I PEKERJAAN PERSIAPAN
TOTAL I 17,500,000
II PEKERJAAN BONGKARAN
1 Bongkar keramik lantai existing dan permukaan screed Existing m2 679.50 35,000 23,782,500
3 Langsiran Bongkaran ke Luar Lokasi m3 6.18 1,000,000 6,183,450
2 Mob demob Loker Existing ls 1.00 5,000,000 5,000,000
34,965,950
JUMLAH 193,987,200
PROFIT 8% 15,518,976
GRAND TOTAL 209,506,176
1 Prosedur pembayaran
- Tahap 1 : 50% Dibayarkan Setelah PO dikirimkan
Sisanya Progress
CV. MJP
Mahmud