grouting campuran 11,508,475.00
21 . A. 4.1.2.21. Bahan 1 m3 grouting tidak campuran 12,225,400.00
22 . A. 4.1.2.22. Upah melakukan 1 titik grouting pada join pracetak 29,326.00
23 . A. 4.1.2.23. Pemasangan 1 titik bekisting join pracetak 82,979.05
KELOMPOK PEKERJAAN JENIS PEKERJAAN HARGA SATUAN
LEVEL 1 KET.
(LEVEL 2) (SUB LEVEL 2) (Rp)
24 . A. 4.1.2.24. Upah 1 titik join dengan sling 38,841.00
4.2.1
Pekerjaan Besi & Aluminium 1 . A. 4.2.1.1. Pemasangan 1 kg besi profil 29,496.50
2 . A. 4.2.1.2. Pemasangan 1 kg rangka kuda-kuda baja IWF 29,496.50
3 . A. 4.2.1.3. Pengerjaan 100 kg pekerjaan perakitan 109,571.00
4 . A. 4.2.1.4. Pembuatan 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku 1,047,923.25
5 . A. 4.2.1.5. Pembuatan 10 cm pengelasan dengan las listrik 40,260.00
6 . A. 4.2.1.6. Pembuatan 1 m2 rangka jendela besi scuare tube (25 x 5) cm 589,683.05
7 . A. 4.2.1.7. Pemasangan 1 m2 pintu rolling door besi 308,550.00
8 . A. 4.2.1.8. Pemasangan 1 m2 pintu lipat (folding door) bahan plastik/PVC 404,635.00
9 . A. 4.2.1.9. Pemasangan 1 m2 sunscreen aluminium 131,560.00
10 . A. 4.2.1.10. Pemasangan 1 m2 rolling door aluminium 361,625.00
11 . A. 4.2.1.11. Pemasangan 1 m1 kusen pintu aluminium 129,570.65
12 . A. 4.2.1.12. Pemasangan 1 m2 pintu aluminium strip lebar 8 cm 1,192,921.95
13 . A. 4.2.1.13. Pemasangan 1 m2 pintu kaca rangka aluminium 514,857.75
14 . A. 4.2.1.14. Pemasangan 1 m2 venetions blinds dan vertical blinds 345,460.50
15 . A. 4.2.1.15. Pemasangan 1 m2 terali besi strip ( 2 x 3 ) mm 795,256.00
16 . A. 4.2.1.16. Pemasangan 1 m2 kawat nyamuk 267,151.50
17 . A. 4.2.1.17. Pemasangan 1 m2 jendela nako & tralis 342,078.92
18 . A. 4.2.1.18. Pemasangan 1 m1 talang datar/jurai seng bjls 28 lebar 90 cm 90,145.00
19 . A. 4.2.1.19. Pemasangan 1 m1 talang 1/2 lingkaran D - 15 c, seng plat bjls 20 lebar 45 cm 50,009.21
20 . A. 4.2.1.20. Pemasangan 1 m2 rangka besi hollow 1x40.40.2 mm, modul 60 x 120 cm, dinding partisi 116,564.25
21 . A. 4.2.1.21. Pemasangan 1 m2 rangka besi hollow 1x40.40.2 mm, modul 60 x 60 cm, plafon 138,151.75
4.4.1
Pekerjaan Dinding Pasangan 1 . A. 4.4.1.1. Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu, camp. 1 SP : 2PP 218,447.08
2 . A. 4.4.1.2. Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu, camp. 1 SP : 3PP 205,113.73
3 . A. 4.4.1.3. Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu, camp. 1 SP : 4PP 196,342.11
4 . A. 4.4.1.4. Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu, camp. 1 SP : 5PP 191,525.46
5 . A. 4.4.1.5. Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu, camp. 1 SP : 6PP 189,180.81
6 . A. 4.4.1.6. Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu, camp. 1 SP : 3KP : 10PP 176,422.13
7 . A. 4.4.1.7. Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu, camp. 1 SP : 2PP 104,965.66
8 . A. 4.4.1.8. Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu, camp. 1 SP : 3PP 98,771.61
9 . A. 4.4.1.9. Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu, camp. 1 SP : 4PP 95,145.55
10 . A. 4.4.1.10. Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu, camp. 1 SP : 5PP 92,860.35
11 . A. 4.4.1.11. Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu, camp. 1 SP : 6PP 91,519.01
12 . A. 4.4.1.12. Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu, camp. 1 SP : 8PP 89,087.63
13 . A. 4.4.1.13. Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu, camp. 1 SP : 3KP : 10 90,985.13
14 . A. 4.4.1.14. Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu, camp. 1 SM : 1KP : 1 77,506.41
15 . A. 4.4.1.15. Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu, camp. 1 SM : 1KP : 2 83,826.82
16 . A. 4.4.1.16. Pemasangan 1 m2 dinding conblock HB 20, camp. 1 SP : 3PP 243,784.97
17 . A. 4.4.1.17. Pemasangan 1 m2 dinding conblock HB 20, camp. 1 SP : 4PP 241,634.85
18 . A. 4.4.1.18. Pemasangan 1 m2 dinding conblock HB 15, camp. 1 SP : 3PP 207,484.53
19 . A. 4.4.1.19. Pemasangan 1 m2 dinding conblock HB 15, camp. 1 SP : 4PP 209,236.23
20 . A. 4.4.1.20. Pemasangan 1 m2 dinding conblock HB 10, camp. 1 SP : 3PP 182,447.21
21 . A. 4.4.1.21. Pemasangan 1 m2 dinding conblock HB 10, camp. 1 SP : 4PP 181,664.53
22 . A. 4.4.1.22. Pemasangan 1 m2 dinding terawang (rooster) 12x11x24 cm, camp. 1 SP : 3PP 212,028.08
23 . A. 4.4.1.23. Pemasangan 1 m2 dinding terawang (rooster) 12x11x24 cm, camp. 1 SP : 4PP 208,217.90
24 . A. 4.4.1.24. Pemasangan 1 m2 dinding bata berongga ekspose 12x11x24 cm, camp. 1 SP : 3PP 146,619.33
4.4.2
Pekerjaan Plesteran 1 . A. 4.4.2.1. Pemasangan 1 m2 plesteran 1SP : 1PP tebal 15 mm 50,160.33
2 . A. 4.4.2.2. Pemasangan 1 m2 plesteran 1SP : 2PP tebal 15 mm 43,267.29
3 . A. 4.4.2.3. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15 mm 40,238.88
4 . A. 4.4.2.4. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 15 mm 38,209.71
5 . A. 4.4.2.5.Pemasangan 1 m2 plesteran 1SP : 5PP tebal 15 mm 37,006.53
6 . A. 4.4.2.6.Pemasangan 1 m2 plesteran 1SP : 6PP tebal 15 mm 36,065.04
7 . A. 4.4.2.7.Pemasangan 1 m2 plesteran 1SP : 7PP tebal 15 mm 35,531.43
8 . A. 4.4.2.8.Pemasangan 1 m2 plesteran 1SP : 8PP tebal 15 mm 34,997.82
9 . A. 4.4.2.9.Pemasangan 1 m2 plesteran 1SP : 1/2KP :3PP tebal 15 mm 37,464.57
10 . A. 4.4.2.10.Pemasangan 1 m2 plesteran 1SP : 2KP :8PP tebal 15 mm 34,832.05
11 . A. 4.4.2.11.Pemasangan 1 m2 plesteran 1SM : 1KP :1PP tebal 15 mm 32,946.21
12 . A. 4.4.2.12.Pemasangan 1 m2 plesteran 1SM : 1KP :2PP tebal 15 mm 32,800.35
13 . A. 4.4.2.13.Pemasangan 1 m2 plesteran 1SP: 1PP tebal 20 mm 57,870.45
14 . A. 4.4.2.14.Pemasangan 1 m2 plesteran 1SP: 3PP tebal 20 mm 46,308.57
15 . A. 4.4.2.15.Pemasangan 1 m2 plesteran 1SP: 4PP tebal 20 mm 51,078.28
16 . A. 4.4.2.16.Pemasangan 1 m2 plesteran 1SP: 5PP tebal 20 mm 49,522.77
17 . A. 4.4.2.17.Pemasangan 1 m2 plesteran 1SP: 6PP tebal 20 mm 48,218.72
18 . A. 4.4.2.18.Pemasangan 1 m2 plesteran 1SM : 1KP :2PP tebal 20 mm 45,168.42
KELOMPOK PEKERJAAN JENIS PEKERJAAN HARGA SATUAN
LEVEL 1 KET.
(LEVEL 2) (SUB LEVEL 2) (Rp)
19 . A. 4.4.2.19.Pemasangan 1 m2 berapen 1SP : 5PP tebal 15 mm 24,139.28
20 . A. 4.4.2.20. Pemasangan 1 m1 plesteran skoning 1SP : 3PP lebar 10mm 33,562.60
21 . A. 4.4.2.21.Pemasangan 1 m2 plesteran granit 1SP : 2 granit tebal 1cm 94,272.75
22 . A. 4.4.2.22.Pemasangan 1 m2 plesteran traso 1SP : 2 traso tebal 1cm 94,272.75
23 . A. 4.4.2.23.Pemasangan 1 m2 plesteran ciprat 1SP : 2 PP 29,517.84
24 . A. 4.4.2.24.Pemasangan 1 m2 finishing siar pasangan bata merah 17,398.20
25 . A. 4.4.2.25.Pemasangan 1 m2 finishing siar pasangan conblock ekspose 8,365.50
26 . A. 4.4.2.26. Pemasangan 1 m2 finishing siar pasangan batu kali 1SP : 2PP 36,597.06
27 . A. 4.4.2.27. Pemasangan 1 m2 acian 21,845.31
4.4.3
Pekerjaan Penutup lantai &
Penutup dinding 1 . A. 4.4.3.1. Pemasangan 1 m2 lantai ubin PC abu-abu ukuran 40cm x 40cm 90,695.55
2 . A. 4.4.3.2. Pemasangan 1 m2 lantai ubin PC abu-abu ukuran 30cm x30cm 95,773.80
3 . A. 4.4.3.3. Pemasangan 1 m2 lantai ubin PC abu-abu ukuran 20cm x20cm 102,366.55
4 . A. 4.4.3.4. Pemasangan 1 m2 lantai ubin warna ukuran 40cm x40cm 105,174.30
5 . A. 4.4.3.5. Pemasangan 1 m2 lantai ubin warna ukuran 30cm x30cm 111,122.55
6 . A. 4.4.3.6. Pemasangan 1 m2 lantai ubin warna ukuran 20cm x20cm 116,922.30
7 . A. 4.4.3.7. Pemasangan 1 m2 lantai ubin traso ukuran 40cm x40cm -
8 . A. 4.4.3.8. Pemasangan 1 m2 lantai ubin traso ukuran 30cm x30cm -
9 . A. 4.4.3.9. Pemasangan 1 m2 lantai ubin granit ukuran 40cm x40cm -
10 . A. 4.4.3.10. Pemasangan 1 m2 lantai ubin granit ukuran 30cm x30cm -
11 . A. 4.4.3.11. Pemasangan 1 m2 lantai ubin teralux marmer ukuran 40cm x40cm -
12 . A. 4.4.3.12. Pemasangan 1 m2 lantai ubin teralux marmer ukuran 30cm x30cm -
13 . A. 4.4.3.13. Pemasangan 1 m2 lantai ubin teralux marmer ukuran 60cm x60cm -
14 . A. 4.4.3.14. Pemasangan 1 m2 lantai ubin teralux marmer ukuran 40cm x40cm -
15 . A. 4.4.3.15. Pemasangan 1 m2 lantai ubin teralux marmer ukuran 30cm x30cm -
16 . A. 4.4.3.16. Pemasangan 1 m1plint ubin PC abu-abu ukuran 15cm x20cm -
17 . A. 4.4.3.17. Pemasangan 1 m1 plint ubin PC abu-abu ukuran 10cm x30cm -
18 . A. 4.4.3.18. Pemasangan 1 m1 plint ubin PC abu-abu ukuran 10cm x40cm -
19 . A. 4.4.3.19. Pemasangan 1 m1 plint ubin warna ukuran 10cm x20cm -
20 . A. 4.4.3.20. Pemasangan 1 m1 plint ubin warna ukuran 10cm x30cm -
21 . A. 4.4.3.21. Pemasangan 1 m1 plint ubin warna ukuran 10cm x40cm -
22 . A. 4.4.3.22. Pemasangan 1 m1 plint ubin teraso ukuran 10cm x30cm -
23 . A. 4.4.3.23. Pemasangan 1 m1 plint ubin teraso ukuran 10cm x40cm -
24 . A. 4.4.3.24. Pemasangan 1 m1 plint ubin granit ukuran 10cm x40cm -
25 . A. 4.4.3.25. Pemasangan 1 m1 plint ubin granit ukuran 10cm x30cm -
26 . A. 4.4.3.26. Pemasangan 1 m1 plint ubin teralux kerang ukuran 10cm x40cm -
27 . A. 4.4.3.27. Pemasangan 1 m1 plint ubin teralux kerang ukuran 10cm x30cm -
28 . A. 4.4.3.28. Pemasangan 1 m1 plint ubin teralux marmer ukuran 10cm x60cm -
29 . A. 4.4.3.29. Pemasangan 1 m1 plint ubin teralux marmer ukuran 10cm x40cm -
30 . A. 4.4.3.30. Pemasangan 1 m1 plint ubin teralux marmer ukuran 10cm x30cm -
31 . A. 4.4.3.31. Pemasangan 1 m2 lantai teraso cor di tempat, tebal 3cm -
32 . A. 4.4.3.32. Pemasangan 1 m2 lantai keramik artistik 10cm x20cm -
33 . A. 4.4.3.33. Pemasangan 1 m2 lantai keramik artistik 10cm x10cm atau 5cm x 20cm -
34 . A. 4.4.3.34. Pemasangan 1 m2 lantai keramik ukuran 33cm x 33cm -
35 . A. 4.4.3.35. Pemasangan 1 m2 lantai keramik ukuran 30cm x 30cm 134,218.55
36 . A. 4.4.3.36. Pemasangan 1 m2 lantai keramik ukuran 20cm x 20cm 135,856.05
37 . A. 4.4.3.37. Pemasangan 1 m2 lantai keramik ukuran 10cm x 33cm untuk variasi/ border -
38 . A. 4.4.3.38. Pemasangan 1 m2 lantai keramik mozaik ukuran 30cm x 30cm -
39 . A. 4.4.3.39. Pemasangan 1 m1 plint keramik ukuran 10cm x 20cm -
40 . A. 4.4.3.40. Pemasangan 1 m1 plint keramik ukuran 10cm x 10cm -
41 . A. 4.4.3.41. Pemasangan 1 m1 plint keramik ukuran 5cm x 20cm 23,754.34
42 . A. 4.4.3.42. Pemasangan 1 m1 plint internal cove artistik 5cm x 5cmx 20cm -
43 . A. 4.4.3.43. Pemasangan 1 m2 lantai marmer ukuran 100cm x 100cm -
44 . A. 4.4.3.44. Pemasangan 1 m2 lantai karpet -
45 . A. 4.4.3.45. Pemasangan 1 m2 underlayer ( pelapis bawah karpet ) -
46 . A. 4.4.3.46. Pemasangan 1 m2 lantai parquet kayu -
47 . A. 4.4.3.47. Pemasangan 1 m2 lantai kayu gymfloor -
48 . A. 4.4.3.48. Pemasangan 1 m2 dinding porslen 11cmx 11cm -
49 . A. 4.4.3.49. Pemasangan 1 m2 dinding porslen 10cmx 20cm -
50 . A. 4.4.3.50. Pemasangan 1 m2 dinding porslen 20cmx 20cm -
51 . A. 4.4.3.51. Pemasangan 1 m2 dinding keramik artistik 10cmx 20cm -
52 . A. 4.4.3.52. Pemasangan 1 m2 dinding keramik artistik 5cmx 20cm -
53 . A. 4.4.3.53. Pemasangan 1 m2 dinding keramik 10cmx 20cm -
54 . A. 4.4.3.54. Pemasangan 1 m2 dinding keramik 20cmx 20cm 148,165.55
55 . A. 4.4.3.55. Pemasangan 1 m2 dinding marmer 100cmx 100cm -
56 . A. 4.4.3.56. Pemasangan 1 m2 dinding bata pelapis 3cmx 7cmx 24cm -
KELOMPOK PEKERJAAN JENIS PEKERJAAN HARGA SATUAN
LEVEL 1 KET.
(LEVEL 2) (SUB LEVEL 2) (Rp)
57 . A. 4.4.3.57. Pemasangan 1 m2 dinding batu paras -
58 . A. 4.4.3.58. Pemasangan 1 m2 dinding batu tempel hitam 172,856.34
59 . A. 4.4.3.59. Pemasangan 1 m2 lantai vynil ukuran 30cmx 30cm -
60 . A. 4.4.3.60. Pemasangan 1 m2 wallpaper lebar 50cm -
61 . A. 4.4.3.61. Pemasangan 1 m2 floor harderner -
62 . A. 4.4.3.62. Pemasangan 1 m1 plint vynil 15cm x 30cm -
63 . A. 4.4.3.63. Pemasangan 1 m1 plint kayu tebal 2cm lebar 10cm -
4.5.1
Pekerjaan Plafond 1 . A. 4.5.1.1. Pemasangan 1 m2 langit-langit asbes semen, tebal 4mm, 5mm dan 6mm 25,569.50
2 . A. 4.5.1.2. Pemasangan 1 m2 langit-langit akustik ukuran ( 30 x 30 )cm -
3 . A. 4.5.1.3. Pemasangan 1 m2 langit-langit akustik ukuran ( 30 x60 )cm -
4 . A. 4.5.1.4. Pemasangan 1 m2 langit-langit akustik ukuran ( 60 x 120 )cm -
5 . A. 4.5.1.5. Pemasangan 1 m2 langit-langit tripleks ukuran ( 120 x 240 )cm, tebal 3mm, 4mm dan 6mm 32,386.75
6 . A. 4.5.1.6. Pemasangan 1 m2 langit-langit lambrisering kayu, tebal 9mm -
7 . A. 4.5.1.7. Pemasangan 1 m2 langit-langit gypsum board ukuran ( 120x240x9 )cm, tebal 9mm 37,823.50
8 . A. 4.5.1.8. Pemasangan 1 m2 langit-langit akustik ukuran ( 60x120 )cm, berikut rangka alluminium -
9 . A. 4.5.1.9. Pemasangan 1 m1 list langit-langit kayu profil 12,072.50
10 . A. 4.5.1.10. Pemasangan 1 m2 Rangka langit-langit besi hollow 40.40 138,151.75
4.5.2
Pekerjaan Penutup atap 1 . A. 4.5.2.1. Pemasangan 1 m2 atap genteng palentong kecil 57,191.75
2 . A. 4.5.2.2. Pemasangan 1 m2 atap genteng kodok glazuur 61,316.75
3 . A. 4.5.2.3. Pemasangan 1 m2 atap genteng palentong besar/ super -
4 . A. 4.5.2.4. Pemasangan 1 m1 bubung genteng palentong 66,410.08
5 . A. 4.5.2.5. Pemasangan 1 m1 bubung genteng kodok glazuur 66,410.08
6 . A. 4.5.2.6. Pemasangan 1 m1 bubung genteng palentong besar -
7 . A. 4.5.2.7. Pemasangan 1 m1 roof light fibreglass 90 x 180 -
8 . A. 4.5.2.8. Pemasangan 1 m2 atap asbes gelombang 0,92m x 2,50m x 5mm -
9 . A. 4.5.2.9. Pemasangan 1 m2 atap asbes gelombang 0,92m x 2,25m x 5mm 65,991.75
10 . A. 4.5.2.10. Pemasangan 1 m2 atap asbes gelombang 0,92m x 2,00m x 5mm -
11 . A. 4.5.2.11. Pemasangan 1 m2 atap asbes gelombang 0,92m x 1,80m x 5mm -
12 . A. 4.5.2.12. Pemasangan 1 m2 atap asbes gelombang 1,05m x 3,00m x 4mm 43,351.00
13 . A. 4.5.2.13. Pemasangan 1 m2 atap asbes gelombang 1,05m x 2,70m x 4mm -
14 . A. 4.5.2.14. Pemasangan 1 m2 atap asbes gelombang 1,05m x 2,40m x 4mm 44,093.50
15 . A. 4.5.2.15. Pemasangan 1 m2 atap asbes gelombang 1,05m x 2,10m x 4mm 46,469.50
16 . A. 4.5.2.16. Pemasangan 1 m2 atap asbes gelombang 1,05m x 1,50m x 4mm -
17 . A. 4.5.2.17. Pemasangan 1 m2 atap asbes gelombang 1,08m x 3,00m x 6mm -
18 . A. 4.5.2.18. Pemasangan 1 m2 atap asbes gelombang 1,08m x 2,70m x 6mm -
19 . A. 4.5.2.19. Pemasangan 1 m2 atap asbes gelombang 1,08m x 2,40m x 6mm -
20 . A. 4.5.2.20. Pemasangan 1 m2 atap asbes gelombang 1,08m x 2,10m x 6mm -
21 . A. 4.5.2.21. Pemasangan 1 m2 atap asbes gelombang 1,08m x 1,80m x 6mm -
22 . A. 4.5.2.22. Pemasangan 1 m1 bubung stel gelombang 0,92m 145,846.25
23 . A. 4.5.2.23. Pemasangan 1 m1 bubung stel gelombang 1,05m 85,786.25
24 . A. 4.5.2.24. Pemasangan 1 m1 bubung stel gelombang 1,08m -
25 . A. 4.5.2.25. Pemasangan 1 m1 nok paten 0,92m -
26 . A. 4.5.2.26. Pemasangan 1 m1 nok paten 1,05m -
27 . A. 4.5.2.27. Pemasangan 1 m1 nok paten 1,08m -
28 . A. 4.5.2.28. Pemasangan 1 m1 nok stel rata 0,92m -
29 . A. 4.5.2.29. Pemasangan 1 m1 nok stel rata 1,05m -
30 . A. 4.5.2.30. Pemasangan 1 m2 genteng beton 102,641.00
31 . A. 4.5.2.31. Pemasangan 1 m2 genteng aspal -
32 . A. 4.5.2.32. Pemasangan 1 m2 genteng metal -
33 . A. 4.5.2.33. Pemasangan 1 m2 atap sirap kayu -
34 . A. 4.5.2.34. Pemasangan 1 m1 nok genteng beton 119,111.08
35 . A. 4.5.2.35. Pemasangan 1 m1 nok genteng aspal -
36 . A. 4.5.2.36. Pemasangan 1 m1 nok genteng metal -
37 . A. 4.5.2.37. Pemasangan 1 m1 nok sirap -
38 . A. 4.5.2.38. Pemasangan 1 m2 atap seng gelombang -
39 . A. 4.5.2.39. Pemasangan 1 m1 nok atap seng -
40 . A. 4.5.2.40. Pemasangan 1 m2 atap alumunium -
41 . A. 4.5.2.41. Pemasangan 1 m1 nok alumunium -
42 . A. 4.5.2.42. Pemasangan 1 m2 alumunium foil/sisalation -
4.6.1
Pekerjaan Kayu 1 . A. 4.6.1.1Pembuatan dan pemasangan 1m3 kusen pintu dan kusen jendela, kayu kelas I 35,352,350.00
2 . A. 4.6.1.2 Pembuatan dan pemasangan 1m3 kusen pintu dan kusen jendela, kayu kelas II atau III 13,483,800.00
3 . A. 4.6.1.3 Pembuatan dan pemasangan 1m2 pintu klamp standar kayu kelas II 510,515.50
4 . A. 4.6.1.4 Pembuatan dan pemasangan 1m2 pintu klamp sederhana kayu kelas III 422,515.50
5 . A. 4.6.1.5 Pembuatan dan pemasangan 1m2 daun pintu panel, kayu kelas I atau II 686,950.00
KELOMPOK PEKERJAAN JENIS PEKERJAAN HARGA SATUAN
LEVEL 1 KET.
(LEVEL 2) (SUB LEVEL 2) (Rp)
6 . A. 4.6.1.6 Pembuatan dan pemasangan 1m2 pintu dan jendela kaca, kayu kelas I atau II 464,640.00
7 . A. 4.6.1.7Pembuatan dan pemasangan 1m2 pintu dan jendela jalusi kayu kelas I atau II 937,750.00
8 . A. 4.6.1.8 Pembuatan 1m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup 523,523.00
9 . A. 4.6.1.9 Pembuatan 1m2 daun pintu plywood rangkap, rangka expose kayu kelas I atau II 556,028.00
10 . A. 4.6.1.10 Pemasangan 1m2 jalusi kusen kayu kelas I atau II 824,615.00
11 . A. 4.6.1.11 Pemasangan 1m2 teakwood rangkap, rangka expose kayu kelas I 1,097,118.00
12 . A. 4.6.1.12 Pemasangan 1m2 teakwood rangkap lapis formika, rangka expose kayu kelas II 632,043.50
13 . A. 4.6.1.13. Pemasangan 1m3 konstruksi kuda kuda konvensional, kayu kelas I, II dan III 13,008,820.00
14 . A. 4.6.1.14. Pemasangan 1m3 konstruksi kuda kuda expose, kayu kelas I 38,669,840.00
15 . A. 4.6.1.15. Pemasangan 1m3 konstyruksi gording, kayu kelas II 13,682,845.00
16 . A. 4.6.1.16. Pemasangan 1m2 rangka atap genteng keramik, kayu kelas II 165,044.00
17 . A. 4.6.1.17. Pemasangan 1m2 rangka atap genteng beton, kayu kelas II 165,101.75
18 . A. 4.6.1.18. Pemasangan 1m2 rangka atap sirap, kayu kelas II 164,850.40
19 . A. 4.6.1.19. Pemasangan 1m2 rangka langit-langit (50 x 100), kayu kelas II atau III 107,965.00
20 . A. 4.6.1.20. Pemasangan 1m2 rangka langit-langit (60 x 60), cm kayu kelas II atau III 111,017.50
21 . A. 4.6.1.21. Pemasangan 1m' lisplank ukuran (3 x 20), cm kayu kelas I atau II 139,370.00
22 . A. 4.6.1.22. Pemasangan 1m' lisplank ukuran (3 x 30), cm kayu kelas I atau II 138,710.00
23 . A. 4.6.1.23. Pemasangan 1m2 rangka dinding pemisah (60 x 120), cm kayu kelas II atau III 244,548.70
24 . A. 4.6.1.24. Pemasangan 1m2 dinding pemisah teakwood rangkap, rangka kayu kelas II 225,210.70
25 . A. 4.6.1.25. Pemasangan 1m2 dinding pemisah plywood rangkap, rangka kayu kelas II 299,785.20
26 . A. 4.6.1.26. Pemasangan 1m2 dinding lambrisering dari papan kayu kelas I 382,305.00
27 . A. 4.6.1.27. Pemasangan 1m2 dinding lambrisering dari plywood ukuran (120 x 240) 8,835.75
28 . A. 4.6.1.28. Pemasangan 1m2 dinding bilik, rangka kayu kelas III atau IV -
4.6.2
Pekerjaan Kunci & Kaca 1 . A. 4.6.2.1. Pemasangan 1 buah kunci tanam antik -
2 . A. 4.6.2.2. Pemasangan 1 buah kunci tanam biasa 134,750.00
3 . A. 4.6.2.3. Pemasangan 1 buah kunci kamar mandi -
4 . A. 4.6.2.4. Pemasangan 1 buah kunci silinder -
5 . A. 4.6.2.5. Pemasangan 1 buah engsel pintu 27,772.80
6 . A. 4.6.2.6. Pemasangan 1 buah engsel jendela kupu-kupu 20,713.00
7 . A. 4.6.2.7. Pemasangan 1 buah engsel angin -
8 . A. 4.6.2.8. Pemasangan 1 buah spring knip -
9 . A. 4.6.2.9. Pemasangan 1 buah kait angin 29,348.00
10 . A. 4.6.2.10. Pemasangan 1 buah door closer -
11 . A. 4.6.2.11. Pemasangan 1 buah kunci slot -
12 . A. 4.6.2.12. Pemasangan 1 buah Door holder 45,848.00
13 . A. 4.6.2.13. Pemasangan 1 buah Door stop -
14 . A. 4.6.2.14. Pemasangan 1 buah Rel pintu sorong -
15 . A. 4.6.2.15. Pemasangan 1 buah kunci lemari -
16 . A. 4.6.2.16. Pemasangan 1 m2 kaca tebal 3 mm 79,197.80
17 . A. 4.6.2.17. Pemasangan 1 m2 kaca tebal 5 mm 109,447.80
18 . A. 4.6.2.18. Pemasangan 1 m2 kaca tebal 8 mm -
19 . A. 4.6.2.19. Pemasangan 1 m2 kaca buram tebal 12 mm -
20 . A. 4.6.2.20. Pemasangan 1 m2 kaca cermin tebal 5 mm -
21 . A. 4.6.2.21. Pemasangan 1 m2 kaca cermin tebal 8 mm -
22 . A. 4.6.2.22. Pemasangan 1 m2 kaca wireglassed tebal 5 mm -
23 . A. 4.6.2.23. Pemasangan 1 m2 kaca patri tebal 5 mm -
4.7.1
Pekerjaan Pengecatan 1 . A. 4.7.1.1. 1 M2 Pengikisan/ pengerokan permukaan cat lama 2,150.50
2 . A. 4.7.1.2. 1 M2 Pencucian bidang permukaan tembok yang pernah dicat 1,600.50
3 . A. 4.7.1.3. 1 M2 Pengerokan karat pada permukaan baja cara manual 1,930.50
4 . A. 4.7.1.4. 1 M2 Pengecatan bidang kayu baru (1 lapis plamur, 1 lapis cat dasar, 2 lapis cat) 40,139.00
5 . A. 4.7.1.5. 1 M2 Pengecatan bidang kayu baru (1 lapis plamur, 1 lapis cat dasar, 3 lapis cat penutup) 51,265.50
6 . A. 4.7.1.6. Pelaburan 1 M2 bidang kayu degan teak oil -
7 . A. 4.7.1.7. Pelaburan 1 M2 bidang kayu dengan politur 37,059.00
8 . A. 4.7.1.8. Pelaburan 1 M2 bidang kayu cat residu dan cat -
9 . A. 4.7.1.9. Pelaburan 1 M2 bidang kayu dengan vernis -
10 . A. 4.7.1.10. 1 M2 Pengecatan tembok baru (1 lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup 12,129.98
11 . A. 4.7.1.11. 1 M2 Pengecatan tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup 8,537.65
12 . A. 4.7.1.12. 1 M2 Pelaburan tembok dengan kalkarim -
13 . A. 4.7.1.13. 1 M2 Pelaburan tembok dengan kapur sirih 8,910.83
14 . A. 4.7.1.14. 1 M2 Pelaburan tembok lama dengan kapur sirih ( pemeliharaan ) 4,299.63
15 . A. 4.7.1.15. 1 M2 Pemasangan wallpaper -
16 . A. 4.7.1.16. 1 M2 Pengecatan permukaan baja dengan menie besi 17,072.00
17 . A. 4.7.1.17. 1 M2 Pengecatan permukaan baja dengan menie besi dengan perancah -
18 . A. 4.7.1.18. 1 M2 Pengecatan permukaan baja galvanis secara manual 4 lapis -
19 . A. 4.7.1.19. 1 M2 Pengecatan permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir -
KELOMPOK PEKERJAAN JENIS PEKERJAAN HARGA SATUAN
LEVEL 1 KET.
(LEVEL 2) (SUB LEVEL 2) (Rp)
20 . A. 4.7.1.20. 1 M2 Pengecatan permukaan baja galvanis secara manual sistem 3 lapis -
21 . A. 4.7.1.21. 1 M2 Pengecatan permukaan baja galvanis secara semprot sistem 3 lapis cat mutakhir -
5.1.1
Divisi 5
Pekerjaan Sanitasi Gedung 1 . A. 5.1.1.1. Pemasangan 1 buah clooset duduk / monoblok 1,290,492.50
2 . A. 5.1.1.2. Pemasangan 1 buah clooset jongkok porslin -
3 . A. 5.1.1.3. Pemasangan 1 buah clooset jongkok teraso 295,601.90
4 . A. 5.1.1.3. Pemasangan 1 buah clooset jongkok teraso -
5 . A. 5.1.1.4. Pemasangan 1 buah urinoir 1,273,584.40
6 . A. 5.1.1.5. Pemasangan 1 buah wastafel 497,231.90
7 . A. 5.1.1.6. Pemasangan 1 buah bathcuip porselin -
8 . A. 5.1.1.7. Pemasangan 1 buah bak fiberglass vol 1m3 -
9 . A. 5.1.1.8. Pemasangan 1 buah bak mandi batu bata vol 0,30 m3 1,029,237.00
10 . A. 5.1.1.9. Pemasangan 1 buah bak mandi teraso vol 0,30 m3 -
11 . A. 5.1.1.10. Pemasangan 1 buah bak air fiberglass vol 1 m3 -
12 . A. 5.1.1.11. Pemasangan 1 buah bak beton volume 1 m3 -
13 . A. 5.1.1.12. Pemasangan 1 buah bak cuci piring stainlessteel -
14 . A. 5.1.1.13. Pemasangan 1 buah bak cuci piring teraso -
15 . A. 5.1.1.14. Pemasangan 1 buah floor drain 35,007.50
16 . A. 5.1.1.15. Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm 292,893.70
17 . A. 5.1.1.16. Pemasangan 1 buah bak kontrol pasangan bata 45x45 tinggi 50 cm 449,743.80
18 . A. 5.1.1.17. Pemasangan 1 buah bak kontrol pasangan bata 60x60 tinggi 65 cm 576,492.51
19 . A. 5.1.1.18. Pemasangan 1 m' pipa galvanis diameter 1/2" 23,540.92
20 . A. 5.1.1.19. Pemasangan 1 buah kran diameter 1/2" atau 3/4" 55,123.75
21 . A. 5.1.1.20. Pemasangan 1 m' pipa galvanis diameter 3/4" 26,382.58
22 . A. 5.1.1.21. Pemasangan 1 m' pipa galvanis diameter 1" 30,076.75
23 . A. 5.1.1.22. Pemasangan 1 m' pipa galvanis diameter 1 1/2" 67,433.67
24 . A. 5.1.1.23. Pemasangan 1 m' pipa galvanis diameter 3" 218,286.75
25 . A. 5.1.1.24. Pemasangan 1 m' pipa galvanis diameter 4" 320,586.75
26 . A. 5.1.1.25. Pemasangan 1 m' pipa PVC tipe AW diameter 1/2" 12,956.63
27 . A. 5.1.1.26. Pemasangan 1 m' pipa PVC tipe AW diameter 3/4" 14,874.75
28 . A. 5.1.1.27. Pemasangan 1 m' pipa PVC tipe AW diameter 1" 18,711.00
29 . A. 5.1.1.28. Pemasangan 1 m' pipa PVC tipe AW diameter 1 1/2" 33,394.63
30 . A. 5.1.1.29. Pemasangan 1 m' pipa PVC tipe AW diameter 2" 39,788.38
31 . A. 5.1.1.30. Pemasangan 1 m' pipa PVC tipe AW diameter 2 1/2" 57,838.00
32 . A. 5.1.1.31. Pemasangan 1 m' pipa PVC tipe AW diameter 3" 68,707.38
33 . A. 5.1.1.32. Pemasangan 1 m' pipa PVC tipe AW diameter 4" 110,479.88
34 . A. 5.1.1.33. Pemasangan 1 m' pipa air limbah jenis pipa tanah diameter 20 cm -
35 . A. 5.1.1.34. Pemasangan 1 m' pipa air limbah jenis pipa tanah diameter 15 cm -
36 . A. 5.1.1.35. Pemasangan 1 m' pipa beton diameter 15 - 20 cm -
37 . A. 5.1.1.36. Pemasangan 1 m' pipa beton diameter 30 - 100 cm -
8.4.1
Divisi 8
Pekerjaan Pemasangan Pipa 1 . A. 8.4.1.1. Pemasangan 1 m pipa PVC Ø 63 mm
2 . A. 8.4.1.2. Pemasangan 1 m Pipa PVC Æ 90 mm
3 . A. 8.4.1.3. Pemasangan 1 m pipa PVC Ø 110 mm
4 . A. 8.4.1.4. Pemasangan 1 m pipa PVC Ø 150 mm
5 . A. 8.4.1.5. Pemasangan 1 m pipa PVC Ø 200 mm
6 . A. 8.4.1.6. Pemasangan 1 m pipa PVC Ø 250 mm
7 . A. 8.4.1.7. Pemasangan 1 m pipa PVC Ø 300 mm
8 . A. 8.4.1.8. Pemasangan 1 m pipa PVC Ø 400 mm
9 . A. 8.4.1.9. Pemasangan 1 m pipa PVC Ø 450 mm
10 . A. 8.4.1.10. Pemasangan 1 m pipa PVC Ø 500 mm
11 . A. 8.4.1.11. Pemasangan 1 m pipa PVC Ø 600 mm
12 . A. 8.4.1.12. Pemasangan 1 m pipa PVC Ø 800 mm
13 . A. 8.4.1.13. Pemasangan 1 m pipa PVC Ø 900 mm
14 . A. 8.4.1.14. Pemasangan 1 m pipa PVC Ø 1000 mm
15 . A. 8.4.1.15. Pemasangan 1 m pipa PVC Ø 1100 mm
16 . A. 8.4.1.16. Pemasangan 1 m pipa PVC Ø 1200 mm
17 . A. 8.4.1.17. Pemasangan 1 m pipa HDPE Ø 63 mm
18 . A. 8.4.1.18. Pemasangan 1 m pipa HDPE Ø 100 mm
19 . A. 8.4.1.19. Pemasangan 1 m pipa HDPE Ø 125 mm
20 . A. 8.4.1.20. Pemasangan 1 m pipa HDPE Ø 150 mm
21 . A. 8.4.1.21. Pemasangan 1 m pipa HDPE Ø 200 mm
22 . A. 8.4.1.22. Pemasangan 1 m pipa HDPE Ø 250 mm
23 . A. 8.4.1.23. Pemasangan 1 m pipa HDPE Ø 300 mm
24 . A. 8.4.1.24. Pemasangan 1 m pipa HDPE Ø 400 mm
25 . A. 8.4.1.25. Pemasangan 1 m pipa HDPE Ø 450 mm
26 . A. 8.4.1.26. Pemasangan 1 m pipa HDPE Ø 500 mm
KELOMPOK PEKERJAAN JENIS PEKERJAAN HARGA SATUAN
LEVEL 1 KET.
(LEVEL 2) (SUB LEVEL 2) (Rp)
27 . A. 8.4.1.27. Pemasangan 1 m pipa HDPE Ø 600 mm
28 . A. 8.4.1.28. Pemasangan 1 m pipa HDPE Ø 800 mm
29 . A. 8.4.1.29. Pemasangan 1 m pipa HDPE Ø 900 mm
30 . A. 8.4.1.30. Pemasangan 1 m pipa HDPE Ø 1000 mm
31 . A. 8.4.1.31. Pemasangan 1 m pipa HDPE Ø 1100 mm
32 . A. 8.4.1.32. Pemasangan 1 m pipa HDPE Ø 1200 mm
33 . A. 8.4.1.33. Pemasangan 1 m pipa GIP Ø 63 mm
34 . A. 8.4.1.34. Pemasangan 1 m pipa GIP Ø 100 mm
35 . A. 8.4.1.35. Pemasangan 1 m pipa GIP Ø 125 mm
36 . A. 8.4.1.36. Pemasangan 1 m pipa GIP Ø 150 mm
37 . A. 8.4.1.37. Pemasangan 1 m pipa GIP Ø 200 mm
38 . A. 8.4.1.38. Pemasangan 1 m pipa GIP Ø 250 mm
39 . A. 8.4.1.39. Pemasangan 1 m pipa GIP Ø 300 mm
40 . A. 8.4.1.40. Pemasangan 1 m pipa GIP Ø 400 mm
41 . A. 8.4.1.41. Pemasangan 1 m pipa GIP Ø 450 mm
42 . A. 8.4.1.42. Pemasangan 1 m pipa GIP Ø 500 mm
43 . A. 8.4.1.43. Pemasangan 1 m pipa GIP Ø 600 mm
44 . A. 8.4.1.44. Pemasangan 1 m pipa GIP Ø 800 mm
45 . A. 8.4.1.45. Pemasangan 1 m pipa GIP Ø 900 mm
46 . A. 8.4.1.46. Pemasangan 1 m pipa GIP Ø 1000 mm
47 . A. 8.4.1.48. Pemasangan 1 m pipa GIP Ø 1200 mm
48 . A. 8.4.1.49. Pemasangan 1 m pipa DCI Ø 100 mm
49 . A. 8.4.1.50. Pemasangan 1 m pipa DCI Ø 125 mm
50 . A. 8.4.1.51. Pemasangan 1 m pipa DCI Ø 150 mm
51 . A. 8.4.1.52. Pemasangan 1 m pipa DCI Ø 200 mm
52 . A. 8.4.1.53. Pemasangan 1 m pipa DCI Ø 250 mm
53 . A. 8.4.1.54. Pemasangan 1 m pipa DCI Ø 300 mm
54 . A. 8.4.1.55. Pemasangan 1 m pipa DCI Ø 400 mm
55 . A. 8.4.1.56. Pemasangan 1 m pipa DCI Ø 450 mm
56 . A. 8.4.1.57. Pemasangan 1 m pipa DCI Ø 500 mm
57 . A. 8.4.1.58. Pemasangan 1 m pipa DCI Ø 600 mm
58 . A. 8.4.1.59. Pemasangan 1 m pipa DCI Ø 800 mm
59 . A. 8.4.1.60. Pemasangan 1 m pipa DCI Ø 900 mm
60 . A. 8.4.1.61. Pemasangan 1 m pipa DCI Ø 1000 mm
61 . A. 8.4.1.62. Pemasangan 1 m pipa DCI Ø 1100 mm
62 . A. 8.4.1.63. Pemasangan 1 m pipa DCI Ø 1200 mm
63 . A. 8.4.1.64. Pemasangan 1 m pipa baja Ø 63 mm
64 . A. 8.4.1.65. Pemasangan 1 m pipa baja Ø 100 mm
65 . A. 8.4.1.66. Pemasangan 1 m pipa baja Ø 125 mm
66 . A. 8.4.1.67. Pemasangan 1 m pipa baja Ø 150 mm
67 . A. 8.4.1.68. Pemasangan 1 m pipa baja Ø 200 mm
68 . A. 8.4.1.69. Pemasangan 1 m pipa baja Ø 250 mm
69 . A. 8.4.1.70. Pemasangan 1 m pipa baja Ø 300 mm
70 . A. 8.4.1.71. Pemasangan 1 m pipa baja Ø 400 mm
71 . A. 8.4.1.72. Pemasangan 1 m pipa baja Ø 450 mm
72 . A. 8.4.1.73. Pemasangan 1 m pipa baja Ø 500 mm
73 . A. 8.4.1.74. Pemasangan 1 m pipa baja Ø 600 mm
74 . A. 8.4.1.75. Pemasangan 1 m pipa baja Ø 800 mm
75 . A. 8.4.1.76. Pemasangan 1 m pipa baja Ø 900 mm
76 . A. 8.4.1.77. Pemasangan 1 m pipa baja Ø 1000 mm
77 . A. 8.4.1.78. Pemasangan 1 m pipa baja Ø 1100 mm
78 . A. 8.4.1.79. Pemasangan 1 m pipa baja Ø 1200 mm
8.4.2
Pekerjaan Pemotongan Pipa 1 . A. 8.4.2.1. Pemotongan 1 buah pipa PVC Ø 63 mm
2 . A. 8.4.2.2. Pemotongan 1 buah pipa PVC Ø 90 mm
3 . A. 8.4.2.3. Pemotongan 1 buah pipa PVC Ø 110 mm
4 . A. 8.4.2.4. Pemotongan 1 buah pipa PVC Ø 150 mm
5 . A. 8.4.2.5. Pemotongan 1 buah pipa PVC Ø 200 mm
6 . A. 8.4.2.6. Pemotongan 1 buah pipa PVC Ø 250 mm
7 . A. 8.4.2.7. Pemotongan 1 buah pipa PVC Ø 300 mm
8 . A. 8.4.2.8. Pemotongan 1 buah pipa PVC Ø 400 mm
9 . A. 8.4.2.9. Pemotongan 1 buah pipa PVC Ø 450 mm
10 . A. 8.4.2.10. Pemotongan 1 buah pipa PVC Ø 500 mm
11 . A. 8.4.2.11. Pemotongan 1 buah pipa PVC Ø 600 mm
12 . A. 8.4.2.12. Pemotongan 1 buah pipa PVC Ø 800 mm
13 . A. 8.4.2.13. Pemotongan 1 buah pipa PVC Ø 900 mm
14 . A. 8.4.2.14. Pemotongan 1 buah pipa PVC Ø 1000 mm
KELOMPOK PEKERJAAN JENIS PEKERJAAN HARGA SATUAN
LEVEL 1 KET.
(LEVEL 2) (SUB LEVEL 2) (Rp)
15 . A. 8.4.2.15. Pemotongan 1 buah pipa PVC Ø 1100 mm
16 . A. 8.4.2.16. Pemotongan 1 buah pipa PVC Ø 1200 mm
17 . A. 8.4.2.17. Pemotongan 1 buah pipa HDPE Ø 63 mm
18 . A. 8.4.2.18. Pemotongan 1 buah pipa HDPE Ø 100 mm
19 . A. 8.4.2.19. Pemotongan 1 buah pipa HDPE Ø 125 mm
20 . A. 8.4.2.20. Pemotongan 1 buah pipa HDPE Ø 150 mm
21 . A. 8.4.2.21. Pemotongan 1 buah pipa HDPE Ø 200 mm
22 . A. 8.4.2.22. Pemotongan 1 buah pipa HDPE Ø 250 mm
23 . A. 8.4.2.23. Pemotongan 1 buah pipa HDPE Ø 300 mm
24 . A. 8.4.2.24. Pemotongan 1 buah pipa HDPE Ø 400 mm
25 . A. 8.4.2.25. Pemotongan 1 buah pipa HDPE Ø 450 mm
26 . A. 8.4.2.26. Pemotongan 1 buah pipa HDPE Ø 500 mm
27 . A. 8.4.2.27. Pemotongan 1 buah pipa HDPE Ø 600 mm
28 . A. 8.4.2.28. Pemotongan 1 buah pipa HDPE Ø 800 mm
29 . A. 8.4.2.29. Pemotongan 1 buah pipa HDPE Ø 900 mm
30 . A. 8.4.2.30. Pemotongan 1 buah pipa HDPE Ø 1000 mm
31 . A. 8.4.2.31. Pemotongan 1 buah pipa HDPE Ø 1100 mm
32 . A. 8.4.2.32. Pemotongan 1 buah pipa HDPE Ø 1200 mm
33 . A. 8.4.2.33. Pemotongan 1 buah pipa GIP Ø 63 mm
34 . A. 8.4.2.34. Pemotongan 1 buah pipa GIP Ø 100 mm
35 . A. 8.4.2.35. Pemotongan 1 buah pipa GIP Ø 125 mm
36 . A. 8.4.2.36. Pemotongan 1 buah pipa GIP Ø 150 mm
37 . A. 8.4.2.37. Pemotongan 1 buah pipa GIP Ø 200 mm
38 . A. 8.4.2.38. Pemotongan 1 buah pipa GIP Ø 250 mm
39 . A. 8.4.2.39. Pemotongan 1 buah pipa GIP Ø 300 mm
40 . A. 8.4.2.40. Pemotongan 1 buah pipa GIP Ø 400 mm
41 . A. 8.4.2.41. Pemotongan 1 buah pipa GIP Ø 450 mm
42 . A. 8.4.2.42. Pemotongan 1 buah pipa GIP Ø 500 mm
43 . A. 8.4.2.43. Pemotongan 1 buah pipa GIP Ø 600 mm
44 . A. 8.4.2.44. Pemotongan 1 buah pipa GIP Ø 800 mm
45 . A. 8.4.2.45. Pemotongan 1 buah pipa GIP Ø 900 mm
46 . A. 8.4.2.46. Pemotongan 1 buah pipa GIP Ø 1000 mm
47 . A. 8.4.2.47. Pemotongan 1 buah pipa GIP Ø 1100 mm
48 . A. 8.4.2.48. Pemotongan 1 buah pipa GIP Ø 1200 mm
49 . A. 8.4.2.49. Pemotongan 1 buah pipa DCI Ø 100 mm
50 . A. 8.4.2.50. Pemotongan 1 buah pipa DCI Ø 125 mm
51 . A. 8.4.2.51. Pemotongan 1 buah pipa DCI Ø 150 mm
52 . A. 8.4.2.52. Pemotongan 1 buah pipa DCI Ø 200 mm
53 . A. 8.4.2.53. Pemotongan 1 buah pipa DCI Ø 250 mm
54 . A. 8.4.2.54. Pemotongan 1 buah pipa DCI Ø 300 mm
55 . A. 8.4.2.55. Pemotongan 1 buah pipa DCI Ø 400 mm
56 . A. 8.4.2.56. Pemotongan 1 buah pipa DCI Ø 450 mm
57 . A. 8.4.2.57. Pemotongan 1 buah pipa DCI Ø 500 mm
58 . A. 8.4.2.58. Pemotongan 1 buah pipa DCI Ø 600 mm
59 . A. 8.4.2.59. Pemotongan 1 buah pipa DCI Ø 800 mm
60 . A. 8.4.2.60. Pemotongan 1 buah pipa DCI Ø 900 mm
61 . A. 8.4.2.61. Pemotongan 1 buah pipa DCI Ø 1000 mm
62 . A. 8.4.2.62. Pemotongan 1 buah pipa DCI Ø 1100 mm
63 . A. 8.4.2.63. Pemotongan 1 buah pipa DCI Ø 1200 mm
64 . A. 8.4.2.64. Pemotongan 1 buah pipa baja Ø 63 mm
65 . A. 8.4.2.65. Pemotongan 1 buah pipa baja Ø 100 mm
66 . A. 8.4.2.66. Pemotongan 1 buah pipa baja Ø 125 mm
67 . A. 8.4.2.67. Pemotongan 1 buah pipa baja Ø 150 mm
68 . A. 8.4.2.68. Pemotongan 1 buah pipa baja Ø 200 mm
69 . A. 8.4.2.69. Pemotongan 1 buah pipa baja Ø 250 mm
70 . A. 8.4.2.70. Pemotongan 1 buah pipa baja Ø 300 mm
71 . A. 8.4.2.71. Pemotongan 1 buah pipa baja Ø 400 mm
72 . A. 8.4.2.72. Pemotongan 1 buah pipa baja Ø 450 mm
73 . A. 8.4.2.73. Pemotongan 1 buah pipa baja Ø 500 mm
74 . A. 8.4.2.74. Pemotongan 1 buah pipa baja Ø 600 mm
75 . A. 8.4.2.75. Pemotongan 1 buah pipa baja Ø 800 mm
76 . A. 8.4.2.76. Pemotongan 1 buah pipa baja Ø 900 mm
77 . A. 8.4.2.77. Pemotongan 1 buah pipa baja Ø 1000 mm
78 . A. 8.4.2.78. Pemotongan 1 buah pipa baja Ø 1100 mm
79 . A. 8.4.2.79. Pemotongan 1 buah pipa baja Ø 1200 mm
8.4.3
Pekerjaan Aksesoris Pipa 1 . A. 8.4.3.1. Pemasangan 1 Buah Valve Æ 150 MM
KELOMPOK PEKERJAAN JENIS PEKERJAAN HARGA SATUAN
LEVEL 1 KET.
(LEVEL 2) (SUB LEVEL 2) (Rp)
2 . A. 8.4.3.2. Pemasangan 1 Buah Valve Æ 200 MM
3 . A. 8.4.3.3. Pemasangan 1 Buah Valve Æ 250 MM
4 . A. 8.4.3.4. Pemasangan 1 Buah Valve Æ 300 MM
5 . A. 8.4.3.5. Pemasangan 1 Buah Valve Æ 400 MM
6 . A. 8.4.3.6. Pemasangan 1 Buah Valve Æ 450 MM
7 . A. 8.4.3.7. Pemasangan 1 Buah Valve Æ 500 MM
8 . A. 8.4.3.8. Pemasangan 1 Buah Valve Æ 600 MM
9 . A. 8.4.3.9. Pemasangan 1 Buah Valve Æ 700 MM
10 . A. 8.4.3.10. Pemasangan 1 Buah Valve Æ 800 MM
11 . A. 8.4.3.11. Pemasangan 1 Buah Valve Æ 900 MM
12 . A. 8.4.3.12. Pemasangan 1 Buah Valve Æ 1000 MM
13 . A. 8.4.3.13. Pemasangan 1 Buah Valve Æ 1100 MM
14 . A. 8.4.3.14. Pemasangan 1 Buah Valve Æ 1200 MM
15 . A. 8.4.3.15. Pemasangan 1 Buah Tee Æ 150 MM
16 . A. 8.4.3.16. Pemasangan 1 Buah Tee Æ 200 MM
17 . A. 8.4.3.17. Pemasangan 1 Buah Tee Æ 250 MM
18 . A. 8.4.3.18. Pemasangan 1 Buah Tee Æ 300 MM
19 . A. 8.4.3.19. Pemasangan 1 Buah Tee Æ 400 MM
20 . A. 8.4.3.20. Pemasangan 1 Buah Tee Æ 450 MM
21 . A. 8.4.3.21. Pemasangan 1 Buah Tee Æ 500 MM
22 . A. 8.4.3.22. Pemasangan 1 Buah Tee Æ 600 MM
23 . A. 8.4.3.23. Pemasangan 1 Buah Tee Æ 700 MM
24 . A. 8.4.3.24. Pemasangan 1 Buah Tee Æ 800 MM
25 . A. 8.4.3.25. Pemasangan 1 Buah Tee Æ 900 MM
26 . A. 8.4.3.26. Pemasangan 1 Buah Tee Æ 1000 MM
27 . A. 8.4.3.27. Pemasangan 1 Buah Tee Æ 1100 MM
28 . A. 8.4.3.28. Pemasangan 1 Buah Tee Æ 1200 MM
8.4.4
Pekerjaan Penyambungan Pipa 1 . A. 8.4.4.1. Penyambungan 1 buah pipa baru ke pipa yang ada Ø 80 mm
2 . A. 8.4.4.2. Penyambungan 1 buah pipa baru ke pipa yang ada Ø 100 mm
3 . A. 8.4.4.3. Penyambungan 1 buah pipa baru ke pipa yang ada Ø 150 mm
4 . A. 8.4.4.4. Penyambungan 1 buah pipa baru ke pipa yang ada Ø 200 mm
5 . A. 8.4.4.5. Penyambungan 1 buah pipa baru ke pipa yang ada Ø 250 mm
6 . A. 8.4.4.6. Penyambungan 1 buah pipa baru ke pipa yang ada Ø 300 mm
7 . A. 8.4.4.7. Penyambungan 1 buah pipa baru ke pipa yang ada Ø 400 mm
8 . A. 8.4.4.8. Penyambungan 1 buah pipa baru ke pipa yang ada Ø 450 mm
9 . A. 8.4.4.9. Penyambungan 1 buah pipa baru ke pipa yang ada Ø 500 mm
10 . A. 8.4.4.10. Penyambungan 1 buah pipa baru ke pipa yang ada Ø 600 mm
11 . A. 8.4.4.11. Penyambungan 1 buah pipa baru ke pipa yang ada Ø 700 mm
12 . A. 8.4.4.12. Penyambungan 1 buah pipa baru ke pipa yang ada Ø 800 mm
8.4.5
Pekerjaan Pengetesan Pipa 1 . A. 8.4.5.1. Pengetesan 1 m pipa Ø 50 mm
2 . A. 8.4.5.2. Pengetesan 1 m pipa Ø 75 mm
3 . A. 8.4.5.3. Pengetesan 1 m pipa Ø 100 mm
4 . A. 8.4.5.4. Pengetesan 1 m pipa Ø 150 mm
5 . A. 8.4.5.5. Pengetesan 1 m pipa Ø 200 mm
6 . A. 8.4.5.6. Pengetesan 1 m pipa Ø 250 mm
7 . A. 8.4.5.7. Pengetesan 1 m pipa Ø 300 mm
8 . A. 8.4.5.8. Pengetesan 1 m pipa Ø 400 mm
9 . A. 8.4.5.9. Pengetesan 1 m pipa Ø 500 mm
10 . A. 8.4.5.10. Pengetesan 1 m pipa Ø 600 mm
DAFTAR HARGA SATUAN BAHAN DAN UPAH
TAHUN 2014
NO. URAIAN SATUAN SHBJ TB. VIJAYA TB. BERKAH ABADI TB. DIAN MULYA EE OE KETERANGAN
1 2 3 4 5
UPAH
1 Pekerja Oh Rp 45,000.00 Rp 45,000.00 Rp 45,000.00
2 Tenaga gali tanah/pondasi Oh Rp 45,000.00 Rp 45,000.00 Rp 45,000.00
3 Tukang batu Oh Rp 55,000.00 Rp 55,000.00 Rp 55,000.00
4 Tukang kayu Oh Rp 57,500.00 Rp 57,500.00 Rp 57,500.00
5 Tukang cat Oh Rp 55,000.00 Rp 55,000.00 Rp 55,000.00
6 Tukang besi Oh Rp 55,000.00 Rp 55,000.00 Rp 55,000.00
7 Tukang politur Oh Rp 55,000.00 Rp 55,000.00 Rp 55,000.00
8 Tukang Listrik Oh Rp 55,000.00 Rp 55,000.00 Rp 55,000.00
Tukang Las Konstruksi Oh Rp 55,000.00 Rp 57,500.00
Tukang Las biasa Oh Rp 55,000.00 Rp 55,000.00
9 Tukang Pipa ledeng Oh Rp 55,000.00 Rp 55,000.00 Rp 55,000.00
Tukang Vibrator Oh Rp 55,000.00 Rp 55,000.00
Tukang Erection Oh Rp 55,000.00 Rp 55,000.00
Operator crane Oh Rp 60,000.00
Pembantu operator crane Oh Rp 55,000.00
10 Kepala tukang batu Oh Rp 57,500.00 Rp 57,500.00 Rp 57,500.00
11 Kepala tukang kayu Oh Rp 60,000.00 Rp 60,000.00 Rp 60,000.00
12 Kepala tukang cat Oh Rp 57,500.00 Rp 57,500.00 Rp 57,500.00
13 Kepala tukang besi Oh Rp 57,500.00 Rp 57,500.00 Rp 57,500.00
14 Kepala tukang politur Oh Rp 57,500.00 Rp 57,500.00 Rp 57,500.00
15 Mandor Oh Rp 60,000.00 Rp 60,000.00 Rp 60,000.00
BAHAN
1 Air m3 Rp 35,000.00 Rp - Rp - Rp - Rp 35,000.00 Rp 35,000.00 Belum termasuk pajak dan
2 Alumnium foil roll Rp 73,000.00 Rp - Rp - Rp - Rp 73,000.00 Rp 73,000.00 retribusi bahan galian C
3 Aspal curah kg Rp 11,226.00 Rp - Rp - Rp - Rp 11,226.00 Rp 11,226.00
Aspal drum AC 60/70 kg Rp 12,661.00 Rp - Rp - Rp - Rp 12,661.00 Rp 12,661.00
4 Asbes gelombang kecil
3000x1050x4 mm lbr Rp 73,500.00 Rp 75,000.00 Rp 80,000.00 Rp 80,000.00 Rp 73,500.00 Rp 73,500.00
2400x1050x4 mm lbr Rp 60,000.00 Rp 60,000.00 Rp 65,000.00 Rp 64,000.00 Rp 60,000.00 Rp 60,000.00
2100x1050x4 mm lbr Rp 56,000.00 Rp 53,000.00 Rp 57,500.00 Rp 56,000.00 Rp 56,000.00 Rp 53,000.00
1800x1050x4 mm lbr Rp 48,000.00 Rp 45,000.00 Rp 50,000.00 Rp 50,000.00 Rp 48,000.00 Rp 45,000.00
5 Asbes gelombang besar
3000x1020x5 mm lbr Rp 115,000.00 Rp 115,000.00 Rp - Rp 102,500.00 Rp 102,500.00 Rp 102,500.00
2250x920x5 mm lbr Rp 92,500.00 Rp 87,000.00 Rp - Rp 76,500.00 Rp 76,500.00 Rp 76,500.00
1500x920x5 mm lbr Rp 57,500.00 Rp 60,000.00 Rp - Rp 52,500.00 Rp 52,500.00 Rp 52,500.00
3000x920x6 mm lbr Rp 132,500.00 Rp - Rp - Rp 122,500.00 Rp 122,500.00 Rp 122,500.00
2250x920x6 mm lbr Rp 118,000.00 Rp - Rp - Rp 92,500.00 Rp 92,500.00 Rp 92,500.00
1500x920x6 mm lbr Rp 80,000.00 Rp - Rp - Rp 62,500.00 Rp 62,500.00 Rp 62,500.00
6 Asbes plat
1000x1000x3 mm lbr Rp 12,000.00 Rp 16,000.00 Rp - Rp 16,500.00 Rp 12,000.00 Rp 12,000.00
1000x2000x3 mm lbr Rp 24,000.00 Rp 30,000.00 Rp - Rp 35,000.00 Rp 24,000.00 Rp 24,000.00
500x2000x3 mm lbr Rp 12,000.00 Rp 17,000.00 Rp - Rp 17,500.00 Rp 12,000.00 Rp 12,000.00
250x2000x4 mm lbr Rp 10,500.00 Rp - Rp - Rp - Rp 10,500.00 Rp 10,500.00
1200x2400x4 mm lbr Rp 50,000.00 Rp 54,000.00 Rp 56,000.00 Rp 57,500.00 Rp 50,000.00 Rp 50,000.00
1000x1000x4 mm lbr Rp 15,500.00 Rp 17,500.00 Rp 18,500.00 Rp - Rp 15,500.00 Rp 15,500.00
1200x2400x5 mm lbr Rp 54,000.00 Rp - Rp - Rp - Rp 54,000.00 Rp 54,000.00
1200x2400x6 mm lbr Rp 57,500.00 Rp - Rp - Rp - Rp 57,500.00 Rp 57,500.00
NO. URAIAN SATUAN SHBJ TB. VIJAYA TB. BERKAH ABADI TB. DIAN MULYA EE OE KETERANGAN
1 2 3 4 5
7 Asbes nok
Gelombang kecil bj Rp 32,000.00 Rp 34,000.00 Rp 30,000.00 Rp 35,000.00 Rp 30,000.00 Rp 30,000.00
Gelombang besar bj Rp 49,000.00 Rp 54,000.00 Rp - Rp 52,500.00 Rp 49,000.00 Rp 49,000.00
8 Batu bata apple 4 bj Rp 700.00 Rp 650.00 Rp 700.00 Rp 750.00 Rp 650.00 Rp 650.00
9 Batu bata apple 5 bj Rp 600.00 Rp 600.00 Rp 600.00 Rp - Rp 600.00 Rp 600.00
Batu bata berongga expose bj Rp 1,250.00
10 Batu belah hitam
batu belah 15/20 m3 Rp 145,000.00 Rp - Rp - Rp - Rp 137,500.00 Rp 137,500.00
batu belah 10/15 m3 Rp 156,000.00 Rp - Rp - Rp - Rp 156,000.00 Rp 156,000.00
batu belah 5/7 m3 Rp 241,500.00 Rp - Rp - Rp - Rp 241,500.00 Rp 240,000.00
batu belah 4/6 m3 Rp 252,000.00 Rp - Rp - Rp - Rp 252,000.00 Rp 250,000.00
batu kricak 3/4 (MS) m3 Rp 275,000.00 Rp 150,000.00 Rp 70,000.00 Rp - Rp 275,000.00 Rp 270,000.00
batu kricak 2/3 (MS) m3 Rp 286,000.00 Rp 150,000.00 Rp 70,000.00 Rp - Rp 286,000.00 Rp 280,000.00
11 Batu belah putih m3 Rp 111,400.00 Rp 65,000.00 Rp 40,000.00 Rp - Rp 111,400.00 Rp 111,400.00
Batu granit kg Rp 2,500.00
12 Baja dan Besi
Baja WF kg Rp 23,000.00 Rp - Rp - Rp - Rp 17,500.00 Rp 17,000.00
Besi cor kg Rp 9,000.00 Rp - Rp - Rp - Rp 9,000.00 Rp 9,000.00
Besi beton kg Rp 9,000.00 Rp 8,700.00 Rp 8,900.00 Rp 9,500.00 Rp 8,900.00 Rp 8,900.00
Besi scuare tube m Rp 22,000.00
Profil aluminium m' Rp 95,000.00
Aluminium strip m' Rp 45,000.00
Skrup fixer bh Rp 3,500.00
sealant tube Rp 25,000.00
Profil kaca m Rp 7,500.00
Besi hollow 40.40.2 m Rp 17,500.00
13 Batako pejal bj Rp 2,200.00 Rp 2,300.00 Rp 2,500.00 Rp 2,250.00 Rp 2,200.00 Rp 2,200.00
14 Bambu btg
Bambu apus btg Rp 10,000.00 Rp - Rp 10,000.00 Rp 8,500.00 Rp 10,000.00 Rp 8,500.00
Bambu wulung btg Rp 10,000.00 Rp - Rp - Rp - Rp 10,000.00 Rp 10,000.00
Bambu petung btg Rp 60,000.00 Rp - Rp - Rp - Rp 60,000.00 Rp 60,000.00
15 Buis beton
diameter 15 mm x 1 m bj Rp 29,000.00 Rp 20,000.00 Rp - Rp - Rp 20,000.00 Rp 20,000.00
diameter 20 mm x 1 m bj Rp 34,500.00 Rp 25,000.00 Rp - Rp - Rp 25,000.00 Rp 25,000.00
diameter 25 mm x 1 m bj Rp 36,500.00 Rp 28,000.00 Rp - Rp - Rp 28,000.00 Rp 28,000.00
diameter 30 mm x 1 m bj Rp 44,000.00 Rp 32,000.00 Rp - Rp - Rp 32,000.00 Rp 32,000.00
diameter 40 mm x 1 m bj Rp 57,000.00 Rp 43,000.00 Rp - Rp - Rp 43,000.00 Rp 43,000.00
diameter 60 mm x 0,5 m bj Rp 47,000.00 Rp 45,000.00 Rp 45,000.00 Rp - Rp 45,000.00 Rp 45,000.00
diameter 80 mm x 0,5 m bj Rp 58,000.00 Rp 50,000.00 Rp 50,000.00 Rp - Rp 50,000.00 Rp 50,000.00
diameter 100 mm x 0,5 m bj Rp 78,000.00 Rp - Rp - Rp - Rp 78,000.00 Rp 78,000.00
16 Cat
cat kayu kg Rp 57,500.00 Rp 55,000.00 Rp 55,500.00 Rp 55,000.00 Rp 55,000.00 Rp 55,000.00 Emco
cat meni kg Rp 22,000.00 Rp 23,000.00 Rp 22,500.00 Rp 22,500.00 Rp 22,000.00 Rp 22,000.00
cat besi kg Rp 57,500.00 Rp 55,000.00 Rp 55,500.00 Rp 55,000.00 Rp 55,000.00 Rp 55,000.00
cat tembok interior (Decolith) kg Rp 14,500.00 Rp 15,600.00 Rp 16,200.00 Rp 16,000.00 Rp 14,500.00 Rp 14,500.00 Decolith
cat tembok exterior (Dulux) kg Rp - Rp - Rp 100,000.00 Rp 100,000.00 Rp 100,000.00
cat tembok exterior (Mowilex) kg Rp - Rp 26,000.00 Rp - Rp 26,000.00 Rp 26,000.00
Dempul tembok/ plamir kg Rp 22,000.00 Rp 9,000.00 Rp 9,500.00 Rp 9,500.00 Rp 9,000.00 Rp 9,000.00
Dempul kayu kg Rp 22,000.00 Rp 23,000.00 Rp 22,500.00 Rp 22,500.00 Rp 22,000.00 Rp 22,000.00
Dinabolt dia 12 mm ( 10-15 cm) bh Rp 1,250.00
Engsel pintu bh Rp 19,000.00 Rp 15,000.00 Rp 27,500.00 Rp 17,500.00 Rp 15,000.00 Rp 15,000.00
Engsel jendela bh Rp 16,000.00 Rp 12,000.00 Rp 22,500.00 Rp 12,500.00 Rp 12,000.00 Rp 12,000.00
eternit 100 x 100 (polos) lbr Rp 15,500.00 Rp 18,000.00 Rp 15,500.00 Rp 16,500.00 Rp 15,500.00 Rp 15,500.00
NO. URAIAN SATUAN SHBJ TB. VIJAYA TB. BERKAH ABADI TB. DIAN MULYA EE OE KETERANGAN
1 2 3 4 5
17 Fiberglas lbr Rp 52,500.00 Rp - Rp - Rp - Rp 52,500.00 Rp 52,500.00
18 Filler kg Rp 4,000.00 Rp - Rp 30,000.00 Rp - Rp 4,000.00 Rp 4,000.00
19 Formika 120 x 240 cm lbr Rp 68,500.00 Rp - Rp - Rp - Rp 68,500.00 Rp 68,500.00
20 Gebalan rumput m2 Rp 8,500.00 Rp - Rp - Rp - Rp 8,500.00 Rp 8,500.00
29 Grendel
Grendel pintu bh Rp 11,000.00 Rp 4,000.00 Rp 9,000.00 Rp 10,000.00 Rp 9,000.00 Rp 9,000.00
Grendel jendela bh Rp 8,000.00 Rp 2,500.00 Rp 6,000.00 Rp 7,500.00 Rp 6,000.00 Rp 6,000.00
30 Genteng
genteng beton besar bj Rp 7,000.00 Rp - Rp - Rp - Rp 7,000.00 Rp 7,000.00
genteng beton kecil bj Rp 3,500.00 Rp - Rp - Rp - Rp 3,500.00 Rp 3,500.00
genteng tanah paris bj Rp 1,800.00 Rp 1,300.00 Rp 1,700.00 Rp 1,600.00 Rp 1,600.00 Rp 1,600.00
genteng tanah kodok bj Rp 1,750.00 Rp 1,500.00 Rp - Rp 2,250.00 Rp 1,750.00 Rp 1,750.00
genteng kaca 3 mm bj Rp 13,500.00 Rp 7,000.00 Rp 10,000.00 Rp 6,500.00 Rp 6,500.00 Rp 6,500.00
genteng kaca kodok bj Rp 16,500.00 Rp 8,500.00 Rp - Rp - Rp 8,500.00 Rp 8,500.00
Bubungan genteng beton bj Rp 16,000.00 Rp - Rp - Rp - Rp 16,000.00 Rp 16,000.00
Bubungan genteng tanah bj Rp 3,600.00 Rp 3,000.00 Rp - Rp 4,500.00 Rp 3,000.00 Rp 3,000.00
31 Geotekstil m2 Rp 25,000.00 Rp - Rp - Rp - Rp 25,000.00 Rp 25,000.00
Gypsum Board lbr Rp 25,000.00 Rp - Rp - Rp - Rp 65,000.00
32 Handel pintu bh Rp 11,000.00 Rp 50,000.00 Rp 150,000.00 Rp 7,500.00 Rp 7,500.00 Rp 7,500.00
Handel jendela bh Rp - Rp 6,000.00 Rp 5,000.00 Rp 5,000.00 Rp 5,000.00
33 Hak angin bh Rp 16,000.00 Rp 7,000.00 Rp 10,000.00 Rp 10,000.00 Rp 16,000.00 Rp 10,000.00
H.B 20 bh Rp 4,592.00
H.B 15 bh Rp 5,016.00
H.B 10 bh Rp 6,000.00
34 Ijuk kg Rp 16,500.00 Rp 5,000.00 Rp 6,000.00 Rp - Rp 6,000.00 Rp 6,000.00
29 Kaca
kaca bening 3 mm m2 Rp 55,000.00 Rp - Rp - Rp 65,000.00 Rp 55,000.00 Rp 55,000.00
kaca bening 5 mm m2 Rp 80,000.00 Rp - Rp - Rp 80,000.00 Rp 80,000.00 Rp 80,000.00
Kaca buram 3 mm m2 Rp 62,500.00 Rp - Rp - Rp 70,000.00 Rp 62,500.00 Rp 62,500.00
kaca buram 5 mm m2 Rp 82,500.00 Rp - Rp - Rp 105,000.00 Rp 82,500.00 Rp 82,500.00
kaca reyband 5 mm m2 Rp 90,000.00 Rp - Rp - Rp 90,000.00 Rp 90,000.00 Rp 90,000.00
Glassblok bh Rp 16,000.00 Rp 18,000.00 Rp 17,500.00 Rp 16,000.00 Rp 16,000.00
30 Karpet lebar 90 cm m' Rp 13,000.00 Rp 11,000.00 Rp 15,000.00 Rp 17,500.00 Rp 11,000.00 Rp 11,000.00
31 kayu bakar m3 Rp 2,000,000.00 Rp - Rp - Rp - Rp 2,000,000.00 Rp 2,000,000.00
32 kayu begesteng m3 Rp 3,000,000.00 Rp - Rp - Rp 1,250,000.00 Rp 1,250,000.00 Rp 1,250,000.00 dpt untuk begesteng
33 Kayu dolken m3 Rp 2,700,000.00 Rp - Rp - Rp - Rp 2,700,000.00 Rp 2,700,000.00
Kayu dolken, 4 mtran btg Rp 2,700,000.00 Rp - Rp - Rp - Rp 54,000.00 Rp 54,000.00
34 Kayu jati Kelas I
papan m3 Rp 28,500,000.00 Rp - Rp - Rp - Rp 28,500,000.00 Rp 28,500,000.00
balok m3 Rp 27,800,000.00 Rp - Rp - Rp - Rp 27,800,000.00 Rp 27,800,000.00
reng m' Rp 4,500.00 Rp - Rp - Rp - Rp 4,500.00 Rp 4,500.00
35 Kayu kamper
papan m3 Rp 9,500,000.00 Rp - Rp - Rp 9,150,000.00 Rp 9,500,000.00 Rp 9,150,000.00
balok m3 Rp 9,000,000.00 Rp - Rp - Rp 8,750,000.00 Rp 9,000,000.00 Rp 8,750,000.00
reng m' Rp 3,100.00 Rp - Rp - Rp 1,860.00 Rp 2,000.00 Rp 1,860.00
36 Kayu Bangkirei
papan m3 Rp 10,000,000.00 Rp 10,000,000.00 Rp 11,250,000.00 Rp 10,250,000.00 Rp 10,000,000.00 Rp 10,000,000.00
balok m3 Rp 9,700,000.00 Rp 8,000,000.00 Rp 10,156,250.00 Rp 9,550,000.00 Rp 9,700,000.00 Rp 9,550,000.00
reng m' Rp 3,400.00 Rp 2,280.00 Rp 3,200.00 Rp 2,370.00 Rp 2,500.00 Rp 2,280.00
37 Kayu kruing
papan m3 Rp 7,500,000.00 Rp 5,500,000.00 Rp 7,187,500.00 Rp 6,050,000.00 Rp 7,500,000.00 Rp 7,187,500.00
balok m3 Rp 7,000,000.00 Rp 5,000,000.00 Rp 5,729,000.00 Rp 5,500,000.00 Rp 5,729,000.00 Rp 5,500,000.00
reng m' Rp 2,100.00 Rp 1,800.00 Rp 2,700.00 Rp 1,650.00 Rp 1,800.00 Rp 1,650.00
NO. URAIAN SATUAN SHBJ TB. VIJAYA TB. BERKAH ABADI TB. DIAN MULYA EE OE KETERANGAN
1 2 3 4 5
38 Kayu meranti
papan m3 Rp 6,250,000.00 Rp 5,000,000.00 Rp 6,062,500.00 Rp 4,650,000.00 Rp 6,250,000.00 Rp 6,062,500.00
balok m3 Rp 6,000,000.00 Rp 4,000,000.00 Rp - Rp 4,250,000.00 Rp 4,250,000.00 Rp 4,250,000.00
reng m' Rp 2,000.00 Rp 1,500.00 Rp 2,700.00 Rp 1,200.00 Rp 1,500.00 Rp 1,500.00
39 Kayu glugu m3 Rp 3,750,000.00 Rp - Rp - Rp - Rp 3,750,000.00 Rp 3,750,000.00 Klas I
40 Kayu lapis tripleks 3 mm lbr Rp 50,000.00 Rp 45,000.00 Rp 49,000.00 Rp 47,500.00 Rp 47,500.00 Rp 45,000.00
41 Kayu lapis tripleks 4 mm lbr Rp 60,000.00 Rp 55,000.00 Rp 59,000.00 Rp 60,000.00 Rp 59,000.00 Rp 55,000.00
42 Kayu lapis tripleks 6 mm lbr Rp 70,000.00 Rp 65,000.00 Rp 69,000.00 Rp 72,500.00 Rp 69,000.00 Rp 65,000.00
Kayu lapis tripleks 9 mm lbr Rp 100,000.00 Rp 115,000.00 Rp 120,000.00 Rp 115,000.00 Rp 100,000.00
43 Kayu lapis tripleks 12 mm lbr Rp 131,000.00 Rp 150,000.00 Rp 135,000.00 Rp 152,500.00 Rp 131,000.00 Rp 131,000.00
44 Kayu lapis teakwood 4 mm lbr Rp 90,000.00 Rp 100,000.00 Rp - Rp - Rp 90,000.00 Rp 90,000.00
45 Kapur pasang m3 Rp 175,000.00 Rp - Rp 115,000.00 Rp - Rp 115,000.00 Rp 115,000.00
46 Kapur sirih m3 Rp 210,000.00 Rp - Rp - Rp - Rp 210,000.00 Rp 210,000.00
47 Kawat ayakan m2 Rp 17,500.00 Rp 15,000.00 Rp 13,000.00 Rp - Rp 17,500.00 Rp 15,000.00
Kawat Las kg Rp 28,000.00
Kawat nyamuk aluminium m2 Rp 22,000.00
48 Kawat beton / bendrat kg Rp 13,500.00 Rp 14,000.00 Rp 14,500.00 Rp 15,000.00 Rp 13,500.00 Rp 13,500.00
49 Kawat bronjong kg Rp 16,500.00 Rp 16,000.00 Rp - Rp - Rp 16,500.00 Rp 16,000.00
Kawat duri kg Rp 12,000.00 Rp 12,000.00
Kawat jaring galvanis, pj. 240 cm unit Rp 60,000.00 Rp 60,000.00
50 Split beton m3 Rp 190,000.00 Rp 150,000.00 Rp 70,000.00 Rp - Rp 150,000.00 Rp 150,000.00
Split beton kg Rp 190,000.00 Rp 150,000.00 Rp 70,000.00 Rp - Rp 111.11
51 Krokos/ kroco 2-4 cm m3 Rp 126,000.00 Rp - Rp - Rp - Rp 126,000.00 Rp 125,000.00
52 Kunci tanam besar bh Rp 225,000.00 Rp 65,000.00 Rp 90,000.00 Rp 100,000.00 Rp 90,000.00 Rp 90,000.00 SES
53 Kunci tanam kecil bh Rp 105,000.00 Rp 55,000.00 Rp 80,000.00 Rp 55,000.00 Rp 55,000.00 Rp 55,000.00 PIONEER
54 Kloset duduk lengkap bh Rp 1,050,000.00 Rp 1,100,000.00 Rp 900,000.00 Rp 1,100,000.00 Rp 900,000.00 Rp 900,000.00
55 Kloset jongkok bh Rp 116,000.00 Rp 125,000.00 Rp 130,000.00 Rp 125,000.00 Rp 116,000.00 Rp 116,000.00
56 Lem aica aibon kg Rp 42,000.00 Rp - Rp - Rp 65,000.00 Rp 42,000.00 Rp 42,000.00
Lem kayu kg Rp 42,000.00 Rp - Rp - Rp 65,000.00 Rp 12,000.00
Lis Profil kayu m' Rp 42,000.00 Rp - Rp - Rp 65,000.00 Rp 5,000.00
57 Melamin kg Rp 68,000.00 Rp 55,000.00 Rp - Rp 52,500.00 Rp 55,000.00 Rp 52,500.00
58 Minyak cat/ Thinner ltr Rp 15,000.00 Rp 18,000.00 Rp 17,500.00 Rp 17,500.00 Rp 15,000.00 Rp 15,000.00
59 Minyak tanah ltr Rp 8,000.00 Rp - Rp - Rp - Rp 8,000.00 Rp 8,000.00
Minyak bekisting ltr Rp 12,000.00
60 Oli gardan ltr Rp 42,000.00 Rp - Rp - Rp - Rp 42,000.00 Rp 42,000.00
61 Oli mesin ltr Rp 35,000.00 Rp - Rp - Rp - Rp 35,000.00 Rp 35,000.00
62 Pasir pasang
pasir pasang m3 Rp 133,000.00 Rp 60,000.00 Rp 40,000.00 Rp - Rp 132,900.00 Rp 132,900.00
pasir pasang kg Rp 133,000.00 Rp 60,000.00 Rp 40,000.00 Rp - Rp 94.93
pasir beton m3 Rp 133,000.00 Rp - Rp - Rp - Rp 132,900.00 Rp 132,900.00
pasir beton kg Rp 133,000.00 Rp - Rp - Rp - Rp 94.93
63 Pasir urug m3 Rp 123,000.00 Rp 45,000.00 Rp 40,000.00 Rp - Rp 114,500.00 Rp 114,500.00
64 Paku besar, sedang kg Rp 15,000.00 Rp 11,000.00 Rp 12,000.00 Rp 12,000.00 Rp 12,000.00 Rp 12,000.00
65 Paku kecil kg Rp 16,000.00 Rp 18,000.00 Rp 16,000.00 Rp 17,500.00 Rp 16,000.00 Rp 16,000.00
66 Paku payung kg Rp 21,000.00 Rp 18,000.00 Rp 20,000.00 Rp 20,000.00 Rp 21,000.00 Rp 20,000.00
Paku skrup kg Rp 21,000.00 Rp 18,000.00 Rp 20,000.00 Rp 20,000.00 Rp 25,000.00
Panel beton pracetak uk. 240x40x5 cm lbr Rp 110,000.00 Rp 110,000.00
Kolom beton pracetak buah Rp 250,000.00 Rp 250,000.00
67 Pipa
galvanis diameter 0,5 " btg Rp 80,000.00 Rp - Rp 46,000.00 Rp 75,000.00 Rp 46,000.00 Rp 46,000.00
galvanis diameter 0,75 " btg Rp 105,000.00 Rp - Rp 56,000.00 Rp 95,000.00 Rp 56,000.00 Rp 56,000.00
galvanis diameter 1" btg Rp 130,000.00 Rp - Rp 69,000.00 Rp 115,000.00 Rp 69,000.00 Rp 69,000.00
galvanis diameter 1,5 " btg Rp 315,000.00 Rp - Rp 105,000.00 Rp 175,000.00 Rp 175,000.00 Rp 175,000.00
NO. URAIAN SATUAN SHBJ TB. VIJAYA TB. BERKAH ABADI TB. DIAN MULYA EE OE KETERANGAN
1 2 3 4 5
galvanis diameter 3" btg Rp 690,000.00 Rp - Rp - Rp - Rp 690,000.00 Rp 690,000.00
galvanis diameter 4" btg Rp 1,050,000.00 Rp - Rp - Rp - Rp 1,050,000.00 Rp 1,050,000.00
PVC 4 m diameter 0,5" AW btg Rp 16,500.00 Rp 17,000.00 Rp 20,000.00 Rp 18,500.00 Rp 16,500.00 Rp 16,500.00
PVC 4 m diameter 0,75" AW btg Rp 21,000.00 Rp 23,000.00 Rp 26,000.00 Rp 24,000.00 Rp 21,000.00 Rp 21,000.00
PVC 4 m diameter 1" AW btg Rp 30,000.00 Rp 32,000.00 Rp 51,000.00 Rp 33,500.00 Rp 30,000.00 Rp 30,000.00
PVC 4 m diameter 1,5" D btg Rp 36,500.00 Rp 34,000.00 Rp 39,000.00 Rp 35,000.00 Rp 35,000.00 Rp 34,000.00
PVC 4 m diameter 1,5" AW btg Rp 52,000.00 Rp 59,000.00 Rp 57,500.00 Rp 57,500.00 Rp 57,500.00
PVC 4 m diameter 2" D btg Rp 42,000.00 Rp 48,000.00 Rp 45,000.00 Rp 45,000.00 Rp 45,000.00
PVC 4 m diameter 2" AW btg Rp 66,000.00 Rp 73,000.00 Rp 72,500.00 Rp 72,500.00 Rp 66,000.00
PVC 4 m diameter 2,5" D btg Rp 57,000.00 Rp 62,500.00 Rp 62,500.00 Rp 57,000.00 Rp 57,000.00
PVC 4 m diameter 2,5" AW btg Rp 98,000.00 Rp 104,500.00 Rp 105,000.00 Rp 104,500.00 Rp 104,500.00
PVC 4 m diameter 3" D btg Rp 95,000.00 Rp 73,000.00 Rp 78,000.00 Rp 77,500.00 Rp 77,500.00 Rp 73,000.00
PVC 4 m diameter 3" AW btg Rp 130,000.00 Rp 140,000.00 Rp 142,500.00 Rp 130,000.00 Rp 130,000.00
PVC 4 m diameter 4" D btg Rp 155,000.00 Rp 103,000.00 Rp 118,000.00 Rp 120,000.00 Rp 118,000.00 Rp 103,000.00
PVC 4 m diameter 4" AW btg Rp 225,000.00 Rp 228,000.00 Rp 235,000.00 Rp 228,000.00 Rp 225,000.00
68 Paving (abu - abu) tebal 6 cm m2 Rp 35,000.00 Rp 29,000.00 Rp - Rp - Rp 29,000.00 Rp 29,000.00
69 Paving ( warna ) tebal 8 cm m2 Rp 50,000.00 Rp - Rp - Rp - Rp 50,000.00 Rp 50,000.00
Paving beton press tebal 8 cm m2 Rp 60,000.00 Rp - Rp - Rp - Rp 60,000.00 Rp 60,000.00
70 Plastik gelombang bh Rp 62,000.00 Rp - Rp 80,000.00 Rp 20,000.00 Rp 20,000.00 Rp 20,000.00 3M
71 Plamuur kayu kg Rp - Rp 23,000.00 Rp 22,500.00 Rp - Rp 22,500.00 Rp 22,500.00
72 Plywood 9000x2100x4 mm lbr Rp 90,000.00 Rp 100,000.00 Rp - Rp 65,000.00 Rp 65,000.00 Rp 65,000.00
73 Plywood 1200x2400x4 mm lbr Rp 150,000.00 Rp 150,000.00 Rp - Rp - Rp 150,000.00 Rp 150,000.00
Plywood phenol film 12 mm lbr Rp 150,000.00 Rp 150,000.00 Rp - Rp - Rp 250,000.00
74 Politur ltr Rp 90,000.00 Rp 45,000.00 Rp 45,000.00 Rp 65,000.00 Rp 45,000.00 Rp 45,000.00
PVC Waterstop 150 mm m' Rp 178,000.00
PVC Waterstop 200 mm m' Rp 268,000.00
PVC Waterstop 230 - 320 mm m' Rp 874,000.00
Residu ltr Rp 12,659.00 Rp 12,659.00
Rooster terawang bh Rp 5,000.00
75 Semen (PC)
Semen nusantara, Tiga roda zak Rp 52,000.00 Rp 51,500.00 Rp 52,000.00 Rp 51,500.00 Rp 51,500.00 Rp 51,500.00
Semen putih zak Rp 65,000.00 Rp 75,000.00 Rp 75,000.00 Rp 85,000.00 Rp 65,000.00 Rp 65,000.00
Semen warna kg Rp 1,625.00 Rp 9,000.00 Rp 10,000.00 Rp 9,500.00 Rp 1,625.00 Rp 1,600.00
Sika grout 215 kg Rp 6,000.00
Screening kg Rp 5,000.00
76 Semen merah m3 Rp - Rp - Rp - Rp - Rp 350,000.00 Rp -
77 Seng plat
seng BJLS 20 lebar 45 cm lbr Rp 18,000.00 Rp 13,000.00 Rp 13,500.00 Rp 15,000.00 Rp 13,000.00 Rp 13,000.00
seng BJLS 20 lebar 55 cm lbr Rp 25,000.00 Rp 14,000.00 Rp 15,500.00 Rp 18,500.00 Rp 14,000.00 Rp 14,000.00
seng BJLS 20 lebar 60 cm lbr Rp 27,000.00 Rp 15,000.00 Rp 16,500.00 Rp 20,000.00 Rp 15,000.00 Rp 15,000.00
seng BJLS 20 lebar 70 cm lbr Rp 30,000.00 Rp 20,000.00 Rp 20,000.00 Rp 22,500.00 Rp 20,000.00 Rp 20,000.00
seng BJLS 20 lebar 80 cm lbr Rp 32,000.00 Rp 22,000.00 Rp 21,000.00 Rp - Rp 21,000.00 Rp 21,000.00
seng BJLS 20 lebar 90 cm lbr Rp 34,000.00 Rp 23,000.00 Rp 24,000.00 Rp 26,500.00 Rp 23,000.00 Rp 23,000.00
seng BJLS 25 lebar 90 cm lbr Rp 42,000.00 Rp - Rp 35,000.00 Rp - Rp 35,000.00 Rp 35,000.00
78 Seng gelombang
BJLS 30 90x180 cm lbr Rp 80,000.00 Rp 58,000.00 Rp - Rp 57,500.00 Rp 69,000.00 Rp 69,000.00
BJLS 25 90x180 cm lbr Rp 69,000.00 Rp - Rp - Rp - Rp 58,000.00 Rp 58,000.00
BJLS 20 90x240 cm lbr Rp 90,000.00 Rp 50,000.00 Rp 52,000.00 Rp 55,000.00 Rp 52,000.00 Rp 50,000.00
BJLS 20 90x300 cm lbr Rp 110,000.00 Rp 62,000.00 Rp 63,000.00 Rp 83,500.00 Rp 63,000.00 Rp 62,000.00
79 Solar ltr Rp 5,500.00 Rp - Rp - Rp - Rp 5,500.00 Rp 5,500.00
Soda api kg Rp 5,500.00 Rp - Rp - Rp - Rp 22,000.00
80 Sirlak kg Rp 118,000.00 Rp - Rp 250,000.00 Rp - Rp 118,000.00 Rp 118,000.00
81 Sirtu m3 Rp 130,000.00 Rp - Rp - Rp - Rp 128,000.00 Rp 128,000.00
NO. URAIAN SATUAN SHBJ TB. VIJAYA TB. BERKAH ABADI TB. DIAN MULYA EE OE KETERANGAN
1 2 3 4 5
82 Spritus ltr Rp 9,000.00 Rp - Rp 8,500.00 Rp 9,000.00 Rp 8,500.00 Rp 8,500.00
Spacer buah Rp 9,000.00 Rp - Rp 8,500.00 Rp 9,000.00 Rp 4,500.00
Storox-100 kg Rp 9,000.00 Rp - Rp 8,500.00 Rp 9,000.00 Rp 28,000.00
83 Tanah urugan m3 Rp 55,000.00 Rp - Rp - Rp - Rp 55,000.00 Rp 52,500.00
Tanah liat m3 Rp 65,000.00 Rp 65,000.00
84 Teak oil ltr Rp 17,000.00 Rp - Rp - Rp - Rp 17,000.00 Rp 17,000.00
85 Teer ltr Rp 12,000.00 Rp - Rp - Rp - Rp 12,000.00 Rp 12,000.00
86 Terpentin ltr Rp 13,500.00 Rp - Rp - Rp - Rp 13,500.00 Rp 13,500.00
87 Tegel
marmer 40x40 cm m2 Rp 125,000.00 Rp - Rp - Rp - Rp 125,000.00 Rp 125,000.00
keramik 20x20 cm m2 Rp 44,000.00 Rp 45,000.00 Rp 47,500.00 Rp 50,000.00 Rp 44,000.00 Rp 44,000.00
keramik 20x25 cm m2 Rp 44,000.00 Rp 47,000.00 Rp 48,000.00 Rp 47,500.00 Rp 44,000.00 Rp 44,000.00
keramik 30x30 cm m2 Rp 44,000.00 Rp 41,000.00 Rp 43,000.00 Rp 42,500.00 Rp 42,500.00 Rp 41,000.00
keramik 30x30 cm anti slip m2 Rp 47,000.00 Rp 49,000.00 Rp 47,500.00 Rp 47,000.00 Rp 47,000.00
keramik 40x40 cm m2 Rp 47,000.00 Rp 47,000.00 Rp 48,000.00 Rp 47,500.00 Rp 47,000.00 Rp 47,000.00
porselin 11x11 cm m2 Rp - Rp 50,000.00 Rp - Rp - Rp 50,000.00 Rp 50,000.00
teraso 30x30 cm m2 Rp - Rp - Rp - Rp - Rp - Rp -
kembang 20x20 cm m2 Rp - Rp - Rp - Rp - Rp - Rp -
kembang 30x30 cm m2 Rp - Rp - Rp - Rp - Rp - Rp -
warna 20x20 cm m2 Rp - Rp - Rp - Rp - Rp 59,500.00 Rp -
warna 30x30 cm m2 Rp - Rp - Rp - Rp - Rp 55,000.00 Rp -
warna 40x40 cm m3 Rp - Rp - Rp - Rp - Rp 50,000.00
abu - abu 20x20 cm m2 Rp - Rp - Rp 49,500.00 Rp - Rp 49,500.00 Rp 49,500.00
abu - abu 30x30 cm m2 Rp - Rp - Rp 45,000.00 Rp - Rp 45,000.00 Rp 45,000.00
abu - abu 40x40 cm m2 Rp - Rp - Rp 45,000.00 Rp - Rp 40,000.00
88 Thinner melamin ltr Rp 28,000.00 Rp - Rp - Rp - Rp 28,000.00 Rp 28,000.00
89 Urioir bh Rp 800,000.00 Rp - Rp - Rp - Rp 800,000.00 Rp 800,000.00
90 Vet kg Rp 22,500.00 Rp - Rp - Rp - Rp 22,500.00 Rp 22,500.00
91 Washtafel bh Rp 250,000.00 Rp 225,000.00 Rp 400,000.00 Rp 250,000.00 Rp 225,000.00 Rp 225,000.00
Wiremesh kg Rp 250,000.00 Rp 225,000.00 Rp 400,000.00 Rp 250,000.00 Rp 9,400.00
92 Bak mandi lps porselin/ keramik bh Rp 276,000.00 Rp 230,000.00 Rp 250,000.00 Rp 250,000.00 Rp 230,000.00 Rp 230,000.00
93 Bak mandi teraso uk. 50x50x50 cm bh Rp 155,250.00 Rp - Rp - Rp - Rp 155,250.00 Rp 155,250.00
94 Nako daun Rp 17,500.00 Rp - Rp - Rp 12,500.00 Rp 12,500.00 Rp 12,500.00
A. 2.2.1.3. Pembuatan 1 m2 Pagar sementara dari kawat duri tinggi 1,8 meter
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.200 45,000.00 9,000.00
Tukang Kayu L.02 OH 0.400 57,500.00 23,000.00
Kepala Tukang L.03 OH 0.020 60,000.00 1,200.00
Mandor L.04 OH 0.020 60,000.00 1,200.00
JUMLAH TENAGA KERJA 34,400.00
B. BAHAN
Dolken btg 1.000 54,000.00 54,000.00
Kawat duri kg 25.000 12,000.00 300,000.00
PC kg 2.000 1,287.50 2,575.00
Pasir beton m3 0.005 132,900.00 664.50
Kerikil beton m3 0.009 150,000.00 1,350.00
Paku biasa kg 0.030 12,000.00 360.00
JUMLAH HARGA BAHAN 358,949.50
C. PERALATAN
A. 3.2.1.6. Pemasangan 1 m3 Pondasi batu belah (hitam) campuran 1SP : 1KP : 2PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 45,000.00 67,500.00
Tukang Batu L.02 OH 0.750 55,000.00 41,250.00
Kepala Tukang L.03 OH 0.075 57,500.00 4,312.50
Mandor L.04 OH 0.075 60,000.00 4,500.00
JUMLAH TENAGA KERJA 117,562.50
B. BAHAN
Batu belah (hitam) m3 1.200 137,500.00 165,000.00
Semen portland m3 0.170 1,583,625.00 269,216.25
Kapur pasang m3 0.170 115,000.00 19,550.00
Pasir pasang m3 0.340 132,900.00 45,186.00
JUMLAH HARGA BAHAN 498,952.25
C. PERALATAN
A. 3.2.1.6. Pemasangan 1 m3 Pondasi batu belah (putih) campuran 1SP : 1KP : 2PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 45,000.00 67,500.00
Tukang Batu L.02 OH 0.750 55,000.00 41,250.00
Kepala Tukang L.03 OH 0.075 57,500.00 4,312.50
Mandor L.04 OH 0.075 60,000.00 4,500.00
JUMLAH TENAGA KERJA 117,562.50
B. BAHAN
Batu belah (putih) m3 1.200 111,400.00 133,680.00
Semen portland m3 0.170 1,583,625.00 269,216.25
Kapur pasang m3 0.170 115,000.00 19,550.00
Pasir pasang m3 0.340 132,900.00 45,186.00
JUMLAH HARGA BAHAN 467,632.25
C. PERALATAN
A. 3.2.1.7. Pemasangan 1 m3 Pondasi batu belah (hitam) campuran 1SP : 3KP : 10PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 45,000.00 67,500.00
Tukang Batu L.02 OH 0.750 55,000.00 41,250.00
Kepala Tukang L.03 OH 0.075 57,500.00 4,312.50
Mandor L.04 OH 0.075 60,000.00 4,500.00
JUMLAH TENAGA KERJA 117,562.50
B. BAHAN
Batu belah (hitam) m3 1.200 137,500.00 165,000.00
Semen portland kg 61.000 1,287.50 78,537.50
Kapur pasang m3 0.147 115,000.00 16,905.00
Pasir pasang m3 0.492 132,900.00 65,386.80
JUMLAH HARGA BAHAN 325,829.30
C. PERALATAN
A. 3.2.1.7. Pemasangan 1 m3 Pondasi batu belah (putih) campuran 1SP : 3KP : 10PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 45,000.00 67,500.00
Tukang Batu L.02 OH 0.750 55,000.00 41,250.00
Kepala Tukang L.03 OH 0.075 57,500.00 4,312.50
Mandor L.04 OH 0.075 60,000.00 4,500.00
JUMLAH TENAGA KERJA 117,562.50
B. BAHAN
Batu belah (putih) m3 1.200 111,400.00 133,680.00
Semen portland kg 61.000 1,287.50 78,537.50
Kapur pasang m3 0.147 115,000.00 16,905.00
Pasir pasang m3 0.492 132,900.00 65,386.80
JUMLAH HARGA BAHAN 294,509.30
C. PERALATAN
A. 3.2.1.8. Pemasangan 1 m3 Pondasi batu belah (hitam) campuran 1/4SP : 1KP : 4PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 45,000.00 67,500.00
Tukang Batu L.02 OH 0.750 55,000.00 41,250.00
Kepala Tukang L.03 OH 0.075 57,500.00 4,312.50
Mandor L.04 OH 0.075 60,000.00 4,500.00
JUMLAH TENAGA KERJA 117,562.50
B. BAHAN
Batu belah (hitam) m3 1.200 137,500.00 165,000.00
Semen portland kg 41.000 1,287.50 52,787.50
Kapur pasang m3 0.131 115,000.00 15,065.00
Pasir pasang m3 0.523 132,900.00 69,506.70
JUMLAH HARGA BAHAN 302,359.20
C. PERALATAN
A. 3.2.1.8. Pemasangan 1 m3 Pondasi batu belah (putih) campuran 1/4SP : 1KP : 4PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 45,000.00 67,500.00
Tukang Batu L.02 OH 0.750 55,000.00 41,250.00
Kepala Tukang L.03 OH 0.075 57,500.00 4,312.50
Mandor L.04 OH 0.075 60,000.00 4,500.00
JUMLAH TENAGA KERJA 117,562.50
B. BAHAN
Batu belah (putih) m3 1.200 111,400.00 133,680.00
Semen portland kg 41.000 1,287.50 52,787.50
Kapur pasang m3 0.131 115,000.00 15,065.00
Pasir pasang m3 0.523 132,900.00 69,506.70
JUMLAH HARGA BAHAN 271,039.20
C. PERALATAN
A. 3.2.1.10. Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1SP : 2PB : 3 Kr dan 40% batu belah (hitam).
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 3.400 45,000.00 153,000.00
Tukang Batu L.02 OH 0.850 55,000.00 46,750.00
Kepala Tukang L.03 OH 0.085 57,500.00 4,887.50
Mandor L.04 OH 0.170 60,000.00 10,200.00
JUMLAH TENAGA KERJA 214,837.50
B. BAHAN
Batu belah (hitam) m3 0.480 137,500.00 66,000.00
Semen Portland kg 194.000 1,287.50 249,775.00
Pasir beton m3 0.312 132,900.00 41,464.80
Kerikil beton/ split m3 0.468 150,000.00 70,200.00
Besi beton kg 126.000 8,900.00 1,121,400.00
Kawat beton kg 1.800 13,500.00 24,300.00
JUMLAH HARGA BAHAN 1,573,139.80
C. PERALATAN
A. 3.2.1.10. Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1SP : 2PB : 3 Kr dan 40% batu belah (putih).
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 3.400 45,000.00 153,000.00
Tukang Batu L.02 OH 0.850 55,000.00 46,750.00
Kepala Tukang L.03 OH 0.085 57,500.00 4,887.50
Mandor L.04 OH 0.170 60,000.00 10,200.00
JUMLAH TENAGA KERJA 214,837.50
B. BAHAN
Batu belah (putih) m3 0.480 111,400.00 53,472.00
Semen Portland kg 194.000 1,287.50 249,775.00
Pasir beton m3 0.312 132,900.00 41,464.80
Kerikil beton/ split m3 0.468 150,000.00 70,200.00
Besi beton kg 126.000 8,900.00 1,121,400.00
Kawat beton kg 1.800 13,500.00 24,300.00
JUMLAH HARGA BAHAN 1,560,611.80
C. PERALATAN
A. 3.2.1.11. Pemasangan 1 m3 pondasi sumuran batu belah (hitam), diameter 100 cm.
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.400 45,000.00 108,000.00
Tukang Batu L.02 OH 0.800 55,000.00 44,000.00
Kepala Tukang L.03 OH 0.080 57,500.00 4,600.00
Mandor L.04 OH 0.119 60,000.00 7,140.00
JUMLAH TENAGA KERJA 163,740.00
B. BAHAN
Batu belah (hitam) m3 0.450 137,500.00 61,875.00
Semen Portland kg 194.000 1,287.50 249,775.00
Pasir beton m3 0.312 132,900.00 41,464.80
Kerikil beton/ split m3 0.468 150,000.00 70,200.00
JUMLAH HARGA BAHAN 423,314.80
C. PERALATAN
A. 3.2.1.11. Pemasangan 1 m3 pondasi sumuran batu belah (putih), diameter 100 cm.
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.400 45,000.00 108,000.00
Tukang Batu L.02 OH 0.800 55,000.00 44,000.00
Kepala Tukang L.03 OH 0.080 57,500.00 4,600.00
Mandor L.04 OH 0.119 60,000.00 7,140.00
JUMLAH TENAGA KERJA 163,740.00
B. BAHAN
Batu belah (putih) m3 0.450 111,400.00 50,130.00
Semen Portland kg 194.000 1,287.50 249,775.00
Pasir beton m3 0.312 132,900.00 41,464.80
Kerikil beton/ split m3 0.468 150,000.00 70,200.00
JUMLAH HARGA BAHAN 411,569.80
C. PERALATAN
A. 4.1.1.1. Membuat 1 m3 beton mutu f'c = 7,4 Mpa (K100), slump (12 ± 2) cm, w/c = 0,87
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.650 45,000.00 74,250.00
Tukang Batu L.02 OH 0.275 55,000.00 15,125.00
Kepala Tukang L.03 OH 0.028 57,500.00 1,610.00
Mandor L.04 OH 0.083 60,000.00 4,980.00
JUMLAH TENAGA KERJA 95,965.00
B. BAHAN
Semen portland kg 247.000 1,287.50 318,012.50
Pasir beton kg 869.000 94.93 82,492.93
Kerikil (maks 30 mm) kg 999.000 111.11 111,000.00
Air ltr 215.000 35.00 7,525.00
JUMLAH HARGA BAHAN 519,030.43
C. PERALATAN
A. 4.1.1.2. Membuat 1 m3 beton mutu f'c = 9,8 Mpa (K125), slump (12 ± 2) cm, w/c = 0,78
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.650 45,000.00 74,250.00
Tukang Batu L.02 OH 0.275 55,000.00 15,125.00
Kepala Tukang L.03 OH 0.028 57,500.00 1,610.00
Mandor L.04 OH 0.083 60,000.00 4,980.00
JUMLAH TENAGA KERJA 95,965.00
B. BAHAN
Semen portland kg 276.000 1,287.50 355,350.00
Pasir beton kg 828.000 94.93 78,600.86
Kerikil (maks 30 mm) kg 1012.000 111.11 112,444.44
Air ltr 215.000 35.00 7,525.00
JUMLAH HARGA BAHAN 553,920.30
C. PERALATAN
A. 4.1.1.3. Membuat 1 m3 beton mutu f'c = 12,2 Mpa (K150), slump (12 ± 2) cm, w/c = 0,72
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.650 45,000.00 74,250.00
Tukang Batu L.02 OH 0.275 55,000.00 15,125.00
Kepala Tukang L.03 OH 0.028 57,500.00 1,610.00
Mandor L.04 OH 0.083 60,000.00 4,980.00
JUMLAH TENAGA KERJA 95,965.00
B. BAHAN
Semen portland kg 299.000 1,287.50 384,962.50
Pasir beton kg 799.000 94.93 75,847.93
Kerikil (maks 30 mm) kg 1017.000 111.11 113,000.00
Air ltr 215.000 35.00 7,525.00
JUMLAH HARGA BAHAN 581,335.43
C. PERALATAN
A. 4.1.1.4. Membuat 1 m3 lantai kerja beton mutu f'c = 7,4 Mpa (K100), slump (3-6) cm, w/c = 0,97
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.200 45,000.00 54,000.00
Tukang Batu L.02 OH 0.200 55,000.00 11,000.00
Kepala Tukang L.03 OH 0.020 57,500.00 1,150.00
Mandor L.04 OH 0.060 60,000.00 3,600.00
JUMLAH TENAGA KERJA 69,750.00
B. BAHAN
Semen portland kg 230.000 1,287.50 296,125.00
Pasir beton kg 893.000 94.93 84,771.21
Kerikil (maks 30 mm) kg 1027.000 111.11 114,111.11
Air ltr 200.000 35.00 7,000.00
JUMLAH HARGA BAHAN 502,007.33
C. PERALATAN
A. 4.1.1.5. Membuat 1 m3 beton mutu f'c = 14,5 Mpa (K175), slump (12 ± 2) cm, w/c = 0,66
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.650 45,000.00 74,250.00
Tukang Batu L.02 OH 0.275 55,000.00 15,125.00
Kepala Tukang L.03 OH 0.028 57,500.00 1,610.00
Mandor L.04 OH 0.083 60,000.00 4,980.00
JUMLAH TENAGA KERJA 95,965.00
B. BAHAN
Semen portland kg 326.000 1,287.50 419,725.00
Pasir beton kg 760.000 94.93 72,145.71
Kerikil (maks 30 mm) kg 1029.000 111.11 114,333.33
Air ltr 215.000 35.00 7,525.00
JUMLAH HARGA BAHAN 613,729.05
C. PERALATAN
A. 4.1.1.6. Membuat 1 m3 beton mutu f'c = 16,9 Mpa (K200), slump (12 ± 2) cm, w/c = 0,61
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.650 45,000.00 74,250.00
Tukang Batu L.02 OH 0.275 55,000.00 15,125.00
Kepala Tukang L.03 OH 0.028 57,500.00 1,610.00
Mandor L.04 OH 0.083 60,000.00 4,980.00
JUMLAH TENAGA KERJA 95,965.00
B. BAHAN
Semen portland kg 352.000 1,287.50 453,200.00
Pasir beton kg 731.000 94.93 69,392.79
Kerikil (maks 30 mm) kg 1031.000 111.11 114,555.56
Air ltr 215.000 35.00 7,525.00
JUMLAH HARGA BAHAN 644,673.34
C. PERALATAN
A. 4.1.1.7. Membuat 1 m3 beton mutu f'c = 19,3 Mpa (K225), slump (12 ± 2) cm, w/c = 0,58
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.650 45,000.00 74,250.00
Tukang Batu L.02 OH 0.275 55,000.00 15,125.00
Kepala Tukang L.03 OH 0.028 57,500.00 1,610.00
Mandor L.04 OH 0.083 60,000.00 4,980.00
JUMLAH TENAGA KERJA 95,965.00
B. BAHAN
Semen portland kg 371.000 1,287.50 477,662.50
Pasir beton kg 698.000 94.93 66,260.14
Kerikil (maks 30 mm) kg 1047.000 111.11 116,333.33
Air ltr 215.000 35.00 7,525.00
JUMLAH HARGA BAHAN 667,780.98
C. PERALATAN
A. 4.1.1.8. Membuat 1 m3 beton mutu f'c = 21,7 Mpa (K250), slump (12 ± 2) cm, w/c = 0,56
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.650 45,000.00 74,250.00
Tukang Batu L.02 OH 0.275 55,000.00 15,125.00
Kepala Tukang L.03 OH 0.028 57,500.00 1,610.00
Mandor L.04 OH 0.083 60,000.00 4,980.00
JUMLAH TENAGA KERJA 95,965.00
B. BAHAN
Semen portland kg 384.000 1,287.50 494,400.00
Pasir beton kg 692.000 94.93 65,690.57
Kerikil (maks 30 mm) kg 1039.000 111.11 115,444.44
Air ltr 215.000 35.00 7,525.00
JUMLAH HARGA BAHAN 683,060.02
C. PERALATAN
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 779,025.02
E. Profit 10% *D 77,902.50
F. Harga Satuan Pekerjaan (D+E) 856,927.52
A. 4.1.1.9. Membuat 1 m3 beton mutu f'c = 24,0 Mpa (K275), slump (12 ± 2) cm, w/c = 0,53
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.650 45,000.00 74,250.00
Tukang Batu L.02 OH 0.275 55,000.00 15,125.00
Kepala Tukang L.03 OH 0.028 57,500.00 1,610.00
Mandor L.04 OH 0.083 60,000.00 4,980.00
JUMLAH TENAGA KERJA 95,965.00
B. BAHAN
Semen portland kg 406.000 1,287.50 522,725.00
Pasir beton kg 684.000 94.93 64,931.14
Kerikil (maks 30 mm) kg 1026.000 111.11 114,000.00
Air ltr 215.000 35.00 7,525.00
JUMLAH HARGA BAHAN 709,181.14
C. PERALATAN
A. 4.1.1.10. Membuat 1 m3 beton mutu f'c = 26,4 Mpa (K300), slump (12 ± 2) cm, w/c = 0,52
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.650 45,000.00 74,250.00
Tukang Batu L.02 OH 0.275 55,000.00 15,125.00
Kepala Tukang L.03 OH 0.028 57,500.00 1,610.00
Mandor L.04 OH 0.083 60,000.00 4,980.00
JUMLAH TENAGA KERJA 95,965.00
B. BAHAN
Semen portland kg 413.000 1,287.50 531,737.50
Pasir beton kg 681.000 94.93 64,646.36
Kerikil (maks 30 mm) kg 1021.000 111.11 113,444.44
Air ltr 215.000 35.00 7,525.00
JUMLAH HARGA BAHAN 717,353.30
C. PERALATAN
A. 4.1.1.11. Membuat 1 m3 beton mutu f'c = 28,8 Mpa (K325), slump (12 ± 2) cm, w/c = 0,49
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.100 45,000.00 94,500.00
Tukang Batu L.02 OH 0.350 55,000.00 19,250.00
Kepala Tukang L.03 OH 0.035 57,500.00 2,012.50
Mandor L.04 OH 0.105 60,000.00 6,300.00
JUMLAH TENAGA KERJA 122,062.50
B. BAHAN
Semen portland kg 439.000 1,287.50 565,212.50
Pasir beton kg 670.000 94.93 63,602.14
Kerikil (maks 30 mm) kg 1006.000 111.11 111,777.78
Air ltr 215.000 35.00 7,525.00
JUMLAH HARGA BAHAN 748,117.42
C. PERALATAN
A. 4.1.1.12. Membuat 1 m3 beton mutu f'c = 31,2 Mpa (K350), slump (12 ± 2) cm, w/c = 0,48
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.100 45,000.00 94,500.00
Tukang Batu L.02 OH 0.350 55,000.00 19,250.00
Kepala Tukang L.03 OH 0.035 57,500.00 2,012.50
Mandor L.04 OH 0.105 60,000.00 6,300.00
JUMLAH TENAGA KERJA 122,062.50
B. BAHAN
Semen portland kg 448.000 1,287.50 576,800.00
Pasir beton kg 667.000 94.93 63,317.36
Kerikil (maks 30 mm) kg 1000.000 111.11 111,111.11
Air ltr 215.000 35.00 7,525.00
JUMLAH HARGA BAHAN 758,753.47
C. PERALATAN
A. 4.1.2.2. Pembuatan 1 m2 lahan produksi tebal 10 cm beton f'c = 14,5 Mpa (K175), slump (12 ± 2) cm
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.165 45,000.00 7,425.00
Tukang Batu L.02 OH 0.028 55,000.00 1,540.00
Kepala Tukang L.03 OH 0.003 57,500.00 172.50
Mandor L.04 OH 0.008 60,000.00 480.00
JUMLAH TENAGA KERJA 9,617.50
B. BAHAN
Semen portland kg 32.600 1,287.50 41,972.50
Pasir beton kg 76.000 94.93 7,214.57
Kerikil (maks 30 mm) kg 102.900 111.11 11,433.33
Air ltr 21.500 35.00 752.50
JUMLAH HARGA BAHAN 61,372.90
C. PERALATAN
A. 4.1.2.3. Pembuatan 1 m2 lahan produksi tebal 12 cm beton f'c = 14,5 Mpa (K175), slump (12 ± 2) cm
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.198 45,000.00 8,910.00
Tukang Batu L.02 OH 0.033 55,000.00 1,815.00
Kepala Tukang L.03 OH 0.003 57,500.00 172.50
Mandor L.04 OH 0.010 60,000.00 600.00
JUMLAH TENAGA KERJA 11,497.50
B. BAHAN
Semen portland kg 32.120 1,287.50 41,354.50
Pasir beton kg 91.200 94.93 8,657.49
Kerikil (maks 30 mm) kg 123.480 111.11 13,720.00
Air ltr 25.800 35.00 903.00
JUMLAH HARGA BAHAN 64,634.99
C. PERALATAN
A. 4.2.1.4. Pembuatan 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.050 45,000.00 47,250.00
Tukang Las biasa L.02 OH 1.050 55,000.00 57,750.00
Kepala tukang L.03 OH 0.105 57,500.00 6,037.50
Mandor L,04 OH 0.062 60,000.00 3,720.00
JUMLAH TENAGA KERJA 114,757.50
B. BAHAN
Besi siku L 30.30.3 kg 15.000 17,500.00 262,500.00
Besi plat baja kg 32.800 17,500.00 574,000.00
Kawat las kg 0.050 28,000.00 1,400.00
JUMLAH HARGA BAHAN 837,900.00
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 952,657.50
E. Profit 10% *D 95,265.75
F. Harga Satuan Pekerjaan (D+E) 1,047,923.25
A. 4.2.1.20. Pemasangan 1 m2 rangka besi hollow 1x40.40.2 mm, modul 60 x 120 cm, dinding partisi
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.250 45,000.00 11,250.00
Tukang Besi L.02 OH 0.250 55,000.00 13,750.00
Kepala tukang L.03 OH 0.025 57,500.00 1,437.50
Mandor L,04 OH 0.013 60,000.00 780.00
JUMLAH TENAGA KERJA 27,217.50
B. BAHAN
Rangka hollow 40.40.2 mm m 3.500 17,500.00 61,250.00
assesoris (perkuatan, las, dll) Ls 100%xrangka 17,500.00 17,500.00
A. 4.2.1.21. Pemasangan 1 m2 rangka besi hollow 1x40.40.2 mm, modul 60 x 60 cm, plafon
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.350 45,000.00 15,750.00
Tukang Besi L.02 OH 0.350 55,000.00 19,250.00
Kepala tukang L.03 OH 0.035 57,500.00 2,012.50
Mandor L,04 OH 0.018 60,000.00 1,080.00
JUMLAH TENAGA KERJA 38,092.50
B. BAHAN
Rangka hollow 40.40.2 mm m 4.000 17,500.00 70,000.00
assesoris (perkuatan, las, dll) Ls 100%xrangka 17,500.00 17,500.00
A. 4.4.1.2. Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu, camp. 1 SP : 3PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.600 45,000.00 27,000.00
Tukang Batu L.02 OH 0.200 55,000.00 11,000.00
Kepala tukang L.03 OH 0.020 57,500.00 1,150.00
Mandor L,04 OH 0.030 60,000.00 1,800.00
JUMLAH TENAGA KERJA 40,950.00
B. BAHAN
Bata merah buah 140.000 650.00 91,000.00
Semen portland kg 32.950 1,287.50 42,423.13
Pasir pasang m3 0.091 132,900.00 12,093.90
JUMLAH HARGA BAHAN 145,517.03
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 186,467.03
E. Profit 10% *D 18,646.70
F. Harga Satuan Pekerjaan (D+E) 205,113.73
A. 4.4.1.3. Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu, camp. 1 SP : 4PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.600 45,000.00 27,000.00
Tukang Batu L.02 OH 0.200 55,000.00 11,000.00
Kepala tukang L.03 OH 0.020 57,500.00 1,150.00
Mandor L,04 OH 0.030 60,000.00 1,800.00
JUMLAH TENAGA KERJA 40,950.00
B. BAHAN
Bata merah buah 140.000 650.00 91,000.00
Semen portland kg 26.550 1,287.50 34,183.13
Pasir pasang m3 0.093 132,900.00 12,359.70
JUMLAH HARGA BAHAN 137,542.83
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 178,492.83
E. Profit 10% *D 17,849.28
F. Harga Satuan Pekerjaan (D+E) 196,342.11
A. 4.4.1.4. Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu, camp. 1 SP : 5PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.600 45,000.00 27,000.00
Tukang Batu L.02 OH 0.200 55,000.00 11,000.00
Kepala tukang L.03 OH 0.020 57,500.00 1,150.00
Mandor L,04 OH 0.030 60,000.00 1,800.00
JUMLAH TENAGA KERJA 40,950.00
B. BAHAN
Bata merah buah 140.000 650.00 91,000.00
Semen portland kg 22.220 1,287.50 28,608.25
Pasir pasang m3 0.102 132,900.00 13,555.80
JUMLAH HARGA BAHAN 133,164.05
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 174,114.05
E. Profit 10% *D 17,411.41
F. Harga Satuan Pekerjaan (D+E) 191,525.46
A. 4.4.1.5. Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu, camp. 1 SP : 6PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.600 45,000.00 27,000.00
Tukang Batu L.02 OH 0.200 55,000.00 11,000.00
Kepala tukang L.03 OH 0.020 57,500.00 1,150.00
Mandor L,04 OH 0.030 60,000.00 1,800.00
JUMLAH TENAGA KERJA 40,950.00
B. BAHAN
Bata merah buah 140.000 650.00 91,000.00
Semen portland kg 18.500 1,287.50 23,818.75
Pasir pasang m3 0.122 132,900.00 16,213.80
JUMLAH HARGA BAHAN 131,032.55
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 171,982.55
E. Profit 10% *D 17,198.26
F. Harga Satuan Pekerjaan (D+E) 189,180.81
A. 4.4.1.6. Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu, camp. 1 SP : 3KP : 10PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.600 45,000.00 27,000.00
Tukang Batu L.02 OH 0.200 55,000.00 11,000.00
Kepala tukang L.03 OH 0.020 57,500.00 1,150.00
Mandor L,04 OH 0.030 60,000.00 1,800.00
JUMLAH TENAGA KERJA 40,950.00
B. BAHAN
Bata merah buah 140.000 650.00 91,000.00
Semen portland kg 10.080 1,287.50 12,978.00
Kapur padam m3 0.0275 115,000.00 3,162.50
Pasir pasang m3 0.0925 132,900.00 12,293.25
JUMLAH HARGA BAHAN 119,433.75
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 160,383.75
E. Profit 10% *D 16,038.38
F. Harga Satuan Pekerjaan (D+E) 176,422.13
A. 4.4.1.7. Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu, camp. 1 SP : 2PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.300 45,000.00 13,500.00
Tukang Batu L.02 OH 0.100 55,000.00 5,500.00
Kepala tukang L.03 OH 0.010 57,500.00 575.00
Mandor L,04 OH 0.015 60,000.00 900.00
JUMLAH TENAGA KERJA 20,475.00
B. BAHAN
Bata merah buah 70.000 650.00 45,500.00
Semen portland kg 18.950 1,287.50 24,398.13
Pasir pasang m3 0.038 132,900.00 5,050.20
JUMLAH HARGA BAHAN 74,948.33
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 95,423.33
E. Profit 10% *D 9,542.33
F. Harga Satuan Pekerjaan (D+E) 104,965.66
A. 4.4.1.8. Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu, camp. 1 SP : 3PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.300 45,000.00 13,500.00
Tukang Batu L.02 OH 0.100 55,000.00 5,500.00
Kepala tukang L.03 OH 0.010 57,500.00 575.00
Mandor L,04 OH 0.015 60,000.00 900.00
JUMLAH TENAGA KERJA 20,475.00
B. BAHAN
Bata merah buah 70.000 650.00 45,500.00
Semen portland kg 14.370 1,287.50 18,501.38
Pasir pasang m3 0.040 132,900.00 5,316.00
JUMLAH HARGA BAHAN 69,317.38
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 89,792.38
E. Profit 10% *D 8,979.24
F. Harga Satuan Pekerjaan (D+E) 98,771.61
A. 4.4.1.9. Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu, camp. 1 SP : 4PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.300 45,000.00 13,500.00
Tukang Batu L.02 OH 0.100 55,000.00 5,500.00
Kepala tukang L.03 OH 0.010 57,500.00 575.00
Mandor L,04 OH 0.015 60,000.00 900.00
JUMLAH TENAGA KERJA 20,475.00
B. BAHAN
Bata merah buah 70.000 650.00 45,500.00
Semen portland kg 11.500 1,287.50 14,806.25
Pasir pasang m3 0.043 132,900.00 5,714.70
JUMLAH HARGA BAHAN 66,020.95
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 86,495.95
E. Profit 10% *D 8,649.60
F. Harga Satuan Pekerjaan (D+E) 95,145.55
A. 4.4.1.10. Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu, camp. 1 SP : 5PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.300 45,000.00 13,500.00
Tukang Batu L.02 OH 0.100 55,000.00 5,500.00
Kepala tukang L.03 OH 0.010 57,500.00 575.00
Mandor L,04 OH 0.015 60,000.00 900.00
JUMLAH TENAGA KERJA 20,475.00
B. BAHAN
Bata merah buah 70.000 650.00 45,500.00
Semen portland kg 9.680 1,287.50 12,463.00
Pasir pasang m3 0.045 132,900.00 5,980.50
JUMLAH HARGA BAHAN 63,943.50
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 84,418.50
E. Profit 10% *D 8,441.85
F. Harga Satuan Pekerjaan (D+E) 92,860.35
A. 4.4.1.11. Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu, camp. 1 SP : 6PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.300 45,000.00 13,500.00
Tukang Batu L.02 OH 0.100 55,000.00 5,500.00
Kepala tukang L.03 OH 0.010 57,500.00 575.00
Mandor L,04 OH 0.015 60,000.00 900.00
JUMLAH TENAGA KERJA 20,475.00
B. BAHAN
Bata merah buah 70.000 650.00 45,500.00
Semen portland kg 8.320 1,287.50 10,712.00
Pasir pasang m3 0.049 132,900.00 6,512.10
JUMLAH HARGA BAHAN 62,724.10
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 83,199.10
E. Profit 10% *D 8,319.91
F. Harga Satuan Pekerjaan (D+E) 91,519.01
A. 4.4.1.12. Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu, camp. 1 SP : 8PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.300 45,000.00 13,500.00
Tukang Batu L.02 OH 0.100 55,000.00 5,500.00
Kepala tukang L.03 OH 0.010 57,500.00 575.00
Mandor L,04 OH 0.015 60,000.00 900.00
JUMLAH TENAGA KERJA 20,475.00
B. BAHAN
Bata merah buah 70.000 650.00 45,500.00
Semen portland kg 6.500 1,287.50 8,368.75
Pasir pasang m3 0.050 132,900.00 6,645.00
JUMLAH HARGA BAHAN 60,513.75
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 80,988.75
E. Profit 10% *D 8,098.88
F. Harga Satuan Pekerjaan (D+E) 89,087.63
A. 4.4.1.13. Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu, camp. 1 SP : 3KP : 10PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.300 45,000.00 13,500.00
Tukang Batu L.02 OH 0.100 55,000.00 5,500.00
Kepala tukang L.03 OH 0.010 57,500.00 575.00
Mandor L,04 OH 0.015 60,000.00 900.00
JUMLAH TENAGA KERJA 20,475.00
B. BAHAN
Bata merah buah 70.000 650.00 45,500.00
Semen portland kg 6.500 1,287.50 8,368.75
Kapur padam m3 0.015 115,000.00 1,725.00
Pasir pasang m3 0.050 132,900.00 6,645.00
JUMLAH HARGA BAHAN 62,238.75
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 82,713.75
E. Profit 10% *D 8,271.38
F. Harga Satuan Pekerjaan (D+E) 90,985.13
A. 4.4.1.14. Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu, camp. 1 SM : 1KP : 1PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.300 45,000.00 13,500.00
Tukang Batu L.02 OH 0.100 55,000.00 5,500.00
Kepala tukang L.03 OH 0.010 57,500.00 575.00
Mandor L,04 OH 0.015 60,000.00 900.00
JUMLAH TENAGA KERJA 20,475.00
B. BAHAN
Bata merah buah 70.000 650.00 45,500.00
Semen merah m3 0.018 1,287.50 23.17
Kapur padam m3 0.018 115,000.00 2,070.00
Pasir pasang m3 0.018 132,900.00 2,392.20
JUMLAH HARGA BAHAN 49,985.38
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 70,460.38
E. Profit 10% *D 7,046.04
F. Harga Satuan Pekerjaan (D+E) 77,506.41
A. 4.4.1.15. Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu, camp. 1 SM : 1KP : 2PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.300 45,000.00 13,500.00
Tukang Batu L.02 OH 0.100 55,000.00 5,500.00
Kepala tukang L.03 OH 0.010 57,500.00 575.00
Mandor L,04 OH 0.015 60,000.00 900.00
JUMLAH TENAGA KERJA 20,475.00
B. BAHAN
Bata merah buah 70.000 650.00 45,500.00
Semen merah m3 0.014 350,000.00 4,900.00
Kapur padam m3 0.014 115,000.00 1,610.00
Pasir pasang m3 0.028 132,900.00 3,721.20
JUMLAH HARGA BAHAN 55,731.20
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 76,206.20
E. Profit 10% *D 7,620.62
F. Harga Satuan Pekerjaan (D+E) 83,826.82
A. 4.4.1.24. Pemasangan 1 m2 dinding bata berongga ekspose 12x11x24 cm, camp. 1 SP : 3PP
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.300 45,000.00 13,500.00
Tukang Batu L.02 OH 0.150 55,000.00 8,250.00
Kepala tukang L.03 OH 0.015 57,500.00 862.50
Mandor L,04 OH 0.015 60,000.00 900.00
JUMLAH TENAGA KERJA 23,512.50
B. BAHAN
Bata berongga ekspose buah 70.000 1,250.00 87,500.00
Semen portland kg 14.000 1,287.50 18,025.00
Pasir pasang m3 0.032 132,900.00 4,252.80
JUMLAH HARGA BAHAN 109,777.80
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 133,290.30
E. Profit 10% *D 13,329.03
F. Harga Satuan Pekerjaan (D+E) 146,619.33
B. BAHAN
1. PC Kg 15.504 1,287.50 19,961.40
2. PP m3 0.016 132,900.00 2,126.40
JUMLAH HARGA BAHAN 22,087.80
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 45,600.30
E. Profit 10% * D 4,560.03
F. Harga Satuan Pekerjaan (D+E) 50,160.33
A. 4.4.3.33. Pemasangan 1 m2 lantai keramik artistik 10cm x10cm atau 5cm x 20cm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.700 -
Tukang Batu L.02 OH 0.350 -
Kepala Tukang L.03 OH 0.035 -
Mandor L.04 OH 0.035 -
JUMLAH TENAGA KERJA -
B. BAHAN
Ubin keramik Bh 106.000 -
Semen Portlan Kg 8.190 -
Pasir pasang m3 0.045 -
Semen warna Kg 3.200 -
JUMLAH HARGA BAHAN -
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) -
E. Profit 10% * D -
F. Harga Satuan Pekerjaan (D+E) -
A. 4.4.3.37. Pemasangan 1 m2 lantai keramik ukuran 10cm x 33cm untuk variasi/ border
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 1.050 -
Tukang Batu L.02 OH 0.525 -
Kepala Tukang L.03 OH 0.053 -
Mandor L.04 OH 0.053 -
JUMLAH TENAGA KERJA -
B. BAHAN
Ubin keramik Bh 33.000 -
Semen Portlan Kg 9.800 -
Pasir pasang m3 0.045 -
Semen warna Kg 4.370 -
JUMLAH HARGA BAHAN -
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) -
E. Profit 10% * D -
F. Harga Satuan Pekerjaan (D+E) -
A. 4.5.1.5. Pemasangan 1 m2 langit-langit tripleks ukuran ( 120 x 240 )cm, tebal 3mm, 4mm dan 6mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.100 45,000.00 4,500.00
Tukang Kayu L.02 OH 0.100 57,500.00 5,750.00
Kepala Tukang L.03 OH 0.010 60,000.00 600.00
Mandor L.04 OH 0.005 60,000.00 300.00
JUMLAH TENAGA KERJA 11,150.00
B. BAHAN
Tripleks Lembar 0.375 47,500.00 17,812.50
Paku tripleks Kg 0.030 16,000.00 480.00
JUMLAH HARGA BAHAN 18,292.50
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 29,442.50
E. Profit 10% * D 2,944.25
F. Harga Satuan Pekerjaan (D+E) 32,386.75
A. 4.5.1.7. Pemasangan 1 m2 langit-langit gypsum board ukuran ( 120x240x9 )cm, tebal 9mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.100 45,000.00 4,500.00
Tukang Kayu L.02 OH 0.050 57,500.00 2,875.00
Kepala Tukang L.03 OH 0.005 60,000.00 300.00
Mandor L.04 OH 0.005 60,000.00 300.00
JUMLAH TENAGA KERJA 7,975.00
B. BAHAN
Gypsum board Lembar 0.364 65,000.00 23,660.00
Paku skrup Kg 0.110 25,000.00 2,750.00
JUMLAH HARGA BAHAN 26,410.00
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 34,385.00
E. Profit 10% * D 3,438.50
F. Harga Satuan Pekerjaan (D+E) 37,823.50
A. 4.5.1.8. Pemasangan 1 m2 langit-langit akustik ukuran ( 60x120 )cm, berikut rangka alluminium
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.500 -
Tukang Besi L.02 OH 0.500 -
Kepala Tukang L.03 OH 0.050 -
Mandor L.04 OH 0.025 -
JUMLAH TENAGA KERJA -
B. BAHAN
Profil Allum "T" m 3.600 -
Kawat dia 4mm Kg 0.150 -
Ramset Bh 1.050 -
Akustik 60 x 120 Lembar 1.500 -
JUMLAH HARGA BAHAN -
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) -
E. Profit 10% * D -
F. Harga Satuan Pekerjaan (D+E) -
A. 4.6.1.2 Pembuatan dan pemasangan 1m3 kusen pintu dan kusen jendela, kayu kelas II atau III
Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 6.000 45,000.00 270,000.00
Tukang kayu L.03 OH 18.000 57,500.00 1,035,000.00
Kepala Tukang L.03 OH 1.800 60,000.00 108,000.00
Mandor L.04 OH 0.300 60,000.00 18,000.00
JUMLAH TENAGA KERJA 1,431,000.00
B. BAHAN
Balok kayu m3 1.200 9,000,000.00 10,800,000.00
Paku 10 cm kg 1.250 12,000.00 15,000.00
Lem kayu kg 1.000 12,000.00 12,000.00
JUMLAH HARGA BAHAN 10,827,000.00
C. PERALATAN
A. 4.6.1.3 Pembuatan dan pemasangan 1m2 pintu klamp standar kayu kelas II
A. 4.6.1.4 Pembuatan dan pemasangan 1m2 pintu klamp sederhana kayu kelas III
A. 4.6.1.5 Pembuatan dan pemasangan 1m2 daun pintu panel, kayu kelas I atau II
A. 4.6.1.6 Pembuatan dan pemasangan 1m2 pintu dan jendela kaca, kayu kelas I atau II
A. 4.6.1.7Pembuatan dan pemasangan 1m2 pintu dan jendela jalusi kayu kelas I atau II
A. 4.6.1.8 Pembuatan 1m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup
A. 4.6.1.9 Pembuatan 1m2 daun pintu plywood rangkap, rangka expose kayu kelas I atau II
A. 4.6.1.12 Pemasangan 1m2 teakwood rangkap lapis formika, rangka expose kayu kelas II
A. 4.6.1.13. Pemasangan 1m3 konstruksi kuda kuda konvensional, kayu kelas I, II dan III
A. 4.6.1.19. Pemasangan 1m2 rangka langit-langit (50 x 100), kayu kelas II atau III
A. 4.6.1.20. Pemasangan 1m2 rangka langit-langit (60 x 60), cm kayu kelas II atau III
A. 4.6.1.23. Pemasangan 1m2 rangka dinding pemisah (60 x 120), cm kayu kelas II atau III
A. 4.6.1.24. Pemasangan 1m2 dinding pemisah teakwood rangkap, rangka kayu kelas II
A. 4.6.1.25. Pemasangan 1m2 dinding pemisah plywood rangkap, rangka kayu kelas II
A. 4.6.1.27. Pemasangan 1m2 dinding lambrisering dari plywood ukuran (120 x 240)
A. 4.6.1.28. Pemasangan 1m2 dinding bilik, rangka kayu kelas III atau IV
A. 4.7.1.4. 1 M2 Pengecatan bidang kayu baru (1 lapis plamur, 1 lapis cat dasar, 2 lapis cat)
A. 4.7.1.5. 1 M2 Pengecatan bidang kayu baru (1 lapis plamur, 1 lapis cat dasar, 3 lapis cat penutup)
A. 4.7.1.10. 1 M2 Pengecatan tembok baru (1 lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup
A. 4.7.1.11. 1 M2 Pengecatan tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup
A. 4.7.1.19. 1 M2 Pengecatan permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir
A. 4.7.1.21. 1 M2 Pengecatan permukaan baja galvanis secara semprot sistem 3 lapis cat mutakhir
A. 5.1.1.33. Pemasangan 1 m' pipa air limbah jenis pipa tanah diameter 20 cm
A. 5.1.1.34. Pemasangan 1 m' pipa air limbah jenis pipa tanah diameter 15 cm