PT DOCK BINA VISTA REPAIR LIST

Jl. Wajok Hilir No. Km 12, Wajok Hulu, Kec. Jongkat TK. BINA SARANA II
Kab. Mempawah, Kalimantan Barat

SHIP PARTICULAR
Name Of Vessel : TK. BINA SARANA II
Flag : Indonesia
Owner : PT BELIAN KHATULISTIWA LINE
LOA : 100.70 M
Breadth : 27.40 M
Draft : - M
Tinggi : 6.50 M
Status Docking :

Note:
1) Job list below is only for estimation purpose. The dimension, area, material, weight calculation, and quantity will be based on the actual work and can be changed anytime during
repair period.

Post Quantity
JOB DESCRIPTION
No. Each Total Unit(s)
GS. GENERAL SERVICE
Start from up to
Arrival date
Start working date
Finish working date
Docking Date
Undocking date
Sailing/Delivery

GS. 01 DOCKING & UNDOCKING


1 Docking date :
2 Undocking date :
3 Dipersiapkan stop block, diatur posisi dan bantalan-bantalan untuk docking
4 Asistensi naik turun dock menggunakan air bag system

GS. 02 MOORING / UNMOORING


Di sediakan line handler untuk docking dan undocking

GS. 03 HYDRANT
Disediakan alat pemadam (hydrant) guna pencegahan terhadap bahaya kebakaran selama kapal dalam perbaikan

GS. 04 TEMPAT SAMPAH


Disediakan tempat sampah di kapal dan akan di buang berkala

GS. 05 GANGWAY
Disediakan gangway untuk akses ke kapal

GS. 06 SHORE POWER SUPPLY


Connection / disconnect
Per kWH

GS. 07 CRANE / FORKLIFT

GS. 08 TUG ASSISTANCE


Disediakan asistensi tugboat untuk untuk proses naik turun berserta keluar-masuk galangan

HO. HULL & OUTFITTING


HO. 01 Fabrikasi sideboard Fr. 01 - Fr 29 -- STBD
Note : Potong material lama, renew
* Steel Plate 1800 x 3650 x 10 (mm) = 29 Piece(s) 515.7 14956.6 Kg(s)
Angle bar fabrikasi / bending dengan material sebagai berikut :
* Steel Plate 210 x 1800 x 10 (mm) = 174 Piece(s) 29.7 5163.1 Kg(s)
H-Beam 150 x 150 x 7 x 10 x 2400 = 29 Unit 0.031 2157.60 Kg(s)
Half H-Beam 150 x 150 x 7 x 10 x 3650 = 29 Unit 0.031 1640.675 Kg(s)

HO. 02 Fabrikasi sideboard Fr. 32 - Fr 40 -- STBD


Note : Potong material lama, renew
* Steel Plate 1800 x 3650 x 10 (mm) = 8 Piece(s) 515.7 4126.0 Kg(s)
Angle bar fabrikasi / bending dengan material sebagai berikut :
* Steel Plate 210 x 1800 x 10 (mm) = 48 Piece(s) 29.7 1424.3 Kg(s)
H-Beam 150 x 150 x 7 x 10 x 2400 = 8 Unit 0.031 595.20 Kg(s)
Half H-Beam 150 x 150 x 7 x 10 x 3650 = 8 Unit 0.031 452.6 Kg(s)

HO. 03 Fabrikasi sideboard Fr. 41 - Fr 50 -- STBD


Note : Potong material lama, renew
* Steel Plate 1900 x 3650 x 10 (mm) = 10 Piece(s) 544.4 5444.0 Kg(s)
Angle bar fabrikasi / bending dengan material sebagai berikut :
* Steel Plate 210 x 1900 x 10 (mm) = 60 Piece(s) 31.3 1879.3 Kg(s)
H-Beam 150 x 150 x 7 x 10 x 2400 = 10 Unit 0.031 744.00 Kg(s)
Half H-Beam 150 x 150 x 7 x 10 x 3650 = 10 Unit 0.031 565.75 Kg(s)

HO. 04 Fabrikasi sideboard Fr. 01 - Fr 29 -- PORT


Note : Potong material lama, renew
* Steel Plate 1800 x 3650 x 10 (mm) = 29 Piece(s) 515.7 14956.6 Kg(s)
Post Quantity
JOB DESCRIPTION
No. Each Total Unit(s)
GS. GENERAL SERVICE
Angle bar fabrikasi / bending dengan material sebagai berikut :
* Steel Plate 210 x 1800 x 10 (mm) = 174 Piece(s) 29.7 5163.1 Kg(s)
H-Beam 150 x 150 x 7 x 10 x 2400 = 29 Unit 0.031 2157.60 Kg(s)
Half H-Beam 150 x 150 x 7 x 10 x 3650 = 29 Unit 0.031 1640.675 Kg(s)

HO. 05 Fabrikasi sideboard Fr. 32 - Fr 40 -- PORT


Note : Potong material lama, renew
* Steel Plate 1800 x 3650 x 10 (mm) = 8 Piece(s) 515.7 4126.0 Kg(s)
Angle bar fabrikasi / bending dengan material sebagai berikut :
* Steel Plate 210 x 1800 x 10 (mm) = 48 Piece(s) 29.7 1424.3 Kg(s)
H-Beam 150 x 150 x 7 x 10 x 2400 = 8 Unit 0.031 595.20 Kg(s)
Half H-Beam 150 x 150 x 7 x 10 x 3650 = 8 Unit 0.031 452.6 Kg(s)

HO. 06 Fabrikasi sideboard Fr. 41 - Fr 50 -- PORT


Note : Potong material lama, renew
* Steel Plate 1900 x 3650 x 10 (mm) = 10 Piece(s) 544.4 5444.0 Kg(s)
Angle bar fabrikasi / bending dengan material sebagai berikut :
* Steel Plate 210 x 1900 x 10 (mm) = 60 Piece(s) 31.3 1879.3 Kg(s)
H-Beam 150 x 150 x 7 x 10 x 2400 = 10 Unit 0.031 744.00 Kg(s)
Half H-Beam 150 x 150 x 7 x 10 x 3650 = 10 Unit 0.031 565.75 Kg(s)

HO. 07 Fabrikasi sideboard belakang


Note : Potong material lama, renew
* Steel Plate 1800 x 3650 x 10 (mm) = 14 Piece(s) 515.7 7220.4 Kg(s)
Angle bar fabrikasi / bending dengan material sebagai berikut :
* Steel Plate 210 x 1800 x 10 (mm) = 84 Piece(s) 29.7 2492.5 Kg(s)
H-Beam 150 x 150 x 7 x 10 x 2400 = 14 Unit 0.031 1041.60 Kg(s)
Half H-Beam 150 x 150 x 7 x 10 x 3650 = 14 Unit 0.031 792.05 Kg(s)

HO. 08 Fabrikasi sideboard depan


Note : Potong material lama, renew
* Steel Plate 1800 x 3650 x 10 (mm) = 7 Piece(s) 515.7 3610.2 Kg(s)
Angle bar fabrikasi / bending dengan material sebagai berikut :
* Steel Plate 210 x 1800 x 10 (mm) = 49 Piece(s) 29.7 1454.0 Kg(s)
H-Beam 150 x 150 x 7 x 10 x 2400 = 7 Unit 0.031 520.80 Kg(s)
Half H-Beam 150 x 150 x 7 x 10 x 3650 = 7 Unit 0.031 396.025 Kg(s)

* Steel Plate 900 x 3650 x 10 (mm) = 1 Piece(s) 257.9 257.9 Kg(s)


Angle bar fabrikasi / bending dengan material sebagai berikut :
* Steel Plate 210 x 1800 x 10 (mm) = 6 Piece(s) 29.7 178.0 Kg(s)
H-Beam 150 x 150 x 7 x 10 x 2400 = 1 Unit 0.031 74.40 Kg(s)
Half H-Beam 150 x 150 x 7 x 10 x 3650 = 1 Unit 0.031 56.575 Kg(s)

HO. 09 Fabrikasi pintu sideboard -- PORT


Note : Potong material lama, renew
* Steel Plate 5400 x 600 x 10 (mm) = 5 Piece(s) 254.3 1271.7 Kg(s)
* Steel Plate 5400 x 650 x 10 (mm) = 1 Piece(s) 275.5 275.5 Kg(s)
Web bar fabrikasi / bending dengan material sebagai berikut :
* Steel Plate 230 x 5400 x 12 (mm) = 18 Piece(s) 117.0 2105.9 Kg(s)
* Steel Plate 230 x 600 x 12 (mm) = 35 Piece(s) 13.0 455.0 Kg(s)
* Steel Plate 230 x 650 x 12 (mm) = 7 Piece(s) 14.1 98.6 Kg(s)
H-Beam 250 x 250 x 9 x 14 x 3650 = 2 Unit 0.071 518.3 Kg(s)
H-Beam 250 x 250 x 9 x 14 x 2400 = 2 Unit 0.071 340.8 Kg(s)

HO. 10 Fabrikasi pintu sideboard -- STBD


Note : Potong material lama, renew
* Steel Plate 5400 x 600 x 10 (mm) = 5 Piece(s) 254.3 1271.7 Kg(s)
* Steel Plate 5400 x 650 x 10 (mm) = 1 Piece(s) 275.5 275.5 Kg(s)
Web bar fabrikasi / bending dengan material sebagai berikut :
* Steel Plate 230 x 5400 x 12 (mm) = 18 Piece(s) 117.0 2105.9 Kg(s)
* Steel Plate 230 x 600 x 12 (mm) = 35 Piece(s) 13.0 455.0 Kg(s)
* Steel Plate 230 x 650 x 12 (mm) = 7 Piece(s) 14.1 98.6 Kg(s)
H-Beam 250 x 250 x 9 x 14 x 3650 = 2 Unit 0.071 518.3 Kg(s)
H-Beam 250 x 250 x 9 x 14 x 2400 = 2 Unit 0.071 340.8 Kg(s)

HO. 11 Fabrikasi pintu sideboard -- Depan


Note : Potong material lama, renew
* Steel Plate 5400 x 600 x 10 (mm) = 5 Piece(s) 254.3 1271.7 Kg(s)
* Steel Plate 5400 x 650 x 10 (mm) = 1 Piece(s) 275.5 275.5 Kg(s)
Web bar fabrikasi / bending dengan material sebagai berikut :
* Steel Plate 230 x 5400 x 12 (mm) = 18 Piece(s) 117.0 2105.9 Kg(s)
* Steel Plate 230 x 600 x 12 (mm) = 35 Piece(s) 13.0 455.0 Kg(s)
* Steel Plate 230 x 650 x 12 (mm) = 7 Piece(s) 14.1 98.6 Kg(s)
H-Beam 250 x 250 x 9 x 14 x 3650 = 2 Unit 0.071 518.3 Kg(s)
H-Beam 250 x 250 x 9 x 14 x 2400 = 2 Unit 0.071 340.8 Kg(s)

Total 111590.1 Kg(S)


Post Quantity
JOB DESCRIPTION
No. Each Total Unit(s)
GS. GENERAL SERVICE
Resume material :
Plate 10 per sheet 871.35 Kgs
Material plate 10 untuk sideboard 59883.72 Kgs 68.73 Sheet plate
Material plate 10 untuk pintu 4641.7 Kgs 5.33 Sheet plate
Total 74 Sheet plate

Material plate 10 untuk fabrikasi Angle bar 125 x 75 x 10


Sideboard 21057.9 Kgs 1277.40 Mtrs 212.90 Length 24.60 Sheet plate

Material plate 12 untuk fabrikasi Web 140 x 80 x 12


Pintu 7978.5 Kgs 368.25 Mtrs 61.38 Length 8.00 Sheet plate

H-beam 150 x 150 15193.10 Kgs 58.00 Length/12M


H-beam 250 x 250 2577.30 Kgs 6.00 Length/12M
PT DOCK BINA VISTA REPAIR LIST
Jl. Wajok Hilir No. Km 12, Wajok Hulu, Kec. Jongkat TK. BINA SARANA II
Kab. Mempawah, Kalimantan Barat

SHIP PARTICULAR
Name Of Vessel : TK. BINA SARANA II
Flag : Indonesia
Owner : PT BELIAN KHATULISTIWA LINE
LOA : 100.70 M
Breadth : 27.40 M
Draft : - M
Tinggi : 6.50 M
Status Docking :

Note:
1) Job list below is only for estimation purpose. The dimension, area, material, weight calculation, and quantity will be based on the actual work and can be changed anytime
during repair period.

Post Quantity
JOB DESCRIPTION
No. Each Total Unit(s)
GS. GENERAL SERVICE
Start from up to
Arrival date
Start working date
Finish working date
Docking Date
Undocking date
Sailing/Delivery

GS. 01 DOCKING & UNDOCKING


1 Docking date :
2 Undocking date :
3 Dipersiapkan stop block, diatur posisi dan bantalan-bantalan untuk docking
4 Asistensi naik turun dock menggunakan air bag system

GS. 02 MOORING / UNMOORING


Di sediakan line handler untuk docking dan undocking

GS. 03 HYDRANT
Disediakan alat pemadam (hydrant) guna pencegahan terhadap bahaya kebakaran selama kapal dalam perbaikan

GS. 04 TEMPAT SAMPAH


Disediakan tempat sampah di kapal dan akan di buang berkala

GS. 05 GANGWAY
Disediakan gangway untuk akses ke kapal

GS. 06 SHORE POWER SUPPLY


Connection / disconnect
Per kWH

GS. 07 CRANE / FORKLIFT

GS. 08 TUG ASSISTANCE


Disediakan asistensi tugboat untuk untuk proses naik turun berserta keluar-masuk galangan

HO. HULL & OUTFITTING


HO. 01 Fabrikasi sideboard Fr. 01 - Fr 29 -- STBD
Note : Potong material lama, renew
* Steel Plate 1800 x 3600 x 10 (mm) = 29 Piece(s) 508.7 14751.7 Kg(s)
Angle bar fabrikasi / bending dengan material sebagai berikut :
* Steel Plate 210 x 1800 x 10 (mm) = 174 Piece(s) 29.7 5163.1 Kg(s)
H-Beam 150 x 150 x 7 x 10 x 2400 = 29 Unit 0.031 2157.60 Kg(s)
H-Beam 150 x 150 x 7 x 10 x 3650 = 29 Unit 0.031 3281.35 Kg(s)

HO. 02 Fabrikasi sideboard Fr. 32 - Fr 40 -- STBD


Note : Potong material lama, renew
* Steel Plate 1800 x 3600 x 10 (mm) = 8 Piece(s) 508.7 4069.4 Kg(s)
Angle bar fabrikasi / bending dengan material sebagai berikut :
* Steel Plate 210 x 1800 x 10 (mm) = 48 Piece(s) 29.7 1424.3 Kg(s)
H-Beam 150 x 150 x 7 x 10 x 2400 = 8 Unit 0.031 595.20 Kg(s)
H-Beam 150 x 150 x 7 x 10 x 3650 = 8 Unit 0.031 905.2 Kg(s)

HO. 03 Fabrikasi sideboard Fr. 41 - Fr 50 -- STBD


Note : Potong material lama, renew
* Steel Plate 1900 x 3600 x 10 (mm) = 10 Piece(s) 536.9 5369.4 Kg(s)
Angle bar fabrikasi / bending dengan material sebagai berikut :
* Steel Plate 210 x 1900 x 10 (mm) = 60 Piece(s) 31.3 1879.3 Kg(s)
H-Beam 150 x 150 x 7 x 10 x 2400 = 10 Unit 0.031 744.00 Kg(s)
H-Beam 150 x 150 x 7 x 10 x 3650 = 10 Unit 0.031 1131.5 Kg(s)

HO. 04 Fabrikasi sideboard Fr. 01 - Fr 29 -- PORT


Note : Potong material lama, renew
Post Quantity
JOB DESCRIPTION
No. Each Total Unit(s)
GS. GENERAL SERVICE
* Steel Plate 1800 x 3600 x 10 (mm) = 29 Piece(s) 508.7 14751.7 Kg(s)
Angle bar fabrikasi / bending dengan material sebagai berikut :
* Steel Plate 210 x 1800 x 10 (mm) = 174 Piece(s) 29.7 5163.1 Kg(s)
H-Beam 150 x 150 x 7 x 10 x 2400 = 29 Unit 0.031 2157.60 Kg(s)
H-Beam 150 x 150 x 7 x 10 x 3650 = 29 Unit 0.031 3281.35 Kg(s)

HO. 05 Fabrikasi sideboard Fr. 32 - Fr 40 -- PORT


Note : Potong material lama, renew
* Steel Plate 1800 x 3600 x 10 (mm) = 8 Piece(s) 508.7 4069.4 Kg(s)
Angle bar fabrikasi / bending dengan material sebagai berikut :
* Steel Plate 210 x 1800 x 10 (mm) = 48 Piece(s) 29.7 1424.3 Kg(s)
H-Beam 150 x 150 x 7 x 10 x 2400 = 8 Unit 0.031 595.20 Kg(s)
H-Beam 150 x 150 x 7 x 10 x 3650 = 8 Unit 0.031 905.2 Kg(s)

HO. 06 Fabrikasi sideboard Fr. 41 - Fr 50 -- PORT


Note : Potong material lama, renew
* Steel Plate 1900 x 3600 x 10 (mm) = 10 Piece(s) 536.9 5369.4 Kg(s)
Angle bar fabrikasi / bending dengan material sebagai berikut :
* Steel Plate 210 x 1900 x 10 (mm) = 60 Piece(s) 31.3 1879.3 Kg(s)
H-Beam 150 x 150 x 7 x 10 x 2400 = 10 Unit 0.031 744.00 Kg(s)
H-Beam 150 x 150 x 7 x 10 x 3650 = 10 Unit 0.031 1131.5 Kg(s)

HO. 07 Fabrikasi sideboard belakang


Note : Potong material lama, renew
* Steel Plate 1800 x 3600 x 10 (mm) = 14 Piece(s) 508.7 7121.5 Kg(s)
Angle bar fabrikasi / bending dengan material sebagai berikut :
* Steel Plate 210 x 1800 x 10 (mm) = 84 Piece(s) 29.7 2492.5 Kg(s)
H-Beam 150 x 150 x 7 x 10 x 2400 = 14 Unit 0.031 1041.60 Kg(s)
H-Beam 150 x 150 x 7 x 10 x 3650 = 14 Unit 0.031 1584.1 Kg(s)

HO. 08 Fabrikasi sideboard depan


Note : Potong material lama, renew
* Steel Plate 1800 x 3600 x 10 (mm) = 7 Piece(s) 508.7 3560.8 Kg(s)
Angle bar fabrikasi / bending dengan material sebagai berikut :
* Steel Plate 210 x 1800 x 10 (mm) = 49 Piece(s) 29.7 1454.0 Kg(s)
H-Beam 150 x 150 x 7 x 10 x 2400 = 7 Unit 0.031 520.80 Kg(s)
H-Beam 150 x 150 x 7 x 10 x 3650 = 7 Unit 0.031 792.05 Kg(s)

* Steel Plate 900 x 3600 x 10 (mm) = 1 Piece(s) 254.3 254.3 Kg(s)


Angle bar fabrikasi / bending dengan material sebagai berikut :
* Steel Plate 210 x 1800 x 10 (mm) = 6 Piece(s) 29.7 178.0 Kg(s)
H-Beam 150 x 150 x 7 x 10 x 2400 = 1 Unit 0.031 74.40 Kg(s)
H-Beam 150 x 150 x 7 x 10 x 3650 = 1 Unit 0.031 113.15 Kg(s)

HO. 09 Fabrikasi pintu sideboard -- PORT


Note : Potong material lama, renew
* Steel Plate 5400 x 600 x 10 (mm) = 5 Piece(s) 254.3 1271.7 Kg(s)
* Steel Plate 5400 x 650 x 10 (mm) = 1 Piece(s) 275.5 275.5 Kg(s)
Web bar fabrikasi / bending dengan material sebagai berikut :
* Steel Plate 230 x 5400 x 12 (mm) = 18 Piece(s) 117.0 2105.9 Kg(s)
* Steel Plate 230 x 600 x 12 (mm) = 35 Piece(s) 13.0 455.0 Kg(s)
* Steel Plate 230 x 650 x 12 (mm) = 7 Piece(s) 14.1 98.6 Kg(s)
H-Beam 250 x 250 x 9 x 14 x 3650 = 2 Unit 0.071 518.3 Kg(s)
H-Beam 250 x 250 x 9 x 14 x 2400 = 2 Unit 0.071 340.8 Kg(s)

HO. 10 Fabrikasi pintu sideboard -- STBD


Note : Potong material lama, renew
* Steel Plate 5400 x 600 x 10 (mm) = 5 Piece(s) 254.3 1271.7 Kg(s)
* Steel Plate 5400 x 650 x 10 (mm) = 1 Piece(s) 275.5 275.5 Kg(s)
Web bar fabrikasi / bending dengan material sebagai berikut :
* Steel Plate 230 x 5400 x 12 (mm) = 18 Piece(s) 117.0 2105.9 Kg(s)
* Steel Plate 230 x 600 x 12 (mm) = 35 Piece(s) 13.0 455.0 Kg(s)
* Steel Plate 230 x 650 x 12 (mm) = 7 Piece(s) 14.1 98.6 Kg(s)
H-Beam 250 x 250 x 9 x 14 x 3650 = 2 Unit 0.071 518.3 Kg(s)
H-Beam 250 x 250 x 9 x 14 x 2400 = 2 Unit 0.071 340.8 Kg(s)

HO. 11 Fabrikasi pintu sideboard -- Depan


Note : Potong material lama, renew
* Steel Plate 5400 x 600 x 10 (mm) = 5 Piece(s) 254.3 1271.7 Kg(s)
* Steel Plate 5400 x 650 x 10 (mm) = 1 Piece(s) 275.5 275.5 Kg(s)
Web bar fabrikasi / bending dengan material sebagai berikut :
* Steel Plate 230 x 5400 x 12 (mm) = 18 Piece(s) 117.0 2105.9 Kg(s)
* Steel Plate 230 x 600 x 12 (mm) = 35 Piece(s) 13.0 455.0 Kg(s)
* Steel Plate 230 x 650 x 12 (mm) = 7 Piece(s) 14.1 98.6 Kg(s)
H-Beam 250 x 250 x 9 x 14 x 3650 = 2 Unit 0.071 518.3 Kg(s)
H-Beam 250 x 250 x 9 x 14 x 2400 = 2 Unit 0.071 340.8 Kg(s)

Total 117329.0 Kg(S)


Post Quantity
JOB DESCRIPTION
No. Each Total Unit(s)
GS. GENERAL SERVICE
Resume material :
Plate 10 per sheet 871.35 Kgs
Material plate 10 untuk sideboard 59063.40 Kgs 67.78 Sheet plate
Material plate 10 untuk pintu 4641.7 Kgs 5.33 Sheet plate
Total 73 Sheet plate

Material plate 10 untuk fabrikasi Angle bar 125 x 75 x 10


Sideboard 21057.9 Kgs 1277.40 Mtrs 212.90 Length 24.60 Sheet plate

Material plate 12 untuk fabrikasi Web 140 x 80 x 12


Pintu 7978.5 Kgs 368.25 Mtrs 61.38 Length 8.00 Sheet plate

H-beam 150 x 150 21755.80 Kgs 58.00 Length/12M


H-beam 250 x 250 2577.30 Kgs 6.00 Length/12M
PT DOCK BINA VISTA
Jl. Wajok Hilir No. Km 12, Wajok Hulu, Kec. Jongkat
Kab. Mempawah, Kalimantan Barat

SHIP PARTICULAR
Name Of Vessel : TK. BINA SARANA II
Flag : Indonesia
Owner : PT BELIAN KHATULISTIWA LINE
LOA : 100.70 M
Breadth : 27.40 M
Draft : - M
Tinggi : 6.50 M
Status Docking :

Note:
1)
Job list below is only for estimation purpose. The dimension, area, material, weight calculation, and q

Post
JOB DESCRIPTION
No.
GS. GENERAL SERVICE
Start from up to
Arrival date
Start working date
Finish working date
Docking Date
Undocking date
Sailing/Delivery

GS. 01 DOCKING & UNDOCKING


1 Docking date :
2 Undocking date :
3 Dipersiapkan stop block, diatur posisi dan bantalan-bantalan untuk docking
4 Asistensi naik turun dock menggunakan air bag system

GS. 02 MOORING / UNMOORING


Di sediakan line handler untuk docking dan undocking

GS. 03 HYDRANT
Disediakan alat pemadam (hydrant) guna pencegahan terhadap bahaya kebakaran selama kapal dalam

GS. 04 TEMPAT SAMPAH


Disediakan tempat sampah di kapal dan akan di buang berkala
GS. 05 GANGWAY
Disediakan gangway untuk akses ke kapal

GS. 06 SHORE POWER SUPPLY


Connection / disconnect
Per kWH

GS. 07 CRANE / FORKLIFT

GS. 08 TUG ASSISTANCE


Disediakan asistensi tugboat untuk untuk proses naik turun berserta keluar-masuk galangan

GS. 09 SCAFFOLDING
Principal dimension: LOA = 100.70
Bm = 27.40
Hm = 6.50
Draft = -

HO. HULL & OUTFITTING


HO. 01 Fabrikasi sideboard Fr. 01 - Fr 29 -- STBD
# Fr 1 - 9
Note : Potong material lama, renew
* Steel Plate 1800 x 6030 x 10
* Steel Plate 1800 x 2600 x 10
* plate bending (125 x 75) 200 x 1800 x 10
* plate bending (125 x 75) 200 x 2300 x 10
* plate bending (125 x 75) 200 x 1300 x 10
* plate bending (125 x 75) 200 x 6030 x 10
* plate bending (125 x 75) 200 x 2600 x 10
* H - beam 150 x 150 x 2400
* H - beam 150 x 150 x 3600
* Steel Plate 200 x 270 x 10
* Slop well

# Fr 10 - 15
Note : Potong material lama, renew
* Steel Plate 1800 x 6030 x 10
* plate bending (125 x 75) 200 x 1800 x 10
* plate bending (125 x 75) 200 x 6030 x 10
* H - beam 150 x 150 x 2400
* H - beam 150 x 150 x 3600
* Steel Plate 200 x 270 x 10
* Slop well
* plate bending (125 x 75) 200 x 1800 x 10

# Fr 16 - 22
Note : Potong material lama, renew
* Steel Plate 1800 x 6030 x 10
* plate bending (125 x 75) 200 x 1800 x 10
* plate bending (125 x 75) 200 x 2300 x 10
* plate bending (125 x 75) 200 x 1300 x 10
* plate bending (125 x 75) 200 x 6030 x 10
* H - beam 150 x 150 x 2400
* H - beam 150 x 150 x 3600
* Steel Plate 200 x 270 x 10
* Slop well

# Fr 23 - 29
Note : Potong material lama, renew
* Steel Plate 1800 x 6030 x 10
* plate bending (125 x 75) 200 x 1800 x 10
* plate bending (125 x 75) 200 x 6030 x 10
* H - beam 150 x 150 x 2400
* H - beam 150 x 150 x 3600
* H - beam 250 x 250 x 3600
* H - beam 250 x 250 x 2700
* Steel Plate 200 x 270 x 10
* Slop well
* Steel Plate 350 x 350 x 12
* Slop well

HO. 02 Fabrikasi sideboard Fr. 32 - Fr 40 -- STBD

# Fr 32 - 35
Note : Potong material lama, renew
* Steel Plate 1800 x 5350 x 10
* plate bending (125 x 75) 200 x 1800 x 10
* plate bending (125 x 75) 200 x 2460 x 10
* H - beam 150 x 150 x 2400
* H - beam 150 x 150 x 3600
* H - beam 250 x 250 x 2700
* H - beam 250 x 250 x 3600
* Steel Plate 150 x 3600 x 10
* Steel Plate 200 x 270 x 10
* Slop well
* Steel Plate 350 x 350 x 12
* Slop well

# Fr 35 - 40
Note : Potong material lama, renew
* Steel Plate 1800 x 6030 x 10
* Steel Plate 1800 x 3280 x 10
* plate bending (125 x 75) 200 x x x 10
* plate bending (125 x 75) 200 x 1300 x 10
* plate bending (125 x 75) 200 x 6030 x 10
* plate bending (125 x 75) 200 x 3280 x 10
* H - beam 150 x 150 x 2400
* H - beam 150 x 150 x 3600
* Steel Plate 200 x 270 x 10
* Slop well

HO. 03 Fabrikasi sideboard Fr. 41 - Fr 50 -- STBD


Note : Potong material lama, renew
* Steel Plate 1800 x 6030 x 10
* plate bending (125 x 75) 200 x 1900 x 10
* plate bending (125 x 75) 200 x 1800 x 10
* plate bending (125 x 75) 200 x 6030 x 10
* H - beam 150 x 150 x 2400
* H - beam 150 x 150 x 3600
* Steel Plate 200 x 270 x 10
* Slop well
* Steel Plate 100 x 400 x 10
* Steel Plate 120 x 400 x 10
* Steel Plate 120 x 400 x 10
* Steel Plate 100 x 100 x 10

HO. 04 Fabrikasi sideboard Fr. 01 - Fr 29 -- PORT


# Fr 1 - 9
Note : Potong material lama, renew
* Steel Plate 1800 x 6030 x 10
* Steel Plate 1800 x 2600 x 10
* plate bending (125 x 75) 200 x 1800 x 10
* plate bending (125 x 75) 200 x 2300 x 10
* plate bending (125 x 75) 200 x 1300 x 10
* plate bending (125 x 75) 200 x 6030 x 10
* plate bending (125 x 75) 200 x 2600 x 10
* H - beam 150 x 150 x 2400
* H - beam 150 x 150 x 3600
* Steel Plate 200 x 270 x 10
* Slop well

# Fr 10 - 15
Note : Potong material lama, renew
* Steel Plate 1800 x 6030 x 10
* plate bending (125 x 75) 200 x 1800 x 10
* plate bending (125 x 75) 200 x 6030 x 10
* H - beam 150 x 150 x 2400
* H - beam 150 x 150 x 3600
* Steel Plate 200 x 270 x 10
* Slop well
* plate bending (125 x 75) 200 x 1800 x 10

# Fr 16 - 22
Note : Potong material lama, renew
* Steel Plate 1800 x 6030 x 10
* plate bending (125 x 75) 200 x 1800 x 10
* plate bending (125 x 75) 200 x 2300 x 10
* plate bending (125 x 75) 200 x 1300 x 10
* plate bending (125 x 75) 200 x 6030 x 10
* H - beam 150 x 150 x 2400
* H - beam 150 x 150 x 3600
* Steel Plate 200 x 270 x 10
* Slop well

# Fr 23 - 29
Note : Potong material lama, renew
* Steel Plate 1800 x 6030 x 10
* plate bending (125 x 75) 200 x 1800 x 10
* plate bending (125 x 75) 200 x 6030 x 10
* H - beam 150 x 150 x 2400
* H - beam 150 x 150 x 3600
* H - beam 250 x 250 x 3600
* H - beam 250 x 250 x 2700
* Steel Plate 200 x 270 x 10
* Slop well
* Steel Plate 350 x 350 x 12
* Slop well

HO. 05 Fabrikasi sideboard Fr. 32 - Fr 40 -- PORT

# Fr 32 - 35
Note : Potong material lama, renew
* Steel Plate 1800 x 5350 x 10
* plate bending (125 x 75) 200 x 1800 x 10
* plate bending (125 x 75) 200 x 2460 x 10
* H - beam 150 x 150 x 2400
* H - beam 150 x 150 x 3600
* H - beam 250 x 250 x 2700
* H - beam 250 x 250 x 3600
* Steel Plate 150 x 3600 x 10
* Steel Plate 200 x 270 x 10
* Slop well
* Steel Plate 350 x 350 x 12
* Slop well
# Fr 35 - 40
Note : Potong material lama, renew
* Steel Plate 1800 x 6030 x 10
* Steel Plate 1800 x 3280 x 10
* plate bending (125 x 75) 200 x 1800 x 10
* plate bending (125 x 75) 200 x 1300 x 10
* plate bending (125 x 75) 200 x 6030 x 10
* plate bending (125 x 75) 200 x 3780 x 10
* H - beam 150 x 150 x 2400
* H - beam 150 x 150 x 3600
* Steel Plate 200 x 270 x 10
* Slop well

HO. 06 Fabrikasi sideboard Fr. 41 - Fr 50 -- PORT


Note : Potong material lama, renew
* Steel Plate 1800 x 6030 x 10
* plate bending (125 x 75) 200 x 1900 x 10
* plate bending (125 x 75) 200 x 1800 x 10
* plate bending (125 x 75) 200 x 6030 x 10
* H - beam 150 x 150 x 2400
* H - beam 150 x 150 x 3600
* Steel Plate 200 x 270 x 10
* Slop well

HO. 07 Fabrikasi sideboard belakang


Note : Potong material lama, renew

# Stbd
* Steel Plate 1800 x 6030 x 10
* Steel Plate 1800 x 600 x 10
* plate bending (125 x 75) 200 x 1950 x 10
* plate bending (125 x 75) 200 x 1800 x 10
* plate bending (125 x 75) 200 x 6030 x 10
* plate bending (125 x 75) 200 x 950 x 10
* H - beam 150 x 150 x 2400
* H - beam 150 x 150 x 3600
* Steel Plate 200 x 270 x 10
* Slop well

# Port
* Steel Plate 1800 x 6030 x 10
* Steel Plate 1800 x 600 x 10
* plate bending (125 x 75) 200 x 1950 x 10
* plate bending (125 x 75) 200 x 1800 x 10
* plate bending (125 x 75) 200 x 6030 x 10
* plate bending (125 x 75) 200 x 950 x 10
* H - beam 150 x 150 x 2400
* H - beam 150 x 150 x 3600
* Steel Plate 200 x 270 x 10
* Slop well

HO. 08 Fabrikasi sideboard depan


Note : Potong material lama, renew
* Steel Plate 1800 x 3800 x 10
* Steel Plate 1800 x 2750 x 10
* plate bending (125 x 75) 200 x 1800 x 10
* plate bending (125 x 75) 200 x 700 x 10
* H - beam 150 x 150 x 3600
* H - beam 250 x 150 x 2400
* H - beam 250 x 250 x 3600
* H - beam 250 x 250 x 2400
* Steel Plate 200 x 270 x 10
* Slop well
* Steel Plate 350 x 350 x 12
* Slop well
* Steel Plate 400 x 100 x 10
* Steel Plate 430 x 100 x 10
* Steel Plate 640 x 100 x 10
* Steel Plate 750 x 100 x 10

HO. 09 Fabrikasi pintu sideboard -- PORT


Note : Potong material lama, renew
* Steel Plate 600 x 5400 x 10
* plate bending (75 x 155) 230 x 5400 x 10
* plate bending (75 x 155) 230 x 600 x 10
* Steel Plate 120 x 120 x 14
* Drillwork Kupingan 20 x 20 (mm)
* Drillwork Kupingan 60 x 120 (mm)
* Drillwork lubang air 20 x 20 (mm)

HO. 10 Fabrikasi pintu sideboard -- STBD


Note : Potong material lama, renew
* Steel Plate 600 x 5400 x 10
* plate bending (75 x 155) 230 x 5400 x 10
* plate bending (75 x 155) 230 x 600 x 10
* Steel Plate 120 x 120 x 14
* Drillwork Kupingan 20 x 20 (mm)
* Drillwork Kupingan 60 x 120 (mm)
* Drillwork lubang air 20 x 20 (mm)

HO. 11 Fabrikasi pintu sideboard -- Depan


Note : Potong material lama, renew
* Steel Plate 600 x 5400 x 10
* plate bending (75 x 155) 230 x 5400 x 10
* plate bending (75 x 155) 230 x 600 x 10
* Steel Plate 120 x 120 x 14
* Drillwork Kupingan 20 x 20 (mm)
* Drillwork Kupingan 60 x 120 (mm)
* Drillwork lubang air 20 x 20 (mm)

HO. 12 Replating area main deck


Note : Potong material lama, renew

- (stbd)
* Steel Plate 400 x 400 x 12
* Steel Plate 100 x 100 x 12

HO. 13 Renew rantai jangkar - turunkan, dan naikkan kembali


Note : Turunkan material lama, Renewe
Detail spec :
Remove : Cancel (Tgl 13 Februari 2024)
-- Sling Jangkar

Naik turun :
-- Jangkar

Note : renew material Cancel (Tgl 13 Februari 2024)


Detail spec :
-- Rantai Jangkar dia. 38 mm
-- Kenter shackle
-- Swivel
-- Stopper

HO. 14 Gypsi winch jangkar Cancel (Tgl 13 Februari 2024)


Note : fabrikasi gypsi winch
Remove :
* Drum sling

Fabrikasi :
* Anchor winch
-- include seating
HO. 15 Chain locker Cancel (Tgl 13 Februari 2024)
Note : Fabrikasi, install
Fabrikasi :
* Chain locker
Opsi A Note : Jika rumah jangkar tidak di geser, maka buat chain locker baru
Detail spec :
* Stopper jangkar
* Steel Plate 1800 x 1200 x 10
Manhole * Steel Plate 640 x 500 x 10
Manhole * Steel Plate 640 x 100 x 10
Manhole * Steel Plate 500 x 100 x 10
Girder * Angle Bar 450 x 150 x 10
H-Beam 150 x 150 x 7 x
H-Beam 150 x 150 x 7 x
Urlup * Steel Pipe DN 200 (8") x Sch.80 x
* Round Bar L.1000 -- Ø50 (mm)
* Stud Bolt & Nut M16 x 50 mm Length (Stainless)
* Gasket Rubber gasket 5 mm thk. (640 x 500)
* Bitter end shackle
* Anchor shackle
EST kebutuhan untuk chainloker baru 3.6

Opsi B Note : Jika rumah jangkar digeser, maka bisa pakai chain locker yang lama
Detail spec :
* Stopper jangkar
* Steel Plate 2700 x 1500 x 10
* Steel Plate 2283 x 1500 x 10
Manhole * Steel Plate 640 x 500 x 10
Manhole * Steel Plate 640 x 100 x 10
Manhole * Steel Plate 500 x 100 x 10
* Angle Bar 150 x 150 x 10
* Angle Bar 150 x 150 x 10
Urlup * Steel Pipe DN 200 (8") x Sch.80 x
* Round Bar L.1000 -- Ø50 (mm)
* Stud Bolt & Nut M16 x 50 mm Length (Stainless)
* Gasket Rubber gasket 5 mm thk. (640 x 500)
* Bitter end shackle
* Anchor shackle
EST volume chain locker lama 9.2

HO. 16 Doble Bollard -- Port


Note : Bngokar material lama, renew (2 unit)
* Steel Plate 1350 x 500 x 10
* Steel Plate 150 x 420 x 10
* Steel Plate 150 x 1280 x 10
* Steel Plate 420 x 1280 x 10
* Steel Plate 330 x 330 x 10
* Steel Pipe DN 300 (12") x Sch.80 x
* Round Bar L.1500 -- Ø65 (mm)

* Steel Plate 1350 x 500 x 12


* Steel Plate 150 x 420 x 10
* Steel Plate 150 x 1280 x 10
* Steel Plate 420 x 1280 x 10
* Steel Plate 330 x 330 x 10
* Steel Pipe DN 300 (12") x Sch.80 x
* Round Bar L.530 -- Ø50 (mm)
* Steel Plate 100 x 130 x 10
* Steel Plate 50 x 130 x 10
* Steel Plate 130 x 430 x 10

HO. 17 Doble Bollard -- Stbd


Note : Bngokar material lama, renew
* Steel Plate 510 x 1400 x 12
* Steel Plate 150 x 380 x 12
* Steel Plate 150 x 1300 x 12
* Steel Plate 400 x 1300 x 12
* Steel Plate 330 x 330 x 12
* Steel Plate 100 x 100 x 12
* Steel Plate 50 x 100 x 12
* Steel Pipe DN 300 (12") x Sch.80 x
* Slop well
* Round Bar L.600 -- Ø50 (mm)

HO. 18 Doble Bollard -- AP


Note : Bngokar material lama, renew (1 Unit)
* Steel Plate 510 x 1400 x 12
* Steel Plate 150 x 380 x 12
* Steel Plate 150 x 1300 x 12
* Steel Plate 400 x 1300 x 12
* Steel Plate 330 x 330 x 12
* Steel Plate 100 x 100 x 10
* Steel Plate 50 x 100 x 10
* Steel Pipe DN 300 (12") x Sch.80 x
* Slop well
* Round Bar L.600 -- Ø50 (mm)

HO. 19 Fender deck -- Port


Note : Bngokar material lama, renew (depan + belakang)
* Steel Plate 300 x 6000 x 10
Buat menjadi siku bending 100 x 200

HO. 20 Fender deck -- Stbd


Note : Bngokar material lama, renew (depan + belakang)
# Fr 0 - 30
* plate bending (100 x 200) 300 x 6030 x 10
* plate bending (100 x 200) 300 x 6030 x 10
# Fr 35 - 45
* plate bending (100 x 200) 300 x 6030 x 10
* plate bending (100 x 200) 300 x 6030 x 10
* plate bending (100 x 200) 300 x 6030 x 10

# Fr 50 - 52
* plate bending (100 x 200) 300 x 2350 x 10

# Belakang
* plate bending (100 x 200) 300 x 6030 x 10

HO. 21 Pengantian pad eye dan tire fender


Note : Potong material lama dan pasang baru
Pad eye
* Steel Plate 130 x 80 x 12
-- Drill work Ø20 mm for plate thickness

Dapra
* Chain Link 2000 x Ø16 mm (5/8") Galvanized
* Chain Shackle Ø16 mm (5/8") Galvanized
* Tire Fender Dia. 1000 x 200
-- Drill work Ø100 mm for Tire Fender

HO. 22 Penambahan besar lubang pintu rantai jangkar


Note : Reposisi, service
* Steel Plate 600 x 650 x 10
* Steel Plate 280 x 1300 x 10

HO. 23 Pintu rumah jangkar


Note : service
* Free up kunci dalam
* Free up engsel

HO. 24 Perbaikan roller jangkar


Note : service
* Service roller
* Round Bar L.500 -- Ø65 (mm)

HO. 25 Replating main deck


Note : Bngokar material lama, renew
* Steel Plate 1800 x 2000 x 12
* Steel Plate 200 x 400 x 10
* Steel Plate 500 x 500 x 10
* Steel Plate 300 x 400 x 10
Hasil UT 6.3 7.1 5.7
HO. 26 Replating bottom -- FP (sb) To be confirm
Note : Bngokar material lama, renew
* Steel Plate 1810 x 2000 x 12
* Steel Plate 1810 x 1900 x 12
* Steel Plate 300 x 600 x 12
* Steel Plate 1810 x 1500 x 12

HO. 27 Penggantian rantai towing -- P&S Supply by owner


Note : Ganti pasang baru
* Rantai towing 5000 x Ø 35 mm (1 3/4")
* Omega shackle

HO. 28 Pusher Tug Ps & sb


Note : Renew, buat baru
Depan (ps & sb)
* H - beam 250 x 250 x 2000
* H - beam 250 x 250 x 2400
* H - beam 250 x 250 x 700
* Steel Plate 250 x 250 x 12
* Steel Plate 350 x 350 x 20
* Slop well

Belakang (ps & sb)


* H - beam 250 x 250 x 2000
* H - beam 250 x 250 x 2400
* H - beam 250 x 250 x 700

HO. 29 Penambahan pipa fender haluan


Note : Fabrikasi, instal
* Steel Plate 200 x 6030 x 12
* Steel Plate 200 x 2000 x 12
* Steel Plate 200 x 3000 x 12
* Steel Pipe DN 150 (6") x Sch.80 x
* Steel Pipe DN 150 (6") x Sch.80 x
* Steel Pipe DN 150 (6") x Sch.80 x
* Steel Plate 60 x 150 x 12

HO. 30 Angka draft & draft mark


Note : Fabrikasi, instal
* Steel Plate 150 x 100 x 10
* Steel Plate 100 x 400 x 10

HO. 31 Dudukan lampu P&S


Note : Fabrikasi, instal
* Steel Plate 220 x 220 x 10
* Steel Plate 270 x 200 x 10
* Steel Plate 270 x 220 x 10
* Steel Plate 160 x 260 x 10
* Steel Plate 220 x 530 x 10
* Steel Plate 160 x 260 x 10

HO. 32 Buka dan pasang kembali Manhole


Note : Buka, service , tutup kembali, penyemenan
* Manhole
* Gasket Rubber gasket 5 mm thk. (750 x 650)
* Stud Bolt & Nut M16 x 50 mm Length (Stainless)
* Bongkar semen
* Install semen kembali

HO. 33 Perbaikan dinding chain loker


Note : Bngokar material lama, renew
* Steel Plate 450 x 1900 x 10
* Steel Plate 900 x 350 x 10
* Steel Plate 310 x 1420 x 10

HO. 34 Rewellding main deck depan luar


Note : Bngokar material lama, renew
* Rewellding 2 phase x 100
* Rewellding 2 phase x 30

HO. 35 Replating Lambung -- FP (sb & ps) To be confirm


Note : Bngokar material lama, renew
# (sb)
* Steel Plate 2360 x 300 x 12
* Steel Plate 1260 x 2650 x 12
* Steel Plate 1200 x 2200 x 12
# (ps)
* Steel Plate 2830 x 1300 x 12

HO. 36 Rewellding main deck Stbd yang pecah


Note : Bngokar material lama, renew
* Rewellding 2 phase x 1500
* Rewellding 2 phase x 100

HO. 37 Penggantian Cathodic Protection (Anti Karat) (spply by owner)


Note : pasang baru
* Aluminium Anode S-9 L H
* Aluminium Anode S-9 L H
* Aluminium Anode S-9 L H

HO. 38 Buat Baru Tutup Mainhole Tangki Center 2


Note : Buat baru
* Steel Plate 500 x 750 x 12
* Steel Pipe DN 25 (1") x Sch.40 x
* Round Bar L.300 -- Ø20 (mm)
* Drill Work 1/2" Dia

HO. 39 Kupingan Docking & Undocking (Ps/Sb)


Note : Pasang baru dan Lepas lagi
* Steel Plate 800 x 400 x 35
* Steel Plate 800 x 300 x 35
* Steel Plate 300 x 300 x 14
Asistensi : Dipasang untuk tempat tali winch docking dan delepas saat undocking selesai

BP. BLASTING & PAINTING WORK


BP. 01 Bottom Under Water Area & Top Side
* Area bottom
- Bottom 27.4 x 62.90
- lambung (92,60 + 62,90) / 2 x
- linggi haluan 23.4 x 27.4
- linggi buritan 7 x 27.4
- skeg 1.4 x 10.4 x
* Blasting
Location --- 30% Spot Area bottom
70% Sweep area bottom
* Painting
Location --- Painting Area Bottom

* Area Top side


- lambung (100,7 + 92,6) / 2 x
100.7 x 2 x
- linggi haluan 4.49 x 10.4
- linggi buritan 7.2 x 27.4
- skeg 3.5 x 8 /
- Transom buritan 2 x 27.4

* Blasting
Location --- 30% Spot Area bottom
70% Sweep area bottom
* Painting
Location --- Painting Area top side & bulwark external

BP. 02 Side board


* Dinding sidebord (ps - sb)
- Dinding (ps - sb) 74.96 x 3.6 x 2
- Diagonal Dinding (ps - sb) 74.96 x 0.2 x 2
- Stay dinding (ps - sb) 0.71 x 3.6 x 44
- Skur dinding (ps - sb) 0.86 x 2.4 x 44

* Dinding Belakang
- Dinding 25.32 x 3.6 x 2
- Diagonal Dinding 25.32 x 0.2 x 2
- Stay dinding 0.71 x 3.6 x 14
- Skur dinding 0.86 x 2.4 x 14

* Dinding Belakang
- Dinding 6.3 x 3.6 x 2
- Diagonal Dinding 6.3 x 0.2 x 2
- Stay dinding 0.71 x 3.6 x 8
- Skur dinding 0.86 x 2.4 x 8

* Pintu (ps - sb) & Depan


- Pintu 0.6 x 5.4 x 2
- Diagonal pintu 0.23 x 5.4 x 2
- Diagonal pintu 0.23 x 0.6 x 2

* Full blasting
Location --- Area Sidebord

* Swepp blasting
Note : - perbaikan cat yang rusak akibat terkena pengelasan di suip ulang
Location --- Area Sidebord

* Painting
Location --- Painting Area Sidebord

BP 03. Dilaksanakan perawatan (sandblasting) dan pengecetan dengan white paint pada draft mark,
plimsol mark dan nama kapal
BP 04. Dilaksanakan pembuatan lis/cat garis bottom-topside line pada sekeliling kapal
BP 05. Dilaksanakan Pencucian di area dinding side board menggunakan air bersih & di sikat

CW. CLEANING WORK


CW. 01 Cleaning Deck Cargo

Resume material :
Plate 10 per sheet 871.35 Kgs
Material plate 10 untuk sideboard #REF!
Material plate 10 untuk pintu #REF!
Material plate 10 untuk fabrikasi Angle bar 125 x 75 x 10
Sideboard #REF!

Material plate 12 untuk fabrikasi Web 140 x 80 x 12


Pintu #REF!

H-beam 150 x 150 #REF!


H-beam 250 x 250 #REF!
REPAIR LIST
TK. BINA SARANA II

STIWA LINE

eight calculation, and quantity will be based on the actual work and can be changed anytime during repair period.

DESCRIPTION

aran selama kapal dalam perbaikan


suk galangan

M
M
M
M

(mm) = 4 Piece(s)
(mm) = 2 Piece(s)
(mm) = 30 Piece(s)
(mm) = 5 Piece(s)
(mm) = 5 Piece(s)
(mm) = 2 Piece(s) Top atas
(mm) = 1 Piece(s) Top atas
(mm) = 9 Unit Skur
(mm) = 9 Unit Stay
(mm) = 18 Piece(s)
= 36 Piece(s)

(mm) = 4 Piece(s)
(mm) = 30 Piece(s)
(mm) = 2 Piece(s) Top atas
(mm) = 6 Unit Skur
(mm) = 6 Unit Stay
(mm) = 12 Piece(s)
= 24 Piece(s)
(mm) = 5 Piece(s)
(mm) = 4 Piece(s)
(mm) = 20 Piece(s)
(mm) = 5 Piece(s)
(mm) = 5 Piece(s)
(mm) = 2 Piece(s) Top atas
(mm) = 7 Unit Skur
(mm) = 7 Unit Stay
(mm) = 14 Piece(s)
= 28 Piece(s)

(mm) = 4 Piece(s)
(mm) = 35 Piece(s)
(mm) = 2 Piece(s) Top atas
(mm) = 6 Unit Skur
(mm) = 6 Unit Stay
(mm) = 1 Unit Skur
(mm) = 1 Unit Stay
(mm) = 12 Piece(s)
= 24 Piece(s)
(mm) = 2 Piece(s)
= 4 Piece(s)

(mm) = 2 Piece(s)
(mm) = 12 Piece(s)
(mm) = 6 Piece(s)
(mm) = 2 Unit Skur
(mm) = 2 Unit Stay
(mm) = 1 Unit Skur
(mm) = 2 Unit Stay
(mm) = 1 Piece(s)
(mm) = 4 Piece(s)
= 8 Piece(s)
(mm) = 2 Piece(s)
= 4 Piece(s)

(mm) = 2 Piece(s)
(mm) = 2 Piece(s)
(mm) = 20 Piece(s)
(mm) = 5 Piece(s)
(mm) = 1 Piece(s) Top atas
(mm) = 1 Piece(s) Top atas
(mm) = 6 Unit Skur
(mm) = 6 Unit Stay
(mm) = 12 Piece(s)
= 24 Piece(s)

(mm) = 6 Piece(s)
(mm) = 5 Piece(s)
(mm) = 45 Piece(s)
(mm) = 3 Piece(s) Top atas
(mm) = 10 Unit Skur
(mm) = 10 Unit Stay
(mm) = 20 Piece(s)
= 40 Piece(s)
(mm) = 4 Piece(s)
(mm) = 4 Piece(s)
(mm) = 1 Piece(s)
(mm) = 1 Piece(s)

(mm) = 4 Piece(s)
(mm) = 2 Piece(s)
(mm) = 30 Piece(s)
(mm) = 5 Piece(s)
(mm) = 5 Piece(s)
(mm) = 2 Piece(s) Top atas
(mm) = 1 Piece(s) Top atas
(mm) = 9 Unit Skur
(mm) = 9 Unit Stay
(mm) = 18 Piece(s)
= 36 Piece(s)

(mm) = 4 Piece(s)
(mm) = 30 Piece(s)
(mm) = 2 Piece(s) Top atas
(mm) = 6 Unit Skur
(mm) = 6 Unit Stay
(mm) = 12 Piece(s)
= 24 Piece(s)
(mm) = 5 Piece(s)

(mm) = 4 Piece(s)
(mm) = 20 Piece(s)
(mm) = 5 Piece(s)
(mm) = 5 Piece(s)
(mm) = 2 Piece(s) Top atas
(mm) = 7 Unit Skur
(mm) = 7 Unit Stay
(mm) = 14 Piece(s)
= 28 Piece(s)

(mm) = 4 Piece(s)
(mm) = 35 Piece(s)
(mm) = 2 Piece(s) Top atas
(mm) = 6 Unit Skur
(mm) = 6 Unit Stay
(mm) = 1 Unit Skur
(mm) = 1 Unit Stay
(mm) = 12 Piece(s)
= 24 Piece(s)
(mm) = 2 Piece(s)
= 4 Piece(s)

(mm) = 2 Piece(s)
(mm) = 12 Piece(s)
(mm) = 6 Piece(s)
(mm) = 2 Unit Skur
(mm) = 2 Unit Stay
(mm) = 1 Unit Skur
(mm) = 2 Unit Stay
(mm) = 1 Piece(s)
(mm) = 4 Piece(s)
= 4 Piece(s)
(mm) = 2 Piece(s)
= 4 Piece(s)
(mm) = 2 Piece(s)
(mm) = 2 Piece(s)
(mm) = 20 Piece(s)
(mm) = 5 Piece(s)
(mm) = 1 Piece(s) Top atas
(mm) = 1 Piece(s) Top atas
(mm) = 6 Unit Skur
(mm) = 6 Unit Stay
(mm) = 12 Piece(s)
= 24 Piece(s)

(mm) = 6 Piece(s)
(mm) = 5 Piece(s)
(mm) = 45 Piece(s)
(mm) = 3 Piece(s) Top atas
(mm) = 10 Unit Skur
(mm) = 10 Unit Stay
(mm) = 20 Piece(s)
= 40 Piece(s)

(mm) = 4 Piece(s)
(mm) = 2 Piece(s)
(mm) = 5 Piece(s)
(mm) = 30 Piece(s)
(mm) = 2 Piece(s) Top atas
(mm) = 1 Piece(s) Top atas
(mm) = 7 Unit Skur
(mm) = 7 Unit Stay
(mm) = 14 Piece(s)
= 28 Piece(s)

(mm) = 4 Piece(s)
(mm) = 2 Piece(s)
(mm) = 5 Piece(s)
(mm) = 30 Piece(s)
(mm) = 2 Piece(s) Top atas
(mm) = 1 Piece(s) Top atas
(mm) = 7 Unit Skur
(mm) = 7 Unit Stay
(mm) = 14 Piece(s)
= 28 Piece(s)

(mm) = 4 Piece(s)
(mm) = 4 Piece(s)
(mm) = 36 Piece(s)
(mm) = 6 Piece(s)
(mm) = 6 Unit Skur
(mm) = 6 Unit Stay
(mm) = 2 Unit Skur
(mm) = 2 Unit Stay
(mm) = 12 Piece(s)
= 24 Piece(s)
(mm) = 2 Piece(s)
= 4 Piece(s)
(mm) = 5 Piece(s)
(mm) = 5 Piece(s)
(mm) = 5 Piece(s)
(mm) = 5 Piece(s)

(mm) = 6 Piece(s)
(mm) = 18 Piece(s)
(mm) = 42 Piece(s)
(mm) = 12 Piece(s) Kupingan
= 12 Piece(s)
= 12 Piece(s)
= 36 Piece(s)

(mm) = 6 Piece(s)
(mm) = 18 Piece(s)
(mm) = 42 Piece(s)
(mm) = 12 Piece(s) Kupingan
= 12 Piece(s)
= 12 Piece(s)
= 36 Piece(s)
(mm) = 6 Piece(s)
(mm) = 18 Piece(s)
(mm) = 42 Piece(s)
(mm) = 12 Piece(s) Kupingan
= 12 Piece(s)
= 12 Piece(s)
= 36 Piece(s)

(mm) = 1 Piece(s)
(mm) = 3 Piece(s)

= 1 Lot(s)

= 1 Unit(s)

= 7 Segel(s)
= 6 Unit(s)
= 1 Set(s)
= 1 Unit(s)

= 1 Lot(s)

= 1 Set(s)
= 1 Lot(s)

= 1 Unit(s)

= 1 Lot(s)
(mm) = 4 Piece(s)
(mm) = 1 Piece(s)
(mm) = 2 Piece(s)
(mm) = 2 Piece(s)
3600 mm-L = 2 Length(s)
10 x 1200 = 2 Unit
10 x 1800 = 1 Unit
300 mm-L = 1 Length(s)
= 1 Length(s)
= 20 Set(s)
= 1 Sheet(s)
= 1 Unit(s)
= 1 Unit(s)
m3

= 1 Lot(s)
(mm) = 2 Piece(s)
(mm) = 2 Piece(s)
(mm) = 1 Piece(s)
(mm) = 2 Piece(s)
(mm) = 2 Piece(s)
2700 mm-L = 4 Length(s)
2283 mm-L = 4 Length(s)
300 mm-L = 1 Length(s)
= 1 Length(s)
= 20 Set(s)
= 1 Sheet(s)
= 1 Unit(s)
= 1 Unit(s)
m3

(mm) = 1 Piece(s)
(mm) = 2 Piece(s)
(mm) = 2 Piece(s)
(mm) = 1 Piece(s)
(mm) = 2 Piece(s)
600 mm-L = 2 Length(s)
= 2 Length(s)

(mm) = 1 Piece(s)
(mm) = 2 Piece(s)
(mm) = 2 Piece(s)
(mm) = 1 Piece(s)
(mm) = 2 Piece(s)
600 mm-L = 2 Length(s)
= 2 Length(s)
(mm) = 2 Piece(s)
(mm) = 4 Piece(s)
(mm) = 1 Piece(s)

(mm) = 2 Piece(s) Tapak


(mm) = 4 Piece(s)
(mm) = 4 Piece(s)
(mm) = 2 Piece(s)
(mm) = 2 Piece(s)
(mm) = 8 Piece(s)
(mm) = 8 Piece(s)
600 mm-L = 4 Length(s)
= 4 Piece(s)
= 4 Length(s)

(mm) = 1 Piece(s) Tapak


(mm) = 2 Piece(s)
(mm) = 2 Piece(s)
(mm) = 1 Piece(s)
(mm) = 1 Piece(s)
(mm) = 4 Piece(s)
(mm) = 4 Piece(s)
600 mm-L = 2 Length(s)
= 4 Piece(s)
= 2 Length(s)

(mm) = 19 Piece(s)

(mm) = 1 Piece(s) (R)


(mm) = 8 Piece(s)
(mm) = 1 Piece(s)
(mm) = 1 Piece(s) 9R
(mm) = 1 Piece(s) 5R

(mm) = 1 Piece(s) 8R

(mm) = 2 Piece(s)

(mm) = 80 Piece(s)
10 mm = 80 Hole(s)

= 40 Lengths
= 80 Pieces
= 40 Pieces
= 120 Hole(s)

(mm) = 2 Piece(s)
(mm) = 1 Piece(s) (os) Bongkar plate

= 1 Lot(s)
= 1 Lot(s)

= 1 Lot(s)
= 2 Length(s)

(mm) = 1 Piece(s) Deck luar Depan (ps)


(mm) = 1 Piece(s)
(mm) = 1 Piece(s)
(mm) = 1 Piece(s)
(mm) = 1 Piece(s) R
(mm) = 1 Piece(s) R
(mm) = 4 Piece(s) Tulangan dalam
(mm) = 1 Piece(s) R

35 mm (1 3/4") = 2 Length(s)
= 2 Unit(s)

(mm) = 4 Unit
(mm) = 4 Unit
(mm) = 4 Unit
(mm) = 4 Piece(s) Braket
(mm) = 8 Piece(s)
= 16 Piece(s)

(mm) = 2 Unit
(mm) = 2 Unit
(mm) = 2 Unit

(mm) = 4 Piece(s)
(mm) = 2 Piece(s)
(mm) = 2 Piece(s)
6000 mm-L = 4 Length(s) 14 R
2000 mm-L = 2 Length(s)
3000 mm-L = 2 Length(s)
(mm) = 68 Piece(s)

(mm) = 30 Piece(s)
(mm) = 2 Piece(s)

(mm) = 2 Piece(s)
(mm) = 2 Piece(s)
(mm) = 2 Piece(s)
(mm) = 4 Piece(s)
(mm) = 1 Piece(s) (R)
(mm) = 1 Piece(s)

= 24 Unit
= 24 Sheet(s)
= 26 Set(s)
= 24 Unit
= 24 Unit

(mm) = 1 Piece(s)
(mm) = 1 Piece(s)
(mm) = 1 Piece(s)

(mm) = 1 Piece(s)
(mm) = 1 Piece(s)

(mm) = 1 Piece(s)
(mm) = 1 Piece(s)
(mm) = 1 Piece(s)

(mm) = 1 Piece(s)

(mm) = 2 Piece(s)
(mm) = 2 Piece(s)

spply by owner)

= 26 Piece(s)
= 26 Piece(s)
= 25 Piece(s)
(mm) = 1 Piece(s)
50 mm-L = 2 Length(s)
= 1 Length(s) 4R
= 20 Hole(s)

(mm) = 2 Piece(s)
(mm) = 2 Piece(s)
(mm) = 8 Piece(s)

2 x 1.3

2816 x 3 Coats

3.5 x 2
2

2 x 4

1434.1 x 2 Coats

x 2
x 6 x 2
x 2
x 2

x 6

x 2
x 6 x 2

x 18
x 3 x 18
x 7 x 18

2597

2597

2597 x 3 Coats

t pada draft mark,

& di sikat

= 1 Lot(s)

Kgs #REF! Sheet plate


Kgs #REF! Sheet plate
Total #REF! Sheet plate

Kgs 0.00 Mtrs 0.00 Length 24.60

Kgs #REF! Mtrs #REF! Length 8.00

Kgs 58.00 Length/12M


Kgs 6.00 Length/12M
anytime during repair period.

Quantity Harga
Ketrangan
Each Total Unit(s) Harga
Harga
Total
852.0 3408.2 Kg(s) Pak yanto 13-Dec-23
367.4 734.8 Kg(s)
28.3 847.8 Kg(s)
36.1 180.6 Kg(s)
20.4 102.1 Kg(s)
94.7 189.3 Kg(s)
40.8 40.8 Kg(s)
75.6 680.40 Kg(s)
113.4 1020.60 Kg(s)
18.0 76.3 Piece(s) Pak yanto 13-Mar-24
36.0 Piece(s)

852.0 3408.2 Kg(s) Pak yanto 13-Dec-23


28.3 847.8 Kg(s)
94.7 189.3 Kg(s)
75.6 453.60 Kg(s)
113.4 680.40 Kg(s)
12.0 50.9 Piece(s) Pak yanto 13-Mar-24
24.0 Piece(s)
28.3 141.3 Kg(s) Pak yanto 14-Mar-24
852.0 3408.2 Kg(s) Pak yanto 13-Dec-23
28.3 565.2 Kg(s)
36.1 180.6 Kg(s)
20.4 102.1 Kg(s)
94.7 189.3 Kg(s)
75.6 529.20 Kg(s)
113.4 793.80 Kg(s)
14.0 59.3 Piece(s) Pak yanto 13-Mar-24
28.0 Piece(s)

852.0 3408.2 Kg(s) Pak yanto 13-Dec-23


28.3 989.1 Kg(s)
94.7 189.3 Kg(s)
75.6 453.60 Kg(s)
113.4 680.40 Kg(s)
260.7 260.70 Kg(s) Pak yanto 28-Feb-24
195.525 195.53 Kg(s)
12.0 50.9 Piece(s) Pak yanto 13-Mar-24
24.0 Piece(s)
11.5 23.1 Kg(s)
4.0 Piece(s)

756.0 1511.9 Kg(s) Pak yanto 1-Mar-24


28.3 339.1 Kg(s)
38.6 231.7 Kg(s)
75.6 151.20 Kg(s)
113.4 226.80 Kg(s)
195.525 195.53 Kg(s)
260.7 521.40 Kg(s)
42.4 42.4 Kg(s) pak edi 1-Mar-24
4.0 17.0 Piece(s) Pak yanto 13-Mar-24
8.0 Piece(s)
11.5 23.1 Kg(s)
4.0 Piece(s)

852.0 1704.1 Kg(s) Pak edi 13-Dec-23


463.5 926.9 Kg(s)
#VALUE! #VALUE! Kg(s)
20.4 102.1 Kg(s)
94.7 94.7 Kg(s)
51.5 51.5 Kg(s)
75.6 453.60 Kg(s)
113.4 680.40 Kg(s)
12.0 50.9 Piece(s) Pak edi 13-Mar-24
24.0 Piece(s)

852.0 5112.2 Kg(s) Pak edi 13-Dec-23


29.8 149.1 Kg(s)
28.3 1271.7 Kg(s)
94.7 284.0 Kg(s)
75.6 756.00 Kg(s)
113.4 1134.00 Kg(s)
20.0 84.8 Piece(s) Pak edi 13-Mar-24
40.0 Piece(s)
4.0 12.6 Piece(s) Pak edi 14-Mar-24
4.0 15.1 Piece(s)
1.0 3.8 Piece(s)
1.0 0.8 Piece(s)

852.0 3408.2 Kg(s) Pak Imam 13-Dec-23


367.4 734.8 Kg(s)
28.3 847.8 Kg(s)
36.1 180.6 Kg(s)
20.4 102.1 Kg(s)
94.7 189.3 Kg(s)
40.8 40.8 Kg(s)
75.6 680.40 Kg(s)
113.4 1020.60 Kg(s)
18.0 76.3 Piece(s) Pak Imam 13-Mar-24
36.0 Piece(s)

852.0 3408.2 Kg(s) Pak Imam 13-Dec-23


28.3 847.8 Kg(s)
94.7 189.3 Kg(s)
75.6 453.60 Kg(s)
113.4 680.40 Kg(s)
12.0 50.9 Piece(s) Pak Imam 13-Mar-24
24.0 Piece(s)
28.3 141.3 Kg(s) Pak Imam 14-Mar-24

852.0 3408.2 Kg(s) Pak Imam 13-Dec-23


28.3 565.2 Kg(s)
36.1 180.6 Kg(s)
20.4 102.1 Kg(s)
94.7 189.3 Kg(s)
75.6 529.20 Kg(s)
113.4 793.80 Kg(s)
14.0 59.3 Piece(s) Pak Imam 13-Mar-24
28.0 Piece(s)

852.0 3408.2 Kg(s) Pak Imam 13-Dec-23


28.3 989.1 Kg(s)
94.7 189.3 Kg(s)
75.6 453.60 Kg(s)
113.4 680.40 Kg(s)
260.7 260.70 Kg(s) Pak Imam 28-Feb-24
195.525 195.53 Kg(s)
12.0 50.9 Piece(s) Pak Imam 13-Mar-24
24.0 Piece(s)
11.5 23.1 Kg(s)
4.0 Piece(s)

756.0 1511.9 Kg(s) pak Imam 1-Mar-24


28.3 339.1 Kg(s)
38.6 231.7 Kg(s)
75.6 151.20 Kg(s)
113.4 226.80 Kg(s)
195.525 195.53 Kg(s)
260.7 521.40 Kg(s)
42.4 42.4 Kg(s) pak edi 1-Mar-24
4.0 17.0 Piece(s) Pak Imam 13-Mar-24
4.0 Piece(s)
11.5 23.1 Kg(s)
4.0 Piece(s)
852.0 1704.1 Kg(s) Pak edi 13-Dec-23
463.5 926.9 Kg(s)
28.3 565.2 Kg(s)
20.4 102.1 Kg(s)
94.7 94.7 Kg(s)
59.3 59.3 Kg(s)
75.6 453.60 Kg(s)
113.4 680.40 Kg(s)
12.0 50.9 Piece(s) Pak edi 13-Mar-24
24.0 Piece(s)

852.0 5112.2 Kg(s) Pak edi 13-Dec-23


29.8 149.1 Kg(s)
28.3 1271.7 Kg(s)
94.7 284.0 Kg(s)
75.6 756.00 Kg(s)
113.4 1134.00 Kg(s)
20.0 84.8 Piece(s) Pak edi 13-Mar-24
40.0 Piece(s)

852.0 3408.2 Kg(s) Pak yanto 24-Jan-24


84.8 169.6 Kg(s)
30.6 153.1 Kg(s)
28.3 847.8 Kg(s)
94.7 189.3 Kg(s)
14.9 14.9 Kg(s)
75.6 529.20 Kg(s)
113.4 793.80 Kg(s)
14.0 59.3 Piece(s) Pak yanto 13-Mar-24
28.0 Piece(s)

852.0 3408.2 Kg(s) Pak Imam 24-Jan-24


84.8 169.6 Kg(s)
30.6 153.1 Kg(s)
28.3 847.8 Kg(s)
94.7 189.3 Kg(s)
14.9 14.9 Kg(s)
75.6 529.20 Kg(s)
113.4 793.80 Kg(s)
14.0 59.3 Piece(s) Pak imam 13-Mar-24
28.0 Piece(s)

536.9 2147.8 Kg(s) Pak edi 28-Feb-24


388.6 1554.3 Kg(s)
28.3 1017.4 Kg(s)
11.0 65.9 Kg(s)
113.4 680.40 Kg(s)
75.6 453.60 Kg(s)
260.7 521.40 Kg(s)
173.8 347.60 Kg(s)
12.0 50.9 Piece(s) Pak edi 13-Mar-24
24.0 Piece(s)
11.5 23.1 Kg(s)
4.0 Piece(s)
5.0 15.7 Piece(s) Pak edi 13-Mar-24
5.0 16.9 Piece(s)
5.0 25.1 Piece(s)
5.0 29.4 Piece(s)

254.3 1526.0 Kg(s) Pak Imam 24-Jan-24


97.5 1754.9 Kg(s)
10.8 455.0 Kg(s)
12.0 19.0 Piece(s)
12.0 144.0 Piece(s)
12.0 144.0 Piece(s)
36.0 1296.0 Piece(s)

254.3 1526.0 Kg(s) Pak yanto 24-Jan-24


97.5 1754.9 Kg(s)
10.8 455.0 Kg(s)
12.0 19.0 Piece(s)
12.0 144.0 Piece(s)
12.0 144.0 Piece(s)
36.0 1296.0 Piece(s)
254.3 1526.0 Kg(s) Pak edi 24-Jan-24
97.5 1754.9 Kg(s)
10.8 455.0 Kg(s)
12.0 19.0 Piece(s)
12.0 144.0 Piece(s)
12.0 144.0 Piece(s)
36.0 1296.0 Piece(s)

15.1 15.1 Kg(s) Pak yanto 22-Feb-24


3.0 2.8 Kg(s)

1.00 Lot(s)

1.00 Unit(s)

192.50 mtrs
6.00 Unit(s)
1.00 Set(s)
1.00 Unit(s)

1.00 Lot(s)

1.00 Set(s)
1.00 Lot(s)

1.00 Unit(s)

1.0 Lot(s)
169.56 kg(s)
25.12 kg(s)
5.02 kg(s)
3.93 kg(s)
168.1 Kg(s)
0.031 Kg(s)
0.031 Kg(s)
0.30 mtrs
15.4 Kg(s)
20 Set(s)
1 Sheet(s)
1.00 Unit(s)
1.00 Unit(s)

1.0 Lot(s)
317.93 kg(s)
268.82 kg(s)
25.12 kg(s)
5.02 kg(s)
3.93 kg(s)
62.5 Kg(s)
52.9 Kg(s)
0.30 mtrs
15.4 Kg(s)
20 Set(s)
1 Sheet(s)
1.00 Unit(s)
1.00 Unit(s)

52.99 52.99 kg(s) Pak Imam 28-Feb-24


2.00 9.89 Piece(s)
15.07 30.14 kg(s)
42.20 42.20 kg(s)
8.55 17.10 kg(s)
2.00 mtrs
39.1 78.1 Kg(s)

63.59 63.59 kg(s) Pak edi 1-Mar-24


2.00 9.89 Piece(s)
15.07 30.14 kg(s)
42.20 42.20 kg(s)
8.55 17.10 kg(s)
2.00 mtrs
8.5 17.0 Kg(s)
2.00 2.04 Piece(s) Pak edi 12-Mar-24
4.00 2.04 Piece(s)
1.00 4.39 Piece(s)

67.26 134.52 kg(s) Pak yanto 12-Mar-24


4.00 21.48 Piece(s)
18.37 73.48 kg(s)
48.98 97.97 kg(s)
10.26 20.52 kg(s)
8.00 7.54 Piece(s)
8.00 3.77 Piece(s)
4.00 Piece(s)
4.00 Piece(s)
9.6 38.4 Kg(s) Pak yanto 14-Mar-24

67.26 67.26 kg(s) Pak yanto 12-Mar-24


2.00 10.74 Piece(s)
18.37 36.74 kg(s)
48.98 48.98 kg(s)
10.26 10.26 kg(s)
4.00 3.14 Piece(s)
4.00 1.57 Piece(s)
2.00 Piece(s)
4.00 Piece(s)
9.6 19.2 Kg(s) Pak yanto 14-Mar-24

141.30 2684.70 kg(s)

142.0 142.0 Kg(s) Pak yanto 12-Mar-24


142.0 1136.1 Kg(s)
142.0 142.0 Kg(s) pak edi 12-Mar-24
142.0 142.0 Kg(s) pak edi 14-Mar-24
142.0 142.0 Kg(s)

55.3 55.3 Kg(s) pak edi 14-Mar-24

142.0 284.0 Kg(s) Pak yanto 12-Mar-24

1.0 78.4 Kg(s)


80 Hole(s)

80 mtr
80 Pieces
40 Pieces
120 Hole(s)

30.62 61.23 kg(s) Pak edi 28-Feb-24


28.57 28.57 kg(s)

1.0 Lot(s)
1.0 Lot(s)

1.0 Lot(s)
13.0 26.0 kg(s)

339.12 339.12 kg(s) Pak edi 28-Feb-24


6.28 6.28 kg(s)
19.63 19.63 kg(s)
9.42 9.42 kg(s)
341.00 341.00 kg(s) Pak edi 28-Feb-24
323.95 323.95 kg(s)
16.96 67.82 kg(s)
255.75 255.75 kg(s) Pak edi 5-Mar-24

10 mtrs
2.00 Unit(s)

144.83333333333 579.33 Kg(s) Pak edi 7-Mar-24


173.8 695.20 Kg(s)
50.691666666667 202.77 Kg(s)
4.0 23.6 Piece(s)
19.23 153.86 kg(s) Pak edi 14-Mar-24
16.00 Piece(s)

144.83333333333 289.67 Kg(s) pak yanto 12-Mar-24


173.8 347.60 Kg(s)
50.691666666667 101.38 Kg(s)

113.61 454.42 kg(s) Pak edi 1-Mar-24


37.68 75.36 kg(s)
56.52 113.04 kg(s)
24.00 mtrs Pak edi 12-Mar-24
4.00 mtrs
6.00 mtrs
68.00 57.65 Piece(s)

1.18 35.33 kg(s)


3.14 6.28 kg(s)

2.0 7.6 Piece(s) Work shop pak budi 9-Mar-24


2.0 8.5 Piece(s)
2.0 9.3 Piece(s)
4.0 13.1 Piece(s)
1.0 9.2 Piece(s)
1.0 3.3 Piece(s)

30 Unit
24 Sheet(s)
26 Set(s)
30 Unit
30 Unit

67.12 67.12 kg(s) Pak edi 28-Feb-24


24.73 24.73 kg(s)
34.56 34.56 kg(s) Pak edi 1-Mar-24

1.00 Piece(s) Pak edi 1-Mar-24


1.00 Piece(s)

66.69 66.69 kg(s) Pak edi 5-Mar-24


314.53 314.53 kg(s)
248.69 248.69 kg(s)

346.56 346.56 kg(s) Pak edi 5-Mar-24

3.00 mtr (s) pak yanto 12-Mar-24


2.00 Piece(s)

26.00 Piece(s) pak Imam ###


26.00 Piece(s) pak edi ###
25.00 Piece(s) Pak Yanto ###
35.33 35.33 kg(s) Workshop Pak Budi 18-Mar-24
2.00 Piece(s)
1.00 Piece(s)
20.00 Hole(s)

87.92 175.84 kg(s) Workshop Pak Budi 19-Mar-24


65.94 131.88 kg(s)
8.00 Piece(s)

1723.5 Pak sutarno 23-Feb-24


201.4
641.2
191.8
58.2

844.81 m 2
Pak sutarno 23-Feb-24
1971.22 m 2

8448.00 m 2
Pak sutarno 23-Feb-24

676.6 Pak sutarno 23-Feb-24


402.8
46.7
197.3
56.0
54.8

430.24 m 2
Pak sutarno 23-Feb-24
1003.89 m 2

2868.20 m 2
Pak sutarno 23-Feb-24

1079.4 m 2
Pak sutarno 24-Jan-24
359.8 m 2

224.9 m 2
181.6 m 2

182.3 m 2
Pak sutarno 24-Jan-24
60.8 m 2

35.8 m 2

28.9 m 2

90.7 m 2
Pak sutarno 29-Jan-24
30.2 m 2

20.4 m 2

16.5 m 2

116.6 m 2
Pak sutarno 24-Jan-24
134.1 m 2

34.8 m 2

2597.00 m 2
Pak sutarno 24-Jan-24

2597.00 m 2
Pak sutarno 23-Feb-24

7791.00 m 2
Pak sutarno 24-Jan-24

1.00 Ls Pak sutarno 23-Feb-24

1.00 Ls Pak sutarno 23-Feb-24


2597.00 m 2
Pak sutarno 23-Feb-24

1 Lot(s)

Total #VALUE! Kg(S)


12780
213
Sheet plate Sheet Rp 63,900,000
#DIV/0!

Sheet plate Sheet plate

#VALUE! Rp-
#VALUE! Rp -

#VALUE! Rp -
#VALUE! -
#VALUE! ###
#VALUE! ###
#VALUE! ###
#VALUE! ###
Rp 31,200,000 ###
PT DOCK BINA VISTA REPAIR LIST
Jl. Wajok Hilir No. Km 12, Wajok Hulu, Kec. Jongkat TK. BINA SARANA II
Kab. Mempawah, Kalimantan Barat

SHIP PARTICULAR
Name Of Vessel : TK. BINA SARANA II
Flag : Indonesia
Owner : PT BELIAN KHATULISTIWA LINE
LOA : 100.70 M
Breadth : 27.40 M
Draft : - M
Tinggi : 6.50 M
Status Docking :

Note:
1) Job list below is only for estimation purpose. The dimension, area, material, weight calculation, and quantity will be based on the actual work and can be
changed anytime during repair period.

Post Quantity
JOB DESCRIPTION
No. Each Total
HO. HULL & OUTFITTING
HO. 39 Kupingan Docking & Undocking (Ps/Sb)
Note : Pasang baru dan Lepas lagi
* Steel Plate 800 x 400 x 35 (mm) = 2 Piece(s) 87.92 175.84
* Steel Plate 800 x 300 x 35 (mm) = 2 Piece(s) 65.94 131.88
* Steel Plate 300 x 300 x 14 (mm) = 8 Piece(s) 8.00
Asistensi : Dipasang untuk tempat tali winch docking dan dilepas saat undocking selesai

Total 307.7
he actual work and can be

Quantity Harga
Ketrangan
Unit(s) Harga Total

kg(s) Rp 26,500 Rp 4,659,760 Workshop Pak Budi ###


kg(s) Rp 26,500 Rp 3,494,820
Piece(s) Rp 200,000 Rp 1,600,000

Kg(S)