PT DOCK BINA VISTA REPAIR LIST

Jl. Wajok Hilir No. Km 12, Wajok Hulu, Kec. Jongkat TK. BINA SARANA II
Kab. Mempawah, Kalimantan Barat

SHIP PARTICULAR
Name Of Vessel : TK. BINA SARANA II
Flag : Indonesia
Owner : PT BELIAN KHATULISTIWA LINE
LOA : 100.70 M
Breadth : 27.40 M
Draft : - M
Tinggi : 6.50 M
Status Docking :

Note:
1) Job list below is only for estimation purpose. The dimension, area, material, weight calculation, and quantity will be based on the actual work and can be changed anytime during
repair period.

Post Quantity
JOB DESCRIPTION
No. Each Total Unit(s)
GS. GENERAL SERVICE
Start from up to
Arrival date
Start working date
Finish working date
Docking Date
Undocking date
Sailing/Delivery

GS. 01 DOCKING & UNDOCKING


1 Docking date :
2 Undocking date :
3 Dipersiapkan stop block, diatur posisi dan bantalan-bantalan untuk docking
4 Asistensi naik turun dock menggunakan air bag system

GS. 02 MOORING / UNMOORING


Di sediakan line handler untuk docking dan undocking

GS. 03 HYDRANT
Disediakan alat pemadam (hydrant) guna pencegahan terhadap bahaya kebakaran selama kapal dalam perbaikan

GS. 04 TEMPAT SAMPAH


Disediakan tempat sampah di kapal dan akan di buang berkala

GS. 05 GANGWAY
Disediakan gangway untuk akses ke kapal

GS. 06 SHORE POWER SUPPLY


Connection / disconnect
Per kWH

GS. 07 CRANE / FORKLIFT

GS. 08 TUG ASSISTANCE


Disediakan asistensi tugboat untuk untuk proses naik turun berserta keluar-masuk galangan

HO. HULL & OUTFITTING


HO. 01 Fabrikasi sideboard Fr. 01 - Fr 29 -- STBD
Note : Potong material lama, renew
* Steel Plate 1800 x 3650 x 10 (mm) = 29 Piece(s) 515.7 14956.6 Kg(s)
Angle bar fabrikasi / bending dengan material sebagai berikut :
* Steel Plate 210 x 1800 x 10 (mm) = 174 Piece(s) 29.7 5163.1 Kg(s)
H-Beam 150 x 150 x 7 x 10 x 2400 = 29 Unit 0.031 2157.60 Kg(s)
Half H-Beam 150 x 150 x 7 x 10 x 3650 = 29 Unit 0.031 1640.675 Kg(s)

HO. 02 Fabrikasi sideboard Fr. 32 - Fr 40 -- STBD


Note : Potong material lama, renew
* Steel Plate 1800 x 3650 x 10 (mm) = 8 Piece(s) 515.7 4126.0 Kg(s)
Angle bar fabrikasi / bending dengan material sebagai berikut :
* Steel Plate 210 x 1800 x 10 (mm) = 48 Piece(s) 29.7 1424.3 Kg(s)
H-Beam 150 x 150 x 7 x 10 x 2400 = 8 Unit 0.031 595.20 Kg(s)
Half H-Beam 150 x 150 x 7 x 10 x 3650 = 8 Unit 0.031 452.6 Kg(s)

HO. 03 Fabrikasi sideboard Fr. 41 - Fr 50 -- STBD


Note : Potong material lama, renew
* Steel Plate 1900 x 3650 x 10 (mm) = 10 Piece(s) 544.4 5444.0 Kg(s)
Angle bar fabrikasi / bending dengan material sebagai berikut :
* Steel Plate 210 x 1900 x 10 (mm) = 60 Piece(s) 31.3 1879.3 Kg(s)
H-Beam 150 x 150 x 7 x 10 x 2400 = 10 Unit 0.031 744.00 Kg(s)
Half H-Beam 150 x 150 x 7 x 10 x 3650 = 10 Unit 0.031 565.75 Kg(s)

HO. 04 Fabrikasi sideboard Fr. 01 - Fr 29 -- PORT


Note : Potong material lama, renew
* Steel Plate 1800 x 3650 x 10 (mm) = 29 Piece(s) 515.7 14956.6 Kg(s)
Post Quantity
JOB DESCRIPTION
No. Each Total Unit(s)
GS. GENERAL SERVICE
Angle bar fabrikasi / bending dengan material sebagai berikut :
* Steel Plate 210 x 1800 x 10 (mm) = 174 Piece(s) 29.7 5163.1 Kg(s)
H-Beam 150 x 150 x 7 x 10 x 2400 = 29 Unit 0.031 2157.60 Kg(s)
Half H-Beam 150 x 150 x 7 x 10 x 3650 = 29 Unit 0.031 1640.675 Kg(s)

HO. 05 Fabrikasi sideboard Fr. 32 - Fr 40 -- PORT


Note : Potong material lama, renew
* Steel Plate 1800 x 3650 x 10 (mm) = 8 Piece(s) 515.7 4126.0 Kg(s)
Angle bar fabrikasi / bending dengan material sebagai berikut :
* Steel Plate 210 x 1800 x 10 (mm) = 48 Piece(s) 29.7 1424.3 Kg(s)
H-Beam 150 x 150 x 7 x 10 x 2400 = 8 Unit 0.031 595.20 Kg(s)
Half H-Beam 150 x 150 x 7 x 10 x 3650 = 8 Unit 0.031 452.6 Kg(s)

HO. 06 Fabrikasi sideboard Fr. 41 - Fr 50 -- PORT


Note : Potong material lama, renew
* Steel Plate 1900 x 3650 x 10 (mm) = 10 Piece(s) 544.4 5444.0 Kg(s)
Angle bar fabrikasi / bending dengan material sebagai berikut :
* Steel Plate 210 x 1900 x 10 (mm) = 60 Piece(s) 31.3 1879.3 Kg(s)
H-Beam 150 x 150 x 7 x 10 x 2400 = 10 Unit 0.031 744.00 Kg(s)
Half H-Beam 150 x 150 x 7 x 10 x 3650 = 10 Unit 0.031 565.75 Kg(s)

HO. 07 Fabrikasi sideboard belakang


Note : Potong material lama, renew
* Steel Plate 1800 x 3650 x 10 (mm) = 14 Piece(s) 515.7 7220.4 Kg(s)
Angle bar fabrikasi / bending dengan material sebagai berikut :
* Steel Plate 210 x 1800 x 10 (mm) = 84 Piece(s) 29.7 2492.5 Kg(s)
H-Beam 150 x 150 x 7 x 10 x 2400 = 14 Unit 0.031 1041.60 Kg(s)
Half H-Beam 150 x 150 x 7 x 10 x 3650 = 14 Unit 0.031 792.05 Kg(s)

HO. 08 Fabrikasi sideboard depan


Note : Potong material lama, renew
* Steel Plate 1800 x 3650 x 10 (mm) = 7 Piece(s) 515.7 3610.2 Kg(s)
Angle bar fabrikasi / bending dengan material sebagai berikut :
* Steel Plate 210 x 1800 x 10 (mm) = 49 Piece(s) 29.7 1454.0 Kg(s)
H-Beam 150 x 150 x 7 x 10 x 2400 = 7 Unit 0.031 520.80 Kg(s)
Half H-Beam 150 x 150 x 7 x 10 x 3650 = 7 Unit 0.031 396.025 Kg(s)

* Steel Plate 900 x 3650 x 10 (mm) = 1 Piece(s) 257.9 257.9 Kg(s)


Angle bar fabrikasi / bending dengan material sebagai berikut :
* Steel Plate 210 x 1800 x 10 (mm) = 6 Piece(s) 29.7 178.0 Kg(s)
H-Beam 150 x 150 x 7 x 10 x 2400 = 1 Unit 0.031 74.40 Kg(s)
Half H-Beam 150 x 150 x 7 x 10 x 3650 = 1 Unit 0.031 56.575 Kg(s)

HO. 09 Fabrikasi pintu sideboard -- PORT


Note : Potong material lama, renew
* Steel Plate 5400 x 600 x 10 (mm) = 5 Piece(s) 254.3 1271.7 Kg(s)
* Steel Plate 5400 x 650 x 10 (mm) = 1 Piece(s) 275.5 275.5 Kg(s)
Web bar fabrikasi / bending dengan material sebagai berikut :
* Steel Plate 230 x 5400 x 12 (mm) = 18 Piece(s) 117.0 2105.9 Kg(s)
* Steel Plate 230 x 600 x 12 (mm) = 35 Piece(s) 13.0 455.0 Kg(s)
* Steel Plate 230 x 650 x 12 (mm) = 7 Piece(s) 14.1 98.6 Kg(s)
H-Beam 250 x 250 x 9 x 14 x 3650 = 2 Unit 0.071 518.3 Kg(s)
H-Beam 250 x 250 x 9 x 14 x 2400 = 2 Unit 0.071 340.8 Kg(s)

HO. 10 Fabrikasi pintu sideboard -- STBD


Note : Potong material lama, renew
* Steel Plate 5400 x 600 x 10 (mm) = 5 Piece(s) 254.3 1271.7 Kg(s)
* Steel Plate 5400 x 650 x 10 (mm) = 1 Piece(s) 275.5 275.5 Kg(s)
Web bar fabrikasi / bending dengan material sebagai berikut :
* Steel Plate 230 x 5400 x 12 (mm) = 18 Piece(s) 117.0 2105.9 Kg(s)
* Steel Plate 230 x 600 x 12 (mm) = 35 Piece(s) 13.0 455.0 Kg(s)
* Steel Plate 230 x 650 x 12 (mm) = 7 Piece(s) 14.1 98.6 Kg(s)
H-Beam 250 x 250 x 9 x 14 x 3650 = 2 Unit 0.071 518.3 Kg(s)
H-Beam 250 x 250 x 9 x 14 x 2400 = 2 Unit 0.071 340.8 Kg(s)

HO. 11 Fabrikasi pintu sideboard -- Depan


Note : Potong material lama, renew
* Steel Plate 5400 x 600 x 10 (mm) = 5 Piece(s) 254.3 1271.7 Kg(s)
* Steel Plate 5400 x 650 x 10 (mm) = 1 Piece(s) 275.5 275.5 Kg(s)
Web bar fabrikasi / bending dengan material sebagai berikut :
* Steel Plate 230 x 5400 x 12 (mm) = 18 Piece(s) 117.0 2105.9 Kg(s)
* Steel Plate 230 x 600 x 12 (mm) = 35 Piece(s) 13.0 455.0 Kg(s)
* Steel Plate 230 x 650 x 12 (mm) = 7 Piece(s) 14.1 98.6 Kg(s)
H-Beam 250 x 250 x 9 x 14 x 3650 = 2 Unit 0.071 518.3 Kg(s)
H-Beam 250 x 250 x 9 x 14 x 2400 = 2 Unit 0.071 340.8 Kg(s)

Total 111590.1 Kg(S)


Post Quantity
JOB DESCRIPTION
No. Each Total Unit(s)
GS. GENERAL SERVICE
Resume material :
Plate 10 per sheet 871.35 Kgs
Material plate 10 untuk sideboard 59883.72 Kgs 68.73 Sheet plate
Material plate 10 untuk pintu 4641.7 Kgs 5.33 Sheet plate
Total 74 Sheet plate

Material plate 10 untuk fabrikasi Angle bar 125 x 75 x 10


Sideboard 21057.9 Kgs 1277.40 Mtrs 212.90 Length 24.60 Sheet plate

Material plate 12 untuk fabrikasi Web 140 x 80 x 12


Pintu 7978.5 Kgs 368.25 Mtrs 61.38 Length 8.00 Sheet plate

H-beam 150 x 150 15193.10 Kgs 58.00 Length/12M


H-beam 250 x 250 2577.30 Kgs 6.00 Length/12M
PT DOCK BINA VISTA REPAIR LIST
Jl. Wajok Hilir No. Km 12, Wajok Hulu, Kec. Jongkat MV KHAIROS JAYA 1
Kab. Mempawah, Kalimantan Barat

SHIP PARTICULAR
Name Of Vessel : MV. KHAIROS JAYA
Flag : Indonesia
Owner :
LOA : M
Breadth : M
Draft : M
Tinggi : M
Status Docking :

Note:
1)
Job list below is only for estimation purpose. The dimension, area, material, weight calculation, and quantity will be based on the actual work and can b

Post
JOB DESCRIPTION
No.
GS. GENERAL SERVICE
Start from up to
Arrival date
Start working date
Finish working date
Docking Date
Undocking date
Sailing/Delivery

GS. 01 DOCKING & UNDOCKING


1 Docking date :
2 Undocking date :
3 Dipersiapkan stop block, diatur posisi dan bantalan-bantalan untuk docking
4 Asistensi naik turun dock menggunakan air bag system

GS. 02 MOORING / UNMOORING


Di sediakan line handler untuk docking dan undocking

GS. 03 HYDRANT
Disediakan alat pemadam (hydrant) guna pencegahan terhadap bahaya kebakaran selama kapal dalam perbaikan

GS. 04 TEMPAT SAMPAH


Disediakan tempat sampah di kapal dan akan di buang berkala

GS. 05 GANGWAY
Disediakan gangway untuk akses ke kapal
GS. 06 SHORE POWER SUPPLY
Connection / disconnect
Per kWH

GS. 07 CRANE / FORKLIFT

GS. 08 TUG ASSISTANCE


Disediakan asistensi tugboat untuk untuk proses naik turun berserta keluar-masuk galangan

GS. 09 SCAFFOLDING
Principal dimension: LOA = 100.70 M
Bm = 27.40 M
Hm = 6.50 M
Draft = - M

HO. HULL & OUTFITTING


HO. 01 Pemeriksaan kondisi jangkar dan rantai jangkar - turunkan, balik rantai, dan naikkan kembali
Note : Turunkan, Calibrasi, Naikkan
Detail spec :
-- Rantai Jangkar Port = 1 Lot(s)
-- Rantai Jangkar Stbd = 1 Lot(s)
-- Jangkar Kg(s) = 2 Unit(s)

Asistensi :
* Crane 2 hari
* Manpoer 2 Orang 2 Hari

HO. 02 Remove safety chine palka


Note : Remove
Palka I
* Steel Plate 300 x 22170 x 10 (mm) = 1 Piece(s)
Note : untuk bagian yang segaris dengan stiffener ambang palka tidak di potong

Palka II
* Steel Plate 300 x 25020 x 10 (mm) = 1 Piece(s)
Note : untuk bagian yang segaris dengan stiffener ambang palka tidak di potong

HO. 03 Perbaikan lengan ponton


Note : Bongkar material lama, renew
Palka I
* Steel Plate 1500 x 300 x 10 (mm) = 16 Piece(s)

Palka II
* Steel Plate 1500 x 300 x 10 (mm) = 18 Piece(s)

HO. 04 Perbaikan watertight door akomodasi


Note : Bongkar material lama, free up, renew
Free up :
* Watertight door (1420 x 620) = 7 Unit(s)

Perbaikan plate list pintu


* Flat bar 50 x 5000 x 8 (mm) List luar = 7 Piece(s)
* Flat bar 50 x 4000 x 8 (mm) List dalam = 7 Piece(s)

HO. 05 Reposisi dudukan AC Stbd


Note : Bongkar material lama, renew
* Angle Bar L.100 x 100 x 10 500 mm-L = 6 Length(s)
* Angle Bar L.100 x 100 x 10 300 mm-L = 6 Length(s)
* Flat bar 100 x 600 x 8 (mm) = 6 Piece(s)

HO. 06 Perbaikan railling poop deck


Note : Bongkar material lama, renew
* Steel Pipe DN 65 (2-1/2") x Sch.40 x 6000 mm-L = 3 Length(s)
* Steel Pipe DN 40 (1-1/2") x Sch.40 x 6000 mm-L = 3 Length(s)

HO. 07 Perbaikan dudukan lampu sorot Aft


Note : Bongkar material lama, renew
* Steel Plate 300 x 300 x 8 (mm) = 1 Piece(s)
-- Dirll work = 4 Hole(s)

HO. 08 Perbaikan railling bridge deck


Note : Bongkar material lama, renew
* Steel Pipe DN 50 (2") x Sch.40 x 6000 mm-L = 3 Length(s)
* Steel Pipe DN 32 (1-1/4") x Sch.40 x 6000 mm-L = 3 Length(s)

HO. 09 Perbaikan dudukan sekoci


Note : Turunkan sekoci, Bongkar material lama, renew, install balik sekoci
* Steel Plate 2150 x 150 x 10 (mm) = 2 Piece(s)
* Steel Plate 2150 x 70 x 10 (mm) = 4 Piece(s)
* Steel Plate 130 x 130 x 10 (mm) = 4 Piece(s)
* Steel Plate 130 x 300 x 10 (mm) = 1 Piece(s)
* Steel Plate 220 x 100 x 10 (mm) = 1 Piece(s)
* Steel Plate 130 x 730 x 10 (mm) = 1 Piece(s)
* Steel Plate 70 x 730 x 10 (mm) = 1 Piece(s)
* Steel Plate 140 x 280 x 10 (mm) = 1 Piece(s)
* Steel Plate 70 x 140 x 10 (mm) = 1 Piece(s)
* Steel Plate 70 x 60 x 10 (mm) = 1 Piece(s)
* Steel Plate 70 x 70 x 10 (mm) = 2 Piece(s)
* Steel Plate 70 x 70 x 10 (mm) = 1 Piece(s)
* Steel Plate 70 x 200 x 10 (mm) = 1 Piece(s)
* Steel Plate 70 x 110 x 10 (mm) = 1 Piece(s)
* Steel Plate 120 x 280 x 10 (mm) = 1 Piece(s)
* Steel Plate 70 x 90 x 10 (mm) = 1 Piece(s)

Asistensi :
* Turunkan sekoci
* Crane 2 hari

HO. 10 Pembuatan double bollard main deck P&S


Note : Fabrikasi, install
* Steel Pipe DN 200 (8") x Sch.80 x 500 mm-L = 2 Length(s)
* Round Bar L.500 -- Ø25 (mm) = 2 Length(s)
* Steel Plate 1300 x 500 x 12 (mm) = 2 Piece(s)
* Steel Plate 100 x 500 x 12 (mm) = 4 Piece(s)
* Steel Plate 100 x 1300 x 12 (mm) = 4 Piece(s)
* Steel Plate 200 x 200 x 12 (mm) = 16 Piece(s)
* Steel Plate 340 x 12 (mm) Circle = 2 Piece(s)

HO. 11 Service fairlead poop deck - AFT


Note : Service
* Fairlead = 5 Unit(s)

HO. 12 Perbaikan dinding funnel


Note : Bongkar material lama, renew
* Steel Plate 2000 x 1500 x 10 (mm) = 1 Piece(s)
* Steel Plate 300 x 2700 x 10 (mm) survey 6 fe = 1 Piece(s)

HO. 13 Pembuatan step ladder Palka I & II


Note : Fabrikasi, Install
Palka I
* Steel Plate 300 x 6000 x 10 (mm) = 4 Piece(s)
* Chequered plate 300 x 600 x 4.5 (mm) = 40 Piece(s)
* Angle Bar L.100 x 100 x 8 1500 mm-L = 4 Length(s)
* Steel Pipe DN 40 (1-1/2") x Sch.40 x 6000 mm-L = 5 Length(s)
* Elbow 90⁰ DN 40 (1-1/2") x Sch.40 = 8 Piece(s)

Palka II
* Steel Plate 300 x 6000 x 10 (mm) = 4 Piece(s)
* Chequered plate 300 x 600 x 4.5 (mm) = 40 Piece(s)
* Angle Bar L.100 x 100 x 8 1500 mm-L = 4 Length(s)
* Steel Pipe DN 40 (1-1/2") x Sch.40 x 6000 mm-L = 5 Length(s)
* Elbow 90⁰ DN 40 (1-1/2") x Sch.40 = 8 Piece(s)

HO. 14 Penambahan BHD Ballast palka I


Note : Fabrikasi, Install
* Steel Plate 1100 x 5580 x 10 (mm) = 2 Piece(s)
bracket * Steel Plate 300 x 300 x 10 (mm) = 18 Piece(s)
* Angle Bar L.150 x 100 x 10 1100 mm-L = 18 Length(s)
Akses * Steel Plate 300 x 5580 x 10 (mm) = 2 Piece(s)

HO. 15 Penambahan BHD Ballast palka II


Note : Fabrikasi, Install
* Steel Plate 1100 x 5580 x 10 (mm) = 2 Piece(s)
bracket * Steel Plate 300 x 300 x 10 (mm) = 18 Piece(s)
* Angle Bar L.150 x 100 x 10 1100 mm-L = 18 Length(s)
Akses * Steel Plate 300 x 5580 x 10 (mm) = 2 Piece(s)

HO. 16 Perbaikan tank top cargo hold I


Note : Bongkar material lama, renew
Tangki balas I (sb)
* Angle Bar L.150 x 150 x 12 6000 mm-L = 1 Length(s)
* Angle Bar L.150 x 150 x 12 3800 mm-L = 1 Length(s)
* Steel Plate 130 x 200 x 10 (mm) = 10 Piece(s)
* Steel Plate 300 x 1250 x 10 (mm) = 1 Piece(s)

Tangki balas I (ps)


* Angle Bar L.150 x 150 x 12 6000 mm-L = 2 Length(s)
* Angle Bar L.150 x 150 x 12 3800 mm-L = 2 Length(s)
* Steel Plate 300 x 1850 x 10 (mm) = 1 Piece(s)

Tangki balas 2 (sb)


* Angle Bar L.150 x 150 x 12 2200 mm-L = 1 Length(s)
* Steel Plate 130 x 200 x 10 (mm) = 1 Piece(s)
* Steel Plate 300 x 6130 x 10 (mm) = 1 Piece(s)
* Steel Plate 350 x 1250 x 10 (mm) = 1 Piece(s)
* Steel Plate 300 x 900 x 10 (mm) = 1 Piece(s)
* Steel Plate 350 x 900 x 10 (mm) = 1 Piece(s)

Tangki balas I (ps)


* Angle Bar L.150 x 150 x 12 2300 mm-L = 2 Length(s)
* Steel Plate 350 x 750 x 10 (mm) = 1 Piece(s)
* Steel Plate 300 x 6130 x 10 (mm) = 2 Piece(s)
* Steel Plate 300 x 5250 x 10 (mm) = 1 Piece(s)
* Steel Plate 330 x 740 x 10 (mm) = 1 Piece(s)
* Steel Plate 350 x 1820 x 10 (mm) = 2 Piece(s)
* Steel Plate 350 x 1870 x 10 (mm) = 1 Piece(s)

HO. 17 Perbaikan tank top cargo hold II


Note : Bongkar material lama, renew
* Steel Plate 1000 x 1000 x 10 (mm) = 1 Piece(s)
Long stiff * Angle Bar L.150 x 100 x 10 1100 mm-L = 1 Length(s)
Trans stiff * Angle Bar L.150 x 100 x 10 1100 mm-L = 1 Length(s)
* Steel Plate 2790 x 1000 x 10 (mm) = 1 Piece(s)
Long stiff * Angle Bar L.150 x 100 x 10 1000 mm-L = 4 Length(s)
Trans stiff * Angle Bar L.150 x 100 x 10 2790 mm-L = 1 Length(s)

* Steel Plate 1500 x 1500 x 10 (mm) = 1 Piece(s)


Long stiff * Angle Bar L.150 x 100 x 10 1500 mm-L = 2 Length(s)
Trans stiff * Angle Bar L.150 x 100 x 10 1500 mm-L = 2 Length(s)

* Steel Plate 900 x 1860 x 10 (mm) = 1 Piece(s)


Long stiff * Angle Bar L.150 x 100 x 10 1860 mm-L = 1 Length(s)
Trans stiff * Angle Bar L.150 x 100 x 10 900 mm-L = 3 Length(s)

* Steel Plate 1860 x 3780 x 10 (mm) = 1 Piece(s)


Long stiff * Angle Bar L.150 x 100 x 10 1860 mm-L = 7 Length(s)
Trans stiff * Angle Bar L.150 x 100 x 10 3780 mm-L = 3 Length(s)

* Steel Plate 4480 x 3780 x 10 (mm) = 1 Piece(s)


Long stiff * Angle Bar L.150 x 100 x 10 3780 mm-L = 7 Length(s)
Trans stiff * Angle Bar L.150 x 100 x 10 4480 mm-L = 6 Length(s)

HO. 18 Kontruksi penambahan crane cargo hold I To be confirm


Note : Fabrikasi
* Steel Pipe DN 200 (8") x Sch.80 x 2000 mm-L = 4 Length(s)
Deck crane * Steel Plate 3000 x 11000 x 12 (mm) = 1 Piece(s)
Samping * Steel Plate 700 x 11000 x 12 (mm) = 2 Piece(s)
Samping * Steel Plate 700 x 3000 x 12 (mm) = 2 Piece(s)
Kontruksi * Steel Plate 700 x 11000 x 10 (mm) = 5 Piece(s)
Kontruksi * Steel Plate 700 x 3000 x 10 (mm) = 18 Piece(s)
Kontruksi * Steel Plate 200 x 11000 x 10 (mm) = 5 Piece(s)
Kontruksi * Steel Plate 200 x 3000 x 10 (mm) = 18 Piece(s)
Bracket * Steel Plate 300 x 300 x 10 (mm) = 10 Piece(s)
H-Beam 250 x 250 x 7 x 10 x 3000 = 2
* Steel Plate 200 x 10 (mm) Circle = 4 Piece(s)
carling * Steel Plate 3000 x 200 x 10 (mm) = 10 Piece(s)

HO. 19 Kontruksi penambahan crane cargo hold II To be confirm


Note : Fabrikasi
* Steel Pipe DN 200 (8") x Sch.80 x 2000 mm-L = 4 Length(s)
Deck crane * Steel Plate 3000 x 11000 x 12 (mm) = 1 Piece(s)
Samping * Steel Plate 700 x 11000 x 12 (mm) = 2 Piece(s)
Samping * Steel Plate 700 x 3000 x 12 (mm) = 2 Piece(s)
Kontruksi * Steel Plate 700 x 11000 x 10 (mm) = 5 Piece(s)
Kontruksi * Steel Plate 700 x 3000 x 10 (mm) = 18 Piece(s)
Kontruksi * Steel Plate 200 x 11000 x 10 (mm) = 5 Piece(s)
Kontruksi * Steel Plate 200 x 3000 x 10 (mm) = 18 Piece(s)
Bracket * Steel Plate 300 x 300 x 10 (mm) = 10 Piece(s)
H-Beam 250 x 250 x 7 x 10 x 3000 = 2
* Steel Plate 200 x 10 (mm) Circle = 4 Piece(s)
carling * Steel Plate 3000 x 200 x 10 (mm) = 10 Piece(s)

HO. 20 Akses painting tanki FPT


Note : Bongkar material lama, install kembali
Old * Steel Plate 1500 x 1800 x 12 (mm) = 1 Piece(s)
Old * Angle Bar L.150 x 100 x 10 1800 mm-L = 2 Length(s)
Old * Angle Bar L.150 x 100 x 10 1500 mm-L = 3 Length(s)

HO. 21 Akses painting tanki APT


Note : Bongkar material lama, install kembali
Old * Steel Plate 1500 x 1800 x 12 (mm) = 1 Piece(s)
Old * Angle Bar L.150 x 100 x 10 1800 mm-L = 2 Length(s)
Old * Angle Bar L.150 x 100 x 10 1500 mm-L = 3 Length(s)
HO. 22 Turunkan & naikkan ponton / cover cargo hold I
Note : Bongkar material lama, install kembali
Pasang penomoran ponton
* Steel Plate 100 x 100 x 8 (mm) = 9 Piece(s)
* Steel Plate 100 x 100 x 8 (mm) = 36 Piece(s)
* Drillwork 20 x 20 = 36 Piece(s)

Asistensi :
* Crane 4 hari
* Manpower 2 Orang 4 Hari

HO. 23 Turunkan & naikkan ponton / cover cargo hold II


Note : Bongkar material lama, install kembali
Pasang penomoran ponton
* Steel Plate 100 x 100 x 8 (mm) = 9 Piece(s)
* Steel Plate 100 x 100 x 8 (mm) = 36 Piece(s)
* Drillwork 20 x 20 = 36 Piece(s)

Asistensi :
* Crane 4 hari
* Manpower 2 Orang 4 Hari

As survey 06 Februari 2024


HO. 24 Perbaikan stiffener cover cargo hold I & II
Note : Bongkar material lama, renew
* Steel Plate 350 x 11000 x 12 (mm) = 50 Piece(s)

HO. 25 Perbaikan hand rail vertical ladder navigation deck


Note : Bongkar material lama, renew
* Steel Pipe DN 40 (1-1/2") x Sch.80 x 6000 mm-L = 1 Length(s)
* Elbow 90⁰ DN 40 (1-1/2") x Sch.80 = 4 Piece(s)

HO. 26 Perbaikan dudukan horn


Note : Bongkar material lama, renew
* Angle Bar L.50 x 50 x 10 500 mm-L = 2 Length(s)

HO. 27 Perbaikan nama kapal top deck


Note : Bongkar material lama, renew
* Steel Plate 600 x 1800 x 8 (mm) = 2 Piece(s)
* Steel Plate 100 x 600 x 8 (mm) = 4 Piece(s)
* Steel Plate 100 x 1800 x 8 (mm) = 4 Piece(s)
* KHAIROS JAYA = 2 Lot(s)
Tinggi font 30 cm

HO. 28 Perbaikan railling navigation deck


Note : Bongkar material lama, renew
* Steel Pipe DN 25 (1") x Sch.40 x 6000 mm-L = 3 Length(s)

As survey 24 Februari 2024


HO. 29 Perbaikan bottom, ada doubler
Note : Bongkar material lama, renew
* Steel Plate 900 x 24000 x 8 (mm) = 1 Piece(s)
* Estimasi kontruksi = 407 Kg(S)

HO. 27 Perbaikan nama kapal -- FP


Note : Bongkar material lama, renew
* KHAIROS JAYA = 2 Lot(s)
Tinggi font 50 cm

HO. 28 Perbaikan nama kapal -- AP


Note : Bongkar material lama, renew
* KHAIROS JAYA = 1 Lot(s)
Tinggi font 40 cm

HO. 29 Buat IMO Number


Note : Fabrikasi, install
* IMO. 1042433 = 1 Lot(s)
Tinggi font 20 cm

HO. 30 Buat Logo di funnel


Note : Fabrikasi, install
* Logo perusahaan = 2 Lot(s)

HO. 31 Rewellding area bottom


* Port
- Rewellding 2 phase x 900 mm-L = 1 Length(s)
- Rewellding 2 phase x 1500 mm-L = 1 Length(s)
- Rewellding 2 phase x 1800 mm-L = 1 Length(s)
- Rewellding 2 phase x 1850 mm-L = 1 Length(s)
- Rewellding 2 phase x 150 mm-L = 1 Length(s)
- Rewellding 2 phase x 500 mm-L = 1 Length(s)
- Rewellding 2 phase x 620 mm-L = 1 Length(s)
- Rewellding 2 phase x 4000 mm-L = 1 Length(s)
- Rewellding 2 phase x 300 mm-L = 1 Length(s)
- Rewellding 2 phase x 400 mm-L = 1 Length(s)
- Rewellding 2 phase x 5900 mm-L = 1 Length(s)
- Rewellding 2 phase x 1200 mm-L = 1 Length(s)
- Rewellding 2 phase x 500 mm-L = 1 Length(s)
- Rewellding 2 phase x 400 mm-L = 1 Length(s)
- Rewellding 2 phase x 200 mm-L = 1 Length(s)
- Rewellding 2 phase x 2100 mm-L = 1 Length(s)
- Rewellding 2 phase x 950 mm-L = 1 Length(s)
- Rewellding 2 phase x 1750 mm-L = 1 Length(s)
- Rewellding 2 phase x 1200 mm-L = 1 Length(s)
- Rewellding 2 phase x 5000 mm-L = 1 Length(s)
- Rewellding 2 phase x 1200 mm-L = 1 Length(s)
- Rewellding 2 phase x 500 mm-L = 1 Length(s)
- Rewellding 2 phase x 300 mm-L = 1 Length(s)
- Rewellding 2 phase x 650 mm-L = 1 Length(s)
- Rewellding 2 phase x 1100 mm-L = 1 Length(s)
- Rewellding 2 phase x 1070 mm-L = 1 Length(s)
- Rewellding 2 phase x 2000 mm-L = 1 Length(s)
* Stbd
- Rewellding 2 phase x 850 mm-L = 1 Length(s)
- Rewellding 2 phase x 4200 mm-L = 1 Length(s)
- Rewellding 2 phase x 7250 mm-L = 1 Length(s)
- Rewellding 2 phase x 2100 mm-L = 1 Length(s)
- Rewellding 2 phase x 1000 mm-L = 1 Length(s)
- Rewellding 2 phase x 100 mm-L = 1 Length(s)
- Rewellding 2 phase x 50 mm-L = 1 Length(s)
- Rewellding 2 phase x 150 mm-L = 2 Length(s)
- Rewellding 2 phase x 500 mm-L = 1 Length(s)
- Rewellding 2 phase x 4700 mm-L = 1 Length(s)
- Rewellding 2 phase x 3050 mm-L = 1 Length(s)
- Rewellding 2 phase x 250 mm-L = 1 Length(s)
- Rewellding 2 phase x 30 mm-L = 3 Length(s)
- Rewellding 2 phase x 5100 mm-L = 1 Length(s)
- Rewellding 2 phase x 3800 mm-L = 1 Length(s)
- Rewellding 2 phase x 1800 mm-L = 1 Length(s)
- Rewellding 2 phase x 250 mm-L = 1 Length(s)
- Rewellding 2 phase x 14300 mm-L = 1 Length(s)
- Rewellding 2 phase x 300 mm-L = 1 Length(s)
- Rewellding 2 phase x 700 mm-L = 1 Length(s)
- Rewellding 2 phase x 1050 mm-L = 1 Length(s)
- Rewellding 2 phase x 900 mm-L = 1 Length(s)
- Rewellding 2 phase x 400 mm-L = 1 Length(s)
- Rewellding 2 phase x 7200 mm-L = 1 Length(s)
- Rewellding 2 phase x 680 mm-L = 1 Length(s)
- Rewellding 2 phase x 1000 mm-L = 1 Length(s)
- Rewellding 2 phase x 1700 mm-L = 1 Length(s)
- Rewellding 3 phase x 50 mm-L = 3 Length(s)
HO. 32. Pelurusan dan penambahn beraket pada sirip (ps&sb)
Note : Pelurusan dengan cara di seset kemudain di tarik menggunakan cotrek sampai lurus
# port
* Steel Plate 270 x 5400 x 10 (mm) = 1 Piece(s)

# Stbd
* Steel Plate 270 x 13600 x 10 (mm) = 1 Piece(s)
* Steel Plate 270 x 2500 x 10 (mm) = 1 Piece(s)
* Steel Plate 160 x 400 x 8 (mm) = 9 Piece(s)

HO. 33 perbaikan roda ponton palka 1 & 2


Note : Reposisi
# Ponton palka 1
* Steel Plate 280 x 550 x 12 (mm) = 20 Piece(s)
* Steel Plate 70 x 250 x 12 (mm) = 20 Piece(s)
* Steel Plate 40 x 150 x 12 (mm) = 60 Piece(s)
* Rundbar Ø 2 1/2" x 180 (mm) = 20 Length(s)
* Roda Ø 5" = 20 Piece(s)
* Steel Plate 100 x 250 x 8 (mm) = 20 Piece(s)
* Steel Plate 280 x 220 x 8 (mm) = 20 Piece(s)

HO. 34 Perbaikan plate bottom


Note : Bongkar material lama, install kembali
* Steel Plate 620 x 4350 x 12 (mm) = 1 Piece(s)
* Steel Plate 800 x 6130 x 12 (mm) = 1 Piece(s)
* Steel Plate 420 x 6130 x 12 (mm) = 1 Piece(s)

HO. 35 Perbaikan tutup / ponton palka 1 & 2


Note : Bongkar material lama, install kembali
# Palka 1
# * Steel Plate 110 x 1900 x 8 (mm) = 1 Piece(s)
* Steel Plate 120 x 3000 x 8 (mm) = 3 Piece(s)
* Steel Plate 80 x 930 x 8 (mm) = 1 Piece(s)
* Steel Plate 200 x 200 x 8 (mm) = 1 Piece(s)
* Steel Plate 80 x 700 x 8 (mm) = 1 Piece(s)
* Steel Plate 270 x 3000 x 8 (mm) = 1 Piece(s)
* Steel Plate 250 x 300 x 8 (mm) = 1 Piece(s)
* Steel Plate 270 x 2750 x 8 (mm) = 1 Piece(s)
* Steel Plate 180 x 300 x 8 (mm) = 1 Piece(s)
* Steel Plate 270 x 1600 x 8 (mm) = 1 Piece(s)
* Steel Plate 80 x 1600 x 8 (mm) = 1 Piece(s)
* Steel Plate 80 x 110 x 8 (mm) = 1 Piece(s)

# * Steel Plate 110 x 600 x 8 (mm) = 1 Piece(s)


* Steel Plate 110 x 2520 x 8 (mm) = 1 Piece(s)
* Steel Plate 110 x 3130 x 8 (mm) = 1 Piece(s)
* Steel Plate 110 x 3350 x 8 (mm) = 1 Piece(s)
* Steel Plate 110 x 1350 x 8 (mm) = 1 Piece(s)
* Steel Plate 90 x 450 x 8 (mm) = 1 Piece(s)

# * Steel Plate 100 x 3000 x 8 (mm) = 2 Piece(s)


* Steel Plate 100 x 1130 x 8 (mm) = 1 Piece(s)
* Steel Plate 100 x 1860 x 8 (mm) = 1 Piece(s)
* Steel Plate 100 x 1900 x 8 (mm) = 1 Piece(s)
* Steel Plate 90 x 580 x 8 (mm) = 1 Piece(s)
* Steel Plate 270 x 270 x 8 (mm) = 1 Piece(s)
* Steel Plate 70 x 250 x 8 (mm) = 1 Piece(s)

# * Steel Plate 110 x 3000 x 8 (mm) = 2 Piece(s)


* Steel Plate 110 x 1130 x 8 (mm) = 1 Piece(s)
* Steel Plate 110 x 1850 x 8 (mm) = 1 Piece(s)
* Steel Plate 110 x 1920 x 8 (mm) = 1 Piece(s)
* Steel Plate 90 x 580 x 8 (mm) = 1 Piece(s)

# * Steel Plate 100 x 1050 x 8 (mm) = 1 Piece(s)

# * Steel Plate 80 x 450 x 8 (mm) = 1 Piece(s)


* Steel Plate 110 x 1750 x 8 (mm) = 1 Piece(s)
* Steel Plate 110 x 350 x 8 (mm) = 1 Piece(s)
* Steel Plate 110 x 920 x 8 (mm) = 1 Piece(s)
* Steel Plate 110 x 3000 x 8 (mm) = 2 Piece(s)
* Steel Plate 110 x 1900 x 8 (mm) = 1 Piece(s)
* Steel Plate 90 x 360 x 8 (mm) = 1 Piece(s)
* Steel Plate 220 x 220 x 8 (mm) = 1 Piece(s)
* Steel Plate 80 x 600 x 8 (mm) = 1 Piece(s)
* Steel Plate 250 x 600 x 8 (mm) = 1 Piece(s)

# * Steel Plate 70 x 460 x 8 (mm) = 1 Piece(s)


* Steel Plate 80 x 1350 x 8 (mm) = 1 Piece(s)
* Steel Plate 80 x 550 x 8 (mm) = 1 Piece(s)
* Steel Plate 110 x 3130 x 8 (mm) = 1 Piece(s)
* Steel Plate 110 x 3100 x 8 (mm) = 2 Piece(s)
* Steel Plate 110 x 1730 x 8 (mm) = 1 Piece(s)
* Steel Plate 110 x 1410 x 8 (mm) = 1 Piece(s)
* Steel Plate 110 x 1520 x 8 (mm) = 1 Piece(s)
* Steel Plate 80 x 340 x 8 (mm) = 1 Piece(s)
* Steel Plate 200 x 200 x 8 (mm) = 1 Piece(s)
* Steel Plate 270 x 450 x 8 (mm) = 1 Piece(s)

# Palka 2
# * Steel Plate 100 x 3000 x 8 (mm) = 3 Piece(s)
* Steel Plate 100 x 1770 x 8 (mm) = 1 Piece(s)
* Steel Plate 80 x 650 x 8 (mm) = 1 Piece(s)
* Steel Plate 200 x 200 x 8 (mm) = 1 Piece(s)

# * Steel Plate 130 x 940 x 8 (mm) = 1 Piece(s)


* Steel Plate 70 x 1000 x 8 (mm) = 1 Piece(s)
* Steel Plate 200 x 200 x 8 (mm) = 2 Piece(s)
* Steel Plate 80 x 610 x 8 (mm) = 1 Piece(s)
* Steel Plate 120 x 300 x 8 (mm) = 1 Piece(s)
* Steel Plate 100 x 1020 x 8 (mm) = 1 Piece(s)
* Steel Plate 100 x 1360 x 8 (mm) = 1 Piece(s)
* Steel Plate 100 x 2400 x 8 (mm) = 1 Piece(s)
* Steel Plate 100 x 3000 x 8 (mm) = 2 Piece(s)

# * Steel Plate 100 x 2500 x 8 (mm) = 1 Piece(s)


* Steel Plate 100 x 2200 x 8 (mm) = 1 Piece(s)
* Steel Plate 100 x 2500 x 8 (mm) = 2 Piece(s)
* Steel Plate 100 x 2000 x 8 (mm) = 1 Piece(s)
* Steel Plate 100 x 1760 x 8 (mm) = 1 Piece(s)

PP. PIPING WORK


PP. 01 Modifikasi ballast system
Note : Fabrikasi, Install
Manifold ballast
* Steel Pipe DN 100 (4") x Sch.80 x 1000 mm-L = 8 Length(s)
* Steel flange DN 100 (4") x 10K = 18 Piece(s)
* Elbow 90⁰ LR DN 100 (4") x Sch.80 = 4 Piece(s)
* Angle valve SDNR DN 100 (4") x 10k Cast iron = 4 Piece(s)
* Gate valve DN 100 (4") x 10k Cast iron = 4 Piece(s)

Penetrasi ke tanki
* Steel Plate 150 x 10 (mm) Circle = 16 Piece(s)
* Steel Pipe DN 100 (4") x Sch.80 x 6000 mm-L = 28 Length(s)
Sleeve * Steel Pipe DN 125 (5") x Sch.80 x 6000 mm-L = 6 Length(s)
* Angle Bar L.100 x 100 x 7 6000 mm-L = 4 Length(s)
* U-Bolt = 24 Piece(s)
* Elbow 90⁰ LR DN 100 (4") x Sch.80 = 20 Piece(s)
* Rose box DN 100 (4") = 4 Piece(s)

Akses kerja
* Buka tutup manhole = 2 Unit(s)
* Buka & pasang akses untuk masuk pipa
Steel Plate 500 x 500 x 10 (mm) = 8 Piece(s)
* Cleaning tanki FO untuk penetrasi pipa ballast

PP. 02 Fabrikasi air vent tanki ballast


Note : Fabrikasi, Install
* Steel Pipe DN 100 (4") x Sch.80 x 6000 mm-L = 8 Length(s)
* Steel Plate 150 x 10 (mm) Circle = 4 Piece(s)
* Elbow 90⁰ LR DN 100 (4") x Sch.80 = 8 Piece(s)

PP. 03 Fabrikasi pipa sounding


Note : Fabrikasi, Install
* Steel Pipe DN 40 (1-1/2") x Sch.80 x 6000 mm-L = 12 Length(s)
* Steel Plate 100 x 10 (mm) Circle = 4 Piece(s)
* Sounding cup = 4 Piece(s)

PP. 04 Perbaikan pipa cooling AE 1


Note : Dismantle, Fabrikasi, Install
Outlet
* Steel Pipe DN 40 (1-1/2") x Sch.80 x 6000 mm-L = 2 Length(s)
* Steel Pipe DN 50 (2") x Sch.80 x 6000 mm-L = 1 Length(s)
* Elbow 90⁰ DN 40 (1-1/2") x Sch.80 = 2 Piece(s)
* Elbow 90⁰ DN 50 (2") x Sch.80 = 2 Piece(s)
* Steel flange DN 40 (1/2") x 10K = 4 Piece(s)
* Steel flange DN 50 (2") x 10K = 2 Piece(s)
Inlet
* Steel Pipe DN 40 (1-1/2") x Sch.80 x 1500 mm-L = 1 Length(s)
* Steel flange DN 40 (1-1/2") x 10K = 2 Piece(s)
* Elbow 90⁰ DN 40 (1-1/2") x Sch.80 = 2 Piece(s)

PP. 04 Perbaikan pipa cooling AE 3


Note : Dismantle, Fabrikasi, Install
Outlet
* Steel Pipe DN 40 (1-1/2") x Sch.80 x 6000 mm-L = 1 Length(s)
* Elbow 90⁰ DN 40 (1-1/2") x Sch.80 = 6 Piece(s)
* Steel flange DN 40 (1/2") x 10K = 6 Piece(s)
Inlet
* Steel Pipe DN 40 (1-1/2") x Sch.80 x 1500 mm-L = 1 Length(s)
* Steel flange DN 40 (1-1/2") x 10K = 1 Piece(s)
* Elbow 90⁰ DN 40 (1-1/2") x Sch.80 = 3 Piece(s)
* Flexible hose 2" x 200 = 1 Length(s)
* Clamp hose 2-1/2" = 2 Piece(s)
* Steel Pipe DN 32 (1-1/4") x Sch.80 x 300 mm-L = 1 Length(s)
* Elbow 90⁰ DN 32 (1-1/4") x Sch.80 = 2 Piece(s)
* Square flange DN 32 (1-1/4") = 1 Piece(s)

PP. 05 Perbaikan pipa GS


Note : Dismantle, Fabrikasi, Install
* Steel Pipe DN 100 (4") x Sch.80 x 6000 mm-L = 2 Length(s)
* Steel flange DN 100 (4") x 10K = 10 Piece(s)
* Elbow 90⁰ DN 100 (4") x Sch.80 = 6 Piece(s)

PP. 06 Perbaikan pipa hydrofour


Note : Dismantle, Fabrikasi, Install
* Steel Pipe DN 40 (1-1/2") x Sch.80 x 6000 mm-L = 1 Length(s)
* Steel flange DN 40 (1-1/2") x 10K = 4 Piece(s)
* Elbow 90⁰ DN 40 (1-1/2") x Sch.80 = 3 Piece(s)

PP. 07 Perbaikan pipa sewage tank


Note : Dismantle, Fabrikasi, Install
* Steel Pipe DN 40 (1-1/2") x Sch.80 x 3000 mm-L = 1 Length(s)
* Steel flange DN 40 (1-1/2") x 10K = 2 Piece(s)
* Elbow 90⁰ DN 40 (1-1/2") x Sch.80 = 3 Piece(s)

PP. 08 Pipa udara engineroom


Note : Dismantle, Fabrikasi, Install
* Steel Pipe DN 80 (3") x Sch.80 x 3000 mm-L = 1 Length(s)
* Elbow 90⁰ DN 80 (3") x Sch.80 = 2 Piece(s)

PP. 09 Perbaikan pipa FO transfer brige deck


Note : Dismantle, Fabrikasi, Install
* Steel Pipe DN 40 (1-1/2") x Sch.80 x 6000 mm-L = 2 Length(s)
* Steel flange DN 40 (1-1/2") x 10K = 6 Piece(s)
* Elbow 90⁰ DN 40 (1-1/2") x Sch.80 = 5 Piece(s)

PP. 10 Perbaikan pipa scupper bridge deck


Note : Dismantle, Fabrikasi, Install
* Steel Pipe DN 50 (2") x Sch.80 x 2000 mm-L = 1 Length(s)
* Elbow 90⁰ DN 50 (2") x Sch.80 = 2 Piece(s)

PP. 12 Perbaikan pipa scupper poop deck


Note : Dismantle, Fabrikasi, Install
* Steel Pipe DN 50 (2") x Sch.80 x 2000 mm-L = 4 Length(s)

PP. 13 Perbaikan pipa bilge FP -- Main deck


Note : Dismantle, Fabrikasi, Install
* Steel Pipe DN 125 (5") x Sch.80 x 1500 mm-L = 1 Length(s)
* Steel flange DN 125 (5") x 10K = 2 Piece(s)

PP. 14 Perbaikan pipa hydrant main deck


Note : Dismantle, Fabrikasi, Install
* Steel Pipe DN 100 (4") x Sch.80 x 6000 mm-L = 10 Length(s)
* Steel Pipe DN 65 (2-1/2") x Sch.80 x 6000 mm-L = 2 Length(s)
* Steel flange DN 100 (4") x 10K = 20 Piece(s)
* Steel flange DN 65 (2-1/2") x 10K = 4 Piece(s)

PP. 15 Perbaikan pipa sounding FO


Note : Dismantle, Fabrikasi, Install
* Steel Pipe DN 50 (2") x Sch.80 x 6000 mm-L = 1 Length(s)
* End cup sounding = 1 Piece(s)

PP. 16 Perbaikan pipa bunker FO main deck


Note : Dismantle, Fabrikasi, Install
* Steel Pipe DN 100 (4") x Sch.80 x 4000 mm-L = 1 Length(s)
* Steel flange DN 100 (4") x 10K = 2 Piece(s)
* Elbow 90⁰ DN 100 (4") x Sch.80 = 2 Piece(s)

PP. 16 Perbaikan pipa air vent head FO


Note : Dismantle, Fabrikasi, Install
* Steel Pipe DN 100 (4") x Sch.80 x 720 mm-L = 2 Length(s)
* Steel Pipe DN 65 (2-1/2") x Sch.80 x 720 mm-L = 3 Length(s)

PP. 17 Perbaikan pipa scupper navigation deck


Note : Dismantle, Fabrikasi, Install
* Steel Pipe DN 40 (1-1/2") x Sch.80 x 2000 mm-L = 4 Length(s)
* Elbow 90⁰ DN 40 (1-1/2") x Sch.80 = 4 Piece(s)

PP. 18 Perbaikan pipa compressor horn -- top deck


Note : Dismantle, Fabrikasi, Install
* Steel Pipe DN 25 (1") x Sch.80 x 6000 mm-L = 2 Length(s)
* Elbow 90⁰ DN 25 (1") x Sch.80 = 4 Piece(s)

MW. MECHANICAL WORK

MW. 01 Perbaikan Rudder -- Port & Stbd


Note : Bongkar, Check clearance, perbaikan, install
Check Clearance :
* Rudder Port & Stbd = 2 Lot(s)
Bongkar pasang :
* Lower stock -- Port = 1 Lot(s)
* Upper stock -- Port = 1 Lot(s)
* Rudder blade -- Port = 1 Lot(s)
* Spie -- Port = 1 Lot(s)
Perbaikan :
* Perbaikan rudder -- port = 1 Lot(s)

MW. 02 Perbaikan Propeller -- Port & Stbd


Note : Bongkar, Check clearance, perbaikan, install
Check Clearance :
* Propaller Port & Stbd = 2 Lot(s)
Bongkar pasang :
* Propaller -- port = 1 Lot(s)
Perbaikan :
* Build Up propeller -- port = 1 Lot(s)
* Balancing propeller -- port = 1 Lot(s)

VV. VALVE WORK


VV. 01 Service valve cooling A/E I
Note : Bongkar, service, install kembali
* Globe valve DN 40 (1-1/2") x 25 = 3 Piece(s)
* Rubber gasket DN 40 (1-1/2") = 6 Piece(s)
* Bolt & Nut M12 x 55 mm Length = 48 Set(s)

VV. 02 Service valve cooling A/E III


Note : Bongkar, service, install kembali
* Globe valve DN 50 (2") x 25 = 1 Piece(s)
* Rubber gasket DN 50 (2") = 2 Piece(s)
* Bolt & Nut M12 x 55 mm Length = 16 Set(s)
VV. 03 Service valve cooling gearbox
Note : Bongkar, service, install kembali
* Globe valve DN 40 (1-1/2") x 25 = 1 Piece(s)
* Rubber gasket DN 40 (1-1/2") = 2 Piece(s)
* Bolt & Nut M12 x 55 mm Length = 16 Set(s)

VV. 04 Service valve GS


Note : Bongkar, service, install kembali
* Globe valve DN 100 (4") x 10K = 1 Piece(s)
* Rubber gasket DN 100 (4") x 10K = 2 Piece(s)
* Bolt & Nut M16 x 65 mm Length = 16 Set(s)

VV. 05 Service valve sea chest


Note : Bongkar, service, install kembali
* Globe valve DN 100 (4") x 10K = 2 Piece(s)
* Rubber gasket DN 100 (4") x 10K = 4 Piece(s)
* Bolt & Nut M16 x 65 mm Length = 32 Set(s)

VV. 06 Service valve FW


Note : Bongkar, service, install kembali
* Globe valve DN 40 (1-1/2") x 10 = 1 Piece(s)
* Rubber gasket DN 40 (1-1/2") = 2 Piece(s)
* Bolt & Nut M12 x 55 mm Length = 16 Set(s)

VV. 07 Service valve Sewage


Note : Bongkar, service, install kembali
* Globe valve DN 40 (1-1/2") x 10 = 1 Piece(s)
* Rubber gasket DN 40 (1-1/2") = 2 Piece(s)
* Bolt & Nut M12 x 55 mm Length = 16 Set(s)

VV. 08 Service valve hydrant main deck


Note : Bongkar, service, install kembali
* Globe valve DN 50 (2") x 10 = 1 Piece(s)
* Angle valve DN 50 (2") x 10 = 2 Piece(s)
* Gate valve DN 100 (4") x 10 = 2 Piece(s)
* Rubber gasket DN 50 (2") x 10 = 5 Piece(s)
* Bolt & Nut M12 x 55 mm Length = 48 Set(s)
* Rubber gasket DN 100 (4") x 10K = 2 Piece(s)
* Bolt & Nut M14 x 55 mm Length = 16 Set(s)

VV. 09 Service valve bunker FO


Note : Bongkar, service, install kembali
* Gate valve DN 100 (4") x 10 = 2 Piece(s)
* Gasket N/A DN 100 (4") x 10K = 4 Piece(s)
* Bolt & Nut M14 x 55 mm Length = 32 Set(s)

VV. 10 Service air vent head FO


Note : Bongkar, service, install kembali
* Steel Pipe DN 100 (4") = 2 Piece(s)
* Steel Pipe DN 65 (2-1/2") = 3 Piece(s)
* Gasket N/A DN 100 (4") x 10K = 1 Piece(s)
* Bolt & Nut M14 x 55 mm Length = 8 Set(s)
* Gasket N/A DN 65 (2-1/2") = 3 Piece(s)
* Bolt & Nut M12 x 55 mm Length = 24 Set(s)

CW. CLEANING WORK


CW. 01 Cleaning APT
Note : Cleaning
* Cleaning APT = 1 Lot(s)
CW. 02 Cleaning FPT
Note : Cleaning
* Cleaning FPT = 1 Lot(s)

CW. 03 Cleaning tanki ballast


Note : Cleaning
* Ballast 1 P&S = 2 Lot(s)
* Ballast 2 P&S = 2 Lot(s)

CW. 04 Cleaning tangki FO area bawah lantai engin room (ps - sb) dan tengah
Note : Cleaning di kerjakan 5 orang tenga selama 14 hari kerja
Cleaning dengan cara minyak di sedot menggunakan pompa celup kemudian di sekop sampai kering dan dilap menggunakan majun
Cleaning lokasi sempit
* Cleaning = 7 Lot(s)

CW. 05 Cleaning tangki FO Di area kamar mesin (ps - sb)


Note : Cleaning di kerjakan 6 orang tenga selama 7 hari kerja
Cleaning dengan cara minyak di sedot menggunakan pompa celup kemudian di sekop sampai kering dan dilap menggunakan majun
Cleaning lokasi sempit
* Cleaning = 2 Lot(s)

CW. 06 Cleaning tangki FO Di area Scond deck kamar mesin (ps - sb)
Note : Cleaning di kerjakan 6 orang tenga selama 8 hari kerja
Cleaning dengan cara minyak di sedot menggunakan pompa celup kemudian di sekop sampai kering dan dilap menggunakan majun
Cleaning lokasi sempit
* Cleaning = 4 Lot(s)

CW. 07 Cleaning tangki LO area bawah lantai engin room (ps - sb)
Note : Cleaning di kerjakan 5 orang tenga selama 4 hari kerja
Cleaning dengan cara oli di sekop sampai kering dan dilap menggunakan majun
Cleaning lokasi sempit
* Cleaning = 2 Lot(s)

CW. 08 Cleaning Cover dump area bawah lantai engin room (ps - sb)
Note : Cleaning di kerjakan 5 orang tenga selama 4 hari kerja
Cleaning dengan cara Air di sedot menggunakan pompa celup kemudian di sekop sampai kering
Cleaning lokasi sempit
* Cleaning = 2 Lot(s)

BP. BLASTING & PAINTING


BP. 01 Bottom Under Water Area & Top Side
* Area Bottom
- Bottom ((3+3) / 2) x 2 + 8) x 23.9 x 0.85
- trasncom 0.5 x 8
- sirip 4.3 x 0.35 x 4
3.83 x 0.35 x 4
- Cord nozzel 6 x 0.9 x 4
0.5 x 1 x 2
0.12 x 1 x 2
0.5 x 0.9 x 4
- Braket Y 0.4 x 0.75 x 4
0.4 x 1.1 x 2 x 4
- Pengaman bushing d 1.6 x 1.6 / 2 x 2
0.6 x 0.7 x 2
- Pengaman bushing b 0.95 x 0.7 x 2
- Pengaman As propell 0.79 x 1.9 x 2
- Rope Guard 0.5 x 2.6 x 2 x 58
- Sepatu kemudi 0.5 x 1.7 x 2
- Skeg tengah 1.96 x 4.1 x 2
* Painting
Location --- Painting Area bottom 343 x 3 Coats

* Area Top side


- midship ke haluan (0,6 + 2) / 2 x 2 x 23.9 x 0.5
- midship ke buritan (0,5 + 0,6) / 2 x 2 x 23.9 x 0.5
- transcom 0.6 x 8
- fender (ps - sb) 0.38 x 20 x 2
0.38 x 11 x 2
Fender belakang 0.38 x 8
- Pusher 1.6 x 1.6
0.45 x 1.6 x 3
0.3 x 1.6
- bulwark area maindeck (ps1.05 x 16.8 x 2
1.05 x 2.05 / 2 x 2
- bulwark Fore castel de 1.05 x 11 x 2
- Dinding luar stering 1.1 x 8
* Blasting
Location --- 30% Spot blasting Bulwark
70% Sweep blasting Bulwark
* Painting
Location --- Painting Area top side & bulwark external 152.3 x 2 Coats

* Matrial baru
- Plate ( 1 sisi) 1.83 x 6.1
- Plate ( 2 sisi) 1.83 x 6.1 x 4 x 2
- Pipa 0.32 x 6 x 25
* Painting
Location --- Painting Matrial baru 148.5 x 1 Coats

- Plate ( 1 sisi) 1.83 x 6.1 x 17


- Plate ( 2 sisi) 1.83 x 6.1 x 4 x 2
- Siku 0.3 x 2 x 6 x 45
* Painting
Location --- Painting Matrial baru 441.1 x 1 Coats
BP 03. Dilaksanakan perawatan (sandblasting) dan pengecetan dengan white paint pada draft mark,
plimsol mark dan nama kapal
BP 04. Dilaksanakan pembuatan lis/cat garis bottom-topside line pada sekeliling kapal
BP 05. Dilaksanakan Sanblasting serta pengecatan pada rantai dan Jangkar (ps & sb)

TB. ENTEBE EMERALD 89

Pak yanto
- elbow sch 80 dia 1" 12 pcs
- pipa sch 40 dia 1" 6m

pak sutarno
- B+M 1/2" x 2" 12 pcs
- Seling PCV 3 x 4 8 pcs
- b+m 10 mm x 40 mm 8 pcs
- Cekak seling 5 mm 8 pcs
- Elbow sch 80 dia 1" 5 pcs
- Elbow sch 80 dia 1 1/4 4 kg
- Elbow sch 40 dia 2" 2 kg
- Elbow sch 80 dia 2 1/2 6 kg
- Elbow sch 80 dia 3/4" 4 kg
- Pipa sch 80 dia 3/4" 4.5 mtr
- pipa sch 80 dia 2 1/2" 1.25 mtr
- pipa sch 80 dia 1 1/4" 1.35 mtr
- pipa sch 40 dia 1" 2.45 mtr
- plate kapal 12 mm 316.89 mtr
- plate kapal 20 mm 4.71 kg
- Flens 5K 2 1/2" 3 pcs

HARIAN
- As drat 3/4" ss 1 pcs
- Mur 3/4" ss 6 pcs
- paking karet 4 mm 2.5 kg
- Remis paking 8 mm 0.1 kg
- b+m 3/4" x 3" (ss) 12 pcs
- B+m 12 mm x 30 mm (s 8 pcs
- Almunium anoda S - 9 3 pcs
- Rantai seng 5/8" 40 pcs
- Ban dapra L - 1000 4 pcs
S JAYA 1

e actual work and can be changed anytime during repair period.

Quantity
Each Total Unit(s)
1.00 Lot(s)
1.00 Lot(s)
2.00 Unit(s)

522.10 522.10 kg(s)

589.22 589.22 kg(s)

35.33 565.20 kg(s)

35.33 635.85 kg(s)

7.00 Unit(s)

15.70 109.90 kg(s)


12.56 87.92 kg(s)

7.65 45.9 Kg(s)


4.59 27.6 Kg(s)
3.77 22.61 kg(s)
18.00 mtrs
18.00 mtrs

5.65 5.65 kg(s)


4.00 Hole(s)

18.00 mtrs
18.00 mtrs

(os) matrial baru 25.3 50.6 Kg(s)


(os) matrial baru 11.8 47.3 Kg(s)
(os) matrial baru Braket 4.0 1.3 Kg(s)
(os) matrial baru 1.0 3.1 Kg(s)
(os) matrial baru 1.0 1.7 Kg(s)
(os) matrial baru 1.0 7.4 Kg(s)
(os) matrial baru 1.0 4.0 Kg(s)
(os) matrial baru 1.0 3.1 Kg(s)
(os) matrial baru 1.0 0.8 Kg(s)
(os) matrial baru 1.0 0.3 Kg(s)
(os) matrial baru 2.0 0.4 Kg(s)
(os) matrial baru 1.0 0.4 Kg(s)
(os) matrial baru 1.0 1.1 Kg(s)
(os) matrial baru 1.0 0.6 Kg(s)
(os) matrial baru 1.0 2.6 Kg(s)
(os) matrial baru 1.0 0.5 Kg(s)

2 1 mtrs
1.9 3.9 Kg(s)
61.2 122.5 Kg(s)
4.7 18.8 Kg(s)
12.2 49.0 Kg(s)
3.8 60.3 Kg(s)
8.5 17.1 Kg(s)

5.00 Unit(s)

235.50 235.50 kg(s)


63.59 63.59 kg(s)

141.3 565.2 Kg(s)


6.36 254.34 Kg(s)
18.46 73.9 Kg(s)
30.00 mtrs
8.00 Piece(s)

141.3 565.2 Kg(s)


6.36 254.34 Kg(s)
18.46 73.9 Kg(s)
30.00 mtrs
8.00 Piece(s)

481.8 963.7 Kg(s)


7.1 127.2 Kg(s)
21.16 380.8 Kg(s)
131.4 262.8 Kg(s)

481.8 963.7 Kg(s)


7.1 127.2 Kg(s)
21.16 380.8 Kg(s)
131.4 262.8 Kg(s)

(os) matrial baru Long stiff 166.17 166.2 Kg(s)


(os) matrial baru Long stiff 105.24 105.2 Kg(s)
(os) matrial baru Collar 10.0 20.4 Piece(s)
(os) matrial baru Floor melintang 29.4 29.4 Kg(s)

(os) matrial baru Long stiff 166.17 332.3 Kg(s)


(os) matrial baru Long stiff 105.24 210.5 Kg(s)
(os) matrial baru Floor melintang 43.6 43.6 Kg(s)

(os) matrial baru Long stiff 60.93 60.9 Kg(s)


(os) matrial baru Collar 2.0 2.0 Kg(s)
(os) matrial baru Floor mamanjang 144.4 144.4 Kg(s)
(os) matrial baru Floor melintang 34.3 34.3 Kg(s)
(os) matrial baru Floor melintang 21.2 21.2 Kg(s)
(os) matrial baru Floor melintang 24.7 24.7 Kg(s)

(os) matrial baru Long stiff 63.70 127.4 Kg(s)


(os) matrial baru Floor melintang 20.6 20.6 Kg(s)
(os) matrial baru Floor memanjang 144.4 288.7 Kg(s)
(os) matrial baru Floor memanjang 123.6 123.6 Kg(s)
(os) matrial baru Floor melintang 19.2 19.2 Kg(s)
(os) matrial baru Floor melintang 50.0 100.0 Kg(s)
(os) matrial baru Floor melintang 51.4 51.4 Kg(s)

78.5 78.5 Kg(s)


21.16 21.2 Kg(s)
21.16 21.2 Kg(s)
219.0 219.0 Kg(s)
19.23 76.9 Kg(s)
53.66 53.7 Kg(s)

176.6 176.6 Kg(s)


28.85 57.7 Kg(s)
28.85 57.7 Kg(s)

131.4 131.4 Kg(s)


35.77 35.8 Kg(s)
17.31 51.9 Kg(s)

551.9 551.9 Kg(s)


35.77 250.4 Kg(s)
72.70 218.1 Kg(s)

1329.4 1329.4 Kg(s)


72.70 508.9 Kg(s)
86.16 517.0 Kg(s)

8.00 mtrs
3108.6 Kg(s)
725.3 Kg(s)
197.8 Kg(s)
604.4 Kg(s)
164.9 Kg(s)
172.7 Kg(s)
47.1 Kg(s)
7.1 Kg(s)
Unit 0.031 Kg(s)
2.5 Kg(s)
47.1 Kg(s)

8.00 mtrs
3108.6 Kg(s)
725.3 Kg(s)
197.8 Kg(s)
604.4 Kg(s)
164.9 Kg(s)
172.7 Kg(s)
47.1 Kg(s)
7.1 Kg(s)
Unit 0.031 Kg(s)
2.5 Kg(s)
47.1 Kg(s)

254.3 254.3 Kg(s)


34.62 69.2 Kg(s)
28.85 86.5 Kg(s)

254.3 254.3 Kg(s)


34.62 69.2 Kg(s)
28.85 86.5 Kg(s)
9.0 5.7 Piece(s)
(os) matriala baru Kupingan 36.0 22.6 Piece(s)
0.0 0.0 Piece(s)

9.0 5.7 Piece(s)


36.0 22.6 Piece(s)
0.0 0.0 Piece(s)

362.7 18133.5 Kg(s)

6.00 mtrs
4.00 Piece(s)

3.73 7.5 Kg(s)

67.8 135.6 Kg(s)


3.8 15.1 Kg(s)
11.3 45.2 Kg(s)
2.0 Lot(s)

18.00 mtrs

1356.5 1356.5 Kg(s)


406.9 Kg(s)

2.0 Lot(s)
1.0 Lot(s)

1.0 Lot(s)

2.0 Lot(s)

1.00 Piece(s)
1.50 mtrs
1.80 mtrs
1.85 mtrs
1.00 Piece(s)
1.00 Piece(s)
1.00 Piece(s)
4.00 mtrs
1.00 Piece(s)
1.00 Piece(s)
5.90 mtrs
1.20 mtrs
1.00 Piece(s)
1.00 Piece(s)
1.00 Piece(s)
2.10 mtrs
1.00 Piece(s)
1.75 mtrs
1.20 mtrs
5.00 mtrs
1.20 mtrs
1.00 Piece(s)
1.00 Piece(s)
1.00 Piece(s)
1.10 mtrs
1.07 mtrs
2.00 mtrs

1.00 Piece(s)
4.20 mtrs
7.25 mtrs
2.10 mtrs
1.00 mtrs
1.00 Piece(s)
1.00 Piece(s)
2.00 Piece(s)
1.00 Piece(s)
4.70 mtrs
3.05 mtrs
1.00 Piece(s)
3.00 Piece(s)
5.10 mtrs
3.80 mtrs
1.80 mtrs
1.00 Piece(s)
14.30 mtrs
1.00 Piece(s)
1.00 Piece(s)
1.05 mtrs
1.00 Piece(s)
1.00 Piece(s)
7.20 mtrs
1.00 Piece(s)
1.00 mtrs
1.70 mtrs
3.00 Piece(s)

(os) matrial lama 114.5 114.5 Kg(s)

(os) matrial lama 288.3 288.3 Kg(s)


(os) matrial lama 53.0 53.0 Kg(s)
(os) matrial baru 9.0 36.2 Piece(s)

(os) matrial baru 14.5 290.1 Kg(s)


(os) matrial baru 20.0 33.0 Piece(s)
(os) matrial baru 60.0 33.9 Piece(s)
(os) matrial lama pin 20.0 93.6 Piece(s)
(os) matrial lama 20.0 Piece(s)
(os) Pemotongan 20.0 31.4 Piece(s)
(os) Pemotongan 20.0 77.4 Piece(s)

(os) matrial baru fr 57/58 - 65/66 L. K 254.1 254.1 Kg(s)


(os) matrial baru fr 36/37 - 47/48 L. K 462.0 462.0 Kg(s)
(os) matrial baru fr 47/48 - 57/58 L. K 242.5 242.5 Kg(s)

(os) matrial baru 13.1 13.1 Kg(s)


(os) matrial baru 22.6 67.8 Kg(s)
(os) matrial baru 1.0 4.7 Piece(s)
(os) matrial baru 1.0 2.5 Piece(s)
(os) matrial baru 1.0 3.5 Piece(s)
(os) matrial baru 50.9 50.9 Kg(s)
(os) matrial baru 1.0 4.7 Piece(s)
(os) matrial baru 46.6 46.6 Kg(s)
(os) matrial baru 1.0 3.4 Piece(s)
(os) matrial baru 27.1 27.1 Kg(s)
(os) matrial baru 8.0 8.0 Kg(s)
(os) matrial baru 1.0 0.6 Piece(s)

(os) matrial baru 1.0 4.1 Piece(s)


(os) matrial baru 17.4 17.4 Kg(s)
(os) matrial baru 21.6 21.6 Kg(s)
(os) matrial baru 23.1 23.1 Kg(s)
(os) matrial baru 9.3 9.3 Kg(s)
(os) matrial baru 1.0 2.5 Piece(s)

(os) matrial baru 18.8 37.7 Kg(s)


(os) matrial baru 7.1 7.1 Kg(s)
(os) matrial baru 11.7 11.7 Kg(s)
(os) matrial baru 11.9 11.9 Kg(s)
(os) matrial baru 1.0 3.3 Piece(s)
(os) matrial baru 1.0 4.6 Piece(s)
(os) matrial baru 1.0 1.1 Piece(s)

(os) matrial baru 20.7 41.4 Kg(s)


(os) matrial baru 7.8 7.8 Kg(s)
(os) matrial baru 12.8 12.8 Kg(s)
(os) matrial baru 13.3 13.3 Kg(s)
(os) matrial baru 1.0 3.3 Piece(s)

(os) matrial baru 1.0 6.6 Piece(s)

(os) matrial baru 1.0 2.3 Piece(s)


(os) matrial baru 12.1 12.1 Kg(s)
(os) matrial baru 1.0 2.4 Piece(s)
(os) matrial baru 1.0 6.4 Piece(s)
(os) matrial baru 20.7 41.4 Kg(s)
(os) matrial baru 13.1 13.1 Kg(s)
(os) matrial baru 1.0 2.0 Piece(s)
(os) matrial baru 1.0 3.0 Piece(s)
(os) matrial baru 1.0 3.0 Piece(s)
(os) matrial baru 9.4 9.4 Kg(s)

(os) matrial baru 1.0 2.0 Piece(s)


(os) matrial baru 6.8 6.8 Kg(s)
(os) matrial baru 1.0 2.8 Piece(s)
(os) matrial baru 21.6 21.6 Kg(s)
(os) matrial baru 21.4 42.8 Kg(s)
(os) matrial baru 12.0 12.0 Kg(s)
(os) matrial baru 9.7 9.7 Kg(s)
(os) matrial baru 10.5 10.5 Kg(s)
(os) matrial baru 1.0 1.7 Piece(s)
(os) matrial baru 1.0 2.5 Piece(s)
(os) matrial baru 7.6 7.6 Kg(s)

(os) matrial baru 18.8 56.5 Kg(s)


(os) matrial baru 11.1 11.1 Kg(s)
(os) matrial baru 1.0 3.3 Piece(s)
(os) matrial baru 1.0 2.5 Piece(s)

(os) matrial baru 7.7 7.7 Kg(s)


(os) matrial baru 1.0 4.4 Piece(s)
(os) matrial baru 2.0 5.0 Piece(s)
(os) matrial baru 1.0 3.1 Piece(s)
(os) matrial baru 1.0 2.3 Piece(s)
(os) matrial baru 1.0 6.4 Piece(s)
(os) matrial baru 8.5 8.5 Kg(s)
(os) matrial baru 15.1 15.1 Kg(s)
(os) matrial baru 18.8 37.7 Kg(s)

(os) matrial baru 15.7 15.7 Kg(s)


(os) matrial baru 13.8 13.8 Kg(s)
(os) matrial baru 15.7 31.4 Kg(s)
(os) matrial baru 12.6 12.6 Kg(s)
(os) matrial baru 11.1 11.1 Kg(s)
8.00 mtrs
18.00 Piece(s)
4.00 Piece(s)
4.00 Piece(s)
4.00 Piece(s)

1.4 22.2 Kg(s)


168.00 mtrs
36.00 mtrs
64.79 259.1 Kg(s)
24.00 Piece(s)
20.00 Piece(s)
4.00 Piece(s)

2.00 Unit(s)

19.6 157.0 Kg(s)

48.00 mtrs
1.4 5.5 Kg(s)
8.00 Piece(s)

72.00 mtrs
0.6 2.5 Kg(s)
4.00 Piece(s)

12.00 mtrs
6.00 mtrs
2.00 Piece(s)
2.00 Piece(s)
4.00 Piece(s)
2.00 Piece(s)

1.50 mtrs
2.00 Piece(s)
2.00 Piece(s)

6.00 mtrs
6.00 Piece(s)
6.00 Piece(s)

1.50 mtrs
1.00 Piece(s)
3.00 Piece(s)
0.20 mtrs
2.00 Piece(s)
0.30 mtrs
2.00 Piece(s)
1.00 Piece(s)

12.00 mtrs
10.00 Piece(s)
6.00 Piece(s)

6.00 mtrs
4.00 Piece(s)
3.00 Piece(s)

3.00 mtrs
2.00 Piece(s)
3.00 Piece(s)

3.00 mtrs
2.00 Piece(s)

12.00 mtrs
6.00 Piece(s)
5.00 Piece(s)

2.00 mtrs
2.00 Piece(s)

8.00 mtrs

1.50 mtrs
2.00 Piece(s)

60.00 mtrs
12.00 mtrs
20.00 Piece(s)
4.00 Piece(s)
6.00 mtrs
1.00 Piece(s)

4.00 mtrs
2.00 Piece(s)
2.00 Piece(s)

1.44 mtrs
2.16 mtrs

8.00 mtrs
4.00 Piece(s)

12.00 mtrs
4.00 Piece(s)

2.00 Lot(s)

1.00 Lot(s)
1.00 Lot(s)
1.00 Lot(s)
1.00 Lot(s)

1.00 Lot(s)

2.00 Lot(s)

1.00 Lot(s)

1.00 Lot(s)
1.00 Lot(s)

3.00 Piece(s)
6.00 Piece(s)
48.00 Set(s)

1.00 Piece(s)
2.00 Piece(s)
16.00 Set(s)
1.00 Piece(s)
2.00 Piece(s)
16.00 Set(s)

1.00 Piece(s)
2.00 Piece(s)
16.00 Set(s)

2.00 Piece(s)
4.00 Piece(s)
32.00 Set(s)

1.00 Piece(s)
2.00 Piece(s)
16.00 Set(s)

1.00 Piece(s)
2.00 Piece(s)
16.00 Set(s)

1.00 Piece(s)
2.00 Piece(s)
2.00 Piece(s)
5.00 Piece(s)
48.00 Set(s)
2.00 Piece(s)
16.00 Set(s)

2.00 Piece(s)
4.00 Piece(s)
32.00 Set(s)

2.00 Piece(s)
3.00 Piece(s)
1.00 Piece(s)
8.00 Set(s)
3.00 Piece(s)
24.00 Set(s)

1.00 Lot(s)
1.00 Lot(s)

2.00 Lot(s)
2.00 Lot(s)

ggunakan majun

7.00 Lot(s)

ggunakan majun

2.00 Lot(s)

ggunakan majun

4.00 Lot(s)

2.00 Lot(s)

2.00 Lot(s)

235.0 m 2

4.0 m 2

6.0 m 2

5.4 m 2

21.6 m 2

1.0 m 2

0.2 m 2

1.8 m 2

1.2 m 2

3.5 m 2

2.6 m 2

0.8 m 2

1.3 m 2

3.0 m 2

37.7 m 2

1.7 m 2

16.1 m 2
1029.00 m 2

31.1 m 2

13.2 m 2

4.8 m 2

15.2 m 2

8.4 m 2

3.0 m 2

2.6 m 2

2.2 m 2

2.6 m 2

35.3
2.2
23.1
8.8

20.80 m 2

48.53 m 2

304.60 m 2

11.2 m 2

89.3 m 2

48.0 m 2

148.50 m 2

189.8 m 2

89.3 m 2

162.0 m 2

441.10 m 2

1.00 Ls

1.00 Ls
2.00 Ls

Total 38811.1 Kg(S)

Rp 194,055,442
Rp 64,685,147

Rp 970,277,208
543,355,237
-
-
-
-

Rp 970,277,208.07
Rp 323,425,736.02
Rp 107,808,578.67
Rp 31,200,000
Harga
Ketrangan
Harga Harga
Total
Pak yanto 19-Mar-24
###

2181.7 ######
2.5733333 1

Pak Edi 19-Mar-24

Pak Imam 19-Mar-24

Pak Edi 19-Mar-24

Pak Imam 19-Mar-24

1100
1100
4000
2790

3000
3000

1860
2700

13020
11340

26460
26880
16.208333
pak Imam 29-Feb-24

Pak yanto 29-Feb-24


harian kontruksi 29-Feb-24

harian kontruksi 5-Mar-24

harian kontruksi 13-Mar-24

harian kontruksi 5-Mar-24

harian kontruksi 13-Mar-24


harian kontruksi 16-Mar-24

harian kontruksi 19-Mar-24

pak Imam 5-Mar-24

Pak yanto 5-Mar-24

work shop pak budi 5-Mar-24

Pak yanto 13-Mar-24


Pak yanto 16-Mar-24
Pak yanto 19-Mar-24

Pak edi 13-Mar-24

Pak edi 16-Mar-24

Pak edi 16-Mar-24


Pak Imam 13-Mar-24

Pak Imam 13-Mar-24

Pak Imam 13-Mar-24

Pak Imam 16-Mar-24

Pak yanto 13-Mar-24

Pak yanto 13-Mar-24

Pak yanto 16-Mar-24


Harian 16-Mar-24

Harian 16-Mar-24

Harian 16-Mar-24

Harian 16-Mar-24

Harian 16-Mar-24

Pak sutarno ###


Pak sutarno ###

Pak sutarno ###

Pak sutarno ###

Pak sutarno ###

Pak muklis ###

Pak muklis ###

Pak muklis ###

Pak muklis ###


Pak sutarno ###

Pak sutarno ###


Pak sutarno ###

Rp -
Rp -

Rp -
-
-
-
-
-

Rp -
Rp -
Rp -
Rp 31,200,000
PT DOCK BINA VISTA REPAIR LIST
Jl. Wajok Hilir No. Km 12, Wajok Hulu, Kec. Jongkat MV KHAIROS JAYA 1
Kab. Mempawah, Kalimantan Barat

SHIP PARTICULAR
Name Of Vessel : MV. KHAIROS JAYA
Flag : Indonesia
Owner :
LOA : M
Breadth : M
Draft : M
Tinggi : M
Status Docking :

Note:
1) Job list below is only for estimation purpose. The dimension, area, material, weight calculation, and quantity will be based on the actual work and can be changed an
repair period.

Post
JOB DESCRIPTION
No.
HO. HULL & OUTFITTING

HO. 09 Perbaikan dudukan sekoci


Note : Turunkan sekoci, Bongkar material lama, renew, install balik sekoci
* Steel Plate 2150 x 150 x 10 (mm) = 2 Piece(s)
* Steel Plate 2150 x 70 x 10 (mm) = 4 Piece(s)
* Steel Plate 130 x 130 x 10 (mm) = 4 Piece(s)
* Steel Plate 130 x 300 x 10 (mm) = 1 Piece(s)
* Steel Plate 220 x 100 x 10 (mm) = 1 Piece(s)
* Steel Plate 130 x 730 x 10 (mm) = 1 Piece(s)
* Steel Plate 70 x 730 x 10 (mm) = 1 Piece(s)
* Steel Plate 140 x 280 x 10 (mm) = 1 Piece(s)
* Steel Plate 70 x 140 x 10 (mm) = 1 Piece(s)
* Steel Plate 70 x 60 x 10 (mm) = 1 Piece(s)
* Steel Plate 70 x 70 x 10 (mm) = 2 Piece(s)
* Steel Plate 70 x 70 x 10 (mm) = 1 Piece(s)
* Steel Plate 70 x 200 x 10 (mm) = 1 Piece(s)
* Steel Plate 70 x 110 x 10 (mm) = 1 Piece(s)
* Steel Plate 120 x 280 x 10 (mm) = 1 Piece(s)
* Steel Plate 70 x 90 x 10 (mm) = 1 Piece(s)

HO. 16 Perbaikan tank top cargo hold I


Note : Bongkar material lama, renew
# Portside
Tangki balas I (sb)
* Angle Bar L.150 x 150 x 12 6000 mm-L = 1 Length(s)
* Angle Bar L.150 x 150 x 12 3800 mm-L = 1 Length(s)
* Steel Plate 130 x 200 x 10 (mm) = 10 Piece(s)
* Steel Plate 300 x 1250 x 10 (mm) = 1 Piece(s)

Tangki balas I (ps)


* Angle Bar L.150 x 150 x 12 6000 mm-L = 2 Length(s)
* Angle Bar L.150 x 150 x 12 3800 mm-L = 2 Length(s)
* Steel Plate 300 x 1850 x 10 (mm) = 1 Piece(s)

Tangki balas 2 (sb)


* Angle Bar L.150 x 150 x 12 2200 mm-L = 1 Length(s)
* Steel Plate 130 x 200 x 10 (mm) = 1 Piece(s)
* Steel Plate 300 x 6130 x 10 (mm) = 1 Piece(s)
* Steel Plate 350 x 1250 x 10 (mm) = 1 Piece(s)
* Steel Plate 300 x 900 x 10 (mm) = 1 Piece(s)
* Steel Plate 350 x 900 x 10 (mm) = 1 Piece(s)

# Starboard
Tangki balas I (ps)
* Angle Bar L.150 x 150 x 12 2300 mm-L = 2 Length(s)
* Steel Plate 350 x 750 x 10 (mm) = 1 Piece(s)
* Steel Plate 300 x 6130 x 10 (mm) = 2 Piece(s)
* Steel Plate 300 x 5250 x 10 (mm) = 1 Piece(s)
* Steel Plate 330 x 740 x 10 (mm) = 1 Piece(s)
* Steel Plate 350 x 1820 x 10 (mm) = 2 Piece(s)
* Steel Plate 350 x 1870 x 10 (mm) = 1 Piece(s)

HO. 31 Rewelding area bottom


* Stbd
- Rewelding 2 phase x 1700 mm-L = 1 Length(s)
- Rewelding 3 phase x 50 mm-L = 3 Length(s)

HO. 34 Perbaikan plate bottom


Note : Bongkar material lama, install kembali
* Steel Plate 620 x 4350 x 12 (mm) = 1 Piece(s)
* Steel Plate 800 x 6130 x 12 (mm) = 1 Piece(s)
* Steel Plate 420 x 6130 x 12 (mm) = 1 Piece(s)

CW. CLEANING WORK

CW. 08 Cleaning Cover dump area bawah lantai engin room (ps - sb)
Note : Cleaning di kerjakan 5 orang tenga selama 4 hari kerja
Cleaning dengan cara Air di sedot menggunakan pompa celup kemudian di sekop sampai kering
Cleaning lokasi sempit
* Cleaning = 2 Lot(s)

BP. BLASTING & PAINTING


* Matrial baru
- Plate ( 1 sisi) 1.83 x 6.1 x 17
- Plate ( 2 sisi) 1.83 x 6.1 x 4 x 2
- Siku 0.3 x 2 x 6 x 45
* Painting
Location --- Painting Material baru 441.1 x 1 Coats
V KHAIROS JAYA 1

on, and quantity will be based on the actual work and can be changed anytime during

Quantity Harga
Ketrangan
Each Total Unit(s) Harga Total

(os) 25.3 50.6 Kg(s) Rp 15,000 Rp 759,488 Pak yanto ###


(os) 11.8 47.3 Kg(s) Rp 15,000 Rp 708,855
(os) Braket 4.0 Piece(s) Rp 100,000 Rp 400,000
(os) 1.0 Piece(s) Rp 100,000 Rp 100,000
(os) 1.0 Piece(s) Rp 100,000 Rp 100,000
(os) 7.4 7.4 Kg(s) Rp 15,000 Rp 111,745
(os) 1.0 Piece(s) Rp 100,000 Rp 100,000
(os) 1.0 Piece(s) Rp 100,000 Rp 100,000
(os) 1.0 Piece(s) Rp 100,000 Rp 100,000
(os) 1.0 Piece(s) Rp 100,000 Rp 100,000
(os) 2.0 Piece(s) Rp 100,000 Rp 200,000
(os) 1.0 Piece(s) Rp 100,000 Rp 100,000
(os) 1.0 Piece(s) Rp 100,000 Rp 100,000
(os) 1.0 Piece(s) Rp 100,000 Rp 100,000
(os) 1.0 Piece(s) Rp 100,000 Rp 100,000
(os) 1.0 Piece(s) Rp 100,000 Rp 100,000

(os) Long stiff 166.17 166.2 Kg(s) Rp 15,000 Rp 2,492,532 Pak Edi ###
(os) Long stiff 105.24 105.2 Kg(s) Rp 15,000 Rp 1,578,604
(os) Collar 10.0 Piece(s) Rp 100,000 Rp 1,000,000
(os) Floor melintang 29.4 29.4 Kg(s) Rp 15,000 Rp 441,563

(os) Long stiff 166.17 332.3 Kg(s) Rp 15,000 Rp 4,985,064 Pak Imam ###
(os) Long stiff 105.24 210.5 Kg(s) Rp 15,000 Rp 3,157,207
(os) Floor melintang 43.6 43.6 Kg(s) Rp 15,000 Rp 653,512

(os) Long stiff 60.93 60.9 Kg(s) Rp 15,000 Rp 913,928 Pak Edi ###
(os) Collar 1.0 Piece(s) Rp 100,000 Rp 100,000
(os) Floor mamanjang 144.4 144.4 Kg(s) Rp 15,000 Rp 2,165,423
(os) Floor melintang 34.3 34.3 Kg(s) Rp 15,000 Rp 515,156
(os) Floor melintang 21.2 21.2 Kg(s) Rp 15,000 Rp 317,925
(os) Floor melintang 24.7 24.7 Kg(s) Rp 15,000 Rp 370,913

(os) Long stiff 63.70 127.4 Kg(s) Rp 15,000 Rp 1,910,941 Pak Imam ###
(os) Floor melintang 20.6 20.6 Kg(s) Rp 15,000 Rp 309,094
(os) Floor memanjang 144.4 288.7 Kg(s) Rp 15,000 Rp 4,330,845
(os) Floor memanjang 123.6 123.6 Kg(s) Rp 15,000 Rp 1,854,562
(os) Floor melintang 19.2 19.2 Kg(s) Rp 15,000 Rp 287,546
(os) Floor melintang 50.0 100.0 Kg(s) Rp 15,000 Rp 1,500,135
(os) Floor melintang 51.4 51.4 Kg(s) Rp 15,000 Rp 770,674

1.70 mtrs Rp 135,000 Rp 229,500 harian kontruksi ###


3.00 Piece(s) Rp 56,000 Rp 168,000

(os) matrial baru fr 57/58 - 65/66 L. Kill 254.1 254.1 Kg(s) Pak yanto ###
(os) matrial baru fr 36/37 - 47/48 L. Kill 462.0 462.0 Kg(s) Pak yanto ###
(os) fr 47/48 - 57/58 L. Kill 242.5 242.5 Kg(s) Rp 15,000 Rp 3,637,910 Pak yanto ###

2.00 Lot(s) Harian ###

189.8 m2 Rp 65,000 Rp 12,335,115 Pak muklis ###


89.3 m2 Rp 65,000 Rp 5,804,760
162.0 m2 Rp 65,000 Rp 10,530,000

441.10 m2 Rp 6,500 Rp 2,867,150 Pak muklis ###

Total 2967.6 Kg(S)