Anda di halaman 1dari 6

PT DOCK BINA VISTA REPAIR LIST

Jl. Wajok Hilir No. Km 12, Wajok Hulu, Kec. Jongkat TK. BINA SARANA II
Kab. Mempawah, Kalimantan Barat

SHIP PARTICULAR
Name Of Vessel : TK. BINA SARANA II
Flag : Indonesia
Owner : PT BELIAN KHATULISTIWA LINE
LOA : 100.70 M
Breadth : 27.40 M
Draft : - M
Tinggi : 6.50 M
Status Docking :

Note:
1) Job list below is only for estimation purpose. The dimension, area, material, weight calculation, and quantity will be based on the actual work and can be changed anytime during
repair period.

Post Quantity
JOB DESCRIPTION
No. Each Total Unit(s)
GS. GENERAL SERVICE
Start from up to
Arrival date
Start working date
Finish working date
Docking Date
Undocking date
Sailing/Delivery

GS. 01 DOCKING & UNDOCKING


1 Docking date :
2 Undocking date :
3 Dipersiapkan stop block, diatur posisi dan bantalan-bantalan untuk docking
4 Asistensi naik turun dock menggunakan air bag system

GS. 02 MOORING / UNMOORING


Di sediakan line handler untuk docking dan undocking

GS. 03 HYDRANT
Disediakan alat pemadam (hydrant) guna pencegahan terhadap bahaya kebakaran selama kapal dalam perbaikan

GS. 04 TEMPAT SAMPAH


Disediakan tempat sampah di kapal dan akan di buang berkala

GS. 05 GANGWAY
Disediakan gangway untuk akses ke kapal

GS. 06 SHORE POWER SUPPLY


Connection / disconnect
Per kWH

GS. 07 CRANE / FORKLIFT

GS. 08 TUG ASSISTANCE


Disediakan asistensi tugboat untuk untuk proses naik turun berserta keluar-masuk galangan

HO. HULL & OUTFITTING


HO. 01 Fabrikasi sideboard Fr. 01 - Fr 29 -- STBD
Note : Potong material lama, renew
* Steel Plate 1800 x 3650 x 10 (mm) = 29 Piece(s) 515.7 14956.6 Kg(s)
Angle bar fabrikasi / bending dengan material sebagai berikut :
* Steel Plate 210 x 1800 x 10 (mm) = 174 Piece(s) 29.7 5163.1 Kg(s)
H-Beam 150 x 150 x 7 x 10 x 2400 = 29 Unit 0.031 2157.60 Kg(s)
Half H-Beam 150 x 150 x 7 x 10 x 3650 = 29 Unit 0.031 1640.675 Kg(s)

HO. 02 Fabrikasi sideboard Fr. 32 - Fr 40 -- STBD


Note : Potong material lama, renew
* Steel Plate 1800 x 3650 x 10 (mm) = 8 Piece(s) 515.7 4126.0 Kg(s)
Angle bar fabrikasi / bending dengan material sebagai berikut :
* Steel Plate 210 x 1800 x 10 (mm) = 48 Piece(s) 29.7 1424.3 Kg(s)
H-Beam 150 x 150 x 7 x 10 x 2400 = 8 Unit 0.031 595.20 Kg(s)
Half H-Beam 150 x 150 x 7 x 10 x 3650 = 8 Unit 0.031 452.6 Kg(s)

HO. 03 Fabrikasi sideboard Fr. 41 - Fr 50 -- STBD


Note : Potong material lama, renew
* Steel Plate 1900 x 3650 x 10 (mm) = 10 Piece(s) 544.4 5444.0 Kg(s)
Angle bar fabrikasi / bending dengan material sebagai berikut :
* Steel Plate 210 x 1900 x 10 (mm) = 60 Piece(s) 31.3 1879.3 Kg(s)
H-Beam 150 x 150 x 7 x 10 x 2400 = 10 Unit 0.031 744.00 Kg(s)
Half H-Beam 150 x 150 x 7 x 10 x 3650 = 10 Unit 0.031 565.75 Kg(s)

HO. 04 Fabrikasi sideboard Fr. 01 - Fr 29 -- PORT


Note : Potong material lama, renew
* Steel Plate 1800 x 3650 x 10 (mm) = 29 Piece(s) 515.7 14956.6 Kg(s)
Post Quantity
JOB DESCRIPTION
No. Each Total Unit(s)
GS. GENERAL SERVICE
Angle bar fabrikasi / bending dengan material sebagai berikut :
* Steel Plate 210 x 1800 x 10 (mm) = 174 Piece(s) 29.7 5163.1 Kg(s)
H-Beam 150 x 150 x 7 x 10 x 2400 = 29 Unit 0.031 2157.60 Kg(s)
Half H-Beam 150 x 150 x 7 x 10 x 3650 = 29 Unit 0.031 1640.675 Kg(s)

HO. 05 Fabrikasi sideboard Fr. 32 - Fr 40 -- PORT


Note : Potong material lama, renew
* Steel Plate 1800 x 3650 x 10 (mm) = 8 Piece(s) 515.7 4126.0 Kg(s)
Angle bar fabrikasi / bending dengan material sebagai berikut :
* Steel Plate 210 x 1800 x 10 (mm) = 48 Piece(s) 29.7 1424.3 Kg(s)
H-Beam 150 x 150 x 7 x 10 x 2400 = 8 Unit 0.031 595.20 Kg(s)
Half H-Beam 150 x 150 x 7 x 10 x 3650 = 8 Unit 0.031 452.6 Kg(s)

HO. 06 Fabrikasi sideboard Fr. 41 - Fr 50 -- PORT


Note : Potong material lama, renew
* Steel Plate 1900 x 3650 x 10 (mm) = 10 Piece(s) 544.4 5444.0 Kg(s)
Angle bar fabrikasi / bending dengan material sebagai berikut :
* Steel Plate 210 x 1900 x 10 (mm) = 60 Piece(s) 31.3 1879.3 Kg(s)
H-Beam 150 x 150 x 7 x 10 x 2400 = 10 Unit 0.031 744.00 Kg(s)
Half H-Beam 150 x 150 x 7 x 10 x 3650 = 10 Unit 0.031 565.75 Kg(s)

HO. 07 Fabrikasi sideboard belakang


Note : Potong material lama, renew
* Steel Plate 1800 x 3650 x 10 (mm) = 14 Piece(s) 515.7 7220.4 Kg(s)
Angle bar fabrikasi / bending dengan material sebagai berikut :
* Steel Plate 210 x 1800 x 10 (mm) = 84 Piece(s) 29.7 2492.5 Kg(s)
H-Beam 150 x 150 x 7 x 10 x 2400 = 14 Unit 0.031 1041.60 Kg(s)
Half H-Beam 150 x 150 x 7 x 10 x 3650 = 14 Unit 0.031 792.05 Kg(s)

HO. 08 Fabrikasi sideboard depan


Note : Potong material lama, renew
* Steel Plate 1800 x 3650 x 10 (mm) = 7 Piece(s) 515.7 3610.2 Kg(s)
Angle bar fabrikasi / bending dengan material sebagai berikut :
* Steel Plate 210 x 1800 x 10 (mm) = 49 Piece(s) 29.7 1454.0 Kg(s)
H-Beam 150 x 150 x 7 x 10 x 2400 = 7 Unit 0.031 520.80 Kg(s)
Half H-Beam 150 x 150 x 7 x 10 x 3650 = 7 Unit 0.031 396.025 Kg(s)

* Steel Plate 900 x 3650 x 10 (mm) = 1 Piece(s) 257.9 257.9 Kg(s)


Angle bar fabrikasi / bending dengan material sebagai berikut :
* Steel Plate 210 x 1800 x 10 (mm) = 6 Piece(s) 29.7 178.0 Kg(s)
H-Beam 150 x 150 x 7 x 10 x 2400 = 1 Unit 0.031 74.40 Kg(s)
Half H-Beam 150 x 150 x 7 x 10 x 3650 = 1 Unit 0.031 56.575 Kg(s)

HO. 09 Fabrikasi pintu sideboard -- PORT


Note : Potong material lama, renew
* Steel Plate 5400 x 600 x 10 (mm) = 5 Piece(s) 254.3 1271.7 Kg(s)
* Steel Plate 5400 x 650 x 10 (mm) = 1 Piece(s) 275.5 275.5 Kg(s)
Web bar fabrikasi / bending dengan material sebagai berikut :
* Steel Plate 230 x 5400 x 12 (mm) = 18 Piece(s) 117.0 2105.9 Kg(s)
* Steel Plate 230 x 600 x 12 (mm) = 35 Piece(s) 13.0 455.0 Kg(s)
* Steel Plate 230 x 650 x 12 (mm) = 7 Piece(s) 14.1 98.6 Kg(s)
H-Beam 250 x 250 x 9 x 14 x 3650 = 2 Unit 0.071 518.3 Kg(s)
H-Beam 250 x 250 x 9 x 14 x 2400 = 2 Unit 0.071 340.8 Kg(s)

HO. 10 Fabrikasi pintu sideboard -- STBD


Note : Potong material lama, renew
* Steel Plate 5400 x 600 x 10 (mm) = 5 Piece(s) 254.3 1271.7 Kg(s)
* Steel Plate 5400 x 650 x 10 (mm) = 1 Piece(s) 275.5 275.5 Kg(s)
Web bar fabrikasi / bending dengan material sebagai berikut :
* Steel Plate 230 x 5400 x 12 (mm) = 18 Piece(s) 117.0 2105.9 Kg(s)
* Steel Plate 230 x 600 x 12 (mm) = 35 Piece(s) 13.0 455.0 Kg(s)
* Steel Plate 230 x 650 x 12 (mm) = 7 Piece(s) 14.1 98.6 Kg(s)
H-Beam 250 x 250 x 9 x 14 x 3650 = 2 Unit 0.071 518.3 Kg(s)
H-Beam 250 x 250 x 9 x 14 x 2400 = 2 Unit 0.071 340.8 Kg(s)

HO. 11 Fabrikasi pintu sideboard -- Depan


Note : Potong material lama, renew
* Steel Plate 5400 x 600 x 10 (mm) = 5 Piece(s) 254.3 1271.7 Kg(s)
* Steel Plate 5400 x 650 x 10 (mm) = 1 Piece(s) 275.5 275.5 Kg(s)
Web bar fabrikasi / bending dengan material sebagai berikut :
* Steel Plate 230 x 5400 x 12 (mm) = 18 Piece(s) 117.0 2105.9 Kg(s)
* Steel Plate 230 x 600 x 12 (mm) = 35 Piece(s) 13.0 455.0 Kg(s)
* Steel Plate 230 x 650 x 12 (mm) = 7 Piece(s) 14.1 98.6 Kg(s)
H-Beam 250 x 250 x 9 x 14 x 3650 = 2 Unit 0.071 518.3 Kg(s)
H-Beam 250 x 250 x 9 x 14 x 2400 = 2 Unit 0.071 340.8 Kg(s)

Total 111590.1 Kg(S)


Post Quantity
JOB DESCRIPTION
No. Each Total Unit(s)
GS. GENERAL SERVICE
Resume material :
Plate 10 per sheet 871.35 Kgs
Material plate 10 untuk sideboard 59883.72 Kgs 68.73 Sheet plate
Material plate 10 untuk pintu 4641.7 Kgs 5.33 Sheet plate
Total 74 Sheet plate

Material plate 10 untuk fabrikasi Angle bar 125 x 75 x 10


Sideboard 21057.9 Kgs 1277.40 Mtrs 212.90 Length 24.60 Sheet plate

Material plate 12 untuk fabrikasi Web 140 x 80 x 12


Pintu 7978.5 Kgs 368.25 Mtrs 61.38 Length 8.00 Sheet plate

H-beam 150 x 150 15193.10 Kgs 58.00 Length/12M


H-beam 250 x 250 2577.30 Kgs 6.00 Length/12M
PT DOCK BINA VISTA REPAIR LIST
Jl. Wajok Hilir No. Km 12, Wajok Hulu, Kec. Jongkat SARANA GALANGAN (Excavator SUMITOMO)
Kab. Mempawah, Kalimantan Barat

Post Quantity Harga


JOB DESCRIPTION Ketrangan
No. Each Total Unit(s) Harga Total
BP. BLASTING & PAINTING
BP. 01 Roller roda sebelah kiri
Note : Bongkar material lama, renew
* Steel Plate 50 x 100 x 14 (mm) = 2 Piece(s) 2.00 Pieces(s) Workshop Pak Budi ###
* Steel Plate 150 x 200 x 14 (mm) = 2 Piece(s) 2.00 Pieces(s)
* Steel Plate 50 x 200 x 14 (mm) = 2 Piece(s) 2.00 Pieces(s)
* Bolt & Nut 1/2" x 3" = 4 Set(s) 4.00 Set(s)

Total 0.0 Kg(S)


PT DOCK BINA VISTA REPAIR LIST
Jl. Wajok Hilir No. Km 12, Wajok Hulu, Kec. Jongkat SARANA GALANGAN (Excavator SUMITOMO)
Kab. Mempawah, Kalimantan Barat

Post Quantity
JOB DESCRIPTION
No. Each Total Unit(s)
BP. BLASTING & PAINTING
BP. 01 Roller roda sebelah kiri
Note : Bongkar material lama, renew
* Steel Plate 50 x 100 x 14 (mm) = 2 Piece(s) 2.00 Pieces(s)
* Steel Plate 150 x 200 x 14 (mm) = 2 Piece(s) 2.00 Pieces(s)
* Steel Plate 50 x 200 x 14 (mm) = 2 Piece(s) 2.00 Pieces(s)
* Bolt & Nut 1/2" x 3" = 4 Set(s) 4.00 Set(s)

Total 0.0 Kg(S)


Harga
Ketrangan
Harga Harga Total

Workshop Pak Budi ###

Anda mungkin juga menyukai