GABLE FRAME
Kontrol Batang WF BJ/PPBBI/TS/02 Kontrolwf
Kontrol Batang Komposit BJ/PPBBI/TS/02-1 komposit
Sambungan Las dan Baut BJ/PPBBI/TS/03 sambWF
Sambungan balok dgn balok BJ/PPBBI/TS/03-1 sambbalok
Perhitungan Kontrol Kolom BJ/PPBBI/TS/04 kontrolkolom
Perhitungan Plat Kaki Kolom Pipa BJ/PPBBI/TS/05-1 platkakipipa
Perhitungan Plat Kaki Kolom WF BJ/PPBBI/TS/05-2 platkakiWF
TRUSS
Kontrol Tegangan Rangka Baja BJ/PPBBI/TS/06 tegtruss
DAFTAR ISI
COVER
SHADING NET
Konsep Dasar Perencanaan Struktur
Profil Kuda-kuda
Perhitungan sambungan
GUDANG LOGISTIK
Konsep Dasar Perencanaan Struktur
Gording
Kuda-kuda Joint Atas
Kuda-kuda Joint Bawah
Dudukan Kolom
Lampiran
No. Doc : STRNOTE/TS/01
Judul Dokument Data Perencanaan Konstruksi Baja
Rev :
Material
Struktur Baja JIS G3010 Gr.SS400
fy 235 Mpa
Baut ASTM HTB A325 N
Ft 44 Ksi (Allowable Tension)
Fv 21 Ksi (Allowable Shear)
Baut Angker ASTM A307 U-7/8"
Ft 20 Ksi (Allowable Tension)
Fv 10 Ksi (Allowable Shear)
Pembebanan
a. Beban Mati (DL)
Sesuai dengan Peraturan Pembebanan Indonesia dan berat jenis bahan
yang dipakai.
b. Beban Hidup (LL)
c. Beban Angin (W)
d. Kombinasi Pembebanan
- Comb1 1.4 DL
- Comb2 1.2 DL + 0.5 LL
- Comb3 1.2 DL + 1.6 LL + 0.8 W
- Comb4 1.2 DL + 1.6 LL - 0.8 W
Analisa Struktur
- Analisa struktur dilakukan secara Perhitungan Manual
Data Perencanaan
- Jarak antar kolom : max 10 meter
- Tinggi kolom : 6 meter
- Bahan atap : zingkalum
- Kemiringan atap : 10 derajat
Properties
- Model : Portal 2D
- Design code : AISC - LRFD99
- Rangka Kuda-kuda : Baja
- Tinggi Lantai : 6 Meter
- Ukuran kolom : Baja WF 400/200
- Ukuran gording : CNP 150/75
- Ukuran frame : -
No. Doc : NOTE/TS/03
Judul Dokument Input dan Output Data
Rev :
PROFIL KUDA-KUDA
Jarak antar kuda-kuda = 10 m
Bentang kuda-kuda = 28.00 m
Sudut kemiringan = 10 o
Gording = CNP 150.65.3.2
Berat gording = 7.517 kg/m'
Jarak antar gording = 120 cm
Atap = Zingkalum 0,6 mm
Berat atap = 6.94 kg/m2
Tekanan angin = 40 kg/m2
PEMBEBANAN
Beban yang diterima gording :
- Berat atap = 6.94 x 1.2 x 28 = 233.18 kg
- Berat gording = 7.517 x 28 = 210.48 kg
443.66 kg
Lain-lain 10 % = 44.37 kg
DL = 488.03 kg
PEMBEBANAN
PROFIL KUDA-KUDA
Jarak antar kuda-kuda = 10 m
Bentang kuda-kuda = 16.00 m
Sudut kemiringan = 10 o
SIN COS
Gording = CNP 150.65.3.2 0.17 0.98
Berat gording = 7.517 kg/m'
Jarak antar gording = 120 cm
Banyak Gording = 26 Pcs
Bahan AtapAtap = Zingkalum 0,6 mm
Luas Atap = 2305.16 m2
Berat atap = 6.94 kg/m2
Tekanan angin = 40 kg/m2
PEMBEBANAN
PEMBEBANAN
Beban mati (DL)
qD = 1,548.90 Kg/m
qDx = qD x sin 10 = 268.96 Kg/m
qDy = qD y cos 10 = 1,525.37 Kg/m
qLx = 34.04 Kg
qLy = 193.02 Kg
Check bahan
OUTPUT SAP2000
f = 0.08 cm < 4 cm OK
No. Doc : BJ/PPBBI/TS/01
Judul Dokument Perhitungan Gording/Balok Anak
Rev :
GORDING
###
Perhitungan Gording
Data-data
- Jarak kuda-kuda max = 1000 cm - kode(1-18) 18
- Bentang kuda-kuda = 1,600 cm GORDING 1
- Jarak Gording = 120 cm
- Berat penutup atap = 6.94 kg/m2
- Berat angin = 40 kg/m2
- Kemiringan kuda-kuda = 10 derajat
- Direncanakan Gording CNP 150 t=3.2 mm (CNP150.65.20.3,2)
Wx = 44.3 cm3
Wy = 12.2 cm3
Ix = 332.00 cm4
Iy = 538.00 cm4
A = 9.6 cm2
g = 7.51 kg/m'
qx = q cos a
qy = q sin a
Kontrol Tegangan
Wx = 44.3 cm3 Bj. 33/37/41/44/50//52 ? 37
Wy = 12.2 cm3 s (ijin) 1600 kg/cm2
My = 2955 kgcm
Mx = 44117 kgcm
qy = 2.51 x 5 = 12.55 kg
Py = 17.36 kg
29.91 kg x 6.77
Q = 202.48 kg
###
No. Doc : BJ/PPBBI/TS/02
Judul Dokument Kontrol Batang WF
Rev :
Kuda-kuda A DETAIL A
Data-data
- Lokasi _______________________
- Type Kuda-kuda A
- Gambar DETAIL A
- Direncanakan WF 300.150.6,5.9 - kode(1-8) 6
Wx 481 cm3 h 30 cm
Wy 67.7 cm3 b 15 cm
Ix 7210 cm4 ts 0.9 cm
Iy 508 cm4 tb 0.65 cm
A 46.78 cm2
g 36.7 kg/m'
Bentang = 28 meter
D = 1548.90 kg
N = 2799.41 kg
Mtum = 944.00 kgm
Mlap = 950.25 kgm
f = 0.732 cm
Kesimpulan
Tegangan OK Lipat balok ( OK )
Lendutan OK KIP (OK)
Geser ( OK )
Kontrol Tegangan
Wx = 481 cm3 Bj. 33/37/41/44/50//52 ? 37
A = 46.78 cm3 s (ijin) 1600 kg/cm2
P = 2799 kgcm
M = 95025 kgcm
Kontrol Lendutan
L = 2800 cm
Ix = 7210 cm4
Kontrol Geser
h 30 cm b 15 cm
tb 0.65 cm ts 0.9 cm
Ls 2800 cm Ix 7210 cm4
Fe 310/360/430/510 ? 360
s (ijin) 1600 kg/cm2
dx = (15 x 0.9){0.5 x (30-0.9)} + (0.65 x 14.1) x 7.05
= 261.04 cm3
D = 1548.90 kg
t = (1,548.90 x 261.04) = 86.27 kg/cm2 < 0.5 x 1600 = 928 kg/cm2
0.65 x 7210 ( OK )
Kontrol Lipat
sr = 3267 kg/cm2 bp = 15 cm
sd = 257.40 kg/cm2 tp = 0.9 cm
C1 = 2800 x 30 = 6222.222
15 x 0.9
Kuda-kuda A DETAIL A
Data-data
- Lokasi _______________________
- Type Kuda-kuda A
- Gambar DETAIL A
- Direncanakan WF 300.150.6,5.9 - kode(1-12) 6
h 30 cm ts 0.900 cm
b 15 cm tb 0.65 cm
D = 1548.90 kg h = 30 cm
N = 2799.41 kg D = 2.2 cm
M = 1386.13 kgm n = 4
a = 10 derajat s = 7.07 cm >6.6ok
Data-data
D = 1548.90 kg
N = 2799.41 kg
M = 1386.13 kgm
Moment Inersia
- h dihitung dari jarak alat sambung pertama (h0)
diameter alat sambung (d) 2.2 cm
h h^2
h1 0.8 cm 0.64 cm2
h2 1.4 cm 1.96 cm2
h3 2 cm 4 cm2
h4 2.6 cm 6.76 cm2
h5 3.8 cm 14.44 cm2
h6 4.4 cm 19.36 cm2
h7 5 cm 25 cm2
h8 5.6 cm 31.36 cm2
htot = 25.6 cm A= 103.52 cm2
Tegangan Idiil
Fe 310/360/430/510 ? 360
s (ijin) 1600 kg/cm2
s8
0.9
s7 s7
28.7
s6 s6
s5 s5
0.9
s4 s4
s3 s3 10
s2 s2 0.9
15
Statis Moment
las terhadap las bagian bawah
s2 = 2(7.175x0.64)1.7 = 15.97 cm3
s3 = 2(9.1x0.46)6.1 = 50.91 cm3
s4 = 2(7.175x0.64)10.2 = 93.26 cm3
s5 = 2(7.175x0.64)11.7 = 107.29 cm3
s6 = 2(27.8x0.46)25.3 = 645.31 cm3
s7 = 2(7.2x0.64)39.1 = 356.95 cm3
s8 = (15.0x0.64)40.4 = 385.76 cm3
1655.47 cm3
A = 9.55 + 9.13 + 8.37 + 9.13 + 9.13 + 25.52 + 9.13 + 9.55
= 89.51 cm2
Yb = 1,655.47/89.51 = 18.50 cm
Ya = 41.36 - 18.50 = 22.87 cm
Inersia Las
Ix1 = (1/12 x 15 x 0.64^3) + (9.55 x 18.07^2) = 3117.71 cm4
Ix2 = 2(1/12 x 7.175 x 0.64^3) + (9.13 x 16.75^2) = 2561.54 cm4
Ix3 = 2(1/12 x 0.46 x 9.10^3) + (8.37 x 12.15^2) = 1291.67 cm4
Ix4 = 2(1/12 x 7.18 x 0.64^3) + (9.14 x 8.07^2) = 595.22 cm4
Ix5 = 2(1/12 x 7.18 x 0.64^3) + (9.14 x 6.75^2) = 416.02 cm4
Ix6 = 2(1/12 x 0.46 x 27.76^3) + (25.52 x 6.61^2) = 2755.34 cm4
Ix7 = 2(1/12 x 7.18 x 0.64^3) + (9.14 x 21.12^2) = 4073.36 cm4
Ix8 = (1/12 x 15 x 0.64^3) + (9.55 x 22.44^2) = 4808.55 cm4
Ix = 19619.40 cm4
Momen Tahanan
Ix = 19619.40 cm4
ya = 22.87 cm
yb = 18.50 cm
Wb = 19619.40 = 1060.77
18.50
Wa = 19619.40 = 857.96
22.87
Kontrol Tegangan
M = 138613 kgcm Bj. 33/37/41/44/50//52 ? 37
W = 857.96 cm3 s (ijin) 1600 kg/cm2
D = 2799 kg
A = 89.51 cm2
N = 1549 kg
sa = 138,613 / 857.96
= 161.56 kg/cm2
sn = 2,799 / 89.51
= 31.28 kg/cm2
t = 1,549 / 89.51
= 17.30 kg/cm2
sb = 31.28 + 17.30
= 48.58 kg/cm2
s5
0.9
s4 s4
28.2
s3 s3
s2 s2 0.9
s1
15
Moment Inersia
las terhadap las bagian bawah
- 2 x 0.64 x 15 x 16.32^2 = 5087.64 cm4
- 4 x 0.64 x 6.26 x 13.68^2 = 2978.30 cm4
- 2 x 0.46 x 26.93^3 : 12 = 1495.6193 cm4
Ix = 9561.56 cm4
Luas Penampang Las
- 2 x 0.64 x 15 = 19.09 cm2
- 4 x 0.64 x 6.26 = 15.92 cm2
- 2 x 0.46 x 26.93 = 24.75 cm2
F = 59.77 cm2
Moment Tahanan
Wx = 9561.56 = 618.49 cm3
15.46
Kontrol Tegangan
M = 138613 kgcm Bj. 33/37/41/44/50//52 ? 37
W = 618.49 cm3 s (ijin) 1600 kg/cm2
P = 1549 kg
F = 59.77 cm2
sm = 138,613 / 618.49
= 224.12 kg/cm2
tm = 1,549 / 59.77
= 25.91 kg/cm2
Balok - WF 300.150.6,5.9
Data-data
- Lokasi _______________________
- Type -
- Gambar WF 300.150.6,5.9
V1 = 7240 kg
M = 12857 kgm
Aplat = 1 x 30 = 30 cm2
Hub. Balok induk dengan baja siku adalah samb. Iris tunggal
Data-data
P 7,240.00 kg Bj. 33/37/41/44/50//52 ? 37
tebal plat sambung (d) 1.00 cm s (ijin) 1600
diameter alat sambung (d) 1.60 cm - sambungan iris tunggal
Kekuatan baut
Ppaku = 4 x 3840 = 15360 kg > 7,240 kg (OK)
Sambungan las
Data-data
V1 = 7240 kg Bj. 33/37/41/44/50//52 ? 37
M = 12857 kgm
Plat = 1 cm s (ijin) 1600 kg/cm2
hplat = 30 cm
bplat = 20 cm
tlas = 1.50 cm
Kontrol tegangan
st = sqrt(2.91^2 + 3 x 57.46^2)
= 71.83 kg/cm2 < 1600 kg/cm2 (OK)
No. Doc : BJ/PPBBI/TS/05-2
Judul Dokument Perhitungan Plat Kaki Kolom WF
Rev :
Data-data
- Lokasi _______________________
- Type Kolom A
- Gambar DETAIL A
- Direncanakan WF 400.200.8.13 - kode(1-8) 8
Wx 1190 cm3 h 40 cm
Wy 174 cm3 b 20 cm
A 84.12 cm2 ts 1.3 cm
g 66 kg/m' tb 0.8 cm
D = 3480 kg
N = 5199.83 kg
L = 3.5 m
Pembebanan
Bs. P = = 5199.83 kg
Bs. Kolom Bj = 66 x 3.5 = 231 kg
Ptot = 5430.83 kg
Kesimpulan
Tegangan las ( OK )
Tegangan plat kaki ( OK )
Dimensi plat 50 x 50 x 1 cm
Angker 9 D22
Panjang angker 60 cm
s5
s5
1.3
s4 s4
37.4
s3 s3
s2 s2 1.3
s1
20
Moment Inersia
las terhadap las bagian bawah
- 2 x 0.92 x 20 x 21.91^2 = 17655.71 cm4
- 4 x 0.92 x 8.47 x 18.09^2 = 10186.92 cm4
- 2 x 0.57 x 35.56^3 : 12 = 4239.98942 cm4
Ix = 32082.62 cm4
Luas Penampang Las
- 2 x 0.92 x 20 = 36.77 cm2
- 4 x 0.92 x 8.47 = 31.14 cm2
- 2 x 0.57 x 35.56 = 40.23 cm2
F = 108.14 cm2
Moment Tahanan
Wx = 32082.62 = 1560.01 cm3
20.57
Kontrol Tegangan
M = 12180 kgcm Bj. 33/37/41/44/50//52 ? 37
W = 1560.01 cm3 s (ijin) 1600 kg/cm2
P = 5431 kg
F = 84.12 cm2
sm = 12,180 / 1,560.01
= 7.81 kg/cm2
tm = 5,431 / 84.12
= 64.56 kg/cm2
Dimensi Plat
h = 40 cm
b = 20 cm
tb = 0.5 cm
ts = 0.8 cm
B = 2 x 5 + 20 = 30 cm ~ 50 cm
L = 2 x 5 + 40 = 50 cm ~ 50 cm
Statika
D = 2.2 cm
x = 56.29
50 - x 1,218,000 / 20,833.33
x = 56.29
50 - x 58.46
x = (56.29 x 50)
(58.46 + 56.29)
x = 24.53 cm
Ln = 0.14 x 3.80 x 2080 >= 0.013 x 2.2 x 2080 (PBI '71 : 74)
sqrt( 300 )
= 63.91 > 59.488 ( OK )
~ 60 cm
Sehingga dipakai angker D2.2 - 60 cm
No. Doc : BJ/PPBBI/TS/04
Judul Dokument Perhitungan Kontrol Kolom
Rev :
Data-data
- Lokasi _______________________
- Type Kolom A
- Gambar DETAIL A
- Direncanakan WF 400.200.8.0.13
- kode(1-23) 8
Wx 1190 cm3
Wy 174 cm3
ix 16.8 cm4
iy 4.54 cm4
A 84.12 cm2
g 66 kg/m'
D = 3480 kg
N = 5199.83 kg
L = 3.5 m
Kesimpulan
Tegangan ( OK )
Pembebanan
Bs. P = = 5199.83 kg
Bs. Kolom Bj = 66 x 3.5 = 231 kg
Ptot = 5430.83 kg
ly = 1600
4.54
l = 352.42 Fe 310/360/430/510 ? 360
===> wy= 7.72 s (ijin) 1600 kg/cm2
81 10617 141.600 2x70.70.7 2.000 ### ### 2.970 1.100 1.300 9.400 1.000 18.800 13.600 2.124 4.068 66.672 1.412 0.000 1133.144 780.654 1600 OK
82 9636 141.600 2x70.70.7 2.000 ### ### 2.970 1.100 1.300 9.400 1.000 18.800 13.600 2.124 4.068 66.672 1.412 0.000 1133.144 708.513 1600 OK
83 8403 141.600 2x70.70.7 2.000 ### ### 2.970 1.100 1.300 9.400 1.000 18.800 13.600 2.124 4.068 66.672 1.412 0.000 1133.144 617.872 1600 OK
84 7175 141.600 2x70.70.7 2.000 ### ### 2.970 1.100 1.300 9.400 1.000 18.800 13.600 2.124 4.068 66.672 1.412 0.000 1133.144 527.545 1600 OK
85 5925 141.600 2x70.70.7 2.000 ### ### 2.970 1.100 1.300 9.400 1.000 18.800 13.600 2.124 4.068 66.672 1.412 0.000 1133.144 435.683 1600 OK
129 70.27 40.000 2x70.70.7 2.000 ### ### 2.970 1.100 1.300 9.400 1.000 18.800 13.600 2.124 4.068 18.834 1.000 3.738 1600.000 0.000 1600 OK
PERHITUNGAN STRUKTUR
KEGIATAN :
PEMBANGUNAN INFRASTRUKTUR
SITE PALARAN
PEKERJAAN :
PEMBANGUNAN
GUDANG LOGISTIK
LOKASI :
ELEVASI 94
SITE PALARAN
TAHUN :
2017